CN108633023A - Business method for pre-emptively, device and base station - Google Patents

Business method for pre-emptively, device and base station Download PDF

Info

Publication number
CN108633023A
CN108633023A CN201710180267.7A CN201710180267A CN108633023A CN 108633023 A CN108633023 A CN 108633023A CN 201710180267 A CN201710180267 A CN 201710180267A CN 108633023 A CN108633023 A CN 108633023A
Authority
CN
China
Prior art keywords
business
embb
symbol
seizing
urllc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710180267.7A
Other languages
Chinese (zh)
Other versions
CN108633023B (en
Inventor
黄甦
张飒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Spreadtrum Communications Shanghai Co Ltd
Original Assignee
Spreadtrum Communications Shanghai Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Spreadtrum Communications Shanghai Co Ltd filed Critical Spreadtrum Communications Shanghai Co Ltd
Priority to CN201710180267.7A priority Critical patent/CN108633023B/en
Publication of CN108633023A publication Critical patent/CN108633023A/en
Application granted granted Critical
Publication of CN108633023B publication Critical patent/CN108633023B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/50Allocation or scheduling criteria for wireless resources
    • H04W72/535Allocation or scheduling criteria for wireless resources based on resource usage policies
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/12Wireless traffic scheduling
    • H04W72/1263Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/50Allocation or scheduling criteria for wireless resources
    • H04W72/53Allocation or scheduling criteria for wireless resources based on regulatory allocation policies

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

A kind of business method for pre-emptively, device and base station, business method for pre-emptively include:When URLLC business seizes eMBB business, in each downlink unit transmission unit of the eMBB business, the URLLC business is dispatched in the sign resources for forbidding seizing except assemble of symbol and is seized, it is described to forbid seizing assemble of symbol being preconfigured;URLLC business datums are sent using the sign resources accounted for are robbed.Technical solution of the present invention can reduce URLLC business and seize influence to eMBB service features.

Description

Business method for pre-emptively, device and base station
Technical field
The present invention relates to a kind of field of communication technology more particularly to business method for pre-emptively, device and base stations.
Background technology
In downlink transfer, ultralow time delay high reliable communication (the Ultra-reliable low-latency of burst Communication, URLLC) business can take up ongoing enhanced mobile broadband (Enhance mobile Broad-band, eMBB) business used resource, to ensure delay requirement.EMBB business is seized by URLLC business (preemption) eMBB business can be influenced.
In the prior art, the scheme seized by URLLC business for eMBB business is limited primarily to emulate.In simulations, when When partial symbols are seized by URLLC business in the downlink data of eMBB, if indicated without preempting resources, eMBB user equipmenies (User Equipment, UE) mistake demodulates the data of URLLC as the data of oneself, and performance severe exacerbation is caused;Such as For fruit there are when preempting resources instruction, eMBB user is equivalent to eMBB data transmissions etc. by the data discarding of URLLC preempting resources Imitating code check reduces, and BLER(block error rate) (Block Error Rate, BLER) is caused to increase, and performance more or less deteriorates, but compares Do not have performance when preempting resources instruction want it is excellent very much.Another solution is, when being indicated containing preempting resources, URLLC Reference signal (reference signal, the RS) resource for avoiding seizing eMBB, ensure eMBB channel estimation can normally into Row, to support the demodulation of eMBB data.
But the shortcomings that existing scheme, is, there may be multigroup reference signals by practical eMBB UE, for example, data demodulation Reference signal (Demodulation reference signal, DMRS), phase noise reference signal (Phase Tracking reference signal, PT-RS), channel state information reference signals (Channel state information reference signal,CSI-RS).If URLLC avoids dispatching on the symbol where all RS, that The optional symbols of URLLC are possible to can be seldom, can not be seized so as to cause URLLC, causes the delay of URLLC business to increase, drop Meaning caused by behavior itself is seized in low introducing.In addition, the resource for being not used in transmission RS can be used for seizing by URLLC, that URLLC needs to know the RS configurations of current eMBB user;For URLLC, additional signaling overheads is needed so that receive It is opaque.
Invention content
Present invention solves the technical problem that being how to reduce URLLC business to seize influence to eMBB service features.
In order to solve the above technical problems, the embodiment of the present invention provides a kind of business method for pre-emptively, business method for pre-emptively includes:
When URLLC business seizes eMBB business, in each downlink unit transmission unit of the eMBB business, prohibiting The URLLC business is dispatched in the sign resources only seized except assemble of symbol to be seized, it is described to forbid seizing assemble of symbol It is preconfigured;URLLC business datums are sent using the sign resources accounted for are robbed.
Optionally, the business method for pre-emptively further includes:It sends resource and seizes instruction information to eMBB user equipmenies, with logical Know the position that the sign resources accounted for are robbed described in the eMBB user equipmenies.
Optionally, the transmission resource, which is seized, indicates that information to eMBB user equipmenies include:Determine that the eMBB user sets It is standby to be seized described in the first frequency resource location robbed in the sign resources accounted for and the URLLC business datums To sign resources on second frequency resource location;If the first frequency resource location and the second frequency resource-niche It sets in the presence of overlapping, then sends the resource and seize instruction information to the eMBB user equipmenies.
Optionally, described that the URLLC business is dispatched in the sign resources for forbidding seizing except assemble of symbol into robbing Further include before accounting for:The position for forbidding seizing all sign resources in assemble of symbol is sent to the eMBB user to set It is standby.
Optionally, the bit number that the resource is seized shared by instruction information is equal to:The downlink unit of the eMBB business passes Sign resources sum shared by defeated unit and the difference for forbidding seizing all sign resources sums in assemble of symbol.
Optionally, the eMBB user equipmenies account for described rob after receiving the resource and seizing instruction information Sign resources on the data bit log-likelihood ratio that carries reset.
Optionally, described to forbid seizing assemble of symbol including at least the occupied symbol money of advance data demodulated reference signal Source.
Optionally, the downlink of the time span and the URLLC business of the downlink unit transmission unit of the eMBB business The time span of unit transmission unit is identical or different.
In order to solve the above technical problems, the embodiment of the invention also discloses a kind of business to seize device, business seizes device Including:
Module is seized, suitable for when URLLC business seizes eMBB business, being passed in each downlink unit of the eMBB business In defeated unit, the URLLC business is dispatched in the sign resources for forbidding seizing except assemble of symbol and is seized, it is described to forbid It is preconfigured to seize assemble of symbol;URLLC business datum sending modules, suitable for utilizing the sign resources robbed and accounted for send URLLC business datums.
Optionally, the business seizes device and further includes:Indicating module is seized, instruction information is seized extremely suitable for sending resource EMBB user equipmenies, to notify to rob the position of the sign resources accounted for described in the eMBB user equipmenies.
Optionally, the indicating module of seizing includes:Determination unit is adapted to determine that the eMBB user equipmenies are robbed described First frequency resource location and the URLLC business datums in the sign resources accounted for is in the symbol money robbed and accounted for Second frequency resource location on source;Transmission unit, if provided suitable for the first frequency resource location and the second frequency Source position, which exists, to be overlapped, then sends the resource and seize instruction information to the eMBB user equipmenies.
Optionally, the business seizes device and further includes:Position sending module, suitable for forbidding seizing assemble of symbol by described In the positions of all sign resources be sent to the eMBB user equipmenies.
Optionally, the bit number that the resource is seized shared by instruction information is equal to:The downlink unit of the eMBB business passes Sign resources sum shared by defeated unit and the difference for forbidding seizing all sign resources sums in assemble of symbol.
Optionally, the eMBB user equipmenies account for described rob after receiving the resource and seizing instruction information Sign resources on the data bit log-likelihood ratio that carries reset.
Optionally, described to forbid seizing assemble of symbol including at least the occupied symbol money of advance data demodulated reference signal Source.
Optionally, the downlink of the time span and the URLLC business of the downlink unit transmission unit of the eMBB business The time span of unit transmission unit is identical or different.
In order to solve the above technical problems, the embodiment of the invention also discloses a kind of base station, the base station includes the business Seize device.
Compared with prior art, the technical solution of the embodiment of the present invention has the advantages that:
Technical solution of the present invention is when URLLC business seizes eMBB business, in each downlink unit of the eMBB business In transmission unit, the URLLC business is dispatched in the sign resources for forbidding seizing except assemble of symbol and is seized, the taboo It is preconfigured only to seize assemble of symbol;URLLC business datums are sent using the sign resources accounted for are robbed.The technology of the present invention side To forbid seizing assemble of symbol by configuring in case, it is ensured that the sign resources in the set will not be seized by URLLC business, from And can ensure to forbid seizing the sign resources in assemble of symbol can be by eMBB business normal uses, to ensure that eMBB industry The performance of business reduces URLLC business and seizes the influence to eMBB service features;In addition, not allowing the resource that URLLC business is seized Granularity is symbol, the resource distribution of the reference signal without knowing eMBB business, ensure that URLLC business can rob and accounts for Resource quantity, to ensure that URLLC business can be executed normally.
Further, it sends resource and seizes instruction information to eMBB user equipmenies, to notify described in the eMBB user equipmenies Rob the position of the sign resources accounted for;The bit number that the resource seizes shared by instruction information is equal to:Under the eMBB business Sign resources sum shared by row unit transmission unit and the difference for forbidding seizing all sign resources sums in assemble of symbol. Technical solution of the present invention will not forbid seizing symbol due to robbing the sign resources accounted for when transmission resource seizes instruction information Sign resources in set, therefore in each downlink unit transmission unit, the sign resources set that can be preempted becomes smaller, money Source seizes the bit number that instruction information occupies and also becomes smaller, to reduce signaling overheads.
Further, described to forbid seizing assemble of symbol including at least the occupied symbol money of advance data demodulated reference signal Source.Technical solution of the present invention, which will forbid seizing assemble of symbol, is limited to advance data demodulated reference signal (Front-loaded DMRS) occupied sign resources, since advance data demodulated reference signal usually only takes up 1 to 2 symbols, and URLLC industry Business data area in each downlink unit transmission unit of eMBB business can normally be seized, therefore can ensure URLLC business When seizing, suffered time delay influence is small as far as possible.It is set in addition, advance data demodulated reference signal can be used for eMBB user Standby demodulation, by ensureing that the occupied sign resources of advance data demodulated reference signal are not seized by URLLC business, to protect Card eMBB user equipmenies can be demodulated normally, and then ensure that the performance for seizing eMBB business under scene.
Description of the drawings
Fig. 1 is a kind of flow chart of business method for pre-emptively of the embodiment of the present invention;
Fig. 2 is a kind of application scenarios schematic diagram of business method for pre-emptively of the embodiment of the present invention;
Fig. 3 is the structural schematic diagram that a kind of business of the embodiment of the present invention seizes device;
Fig. 4 is the structural schematic diagram that another kind business of the embodiment of the present invention seizes device.
Specific implementation mode
As described in the background art, be the shortcomings that existing scheme, practical eMBB UE there may be multigroup reference signal, For example, the reference letter of the reference signal (Demodulation reference signal, DMRS) of data demodulation, phase noise Number (Phase tracking reference signal, PT-RS), channel state information reference signals (Channel state information reference signal,CSI-RS).If URLLC avoids dispatching on the symbol where all RS, that The optional symbols of URLLC are possible to can be seldom, can not be seized so as to cause URLLC, causes the delay of URLLC business to increase, drop Meaning caused by behavior itself is seized in low introducing.In addition, the resource for being not used in transmission RS can be used for seizing by URLLC, that URLLC needs to know the RS configurations of current eMBB user;For URLLC, additional signaling overheads is needed so that receive It is opaque.
Forbid seizing assemble of symbol by configuring in technical solution of the present invention, it is ensured that the sign resources in the set are not It can be seized by URLLC business, thereby may be ensured that the sign resources for forbidding seizing in assemble of symbol can be normal by eMBB business It uses, to ensure that the performance of eMBB business, reduces URLLC business and seize the influence to eMBB service features;In addition, not permitting Perhaps the resource granularity that URLLC business is seized is symbol, and the resource distribution of the reference signal without knowing eMBB business ensures URLLC business can rob the quantity of the resource accounted for, to ensureing that URLLC business can be executed normally.
To make the above purposes, features and advantages of the invention more obvious and understandable, below in conjunction with the accompanying drawings to the present invention Specific embodiment be described in detail.
Fig. 1 is a kind of flow chart of business method for pre-emptively of the embodiment of the present invention.
Business method for pre-emptively in the present embodiment can be used for base station side.
Business method for pre-emptively shown in FIG. 1 may comprise steps of:
Step S101:When URLLC business seizes eMBB business, in each downlink unit transmission list of the eMBB business In member, the URLLC business is dispatched in the sign resources for forbidding seizing except assemble of symbol and is seized, it is described to forbid seizing Assemble of symbol is preconfigured;
Step S102:URLLC business datums are sent using the sign resources accounted for are robbed.
In the present embodiment, eMBB business and URLLC business can be two kinds of communication scenes.Wherein, eMBB business can carry For the big flows mobile broadband service such as more high bandwidth, such as ultra high-definition video;URLLC business can meet various real-time communication need It asks, and reliability higher, such as unmanned, industrial automation business.Specifically, eMBB business and URLLC business can be with It realizes, can also be realized in different base station side in same base station side.
In order to ensure the low time delay of URLLC business, when eMBB business carries out, URLLC business can seize eMBB business Running time-frequency resource.Specifically, the maximum belt that the maximum bandwidth (namely system bandwidth) that URLLC business occupies is occupied with eMBB business Under wide (namely system bandwidth) unanimous circumstances, it may occur that seize.Specifically, the URLLC business seized can correspond to list A URLLC user equipmenies can also correspond to multiple URLLC user equipmenies.Similarly, the eMBB business being preempted can correspond to individually EMBB user equipmenies can also correspond to multiple eMBB user equipmenies.
It will be apparent to a skilled person that eMBB user equipmenies can be the user equipment using eMBB business; URLLC user equipmenies can be the user equipment using URLLC business.
In specific implementation, forbid seizing assemble of symbol being that base station is configured in advance, can also be agreement (namely Communication standard or communication protocol) it is specified.Then in step S101, when URLLC business seizes eMBB business, in the eMBB In each downlink unit transmission unit of business, the URLLC is dispatched in the sign resources for forbidding seizing except assemble of symbol Business is seized.Specifically, downlink unit transmission unit represents minimum data transmission time, it is referred to as transmission time It is spaced (Transmission Time Interval, TTI).It, can be in each downlink unit transmission unit of eMBB business Scheduling URLLC business is seized in the sign resources for forbidding seizing except assemble of symbol, and eMBB business is forbidding seizing symbol Collect the business closed to be unaffected.
For example, eMBB business downlink unit transmission units are a subframe namely 14 sign resources, forbid seizing symbol Collection is combined into the 3rd and the 4th symbol, then URLLC business can be accounted in the 1st, the 2nd, the 5th to the 14th enterprising rob of symbol, and Business of the eMBB business on the 3rd and the 4th symbol is unaffected.Further, the first two symbol in each subframe (namely the 1st and the 2nd symbol) region, remaining symbol are data area in order to control, and URLLC business, which is seized, will not usually seize control Region processed, then URLLC business can be accounted in the 5th to the 14th enterprising rob of symbol.
In specific implementation, after the completion of seizing, in step s 102, the sign resources robbed and accounted for can be utilized to send URLLC Business datum.That is, being set at least one URLLC user using the sign resources accounted for transmission URLLC business datums are robbed It is standby.
The embodiment of the present invention forbids seizing assemble of symbol by configuring, it is ensured that sign resources in the set will not be by URLLC business is seized, thereby may be ensured that forbid seizing sign resources in assemble of symbol can by eMBB business normal uses, To ensure that the performance of eMBB business, reduces URLLC business and seize the influence to eMBB service features;In addition, not allowing The resource granularity that URLLC business is seized is symbol, and the resource distribution of the reference signal without knowing eMBB business ensure that URLLC business can rob the quantity of the resource accounted for, to ensure that URLLC business can be executed normally.
Preferably, can also include after step S102:It sends resource and seizes instruction information to eMBB user equipmenies, with logical Know the position that the sign resources accounted for are robbed described in the eMBB user equipmenies.
In specific implementation, after the completion of seizing, instruction information can be seized by resource, URLLC business is robbed to the symbol accounted for The position informing eMBB user equipmenies of number resource.Since rob the sign resources accounted for transmission is URLLC business datums, lead to The position that notice eMBB user equipmenies rob the sign resources accounted for is crossed, can make eMBB user equipmenies that can be seized to avoid demodulation To sign resources on URLLC business datums, to avoid eMBB service features deteriorate and BLER(block error rate) increase.
Further, the eMBB user equipmenies are seized after receiving the resource and seizing instruction information by described To sign resources on the data bit log-likelihood ratio that carries reset.Specifically, eMBB user equipmenies are robbed receiving resource It accounts for before instruction information, the data bit log-likelihood ratio carried on each symbol in downlink unit transmission unit can be demodulated (Likelihood Rate,LLR).For example, demodulating the data bit pair carried on each symbol in downlink unit transmission unit Counting likelihood ratio is:{LLR1 3, LLR2 3..., LLRn3 3,LLR1 4, LLR2 4..., LLRn4 4,…,LLR1 14, LLR2 14..., LLRn14 14}.Wherein, LLRn lIt is the bit number for including on first of symbol for n-th of the LLR solved on first of symbol, nl.By In corresponding reference signal may be carried on symbol, the data bit number of distinct symbols is caused to have difference.Assuming that URLLC business Symbol 8,9,12,13 is seized, the eMBB bits of traffic data LLR in then symbol 8,9,12,13 is invalid, then eMBB user equipmenies exist It receives resource to seize after instruction information, eMBB user equipmenies reset the bit LLR on symbol 8,9,12,13, i.e. { LLR1 8= 0, LLR2 8=0 ..., LLRn8 8=0, LLR1 9=0, LLR2 9=0 ..., LLRn9 9=0, LLR1 12=0, LLR2 12=0 ..., LLRn12 12=0, LLR1 13=0, LLR2 13=0 ..., LLRn13 13=0 }, it is then fed into decoder.
Further, transmission resource is seized instruction information to eMBB user equipmenies and be may comprise steps of:Described in determination EMBB user equipmenies are in the first frequency resource location robbed in the sign resources accounted for and the URLLC business datums In the second frequency resource location robbed in the sign resources accounted for;If the first frequency resource location and described second Frequency resource position, which exists, to be overlapped, then sends the resource and seize instruction information to the eMBB user equipmenies.
In specific implementation, Fig. 2 is can refer to, Fig. 2 is a kind of application scenarios signal of business method for pre-emptively of the embodiment of the present invention Figure.Wherein, time-domain symbol is laterally indicated, it is longitudinal to indicate frequency domain bandwidth.Each downlink unit transmission unit of eMBB business includes 14 symbols.In the system bandwidth f1-f4 of eMBB business, there are three user equipmenies:EMBB user equipmenies 1, eMBB user equipmenies 2 and eMBB user equipmenies 3, and certain bandwidth is occupied respectively.
After the completion of seizing, URLLC business is robbed in the time domain accounts for symbol 7, symbol 8, symbol 11 and symbol 12 (in such as figure Shown in dash area).For eMBB user equipmenies 1, first frequency resource location is f1-f2, and URLLC business is in symbol 7, symbol Second frequency resource location on numbers 8 frequency domain is f1-f5, and first frequency resource location and the second frequency resource location are deposited It is overlapping, then can send resource and seize instruction information to eMBB user equipmenies 1,1 symbol 7 of notice eMBB user equipmenies, symbol 8 It is preempted.
Further, on 8 frequency domain of symbol 7 and symbol, URLLC business occupy eMBB user equipmenies 1 bandwidth and A part for the bandwidth (f2-f3) of eMBB user equipmenies 2;On 12 frequency domain of symbol 11 and symbol, URLLC business occupies eMBB and uses A part for the bandwidth (f3-f4) of family equipment 3.In this case, even if URLLC business occupies the band of eMBB user equipmenies 2 A part for the bandwidth of a wide part and user equipment 3, but seized in instruction information in resource and can also indicate that eMBB user 2 symbol 7 of equipment and symbol 8 are preempted, and 3 symbol 11 of instruction eMBB user equipmenies and symbol 12 are preempted.So, eMBB user sets Standby 2 in demodulation, abandons the total data on symbol 7 and symbol 8, and eMBB user equipmenies 3 abandon symbol 11 and symbol in demodulation Total data on numbers 12.
Preferably, it may comprise steps of before step S101:Forbid seizing all symbols in assemble of symbol by described The position of number resource is sent to the eMBB user equipmenies.Specifically, if forbidding seizing assemble of symbol being that base station is matched in advance It sets, then the position for forbidding seizing all sign resources in assemble of symbol can be sent to the eMBB user by base station sets It is standby.If forbidding seizing assemble of symbol being that agreement is specified, eMBB user equipmenies, which have learned that, to be forbidden seizing in assemble of symbol The position of all sign resources, is informed without base station.
Further, the bit number that the resource is seized shared by instruction information is equal to:The downlink unit of the eMBB business Sign resources sum shared by transmission unit and the difference for forbidding seizing all sign resources sums in assemble of symbol.This implementation Example by the position for forbidding seizing all sign resources in assemble of symbol by informing eMBB user equipmenies, so that resource is seized Indicate that the bit number shared by information can be reduced, to reduce signaling overheads.
Specifically, by taking downlink unit transmission unit occupies 14 symbols as an example, if eMBB user equipmenies cannot be known Forbid seizing the position of all sign resources in assemble of symbol, then resource seize instruction information need 14 bits, each bit with Each symbol is corresponding.If eMBB user equipmenies know that the position for forbidding seizing all sign resources in assemble of symbol is the 3rd With the 4th symbol, then resource, which is seized, indicates that information needs 12 bits, each bit and the 1st, the 2nd, the 5th to the 14th symbol phase It is corresponding.
Closer, the bit number that the resource is seized shared by instruction information is equal to:The downlink list of the eMBB business Sign resources sum shared by the transmission unit of position forbids seizing all sign resources sums and control in assemble of symbol described in subtracting Sign resources sum shared by region processed.By taking downlink unit transmission unit occupies 14 symbols as an example, downlink unit transmission unit The first two symbol region, URLLC business do not seize control area usually in order to control.Therefore if eMBB user equipmenies know taboo The position for only seizing all sign resources in assemble of symbol is the 3rd and the 4th symbol, then resource, which is seized, indicates that information only needs 10 Bit, each bit are corresponding with the 5th to the 14th symbol.
Preferably, the downlink of the time span and the URLLC business of the downlink unit transmission unit of the eMBB business The time span of unit transmission unit is identical or different.For example, the downlink unit transmission unit of eMBB business occupies 10ms, The downlink unit transmission unit of URLLC business occupies 5ms.
Preferably, described to forbid seizing assemble of symbol including at least the occupied symbol money of advance data demodulated reference signal Source.
Closer, forbid seizing assemble of symbol only including the occupied symbol money of advance data demodulated reference signal Source.
Specifically, assemble of symbol where advance data demodulated reference signal (Front-loaded DMRS) does not allow URLLC business is seized;In the reference signal of assemble of symbol where other reference signals, such as additional DMRS, phase noise (Phase tracking reference signal, PT-RS), channel state information reference signals (Channel state Information reference signal, CSI-RS) where assemble of symbol on allow URLLC business seize.Due to preceding It sets data demodulation reference signal and usually only takes up 1 to 2 symbols, and URLLC business is in each downlink unit transmission of eMBB business Data area can normally be seized in unit, therefore can ensure the URLLC business time delay influence suffered when seizing as far as possible It is small.In addition, advance data demodulated reference signal can be used for the demodulation of eMBB user equipmenies, by ensureing advance data demodulation The occupied sign resources of reference signal are not seized by URLLC business, to ensure that eMBB user equipmenies can be demodulated normally, into And it ensure that the performance for seizing eMBB business under scene.
Fig. 3 is the structural schematic diagram that a kind of business of the embodiment of the present invention seizes device.
Business in the present embodiment seizes device 30 and can be used for base station side.
Business shown in Fig. 3 seizes device 30:Seize module 301 and URLLC business datum sending modules 302。
Wherein, it seizes module 301 to be suitable for when URLLC business seizes eMBB business, in the eMBB business per once In row unit transmission unit, the URLLC business is dispatched in the sign resources for forbidding seizing except assemble of symbol and is seized, It is described to forbid seizing assemble of symbol being preconfigured.
URLLC business datums sending module 302 is suitable for utilizing the sign resources robbed and accounted for send URLLC business datums.
The embodiment of the present invention will not forbid robbing due to robbing the sign resources accounted for when transmission resource seizes instruction information The sign resources in assemble of symbol are accounted for, therefore in each downlink unit transmission unit, the sign resources set that can be preempted Become smaller, resource seizes the bit number that instruction information occupies and also becomes smaller, to reduce signaling overheads.
Preferably, the downlink of the time span and the URLLC business of the downlink unit transmission unit of the eMBB business The time span of unit transmission unit is identical or different
Preferably, described to forbid seizing assemble of symbol including at least the occupied symbol money of advance data demodulated reference signal Source.
The operation principle of device 30, more contents of working method are seized about the business, are referred to Fig. 1 to Fig. 2 In associated description, which is not described herein again.
Fig. 4 is the structural schematic diagram that a kind of business of the embodiment of the present invention seizes device.
Business shown in Fig. 4 seizes device 40:Seize module 402 and URLLC business datum sending modules 403。
The specific implementation mode for seizing module 402 and URLLC business datums sending module 403 can refer to shown in Fig. 3 rob Module 301 and URLLC business datums sending module 302 are accounted for, details are not described herein again.
Preferably, it can also include seizing indicating module 404 that business shown in Fig. 4, which seizes device 40, seize indicating module 404, which are suitable for sending resource, seizes instruction information to eMBB user equipmenies, is accounted for notifying to rob described in the eMBB user equipmenies The position of sign resources.
Further, the eMBB user equipmenies are seized after receiving the resource and seizing instruction information by described To sign resources on the data bit log-likelihood ratio that carries reset.
Preferably, it seizes indicating module 404 and can include determining that unit 4041 and transmission unit 4042.Determination unit 4041 It is adapted to determine that the eMBB user equipmenies in the first frequency resource location robbed in the sign resources accounted for and described URLLC business datums are in the second frequency resource location robbed in the sign resources accounted for;If transmission unit 4042 is suitable for The first frequency resource location and the second frequency resource location, which exist, to be overlapped, then sends the resource and seize instruction information To the eMBB user equipmenies.
Preferably, it can also include position sending module 401, position sending module that business shown in Fig. 4, which seizes device 40, 401 are suitable for the position for forbidding seizing all sign resources in assemble of symbol being sent to the eMBB user equipmenies.
Further, the bit number that the resource is seized shared by instruction information is equal to:The downlink unit of the eMBB business Sign resources sum shared by transmission unit and the difference for forbidding seizing all sign resources sums in assemble of symbol.
The operation principle of device 40, more contents of working method are seized about the business, are referred to Fig. 1 to Fig. 3 In associated description, which is not described herein again.
The embodiment of the invention also discloses a kind of base station, the base station may include that business shown in Fig. 3 seizes device 30, Or business shown in Fig. 4 seizes device 40.The base station can execute URLLC business and seize eMBB business, ensure simultaneously The performance of URLLC business and eMBB business.
One of ordinary skill in the art will appreciate that all or part of step in the various methods of above-described embodiment is can It is completed with instructing relevant hardware by program, which can be stored in computer readable storage medium, to store Medium may include:ROM, RAM, disk or CD etc..
Although present disclosure is as above, present invention is not limited to this.Any those skilled in the art are not departing from this It in the spirit and scope of invention, can make various changes or modifications, therefore protection scope of the present invention should be with claim institute Subject to the range of restriction.

Claims (17)

1. a kind of business method for pre-emptively, which is characterized in that including:
When URLLC business seizes eMBB business, in each downlink unit transmission unit of the eMBB business, forbidding robbing It accounts in the sign resources except assemble of symbol and dispatches the URLLC business and seized, it is described to forbid seizing assemble of symbol being pre- First configure;
URLLC business datums are sent using the sign resources accounted for are robbed.
2. business method for pre-emptively according to claim 1, which is characterized in that further include:
It sends resource and seizes instruction information to eMBB user equipmenies, to notify to rob the symbol accounted for described in the eMBB user equipmenies The position of resource.
3. business method for pre-emptively according to claim 2, which is characterized in that the transmission resource seizes instruction information extremely EMBB user equipmenies include:
Determine the eMBB user equipmenies in the first frequency resource location robbed in the sign resources accounted for and described URLLC business datums are in the second frequency resource location robbed in the sign resources accounted for;
It is overlapped if the first frequency resource location and the second frequency resource location exist, sends the resource and seize Indicate information to the eMBB user equipmenies.
4. business method for pre-emptively according to claim 2, which is characterized in that described to forbid seizing except assemble of symbol It is dispatched in sign resources before the URLLC business is seized and further includes:
The position for forbidding seizing all sign resources in assemble of symbol is sent to the eMBB user equipmenies.
5. business method for pre-emptively according to claim 4, which is characterized in that the resource seizes the ratio shared by instruction information Special number is equal to:Sign resources sum shared by the downlink unit transmission unit of the eMBB business is forbidden seizing glossary of symbols with described The difference of all sign resources sums in conjunction.
6. business method for pre-emptively according to claim 2, which is characterized in that the eMBB user equipmenies are described in receiving Resource is seized after instruction information, and the data bit log-likelihood ratio carried in the sign resources accounted for of robbing is reset.
7. business method for pre-emptively according to any one of claims 1 to 6, which is characterized in that described to forbid seizing glossary of symbols It closes and includes at least the occupied sign resources of advance data demodulated reference signal.
8. business method for pre-emptively according to any one of claims 1 to 6, which is characterized in that the downlink of the eMBB business The time span of unit transmission unit and the time span of the downlink unit transmission unit of the URLLC business are identical or different.
9. a kind of business seizes device, which is characterized in that including:
Module is seized, suitable for when URLLC business seizes eMBB business, in each downlink unit transmission list of the eMBB business In member, the URLLC business is dispatched in the sign resources for forbidding seizing except assemble of symbol and is seized, it is described to forbid seizing Assemble of symbol is preconfigured;
URLLC business datum sending modules, suitable for utilizing the sign resources robbed and accounted for send URLLC business datums.
10. business according to claim 9 seizes device, which is characterized in that further include:
Indicating module is seized, instruction information is seized to eMBB user equipmenies, to notify the eMBB user to set suitable for sending resource The standby position for robbing the sign resources accounted for.
11. business according to claim 10 seizes device, which is characterized in that the indicating module of seizing includes:
Determination unit is adapted to determine that the eMBB user equipmenies in the first frequency resource-niche robbed in the sign resources accounted for It sets and the URLLC business datums is in the second frequency resource location robbed in the sign resources accounted for;
Transmission unit is overlapped if existed suitable for the first frequency resource location and the second frequency resource location, is sent out The resource is sent to seize instruction information to the eMBB user equipmenies.
12. business according to claim 10 seizes device, which is characterized in that further include:
Position sending module, suitable for the position for forbidding seizing all sign resources in assemble of symbol is sent to the eMBB User equipment.
13. business according to claim 12 seizes device, which is characterized in that the resource is seized shared by instruction information Bit number is equal to:Sign resources sum shared by the downlink unit transmission unit of the eMBB business is forbidden seizing symbol with described The difference of all sign resources sums in set.
14. business according to claim 10 seizes device, which is characterized in that the eMBB user equipmenies are receiving It states resource to seize after instruction information, the data bit log-likelihood ratio carried in the sign resources accounted for of robbing is reset.
15. seizing device according to claim 9 to 14 any one of them business, which is characterized in that described to forbid seizing symbol Set includes at least the occupied sign resources of advance data demodulated reference signal.
16. seizing device according to claim 9 to 14 any one of them business, which is characterized in that under the eMBB business The time span of row unit transmission unit is identical as the time span of downlink unit transmission unit of the URLLC business or not Together.
17. a kind of base station, which is characterized in that seize device including such as claim 9 to 16 any one of them business.
CN201710180267.7A 2017-03-23 2017-03-23 Service preemption method, device and base station Active CN108633023B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710180267.7A CN108633023B (en) 2017-03-23 2017-03-23 Service preemption method, device and base station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710180267.7A CN108633023B (en) 2017-03-23 2017-03-23 Service preemption method, device and base station

Publications (2)

Publication Number Publication Date
CN108633023A true CN108633023A (en) 2018-10-09
CN108633023B CN108633023B (en) 2021-11-02

Family

ID=63706577

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710180267.7A Active CN108633023B (en) 2017-03-23 2017-03-23 Service preemption method, device and base station

Country Status (1)

Country Link
CN (1) CN108633023B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020163986A1 (en) * 2019-02-11 2020-08-20 Oppo广东移动通信有限公司 Resource indication method, terminal device, and network device
CN111988236A (en) * 2019-05-22 2020-11-24 华为技术有限公司 Method, device and system for resource preemption
WO2021097590A1 (en) * 2019-11-18 2021-05-27 Zte Corporation Systems and methods for determining information indicative of cancelation
WO2021204108A1 (en) * 2020-04-10 2021-10-14 索尼集团公司 Electronic device, communication method, and storage medium
WO2022155773A1 (en) * 2021-01-19 2022-07-28 捷开通讯(深圳)有限公司 Resource preemption processing method, communication device, and readable storage medium
WO2022155774A1 (en) * 2021-01-19 2022-07-28 捷开通讯(深圳)有限公司 Resource preemption processing method, communication device, and readable storage medium

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
FUJITSU: "Preemption based Multiplexing eMBB and URLLC", 《3GPP》 *
SAMSUNG: "Summary of e-mail discussions on multiplexing eMBB and URLLC in DL", 《3GPP》 *
SEQUANS COMMUNICATIONS: "Preemption-based multiplexing of URLLC and eMBB in DL", 《3GPP》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020163986A1 (en) * 2019-02-11 2020-08-20 Oppo广东移动通信有限公司 Resource indication method, terminal device, and network device
CN113597005A (en) * 2019-02-11 2021-11-02 Oppo广东移动通信有限公司 Resource indication method, terminal equipment and network equipment
CN113597005B (en) * 2019-02-11 2023-04-07 Oppo广东移动通信有限公司 Resource indication method, terminal equipment and network equipment
CN111988236A (en) * 2019-05-22 2020-11-24 华为技术有限公司 Method, device and system for resource preemption
WO2020233686A1 (en) * 2019-05-22 2020-11-26 华为技术有限公司 Resource preemption method, device and system
CN111988236B (en) * 2019-05-22 2022-07-29 华为技术有限公司 Resource preemption method, device and system
US11785627B2 (en) 2019-05-22 2023-10-10 Huawei Technologies Co., Ltd. Resource preemption method, apparatus, and system
WO2021097590A1 (en) * 2019-11-18 2021-05-27 Zte Corporation Systems and methods for determining information indicative of cancelation
WO2021204108A1 (en) * 2020-04-10 2021-10-14 索尼集团公司 Electronic device, communication method, and storage medium
WO2022155773A1 (en) * 2021-01-19 2022-07-28 捷开通讯(深圳)有限公司 Resource preemption processing method, communication device, and readable storage medium
WO2022155774A1 (en) * 2021-01-19 2022-07-28 捷开通讯(深圳)有限公司 Resource preemption processing method, communication device, and readable storage medium

Also Published As

Publication number Publication date
CN108633023B (en) 2021-11-02

Similar Documents

Publication Publication Date Title
CN108633023A (en) Business method for pre-emptively, device and base station
CN102123432B (en) A kind of resource instruction of down control channel and detection method, equipment
US10985886B2 (en) Downlink channel decoding method, downlink information transmission method, user equipment, and base station
JP5295430B2 (en) Resource allocation method and system, blind detection method, base station, user equipment
JP4906915B2 (en) Wireless communication method, wireless communication system, and base station
CN110248412B (en) Transmission method, equipment and system for preemption information
EP3711401B1 (en) Method and apparatus for transmission resource selection
CN110035439B (en) LAA transmission method and device in cellular network
EP4195562A1 (en) Resource selection method and apparatus, resource indication method and apparatus, and terminals and storage medium
EP2683207A1 (en) Sub-frame configuration method, data processing method, base station, and user equipment
US10855509B2 (en) Data transceiving method and apparatus
US20140314018A1 (en) Pilot resource allocation method and device
CN107846707B (en) Method and device in grant-free UE and base station
KR101583580B1 (en) Control channel transmission method and device
KR20190008887A (en) Data transmission method, terminal and base station
CN111901083A (en) Quasi co-location information acquisition method, communication node and storage medium
WO2017076196A1 (en) Method and device for reserving data transmission resource
CN108347294B (en) Data detection method and terminal
EP3001743A1 (en) Method and device for detecting and sending downlink control information
CN109964413A (en) A kind of method and apparatus in the user equipment for being used for multi-antenna transmission, base station
JP5603411B2 (en) Wireless communication apparatus and wireless communication method
CN103312439A (en) Channel state information reference signal (CSI-RS) processing method and device
CN104703159A (en) Network auxiliary information delivery method and device
US20200037351A1 (en) Downlink control channel configuration method, network device, and terminal
CN110582122A (en) resource indication method, device, service node and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant