CN108628979A - Power cut record dissemination method, system, computer equipment and storage medium - Google Patents

Power cut record dissemination method, system, computer equipment and storage medium Download PDF

Info

Publication number
CN108628979A
CN108628979A CN201810388268.5A CN201810388268A CN108628979A CN 108628979 A CN108628979 A CN 108628979A CN 201810388268 A CN201810388268 A CN 201810388268A CN 108628979 A CN108628979 A CN 108628979A
Authority
CN
China
Prior art keywords
distribution transforming
power
power cut
information
cut record
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810388268.5A
Other languages
Chinese (zh)
Other versions
CN108628979B (en
Inventor
黄欣
吴任博
肖健
郑学青
彭依明
黎颖诗
徐雯清
王志强
张汉之
单婧婧
周浩洁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Dongfang Electronics Co Ltd
Original Assignee
Guangzhou Power Supply Bureau Co Ltd
Dongfang Electronics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Power Supply Bureau Co Ltd, Dongfang Electronics Co Ltd filed Critical Guangzhou Power Supply Bureau Co Ltd
Priority to CN201810388268.5A priority Critical patent/CN108628979B/en
Publication of CN108628979A publication Critical patent/CN108628979A/en
Application granted granted Critical
Publication of CN108628979B publication Critical patent/CN108628979B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D10/00Energy efficient computing, e.g. low power processors, power management or thermal management

Landscapes

  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Water Supply & Treatment (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

This application involves a kind of power cut record dissemination method, system, computer equipment and storage mediums.The method includes:The distribution transforming outage information that metering system is sent is read using pre-set time window, wherein, distribution transforming outage information includes the information of more than one power failure distribution transforming, according to the power failure distribution transforming in time window, it determines the fault location information having a power failure, buffer area is stored in using fault location information as a power cut record, if power cut record does not update in the preset buffer memory time, the power cut record is stored in formal area from buffering area, and the power cut record is issued from formal area.Technical scheme of the present invention is the publication that power cut record can be instant by the way that the storage strategy of cache-time and abort situation is arranged.

Description

Power cut record dissemination method, system, computer equipment and storage medium
Technical field
This application involves power distribution information distribution technology fields, more particularly to a kind of power cut record dissemination method, system, meter Calculate machine equipment and storage medium.
Background technology
When power-off event occurs, metering system, which is responsible for acquiring distribution transforming, stops multiplexed electrical signal, metric data, but is measuring There is no the topological model of power distribution network in system, so the position that can not have a power failure come reasoning according to the distribution situation of decompression distribution transforming.Cause This, needs distribution transforming stopping multiplexed electrical signal to be pushed to distribution main website, then combines the analysis of distribution topological model to stop by distribution main website The position of electricity.According to existing this pattern, distribution transforming power cut signal is acquired by metering system first, is then forwarded to distribution master In standing, there are two time delays for this process, if a power-off event causes two distribution transformings to have a power failure, the letter that this two distribution transformings have a power failure The time that breath passes to distribution main website may differ by more than ten minutes, and traditional power-off fault position analysis is matched waiting for all power failures When the information of change is passed to distribution main website, just start to analyze power-off switch position.However this mode, there may be power failure distribution transforming letter The incoming overlong time with point main website of breath, causes outage information publication not in time.
Invention content
Based on this, it is necessary to which in view of the above technical problems, providing a kind of can solve outage information publication asking not in time Power cut record dissemination method, system, computer equipment and the storage medium of topic.
A kind of power cut record dissemination method, the method includes:
The distribution transforming outage information that metering system is sent is read using pre-set time window, wherein distribution transforming, which has a power failure, to be believed Breath includes the information of more than one power failure distribution transforming;
According to the power failure distribution transforming in time window, the fault location information having a power failure is determined;
It is stored in buffer area using the fault location information as a power cut record;If the power failure in the preset buffer memory time Record does not update, and the power cut record is stored in formal area from buffering area, and issue the power cut record from formal area.
The time window includes in one of the embodiments,:First time window and the second time window, described Two time windows further include in the first time window:Metering system is chronologically read using second time window The distribution transforming outage information of transmission, while reading the distribution transforming telegram in reply information that metering system is sent using the first time window;Root According to distribution transforming outage information described in distribution transforming telegram in reply information update, wherein the distribution transforming telegram in reply information includes telegram in reply distribution transforming Information.
Further include in one of the embodiments,:When the first time window reads the distribution transforming telegram in reply information, Whether the information for detecting the telegram in reply distribution transforming is included in the distribution transforming outage information of second time window;If so, from institute It states and deletes the information that the telegram in reply distribution transforming corresponds to power failure distribution transforming in distribution transforming outage information.
Further include in one of the embodiments,:Divided by its affiliated feeder line gate out switch according to the power failure distribution transforming Group calculates the distribution transforming distributed intelligence that is each grouped, according to the topological model of power distribution network and the distribution transforming distributed intelligence being each grouped, Determine power-off fault location information.
Further include in one of the embodiments,:Stop with the presence or absence of corresponding with the power cut record in detection cache-time Electric fault position is in the power-off fault location information request deposit of same feeder line gate out switch;According to testing result, judgement is It is no to need to update the power cut record.
Further include in one of the embodiments,:If testing result is yes, match in the corresponding power failure of the power cut record When the number of change is not less than the number of the corresponding power failure distribution transforming of fault location information of request deposit, judgement need not update; The number of the corresponding power failure distribution transforming of the power cut record is less than the number of the corresponding power failure distribution transforming of fault location information of request deposit When mesh, judge that the fault location information according to request deposit is needed to update the power cut record;If testing result is no, judge It need not update.
Further include in one of the embodiments,:In the power cut record and the buffer area that detect the formal area Whether corresponding power cut record is consistent, according to testing result and pre-set machine learning algorithm, when adjusting the caching Between.
A kind of power cut record delivery system, the system comprises:
Window read module reads the distribution transforming outage information that metering system is sent using pre-set time window, In, distribution transforming outage information includes the information of more than one power failure distribution transforming;
Analysis module, for according to the power failure distribution transforming in time window, determining the fault location information having a power failure;
Release module, for being stored in buffer area using the fault location information as a power cut record;If preset buffer memory The power cut record does not update in time, the power cut record is stored in formal area from buffering area, and issue institute from formal area State power cut record.
A kind of computer equipment, including memory and processor, the memory are stored with computer program, the processing Device realizes following steps when executing the computer program:
The distribution transforming outage information that metering system is sent is read using pre-set time window, wherein distribution transforming, which has a power failure, to be believed Breath includes the information of more than one power failure distribution transforming;
According to the power failure distribution transforming in time window, the fault location information having a power failure is determined;
It is stored in buffer area using the fault location information as a power cut record;If the power failure in the preset buffer memory time Record does not update, and the power cut record is stored in formal area from buffering area, and issue the power cut record from formal area.
A kind of computer readable storage medium, is stored thereon with computer program, and the computer program is held by processor Following steps are realized when row:
The distribution transforming outage information that metering system is sent is read using pre-set time window, wherein distribution transforming, which has a power failure, to be believed Breath includes the information of more than one power failure distribution transforming;
According to the power failure distribution transforming in time window, the fault location information having a power failure is determined;
It is stored in buffer area using the fault location information as a power cut record;If the power failure in the preset buffer memory time Record does not update, and the power cut record is stored in formal area from buffering area, and issue the power cut record from formal area.
Above-mentioned power cut record dissemination method, system, computer equipment and storage medium, by the way that time window is arranged, then The time can be passed through when carrying out abort situation analysis by reading the distribution transforming outage information that metering system is sent using time window Power failure distribution transforming in window carries out abort situation analysis, so that it is determined that the fault location information having a power failure, by the fault location information Power cut record is just stored in formal area and issued by deposit buffer area if not updating power cut record in cache-time, this Inventive embodiments, so that it is determined that abort situation and being stored in buffer area, pass through and cache-time are arranged by reading distribution transforming outage information Publishing policy issues power cut record in time under the premise of outage information is accurate.
Description of the drawings
Fig. 1 is the applied environment figure of power cut record dissemination method in one embodiment;
Fig. 2 is the flow diagram of power cut record dissemination method in one embodiment;
Fig. 3 is the sequence diagram 1 that time window reads distribution transforming power-off event in one embodiment;
Fig. 4 is the sequence diagram 2 that time window reads distribution transforming power-off event in one embodiment;
Fig. 5 is the sequence diagram 3 that time window reads distribution transforming power-off event in one embodiment;
Fig. 6 is the sequence diagram 4 that time window reads distribution transforming power-off event in one embodiment;
Fig. 7 is the sequence diagram 5 that time window reads distribution transforming power-off event in one embodiment;
Fig. 8 is the sequence diagram 6 that time window reads distribution transforming power-off event in one embodiment;
Fig. 9 is the schematic diagram of power cut record delivery system in an embodiment;
Figure 10 is the internal structure chart of one embodiment Computer equipment.
Specific implementation mode
It is with reference to the accompanying drawings and embodiments, right in order to make the object, technical solution and advantage of the application be more clearly understood The application is further elaborated.It should be appreciated that specific embodiment described herein is only used to explain the application, not For limiting the application.
Power cut record dissemination method provided by the present application, can be applied in application environment as shown in Figure 1.Wherein, match Become 101, distribution transforming 102, distribution transforming 103 and communicate connection with metering system 104, metering system 104 can obtain in each distribution transforming The outage information of acquisition is sent to distribution main website 105 by outage information, metering system 104, is then stopped by the determination of distribution main website 105 Electric switch.When outage information is transmitted, distribution transforming 101, distribution transforming 102, distribution transforming 103 outage information be transferred to metering system 104 according to Secondary generation time delay 1, time delay 2 and time delay 3, these three time delays may be identical, it is also possible to which different, distribution main website is according to the power failure of distribution transforming Information carries out abort situation analysis.
In one embodiment, as shown in Fig. 2, providing a kind of power cut record dissemination method, it is applied to Fig. 1 in this way In distribution main website in for illustrate, include the following steps:
Step 202, the distribution transforming outage information that metering system is sent is read using pre-set time window, wherein match Become the information that outage information includes more than one power failure distribution transforming.
Wherein, the time window in step 202 can refer to sampling window, can be stored in the data that window time is read In time window.
Step 204, according to the power failure distribution transforming in time window, the fault location information having a power failure is determined.
Wherein, the distribution transforming outage information in actual time window refers to reading in current time, time window All distribution transforming outage informations.
Step 206, it is stored in buffer area using the fault location information as a power cut record;If in the preset buffer memory time The power cut record does not update, and the power cut record is stored in formal area from buffering area, and issue the power failure from formal area Record.
Wherein, the buffer area in step 206 can be a database, and every power cut record is maintained in the database, Cache-time refers to the time of power cut record unloading.
In above-mentioned power cut record dissemination method, by the way that time window is arranged, then time window is utilized to read metering system The distribution transforming outage information of transmission can carry out failure when carrying out abort situation analysis by the power failure distribution transforming in time window Position analysis, so that it is determined that the fault location information having a power failure, is stored in buffer area, in cache-time such as by the fault location information Fruit does not update power cut record, and power cut record, which is just stored in formal area, issues, the embodiment of the present invention, is stopped by reading distribution transforming Power information, so that it is determined that abort situation and it is stored in buffer area, it is accurate in outage information by the way that cache-time publishing policy is arranged Under the premise of issue power cut record in time.
In one embodiment, time window includes:First time window and the second time window, the second time window is in institute It states in first time window;As shown in figure 3, chronologically reading metering system using the second time window sends this power-off event Distribution transforming outage information, using first time window read metering system send this power-off event distribution transforming send a telegram in reply information, match Become the information that telegram in reply information includes telegram in reply distribution transforming, it is worth noting that, send a telegram in reply distribution transforming and power failure distribution transforming correspondence indicate same and match Become different states;According to distribution transforming telegram in reply information update distribution transforming outage information.
In fact, since the second time window is among first time window, either first time window or when second Between window be required to receive distribution transforming outage information and distribution transforming telegram in reply information, but only first time window read distribution have a power failure letter Breath, only the second time window read distribution transforming telegram in reply information.
In another embodiment, when first time window reads distribution transforming telegram in reply information, detection telegram in reply distribution transforming is needed Whether information is included in the distribution transforming outage information of the second time window, if so, illustrating that the power failure in distribution transforming outage information is matched Change has been sent a telegram in reply, then it is corresponding delete in distribution transforming outage information to need corresponding update distribution transforming outage information, specific update mode The information of the corresponding power failure distribution transforming of telegram in reply distribution transforming.
As shown in figure 4, it is 39,40 and 41 power failures that the second time window, which reads the complete outage information that becomes again, when first Between the distribution transforming telegram in reply information that reads of window be 45 telegrams in reply, if 39 to have a power failure include that distribution transforming A has a power failure, 45 to send a telegram in reply include distribution transforming A sends a telegram in reply, then multiple change outage information at this time needs to update, the letter that distribution transforming A has a power failure specifically is deleted in multiple change outage information Breath.
In one embodiment, the failure having a power failure can be determined in the following manner according to the power failure distribution transforming in time window Location information:The power failure distribution transforming is grouped by its affiliated feeder line gate out switch, calculates the distribution transforming distribution letter being each grouped Breath, according to the topological model of power distribution network and the distribution transforming distributed intelligence being each grouped, determines power-off fault location information.In distribution The topological model of power grid is configured in main website, topological model discloses the working method of power distribution network, therefore, passes through several power failures Distribution transforming, it may be determined that the reason of power failure and the location information of power failure.Based in this way, then by second Power failure distribution transforming information in time window can analyze fault location information.
In another embodiment, it is also necessary to detect and whether there is power-off fault corresponding with the power cut record in cache-time Position is in the power-off fault location information request deposit of same feeder line gate out switch;According to testing result, judge whether to need Update the power cut record.
In the present embodiment, due to the delay of information transmission, the distribution transforming information of same feeder line may postpone to be transferred to distribution transforming master Stand, therefore be provided with cache-time, in power failure distribution transforming and the buffer area in fault location information by detecting request deposit when Whether power failure distribution transforming in preceding power cut record is in same feeder line, if so, power cut record that may be in buffer area and not perfect, because This needs judges whether to need to update power cut record.
In one embodiment, as shown in figure 5, respectively previous moment and the reading distribution transforming of first time at current time window is stopped The case where power information, distribution transforming power-off event 39, distribution transforming power-off event 40, distribution transforming power-off event 41 and distribution transforming power-off event 42 belong to In same feeder line, in previous moment, the second time window reads distribution transforming power-off event 39, can be with by distribution transforming power-off event 39 Determine a fault location information, and in corresponding deposit buffer area, at current time, the second time window reads distribution transforming power failure Event 39, distribution transforming power-off event 40 and distribution transforming power-off event 41 pass through distribution transforming power-off event 39, distribution transforming power-off event 40 and distribution transforming Power-off event 41 can determine another fault location information, and ask deposit buffer area, at this point, buffer area detects current request The power failure distribution transforming of power failure distribution transforming and the fault location information being currently stored in the data of deposit is in same feeder line, it is therefore desirable to Judge whether to need to update the power cut record in buffer area.
In one embodiment, with the propulsion of time, the distribution transforming power-off event read in the second time window may not Together, four kinds of situations can be divided into:
Situation 1
Distribution transforming power-off event 39, distribution transforming power-off event 40, distribution transforming power-off event 41 and distribution transforming power-off event 42 belong to together One feeder line, as shown in figure 5, the power failure distribution transforming number that the distribution transforming power-off event read in the second time window of current time is related to More than the power failure distribution transforming number that the distribution transforming power-off event that previous moment is read is related to, therefore illustrate the number that previous moment is read According to not perfect, need to update the power cut record in buffer area.
Situation 2
Distribution transforming power-off event 39, distribution transforming power-off event 40, distribution transforming power-off event 41 and distribution transforming power-off event 42 belong to together One feeder line, as shown in fig. 6, the second time window of current time reads distribution transforming power-off event 40, distribution transforming power-off event 41 and matches Become power-off event 42, and the second time of previous moment mine mouth reads distribution transforming power-off event 39, distribution transforming power-off event 40, distribution transforming stop Electric event 41 and distribution transforming power-off event 42, the power failure that the distribution transforming power-off event read in the second time window of current time is related to Distribution transforming number is less than the power failure distribution transforming number that the distribution transforming power-off event that previous moment is read is related to, and illustrates that this distribution transforming has a power failure and believes Breath, which has been read, to be finished, and the power cut record in buffer area need not be updated.
Situation 3
Distribution transforming power-off event 39, distribution transforming power-off event 40, distribution transforming power-off event 41 and distribution transforming power-off event 42 are not admitted to Same feeder line, as shown in fig. 7, the second time window of current time reads distribution transforming power-off event 39 and distribution transforming power-off event 40, And the second time window of previous moment reads distribution transforming power-off event 39, due to distribution transforming power-off event 39 and distribution transforming power-off event 40 Belong to the failure on different feeder lines, it is therefore desirable to update power cut record.
Situation four
Distribution transforming power-off event 39, distribution transforming power-off event 40, distribution transforming power-off event 41 and distribution transforming power-off event 42 are not admitted to Same feeder line, as shown in figure 8, previous moment and the second time window of current time read distribution transforming power-off event 39, distribution transforming Power-off event 40, distribution transforming power-off event 41 and distribution transforming power-off event 42, not new data introduce, therefore judging need not be more Newly.
In addition, in one embodiment, it is as a result more accurate since cache-time is longer, opposite, the real-time of the data is just It is more bad, machine learning algorithm can be set therefore, it is necessary to choose the size of a suitable cache-time without practicability, Then data are largely inputted machine by the relationship for establishing cache-time and power cut record in power cut record in formal area and buffer area Learning algorithm exports cache-time at this time in study to when default accuracy, and chooses the cache-time of output as caching Time.
When selecting machine learning algorithm, the machine learning algorithm of the form of iteration, such as AdaBoost can be selected to calculate Method, to obtain best iterative value.
In the present embodiment, machine learning algorithm can be directed to above-mentioned difference, and whether analyse in depth is because of cache-time mistake Caused by short, by the study of machine algorithm, it can extend cache-time for cache-time is too short, also have for cache-time Sufficient nargin, can shorten cache-time, can ensure under the premise of not influencing accuracy in this way, issue distribution transforming as early as possible and stop Power information, in addition different for the natural environment of each department, communication environment, the delay of data transmission is also different, passes through engineering Algorithm is practised, the best configuration for being adapted to this area cache-time can also be selected as soon as possible.
It should be understood that although each step in the flow chart of Fig. 2 is shown successively according to the instruction of arrow, this A little steps are not that the inevitable sequence indicated according to arrow executes successively.Unless expressly state otherwise herein, these steps It executes there is no the limitation of stringent sequence, these steps can execute in other order.Moreover, at least part in Fig. 2 Step may include that either these sub-steps of multiple stages or stage are executed in synchronization to multiple sub-steps It completes, but can execute at different times, the execution sequence in these sub-steps or stage is also not necessarily to be carried out successively, But it can either the sub-step of other steps or at least part in stage execute in turn or alternately with other steps.
In one embodiment, as shown in figure 9, providing a kind of power cut record delivery system, including:Window read module 902, analysis module 904 and release module 906, wherein:
Window read module 902 reads the distribution transforming outage information that metering system is sent using pre-set time window, Wherein, distribution transforming outage information includes the information of more than one power failure distribution transforming.
Analysis module 904, for according to the power failure distribution transforming in time window, determining the fault location information having a power failure.
Release module 906, for being stored in buffer area using the fault location information as a power cut record;If default slow It deposits the power cut record in the time not update, the power cut record is stored in formal area from buffering area, and issue from formal area The power cut record.
In one embodiment, time window includes:First time window and the second time window, second time window In the first time window;Window read module 902 is additionally operable to chronologically read metering using second time window The distribution transforming outage information that system is sent, while reading the distribution transforming telegram in reply letter that metering system is sent using the first time window Breath, wherein the distribution transforming telegram in reply information includes the information of telegram in reply distribution transforming;According to distribution transforming described in distribution transforming telegram in reply information update Outage information.
In one embodiment, window read module 902 is additionally operable to read the distribution transforming in the first time window multiple When power information, whether the information for detecting the telegram in reply distribution transforming is included in the distribution transforming outage information of second time window;If It is that the information that the telegram in reply distribution transforming corresponds to power failure distribution transforming is then deleted from the distribution transforming outage information.
In one embodiment, analysis module 904 is additionally operable to carry out the power failure distribution transforming by its affiliated feeder line gate out switch Grouping calculates the distribution transforming distributed intelligence being each grouped, according to the topological model of power distribution network and the distribution transforming being each grouped distribution letter Breath, determines power-off fault location information.
In one embodiment, further include update detection module, whether there is and the power failure for detecting in cache-time Record corresponding power-off fault position is in the fault location information request deposit buffer area of same feeder line gate out switch;According to detection As a result, judging whether to need to update the power cut record.
In one embodiment, if update detection module be additionally operable to testing result be it is yes, it is corresponding in the power cut record When the number of power failure distribution transforming is not less than the number of the corresponding power failure distribution transforming of fault location information of request deposit, judgement need not be more Newly;It is less than the corresponding power failure distribution transforming of fault location information of request deposit in the number of the corresponding power failure distribution transforming of the power cut record Number when, judge to need the fault location information according to request deposit to update the power cut record;If testing result is no, Judgement need not update.
In one embodiment, further include cache-time setup module, the power cut record for detecting the formal area Whether power cut record corresponding with the buffer area is consistent, according to testing result and pre-set machine learning algorithm, Adjust the cache-time.
Specific about power cut record delivery system limits the limit that may refer to above for power cut record dissemination method Fixed, details are not described herein.Modules in above-mentioned power cut record delivery system can fully or partially through software, hardware and its It combines to realize.Above-mentioned each module can be embedded in or in the form of hardware independently of in the processor in computer equipment, can also It is stored in a software form in the memory in computer equipment, in order to which processor calls the above modules of execution corresponding Operation.
In one embodiment, a kind of computer equipment is provided, which can be server, internal junction Composition can be as shown in Figure 10.The computer equipment include the processor connected by system bus, memory, network interface and Database.Wherein, the processor of the computer equipment is for providing calculating and control ability.The memory packet of the computer equipment Include non-volatile memory medium, built-in storage.The non-volatile memory medium is stored with operating system, computer program and data Library.The built-in storage provides environment for the operation of operating system and computer program in non-volatile memory medium.The calculating The database of machine equipment is for storing distribution transforming outage information data.The network interface of the computer equipment is used for and external terminal It is communicated by network connection.To realize a kind of power cut record dissemination method when the computer program is executed by processor.
It will be understood by those skilled in the art that structure shown in Figure 10, only with the relevant part of application scheme The block diagram of structure, does not constitute the restriction for the computer equipment being applied thereon to application scheme, and specific computer is set Standby may include either combining certain components than more or fewer components as shown in the figure or being arranged with different components.
In one embodiment, a kind of computer equipment, including memory and processor are provided, is stored in memory Computer program, the processor realize following steps when executing computer program:
The distribution transforming outage information that metering system is sent is read using pre-set time window, wherein distribution transforming, which has a power failure, to be believed Breath includes the information of more than one power failure distribution transforming.
According to the power failure distribution transforming in time window, the fault location information having a power failure is determined.
It is stored in buffer area using the fault location information as a power cut record;If the power failure in the preset buffer memory time Record does not update, and the power cut record is stored in formal area from buffering area, and issue the power cut record from formal area.
In one embodiment, time window includes:First time window and the second time window, second time window Mouth is in the first time window;Processor also realizes following steps when executing computer program:Utilize second time Window chronologically reads the distribution transforming outage information of metering system transmission, while reading metering system using the first time window The distribution transforming telegram in reply information of transmission, wherein the distribution transforming telegram in reply information includes the information of telegram in reply distribution transforming;It is sent a telegram in reply according to the distribution transforming Distribution transforming outage information described in information update.
In one embodiment, following steps are also realized when processor executes computer program:In the first time window When mouth reads the distribution transforming telegram in reply information, whether the information for detecting the telegram in reply distribution transforming is included in second time window In distribution transforming outage information;If so, deleting the information that the telegram in reply distribution transforming corresponds to power failure distribution transforming from the distribution transforming outage information.
In one embodiment, following steps are also realized when processor executes computer program:The power failure distribution transforming is pressed Its affiliated feeder line gate out switch is grouped, and calculates the distribution transforming distributed intelligence that is each grouped, according to the topological model of power distribution network with And the distribution transforming distributed intelligence being each grouped, determine power-off fault location information.
In one embodiment, following steps are also realized when processor executes computer program:It is in detection cache-time The no fault location information request that same feeder line gate out switch is in the presence of power-off fault corresponding with power cut record position is deposited Enter buffer area;According to testing result, judge whether to need to update the power cut record.
In one embodiment, following steps are also realized when processor executes computer program:If testing result is yes, It is not less than the corresponding power failure distribution transforming of fault location information of request deposit in the number of the corresponding power failure distribution transforming of the power cut record Number when, judgement need not update;It is less than the failure of request deposit in the number of the corresponding power failure distribution transforming of the power cut record When the number of the corresponding power failure distribution transforming of location information, judge that the fault location information according to request deposit is needed to update the power failure Record;If testing result is no, judgement need not update.
In one embodiment, following steps are also realized when processor executes computer program:Detect the formal area Whether power cut record power cut record corresponding with the buffer area is consistent, according to testing result and pre-set machine Device learning algorithm adjusts the cache-time.
In one embodiment, a kind of computer readable storage medium is provided, computer program is stored thereon with, is calculated Machine program realizes following steps when being executed by processor:
The distribution transforming outage information that metering system is sent is read with pre-set time window, wherein distribution transforming outage information Include the information of more than one power failure distribution transforming.
According to the power failure distribution transforming in time window, the fault location information having a power failure is determined.
It is stored in buffer area using the fault location information as a power cut record;If the power failure in the preset buffer memory time Record does not update, and the power cut record is stored in formal area from buffering area, and issue the power cut record from formal area.
In one embodiment, time window includes:First time window and the second time window, second time window Mouth is in the first time window;Following steps are also realized when computer program is executed by processor:When using described second Between window chronologically read metering system transmission distribution transforming outage information, while using the first time window read metering system The distribution transforming telegram in reply information that system is sent, wherein the distribution transforming telegram in reply information includes the information of telegram in reply distribution transforming;It is multiple according to the distribution transforming Power information updates the distribution transforming outage information.
In one embodiment, following steps are also realized when computer program is executed by processor:In the first time When window reads the distribution transforming telegram in reply information, whether the information for detecting the telegram in reply distribution transforming is included in second time window Distribution transforming outage information in;If so, deleting the information that the telegram in reply distribution transforming corresponds to power failure distribution transforming from the distribution transforming outage information.
In one embodiment, following steps are also realized when computer program is executed by processor:By the power failure distribution transforming It is grouped by its affiliated feeder line gate out switch, the distribution transforming distributed intelligence being each grouped is calculated, according to the topological model of power distribution network And the distribution transforming distributed intelligence being each grouped, determine power-off fault location information.
In one embodiment, following steps are also realized when computer program is executed by processor:It detects in cache-time The fault location information request of same feeder line gate out switch is in the presence or absence of power-off fault corresponding with power cut record position It is stored in buffer area;According to testing result, judge whether to need to update the power cut record.
In one embodiment, following steps are also realized when computer program is executed by processor:If testing result is yes, Then match in fault location information corresponding power failure of the number of the corresponding power failure distribution transforming of the power cut record not less than request deposit When the number of change, judgement need not update;It is less than the event of request deposit in the number of the corresponding power failure distribution transforming of the power cut record When hindering the number of the corresponding power failure distribution transforming of location information, judge to need to stop described in the fault location information update according to request deposit Electrographic recording;If testing result is no, judgement need not update.
In one embodiment, following steps are also realized when computer program is executed by processor:Detect the formal area Power cut record power cut record corresponding with the buffer area it is whether consistent, it is according to testing result and pre-set Machine learning algorithm adjusts the cache-time.
One of ordinary skill in the art will appreciate that realizing all or part of flow in above-described embodiment method, being can be with Relevant hardware is instructed to complete by computer program, the computer program can be stored in a non-volatile computer In read/write memory medium, the computer program is when being executed, it may include such as the flow of the embodiment of above-mentioned each method.Wherein, Any reference to memory, storage, database or other media used in each embodiment provided herein, Including non-volatile and/or volatile memory.Nonvolatile memory may include read-only memory (ROM), programming ROM (PROM), electrically programmable ROM (EPROM), electrically erasable ROM (EEPROM) or flash memory.Volatile memory may include Random access memory (RAM) or external cache.By way of illustration and not limitation, RAM is available in many forms, Such as static state RAM (SRAM), dynamic ram (DRAM), synchronous dram (SDRAM), double data rate sdram (DDRSDRAM), enhancing Type SDRAM (ESDRAM), synchronization link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic ram (DRDRAM) and memory bus dynamic ram (RDRAM) etc..
Each technical characteristic of above example can be combined arbitrarily, to keep description succinct, not to above-described embodiment In each technical characteristic it is all possible combination be all described, as long as however, the combination of these technical characteristics be not present lance Shield is all considered to be the range of this specification record.
The several embodiments of the application above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art It says, under the premise of not departing from the application design, various modifications and improvements can be made, these belong to the protection of the application Range.Therefore, the protection domain of the application patent should be determined by the appended claims.

Claims (10)

1. a kind of power cut record dissemination method, which is characterized in that the method includes:
The distribution transforming outage information that metering system is sent is read using pre-set time window, wherein in distribution transforming outage information Include the information of more than one power failure distribution transforming;
According to the power failure distribution transforming in time window, the fault location information having a power failure is determined;
It is stored in buffer area using the fault location information as a power cut record;If the power cut record in the preset buffer memory time It does not update, the power cut record is stored in formal area from buffering area, and the power cut record is issued from formal area.
2. power cut record dissemination method according to claim 1, which is characterized in that the time window includes:When first Between window and the second time window, second time window is in the first time window;
The described the step of distribution transforming outage information that metering system is sent is read using pre-set time window, including:
The distribution transforming outage information of metering system transmission is chronologically read using second time window, while utilizing described first Time window reads the distribution transforming telegram in reply information that metering system is sent, wherein the distribution transforming telegram in reply information includes telegram in reply distribution transforming Information;According to distribution transforming outage information described in distribution transforming telegram in reply information update.
3. power cut record dissemination method according to claim 2, which is characterized in that described according to distribution transforming telegram in reply information The step of updating the distribution transforming outage information, including:
The first time window read the distribution transforming send a telegram in reply information when, detect the telegram in reply distribution transforming information whether include In the distribution transforming outage information of second time window;
If so, deleting the information that the telegram in reply distribution transforming corresponds to power failure distribution transforming from the distribution transforming outage information.
4. power cut record dissemination method according to any one of claims 1 to 3, which is characterized in that described according to time window The step of power failure distribution transforming in mouthful, the determining fault location information having a power failure, including:
The power failure distribution transforming is grouped by its affiliated feeder line gate out switch, calculates the distribution transforming distributed intelligence being each grouped, root Topological model according to power distribution network and the distribution transforming distributed intelligence that is each grouped, determine power-off fault location information.
5. power cut record dissemination method according to claim 4, which is characterized in that further include:
In detection cache-time same feeder line gate out switch is in the presence or absence of power-off fault corresponding with power cut record position Fault location information request deposit buffer area;
According to testing result, judge whether to need to update the power cut record.
6. power cut record dissemination method according to claim 5, which is characterized in that it is described according to testing result, judgement is No the step of needing to update the power cut record, including:
If testing result is yes, it is not less than the fault bit of request deposit in the number of the corresponding power failure distribution transforming of the power cut record When confidence ceases the number of corresponding power failure distribution transforming, judgement need not update;In the number of the corresponding power failure distribution transforming of the power cut record When mesh is less than the number of the corresponding power failure distribution transforming of fault location information of request deposit, judge to need the failure according to request deposit Power cut record described in updating location information;
If testing result is no, judgement need not update.
7. according to the power cut record dissemination method described in claim 1,2,3,5, any one of 6, which is characterized in that further include:
Whether the power cut record power cut record corresponding with the buffer area for detecting the formal area is consistent, according to detection As a result and pre-set machine learning algorithm, the cache-time is adjusted.
8. a kind of power cut record delivery system, which is characterized in that the system comprises:
Window read module reads the distribution transforming outage information that metering system is sent, wherein match using pre-set time window Become the information that outage information includes more than one power failure distribution transforming;
Analysis module, for according to the power failure distribution transforming in time window, determining the fault location information having a power failure;
Release module, for being stored in buffer area using the fault location information as a power cut record;If the preset buffer memory time The interior power cut record does not update, and the power cut record is stored in formal area from buffering area, and from stopping described in the publication of formal area Electrographic recording.
9. a kind of computer equipment, including memory and processor, the memory are stored with computer program, feature exists In the processor realizes the power cut record publisher described in any one of claim 1 to 7 when executing the computer program The step of method.
10. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the computer program The step of power cut record dissemination method described in any one of claim 1 to 7 is realized when being executed by processor.
CN201810388268.5A 2018-04-26 2018-04-26 Power failure record issuing method, system, computer equipment and storage medium Active CN108628979B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810388268.5A CN108628979B (en) 2018-04-26 2018-04-26 Power failure record issuing method, system, computer equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810388268.5A CN108628979B (en) 2018-04-26 2018-04-26 Power failure record issuing method, system, computer equipment and storage medium

Publications (2)

Publication Number Publication Date
CN108628979A true CN108628979A (en) 2018-10-09
CN108628979B CN108628979B (en) 2021-02-09

Family

ID=63694695

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810388268.5A Active CN108628979B (en) 2018-04-26 2018-04-26 Power failure record issuing method, system, computer equipment and storage medium

Country Status (1)

Country Link
CN (1) CN108628979B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111583382A (en) * 2019-02-18 2020-08-25 清华大学 Data calculation method and device, computer equipment and storage medium

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103425122A (en) * 2013-08-13 2013-12-04 重庆长安汽车股份有限公司 Fault management method for new energy vehicle controller
CN103440549A (en) * 2013-08-20 2013-12-11 国家电网公司 Power failure dispatching control system and control method thereof
CN103941158A (en) * 2014-04-17 2014-07-23 国家电网公司 Power distribution network fault diagnosis system and method based on multi-source information
CN104215878A (en) * 2014-08-12 2014-12-17 上海交通大学 Device and method for recording fault waveforms of power distribution lines
CN104678258A (en) * 2015-02-27 2015-06-03 国家电网公司 Method for actively studying and judging power distribution network fault based on public/specific transformer information
JP5750782B2 (en) * 2011-03-15 2015-07-22 株式会社大一商会 Pachinko machine
CN105762793A (en) * 2016-03-16 2016-07-13 国网江苏省电力公司电力科学研究院 Distribution network fault power failure loss assessment method considering distributed new energy
CN106646030A (en) * 2016-11-15 2017-05-10 国家电网公司 Power grid fault diagnosis method and device based on multiple data sources and expert rule base
CN107425600A (en) * 2017-05-02 2017-12-01 广东电网有限责任公司惠州供电局 One kind power supply distribution transformer monitoring system
CN107590023A (en) * 2017-08-10 2018-01-16 上海壹账通金融科技有限公司 Data processing method, electronic equipment and computer-readable recording medium
CN107727979A (en) * 2017-11-21 2018-02-23 国网福建省电力有限公司 A kind of failure based on distribution main website studies and judges optimization method
CN107870663A (en) * 2016-09-27 2018-04-03 维谛技术有限公司 The information recording method and device of a kind of power module

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5750782B2 (en) * 2011-03-15 2015-07-22 株式会社大一商会 Pachinko machine
CN103425122A (en) * 2013-08-13 2013-12-04 重庆长安汽车股份有限公司 Fault management method for new energy vehicle controller
CN103440549A (en) * 2013-08-20 2013-12-11 国家电网公司 Power failure dispatching control system and control method thereof
CN103941158A (en) * 2014-04-17 2014-07-23 国家电网公司 Power distribution network fault diagnosis system and method based on multi-source information
CN104215878A (en) * 2014-08-12 2014-12-17 上海交通大学 Device and method for recording fault waveforms of power distribution lines
CN104678258A (en) * 2015-02-27 2015-06-03 国家电网公司 Method for actively studying and judging power distribution network fault based on public/specific transformer information
CN105762793A (en) * 2016-03-16 2016-07-13 国网江苏省电力公司电力科学研究院 Distribution network fault power failure loss assessment method considering distributed new energy
CN107870663A (en) * 2016-09-27 2018-04-03 维谛技术有限公司 The information recording method and device of a kind of power module
CN106646030A (en) * 2016-11-15 2017-05-10 国家电网公司 Power grid fault diagnosis method and device based on multiple data sources and expert rule base
CN107425600A (en) * 2017-05-02 2017-12-01 广东电网有限责任公司惠州供电局 One kind power supply distribution transformer monitoring system
CN107590023A (en) * 2017-08-10 2018-01-16 上海壹账通金融科技有限公司 Data processing method, electronic equipment and computer-readable recording medium
CN107727979A (en) * 2017-11-21 2018-02-23 国网福建省电力有限公司 A kind of failure based on distribution main website studies and judges optimization method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵会茹 等: ""配电网设备故障停电风险实时评估"", 《电力自动化设备》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111583382A (en) * 2019-02-18 2020-08-25 清华大学 Data calculation method and device, computer equipment and storage medium
CN111583382B (en) * 2019-02-18 2023-10-27 清华大学 Data computing method, device, computer equipment and storage medium

Also Published As

Publication number Publication date
CN108628979B (en) 2021-02-09

Similar Documents

Publication Publication Date Title
CN109614262B (en) Service checking method, device and computer readable storage medium
CN111208382B (en) Electric power self-healing test method, device, system, main station and tester
CN109813999B (en) Automatic test platform, method and application of power distribution network fault diagnosis algorithm
CN109614527A (en) Overhaul view generation method, apparatus, computer equipment and storage medium
CN110134795A (en) Generate method, apparatus, computer equipment and the storage medium of validation problem group
CN108539736A (en) Power-off event analysis method, system and computer equipment based on multi-source data
CN110109828A (en) Question and answer interface test method, device, computer equipment and storage medium
CN109766121A (en) Environment profile generation method, device, computer equipment and storage medium
CN116154765A (en) Power topological relation identification method and device, computer equipment and storage medium
CN112330488A (en) Power grid frequency situation prediction method based on transfer learning
CN115865625A (en) Method and device for analyzing fault root cause of communication equipment
CN109828185B (en) Power distribution network fault positioning method for roof-containing photovoltaic power generation system
CN108628979A (en) Power cut record dissemination method, system, computer equipment and storage medium
US20200096959A1 (en) Power system simulation based on snapshot data
CN106018993A (en) Wave recording realization method of channel dynamic configuration
CN110473586B (en) Replacement method, device and equipment for write failure storage unit and storage medium
CN108038127A (en) A kind of method, apparatus, terminal device and the storage medium of data synchronization
CN113010423B (en) Electric energy meter software reliability detection method and device, computer equipment and medium
CN109558956A (en) The evaluation method that goes offline, device, computer equipment and the storage medium of measuring equipment
CN112559012B (en) System upgrading and testing method and device, computer equipment and readable storage medium
US20180039571A1 (en) Semiconductor test apparatus for controlling tester
US11042132B2 (en) Transformative remedial action scheme tool (TRAST)
CN108429347A (en) Distribution network line apparatus monitoring method, device, computer equipment and storage medium
CN107170112A (en) Determination method, device and the finance device of component timing information in finance device
CN113541126A (en) Power distribution network simulation system suitable for verifying advanced algorithm and algorithm verification method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210406

Address after: No.2, Tianhe south 2nd Road, Tianhe District, Guangzhou City, Guangdong Province

Patentee after: Guangzhou Power Supply Bureau of Guangdong Power Grid Co.,Ltd.

Patentee after: DONGFANG ELECTRONICS Co.,Ltd.

Address before: 510620, No. two, No. 2, Tianhe South Road, Guangzhou, Guangdong, Tianhe District

Patentee before: GUANGZHOU POWER SUPPLY Co.,Ltd.

Patentee before: DONGFANG ELECTRONICS Co.,Ltd.