CN108620814A - A kind of production method of aluminum alloy doors and windows - Google Patents
A kind of production method of aluminum alloy doors and windows Download PDFInfo
- Publication number
- CN108620814A CN108620814A CN201710160417.8A CN201710160417A CN108620814A CN 108620814 A CN108620814 A CN 108620814A CN 201710160417 A CN201710160417 A CN 201710160417A CN 108620814 A CN108620814 A CN 108620814A
- Authority
- CN
- China
- Prior art keywords
- osculum
- milling
- production method
- aluminum alloy
- proximate matter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P15/00—Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Joining Of Corner Units Of Frames Or Wings (AREA)
Abstract
The present invention provides a kind of production method of aluminum alloy doors and windows, includes the following steps:A1, stock:Blank size is determined according to drawing and lower material list, other accessories are got ready using milling machine and punching machine using corner brace machine-cut chamfer code using double corner saw sawing principal mode materials;A2, hole milling:Number, the position milling osculum of osculum are determined after stock according to drawing requirement;A3, group angle:By corner brace, rear upper corner combining machine completes positioning fixed step along angle seam alignment proximate matter;A4, assembling:Corresponding sealed ubber strip is loaded onto to proximate matter by drawing, after then installing aluminium draw runner, glazing bead, handware successively, glass gasket is loaded onto after being bumped into glass, is completed.A kind of production method of aluminum alloy doors and windows of offer of the present invention, production method is simple to operation, and high yield rate improves production efficiency.
Description
Technical field
The present invention relates to a kind of production method of door and window, more particularly to a kind of production method of aluminum alloy doors and windows.
Background technology
Shown according to the statistics of Chinese architecture metal structure association, at present the building doors and windows product in China in the market,
Aluminium door and window product proportion is maximum, is 55%.Aluminum alloy doors and windows have light, high-strength, good seal performance, handsome in appearance, resistance to
The advantages that corrosivity is strong, maintenance is simple.
Aluminum alloy doors and windows currently on the market are unstable due to production method, cause the aluminum alloy doors and windows matter produced
Amount ginseng is eaten uneven.
Invention content
The object of the present invention is to provide a kind of production methods of aluminum alloy doors and windows, and production method is simple to operation, yield rate
Height improves production efficiency.
The technical solution adopted by the present invention is:
A kind of production method of aluminum alloy doors and windows, it is characterised in that:This approach includes the following steps:
A1, stock:According to requiring to determine blank size, using double corner saw sawing principal mode materials, using corner brace machine-cut chamfer code,
Other accessories are got ready using milling machine and punching machine;
A2, hole milling:According to number, the position milling osculum for requiring determining osculum after stock;
A3, group angle:It is as follows:
Section material section and corner brace are cleaned, wiping the position of preparation gluing after no greasy dirt with wet rag makes it keep centainly wet
Degree;
Group angle glue is applied in right amount on effective contact surface of corner brace and proximate matter and proximate matter connects on section;
By corner brace, rear upper corner combining machine completes positioning fixed step along angle seam alignment proximate matter;
It is quiet behind group angle to put 12h or more, ensure to enter the next step after glue parches completely;
A4, assembling:Corresponding sealed ubber strip is loaded onto to proximate matter by drawing, then installs aluminium draw runner, glass pressure successively
After item, handware, glass gasket is loaded onto after being bumped into glass, is completed.
Preferably, the osculum answers milling in special drainage cavity bottom, 1 draining of milling when expecting length L≤500mm
Hole, draining hole site is placed in the middle, 2 osculums of milling when 500mm ﹤ L≤1000mm, and draining hole site is away from profiled ends 100mm, draining
Endoporus and exit orifice should misplace 25mm-35mm, and osculum should be fanned at the 150mm of end away from every side and drill through 5 holes Φ, should misplace up and down
The osculum of 25mm, middle stile should be corresponding with the osculum of frame.It is drilled with air equalizer opening Φ at the outside drainage system on frame top
5, both sides at the 200mm of end far from respectively drilling through one.
Preferably, the glass gasket includes spacer pad and load-bearing cushion block, and cushion pad is placed in the groove of proximate matter,
Per two pieces of side, every piece of center line is away from frame end 150mm.
Specific implementation mode
In order to better understand the present invention, the present invention is further described with reference to specific embodiment.
The present invention provides a kind of production method of aluminum alloy doors and windows, includes the following steps:
The first step, stock:It is cut using corner brace machine-cut using double corner saw sawing principal mode materials according to determining blank size is required
Corner brace is sawed using glazing bead and gets other accessories ready using milling machine and punching machine.
Second step, hole milling:Determine that number, the position milling osculum of osculum, osculum are answered after stock according to drawing requirement
Milling is in special drainage cavity bottom, and 1 osculum of milling when expecting length L≤500mm, draining hole site is placed in the middle, and 500mm ﹤ L≤
2 osculums of milling when 1000mm, away from profiled ends 100mm, draining endoporus and exit orifice should misplace 25mm-35mm for draining hole site,
Osculum should be fanned at the 150mm of end away from every side and drill through 5 holes Φ, and should misplace 25mm up and down, and the osculum of middle stile should be with the draining of frame
Hole is corresponding.It is drilled with air equalizer opening Φ 5 at the outside drainage system on frame top, both sides at the 200mm of end far from respectively drilling through one.
Third walks, and organizes angle:It is as follows:
Section material section and corner brace are cleaned, wiping the position of preparation gluing after no greasy dirt with wet rag makes it keep centainly wet
Degree;
Group angle glue is applied in right amount on effective contact surface of corner brace and proximate matter and proximate matter connects on section;
By corner brace, rear upper corner combining machine completes positioning fixed step along angle seam alignment proximate matter;
It is quiet behind group angle to put 12h or more, ensure to enter the next step after glue parches completely.
4th step, assembling:Corresponding sealed ubber strip is loaded onto to proximate matter by drawing, then installs aluminium draw runner, glass successively
After glass press strip, handware, glass gasket is loaded onto after being bumped into glass, glass gasket includes spacer pad and load-bearing cushion block, cushion pad
It is placed in the groove of proximate matter, per two pieces of side, every piece of center line is completed away from frame end 150mm after installing glass gasket.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also include other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that
There is also other identical elements in process, method, article or equipment including the element.
Finally it should be noted that:Obviously, the above embodiment is merely an example for clearly illustrating the present invention, and simultaneously
The non-restriction to embodiment.For those of ordinary skill in the art, it can also do on the basis of the above description
Go out other various forms of variations or variation.There is no necessity and possibility to exhaust all the enbodiments.And thus drawn
The obvious changes or variations that Shen goes out are still in the protection scope of this invention.
Claims (3)
1. a kind of production method of aluminum alloy doors and windows, it is characterised in that:This approach includes the following steps:
A1, stock:According to determining blank size is required, using double corner saw sawing principal mode materials, corner brace machine-cut chamfer code is used, is used
Milling machine and punching machine get other accessories ready;
A2, hole milling:According to number, the position milling osculum for requiring determining osculum after stock;
A3, group angle:It is as follows:
Section material section and corner brace are cleaned, wiping the position of preparation gluing after no greasy dirt with wet rag makes it keep certain humidity;
Group angle glue is applied in right amount on effective contact surface of corner brace and proximate matter and proximate matter connects on section;
By corner brace, rear upper corner combining machine completes positioning fixed step along angle seam alignment proximate matter;
It is quiet behind group angle to put 12h or more, ensure to enter the next step after glue parches completely;
A4, assembling:Corresponding sealed ubber strip is loaded onto to proximate matter by drawing, then installs aluminium draw runner, glazing bead, five successively
After golden part, glass gasket is loaded onto after being bumped into glass, is completed.
2. a kind of production method of aluminum alloy doors and windows according to claim 1, it is characterised in that:The osculum answers milling
In special drainage cavity bottom, 1 osculum of milling when expecting length L≤500mm, draining hole site is placed in the middle, 500mm ﹤ L≤1000mm
When 2 osculums of milling, draining hole site is away from profiled ends 100mm, and draining endoporus and exit orifice should misplace 25mm-35mm, osculum
It should be fanned away from every side at the 150mm of end and drill through 5 holes Φ, should misplace 25mm up and down, and the osculum of middle stile should be opposite with the osculum of frame
It answers.It is drilled with air equalizer opening Φ 5 at the outside drainage system on frame top, both sides at the 200mm of end far from respectively drilling through one.
3. a kind of production method of aluminum alloy doors and windows according to claim 1, it is characterised in that:The glass gasket packet
Spacer pad and load-bearing cushion block are included, cushion pad is placed in the groove of proximate matter, and per two pieces of side, every piece of center line is away from frame end
150mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710160417.8A CN108620814A (en) | 2017-03-17 | 2017-03-17 | A kind of production method of aluminum alloy doors and windows |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710160417.8A CN108620814A (en) | 2017-03-17 | 2017-03-17 | A kind of production method of aluminum alloy doors and windows |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108620814A true CN108620814A (en) | 2018-10-09 |
Family
ID=63686995
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710160417.8A Pending CN108620814A (en) | 2017-03-17 | 2017-03-17 | A kind of production method of aluminum alloy doors and windows |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108620814A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111058732A (en) * | 2019-12-19 | 2020-04-24 | 广州诗尼曼家居股份有限公司 | Assembling method of aluminum frame door free of corner connectors |
CN112211536A (en) * | 2020-09-10 | 2021-01-12 | 斯科瑞新材料科技(山东)股份有限公司 | Water-blocking sealing process for doors and windows |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5103891A (en) * | 1990-02-05 | 1992-04-14 | Cmi International, Inc. | Resurfaced worn flask walls |
CN101244628A (en) * | 2007-02-14 | 2008-08-20 | 山西惠丰机械工业有限公司 | Welding process for aluminum plastics door and window |
CN201358678Y (en) * | 2008-12-25 | 2009-12-09 | 北京嘉寓门窗幕墙股份有限公司 | Aluminum alloy door window with outer frame sealing adhesive tape |
CN101967940A (en) * | 2010-08-26 | 2011-02-09 | 陕西建工集团第一建筑工程有限公司 | Method for manufacturing heat insulation bridge-cut-off aluminum alloy window |
CN105798543A (en) * | 2014-12-31 | 2016-07-27 | 天津市日月门窗有限公司 | Construction process for aluminum alloy door and window |
-
2017
- 2017-03-17 CN CN201710160417.8A patent/CN108620814A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5103891A (en) * | 1990-02-05 | 1992-04-14 | Cmi International, Inc. | Resurfaced worn flask walls |
CN101244628A (en) * | 2007-02-14 | 2008-08-20 | 山西惠丰机械工业有限公司 | Welding process for aluminum plastics door and window |
CN201358678Y (en) * | 2008-12-25 | 2009-12-09 | 北京嘉寓门窗幕墙股份有限公司 | Aluminum alloy door window with outer frame sealing adhesive tape |
CN101967940A (en) * | 2010-08-26 | 2011-02-09 | 陕西建工集团第一建筑工程有限公司 | Method for manufacturing heat insulation bridge-cut-off aluminum alloy window |
CN105798543A (en) * | 2014-12-31 | 2016-07-27 | 天津市日月门窗有限公司 | Construction process for aluminum alloy door and window |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111058732A (en) * | 2019-12-19 | 2020-04-24 | 广州诗尼曼家居股份有限公司 | Assembling method of aluminum frame door free of corner connectors |
CN112211536A (en) * | 2020-09-10 | 2021-01-12 | 斯科瑞新材料科技(山东)股份有限公司 | Water-blocking sealing process for doors and windows |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108620814A (en) | A kind of production method of aluminum alloy doors and windows | |
ATE470776T1 (en) | DOOR OR WINDOW CONSTRUCTION, ESPECIALLY FOR WINDOW OR GLASS FACADES | |
GB2430720A (en) | Frame construction | |
CN205530830U (en) | Outer aluminium fire prevention glass partition wall of interior steel | |
WO2018072272A1 (en) | Glazed window or door having solder-free frame members | |
CN202299900U (en) | Aluminum-wood composite window | |
CN104265120B (en) | The energy-conserving reconstruction method of the old window of the plug-type aluminum-alloy single-glass of a kind of existing building | |
CN211500306U (en) | Aluminum-plastic composite section for energy-saving door and window | |
CN210976241U (en) | Large-span glass curtain wall structure | |
DE502004008724D1 (en) | Wood window system | |
CN2421391Y (en) | Door and window | |
CN207212109U (en) | A kind of lower frame aluminium section bar and the door and window with drainage system | |
CN212194647U (en) | Aluminum product inner structure | |
CN200971699Y (en) | Door and window frame connector | |
CN103615052B (en) | A kind of unit type curtain wall encapsulating method | |
CN204782516U (en) | Energy -conserving window of full glass of frameless | |
CN211776903U (en) | Novel spliced glazing bead of aluminum alloy window | |
CN215108536U (en) | Novel sound-proof aluminum profile structure | |
CN220167793U (en) | Sliding type aluminum alloy door and window | |
CN210649550U (en) | Door and window frame side trompil device | |
CN108193984A (en) | A kind of energy-saving aluminium plastic composite section bar passive type door and window | |
CN206477737U (en) | A kind of medical door pocket of energy Fast Installation | |
CN208650749U (en) | A kind of window that soundproof effect is good | |
CN213683843U (en) | Aluminum alloy door and window | |
CN215108340U (en) | Hollow energy-saving inward-opening inward-falling type heat insulation window |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20181009 |