CN108595807B - 一种巷道底板卸压槽宽度的计算方法 - Google Patents

一种巷道底板卸压槽宽度的计算方法 Download PDF

Info

Publication number
CN108595807B
CN108595807B CN201810334759.1A CN201810334759A CN108595807B CN 108595807 B CN108595807 B CN 108595807B CN 201810334759 A CN201810334759 A CN 201810334759A CN 108595807 B CN108595807 B CN 108595807B
Authority
CN
China
Prior art keywords
tunnel
release groove
pressure relief
groove width
roadway floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810334759.1A
Other languages
English (en)
Other versions
CN108595807A (zh
Inventor
张�杰
周府伟
龙晶晶
孙遥
蔡维山
刘清洲
赵劝
任延兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Anchenxin Information Technology Co ltd
Original Assignee
Xian University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Science and Technology filed Critical Xian University of Science and Technology
Priority to CN201810334759.1A priority Critical patent/CN108595807B/zh
Publication of CN108595807A publication Critical patent/CN108595807A/zh
Application granted granted Critical
Publication of CN108595807B publication Critical patent/CN108595807B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Force Measurement Appropriate To Specific Purposes (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

本本发明公开了一种巷道底板卸压槽宽度的计算方法,包括以下步骤:步骤一、确定卸压槽的深度值h;步骤二、计算水平均布载荷p;步骤三、确定卸压槽深度范围内岩层的弹性模量E;步骤四、确定卸压槽宽度l,卸压槽宽度l应满足公式:该公式中:k为富余系数、l为卸压槽宽度、υ为巷道上覆岩层的泊松比、γ为巷道上覆岩层的平均容重、H为巷道埋深、h为卸压槽深度、E为卸压槽深度范围内岩层的弹性模量。本发明计算方法简单,能够使得卸压槽宽度的选取不再盲目,确保了卸压槽治理巷道底鼓的科学性和合理性,实用性强。

Description

一种巷道底板卸压槽宽度的计算方法
技术领域
本发明属于煤矿开采技术领域,具体是涉及一种巷道底板卸压槽宽度的计算方法。
背景技术
巷道掘出后,底板岩层会在应力作用下向巷道内压曲、扩容、膨胀,形成底鼓。底鼓是煤矿巷道常见的动力现象,现场实测数据表明,我国煤矿巷道顶底板移近量中约2/3是由底板的鼓起变形造成的,底鼓导致巷道断面变形,阻碍通风,妨碍正常运输和行人。治理底鼓的费用占到整个巷道维护总费用的一半以上,底鼓对矿井的生产造成严重影响。如何治理巷道底鼓成为很多煤矿面临的主要难题。
汇总目前国内外各种底鼓控制技术,按照控制机理的不同可分为三大类型,即:支护加固法、卸压法及联合支护法。
卸压槽控制巷道底鼓法是卸压法中的一种,其机理是通过对巷道底板2开设卸压槽6,使得原本作用于巷道底板2的高应力转移至深部较硬的岩层,使底板形成“强弱强”的稳定受力结构,用卸压槽6的变形量来减轻或抵消巷道底板2向巷道1空间内的变形量,保持巷道底板2的稳定,如图2所示。
当对巷道底板2采取开设卸压槽6处理时,卸压槽6参数(深度和宽度)的选取一直是当前研究的热门课题。参数选取过大,浪费大量的人力、物力和财力,参数选取过小,不能有效治理巷道底鼓。在对卸压槽6深度的选取中,目前已形成较为成熟的理论。在卸压槽6宽度的确定上,由于以往学者们只侧重于研究卸压槽6深度对底鼓的治理效果,而忽视了对卸压槽6宽度确定方法的研究,导致目前卸压槽6宽度的选取只能依赖现场经验,这使得在卸压槽6宽度的选取上存在很大的盲目性。
发明内容
本发明的目的在于克服上述现有技术中的不足,提供一种巷道底板卸压槽宽度的计算方法,其根据现有的力学理论和矿山压力理论对卸压槽宽度的确定方法进行了研究,提出科学的卸压槽宽度计算方法,为卸压槽宽度的选取提供科学的理论依据;通过实验和实测获得基本数据,然后进行合理的计算,最终获得卸压槽宽度的合理取值,其计算方法简单;使得卸压槽宽度的选取不再盲目,确保了卸压槽治理巷道底鼓的科学性和合理性,实用性强。
为实现上述目的,本发明采用的技术方案是:一种巷道底板卸压槽宽度的计算方法,其特征在于,包括以下步骤:
步骤一、确定卸压槽的深度值h;
步骤二、计算巷道底板的水平均布载荷p;
步骤三、确定卸压槽深度范围内岩层的弹性模量E;
步骤四、确定卸压槽宽度l,卸压槽宽度l应满足如下公式:
该公式中:k为富余系数、l为卸压槽宽度、υ为巷道上覆岩层的泊松比、γ为巷道上覆岩层的平均容重、H为巷道埋深、h为卸压槽深度、E为卸压槽深度范围内岩层的弹性模量。
上述的一种巷道底板卸压槽宽度的计算方法,其特征在于:步骤二中所述的计算巷道底板的水平均布载荷p是按照如下步骤进行的:
第一步、通过测量或者计算获取巷道埋深值H,通过实验测得巷道上覆岩层的平均容重γ和巷道上覆岩层的泊松比υ,
第二步、通过公式一p=σx=(λγH×103)h和公式二来计算并确定巷道底板的水平均布载荷p,
公式一中,p为巷道底板的水平均布载荷、σx为巷道底板内部的水平应力、γ为巷道上覆岩层的平均容重、H为巷道埋深、h为卸压槽深度、λ为测压系数;
公式二中,λ为测压系数、υ为巷道上覆岩层的泊松比。
上述的一种巷道底板卸压槽宽度的计算方法,其特征在于:步骤三中所述卸压槽深度范围内岩层的弹性模量E是通过原位岩体力学试验测定或者实验室对岩样测试来得到的。
上述的一种巷道底板卸压槽宽度的计算方法,其特征在于:步骤三中所述富余系数k的取值为1.2~1.6。
上述的一种巷道底板卸压槽宽度的计算方法,其特征在于:步骤三中所述富余系数k的取值为1.4。
本发明与现有技术相比具有以下优点:
1、本发明通过实验和实测获得基本数据,然后进行合理的计算,最终获得卸压槽宽度合理的准确值;使得卸压槽宽度的选取不再盲目,确保了卸压槽治理巷道底鼓的科学性。
2、本发明根据现有的力学理论和矿山压力理论对卸压槽宽度的确定方法进行研究,提出科学的卸压槽宽度计算公式方法,为卸压槽宽度的选取提供科学的理论依据。
3、本发明通过计算确定的卸压槽参数能够有效的防止了巷道底鼓的发生,降低了巷道维护费用,解决了由于底鼓引起的工期延误,工作面无法正常交接的问题,达到了安全、高效、低耗、低成本、高效益生产的目的。
4、本发明计算方法简单,实用性强。
下面通过附图和实施例,对本发明做进一步的详细描述。
附图说明
图1为无卸压槽巷道形成底鼓的力学模型图。
图2为现有卸压槽控制巷道底鼓法中的底板“强弱强”的结构示意图。
图3为本发明将巷道卸压槽壁简化为悬臂梁的模型示意图。
图4为本发明卸压槽的左侧槽壁受力模型示意图。
附图标记说明:
1—巷道; 2—巷道底板; 3—底板岩层;
4—应力; 5—槽壁; 6—卸压槽。
具体实施方式
下面结合安山煤矿31煤四盘区胶运大巷巷道底板卸压槽的施工对本发明内容进行进一步说明。
安山煤矿31煤四盘区胶运大巷宽为4.7m,高为2.5m。直接顶为互层中粒砂岩,厚度为7.26m。直接底为泥质粉砂岩,厚度约为8.17m。顶板为锚网支护,帮部不支护,底板采用混凝土硬化。顶板锚杆采用Φ20×2000mm左旋无纵筋螺纹钢锚杆,顶板锚杆间排距为1050×1000mm,钢托梁长度为4700mm,宽度为80mm,排距为1000mm,锚索孔深为5800mm三花布置,间排距为2000×3000mm。大巷掘进过程中,底板岩层3会在应力4的作用下向巷道1内压曲、扩容、膨胀,形成底鼓,如图1所示。使巷道无法正常使用,制约了矿井正常的接续。综合分析,决定在胶运大巷底板开凿卸压槽治理巷道底鼓。
步骤一、确定卸压槽的深度值h;通过已有的理论计算方法结合数值模拟软件得出切槽深度h为2m。
步骤二、计算巷道底板的水平均布载荷p;
第一步、根据该矿地质资料,通过测量或者计算获取巷道埋深值H为131m,巷道上覆岩层的平均容重γ为30KN/m3,巷道上覆岩层的泊松比υ为0.4。
第二步、通过公式p=σx=(λγH×103)h (公式一)
和公式
计算并获得巷道底板的水平均布载荷p,其中,σx为巷道底板内部的水平应力、λ为测压系数;
步骤三、确定卸压槽深度范围内岩层的弹性模量E;根据该矿地质资料,通过原位岩体力学试验测定或者实验室对岩样测试来得到的巷道底板弹性模量E为304MPa。
步骤四、确定卸压槽宽度l,
如图3所示,如果切卸压槽6后,巷道底板2切槽范围内的垂直应力得到释放,槽壁5主要受巷道底板的水平载荷P的作用。因此,可将卸压槽壁5简化为长度为h,截面宽度为b(h/b≥5)的悬臂梁结构。以卸压槽6左侧槽壁5为例进行分析,卸压槽6的左侧槽壁5受力模型如图4所示。
在巷道底板的水平均布载荷p的作用下,悬臂梁的转角方程及挠曲线方程如下:
式中,E为卸压槽深度范围内岩层的弹性模量、w为悬臂梁产生的挠度、θ为左侧槽壁在巷道底板的水平均布载荷p的作用下形成的转角、p为巷道底板的水平均布载荷、z为z轴方向上任意一点的取值(本实施例中z=h)、h为卸压槽深度、I为卸压槽深度范围内岩体截面惯性矩,
此时,在悬臂梁端部Z=h处产生最大挠度wmax
为防治切槽闭合后无法继续吸收底板变形,由卸压槽左右两侧对称性可得切槽宽度l应满足:
将p=σx=(λγH×103)h,hb≥5,代入式(4)得到切槽宽度l:
将步骤一中确定的卸压槽的深度值h;步骤二中获得的巷道埋深值H、巷道上覆岩层的平均容重γ、巷道上覆岩层的泊松比υ;步骤三中获取的卸压槽深度范围内岩层的弹性模量E;最后再带入富余系数k的取值,最终得到切槽宽度l。
在安山煤矿31煤四盘区胶运大巷中,h=2m,H=131m,γ=30KN/m3,υ=0.4,E=304MPa,k=1.2~1.6,优选的k为1.4。将以上数据代入公式(5),得到切槽宽度l=0.4m。
将计算得出的切槽参数用于安山煤矿31煤四盘区胶运大巷底鼓治理过程中,根据现场实测数据,未切卸压槽巷道在0天~80天内变形剧烈;80天~100天内,变形趋于平缓;100天之后变形趋于稳定;平均底鼓量416mm。切卸压槽段巷道在0天~60天内出现较小变形;60~80天内,变形趋于平缓;80天之后,变形趋于稳定;平均底鼓量127mm。切卸压槽段巷道较未切卸压槽巷道底鼓量降低69.4%,巷道变形时间缩短约20天。切卸压槽后的底板表面平整,未发生底鼓现象。
由本发明确定的卸压槽参数有效的防止了巷道底鼓的发生,降低了巷道维护费用,解决了由于底鼓引起的工期延误,工作面无法正常交接的问题,达到了安全、高效、低耗、低成本、高效益生产的目的。
以上所述,仅是本发明的较佳实施例,并非对本发明作任何限制,凡是根据本发明技术实质对以上实施例所作的任何简单修改、变更以及等效结构变换,均仍属于本发明技术方案的保护范围内。

Claims (4)

1.一种巷道底板卸压槽宽度的计算方法,其特征在于,包括以下步骤:
步骤一、确定卸压槽的深度值h;
步骤二、计算巷道底板的水平均布载荷p;
步骤三、确定卸压槽深度范围内岩层的弹性模量E;
步骤四、确定卸压槽宽度l,卸压槽宽度l应满足如下公式:
该公式中:k为富余系数、l为卸压槽宽度、υ为巷道上覆岩层的泊松比、γ为巷道上覆岩层的平均容重、H为巷道埋深、h为卸压槽深度、E为卸压槽深度范围内岩层的弹性模量;
所述富余系数k的取值为1.2~1.6。
2.按照权利要求1所述的一种巷道底板卸压槽宽度的计算方法,其特征在于:步骤二中所述的计算巷道底板的水平均布载荷p是按照如下步骤进行的:
第一步、通过测量或者计算获取巷道埋深值H,通过实验测得巷道上覆岩层的平均容重γ和巷道上覆岩层的泊松比υ,
第二步、通过公式一p=σx=(λγH×103)h和公式二来计算并确定巷道底板的水平均布载荷p,
公式一中,p为巷道底板的水平均布载荷、σx为巷道底板内部的水平应力、γ为巷道上覆岩层的平均容重、H为巷道埋深、h为卸压槽深度、λ为测压系数;
公式二中,λ为测压系数、υ为巷道上覆岩层的泊松比。
3.按照权利要求1所述的一种巷道底板卸压槽宽度的计算方法,其特征在于:步骤三中所述卸压槽深度范围内岩层的弹性模量E是通过原位岩体力学试验测定或者实验室对岩样测试来得到的。
4.按照权利要求1所述的一种巷道底板卸压槽宽度的计算方法,其特征在于:步骤三中所述富余系数k的取值为1.4。
CN201810334759.1A 2018-04-15 2018-04-15 一种巷道底板卸压槽宽度的计算方法 Active CN108595807B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810334759.1A CN108595807B (zh) 2018-04-15 2018-04-15 一种巷道底板卸压槽宽度的计算方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810334759.1A CN108595807B (zh) 2018-04-15 2018-04-15 一种巷道底板卸压槽宽度的计算方法

Publications (2)

Publication Number Publication Date
CN108595807A CN108595807A (zh) 2018-09-28
CN108595807B true CN108595807B (zh) 2019-04-05

Family

ID=63622594

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810334759.1A Active CN108595807B (zh) 2018-04-15 2018-04-15 一种巷道底板卸压槽宽度的计算方法

Country Status (1)

Country Link
CN (1) CN108595807B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113536479B (zh) * 2021-07-06 2024-01-26 宁波信泰机械有限公司 一种高光贴膜及高光涂装的滚压门框式样的设计方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013046200A1 (en) * 2011-09-27 2013-04-04 Mobius Protection Systems Ltd. Safety seat
CN205025479U (zh) * 2015-09-17 2016-02-10 安徽理工大学 一种治理软岩巷道底鼓的底板支护系统
CN106401609A (zh) * 2016-11-10 2017-02-15 河南理工大学 一种控制深部巷道底臌的底板卸压加固结构及其施工方法

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203756206U (zh) * 2014-03-19 2014-08-06 山东科技大学 一种新型软岩巷道底臌治理结构
CN206205903U (zh) * 2016-11-10 2017-05-31 河南理工大学 一种控制深部巷道底臌的底板卸压加固结构
CN107246273B (zh) * 2017-07-30 2023-02-24 河南理工大学 深部巷道钢丝绳网橡胶喷射混凝土支护结构及其施工方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013046200A1 (en) * 2011-09-27 2013-04-04 Mobius Protection Systems Ltd. Safety seat
CN205025479U (zh) * 2015-09-17 2016-02-10 安徽理工大学 一种治理软岩巷道底鼓的底板支护系统
CN106401609A (zh) * 2016-11-10 2017-02-15 河南理工大学 一种控制深部巷道底臌的底板卸压加固结构及其施工方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
"卸压槽卸压法在控制两帮变形中的应用";周单玉;《中国优秀硕士学位论文全文数据库 工程科技Ⅰ辑》;20170815;第20-25页

Also Published As

Publication number Publication date
CN108595807A (zh) 2018-09-28

Similar Documents

Publication Publication Date Title
Chang et al. Research on the width of filling body in gob-side entry retaining with high-water materials
Meng et al. Support technology for mine roadways in extreme weakly cemented strata and its application
CN106050283B (zh) 一种三软煤层回采巷道支护设计方法及装置
Protosenya et al. Geomechanics of low-subsidence construction during the development of underground space in large cities and megalopolises
CN106150546B (zh) 一种根据地表沉陷特征进行采空区部分充填的方法
CN112287578B (zh) 一种端帮开采条件下边坡稳定性计算方法
Zhang et al. Failure characteristics of roof in working face end based on stress evolution of goaf
Ma et al. Field and numerical investigation on the stability of coal pillars of gob-side entry driving with top coal
Liu et al. Characteristics analysis of roof overburden fracture in thick coal seam in deep mining and engineering application of super high water material in backfill mining
Wu et al. Research on Plastic Zone Evolution Law of Surrounding Rock of Gob‐Side Entry Retaining under Typical Roof Conditions in Deep Mine
CN108595807B (zh) 一种巷道底板卸压槽宽度的计算方法
CN108119147B (zh) 一种软岩隧道开挖及初期支护方法
CN107657084B (zh) 基于滑落失稳的复合残采区上行开采可行性定量判定方法
Qi et al. Failure characteristics and control technology of surrounding rock in deep coal seam roadway with large dip angle under the influence of weak structural plane
CN108664699B (zh) 一种静扰动加载的刀柱残采区上行开采可行性判定方法
Chen et al. Study on stability mechanism and control techniques of surrounding rock in gob-side entry retaining with flexible formwork concrete wall
Wang et al. Stress Evolution Mechanism and Control Technology for Reversing Mining and Excavation under Mining‐Induced Dynamic Pressure in Deep Mine
Chen et al. “Relief‐Retaining” Control Technology of Floor Heave in Mining Roadway with Soft Rock: A Case Study
Kong et al. The characteristics of roof breaking and the law of ground pressure behavior in fully mechanized top-coal caving face with large mining height
Wang et al. Research on the surrounding rock control technology of gob-side entry with a narrow coal pillar reserved in a fully mechanized caving face with large mining height
Yu et al. Failure mechanism and stability control technology of rock surrounding a roadway in complex stress conditions
Lai et al. Research of the Backfill Body Compaction Ratio Based on Upward Backfill Safety Mining of the Close‐Distance Coal Seam Group
Zhu et al. Study on the effect of rock stratum structure on the stability of weakly cemented layered floor and the floor control measures: A case study of Meihuajing Mine
Jia et al. Research on the safety control technology of gob-side entry in inclined thick coal seam
Song et al. Study on mechanical characteristics of support system for Shallow-buried Single-Arch subway station in rock stratum

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201223

Address after: 430061 No.3, 15th floor, unit 1, Zhongnan Road, dingziqiao Road, Wen'an street, Wuchang District, Wuhan City, Hubei Province

Patentee after: Wuhan Zhongxu Intellectual Property Service Co.,Ltd.

Address before: 710054 No. 58, Yanta Road, Shaanxi, Xi'an

Patentee before: XI'AN University OF SCIENCE AND TECHNOLOGY

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20231220

Address after: Room 05, 27th Floor, Building 1, Guannan Fuxing Pharmaceutical Park, No. 58 Guanggu Avenue, Donghu New Technology Development Zone, Wuhan City, Hubei Province, 430000 (Wuhan Area of Free Trade Zone)

Patentee after: Wuhan Anchenxin Information Technology Co.,Ltd.

Address before: 430061 No.3, 15th floor, unit 1, Zhongnan Road, dingziqiao Road, Wen'an street, Wuchang District, Wuhan City, Hubei Province

Patentee before: Wuhan Zhongxu Intellectual Property Service Co.,Ltd.

TR01 Transfer of patent right