CN108609147A - A kind of ship leakage runner and fabrication and installation method - Google Patents

A kind of ship leakage runner and fabrication and installation method Download PDF

Info

Publication number
CN108609147A
CN108609147A CN201810477410.3A CN201810477410A CN108609147A CN 108609147 A CN108609147 A CN 108609147A CN 201810477410 A CN201810477410 A CN 201810477410A CN 108609147 A CN108609147 A CN 108609147A
Authority
CN
China
Prior art keywords
component
water inlet
flow channel
inlet flow
welding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810477410.3A
Other languages
Chinese (zh)
Other versions
CN108609147B (en
Inventor
曾凡强
黄庆锋
温道能
黄耀华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSSC Huangpu Wenchong Shipbuilding Co Ltd
Original Assignee
CSSC Huangpu Wenchong Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSSC Huangpu Wenchong Shipbuilding Co Ltd filed Critical CSSC Huangpu Wenchong Shipbuilding Co Ltd
Priority to CN201810477410.3A priority Critical patent/CN108609147B/en
Publication of CN108609147A publication Critical patent/CN108609147A/en
Application granted granted Critical
Publication of CN108609147B publication Critical patent/CN108609147B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63HMARINE PROPULSION OR STEERING
    • B63H11/00Marine propulsion by water jets
    • B63H11/02Marine propulsion by water jets the propulsive medium being ambient water
    • B63H11/04Marine propulsion by water jets the propulsive medium being ambient water by means of pumps
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B71/00Designing vessels; Predicting their performance
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63HMARINE PROPULSION OR STEERING
    • B63H11/00Marine propulsion by water jets
    • B63H2011/006Marine propulsion by water jets with propulsive medium supplied from sources external to propelled vessel, e.g. water from public water supply

Abstract

The invention discloses a kind of ship leakage runner and fabrication and installation methods;It includes the firstth area of the water inlet flow channel component sequentially connected along water (flow) direction, the secondth area of water inlet flow channel component, in the bend part and vent component of bending cylinder shape;It further includes the stern tube shaft protection pipe for being parallel to horizontal plane and the anti-singing piece at the top of the inner surface of connection stern tube shaft protection pipe and bend part that one end passes through the secondth area of water inlet flow channel component.While the present invention had both retained water inlet flow channel structure building berth advantage in bulk, the case where a large amount of parts are bulked in building berth is avoided.

Description

A kind of ship leakage runner and fabrication and installation method
Technical field
The present invention relates to a kind of ship leakage runner and fabrication and installation methods.
Background technology
In ship domain, as a kind of special propulsion mode, it is to utilize to spray high speed water from spray pump for hydraulic jet propulsion The reaction force of stream pushes ship to advance.Hydraulic jet propulsion is compared with traditional propeller propulsion has more advantages, such as eats Water is shallow, propulsive efficiency is high, underwater noise is small, it is strong to adapt to operating mode ability and high-speed space-time bubble performance is good etc..In general, water spray pushes away It is mainly made of into system the part such as water inlet flow channel, spout, spray pump and transmission device, steering navigating reversing device.Water inlet flow channel is both The important component of hydro-jet propulsion system, while being again an organic whole with main hull structure, therefore the system of water inlet flow channel Make mode and erection stage, not only influences the difficulty of construction of runner, but also influence entire hydro-jet propulsion system equipment, the peace of shafting Dress and adjustment.
The installation method of water inlet flow channel was in the past:The stern where water inlet flow channel is segmented first, is made in the segmentation stage It completes, but the segmentation of this stage is not installed into water flow passage structure, intakes after stern segmentation enters the berth combination stage, then by composition Whole parts of flow passage structure are installed on stern segmentation in the building berth stage by mode in bulk.The advantage of the fabrication and installation method Spout, the installation of spray pump equipment and the adjustment of transmission device being easy in hydro-jet propulsion system, by adjusting water inlet flow channel knot Structure ensures the installation accuracy of equipment;But building berth is the narrow resources of shipyard, and building berth construction period is also to weigh shipyard manufacture water One major criterion of flat height, a large amount of parts substantially prolong building berth construction period in building berth mode in bulk, increase ship The guarantee segmentation integrality of platform workload, this mode and current requirements and the requirement for reducing building berth construction period run in the opposite direction.
Invention content
The object of the present invention is to provide a kind of ship leakage runner and fabrication and installation methods, have both retained water inlet flow channel structure ship While platform advantage in bulk, the case where a large amount of parts are bulked in building berth is avoided.
To achieve the above object, a kind of ship leakage runner provided by the present invention comprising sequentially connect along water (flow) direction The firstth area of water inlet flow channel component, the secondth area of water inlet flow channel component, the bend part and vent component in bending cylinder shape connect; It further includes that one end passes through the stern tube shaft for being parallel to horizontal plane of the water inlet flow channel the secondth area component and the bend part to protect Pillar and the connection stern tube shaft protection pipe and the anti-singing piece at the top of the inner surface of the bend part.
In above-mentioned ship leakage runner, the anti-singing piece includes the both sides for being respectively arranged at stern tube shaft protection pipe periphery And the first anti-singing piece and the second anti-singing piece being connect with the top of the bend part inner surface, the anti-singing piece are in Demihull shape.
In above-mentioned ship leakage runner, the connector of vent component connection corresponding with the bend part perpendicular to Horizontal plane.
The present invention also provides a kind of production methods of ship leakage runner, include the following steps:
A) the firstth area of water inlet flow channel component, is made:The part of the steel plate shaped by several, mounts on sectional jig Welding forms;B) the secondth area of water inlet flow channel component, is made:Increase several gear number control moulding bed templates on sectional jig and carries out cross To reinforcement, the part of the steel plate shaped is mounted into welding in moulding bed template;C) bend part, is made:Added by three blocks of steel plates Work is that the part of three pieces of pipes is welded to form, and scale reinforcement is carried out before welding near each girth joint, with the bend part An end face be basal plane, welding is carried out on mounting plate;D) stern tube shaft protection pipe, is made:Pass through finishing by two pieces of steel plate strips Two pieces of semicircle tube components of work forming carry out welding and are assemblied to form;E) vent component, is made:The vent component includes sequentially connecting The preceding cylinder that connects, in horn-like middle cylinder and rear cylinder;The preceding cylinder is rolled by one piece of steel plate strip respectively with rear cylinder It is pressed into cylindrical shape, the middle cylinder is rolled into horn-like by two pieces of sector components.
In the production method of above-mentioned ship leakage runner, in the step c, the bow stern port of the bend part is respectively set It is equipped with the construction surplus of 30mm-70mm.
In the production method of above-mentioned ship leakage runner, in the step d, after the semicircle tube components welding, to institute It states stern tube shaft protection pipe and carries out 0.2MPa hydraulic pressure strength experiments.
In the production method of above-mentioned ship leakage runner, in the step e, when carrying out roll forming, in the steel bar It is provided with wooden model.
The present invention also provides a kind of installation methods of ship leakage runner, include the following steps:Step 1: to it is described into Annular abutment surface between water flow passage the secondth area component and the firstth area of water inlet flow channel component is welded;Step 2: to ship Platform carries out first time axis irradiation, pulls out the first center line of shafting, and by first center line of shafting by the nozzle cap The stern transom plate of part and hull carries out positioning welding;Step 3: according to vent component bow end port and the water inlet flow channel the Position relationship between two areas component bow end port carries out surplus mowing to the bend part, and by the bend part It is welded respectively with the vent component and the secondth area of the water inlet flow channel component bow stern port;Step 4: described curved Anti- singing piece described in the part interior welds of head, the anti-singing piece upper end are welded with the bend part, the anti-singing under piece End wouldn't be handled;Step 5: carrying out second of axis irradiation, in the secondth area of water inlet flow channel, component carries out trepanning, in the trepanning Stern tube shaft protection pipe, the second center line of shafting obtained according to second of axis irradiation is disposed to be directed at the stern tube shaft protection pipe Welding, and cutting anti-singing piece lower end surplus makes the anti-singing piece be bonded with the stern tube shaft protection pipe, and welded.
In the installation method of above-mentioned ship leakage runner, in step 2, in the vent component and first shafting Coaxiality deviation between heart line is less than 2mm.
In the installation method of above-mentioned ship leakage runner, in step 3, the bend part and the vent component Coaxiality deviation is less than 3mm.
A kind of ship leakage runner and fabrication and installation method that above-mentioned technical proposal is provided, compared with prior art, Advantageous effect includes:1, by the way that water inlet flow channel is carried out Region Decomposition, six parts is divided into, the portion of equipment installation will not be influenced Divide directly in the installation of segmentation stage, improves segmentation integrality, shorten building berth construction period;2, will need the building berth stage with Equipment coordinates the part-structure of adjustment and installation, and in such a way that process shifts to an earlier date, part assembly welding, system are carried out on platform for lining Building berth installation is entered back into after component as a whole, avoids the work that a large amount of parts are in bulk in building berth, while ensure that flow passage structure With the nargin of equipment cooperation debugging;3, it is improved by the accuracy control method of increase tooling in making and the welding method in assembly The accuracy of assembly meets technology requirement.
Description of the drawings
Fig. 1 is the structural schematic diagram of the ship leakage runner of the present invention;
Fig. 2 is the anti-singing chip part schematic diagram of the present invention;
Fig. 3 is the A-A sectional views of Fig. 2
Fig. 4 is the vent component schematic diagram of the present invention;
Fig. 5 is the bend part schematic diagram of the present invention;
Fig. 6 is the B-B sectional views of Fig. 5;
Fig. 7 is the C-C sectional views of Fig. 5;
Fig. 8 is the firstth area of water inlet flow channel component moulding bed template schematic diagram of the present invention;
Fig. 9 is the D-D sectional views of Fig. 8;
Wherein, the firstth area of 1- water inlet flow channels component, the secondth area of 2- water inlet flow channels component, 3- bend parts, 31- scales, 4- Vent component, circle is logical before 41-, 42- middle cylinders, and cylinder after 43-, 5- stern tube shaft protection pipes, the anti-singing pieces of 6-, 61- first resists humorous Ring piece, the second anti-singing pieces of 62-.
Specific implementation mode
With reference to the accompanying drawings and examples, the specific implementation mode of the present invention is described in further detail.Implement below Example is not limited to the scope of the present invention for illustrating the present invention.
Please refer to attached drawing 1-9, a kind of ship leakage runner provided by the present invention comprising sequentially connected along water (flow) direction The firstth area of water inlet flow channel component 1, the secondth area of water inlet flow channel component 2, in the bend part 3 and vent component of bending cylinder shape 4;It further includes the stern tube shaft protection pipe 5 for being parallel to horizontal plane and the connection that one end passes through the secondth area of water inlet flow channel component 2 The stern tube shaft protection pipe 5 and the anti-singing piece 6 at the top of the inner surface of the bend part 3.
Based on above-mentioned technical characteristic equipment installation will not be influenced by the way that the ship leakage runner is divided into six regions Part directly segmentation the stage installation, improve segmentation integrality, shorten building berth construction period;And it will need in building berth It is assembled to carry out part in such a way that process shifts to an earlier date on platform for lining for the part-structure in stage and equipment cooperation adjustment and installation Welding enters back into building berth installation after being made as global facility, avoids the work that a large amount of parts are in bulk in building berth, while ensure that stream The nargin of road structure and equipment cooperation debugging.
The anti-singing piece 6 include be respectively arranged at 5 periphery of stern tube shaft protection pipe both sides and with the bend part 3 The 61 and second anti-singing piece 62 of the first anti-singing piece of the top connection of inner surface, the 6 piece shape shape of anti-singing piece;Pass through The anti-singing piece 6 is set, the part lagging edge of sine of screw propeller can be eliminated.
The connector of the connection corresponding with the bend part 3 of the vent component 4 makes the ship perpendicular to horizontal plane Water inlet flow channel can preferably realize that transition is installed.
The present invention also provides a kind of production methods of ship leakage runner, include the following steps:
A) the firstth area of water inlet flow channel component 1, is made:The part of the steel plate shaped by several, is pasted on sectional jig Fill welding composition;B) the secondth area of water inlet flow channel component 2, is made:Increase several gear number control moulding bed templates on sectional jig and does It is good laterally to reinforce, the part of the steel plate shaped is mounted into welding in moulding bed template;C) bend part 3, is made:By three blocks of steel The part that plate is processed as three pieces of pipes is welded to form, and the reinforcement of scale 31 is carried out before welding near each girth joint, with described curved One end face of head part 3 is basal plane, and welding is carried out on mounting plate;D) stern tube shaft protection pipe 5, is made:By two pieces of steel plate strips Two pieces of semicircle tube components by finishing forming carry out welding and are assemblied to form;E) vent component 4, is made:The vent component 4 Including sequentially connect preceding cylinder 41, in horn-like middle cylinder 42 and rear cylinder 43;The preceding cylinder 41 and rear cylinder 43 are rolled into cylindrical shape by one piece of steel plate strip respectively, and the middle cylinder 42 is rolled into horn-like by two pieces of sector components.
Be fabricated separately the ship leakage runner at each position, by making increase tooling accuracy control method and Welding method in assembly improves the accuracy of assembly, meets technology requirement.
In the step c, the bow stern port of the bend part 3 is each provided with the construction surplus of 30mm-70mm, wherein Preferred construction surplus is 50mm, cutting when convenient in subsequent installation to bend part and remaining mate.
In the step d, after the semicircle tube components welding, it is strong that 0.2MPa hydraulic pressure is carried out to the stern tube shaft protection pipe 5 Degree experiment, ensures the intensity of the stern tube shaft protection pipe.
In the step e, when carrying out roll forming, it is provided with wooden model in the steel bar, it is ensured that internal diameter after completing Arbitrary cross section theory should be round.
The present invention also provides a kind of installation methods of ship leakage runner, include the following steps:Step 1: to it is described into Annular abutment surface between the secondth area of water flow passage component 2 and the firstth area of water inlet flow channel component 1 is welded;Step 2: right Building berth carries out first time axis irradiation, pulls out the first center line of shafting, and by first center line of shafting by the spout Component 4 and the stern transom plate of hull carry out positioning welding;Step 3: according to 4 bow end port of the vent component and the feed water flow Position relationship between 2 bow end port of the secondth area of road component carries out surplus mowing to the bend part 3, and by the elbow It is welded respectively with the vent component 4 and the secondth area of water inlet flow channel component 2 the bow stern port of component 3;Step 4: The anti-singing piece 6 described in 3 interior welds of the bend part, anti-6 upper end of singing piece are welded with the bend part 3, institute Stating anti-6 lower end of singing piece wouldn't be handled;Step 5: carrying out second of axis irradiation, in the secondth area of water inlet flow channel, component is opened Hole, in trepanning placement stern tube shaft protection pipe 5, the second center line of shafting obtained according to second of axis irradiation is to the stern tube shaft Protection pipe 5 carries out alignment welding, and cutting the 6 lower end surplus of anti-singing piece makes the anti-singing piece 6 be protected with the stern tube shaft Pipe 5 is bonded, and is welded.
Based on above-mentioned installation method, by the installation method of segmentation, need to coordinate adjustment and installation in building berth stage and equipment Part-structure, process shift to an earlier date by way of, on platform for lining carry out part assembly welding, be made as after global facility again It is installed into building berth, avoids the work that a large amount of parts are in bulk in building berth, while ensure that flow passage structure and equipment cooperation debugging Nargin.
In step 2, the coaxiality deviation between the vent component 4 and first center line of shafting is less than 2mm, Ensure precision when installation.
In step 3, the bend part 3 and the coaxiality deviation of the vent component 4 are less than 3mm, ensure described curved The installation accuracy of head part and the vent component.
In the description of the present invention, it should be noted that term "center", " longitudinal direction ", " transverse direction ", "upper", "lower", The orientation or positional relationship of the instructions such as "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside" is It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of description of the present invention and simplification of the description, rather than instruction or dark Show that signified device or element must have a particular orientation, with specific azimuth configuration and operation, therefore should not be understood as pair The limitation of the present invention.In addition, term " first ", " second ", " third " are used for description purposes only, and it should not be understood as instruction or dark Show relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can Can also be electrical connection to be mechanical connection;It can be directly connected, can also indirectly connected through an intermediary, Ke Yishi Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition Concrete meaning in invention.
In addition, in the description of the present invention, unless otherwise indicated, the meaning of " plurality " is two or more.
It the above is only the preferred embodiment of the present invention, it is noted that those skilled in the art are come It says, without departing from the technical principles of the invention, several improvement and replacement can also be made, these improve and replace and also answer It is considered as protection scope of the present invention.

Claims (10)

1. a kind of ship leakage runner, which is characterized in that it includes along the portion of the firstth area of water inlet flow channel that water (flow) direction sequentially connects Part, the secondth area of water inlet flow channel component, bend part and vent component in bending cylinder shape;
It further includes the stern tube shaft protection pipe for being parallel to horizontal plane and the connection that one end passes through the secondth area of water inlet flow channel component The stern tube shaft protection pipe and the anti-singing piece at the top of the inner surface of the bend part.
2. ship leakage runner as described in claim 1, which is characterized in that the anti-singing piece is described including being respectively arranged at The both sides of stern tube shaft protection pipe periphery and the first anti-singing piece being connect with the top of the bend part inner surface and second anti- Singing piece, the anti-singing piece piece shape shape.
3. ship leakage runner as described in claim 1, which is characterized in that the vent component is opposite with the bend part The connector that should be connected is perpendicular to horizontal plane.
4. a kind of production method based on the ship leakage runner described in claim 1-3, which is characterized in that including following step Suddenly:
A) the firstth area of water inlet flow channel component, is made:The part of the steel plate shaped by several, mounts welding on sectional jig Composition;
B) the secondth area of water inlet flow channel component, is made:Increase several gear number control moulding bed templates on sectional jig and carry out and laterally adds By force, the part of the steel plate shaped is mounted into welding in moulding bed template;
C) bend part, is made:The part for being processed as three pieces of pipes by three blocks of steel plates is welded to form, in each girth joint before welding Scale reinforcement is nearby carried out, using an end face of the bend part as basal plane, welding is carried out on mounting plate;
D) stern tube shaft protection pipe, is made:It is assembled that two pieces of semicircle tube components by two pieces of steel plate strips by finishing forming carry out welding Composition;
E) vent component, is made:The vent component include the preceding cylinder sequentially connected, in horn-like middle cylinder and after Cylinder;The preceding cylinder is rolled into cylindrical shape by one piece of steel plate strip respectively with rear cylinder, and the middle cylinder is by two pieces of sectors zero Part is rolled into horn-like.
5. the production method of ship leakage runner as claimed in claim 4, which is characterized in that described curved in the step c The bow stern port of head part is each provided with the construction surplus of 30mm-70mm.
6. the production method of ship leakage runner as claimed in claim 4, which is characterized in that in the step d, described half After the welding of pipe part, 0.2MPa hydraulic pressure strength experiments are carried out to the stern tube shaft protection pipe.
7. the production method of ship leakage runner as claimed in claim 4, which is characterized in that in the step e, rolled When molded, wooden model is provided in the steel bar.
8. a kind of installation method based on the ship leakage runner described in claim 1-4, which is characterized in that including following step Suddenly:
Step 1: annular abutment surface between the water inlet flow channel the secondth area component and the firstth area of water inlet flow channel component into Row welding;
Step 2: carrying out first time axis irradiation to building berth, the first center line of shafting is pulled out, and pass through first axial center The stern transom plate of the vent component and hull is carried out positioning welding by line;
Step 3: according to the position between vent component bow end port and the secondth area of water inlet flow channel component bow end port Relationship, to the bend part carry out surplus mowing, and by the bow stern port of the bend part respectively with the vent component And secondth area of water inlet flow channel component is welded;
Step 4: the anti-singing piece described in the bend part interior welds, the anti-singing piece upper end and the bend part Welding, the anti-singing piece lower end wouldn't be handled;
Step 5: carrying out second of axis irradiation, in the secondth area of water inlet flow channel, component carries out trepanning, and stern tube shaft is disposed in the trepanning Protection pipe, the second center line of shafting obtained according to second of axis irradiation carry out alignment welding to the stern tube shaft protection pipe, and Cutting anti-singing piece lower end surplus makes the anti-singing piece be bonded with the stern tube shaft protection pipe, and is welded.
9. the installation method of ship leakage runner as claimed in claim 8, which is characterized in that in step 2, the spout Coaxiality deviation between component and first center line of shafting is less than 2mm.
10. the installation method of ship leakage runner as claimed in claim 8, which is characterized in that in step 3, the elbow The coaxiality deviation of component and the vent component is less than 3mm.
CN201810477410.3A 2018-05-18 2018-05-18 Ship water inlet flow channel and manufacturing and mounting method Active CN108609147B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810477410.3A CN108609147B (en) 2018-05-18 2018-05-18 Ship water inlet flow channel and manufacturing and mounting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810477410.3A CN108609147B (en) 2018-05-18 2018-05-18 Ship water inlet flow channel and manufacturing and mounting method

Publications (2)

Publication Number Publication Date
CN108609147A true CN108609147A (en) 2018-10-02
CN108609147B CN108609147B (en) 2020-01-10

Family

ID=63663444

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810477410.3A Active CN108609147B (en) 2018-05-18 2018-05-18 Ship water inlet flow channel and manufacturing and mounting method

Country Status (1)

Country Link
CN (1) CN108609147B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109268608A (en) * 2018-10-31 2019-01-25 中船黄埔文冲船舶有限公司 A kind of elbow and installation method of hydraulic jet propulsion system
CN109263841A (en) * 2018-10-30 2019-01-25 中船黄埔文冲船舶有限公司 A kind of hydraulic jet propulsion system and installation method
CN109455285A (en) * 2018-11-09 2019-03-12 中国船舶工业集团公司第七0八研究所 A kind of reinforcement structure for hydraulic jet propulsion system
CN109551176A (en) * 2018-10-18 2019-04-02 沪东中华造船(集团)有限公司 A kind of production method of steel runner automobile wind tunnel nozzle segment

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04159193A (en) * 1990-10-22 1992-06-02 Yamaha Motor Co Ltd Propulsion device structure for water jet pusher boat
CN1911729A (en) * 2006-09-04 2007-02-14 北京理工大学 Supercavitation gas-liquid multi-phase water spray propeller
CN101848834A (en) * 2007-08-27 2010-09-29 苏尔梵高公司 Weed-cutter for a craft propelled by a water jet
CN105545818A (en) * 2016-01-29 2016-05-04 扬州大学 Chamfered square nozzle of novel water spraying propelling pump device
CN107735315A (en) * 2015-05-27 2018-02-23 安德烈亚斯·德施 Hydro-jet propulsion system and the ship with hydro-jet propulsion system
CN107725476A (en) * 2017-09-27 2018-02-23 江苏科技大学海洋装备研究院 A kind of adjustable hydraulic propeller of blade-section

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04159193A (en) * 1990-10-22 1992-06-02 Yamaha Motor Co Ltd Propulsion device structure for water jet pusher boat
CN1911729A (en) * 2006-09-04 2007-02-14 北京理工大学 Supercavitation gas-liquid multi-phase water spray propeller
CN101848834A (en) * 2007-08-27 2010-09-29 苏尔梵高公司 Weed-cutter for a craft propelled by a water jet
CN107735315A (en) * 2015-05-27 2018-02-23 安德烈亚斯·德施 Hydro-jet propulsion system and the ship with hydro-jet propulsion system
CN105545818A (en) * 2016-01-29 2016-05-04 扬州大学 Chamfered square nozzle of novel water spraying propelling pump device
CN107725476A (en) * 2017-09-27 2018-02-23 江苏科技大学海洋装备研究院 A kind of adjustable hydraulic propeller of blade-section

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109551176A (en) * 2018-10-18 2019-04-02 沪东中华造船(集团)有限公司 A kind of production method of steel runner automobile wind tunnel nozzle segment
CN109263841A (en) * 2018-10-30 2019-01-25 中船黄埔文冲船舶有限公司 A kind of hydraulic jet propulsion system and installation method
CN109268608A (en) * 2018-10-31 2019-01-25 中船黄埔文冲船舶有限公司 A kind of elbow and installation method of hydraulic jet propulsion system
CN109268608B (en) * 2018-10-31 2020-07-03 中船黄埔文冲船舶有限公司 Method for installing elbow of water jet propulsion device
CN109455285A (en) * 2018-11-09 2019-03-12 中国船舶工业集团公司第七0八研究所 A kind of reinforcement structure for hydraulic jet propulsion system

Also Published As

Publication number Publication date
CN108609147B (en) 2020-01-10

Similar Documents

Publication Publication Date Title
CN108609147A (en) A kind of ship leakage runner and fabrication and installation method
CN101870335B (en) Sectional construction precision control method for cylindrical ultra-deep sea drilling platform
CN108189961B (en) A kind of installation method of rudder paddle integration propulsion system
CN101200215B (en) Shipping pipe, manufacture method thereof and shipping having the same
CN109263795B (en) Manufacturing method of side-push horn mouth coaming and guide plate
CN104129489B (en) Integrated waterjet propulsion device and manufacturing and assembling method thereof
CN109319045B (en) Construction method of duplex stainless steel chemical tanker bulkhead intermediate product
CN108860451A (en) Mounting process is built in scientific investigation shipboard push hole device setting-out
CN102328729A (en) Process of afloat ship twin-islet jointing
CN110421320A (en) A kind of positioning piling bar welding procedure of cutter suction dredger
CN109131739A (en) A kind of setting out method of the stern molded line containing runner
CN110254623B (en) Manufacturing method of submerged body segment
CN103298691A (en) A retractable thruster unit for a marine vessel
CN101439758A (en) Dynamic positioning thrust system for Z propeller and elevating rudder
CN101962065B (en) Installation process and tooling of impeller casing of marine water jet propulsion device
CN203921160U (en) Be applicable to the removable sonodome of high speed ship
WO2013094534A1 (en) Steel ship or light alloy ship
CN204297023U (en) To spray water after water suction before the slab glass-felt plastic of hole, iron and steel keel hole high speed vessel
CN101481000A (en) Fiberglass boat neck bearing and shafting mounting technique
US2384981A (en) Boat
CN110102795A (en) A kind of steering engine drilling connecting screw hole method on ship in small space steering gear flat
KR102111984B1 (en) Rudder carrier assembly for a ship and the ship having it
US7765946B1 (en) Integrated bow thrusters
CN215752867U (en) Ship tail fin structure easy to process
CN101434284A (en) Process for mounting glass fibre reinforced plastic ship main ship hull iron pre-outfitting reservation member

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20181002

Assignee: GUANGZHOU WENCHONG SHIPYARD Co.,Ltd.

Assignor: CSSC HUANGPU WENCHONG SHIPBUILDING Co.,Ltd.

Contract record no.: X2021440000195

Denomination of invention: The invention relates to a ship water inlet channel and a manufacturing and installation method thereof