CN108612436A - A kind of bridge cut-off sectional material connection structure and connection method - Google Patents
A kind of bridge cut-off sectional material connection structure and connection method Download PDFInfo
- Publication number
- CN108612436A CN108612436A CN201810662180.8A CN201810662180A CN108612436A CN 108612436 A CN108612436 A CN 108612436A CN 201810662180 A CN201810662180 A CN 201810662180A CN 108612436 A CN108612436 A CN 108612436A
- Authority
- CN
- China
- Prior art keywords
- proximate matter
- jointing part
- section
- section jointing
- bridge cut
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000000463 material Substances 0.000 title claims abstract description 33
- 238000000034 method Methods 0.000 title claims description 12
- 239000003292 glue Substances 0.000 claims abstract description 37
- 241000469816 Varus Species 0.000 claims description 12
- 229910000838 Al alloy Inorganic materials 0.000 claims description 9
- 238000001125 extrusion Methods 0.000 claims description 8
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 6
- 210000002421 cell wall Anatomy 0.000 claims description 5
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 claims description 4
- 239000004677 Nylon Substances 0.000 claims description 4
- 239000010949 copper Substances 0.000 claims description 4
- 229920001778 nylon Polymers 0.000 claims description 4
- 229910000881 Cu alloy Inorganic materials 0.000 claims description 2
- 239000000956 alloy Substances 0.000 claims description 2
- 229910052742 iron Inorganic materials 0.000 claims description 2
- 239000000853 adhesive Substances 0.000 claims 1
- 230000001070 adhesive effect Effects 0.000 claims 1
- 238000004519 manufacturing process Methods 0.000 abstract description 4
- 230000003340 mental effect Effects 0.000 abstract description 4
- 235000008331 Pinus X rigitaeda Nutrition 0.000 abstract description 3
- 235000011613 Pinus brutia Nutrition 0.000 abstract description 3
- 241000018646 Pinus brutia Species 0.000 abstract description 3
- 238000007906 compression Methods 0.000 abstract description 2
- 230000009977 dual effect Effects 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 4
- 229910052751 metal Inorganic materials 0.000 description 4
- 239000002184 metal Substances 0.000 description 4
- 238000005457 optimization Methods 0.000 description 3
- VTYYLEPIZMXCLO-UHFFFAOYSA-L Calcium carbonate Chemical compound [Ca+2].[O-]C([O-])=O VTYYLEPIZMXCLO-UHFFFAOYSA-L 0.000 description 2
- 229910052802 copper Inorganic materials 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000009413 insulation Methods 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 229910000640 Fe alloy Inorganic materials 0.000 description 1
- 239000004831 Hot glue Substances 0.000 description 1
- 229920002302 Nylon 6,6 Polymers 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 239000000654 additive Substances 0.000 description 1
- 230000000996 additive effect Effects 0.000 description 1
- 230000003712 anti-aging effect Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 229910000019 calcium carbonate Inorganic materials 0.000 description 1
- 235000019241 carbon black Nutrition 0.000 description 1
- 239000006229 carbon black Substances 0.000 description 1
- 230000005489 elastic deformation Effects 0.000 description 1
- 238000004134 energy conservation Methods 0.000 description 1
- 239000003365 glass fiber Substances 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 239000012774 insulation material Substances 0.000 description 1
- 230000013011 mating Effects 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 230000000704 physical effect Effects 0.000 description 1
- 239000000843 powder Substances 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000007493 shaping process Methods 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 238000009716 squeeze casting Methods 0.000 description 1
- 239000010935 stainless steel Substances 0.000 description 1
- 229910001220 stainless steel Inorganic materials 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E06—DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
- E06B—FIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
- E06B3/00—Window sashes, door leaves, or like elements for closing wall or like openings; Layout of fixed or moving closures, e.g. windows in wall or like openings; Features of rigidly-mounted outer frames relating to the mounting of wing frames
- E06B3/04—Wing frames not characterised by the manner of movement
- E06B3/263—Frames with special provision for insulation
- E06B3/26301—Frames with special provision for insulation with prefabricated insulating strips between two metal section members
- E06B3/26305—Connection details
-
- E—FIXED CONSTRUCTIONS
- E06—DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
- E06B—FIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
- E06B3/00—Window sashes, door leaves, or like elements for closing wall or like openings; Layout of fixed or moving closures, e.g. windows in wall or like openings; Features of rigidly-mounted outer frames relating to the mounting of wing frames
- E06B3/04—Wing frames not characterised by the manner of movement
- E06B3/263—Frames with special provision for insulation
- E06B3/26301—Frames with special provision for insulation with prefabricated insulating strips between two metal section members
-
- E—FIXED CONSTRUCTIONS
- E06—DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
- E06B—FIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
- E06B3/00—Window sashes, door leaves, or like elements for closing wall or like openings; Layout of fixed or moving closures, e.g. windows in wall or like openings; Features of rigidly-mounted outer frames relating to the mounting of wing frames
- E06B3/04—Wing frames not characterised by the manner of movement
- E06B3/263—Frames with special provision for insulation
- E06B3/26301—Frames with special provision for insulation with prefabricated insulating strips between two metal section members
- E06B3/26305—Connection details
- E06B2003/26309—Connection details using glue
Landscapes
- Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
The present invention provides a kind of bridge cut-off sectional material connection structures, including the first proximate matter, the second proximate matter and the section jointing part for connecting the first proximate matter and the second proximate matter, first proximate matter and the second proximate matter relative spacing are arranged, and the fixing groove for installing support element is divided between being somebody's turn to do, first proximate matter, the second proximate matter have certain interval between the section jointing part, and fixing glue is filled in the gap, the end of the support element is fixed in the fixing glue.It is operated by the way of the invention is tight after first pine, it is connect with the first proximate matter and the second proximate matter gap by section jointing part, and gap is filled by fixing glue and is fixed so that section jointing part can be used to connect the mental section of various dual extension-compression modulus, expand the scope of application of proximate matter, and it is easy to operate, it is applicable to mechanically actuated, the also manually actuated completion for small lot, production efficiency height, without being equipped with special mechanical equipment, cost of labor and machine cost are reduced.
Description
Technical field
The invention belongs to proximate matter interconnection technique fields, and in particular to a kind of bridge cut-off sectional material connection structure and connection method are fitted
Connection for door and window curtain wall proximate matter.
Background technology
As the developing of door and window technology, country are higher and higher to the Functional Requirement of door and window curtain wall and public to quality of the life
Pursuit, the non-Al-alloy metal class door and window of high-quality, curtain wall by be future development trend.
For traditional proximate matter generally based on aluminium alloy extrusions, aluminium alloy occupies door for a long time with the advantage of the physical property of he itself
Window curtain wall market, and production and processing technology on the market surrounds aluminium alloy extrusions and develops.And the better non-aluminum alloy type of performance
Mental section due to machine-shaping the problem of be ignored always, our company overcomes the problems, such as the difficult forming of stainless steel, copper, steel
And its superior physical and mechanical property, sound insulation value and fire protecting performance is played, bridge cut-off technology is developed on its basis, makes material
Heat-proof quality reach high energy conservation standard.
However, being directed to door and window curtain wall proximate matter industry, aluminium alloy proximate matter is mostly used greatly at present by penetrating the two of proximate matter
End reaches connection purpose, and this connection type needs the elasticity modulus of proximate matter smaller, can generate certain elastic deformation, and is directed to
The metal that other elasticity modulus are larger, size progress is slightly lower can not be then applicable in completely.
Therefore, it is necessary to design a kind of proximate matter connection type to be applicable in various elasticity modulus and the metal of different size progresses
The connection of proximate matter.
Invention content
The purpose of the present invention is overcoming existing bridge cut-off proximate matter connection type to be not suitable for, elasticity modulus is larger, size progress is slightly lower
Metal connection the problem of.
For this purpose, an embodiment of the present invention provides a kind of bridge cut-off sectional material connection structure, including the first proximate matter, the second proximate matter and
The section jointing part of the first proximate matter and the second proximate matter is connected, first proximate matter and the second proximate matter relative spacing are arranged, and between this
It is divided into the fixing groove for installing support element, first proximate matter, the second proximate matter have one between the section jointing part
Fixed gap, and fixing glue is filled in the gap, the end of the support element is fixed in the fixing glue.
Further, the both ends of the section jointing part are connected together with the first proximate matter and the second proximate matter respectively.
Further, first proximate matter and the second proximate matter are the frame-type slot structure that a middle side part is equipped with opening, and its
Opening has the varus section to bend inwards, is constituted between the varus section and the side wall of frame-type slot and is fixedly connected with section jointing part
Link slot.
Further, the section jointing part is I-shaped structure, including vertical plate and the water for being connected to vertical plate both ends
Tablet, the both ends of the level board are equipped with the connecting plate being correspondingly connected with the link slot, and the vertical plate is located at the first proximate matter
With the opening of the second proximate matter, and the width of the vertical plate be less than the first proximate matter and the second proximate matter opening width, it is described solid
Determine glue to be filled between the vertical plate and the varus section.
Further, connection is interference fitted between the connecting plate and the cell wall of the link slot.
Further, it is equipped with through-hole in the middle part of the vertical plate.
Further, connection is interference fitted between the support element and the cell wall of fixing groove.
Further, first proximate matter and the second proximate matter are made of iron, copper or aluminum alloy materials, and the proximate matter connects
Fitting is PVC extrusions or nylon extrusion.
In addition, the present invention also provides the connection method of above-mentioned bridge cut-off sectional material connection structure, include the following steps:
1) by the first proximate matter and the second proximate matter arranged for interval, section jointing part be inserted into the first proximate matter and the second proximate matter connecting pin it
Between, interval between the first proximate matter and the second proximate matter and section jointing part constitute fixing groove, section jointing part and the first proximate matter, the
There is certain interval, which communicates with fixing groove between two proximate matters;
2) fixing glue is injected in fixing groove;
3) support element is pressed into fixing groove, support element squeezes fixing glue filling section jointing part and the first proximate matter, the second proximate matter
Between gap;
4) it stands, waits for that nail-free glue cures.
Further, the dosage of the fixing glue be 12ML/M, fixing glue hardening time be 12~for 24 hours.
Compared with prior art, beneficial effects of the present invention:
(1) this bridge cut-off sectional material connection structure provided by the invention passes through between section jointing part and the first proximate matter and the second proximate matter
Gap connects, and fills gap by fixing glue and be fixed so that section jointing part can be used to connect various different springforms
The mental section of amount solves the connectivity problem of the existing larger material of cold-forming shapes elasticity modulus, expands the applicable model of proximate matter
It encloses.
(2) it is operated by the way of the connection method of this bridge cut-off sectional material connection structure provided by the invention is tight after first pine,
It is easy to operate, it is applicable to mechanically actuated, the also manually actuated completion for small lot, production efficiency is high, special without being equipped with
With mechanical equipment, cost of labor and machine cost are reduced.
The present invention is described in further details below with reference to attached drawing.
Description of the drawings
Fig. 1 is the structural schematic diagram of the first proximate matter in the present invention;
Fig. 2 is the structural schematic diagram of medium section connector of the present invention;
Fig. 3 is the structural schematic diagram of the connection of medium section connector the first proximate matter and the second proximate matter of the present invention;
Fig. 4 is the structural schematic diagram that fixing glue is injected in the present invention;
Fig. 5 is the structural schematic diagram that the bridge cut-off sectional material connection structure formed after fixing glue is squeezed in the present invention.
Reference sign:1, the first proximate matter;2, varus section;3, link slot;4, it is open;5, section jointing part;6, vertical
Plate;7, level board;8, connecting plate;9, through-hole;10, gap;11, fixing groove;12, the second proximate matter;13, fixing glue;14, it supports
Part.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts all other
Embodiment shall fall within the protection scope of the present invention.
In the description of the present invention, it is to be understood that, term "center", "upper", "lower", "front", "rear", " left side ",
The orientation or positional relationship of the instructions such as " right side ", "vertical", "horizontal", "top", "bottom", "inner", "outside" is based on ... shown in the drawings
Orientation or positional relationship is merely for convenience of description of the present invention and simplification of the description, do not indicate or imply the indicated device or
Element must have a particular orientation, with specific azimuth configuration and operation, therefore be not considered as limiting the invention.
Term " first ", " second " are used for description purposes only, be not understood to indicate or imply relative importance or
Implicitly indicate the quantity of indicated technical characteristic." first " is defined as a result, the feature of " second " can be expressed or imply
Ground includes one or more this feature;In the description of the present invention, unless otherwise indicated, the meaning of " plurality " is two or
It is more than two.
As shown in figure 5, a kind of bridge cut-off sectional material connection structure is present embodiments provided, including the first proximate matter 1, the second proximate matter 12
And the section jointing part 5 of connection the first proximate matter 1 and the second proximate matter 12,1 and second proximate matter of the first proximate matter, 12 relative spacing
Setting, and should between be divided into fixing groove 11 for installing support element 14, first proximate matter 1, the second proximate matter 12 with the type
There is certain interval 10 between material connector 5, and be filled with fixing glue 13 in the gap 10, the end of the support element 14 is fixed
In the fixing glue 13.Wherein, nail-free glue/hot melt adhesive can be used in fixing glue 13, and pin can be used in support element 14.The embodiment
In by 5 both ends of section jointing part, gap is connect between the first proximate matter 1 and the second proximate matter 12 respectively first, without requiring
The elasticity modulus of first proximate matter 1 and the second proximate matter 12, is applicable not only to the connection of the smaller aluminium alloy extrusions of elasticity modulus, for
The bridge cut-off proximate matters such as the larger iron or copper of elasticity modulus equally can be used section jointing part 5 and carry out gap connection, expand type
The scope of application of material, and PVC extrusions can be used in section jointing part 5(+ 20% micron order Paris white+10% of 65%pvc+5% carbon blacks
Nanometer grade calcium carbonate powder), PVC material is anti-flaming thermal-insulation material, and intensity is high, meets connection request, while nylon also can be used and squeeze
Casting die(+ 5% additive of+25% glass fibre of 70% polyhexamethylene adipamide), the heat-insulated material of nylon material, intensity is high, meets connection
It is required that and the coefficient of expansion it is small, heat-resisting good, and anti-aging property is high, sound insulation value is good;Section jointing part 5 has connected the first type
After material 1 and the second proximate matter 12, then gap is filled by fixing glue 13, section jointing part 5, the first proximate matter 1 and second type is fixed
Material 12, and in order to avoid the first proximate matter 1 and the second proximate matter 12 are relatively moved with fixing glue 13 in fixation procedure, pass through
The support element 14 being arranged between one proximate matter 1 and the second proximate matter 12 supports fixation, further increase section jointing part 5,
Fixed effect between first proximate matter 1 and the second proximate matter 12;Optimization, mistake between the support element 14 and the cell wall of fixing groove 11
It is full of mating connection so that support element 14 plays preferably supporting role to the first proximate matter 1 and the second proximate matter 12.
As a kind of embodiment of optimization, the both ends of the section jointing part 5 respectively with the first proximate matter 1 and the second proximate matter
12 are connected together, and are on the one hand positioned to the connection of the first proximate matter 1 and the second proximate matter 12, ensure the first proximate matter 1 and second type
The relative position connected between material 12, on the other hand can effectively avoid section jointing part 5 and the first proximate matter 1 and the second proximate matter 12 it
Between be only fixed by fixing glue 13, improve the fixed effect between section jointing part 5, the first proximate matter 1 and the second proximate matter 12.
Specifically, as shown in Figure 1, first proximate matter, 1 and second proximate matter 12 is the frame-type that a middle side part is equipped with opening 4
Slot structure, and there is the varus section 2 to bend inwards at its opening 4, it constitutes and fixes between the varus section 2 and the side wall of frame-type slot
The link slot 3 of section jointing part 5, section jointing part 5 a part engaging in this link slot 3, increase section jointing part 5 with
The bonding strength of first proximate matter 1 and the second proximate matter 12, while the structure design of varus section 2 is convenient between section jointing part 5
It is adhesively fixed, further increases the bonding strength of section jointing part 5 and the first proximate matter 1 and the second proximate matter 12, proximate matter is avoided to connect
The shaking of fitting 5.As shown in Fig. 2, the section jointing part 5 is I-shaped structure, including vertical plate 6 and it is connected to vertical plate 6
The both ends of the level board 7 at both ends, the level board 7 are equipped with the connecting plate 8 being connected together corresponding with the link slot 3;Optimization,
Using interference fit connection between the connecting plate 8 and the cell wall of the link slot 3, connecting plate 8 is avoided to be shaken in link slot 3
It is dynamic, increase its bonding strength;The vertical plate 6 is located at the opening 4 of the first proximate matter 1 and the second proximate matter 12, and the vertical plate 6
Width be less than the first proximate matter 1 and the second proximate matter 12 opening 4 width, with the both sides of this vertical plate 6 side corresponding thereto
Between first proximate matter 1 and the varus section 2 of the second proximate matter 12 formed gap 10, the fixing glue 13 be filled in the vertical plate 6 with
Gap 10 between the varus section 2.And for the ease of the connection of section jointing part 5 and the first proximate matter 1 and the second proximate matter 12, institute
6 middle part of vertical plate for stating section jointing part 5 is equipped with through-hole 9, and the design of the through-hole 9 can be used as section jointing part 5 and the first proximate matter 1
With mechanical equipment or manually-operated impetus in 12 connection procedure of the second proximate matter, it is convenient for applying active force to section jointing part 5,
So that it is be bonded more secured between section jointing part 5 and fixing glue 13, while during support element 14 are installed, being conducive to support
Part 14 applies active force so that support element 14 is more firmly mounted.
The connection method being attached using above-mentioned bridge cut-off sectional material connection structure pair the first proximate matter 1 and the second proximate matter 12, tool
Body process is as follows:
First, as shown in figure 3, by 12 arranged for interval of the first proximate matter 1 and the second proximate matter, section jointing part 5 is inserted into 1 He of the first proximate matter
Between the connecting pin of second proximate matter 12, the interval between the first proximate matter 1 and the second proximate matter 12 constitutes fixing groove with section jointing part 5
11, there is certain interval 10, the gap 10 and 11 phase of fixing groove between section jointing part 5 and the first proximate matter 1, the second proximate matter 12
It is logical.
Then, as shown in figure 4, injecting fixing glue 13 in fixing groove 11, the injection rate of fixing glue 13 enables it to fill
Gap 10 between 5 and first proximate matter 1 of full section jointing part, the second proximate matter 12, generally 12ML/M;As shown in figure 5, again solid
Determine to be pressed into support element 14 in slot 11, support element 14 reaches supporting role to the first proximate matter 1 and the second proximate matter 12, while passing through support
Part 14 squeezes fixing glue 13, so that fixing glue 13 is filled between section jointing part 5 and the first proximate matter 1, the second proximate matter 12
10 position of gap.
Finally, 12 are stood~for 24 hours, glue 13 to be fixed cures.
In conclusion being operated by the way of this bridge cut-off sectional material connection structure provided by the invention is tight after first pine, pass through
Gap connects between section jointing part and the first proximate matter and the second proximate matter, and fills gap by fixing glue and be fixed so that
Section jointing part can be used to connect the mental section of various dual extension-compression modulus, and it is larger to solve existing cold-forming shapes elasticity modulus
The connectivity problem of material expands the scope of application of proximate matter., and it is easy to operate, it is applicable to mechanically actuated, for small lot
Also manually actuated completion, production efficiency is high, without being equipped with special mechanical equipment, reduces cost of labor and machine cost.
The foregoing examples are only illustrative of the present invention, does not constitute the limitation to protection scope of the present invention, all
Be with the present invention it is same or analogous design all belong to the scope of protection of the present invention within.
Claims (10)
1. a kind of bridge cut-off sectional material connection structure, it is characterised in that:Including the first proximate matter, the second proximate matter and connection the first proximate matter and
The section jointing part of second proximate matter, first proximate matter and the second proximate matter relative spacing are arranged, and are divided between being somebody's turn to do for installing branch
The fixing groove of support member, first proximate matter, the second proximate matter have certain interval, and the gap between the section jointing part
Interior to be filled with fixing glue, the end of the support element is fixed in the fixing glue.
2. bridge cut-off sectional material connection structure as described in claim 1, it is characterised in that:The both ends of the section jointing part respectively with
First proximate matter and the second proximate matter are connected together.
3. bridge cut-off sectional material connection structure as described in claim 1, it is characterised in that:First proximate matter and the second proximate matter are
One middle side part is equipped with the frame-type slot structure of opening, and its opening has the varus section to bend inwards, the varus section and frame-type
The link slot for being fixedly connected with section jointing part is constituted between the side wall of slot.
4. bridge cut-off sectional material connection structure as claimed in claim 3, it is characterised in that:The section jointing part is I-shaped knot
Structure, including vertical plate and the level board for being connected to vertical plate both ends, the both ends of the level board are equipped with corresponding with the link slot
The connecting plate of connection, the vertical plate is located at the opening of the first proximate matter and the second proximate matter, and the width of the vertical plate is less than
The opening width of first proximate matter and the second proximate matter, the fixing glue are filled between the vertical plate and the varus section.
5. bridge cut-off sectional material connection structure as claimed in claim 4, it is characterised in that:The slot of the connecting plate and the link slot
Connection is interference fitted between wall.
6. bridge cut-off sectional material connection structure as claimed in claim 4, it is characterised in that:Through-hole is equipped in the middle part of the vertical plate.
7. bridge cut-off sectional material connection structure as described in claim 1, it is characterised in that:The support element and the cell wall of fixing groove it
Between be interference fitted connection.
8. bridge cut-off sectional material connection structure as described in claim 1, it is characterised in that:First proximate matter and the second proximate matter are iron
System, copper or aluminum alloy materials are made, and the section jointing part is PVC extrusions or nylon extrusion.
9. such as the connection method of claim 1~8 any one of them bridge cut-off sectional material connection structure, it is characterised in that:Including such as
Lower step:
1) by the first proximate matter and the second proximate matter arranged for interval, section jointing part be inserted into the first proximate matter and the second proximate matter connecting pin it
Between, interval between the first proximate matter and the second proximate matter and section jointing part constitute fixing groove, section jointing part and the first proximate matter, the
There is certain interval, which communicates with fixing groove between two proximate matters;
2) fixing glue is injected in fixing groove;
3) support element is pressed into fixing groove, support element squeezes fixing glue filling section jointing part and the first proximate matter, the second proximate matter
Between gap;
4) it stands, adhesive curing to be fixed.
10. the connection method of bridge cut-off sectional material connection structure as claimed in claim 9, it is characterised in that:The use of the fixing glue
Amount be 12ML/M, fixing glue hardening time be 12~for 24 hours.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810662180.8A CN108612436B (en) | 2018-06-25 | 2018-06-25 | Bridge-cutoff section bar connecting structure and connecting method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810662180.8A CN108612436B (en) | 2018-06-25 | 2018-06-25 | Bridge-cutoff section bar connecting structure and connecting method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108612436A true CN108612436A (en) | 2018-10-02 |
CN108612436B CN108612436B (en) | 2024-04-26 |
Family
ID=63665688
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810662180.8A Active CN108612436B (en) | 2018-06-25 | 2018-06-25 | Bridge-cutoff section bar connecting structure and connecting method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108612436B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111927284A (en) * | 2020-09-15 | 2020-11-13 | 上海晶柏新材料科技有限公司 | Fireproof section bar and fireproof door and fireproof window prepared from same |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2524604Y (en) * | 2002-01-08 | 2002-12-11 | 林正华 | Connector for intervals |
DE10345624A1 (en) * | 2003-09-29 | 2005-05-04 | Kosak Adrian | T-connector for hollow window and door frame sections has opposing tongue rails to engage in grooves in profiles fixed by screws and tail glued to further frame section |
CN201310130Y (en) * | 2008-11-28 | 2009-09-16 | 王斌 | Glue injection fracturing bridge combination section |
CN206592008U (en) * | 2017-01-25 | 2017-10-27 | 佛山市优耐高新材料有限公司 | A kind of high leakproofness bar inserting type heat-insulated |
CN208564300U (en) * | 2018-06-25 | 2019-03-01 | 高晶晶 | A kind of bridge cut-off sectional material connection structure |
-
2018
- 2018-06-25 CN CN201810662180.8A patent/CN108612436B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2524604Y (en) * | 2002-01-08 | 2002-12-11 | 林正华 | Connector for intervals |
DE10345624A1 (en) * | 2003-09-29 | 2005-05-04 | Kosak Adrian | T-connector for hollow window and door frame sections has opposing tongue rails to engage in grooves in profiles fixed by screws and tail glued to further frame section |
CN201310130Y (en) * | 2008-11-28 | 2009-09-16 | 王斌 | Glue injection fracturing bridge combination section |
CN206592008U (en) * | 2017-01-25 | 2017-10-27 | 佛山市优耐高新材料有限公司 | A kind of high leakproofness bar inserting type heat-insulated |
CN208564300U (en) * | 2018-06-25 | 2019-03-01 | 高晶晶 | A kind of bridge cut-off sectional material connection structure |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111927284A (en) * | 2020-09-15 | 2020-11-13 | 上海晶柏新材料科技有限公司 | Fireproof section bar and fireproof door and fireproof window prepared from same |
Also Published As
Publication number | Publication date |
---|---|
CN108612436B (en) | 2024-04-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105401599A (en) | Open trench tunnel main structure tall side wall unilateral vertical mold and construction process thereof | |
CN207512933U (en) | A kind of assembled architecture wall | |
CN109322425A (en) | A kind of plug-in connection system of combined wall board and preparation method thereof | |
CN108612436A (en) | A kind of bridge cut-off sectional material connection structure and connection method | |
CN208564300U (en) | A kind of bridge cut-off sectional material connection structure | |
CN209384462U (en) | A kind of plug-in connection system of combined wall board | |
CN207144265U (en) | A kind of curtain wall | |
CN206581451U (en) | A kind of prefabricated partition board based on light steel skeleton and lightweight concrete | |
CN202866066U (en) | Supporting frame press buckle structure | |
CN205776748U (en) | Box column and unequal-height steel beam connecting structure | |
CN212895727U (en) | Railway track slab crack repairing device | |
CN208329311U (en) | A kind of close joint double-layer metal plate curtain wall mounting structure | |
CN203499067U (en) | Non-uniplanar quadrilateral unit curtain wall | |
CN208792797U (en) | A kind of building steel girder erection auxiliary locator | |
CN206888289U (en) | One kind embossing aluminum facade | |
CN207003737U (en) | A kind of assembling wall body structure with decorative plate of outer wall | |
CN214531388U (en) | Connecting structure for exposed frame glass curtain wall and aluminum plate curtain wall | |
CN201627285U (en) | Light board for building partition walls | |
CN201367658Y (en) | Light lath for building partition wall | |
CN205476189U (en) | Wall structure with roman column | |
CN218028453U (en) | Assembled wall | |
CN204563456U (en) | A kind of exercycle shell fixed structure | |
CN217943699U (en) | Double-block type sleeper slurry blocking and plugging plate and connection structure thereof | |
CN219410550U (en) | Precast beam board hogging moment tooth piece seals anchor template device | |
CN206110605U (en) | Marble laminate flooring |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |