CN108608623A - A kind of injection mold of the moulding pipeline of built-in transition - Google Patents

A kind of injection mold of the moulding pipeline of built-in transition Download PDF

Info

Publication number
CN108608623A
CN108608623A CN201810285840.5A CN201810285840A CN108608623A CN 108608623 A CN108608623 A CN 108608623A CN 201810285840 A CN201810285840 A CN 201810285840A CN 108608623 A CN108608623 A CN 108608623A
Authority
CN
China
Prior art keywords
plate
transition
pipeline
moulding
built
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810285840.5A
Other languages
Chinese (zh)
Inventor
陈雪龙
杨志霞
苏领
陈晓炜
李龙飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yi Yuanxiang
Original Assignee
陈雪龙
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 陈雪龙 filed Critical 陈雪龙
Priority to CN201810285840.5A priority Critical patent/CN108608623A/en
Publication of CN108608623A publication Critical patent/CN108608623A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/26Moulds
    • B29C45/27Sprue channels ; Runner channels or runner nozzles
    • B29C45/2725Manifolds
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C45/00Injection moulding, i.e. forcing the required volume of moulding material through a nozzle into a closed mould; Apparatus therefor
    • B29C45/17Component parts, details or accessories; Auxiliary operations
    • B29C45/26Moulds
    • B29C45/27Sprue channels ; Runner channels or runner nozzles
    • B29C45/2737Heating or cooling means therefor
    • B29C45/2738Heating or cooling means therefor specially adapted for manifolds

Abstract

The invention discloses a kind of injection molds of the built-in moulding pipeline of transition, including top clamping plate, the moulding pipeline of transition and Bottom clamp plate, the centre of the top clamping plate is equipped with sprue bush, and the centre of sprue bush is provided with feed pipe, rebound is installed below the top clamping plate, and rebound is internally provided with melting insulating tube, the inner wall of the melting insulating tube is fixed with stomata, and the centre of stomata is equipped with a point film, a point slurry pipeline is installed between the moulding pipeline of transition, and the moulding pipeline of transition is located at the inside of melting insulating tube, it is provided with string heat pipe between the melting insulating tube, and it is respectively and fixedly provided with a point heat pipe at left and right sides of string heat pipe, the inside of the Bottom clamp plate is equipped with bearing nail, and Bottom clamp plate is located at the lower section of backing plate.The injection mold of the built-in moulding pipeline of transition is built-in with the moulding pipeline of transition, can ensure that final product quality is more preferable, and production is more stable, significantly reduces the output quantity of defect ware.

Description

A kind of injection mold of the moulding pipeline of built-in transition
Technical field
The present invention relates to technical field of mold, the specially a kind of injection mold of the moulding pipeline of built-in transition.
Background technology
Injection mold is a kind of tool producing plasthetics, is also to confer to plasthetics complete structure and accurate dimension Tool, injection molding are to produce a kind of processing method used when certain complex-shaped components in batches, refer specifically to melt heated Plastics by injection molding machine high pressure inject die cavity obtain formed products after cooling and solidifying.
However existing injection mold is easy when being produced and processed to plastic product because of stream of the slurry in mould It is dynamic not enough uniformly to cause to occur stomata inside finished product or at the insufficient problem of mould, to influence final product quality, cause final The more defect ware of output, consuming cost, for this purpose, it is proposed that one kind being built-in with moulding pipeline and final product quality is more preferable, produces More stable injection mold.
Invention content
The purpose of the present invention is to provide a kind of injection molds of the built-in moulding pipeline of transition, to solve above-mentioned background technology The existing injection mold of middle proposition is easy because of flowing of the slurry in mould not when being produced and processed to plastic product It is enough uniformly to cause occur stomata inside finished product or at the insufficient problem of mould.
To achieve the above object, the present invention provides the following technical solutions:A kind of injection mold of the moulding pipeline of built-in transition, Including top clamping plate, the moulding pipeline of transition and Bottom clamp plate, the centre of the top clamping plate is equipped with sprue bush, and sprue bush Centre is provided with feed pipe, rebound is equipped with below the top clamping plate, and the melting that is internally provided with of rebound is kept the temperature The inner wall of pipe, the melting insulating tube is fixed with stomata, and the centre of stomata is equipped with a point film, the moulding pipeline of transition Between a point slurry pipeline is installed, and the moulding pipeline of transition is located at the inside of melting insulating tube, the both sides up and down of described point of slurry pipeline It is respectively and fixedly provided with pouring head, string heat pipe is provided between the melting insulating tube, and be respectively and fixedly provided with a point heat at left and right sides of string heat pipe Pipe, be equipped with solid plate below the rebound, and solid plate is internally provided with cooling water channel, the lower section of the solid plate Moving platen is installed, and is provided with guide post on the right side of moving platen, the inside of the moving platen, which is run through, ventilation pipe, and moving platen Centre be provided with mode chamber, support plate is installed, and backing plate is provided with below support plate below the moving platen, it is described The centre of backing plate is equipped with push plate, and the centre of push plate is provided with sprue puller, is mounted on and pushes away at left and right sides of the sprue puller Bar, and release link is provided on the outside of push rod, the inside of the Bottom clamp plate is equipped with bearing nail, and Bottom clamp plate is located at backing plate Lower section, be fixed with seat board below the Bottom clamp plate, and buckle is installed below seat board, the outside setting of the buckle There is adapter sleeve, and hydraulic stem is installed on the outside of adapter sleeve, retainer plate, and a left side for retainer plate are provided on the outside of the hydraulic stem Right both sides are welded with workbench fixed block.
Preferably, the inner wall of the melting insulating tube is evenly distributed with stomata, and the inside of film is divided to be in mesh knot Structure.
Preferably, surface is bonded to each other between the melting insulating tube and the moulding pipeline of transition, and melts insulating tube and mistake It is "u"-shaped to cross moulding pipeline.
Preferably, the feed pipe is by dividing the moulding pipeline of slurry pipeline and transition to be connected to, and feed pipe and divide slurry pipeline it Between be mutually perpendicular to.
Preferably, described that every 4 of heat pipe is divided to be one group, and the central axes between two groups about string heat pipe are symmetrical.
Preferably, equal sized between the rebound, solid plate, moving platen, support plate and backing plate and rebound, fixed Surface fits closely between template, moving platen, support plate and backing plate.
Preferably, the buckle is annularly uniformly distributed about the central axes of seat board, and between buckle and adapter sleeve mutually Cooperation.
Preferably, the adapter sleeve constitutes stretching structure by hydraulic stem and retainer plate, and between adapter sleeve and retainer plate Radian is equal.
Preferably, the central axes between the workbench fixed block about retainer plate are symmetrical, and the side of workbench fixed block Face is in " C " shape.
Compared with prior art, the beneficial effects of the invention are as follows:The injection mold of the built-in moulding pipeline of transition is built-in with The moulding pipeline of transition can ensure that final product quality is more preferable, and production is more stable, significantly reduces the output quantity of defect ware, gas Being uniformly distributed for hole contributes to hot gas to be uniformly diffused into the moulding pipeline of transition by melting insulating tube, makes in the moulding pipeline of transition The transition slurry moment is acted on by temperature softening, ensures mobility, the mesh-structured of film is divided to be designed with conducive to temperature more Add and be equably applied on the moulding pipeline of transition, melting insulating tube is wrapped in the outside of the moulding pipeline of transition, to transition shaping conduit Slurry provides the hot-fluid of stable circulation inside road, avoids slurry solidified forming inside the moulding pipeline of transition, the design of "u"-shaped Contribute to slurry to be circulated inside the moulding pipeline of transition, complement each other, make inside the moulding pipeline of transition slurry formally into The feeding-passage for entering the mold that just taken the lead in occupying before mode, on the one hand can completely cut off outside air and enter and form gas inside mode On the other hand bubble is then that can make slurry before injection molding there are one transient process, makes each injection-moulding position slurry amount phase as much as possible When, feed pipe is connected with the moulding pipeline of transition, and plastics slurry is introduced into the moulding pipeline of transition, completes slip casting process, point Heat pipe carries out branch transmission to the high temperature transmitted from string heat pipe, is applied to position everywhere in melting insulating tube, melting is made to keep the temperature Pipe internal temperature is balanced, is distributed layer by layer between rebound, solid plate, moving platen, support plate and backing plate, passes through each company between each other Relay part closely against, ensure that the integrally-built firmness of injection mold, at the same make mold have extraordinary sealing effect, It cooperates between buckle and adapter sleeve, seat board is fixed on retainer plate, clamping is fixed to mold, so that mold is placed steady Fixed, hydraulic stem can control the clearance distance between adapter sleeve and retainer plate, can inwardly push adapter sleeve, complete mold dress Folder, adapter sleeve can also be displaced outwardly, mold is unclamped, workbench fixed block be by retainer plate be fixed to workbench on must Structure is wanted, most basic support fixed function is provided for entire injection mold.
Description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is present invention melting insulation pipe structure schematic diagram;
Fig. 3 is the moulding pipeline structural schematic diagram of transition of the present invention;
Fig. 4 is base plate structure schematic diagram of the present invention;
Fig. 5 is fixed ring schematic diagram of the present invention.
In figure:1, top clamping plate, 2, sprue bush, 3, feed pipe, 4, rebound, 5, melting insulating tube, 6, stomata, 7, point heat Diaphragm, 8, the moulding pipeline of transition, 9, divide slurry pipeline, 10, pouring head, 11, string heat pipe, 12, divide heat pipe, 13, solid plate, 14, cold But water channel, 15, moving platen, 16, guide post, 17, ventilation pipe, 18, mode chamber, 19, support plate, 20, backing plate, 21, push plate, 22, Sprue puller, 23, push rod, 24, release link, 25, Bottom clamp plate, 26, bearing nail, 27, seat board, 28, buckle, 29, adapter sleeve, 30, Hydraulic stem, 31, retainer plate, 32, workbench fixed block.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
- 5 are please referred to Fig.1, the present invention provides a kind of technical solution:A kind of injection mold of the moulding pipeline of built-in transition, packet Top clamping plate 1, the moulding pipeline 8 of transition and Bottom clamp plate 25 are included, the centre of top clamping plate 1 is equipped with sprue bush 2, and sprue bush 2 Centre be provided with feed pipe 3, the lower section of top clamping plate 1 is equipped with rebound 4, and the melting that is internally provided with of rebound 4 is protected The inner wall of warm pipe 5, melting insulating tube 5 is fixed with stomata 6, and the centre of stomata 6 is equipped with point film 7, melting insulating tube 5 Inner wall is evenly distributed with stomata 6, and the inside of film 7 is divided to be in mesh-like structure, being uniformly distributed of stomata 6 contribute to hot gas by Melting insulating tube 5 is uniformly diffused into the moulding pipeline of transition 8, makes the transition slurry moment in the moulding pipeline of transition 8 by temperature The effect of softening ensures mobility, and mesh-structured be designed with of film 7 is divided more uniformly to be applied to transition modeling conducive to temperature On shape pipeline 8, a point slurry pipeline 9 is installed, and the moulding pipeline 8 of transition is located at the interior of melting insulating tube 5 between the moulding pipeline of transition 8 Portion melts surface between insulating tube 5 and the moulding pipeline 8 of transition and is bonded to each other, and melting insulating tube 5 and the moulding pipeline 8 of transition are equal For "u"-shaped, melting insulating tube 5 is wrapped in the outside of the moulding pipeline of transition 8, is provided to the moulding 8 inside slurry of pipeline of transition The hot-fluid of stable circulation avoids the moulding 8 inside slurry solidified forming of pipeline of transition, the design of "u"-shaped that slurry is contributed to exist Circulate, complement each other inside the moulding pipeline of transition 8, make the moulding 8 inside slurry of pipeline of transition before formally entering mode just Taken the lead in occupying the feeding-passage of mold, on the one hand can completely cut off outside air and enters and forms bubble inside mode, on the other hand It is then that can make slurry before injection molding there are one transient process, makes each injection-moulding position slurry amount suitable as much as possible, feed pipe 3 is logical Excessively the moulding pipeline of slurry pipeline 9 and transition 8 is connected to, and feed pipe 3 and dividing between slurry pipeline 9 is mutually perpendicular to, feed pipe 3 and transition Moulding pipeline 8 is connected, and plastics slurry is introduced into the moulding pipeline of transition 8, completes slip casting process, divide slurry pipeline 9 up and down Both sides are respectively and fixedly provided with pouring head 10, string heat pipe 11 are provided between melting insulating tube 5, and the left and right sides of string heat pipe 11 is fixed Have point heat pipe 12, it is one group to divide heat pipe 12 every 4, and the central axes between two groups about string heat pipe 11 are symmetrical, divide heat pipe 12 to from The high temperature transmitted in string heat pipe 11 carries out branch transmission, is applied to position everywhere in melting insulating tube 5, makes in melting insulating tube 5 Portion's temperature equalization, the lower section of rebound 4 be equipped with solid plate 13, and solid plate 13 is internally provided with cooling water channel 14, cover half The lower section of plate 13 is equipped with moving platen 15, and the right side of moving platen 15 is provided with guide post 16, and the inside of moving platen 15 is logical through having Feed channel 17, and the centre of moving platen 15 is provided with mode chamber 18, the lower section of moving platen 15 is equipped with support plate 19, and support plate 19 lower section is provided with backing plate 20, equal sized between rebound 4, solid plate 13, moving platen 15, support plate 19 and backing plate 20, And surface fits closely between rebound 4, solid plate 13, moving platen 15, support plate 19 and backing plate 20, rebound 4, solid plate 13, it is distributed layer by layer between moving platen 15, support plate 19 and backing plate 20, between each other by each connecting component closely against guarantee The integrally-built firmness of injection mold, while making mold that there is extraordinary sealing effect, the centre of backing plate 20 is equipped with Push plate 21, and the centre of push plate 21 is provided with sprue puller 22, the left and right sides of sprue puller 22 is mounted on push rod 23, and push rod 23 Outside be provided with release link 24, the inside of Bottom clamp plate 25 is equipped with bearing nail 26, and Bottom clamp plate 25 is located at backing plate 20 The lower section of lower section, Bottom clamp plate 25 is fixed with seat board 27, and the lower section of seat board 27 is equipped with buckle 28, the outside setting of buckle 28 There is adapter sleeve 29, and the outside of adapter sleeve 29 is equipped with hydraulic stem 30, buckle 28 is annularly uniform about the central axes of seat board 27 Distribution, and cooperate between buckle 28 and adapter sleeve 29, it cooperates between buckle 28 and adapter sleeve 29, seat board 27 is fixed Onto retainer plate 31, clamping is fixed to mold, so that mold is placed and stablizes, the outside of hydraulic stem 30 is provided with retainer plate 31, And the left and right sides of retainer plate 31 is welded with workbench fixed block 32, adapter sleeve 29 is made up of hydraulic stem 30 and retainer plate 31 Stretching structure, and radian is equal between adapter sleeve 29 and retainer plate 31, hydraulic stem 30 can control adapter sleeve 29 and retainer plate 31 Between clearance distance, can by adapter sleeve 29 inwardly push, complete clamping mould, adapter sleeve 29 can also be displaced outwardly, Mold is unclamped, the central axes between workbench fixed block 32 about retainer plate 31 are symmetrical, and the side of workbench fixed block 32 In " C " shape, workbench fixed block 32 is the necessary structure being fixed to retainer plate 31 on workbench, is provided for entire injection mold Most basic support fixed function.
Operation principle:For this kind of injection mold first by mode component placement in mode chamber 18, to each portion of mold Position part carries out reasonable installation and fastening, and workbench fixed block 32 is fixed on the table, and base support is provided for entire mold, Under the action of hydraulic stem 30, the clearance distance between adapter sleeve 29 and retainer plate 31 can be adjusted, it both can will be tight Admittedly set 29 inwardly pushes, clamping mould is completed, adapter sleeve 29 can also be displaced outwardly, mold is unclamped, buckle 28 and fastening It cooperates between set 29, clamping is fixed to mold, proceeds by injection molding work, by plastics slurry from sprue bush 2 Feed pipe 3 is circulated into mold, and slurry arrives first at 4 position of rebound, and is flowed in the moulding pipeline of the cyclic annular transition of " u "-shaped 8 It is dynamic, it is passed through thermal current in string heat pipe 11, and the different location of melting insulating tube 5 is respectively transmitted under the action of dividing heat pipe 12, And spread out of from stomata 6 through excessive film 7, in stepless action to the moulding pipeline of transition 8, make the mistake in the moulding pipeline of transition 8 Cross the slurry moment is acted on by temperature softening, ensures mobility, and the "u"-shaped design of the moulding pipeline of transition 8 helps to expect Slurry circulates inside the moulding pipeline of transition 8, complements each other, and the moulding 8 inside slurry of pipeline of transition is made formally to enter mode On the one hand the preceding feeding-passage for just having taken the lead in occupying mold can completely cut off outside air and enter formation bubble inside mode, another Aspect is then that can make slurry before injection molding there are one transient process, makes the slurry amount on each injection-moulding position suitable as much as possible, Slurry is injected into eventually by pouring head 10 in mode element, is passed through cooling flow inside cooling water channel 14, in ventilation pipe 17 It is passed through cooling gas, takes away slurry temperature to the maximum extent, so that product is quickly cooled down forming, and cooling effect is uniform, it is cooling Dynamics is also bigger, and after product cooling forming, the push rod 23 in push plate 21 releases workpiece, and sprue puller 22 moves, guide post 16 Position movement occurs therewith, solid plate 13 and moving platen 15 detach, and shaped article, with mould separating, takes off under the action of push rod 23 After mould, sprue puller 22 retracts to original position, and release link 24 resets push plate 21, completes using for entire injection mold like this Journey.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of variations, modification, replace And modification, the scope of the present invention is defined by the appended.

Claims (9)

1. a kind of injection mold of the moulding pipeline of built-in transition, including top clamping plate (1), the moulding pipeline of transition (8) and dynamic model seat Plate (25), it is characterised in that:The centre of the top clamping plate (1) is equipped with sprue bush (2), and the intermediate setting of sprue bush (2) There is feed pipe (3), rebound (4) is installed below the top clamping plate (1), and rebound (4) is internally provided with melting The inner wall of insulating tube (5), the melting insulating tube (5) is fixed with stomata (6), and the centre of stomata (6) is equipped with a point film (7), a point slurry pipeline (9) is installed, and the moulding pipeline of transition (8) is located at melting insulating tube between the moulding pipeline of the transition (8) (5) both sides up and down of inside, described point of slurry pipeline (9) are respectively and fixedly provided with pouring head (10), are set between the melting insulating tube (5) It is equipped with string heat pipe (11), and is respectively and fixedly provided with a point heat pipe (12) at left and right sides of string heat pipe (11), the lower section peace of the rebound (4) Equipped with solid plate (13), and solid plate (13) is internally provided with cooling water channel (14), the lower section installation of the solid plate (13) There is moving platen (15), and be provided with guide post (16) on the right side of moving platen (15), the inside of the moving platen (15), which is run through, ventilation Pipeline (17), and the centre of moving platen (15) is provided with mode chamber (18), and support plate is equipped with below the moving platen (15) (19), it and below support plate (19) is provided with backing plate (20), the centre of the backing plate (20) is equipped with push plate (21), and push plate (21) centre is provided with sprue puller (22), and push rod (23), and push rod are mounted at left and right sides of the sprue puller (22) (23) release link (24) is provided on the outside of, the inside of the Bottom clamp plate (25) is equipped with bearing nail (26), and Bottom clamp plate (25) it is located at the lower section of backing plate (20), seat board (27), and the lower section of seat board (27) is fixed with below the Bottom clamp plate (25) Buckle (28) is installed, adapter sleeve (29) is provided on the outside of the buckle (28), and liquid is installed on the outside of adapter sleeve (29) Compression bar (30) is provided with retainer plate (31) on the outside of the hydraulic stem (30), and the left and right sides of retainer plate (31) is welded with Workbench fixed block (32).
2. a kind of injection mold of the moulding pipeline of built-in transition according to claim 1, it is characterised in that:The melting is protected The inner wall of temperature pipe (5) is evenly distributed with stomata (6), and the inside of film (7) is divided to be in mesh-like structure.
3. a kind of injection mold of the moulding pipeline of built-in transition according to claim 1, it is characterised in that:The melting is protected Surface is bonded to each other between temperature pipe (5) and the moulding pipeline of transition (8), and is melted insulating tube (5) and be with the moulding pipeline of transition (8) "u"-shaped.
4. a kind of injection mold of the moulding pipeline of built-in transition according to claim 1, it is characterised in that:The feed pipe (3) by dividing slurry pipeline (9) to be connected to the moulding pipeline of transition (8), and feed pipe (3) and dividing between slurry pipeline (9) is mutually perpendicular to.
5. a kind of injection mold of the moulding pipeline of built-in transition according to claim 1, it is characterised in that:Described point of heat pipe (12) every 4 are one group, and the central axes between two groups about string heat pipe (11) are symmetrical.
6. a kind of injection mold of the moulding pipeline of built-in transition according to claim 1, it is characterised in that:The rebound (4), equal sized between solid plate (13), moving platen (15), support plate (19) and backing plate (20), and rebound (4), solid plate (13), surface fits closely between moving platen (15), support plate (19) and backing plate (20).
7. a kind of injection mold of the moulding pipeline of built-in transition according to claim 1, it is characterised in that:The buckle (28) central axes about seat board (27) are annularly uniformly distributed, and are cooperated between buckle (28) and adapter sleeve (29).
8. a kind of injection mold of the moulding pipeline of built-in transition according to claim 1, it is characterised in that:The adapter sleeve (29) stretching structure, and radian phase between adapter sleeve (29) and retainer plate (31) are constituted by hydraulic stem (30) and retainer plate (31) Deng.
9. a kind of injection mold of the moulding pipeline of built-in transition according to claim 1, it is characterised in that:The workbench Central axes between fixed block (32) about retainer plate (31) are symmetrical, and the side of workbench fixed block (32) is in " C " shape.
CN201810285840.5A 2018-04-03 2018-04-03 A kind of injection mold of the moulding pipeline of built-in transition Pending CN108608623A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810285840.5A CN108608623A (en) 2018-04-03 2018-04-03 A kind of injection mold of the moulding pipeline of built-in transition

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810285840.5A CN108608623A (en) 2018-04-03 2018-04-03 A kind of injection mold of the moulding pipeline of built-in transition

Publications (1)

Publication Number Publication Date
CN108608623A true CN108608623A (en) 2018-10-02

Family

ID=63659482

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810285840.5A Pending CN108608623A (en) 2018-04-03 2018-04-03 A kind of injection mold of the moulding pipeline of built-in transition

Country Status (1)

Country Link
CN (1) CN108608623A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204622481U (en) * 2015-04-22 2015-09-09 苏州好特斯模具有限公司 A kind of balanced type ultra-thin light guide board TOP-TIP
EP2976200A1 (en) * 2013-03-18 2016-01-27 Husky Injection Molding Systems S.A. Melt control in an injection molding system
CN106272160A (en) * 2016-08-29 2017-01-04 西安航天动力机械厂 A kind of automatic centering clamping mechanism
CN107234779A (en) * 2017-06-22 2017-10-10 宁波斯穆汽车模具有限公司 Auxiliary fasia console mould
CN206644271U (en) * 2017-03-02 2017-11-17 昆山格润泰电子科技有限公司 A kind of hot flow path of homogeneous heating
CN206748857U (en) * 2017-03-22 2017-12-15 嵊州市腾源模具有限公司 A kind of fixing device of mould
CN107599306A (en) * 2017-09-21 2018-01-19 昆山力维拓工业自动化科技有限公司 A kind of hardware injection mould
CN206953414U (en) * 2017-05-16 2018-02-02 纪晨涵 A kind of injection mold being conveniently replaceable

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2976200A1 (en) * 2013-03-18 2016-01-27 Husky Injection Molding Systems S.A. Melt control in an injection molding system
CN204622481U (en) * 2015-04-22 2015-09-09 苏州好特斯模具有限公司 A kind of balanced type ultra-thin light guide board TOP-TIP
CN106272160A (en) * 2016-08-29 2017-01-04 西安航天动力机械厂 A kind of automatic centering clamping mechanism
CN206644271U (en) * 2017-03-02 2017-11-17 昆山格润泰电子科技有限公司 A kind of hot flow path of homogeneous heating
CN206748857U (en) * 2017-03-22 2017-12-15 嵊州市腾源模具有限公司 A kind of fixing device of mould
CN206953414U (en) * 2017-05-16 2018-02-02 纪晨涵 A kind of injection mold being conveniently replaceable
CN107234779A (en) * 2017-06-22 2017-10-10 宁波斯穆汽车模具有限公司 Auxiliary fasia console mould
CN107599306A (en) * 2017-09-21 2018-01-19 昆山力维拓工业自动化科技有限公司 A kind of hardware injection mould

Similar Documents

Publication Publication Date Title
CN206967884U (en) A kind of automobile middle control integrated electronic connector mould
CN104608331B (en) A kind of large-scale PVC plastic pipe injection mold hot runner dish-style apparatus for pouring
CN102328404A (en) Ejection forming method and injection machine
CN105799124A (en) Cold runner device of liquid silicon rubber injection mold
CN208180137U (en) A kind of automatic demoulding plastic injection mold
CN208020655U (en) Side core-pulling injection mold with groove plastic
CN206614758U (en) The O-shaped rubber seal cold runner die device of one kind production
CN108608623A (en) A kind of injection mold of the moulding pipeline of built-in transition
CN206484819U (en) A kind of novel injection moulding machine mould
CN205572889U (en) Cold heat altered in double -deck water route of injection mold two -chamber trades control system
CN205735802U (en) A kind of rubber mats mould
CN209832459U (en) Nut injection mold
CN209191186U (en) It is a kind of for processing the novel die structure of thin-wall product
CN210389971U (en) Injection mold for auto-parts
CN209426080U (en) A kind of injection mold that silica gel push-button production thermal diffusivity is good
CN208914516U (en) A kind of injection mold apparatus of automobile Lamp cup
CN207014701U (en) A kind of pipe clamp mould
CN205767335U (en) A kind of injection mold with heat insulation function
CN206825849U (en) One kind injection demoulding blowing structure
CN209095942U (en) A kind of automobile tail light injection mold
CN105500628B (en) The cold and hot conversion control system in injection mold two-chamber bilayer water route
CN111645285A (en) Auto parts production injection mold cooling device
CN206406378U (en) A kind of running gate system of multiple flow passages
CN215242505U (en) Multi-insert high-precision injection mold
CN202572817U (en) Fixed mould structure of mould for manufacturing lenses by hot runner

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190606

Address after: 441200 No. 55-128 Xinhua Road, Nancheng Office, Zaoyang City, Xiangyang City, Hubei Province

Applicant after: Yi Yuanxiang

Address before: 100083 Beijing Forestry University, 35 Tsinghua East Road, Haidian District, Beijing

Applicant before: Chen Xuelong

SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination