A kind of high-low pressure complete set of equipments cabinet Download PDF

Info

Publication number
CN108616046A
CN108616046A CN201810310483.3A CN201810310483A CN108616046A CN 108616046 A CN108616046 A CN 108616046A CN 201810310483 A CN201810310483 A CN 201810310483A CN 108616046 A CN108616046 A CN 108616046A
Authority
CN
China
Prior art keywords
equipment cabinet
low pressure
complete set
heating device
pressure complete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810310483.3A
Other languages
Chinese (zh)
Other versions
CN108616046B (en
Inventor
胡德鸿
刘永飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chuzhou Huifeng Electric Co.,Ltd.
Original Assignee
Huaibei Da Chi Electric Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaibei Da Chi Electric Technology Co Ltd filed Critical Huaibei Da Chi Electric Technology Co Ltd
Priority to CN201810310483.3A priority Critical patent/CN108616046B/en
Publication of CN108616046A publication Critical patent/CN108616046A/en
Application granted granted Critical
Publication of CN108616046B publication Critical patent/CN108616046B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/26Casings; Parts thereof or accessories therefor
    • H02B1/30Cabinet-type casings; Parts thereof or accessories therefor
    • H02B1/303Bases or feet
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/26Casings; Parts thereof or accessories therefor
    • H02B1/28Casings; Parts thereof or accessories therefor dustproof, splashproof, drip-proof, waterproof or flameproof
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/26Casings; Parts thereof or accessories therefor
    • H02B1/30Cabinet-type casings; Parts thereof or accessories therefor
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/56Cooling; Ventilation
    • H02B1/565Cooling; Ventilation for cabinets

Abstract

The invention discloses a kind of high-low pressure complete set of equipments cabinets,Including fixed placement pedestal and the equipment cabinet for being disposed thereon end,Heating device case is equipped in the groove,The both sides of the heating device case are equipped with air inlet openings straight slot,The heating device case is internally provided with the cavity for installing fan,It is fixed with heater strip in the rectangular slab intermediate openings,Air inlet duct is equipped in the middle part of the lower end of the cover board,The left and right sides of the cover board is equipped with the ventilation duct of opening upwards,The upper end of the ventilation duct stretches in the gap between the two side and protective plate of equipment cabinet,Heater strip of the present invention heats after being powered,Fan work,The hot-air that heater strip generates is blowed into air inlet duct,Finally it is blown in the gap between the two side and protective plate of equipment cabinet via the ventilation duct being connected to air inlet duct,To improve the bulk temperature inside equipment cabinet body,Prevent equipment cabinet body internal temperature too low,Cause equipment damage inside equipment cabinet body.

Description

A kind of high-low pressure complete set of equipments cabinet
Technical field
The present invention relates to high-low pressure complete set of equipments cabinet technical field, specially a kind of high-low pressure complete set of equipments cabinet knot Structure.
Background technology
High-low pressure complete set of equipments includes switchgear, distribution board, control cabinet, the electrical equipments such as switch-box.Power distribution cabinet (case) point Dynamic power distribution cabinet (case) and light distribution cabinet (case), metering cabinet (case), are the final stage devices of distribution system.Power distribution cabinet is motor The general designation of control centre.Power distribution cabinet is used in the occasion that load is more dispersed, circuit is less;Motor control center is used for load It concentrates, the occasion that circuit is more.The electric energy of a certain circuit of upper level controller switching equipment is distributed to load nearby by they.This grade is set Standby reply load provides protection, monitoring and control.
The use of high-low pressure complete set of equipments appears in some extreme environments, such as under severe cold condition, to equipment Performance requirement is high, once causing equipment to stop using or damage since temperature is too low, causes economic loss, can also be people Life make troubles.
The shell structure of high-low pressure complete set of equipments is generally overall structure, since volume is larger, is unfavorable for the fortune before assembling It is defeated, usually the temperature in use of its internal component is added using heating device case in the shell structure of high-low pressure complete set of equipments Heat, heating device case often occupy the more space in the shell structure of high-low pressure complete set of equipments, are thus unfavorable for height It is pressed into the installation of the shell structure internal component of complete equipment;
Temperature diffusion is slow when the shell internally heating apparatus heating of high-low pressure complete set of equipments at present, and local temperature is high, heating Device is exposed unshielded.And existing technology has the following disadvantages:Since the prodigious area of some humidity is in certain seasons, due to temperature The change dramatically of degree is easy to form condensation in power distribution cabinet, and steam deposits in cabinet to be easy to cause electric short circuit and cause accident.
For this purpose, we release a kind of high-low pressure complete set of equipments cabinet.
Invention content
The purpose of the present invention is to provide a kind of high-low pressure complete set of equipments cabinets, to solve to propose in above-mentioned background technology The problem of.
To achieve the above object, the present invention provides the following technical solutions:A kind of high-low pressure complete set of equipments cabinet, including it is solid Determine pedestal for placed and the equipment cabinet for being disposed thereon end, the inner cavity of the fixed placement pedestal is equipped with groove, in the groove Equipped with heating device case, the both sides of the heating device case are equipped with air inlet openings straight slot, and the heating device case is internally provided with use In the cavity of installation fan, the cavity top is equipped with rectangular slab of the middle part in opening setting, is opened in the middle part of the rectangular slab It is fixed with heater strip in mouthful, the upper end of the heating device case is installed with cover board by sunk screw, under the cover board End middle part is equipped with air inlet duct, and the left and right sides of the cover board is equipped with the ventilation duct of opening upwards, and the ventilation duct connects with air inlet duct Logical, the two side of the equipment cabinet is equipped with the raised plate being vertically arranged, and the two side of the equipment cabinet is solid by raised plate Dingan County is equipped with protective plate, and the upper end of the ventilation duct stretches in the gap between the two side and protective plate of equipment cabinet, institute The bottom for stating equipment cabinet is equipped with square aperture.
Preferably, the lower end of the equipment cabinet is equipped with integrally formed fixed plate, and the fixed plate is bolted In the upper end of fixed placement pedestal.
Preferably, equipment cabinet front, which is connected through the hinge, protective door, is equipped on one side on the outside of the protective door Door handle.
Preferably, the two bottom sides of the groove are equipped with the rubber mount for being used to support heating device bottom portion.
Preferably, cavity top front-rear side walls are equipped with locating slot, and the front and rear part of the rectangular slab is equipped with one between two parties Body formed positioning protrusion, the positioning protrusion are connected in locating slot.
Preferably, the fixed plate is equipped with the opening straight slot for stretching out ventilation duct.
Preferably, the left and right sides of the groove is equipped with the U-type groove for blocking ventilation duct.
Preferably, the protective plate is fixedly connected by screw with raised plate.
Compared with prior art, the beneficial effects of the invention are as follows:Rectangular slab is placed on cavity top and is equipped with by the present invention Opening so that positioning protrusion is connected in locating slot, heating device case is positioned in cavity so that ventilation duct is stuck in U In type groove, then fixed placement pedestal is placed on level ground, equipment cabinet is positioned over the upper end of fixed placement pedestal, makes It obtains ventilation duct to stretch out via opening straight slot, then fixed plate is secured by bolts in the upper end of fixed placement pedestal, thus complete At the integral installation of fixed placement pedestal and equipment cabinet;The dismounting of fixed placement chassis interior equipment is easy for installation, is convenient for Repair is replaced;Heating device case is mounted on fixed placement chassis interior, has saved the inner space of equipment cabinet;Heater strip is powered After heat, fan work, by heater strip generate hot-air blow to air inlet duct, finally blown via the ventilation duct being connected to air inlet duct Into the gap between the two side and protective plate of equipment cabinet, to improve the bulk temperature inside equipment cabinet body, prevent Equipment cabinet body internal temperature is too low, causes equipment damage inside equipment cabinet body;With being capable of quick, uniform eliminating equipment cabinet Interior moisture, installation cost are low, improve equipment safety in utilization.
Description of the drawings
Fig. 1 is fixed placement schematic diagram of base structure of the present invention;
Fig. 2 is cover board of the present invention and heating device tank mounting structure schematic diagram;
Fig. 3 is present device cabinet body structure schematic diagram;
Fig. 4 is present device cabinet and fixed placement base mounting structure schematic diagram;
Fig. 5 is cover board bottom substance schematic diagram of the present invention;
Fig. 6 is protective plate mounting structure schematic diagram of the present invention;
Fig. 7 is that heating device case of the present invention and rectangular slab install decomposition texture schematic diagram.
In figure:1 equipment cabinet, 2 fixed placement pedestals, 3 hinges, 4 protective doors, 5 ventilation ducts, 6 raised plates, 7 cover boards, 8 are consolidated Fixed board, 81 opening straight slots, 82 square apertures, 9 heating device casees, 10 heater strips, 11 air inlet openings straight slots, 12 sunk screws, 13 Air inlet duct, 14 protective plates, 15 screws, 16U type grooves, 17 grooves, 18 rubber mounts, 19 fans, 20 locating slots, 21 rectangular slabs, 22 positioning protrusion, 23 cavitys.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that term "center", "upper", "lower", "left", "right", "vertical", The orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" be based on the orientation or positional relationship shown in the drawings, merely to Convenient for the description present invention and simplify description, do not indicate or imply the indicated device or element must have a particular orientation, With specific azimuth configuration and operation, therefore it is not considered as limiting the invention;Term " first ", " second ", " third " It is used for description purposes only, is not understood to indicate or imply relative importance;In addition, unless otherwise specific regulation and limit Fixed, term " installation ", " connected ", " connection " shall be understood in a broad sense, and can also be detachably to connect for example, it may be being fixedly connected It connects, or is integrally connected;It can be mechanical connection, can also be electrical connection;It can be directly connected, intermediate matchmaker can also be passed through Jie is indirectly connected, and can be the connection inside two elements.It for the ordinary skill in the art, can be with concrete condition Understand the concrete meaning of above-mentioned term in the present invention.
- 7 are please referred to Fig.1, the present invention provides a kind of technical solution:A kind of high-low pressure complete set of equipments cabinet, including fixation The inner cavity of pedestal for placed 2 and the equipment cabinet 1 for being disposed thereon end, the fixed placement pedestal 2 is equipped with groove 17, the groove It is equipped with heating device case 9 in 17, the both sides of the heating device case 9 are equipped with air inlet openings straight slot 11, in the heating device case 9 Portion is equipped with the cavity 23 for installing fan 19, and 23 top of the cavity is equipped with middle part in the rectangular slab 21 of opening setting, institute It states and is fixed with heater strip 10 in 21 intermediate openings of rectangular slab, the upper end of the heating device case 9 is fixed by sunk screw 12 Cover board 7 is installed, air inlet duct 13 is equipped in the middle part of the lower end of the cover board 7, the left and right sides of the cover board 7 is equipped with opening upwards Ventilation duct 5, the ventilation duct 5 are connected to air inlet duct 13, and the two side of the equipment cabinet 1 is equipped with the raised plate being vertically arranged 6, the two side of the equipment cabinet 1 is installed with protective plate 14 by raised plate 6, and the upper end of the ventilation duct 5 stretches to In gap between the two side and protective plate 14 of equipment cabinet 1, the bottom of the equipment cabinet 1 is equipped with square aperture 82.
Specifically, the lower end of the equipment cabinet 1 is equipped with integrally formed fixed plate 8, the fixed plate 8 passes through bolt It is fixed on the upper end of fixed placement pedestal 2.
Specifically, 1 front of equipment cabinet is connected with protective door 4 by hinge 3,4 outside of the protective door is pacified on one side Equipped with door handle.
Specifically, the two bottom sides of the groove 17 are equipped with the rubber mount 18 for being used to support 9 bottom of heating device case.
Specifically, 23 top front-rear side walls of the cavity are equipped with locating slot 20, the front and rear part of the rectangular slab 21 is placed in the middle Equipped with integrally formed positioning protrusion 22, the positioning protrusion 22 is connected in locating slot 20.
Specifically, the fixed plate 8 is equipped with the opening straight slot 81 for stretching out ventilation duct 5.
Specifically, the left and right sides of the groove 17 is equipped with the U-type groove 16 for blocking ventilation duct 5.
Specifically, the protective plate 14 is fixedly connected by screw 15 with raised plate 6.
Specifically, in use, rectangular slab 21 is placed on the opening that 23 top of cavity is equipped with so that positioning protrusion 22 It is connected in locating slot 20, heating device case 9 is positioned in cavity 23 so that ventilation duct 5 is stuck in U-type groove 16, then will Fixed placement pedestal 2 is placed on level ground, and equipment cabinet 1 is positioned over the upper end of fixed placement pedestal 2 so that ventilation duct 5 It is stretched out via opening straight slot 81, then fixed plate 8 is secured by bolts in the upper end of fixed placement pedestal 2, this completes The integral installation of fixed placement pedestal 2 and equipment cabinet 1;Heater strip 10 heats after being powered, and fan 19 works, and heater strip 10 is produced Raw hot-air blows to air inlet duct 13, finally via the ventilation duct 5 being connected to air inlet duct 13 be blown to the two side of equipment cabinet 1 with In gap between protective plate 14, to improve the bulk temperature inside equipment cabinet 1,1 internal temperature of equipment cabinet is prevented It is too low, cause 1 internal unit of equipment cabinet to damage.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of variations, modification, replace And modification, the scope of the present invention is defined by the appended.

Claims (8)

1. a kind of high-low pressure complete set of equipments cabinet, including fixed placement pedestal (2) and the equipment cabinet for being disposed thereon end (1), it is characterised in that:The inner cavity of the fixed placement pedestal (2) is equipped with groove (17), and heating dress is equipped in the groove (17) Case (9) is set, the both sides of the heating device case (9) are equipped with air inlet openings straight slot (11), and the heating device case (9) is internally provided with Cavity (23) for installing fan (19), cavity (23) top are equipped with rectangular slab (21) of the middle part in opening setting, Heater strip (10) is fixed in rectangular slab (21) intermediate openings, the upper end of the heating device case (9) passes through countersunk head spiral shell Nail (12) is installed with cover board (7), and air inlet duct (13), the left and right of the cover board (7) are equipped in the middle part of the lower end of the cover board (7) Both sides are equipped with the ventilation duct (5) of opening upwards, and the ventilation duct (5) is connected to air inlet duct (13), and the two of the equipment cabinet (1) Side wall is equipped with the raised plate (6) that is vertically arranged, and the two side of the equipment cabinet (1) is installed with anti-by raised plate (6) The upper end of backplate (14), the ventilation duct (5) stretches to the gap between the two side of equipment cabinet (1) and protective plate (14) In, the bottom of the equipment cabinet (1) is equipped with square aperture (82).
2. a kind of shell structure of high-low pressure complete set of equipments according to claim 1, it is characterised in that:The equipment cabinet (1) lower end is equipped with integrally formed fixed plate (8), and the fixed plate (8) is secured by bolts in fixed placement pedestal (2) Upper end.
3. a kind of shell structure of high-low pressure complete set of equipments according to claim 1, it is characterised in that:The equipment cabinet (1) front is connected with protective door (4) by hinge (3), and door handle is equipped on one side on the outside of the protective door (4).
4. a kind of shell structure of high-low pressure complete set of equipments according to claim 1, it is characterised in that:The groove (17) Two bottom sides be equipped with and be used to support the rubber mount (18) of heating device case (9) bottom.
5. a kind of shell structure of high-low pressure complete set of equipments according to claim 1, it is characterised in that:The cavity (23) Top front-rear side walls are equipped with locating slot (20), and the front and rear part of the rectangular slab (21) is equipped with integrally formed positioning protrusion between two parties (22), the positioning protrusion (22) is connected in locating slot (20).
6. a kind of shell structure of high-low pressure complete set of equipments according to claim 2, it is characterised in that:The fixed plate (8) it is equipped with the opening straight slot (81) for stretching out ventilation duct (5).
7. a kind of shell structure of high-low pressure complete set of equipments according to claim 1, it is characterised in that:The groove (17) The left and right sides be equipped with U-type groove (16) for blocking ventilation duct (5).
8. a kind of shell structure of high-low pressure complete set of equipments according to claim 1, it is characterised in that:The protective plate (14) it is fixedly connected with raised plate (6) by screw (15).
CN201810310483.3A 2018-04-09 2018-04-09 A kind of high-low pressure complete set of equipments cabinet Active CN108616046B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810310483.3A CN108616046B (en) 2018-04-09 2018-04-09 A kind of high-low pressure complete set of equipments cabinet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810310483.3A CN108616046B (en) 2018-04-09 2018-04-09 A kind of high-low pressure complete set of equipments cabinet

Publications (2)

Publication Number Publication Date
CN108616046A true CN108616046A (en) 2018-10-02
CN108616046B CN108616046B (en) 2019-09-24

Family

ID=63659927

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810310483.3A Active CN108616046B (en) 2018-04-09 2018-04-09 A kind of high-low pressure complete set of equipments cabinet

Country Status (1)

Country Link
CN (1) CN108616046B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111769448A (en) * 2020-06-28 2020-10-13 合肥德源智能科技有限公司 Power system integrated control cabinet for fire engineering

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205377040U (en) * 2016-01-19 2016-07-06 郭新广 Power plant uses novel electric control box
CN106099739A (en) * 2016-08-16 2016-11-09 天津鑫正天电力投资发展有限公司 A kind of ring main unit being provided with wind loop structure
CN106793644A (en) * 2017-01-23 2017-05-31 合肥凯高电气设备有限公司 A kind of outdoor moisture-proof for frequency converter installs case
CN106887793A (en) * 2015-12-15 2017-06-23 天津市威武科技有限公司 Moistureproof distribution box
CN107565415A (en) * 2017-10-28 2018-01-09 邰宝龙 A kind of electric power box of moistureproof rain-proof
CN207069345U (en) * 2017-08-21 2018-03-02 河南省中原智能电气科技有限公司 A kind of moistureproof comprehensive distribution cabinet dried

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106887793A (en) * 2015-12-15 2017-06-23 天津市威武科技有限公司 Moistureproof distribution box
CN205377040U (en) * 2016-01-19 2016-07-06 郭新广 Power plant uses novel electric control box
CN106099739A (en) * 2016-08-16 2016-11-09 天津鑫正天电力投资发展有限公司 A kind of ring main unit being provided with wind loop structure
CN106793644A (en) * 2017-01-23 2017-05-31 合肥凯高电气设备有限公司 A kind of outdoor moisture-proof for frequency converter installs case
CN207069345U (en) * 2017-08-21 2018-03-02 河南省中原智能电气科技有限公司 A kind of moistureproof comprehensive distribution cabinet dried
CN107565415A (en) * 2017-10-28 2018-01-09 邰宝龙 A kind of electric power box of moistureproof rain-proof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111769448A (en) * 2020-06-28 2020-10-13 合肥德源智能科技有限公司 Power system integrated control cabinet for fire engineering

Also Published As

Publication number Publication date
CN108616046B (en) 2019-09-24

Similar Documents

Publication Publication Date Title
CN208299289U (en) A kind of highly-safe power distribution cabinet
CN212726058U (en) Novel dampproofing switch board device
CN110611261A (en) Electrical control cabinet with dehumidification function
CN108616046B (en) A kind of high-low pressure complete set of equipments cabinet
CN211046170U (en) Electrical control cabinet with dehumidification function
CN109038274B (en) Distribution network electrical cabinet and control system thereof
CN110730582A (en) Refrigerating unit electrical appliance control box with built-in protection structure
CN207691252U (en) A kind of electric automatization power distribution cabinet
CN216489320U (en) Cooling device for power distribution cabinet
CN211182915U (en) Solid insulation cabinet that heat dispersion is good
CN108666902B (en) It is a kind of with the complete cabinet that can open top cover
CN213026981U (en) Control cabinet for harbor electromechanical control equipment
CN211017950U (en) Direct current screen convenient to adjust and show angle
CN209658647U (en) Intelligent air exhausting power distribution cabinet
CN206976905U (en) A kind of radiator structure of switch cubicle
CN208226405U (en) A kind of integrated power control cabinet of industrial robot
CN110856404A (en) Network rack mount
CN220511544U (en) Control cabinet with heat dissipation function
CN215816916U (en) High-stability power distribution equipment
CN209805215U (en) Intelligent dehumidifying device for electric power cabinet
CN220273001U (en) Kitchen switch board with safeguard function
CN214069311U (en) Dehumidification device of high-low voltage power distribution cabinet
CN216412806U (en) Anti-creeping transformer convenient to rapidly dissipate heat
CN209233216U (en) A kind of power distribution cabinet being easily installed
CN207320596U (en) A kind of power control cabinet electrical appliance detail assembly panel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201111

Address after: 239000 waist Industrial Park, Anhui, Chuzhou

Patentee after: Chuzhou Huifeng Electric Co.,Ltd.

Address before: 235143 Linhuan Town Industrial Park Area A, Lixi County, Huaibei City, Anhui Province

Patentee before: HUAIBEI DACHI ELECTRIC TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right