CN108592369A - The assembly method of partition board, chassis assembly, air conditioner and air conditioner - Google Patents
The assembly method of partition board, chassis assembly, air conditioner and air conditioner Download PDFInfo
- Publication number
- CN108592369A CN108592369A CN201810470146.0A CN201810470146A CN108592369A CN 108592369 A CN108592369 A CN 108592369A CN 201810470146 A CN201810470146 A CN 201810470146A CN 108592369 A CN108592369 A CN 108592369A
- Authority
- CN
- China
- Prior art keywords
- assembly
- partition board
- sliding slot
- air conditioner
- chassis
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000005192 partition Methods 0.000 title claims abstract description 47
- 238000000034 method Methods 0.000 title claims abstract description 24
- 238000005119 centrifugation Methods 0.000 claims description 16
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 17
- 238000009434 installation Methods 0.000 description 16
- 238000004378 air conditioning Methods 0.000 description 7
- 230000008569 process Effects 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 230000005611 electricity Effects 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 238000003860 storage Methods 0.000 description 3
- 230000000930 thermomechanical effect Effects 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000004888 barrier function Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000001816 cooling Methods 0.000 description 1
- 238000000354 decomposition reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000005057 refrigeration Methods 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F13/00—Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
- F24F13/20—Casings or covers
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F1/00—Room units for air-conditioning, e.g. separate or self-contained units or units receiving primary air from a central station
- F24F1/02—Self-contained room units for air-conditioning, i.e. with all apparatus for treatment installed in a common casing
- F24F1/022—Self-contained room units for air-conditioning, i.e. with all apparatus for treatment installed in a common casing comprising a compressor cycle
- F24F1/027—Self-contained room units for air-conditioning, i.e. with all apparatus for treatment installed in a common casing comprising a compressor cycle mounted in wall openings, e.g. in windows
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F13/00—Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
- F24F13/20—Casings or covers
- F24F2013/205—Mounting a ventilator fan therein
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Air-Conditioning Room Units, And Self-Contained Units In General (AREA)
Abstract
The present invention provides the assembly methods of a kind of partition board, chassis assembly, air conditioner and air conditioner.Wherein, partition board includes:Clapboard body, sliding slot is provided in clapboard body, and there is sliding slot blind end and notch end, sliding slot to be configured to make the neck of part to be installed to be packed into sliding slot by notch end.The low problem of efficiency of the part to be installed in the prior art on partition board can be efficiently solved by applying the technical scheme of the present invention.
Description
Technical field
The present invention relates to art of refrigeration units, in particular to a kind of partition board, chassis assembly, air conditioner and air-conditioning
The assembly method of device.
Background technology
With the continuous improvement of society and living standards, air-conditioning has been used in the various scenes of people's life, existing
Air-conditioning can be divided into window air conditioner and split-type air conditioner.Window air conditioner is mostly installed at room window position, while according to window
The air-out mode of air-conditioning can be classified as outlet air air-conditioning and side air-out air-conditioning.And existing side air-out window air conditioner, although its
The structure of side air-out window machine front baffle is simple, but window machine blade is assemblied in the tedious process in front baffle.Make installation effectiveness
Lowly.
Invention content
The main purpose of the present invention is to provide the assembly method of a kind of partition board, chassis assembly, air conditioner and air conditioner,
To solve the problems, such as that the efficiency that part to be installed in the prior art is mounted on partition board is low.
To achieve the goals above, according to an aspect of the invention, there is provided a kind of partition board, including:Clapboard body, every
Sliding slot is provided on plate ontology, there is sliding slot blind end and notch end, sliding slot to be configured to make the neck of part to be installed by notch end
It is packed into sliding slot.
Further, notch end is located at the upper edge of clapboard body.
Further, sliding slot vertically extends.
Further, there is recess portion, sliding slot to be arranged in clapboard body at recess portion.
According to another aspect of the present invention, a kind of chassis assembly is provided, including chassis and the partition board that is arranged on chassis,
Partition board is above-mentioned partition board.
According to another aspect of the present invention, a kind of air conditioner is provided, including:Chassis assembly and blade motor component,
Chassis assembly is above-mentioned chassis assembly, and blade motor component is arranged in the clapboard body of the partition board of chassis assembly.
Further, blade motor component includes the centrifugation blade, electric machine assembly and axial-flow leaf set gradually, motor
There is component motor shaft, motor shaft to be packed into the blind end of sliding slot, centrifugation blade and axis stream by the notch end of the sliding slot of partition board
Fan blade is located at the both sides of clapboard body.
Further, electric machine assembly includes motor body and the electric machine support to fixed motor body, motor body
With motor shaft.
Further, electric machine support is fixed in clapboard body, and/or, it is fixed on the chassis of chassis assembly.
According to another aspect of the present invention, a kind of assembly method of air conditioner is provided, to above-mentioned air conditioner into luggage
Match, assembly method includes the following steps:Step S01:Assembly centrifugation blade, electric machine assembly and axial-flow leaf are to form fan blade electricity
Thermomechanical components;Step S02:The motor shaft of electric machine assembly is packed by the notch end of the sliding slot of the clapboard body of air conditioner to sliding slot
Blind end.
Further, after step S02, assembly method further includes:Step S03:Electric machine assembly is fixed on partition board sheet
On body.
It applies the technical scheme of the present invention, when assembly is carried out, first can pre-install part to be installed to form an entirety,
The neck of part to be installed is slid by the notch end of sliding slot in sliding slot again, the peace that part to be installed can be realized finally is fixed
Dress.Therefore, above-mentioned installation procedure is succinct so that installation effectiveness greatly improves, and solves part installation to be installed in the prior art
The low problem of efficiency on partition board.
Description of the drawings
The accompanying drawings which form a part of this application are used to provide further understanding of the present invention, and of the invention shows
Meaning property embodiment and its explanation are not constituted improper limitations of the present invention for explaining the present invention.In the accompanying drawings:
Fig. 1 shows the dimensional structure diagram of the embodiment of partition board according to the present invention;
Fig. 2 shows the dimensional structure diagrams of the part-structure of the embodiment one of air conditioner according to the present invention;
Fig. 3 shows the decomposition texture schematic diagram of the blade motor component of the air conditioner of Fig. 2;And
Fig. 4 shows the dimensional structure diagram of the part-structure of the embodiment two of air conditioner according to the present invention.
Wherein, above-mentioned attached drawing includes the following drawings label:
1, notch end;2, blind end;11, chassis;111, indoor section;1111, flow guiding structure;1112, disk ontology;1113、
Boss;112, outdoor section;113, osculum;12, clapboard body;121, sliding slot;122, recess portion;13, baffle plate;20, fan blade electricity
Thermomechanical components;21, centrifugation blade;22, electric machine assembly;221, motor shaft;222, motor body;223, electric machine support;23, axis stream wind
Leaf;30, chassis assembly;50, inserting column.
Specific implementation mode
It should be noted that in the absence of conflict, the features in the embodiments and the embodiments of the present application can phase
Mutually combination.The present invention will be described in detail below with reference to the accompanying drawings and embodiments.
As depicted in figs. 1 and 2, the partition board of the present embodiment includes:Clapboard body 12 is provided with sliding slot in clapboard body 12
121, there is sliding slot 121 blind end 2 and notch end 1, sliding slot 121 to be configured to make the neck of part to be installed to be packed into extremely by notch end 1
In sliding slot 121.
It applies the technical scheme of the present invention, when assembly is carried out, first can pre-install part to be installed to form an entirety,
The neck of part to be installed is slid by the notch end 1 of sliding slot 121 in sliding slot 121 again, is finally fixed can be realized and waits pacifying
The installation of piece installing.Therefore, above-mentioned installation procedure is succinct so that installation effectiveness greatly improves, and solves and in the prior art waits pacifying
The low problem of efficiency of the piece installing on partition board.
Preferably, in the present embodiment, the neck of part to be installed slides into blind end 2 by the notch end 1 of sliding slot 121
Afterwards, it then is fixed.
Specifically in the present embodiment, part to be installed is blade motor component 20, and blade motor component 20 includes centrifugation blade
21, the motor shaft of electric machine assembly 22 and axial-flow leaf 23, electric machine assembly 22 forms above-mentioned neck.In the prior art, usually
Mounting hole is provided on partition board, electric machine assembly 22 and 23 advanced luggage of axial-flow leaf are matched, then by the motor of electric machine assembly 22
Axis passes through mounting hole, then centrifugation blade 21 is mounted on motor shaft, and finally blade motor component 20 is fixed again.It is above-mentioned
Assembling process complex procedures, so that installation effectiveness is relatively low.And in the present embodiment, when being assembled, it will first centrifuge wind
Leaf 21, electric machine assembly 22 and axial-flow leaf 23 are pre-mounted as blade motor component 20, then by the motor shaft of electric machine assembly 22 by
The notch end 1 of sliding slot 121 slides into blind end 2, is finally fixed.Above structure is by axial-flow leaf 23, electric machine assembly
22 and centrifugation blade 21 before whole machine installation with regard to installation be combined together, package is become, to improve efficiency of assembling.When
So, it will be appreciated by those skilled in the art that part to be installed is not limited to above-mentioned blade motor component, only there need to be neck on part to be installed
Portion.
As depicted in figs. 1 and 2, in the present embodiment, notch end 1 is located at the upper edge of clapboard body 12.Specifically, exist
The position of pre-set blind end 2 before sliding slot 121 is set, is then removed on partition board from blind end 2 to the material of upper edge,
To make motor shaft that can directly pass through from top, it is cooperated on blind end 2.Above structure is simple, easy to process, at low cost.
As depicted in figs. 1 and 2, in the present embodiment, sliding slot 121 vertically extends.Above structure makes sliding slot 121
Extending direction and part to be installed gravity direction it is in the same direction so that part to be installed can more successfully slide into sliding slot 121
It is interior.Certainly, it will be appreciated by those skilled in the art that notch end 1 can also be located at the side edge of clapboard body 12, and laterally prolong
It stretches.
As shown in Figure 1, in the present embodiment, there is recess portion 122, sliding slot 121 to be arranged in recess portion 122 in clapboard body 12
Place.Above structure can increase the intensity of clapboard body 12, to increase the service life of partition board.
As shown in Figure 1, in the present embodiment, partition board further includes baffle plate 13.Getting rid of can to the condensed water on baffle plate 13
Inner wall along baffle plate 13 flow to precalculated position.It should be noted that the shape of baffle plate 13 may be set according to actual conditions.
As shown in Fig. 2, present invention also provides a kind of chassis assembly, the embodiment according to the chassis assembly of the application includes
Chassis 11 and the partition board being arranged on chassis 11, partition board are above-mentioned partition board.Since aforementioned barriers have high excellent of installation effectiveness
Point, therefore have the advantages that its chassis assembly also with above-mentioned.
As shown in Fig. 2, in the present embodiment, chassis 11 includes indoor section 111 and outdoor section 112, is set in indoor section 111
It is equipped with flow guiding structure 1111, so that the water in indoor section 111 is directed into outdoor section 112 by flow guiding structure 1111.Above-mentioned drainage
The addition of structure 1111 will can be generated the condensed water stored indoors in section 111 by evaporator and directly be drained to outdoor section 112.
It is usually that the drip tray for extending to outdoor section 112 is provided with outside chassis in the prior art, by drip tray by room
The water of inner segment 111 is drained to outdoor section 112.Above structure is complicated, and material utilization amount is more, and production cost is high.In order to solve above-mentioned ask
Topic, as shown in Fig. 2, in the present embodiment, the surface of at least partly interior section 111 is higher than the surface of outdoor section 112, indoors section
It is provided with drainage trough on 111 part higher than the surface of outdoor section 112, drainage trough forms flow guiding structure 1111.Specifically, at this
In embodiment, the addition of drainage trough will can be generated the condensed water stored indoors in section 111 by evaporator and directly be drained to outdoor
Duan Shang.Above structure is simple, easy to process, while saving foamed material dosage, improves the installation rate on chassis.
As shown in Fig. 2, in the present embodiment, indoor section 111 includes disk ontology 1112 and is arranged on disk ontology 1112
Boss 1113, drainage trough be set on boss 1113 and to outdoor section 112 extend.Preferably, the slot bottom of drainage trough is separate
One end of outdoor section 112 is higher than the slot bottom of drainage trough close to one end of outdoor section 112.Above structure makes condensed water be easier
It flow to outdoor section 112 by drainage trough.
As shown in Fig. 2, in the present embodiment, osculum 113 is provided in outdoor section 112, so that the water in outdoor section 112
It can be discharged.Specifically, in the present embodiment, blade motor component 20 is mounted on partition board, and blade motor component includes axis
Fan blade 23 is flowed, 112 part of outdoor section is equipped with water storage flume, stores the condensed water introduced by indoor section 111, condensed water can be by axis stream wind
Leaf 23, which is got rid of, to be sent to condenser, and the cooling rate of condenser is increased;Send the speed of water far smaller than cold since axial-flow leaf 23 is got rid of
The storage speed of condensate, therefore an osculum 113 is opened up in water storage flume, facilitate and extra condensed water is discharged.
In the present embodiment, it is provided with drain valve at osculum 113.Specifically, drain valve can saving bit by bit according to condensed water
Situation, autonomous is open and close, does not need the manually implemented draining of user and cut-off effect.After the completion of air-conditioning use, it is
Thoroughly the condensed water on discharge chassis, drain valve are also relatively easy to open.
In other embodiments, rubber plug can also be set at osculum 113, and the use of rubber plug is convenient not as good as drain valve, no
Can according to condensed water number it is autonomous open or close, need this manually implemented function of user.But the cost of rubber plug is relatively arranged
Water valve is low, and when need not realize autonomous draining, rubber plug can be used to reach the purpose.
As shown in Fig. 2, in the present embodiment, compressor is fixed on by inserting column 50 on chassis 11, inserting column 50 is riveted on bottom
On disk 11.The mounting means of inserting column 50 on this chassis 11 is changed to riveted structure by original welding structure, reduces Welder
Sequence further increases installation rate.
Present invention also provides a kind of air conditioners, as shown in Figures 2 and 3, according to the embodiment one of the air conditioner of the application
Including:The partition board in the partition board of chassis assembly 30 is arranged in chassis assembly 30 and blade motor component 20, blade motor component 20
On ontology 12, chassis assembly 30 is above-mentioned chassis assembly.Since above-mentioned chassis assembly has the advantages that installation effectiveness is high,
Have the advantages that its air conditioner also with above-mentioned.
As shown in Figures 2 and 3, in embodiment one, blade motor component 20 includes the centrifugation blade 21 set gradually, electricity
Thermomechanical components 22 and axial-flow leaf 23, electric machine assembly 22 have motor shaft 221, the slot that motor shaft 221 passes through the sliding slot 121 of partition board
Mouth end 1 is packed into the blind end 2 of sliding slot 121, and centrifugation blade 21 is located at the both sides of clapboard body 12 with axial-flow leaf 23.
As shown in Figures 2 and 3, in embodiment one, electric machine assembly 22 is including motor body 222 and to fixed motor
The electric machine support 223 of ontology 222, motor body 222 have motor shaft 221.Above structure is simple, it is easy to accomplish.
As shown in Figures 2 and 3, in embodiment one, electric machine support 223 is fixed in clapboard body 12, and/or is fixed on
On chassis 11.Preferably, in embodiment one, electric machine support 223 includes the first mounting plate and the second mounting plate.First installation
Plate is fixed by screws in clapboard body 12, and the second mounting plate is fixed by screws on chassis 11.
As shown in figure 4, the air conditioner of the air conditioner of embodiment two and embodiment one difference lies in:Electric machine support 223
Concrete structure is different.Specifically, in embodiment two, electric machine support 223 is integral type electric machine support, and electric machine support 223 can
Fixed condenser, a component, multiple effects, a side can be played the role of again by enough playing the role of fixed motor body 222
Face reduces production cost, reduces assembly process on the other hand, to improve efficiency of assembling.
Present invention also provides a kind of assembly methods of air conditioner, are assembled to above-mentioned air conditioner, according to the application
The embodiment of assembly method include the following steps:Step S01:Assemble centrifugation blade 21, electric machine assembly 22 and axial-flow leaf
23 form blade motor component 20;Step S02:By the motor shaft 221 of the electric machine assembly 22 of blade motor component 20 by notch end 1
It is packed into blind end 2.Above-mentioned assembly method just pacifies axial-flow leaf 23, electric machine assembly 22 and centrifugation blade 21 before whole machine installation
Assembly is combined, and becomes package, to improve efficiency of assembling, is solved part to be installed in the prior art and is mounted on
The low problem of efficiency on partition board.
In the present embodiment, after step S02, assembly method further includes:Step S03:Electric machine assembly 22 is fixed on
In the clapboard body 12 of partition board.Above-mentioned assembly method enables blade motor component 20 to be more firmly assemblied in clapboard body 12
On.
It should be noted that in the present embodiment, before final assembly, first by axial-flow leaf 23, motor body 222,
Electric machine support 223 and centrifugation blade 21 are preferentially assembled together, and form package.Final assembly when, first partition board is pacified
It is filled to the accurate location on chassis 11, will then be assembled into integrated axial-flow leaf 23, motor body 222, electric machine support 223
And centrifugation blade 21 slides to the blind end 2 on partition board as one by the sliding slot 121 of partition board, is carried out with complete machine other parts
Cooperation.
Sliding slot 121 goes out fluting from the upper side plate of partition board, opens to partition board machine shaft axis hole, this slot keeps motor shaft 221 straight
It connects and slides to axis hole position above partition board.The assembly method for improving original motor and fan blade, largely saves complete machine
It is the time of assembly, cost-effective.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field
For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, any made by repair
Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.
Claims (11)
1. a kind of partition board, which is characterized in that including:
Clapboard body (12), sliding slot (121) is provided on the clapboard body (12), and the sliding slot (121) has blind end (2)
With notch end (1), the sliding slot (121) is configured to make the neck of part to be installed to be packed into the sliding slot by the notch end (1)
(121) in.
2. partition board according to claim 1, which is characterized in that the notch end (1) is located at the clapboard body (12)
At upper edge.
3. partition board according to claim 1 or 2, which is characterized in that the sliding slot (121) vertically extends.
4. partition board according to claim 1, which is characterized in that there is recess portion (122) on the clapboard body (12), it is described
Sliding slot (121) is arranged at the recess portion (122).
Include chassis (11) and the partition board that is arranged on the chassis (11) 5. a kind of chassis assembly, which is characterized in that it is described every
Plate is partition board any one of Claims 1-4.
6. a kind of air conditioner, including:Chassis assembly (30) and blade motor component (20), which is characterized in that the chassis group
Part (30) is the chassis assembly described in claim 5, and the blade motor component (20) is arranged in the chassis assembly (30)
In the clapboard body (12) of partition board.
7. air conditioner according to claim 6, which is characterized in that the blade motor component (20) includes setting gradually
Centrifugation blade (21), electric machine assembly (22) and axial-flow leaf (23), the electric machine assembly (22) have motor shaft (221), institute
Motor shaft (221) is stated to be packed into the blind end of the sliding slot (121) by the notch end (1) of the sliding slot (121) of the partition board
(2), the centrifugation blade (21) is located at the both sides of the clapboard body (12) with the axial-flow leaf (23).
8. air conditioner according to claim 7, which is characterized in that the electric machine assembly (22) includes motor body (222)
And the electric machine support (223) to the fixation motor body (222), the motor body (222) have the motor shaft
(221)。
9. air conditioner according to claim 8, which is characterized in that the electric machine support (223) is fixed on the partition board sheet
On body (12), and/or, it is fixed on the chassis (11) of the chassis assembly (30).
10. a kind of assembly method of air conditioner, assembles the air conditioner described in any one of claim 7 to 9, feature
It is, the assembly method includes the following steps:
Step S01:Centrifugation blade (21), electric machine assembly (22) and axial-flow leaf (23) are assembled to form blade motor component
(20);
Step S02:By the motor shaft (221) of the electric machine assembly (22) by the air conditioner clapboard body (12) sliding slot
(121) notch end (1) is packed into the blind end (2) of the sliding slot (121).
11. assembly method according to claim 10, after the step S02, which is characterized in that the assembly method
Further include:
Step S03:The electric machine assembly (22) is fixed in the clapboard body (12).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810470146.0A CN108592369A (en) | 2018-05-16 | 2018-05-16 | The assembly method of partition board, chassis assembly, air conditioner and air conditioner |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810470146.0A CN108592369A (en) | 2018-05-16 | 2018-05-16 | The assembly method of partition board, chassis assembly, air conditioner and air conditioner |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108592369A true CN108592369A (en) | 2018-09-28 |
Family
ID=63631518
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810470146.0A Withdrawn CN108592369A (en) | 2018-05-16 | 2018-05-16 | The assembly method of partition board, chassis assembly, air conditioner and air conditioner |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108592369A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111059741A (en) * | 2019-12-24 | 2020-04-24 | 珠海格力电器股份有限公司 | Integrated volute front partition plate and window type air conditioner |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN85107648A (en) * | 1984-10-18 | 1986-08-13 | 三菱电机株式会社 | Aircondition |
KR20020009662A (en) * | 2000-07-26 | 2002-02-02 | 구자홍 | Orifice for Air conditioner |
CN201269610Y (en) * | 2008-07-18 | 2009-07-08 | 苏州三星电子有限公司 | Partition board of outdoor unit of air-conditioner |
CN203869274U (en) * | 2013-12-26 | 2014-10-08 | 广东志高暖通设备股份有限公司 | Air conditioner track structure |
CN206145948U (en) * | 2016-10-09 | 2017-05-03 | 珠海格力电器股份有限公司 | Base, two -way hot blast blowpipe apparatus and air conditioner |
CN106679147A (en) * | 2016-11-17 | 2017-05-17 | 珠海格力电器股份有限公司 | Air conditioner |
CN206191779U (en) * | 2016-11-17 | 2017-05-24 | 珠海格力电器股份有限公司 | Air -conditioner |
CN206626085U (en) * | 2017-04-13 | 2017-11-10 | 衢州职业技术学院 | Mechanical part is movably hinged device |
CN207317119U (en) * | 2017-09-27 | 2018-05-04 | Tcl空调器(中山)有限公司 | Window air conditioner |
CN208595679U (en) * | 2018-05-16 | 2019-03-12 | 珠海格力电器股份有限公司 | Partition, chassis assembly and air conditioner |
-
2018
- 2018-05-16 CN CN201810470146.0A patent/CN108592369A/en not_active Withdrawn
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN85107648A (en) * | 1984-10-18 | 1986-08-13 | 三菱电机株式会社 | Aircondition |
KR20020009662A (en) * | 2000-07-26 | 2002-02-02 | 구자홍 | Orifice for Air conditioner |
CN201269610Y (en) * | 2008-07-18 | 2009-07-08 | 苏州三星电子有限公司 | Partition board of outdoor unit of air-conditioner |
CN203869274U (en) * | 2013-12-26 | 2014-10-08 | 广东志高暖通设备股份有限公司 | Air conditioner track structure |
CN206145948U (en) * | 2016-10-09 | 2017-05-03 | 珠海格力电器股份有限公司 | Base, two -way hot blast blowpipe apparatus and air conditioner |
CN106679147A (en) * | 2016-11-17 | 2017-05-17 | 珠海格力电器股份有限公司 | Air conditioner |
CN206191779U (en) * | 2016-11-17 | 2017-05-24 | 珠海格力电器股份有限公司 | Air -conditioner |
CN206626085U (en) * | 2017-04-13 | 2017-11-10 | 衢州职业技术学院 | Mechanical part is movably hinged device |
CN207317119U (en) * | 2017-09-27 | 2018-05-04 | Tcl空调器(中山)有限公司 | Window air conditioner |
CN208595679U (en) * | 2018-05-16 | 2019-03-12 | 珠海格力电器股份有限公司 | Partition, chassis assembly and air conditioner |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111059741A (en) * | 2019-12-24 | 2020-04-24 | 珠海格力电器股份有限公司 | Integrated volute front partition plate and window type air conditioner |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105972697B (en) | Air-conditioning | |
EP1943467B1 (en) | Dehumidifier | |
US7891206B2 (en) | Dehumidifier | |
US9587841B2 (en) | Turbo fan and ceiling type air conditioner using the same | |
CN202511389U (en) | Air-conditioner indoor unit and air-conditioner comprising the same | |
CN105378389A (en) | Air-conditioner | |
EP3339755A1 (en) | Air conditioner | |
CN106765648A (en) | Dehumidifying air conditioner integrated machine | |
CN101684956A (en) | Dehumidifier | |
CN107975868A (en) | Air-conditioning | |
CN206410246U (en) | Dehumidifying air conditioner integrated machine | |
CN208595679U (en) | Partition, chassis assembly and air conditioner | |
CN209706223U (en) | Air conditioner indoor unit | |
CN108592369A (en) | The assembly method of partition board, chassis assembly, air conditioner and air conditioner | |
KR20100119140A (en) | Indoor unit for air-conditioner | |
CN102374630A (en) | Indoor unit for air conditioner | |
KR20060075945A (en) | Indoor unit of air conditioner | |
KR101224646B1 (en) | Airconditioner indoor unit | |
CN107036178A (en) | Window air conditioner | |
CN208238216U (en) | Chassis and air conditioner with it | |
KR20100007303A (en) | Air conditioner | |
KR20070030070A (en) | Air conditioner | |
CN106152272A (en) | Air conditioner room unit and air conditioning system | |
CN106225133A (en) | For erecting the damping device of money wall-hanging air conditioner and perpendicular money wall-hanging air conditioner | |
CN207196699U (en) | Window air conditioner |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20180928 |