CN108620826A - A kind of compressor crank shaft preparation method - Google Patents

A kind of compressor crank shaft preparation method Download PDF

Info

Publication number
CN108620826A
CN108620826A CN201810440348.0A CN201810440348A CN108620826A CN 108620826 A CN108620826 A CN 108620826A CN 201810440348 A CN201810440348 A CN 201810440348A CN 108620826 A CN108620826 A CN 108620826A
Authority
CN
China
Prior art keywords
bent axle
forging
blanking
crank shaft
compressor crank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810440348.0A
Other languages
Chinese (zh)
Inventor
陈盛远
王胜
陈勇
孙海峰
贾飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chaohu Nante Precision Manufacturing Co Ltd
Original Assignee
Chaohu Nante Precision Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chaohu Nante Precision Manufacturing Co Ltd filed Critical Chaohu Nante Precision Manufacturing Co Ltd
Priority to CN201810440348.0A priority Critical patent/CN108620826A/en
Publication of CN108620826A publication Critical patent/CN108620826A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass

Abstract

The invention discloses a kind of compressor crank shaft preparation methods, include the following steps:Blanking and peeling:It selects No. 45 steel of refining, chemical analysis and mechanical performance to meet the regulation of GB699 and GB3077, and requires Mo < 0.1% and through hot upset test, blanking is carried out using sawing process, and peeling is carried out to the material after blanking;Heating and forging:It using step-by-step movement heated by gas stove heat, is then forged, forging process is divided into blocking, finish-forging twice work step.The present invention has the advantages that production efficiency is high, complete automatic forging assembly line can be formed, avoid the problem of complex process and high rejection rate, it is sufficiently complex from mold manufacturing to specific production process to solve existing Production of Crankshaft technology, due also to due to the generation of stomata and dreg defect, high rejection rate in product, blank needs are manufactured simultaneously to reserve compared with margin, it is processed again through multiple working procedure, the problem of stock utilization is low, manufacturing procedure is complicated, low production efficiency.

Description

A kind of compressor crank shaft preparation method
Technical field
The present invention relates to Compressor Technology field, specially a kind of compressor crank shaft preparation method.
Background technology
Bent axle is the critical component of rotating air conditioner compressor, thus it is higher to its performance requirement, to further increase pressure Contracting engine efficiency, compressor producer, which is all made of, reduces bent axle diameter, reduces the method for contact area, improves efficiency, but its is wear-resistant Performance is greatly lowered, and cannot be satisfied the needs of reliability, makes the method for reduction bent axle diameter, is restricted.Currently, compressor Surface treatment of the manufacturing industry to bent axle generally uses two kinds of techniques:1, crankshaft surface carries out phosphorating treatment:Parkerized phosphatization Film, general 1-3um, film-base junction resultant force are low, it is easy to fall off, and friction coefficient is high, wear resistance is poor, and film thickness deviation compared with Greatly, about in 0.5-1um, in use, demand, and substance in phosphorating treatment use is cannot be satisfied, direct emission is unable to, to ring Border has harmfulness;2, after phosphorating treatment, MOS2 coatings are sprayed:Film thickness 1-3um, film-base junction resultant force are compared with phosphatization, are not had There is improvement, but reduces friction coefficient;MoS2 coatings start to aoxidize at 300 DEG C, and in wet condition, it is easy to it fails, Therefore with phosphatization ratio, certain compressor efficiency is improved, but still cannot be satisfied demand.Chinese invention patent A kind of wear-resisting compressor crank shaft and preparation method thereof is proposed in CN102628154A, although which improves the resistance to of bent axle Mill property, but it is sufficiently complex from mold manufacturing to specific production process, due also to due to the production of stomata and dreg defect in product It is raw, high rejection rate, while manufacturing blank needs and reserving compared with margin, then be processed through multiple working procedure, stock utilization is low, adds Work complex procedures, low production efficiency, for this purpose, it is proposed that a kind of compressor crank shaft preparation method.
Invention content
It is mentioned above in the background art to solve the purpose of the present invention is to provide a kind of compressor crank shaft preparation method Problem.
To achieve the above object, the present invention provides the following technical solutions:A kind of compressor crank shaft preparation method, including it is as follows Step:
(1) blanking and peeling:No. 45 steel of refining, chemical analysis and mechanical performance are selected to meet the rule of GB699 and GB3077 It is fixed, and require Mo < 0.1% and through hot upset test, blanking is carried out using sawing process, and peeling is carried out to the material after blanking;
(2) it heats and forges:Using step-by-step movement heated by gas stove heat, then forged, forging process be divided into blocking, Finish-forging twice work step;
(3) trimming and torsion are turned:Forging trimming on crank press after finish-forging forming, is turned in torsion on machine after bent axle trimming Turn round and turns;
(4) correction process:Bent axle after turning is corrected twice, calibration equipment hydraulic corrector, after correcting for the first time, rotation Turn 90 ° of progress second-order corrections, the temperature of correction is maintained at 850 DEG C or so;
(5) it is heat-treated:Bent axle after correction will be heat-treated, and the bent axle of 45 steel of refining requires normalized treatment, heat treatment Bent axle hardness afterwards is HB180-228, and grain size is 5-8 grades;
(6) it clears up:Bent axle after heat treatment checked, wherein main shaft diameter run-out tolerance, connecting rod diameter angle and heat treatment Hardness will carry out a hundred percent inspection, and the selective examination of remaining size checks and obtains finished product after all qualified bent axle is handled by immersion oil.
Preferably, the initial forging temperature in the step (2) is 1170-1200 DEG C.
Preferably, it is 950-1050 DEG C that bent axle, which turns round the temperature turned, in the step (2).
Preferably, the underproof bent axle of run-out tolerance carries out cold alignment in the step (6) and stress relief annealing, hardness are unqualified Bent axle re-start heat treatment.
Preferably, the underproof bent axle of connecting rod diameter angle is individually placed in the step (6), after certain batch, again It is corrected process.
Compared with prior art, the beneficial effects of the invention are as follows:The present invention is forged using hotdie forging press, can be into Row multimode thorax die forging, automated production, forging precision is high, and bent axle is prepared by using forging technology, has production efficiency high Advantage can form complete automatic forging assembly line, avoid the problem of complex process and high rejection rate, solve existing bent axle Production technology is sufficiently complex from mold manufacturing to specific production process, due also to due to the production of stomata and dreg defect in product It is raw, high rejection rate, while manufacturing blank needs and reserving compared with margin, then be processed through multiple working procedure, stock utilization is low, adds The problem of work complex procedures, low production efficiency.
Specific implementation mode
The following is a clear and complete description of the technical scheme in the embodiments of the invention, it is clear that described embodiment Only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, the common skill in this field The every other embodiment that art personnel are obtained without making creative work belongs to the model that the present invention protects It encloses.
The present invention provides a kind of technical solution:A kind of compressor crank shaft preparation method, includes the following steps:
(1) blanking and peeling:No. 45 steel of refining, chemical analysis and mechanical performance are selected to meet the rule of GB699 and GB3077 It is fixed, and require Mo < 0.1% and through hot upset test, blanking is carried out using sawing process, and peeling is carried out to the material after blanking;
(2) it heats and forges:Using step-by-step movement heated by gas stove heat, then forged, forging process be divided into blocking, Finish-forging twice work step;
(3) trimming and torsion are turned:Forging trimming on crank press after finish-forging forming, is turned in torsion on machine after bent axle trimming Turn round and turns;
(4) correction process:Bent axle after turning is corrected twice, calibration equipment hydraulic corrector, after correcting for the first time, rotation Turn 90 ° of progress second-order corrections, the temperature of correction is maintained at 850 DEG C or so;
(5) it is heat-treated:Bent axle after correction will be heat-treated, and the bent axle of 45 steel of refining requires normalized treatment, heat treatment Bent axle hardness afterwards is HB180-228, and grain size is 5-8 grades;
(6) it clears up:Bent axle after heat treatment checked, wherein main shaft diameter run-out tolerance, connecting rod diameter angle and heat treatment Hardness will carry out a hundred percent inspection, and the selective examination of remaining size checks and obtains finished product after all qualified bent axle is handled by immersion oil.
Embodiment one:
No. 45 steel of refining are selected first, and chemical analysis and mechanical performance meet the regulation of GB699 and GB3077, and require Mo < 0.1% and through hot upset test, carries out blanking, and carry out peeling to the material after blanking using sawing process;Then using step It into formula heated by gas stove heat, is then forged, forging process is divided into blocking, finish-forging twice work step;Forging after finish-forging forming Part trimming on crank press is turned to carry out turning round on machine and be turned after bent axle trimming in torsion;Bent axle after turning is corrected twice, correction Equipment hydraulic corrector is rotated by 90 ° carry out second-order correction, the temperature of correction is maintained at 850 DEG C or so after correcting for the first time; Bent axle after correction will be heat-treated, the bent axle requirement normalized treatment of 45 steel of refining, and the bent axle hardness after heat treatment is HB180-228, grain size are 5-8 grades;Bent axle after heat treatment checked, wherein main shaft diameter run-out tolerance, connecting rod diameter angle A hundred percent inspection, remaining size selective examination, after checking that all qualified bent axle is handled by immersion oil are carried out with heat treatment hardness Obtain finished product.
Embodiment two:
In embodiment one, following processes are added:
Initial forging temperature in step (2) is 1170-1200 DEG C;It is 950-1050 DEG C that bent axle, which turns round the temperature turned, in step (2).
No. 45 steel of refining are selected first, and chemical analysis and mechanical performance meet the regulation of GB699 and GB3077, and require Mo < 0.1% and through hot upset test, carries out blanking, and carry out peeling to the material after blanking using sawing process;Then using step Into formula heated by gas stove heat, wherein initial forging temperature is 1170-1200 DEG C, is then forged, forging process is divided into blocking, end Forge twice work step;Forging trimming on crank press after finish-forging forming is turned to carry out turning round on machine and be turned after bent axle trimming in torsion, It is 950-1050 DEG C that middle bent axle, which turns round the temperature turned,;Bent axle after turning is corrected twice, calibration equipment hydraulic corrector, for the first time After correction, it is rotated by 90 ° carry out second-order correction, the temperature of correction is maintained at 850 DEG C or so;Bent axle after correction will carry out hot place The bent axle of reason, 45 steel of refining requires normalized treatment, and the bent axle hardness after heat treatment is HB180-228, and grain size is 5-8 grades;Heat Treated, and bent axle is checked, wherein main shaft diameter run-out tolerance, connecting rod diameter angle and heat treatment hardness will carry out absolutely It checks, the selective examination of remaining size, checks and obtain finished product after all qualified bent axle is handled by immersion oil.
Embodiment three:
In embodiment two, following processes are added:
The underproof bent axle of run-out tolerance carries out cold alignment and stress relief annealing in step (6), and the underproof bent axle of hardness is again It is heat-treated.
No. 45 steel of refining are selected first, and chemical analysis and mechanical performance meet the regulation of GB699 and GB3077, and require Mo < 0.1% and through hot upset test, carries out blanking, and carry out peeling to the material after blanking using sawing process;Then using step Into formula heated by gas stove heat, wherein initial forging temperature is 1170-1200 DEG C, is then forged, forging process is divided into blocking, end Forge twice work step;Forging trimming on crank press after finish-forging forming is turned to carry out turning round on machine and be turned after bent axle trimming in torsion, It is 950-1050 DEG C that middle bent axle, which turns round the temperature turned,;Bent axle after turning is corrected twice, calibration equipment hydraulic corrector, for the first time After correction, it is rotated by 90 ° carry out second-order correction, the temperature of correction is maintained at 850 DEG C or so;Bent axle after correction will carry out hot place The bent axle of reason, 45 steel of refining requires normalized treatment, and the bent axle hardness after heat treatment is HB180-228, and grain size is 5-8 grades;Heat Treated, and bent axle is checked, wherein main shaft diameter run-out tolerance, connecting rod diameter angle and heat treatment hardness will carry out absolutely It checks, the selective examination of remaining size, checks and obtain finished product after all qualified bent axle is handled by immersion oil;When the underproof bent axle of run-out tolerance Cold alignment and stress relief annealing are carried out, the underproof bent axle of hardness re-starts heat treatment.
Example IV:
In embodiment three, following processes are added:
The underproof bent axle of connecting rod diameter angle is individually placed in step (6), after certain batch, re-starts correction work Sequence.
No. 45 steel of refining are selected first, and chemical analysis and mechanical performance meet the regulation of GB699 and GB3077, and require Mo < 0.1% and through hot upset test, carries out blanking, and carry out peeling to the material after blanking using sawing process;Then using step Into formula heated by gas stove heat, wherein initial forging temperature is 1170-1200 DEG C, is then forged, forging process is divided into blocking, end Forge twice work step;Forging trimming on crank press after finish-forging forming is turned to carry out turning round on machine and be turned after bent axle trimming in torsion, It is 950-1050 DEG C that middle bent axle, which turns round the temperature turned,;Bent axle after turning is corrected twice, calibration equipment hydraulic corrector, for the first time After correction, it is rotated by 90 ° carry out second-order correction, the temperature of correction is maintained at 850 DEG C or so;Bent axle after correction will carry out hot place The bent axle of reason, 45 steel of refining requires normalized treatment, and the bent axle hardness after heat treatment is HB180-228, and grain size is 5-8 grades;Heat Treated, and bent axle is checked, wherein main shaft diameter run-out tolerance, connecting rod diameter angle and heat treatment hardness will carry out absolutely It checks, the selective examination of remaining size, checks and obtain finished product after all qualified bent axle is handled by immersion oil;When the underproof bent axle of run-out tolerance Cold alignment and stress relief annealing are carried out, the underproof bent axle of hardness re-starts heat treatment;When the underproof song of connecting rod diameter angle Axis is individually placed, after certain batch, re-starts correcting process.
The present invention is forged using hotdie forging press, can carry out multimode thorax die forging, automated production, forging precision Height prepares bent axle by using forging technology, has the advantages that production efficiency is high, can form complete automatic forging flowing water Line avoids the problem of complex process and high rejection rate, solves existing Production of Crankshaft technology from mold manufacturing to specific production Process is sufficiently complex, due also to due to the generation of stomata and dreg defect, high rejection rate in product, while manufacturing blank needs and staying Go out compared with margin, then is processed through multiple working procedure, the problem of stock utilization is low, manufacturing procedure is complicated, low production efficiency.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of variations, modification, replace And modification, the scope of the present invention is defined by the appended.

Claims (5)

1. a kind of compressor crank shaft preparation method, it is characterised in that:Include the following steps:
(1) blanking and peeling:No. 45 steel of refining, chemical analysis and mechanical performance are selected to meet the regulation of GB699 and GB3077, and It is required that Mo < 0.1% and through hot upset test, carry out blanking, and carry out peeling to the material after blanking using sawing process;
(2) it heats and forges:It using step-by-step movement heated by gas stove heat, is then forged, forging process is divided into blocking, finish-forging Twice work step;
(3) trimming and torsion are turned:Forging trimming on crank press after finish-forging forming, turns in torsion after bent axle trimming and is carried out on machine Torsion is turned;
(4) correction process:Bent axle after turning is corrected twice, calibration equipment hydraulic corrector, after correcting for the first time, rotation 90 ° of progress second-order corrections, the temperature of correction are maintained at 850 DEG C or so;
(5) it is heat-treated:Bent axle after correction will be heat-treated, and the bent axle of 45 steel of refining requires normalized treatment, after heat treatment Bent axle hardness is HB180-228, and grain size is 5-8 grades;
(6) it clears up:Bent axle after heat treatment checked, wherein main shaft diameter run-out tolerance, connecting rod diameter angle and heat treatment hardness A hundred percent inspection is carried out, the selective examination of remaining size checks and obtains finished product after all qualified bent axle is handled by immersion oil.
2. a kind of compressor crank shaft preparation method according to claim 1, it is characterised in that:Beginning in the step (2) It is 1170-1200 DEG C to forge temperature.
3. a kind of compressor crank shaft preparation method according to claim 1, it is characterised in that:Bent axle in the step (2) It is 950-1050 DEG C to turn round the temperature turned.
4. a kind of compressor crank shaft preparation method according to claim 1, it is characterised in that:Run-out tolerance in the step (6) Underproof bent axle carries out cold alignment and stress relief annealing, the underproof bent axle of hardness re-start heat treatment.
5. a kind of compressor crank shaft preparation method according to claim 1, it is characterised in that:Connecting rod in the step (6) The underproof bent axle of diameter angle is individually placed, after certain batch, re-starts correcting process.
CN201810440348.0A 2018-05-10 2018-05-10 A kind of compressor crank shaft preparation method Pending CN108620826A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810440348.0A CN108620826A (en) 2018-05-10 2018-05-10 A kind of compressor crank shaft preparation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810440348.0A CN108620826A (en) 2018-05-10 2018-05-10 A kind of compressor crank shaft preparation method

Publications (1)

Publication Number Publication Date
CN108620826A true CN108620826A (en) 2018-10-09

Family

ID=63692207

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810440348.0A Pending CN108620826A (en) 2018-05-10 2018-05-10 A kind of compressor crank shaft preparation method

Country Status (1)

Country Link
CN (1) CN108620826A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115446554A (en) * 2022-10-09 2022-12-09 安徽扬山联合精密技术有限公司 Compressor crankshaft production process

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101823116A (en) * 2010-05-11 2010-09-08 林素伟 Forging process for engine crankshaft of excavator
CN102451876A (en) * 2010-10-22 2012-05-16 株式会社梅塔拉特 Manufacturing method of crankshaft and crankshaft manufactured through the same
CN102989983A (en) * 2012-08-22 2013-03-27 昌利锻造有限公司 Forging method of automobile engine crankshaft
WO2017089977A1 (en) * 2015-11-24 2017-06-01 Bharat Forge Limited A forged crankshaft and a process of making it

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101823116A (en) * 2010-05-11 2010-09-08 林素伟 Forging process for engine crankshaft of excavator
CN102451876A (en) * 2010-10-22 2012-05-16 株式会社梅塔拉特 Manufacturing method of crankshaft and crankshaft manufactured through the same
CN102989983A (en) * 2012-08-22 2013-03-27 昌利锻造有限公司 Forging method of automobile engine crankshaft
WO2017089977A1 (en) * 2015-11-24 2017-06-01 Bharat Forge Limited A forged crankshaft and a process of making it

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
付翔: "曲轴锻造、扭拐工艺的研究和实践", 《锻压技术》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115446554A (en) * 2022-10-09 2022-12-09 安徽扬山联合精密技术有限公司 Compressor crankshaft production process

Similar Documents

Publication Publication Date Title
CN109822024B (en) Forging and heat treatment process of 750 ℃ high-temperature alloy forging
EP2703100B1 (en) Fabrication method for stepped forged material
JPWO2005075121A1 (en) Cold-finished seamless steel pipe
CN107283122A (en) A kind of manufacturing process of automobile hollow semiaxis
CN105057988A (en) Method for preparing turbine sealing rings through alloy wire rod
CN102699104A (en) Preparation method of G20CrNiMo bearing steel pipe
CN108672624A (en) A kind of nickel base superalloy ring forging method
CN108620826A (en) A kind of compressor crank shaft preparation method
CN106826142B (en) The manufacturing method of automobile gearbox jackshaft
CN112935173A (en) Bearing sleeve forge piece die forging blank making and die ring rolling forming process
CN107486524A (en) A kind of preparation method of titanium alloy cake material
CN114472776A (en) Die forging blank making and die ring rolling forming process for high-neck flange forging for wind tower
CN111451425B (en) Forging method for controlling white point defect
CN107716587A (en) A kind of processing method of thin-wall titanium alloy pipe
CN106001343A (en) Free forging process for large hoisting ring
CN107322250A (en) A kind of preparation method of gear ring
CN104791368A (en) Separable crankshaft processing process
CN114317932B (en) Heat treatment method for obtaining balanced state tissue of thick-wall high-cylinder ring forging
CN104057250A (en) Processing technology for guaranteeing assembling interchangeability of inner and outer rings of revolving support
CN111715817B (en) Method for improving rotary forging yield of titanium alloy wire
CN112589020A (en) Waspaloy thin-wall ring forging forming method
CN105755407A (en) Correction method for deformation of aluminum alloy processing piece
CN107497988A (en) A kind of processing method of high temperature alloy Step Shaft
CN105935738B (en) A kind of forging technology of ledeburite steel shaft
CN108817288A (en) A kind of 23Co14Ni12Cr3Mo steel forgings forging forming method with high-intensity and high-tenacity

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181009

WD01 Invention patent application deemed withdrawn after publication