CN108590519A - Suspended ceiling drilling equipment for building construction or interior decoration - Google Patents
Suspended ceiling drilling equipment for building construction or interior decoration Download PDFInfo
- Publication number
- CN108590519A CN108590519A CN201810327571.4A CN201810327571A CN108590519A CN 108590519 A CN108590519 A CN 108590519A CN 201810327571 A CN201810327571 A CN 201810327571A CN 108590519 A CN108590519 A CN 108590519A
- Authority
- CN
- China
- Prior art keywords
- vertical section
- support
- ground
- guide post
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25H—WORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
- B25H1/00—Work benches; Portable stands or supports for positioning portable tools or work to be operated on thereby
- B25H1/0021—Stands, supports or guiding devices for positioning portable tools or for securing them to the work
- B25H1/0035—Extensible supports, e.g. telescopic
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/02—Drilling rigs characterized by means for land transport with their own drive, e.g. skid mounting or wheel mounting
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B15/00—Supports for the drilling machine, e.g. derricks or masts
Abstract
The present invention provides the suspended ceiling drilling equipment for building construction or interior decoration, including electric drill, support moving device, jacking apparatus, the jacking apparatus includes lifting body, lifting-up support and lifting body is installed on lifting-up support, it is provided between the electric drill and lifting-up support and is slidably connected mechanism and electric drill is movably installed in lifting-up support by the mechanism that is slidably connected, the lifting body is used to provide the climbing power needed for drilling for electric drill, the support moving device is connect with lifting body, support moving device is for moving this drilling device and playing a supportive role to lifting body.
Description
Technical field
The present invention relates to a kind of mechanical equipment, more particularly to the equipment of a kind of suspended ceiling drilling or tunnel top drilling.
Background technology
Field of constructional ornament indoors, suspended ceiling drilling are all to ascend a height to be operated manually using worker, in megastore decoratees,
The drawbacks of drilling, is especially prominent, and drilling efficiency seriously delays decoration efficiency;Since working environment is severe in tunnel, worker
Operation be also extremely inconvenient.
Height adjustable moving assembled top filed in 3 days July in 2015 of China Construction First Building Bureau Group Installation Engineering Co., Ltd.
Plate construction auxiliary device(CN 204877287 U), CCFED the First Construction & Engineering Co., Ltd. is in the application on the 1st of September in 2011
A kind of furred ceiling quick perforation device(CN 202391338 U), it discloses a kind of with of the invention for same field
Perforating device uses the lifting work of linked hoisting mechanism control electric drill, the drawbacks of technology to be, the weight of whole equipment
Amount concentrates at electric drill position, and center of gravity is excessively high, and stability is poor, and worker is difficult to operate top drilling machine.
Furred ceiling punch device filed in 11 days November in 2012 of Suzhou Gold Mantis Construction Decoration Co., Ltd.(CN
102953687 A), a kind of and perforating device of the invention for same field is disclosed, is propped up by the way of branched point
The drawbacks of support, the technology, is that, since the working environment of other occasions such as indoor decoration, tunnel is more mixed and disorderly, barrier is more,
Branched supporting way cannot effectively keep balancing, and cause borehole throw larger or unqualified.
A kind of furred ceiling puncher filed in 3 days January in 2014 of Jinling School of Science and Technology(CN 203640643 U), use
The mode that worker holds carries out nail bit, and the weight of whole equipment is all undertaken by worker, easily causes the fatigue of worker, can not be effective
Solve the problems, such as that drilling efficiency is low.
Invention content
To solve the deficiencies in the prior art, it drills the object of the present invention is to provide a kind of suspended ceiling drilling or tunnel top
Equipment, this equipment use one-wheel type mobile device, and it is more convenient when drilling device to move, and idler wheel is matched with fixed mechanism
It closes, realizes the fixation to drilling device.
To realize the above-mentioned technical purpose, the technical solution adopted in the present invention is as follows.
For the suspended ceiling drilling equipment of building construction or interior decoration, including electric drill, support moving device, jacking dress
Set, the jacking apparatus includes that lifting body, lifting-up support and lifting body are installed on lifting-up support, the electric drill with
It is provided between lifting-up support and is slidably connected mechanism and electric drill is movably installed in lifting-up support by the mechanism that is slidably connected, it is described
Lifting body be used to provide climbing power needed for drilling for electric drill, the support moving device connect with lifting body, branch
Support mobile device is for moving this drilling device and playing a supportive role to lifting body;
The support moving device includes support column, idler wheel, fixed mechanism, and the support column is for fixed mechanism and jacking
Connection between device, the fixed mechanism include fixed block, movable part, and the fixed block is used for this drilling device
It is fixed, the movable part is used to idler wheel being movably installed in fixed block, and the idler wheel is set for moving this drilling
Standby, the fixed block includes in connecting plate that is horizontally disposed and being fixedly connected close to the open end on ground with support column, respectively
The fixed plate for being set to connecting plate both ends and extending towards ground direction, connecting plate and two fixed plates constitute U-shaped structure, described
The end face on fixed plate towards ground is the tip of v-shaped structure and fixed plate towards ground.
As being further improved for the technical program.
Above-mentioned lifting-up support can be divided into three parts and respectively vertical section a, horizontal segment, vertical section b, the level
One end of section is fixedly connected with vertical section a, the other end is fixedly connected with vertical section b, and the extending direction of horizontal segment is parallel to ground,
Vertical section a is each perpendicular to ground with the extending direction of vertical section b and vertical section a is opposite with the extending direction of vertical section b and erects
Straight section b is located above vertical section a, and the perforating for being axially perpendicular to ground, the vertical section b are offered on the horizontal segment
On be provided with the guide sleeve for being axially perpendicular to ground and guide sleeve is located at vertical section b towards the side of horizontal segment, the electricity
It drilled through the mechanism that is slidably connected and is movably installed in vertical section b;
The lifting body includes guide post, jacking post, supporting plate, handle, and the guide post, jacking post are the cylinder of both ends open
The axial direction of body structure and the two is each perpendicular to ground, and jacking post pivot bush unit is in the guide post and open end of guide post and jacking
The periphery of column constitutes support level, and the guide post is fixedly installed in horizontal segment and guide post is located at the lower section of horizontal segment, institute
One open end of the jacking post stated is located above horizontal segment, another open end passes through perforating and is located in guide post, the support
Plate is fixedly installed in the open end that jacking post is located above horizontal segment, and face of the supporting plate far from jacking post is arcwall face and arcwall face
It is bent towards away from jacking post direction;
The periphery of the jacking post is provided through the mounting hole of its diameter, and the periphery of the guide post is provided through
The avoid holes of its diameter, the apertures of the avoid holes are more than the aperture of mounting hole and the aperture of avoid holes and the hole of mounting hole
One end of salty conjunction, the handle is hinged end and is hinged with vertical section a and is hinged shaft core line prolonging perpendicular to vertical section a
Stretch direction, the other end is force side and avoid holes and mounting hole, handle is passed through to be located at the hole of the part and mounting hole in mounting hole
Wall is hinged, and the hinged shaft core line between handle, mounting hole is parallel to the hinged shaft core line between handle, vertical section a, described
Handle, be both provided with sliding slot at the articulated shaft at the articulated shaft between mounting hole between handle, vertical section a.
As being further improved for the technical program.
For above-mentioned guide post pivot bush unit in support column, an open end of the guide post is fixedly installed in horizontal segment, another
One open end pivot bush unit is in being provided in support column and between the two the locking machine for being fixed on guide post in support column
Structure;
The top surface of the connecting plate is provided with the intermediolateral column extended towards guide post direction, the intermediolateral column be both ends open and
Coaxially arranged tube structure and intermediolateral column are used to support the connection between column inner cavity and the external world with support column, are set in intermediolateral column
It is equipped with built-in step, the movable part includes guide rod, movable support, rolls spring, and the movable support is set to solid
Between two fixed plates for determining block, one end of the guide rod is fixedly connected with movable support, the other end passes through built-in step, described
Rolling spring be socketed on outside guide rod, roll that one end of spring is contradicted with built-in step, the other end and movable support contradict, rolling
The elastic force of spring of moving makes movable support do the movement close to ground, roll spring elastic force moved upwards less than electric drill it is required
Power, the elastic force for rolling spring are more than the gravity of this drilling device;
The movable support takes the shape of the letter U structure, and movable support includes the intermediate plate being fixedly connected with guide rod, is respectively arranged at centre
Plate both ends and the mounting plate extended towards ground direction, are both provided with through-hole, two fixations of the fixed block on two mounting plates
Pilot hole of the guide direction perpendicular to ground is both provided on plate, the both ends of the idler wheel are coaxially arranged with roller bearing, described
Idler wheel fixed block is movably installed in by roller bearing, idler wheel is set between two mounting plates, and a roller bearing passes through the logical of a mounting plate
Hole is simultaneously located in the pilot hole of a fixed plate, and another roller bearing passes through the through-hole of another mounting plate and the guiding positioned at another fixed plate
In hole.
As being further improved for the technical program.
Above-mentioned support moving device further includes footstep mechanism, and the footstep mechanism includes foot pedal, limited spring, institute
The state for the foot pedal stated is divided into the foot-operated state that extending direction is parallel to ground and contacted with ground, extends perpendicularly to ground
The collapsed state in face, is provided with connecting rod between foot pedal and fixed plate, one end of connecting rod is fixedly connected with foot pedal, is another
The axial direction being hinged at and be hinged shaft core line perpendicular to support column at end and the separate idler wheel of fixed plate, in the connecting rod
Restricted bar is set, and the limitation bar extends towards the direction far from foot pedal and limitation bar is located at below connecting rod and limits
The hinged end of bar processed and connecting rod constitutes v-shaped structure, the side of the separate idler wheel of the fixed plate be provided with connection bump a,
The free end of fixed lobe, the limitation bar is provided with connection bump b, and the fixed lobe is set to limitation bar, connection
Junction between junction and fixed lobe between bar and limitation bar, connecting rod contradicts, and the one of the limited spring
End connect with connection bump a, the other end and connection bump b connections, and when foot pedal is in the state of riding, the elastic force of limited spring leads to
Cross limitation bar, connecting rod makes foot pedal do the relative motion close to ground, when foot pedal is in collapsed state, the bullet of limited spring
Power is by limiting bar, connecting rod makes foot pedal do the movement close to idler wheel.
As being further improved for the technical program.
Scale value is provided on above-mentioned vertical section b, the outside of vertical section b is socketed with positioning member, the positioning structure
Part includes locating ring, positioning bolt, and the locating ring is loop configuration and is socketed on the outside of vertical section b, locating ring
Side is provided with location hole, and the positioning bolt is set in location hole and connection type between the two connects for screw thread
It connects.
The advantageous effect of the present invention compared with prior art is:Present invention employs the mobile devices of one-wheel type, can
The more cluttered environment of barrier is adapted to, it is more convenient when drilling device to move, while mobile device further includes fixed mechanism, rolling
Drilling device can be fixed on ground by wheel with fixed mechanism cooperation, and fixed mechanism uses the reaction generated when moving handle
Drilling device is fixed in power, is not necessarily to excessive force, versus Multi-Point supporting way, and the present invention can not only effectively keep balancing
And borehole accuracy is improved, and the weight of equipment undertakes without operating personnel, reduces the labour of operating personnel.
Description of the drawings
It in order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will be to institute in embodiment
Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some of the present invention
Embodiment for those of ordinary skill in the art without having to pay creative labor, can also be according to these
Attached drawing obtains other attached drawings.
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is the structural schematic diagram of the jacking apparatus of the present invention.
Fig. 3 is the structural schematic diagram of the jacking apparatus of the present invention.
Fig. 4 is the structural schematic diagram of the lifting-up support of the present invention.
Fig. 5 is the cooperation figure of the electric drill of the present invention and the mechanism that is slidably connected.
Fig. 6 is the structural schematic diagram of the mechanism that is slidably connected of the present invention.
Fig. 7 is the sectional view of the lifting body of the present invention.
Fig. 8 is the structural schematic diagram of the retaining mechanism of the present invention.
Fig. 9 is the sectional view of the support moving device of the present invention.
Figure 10 is the structural schematic diagram of the movable part of the present invention.
Figure 11 is the structural schematic diagram of the plummet mechanism of the present invention.
Each label meaning is in figure:
100, support moving device;110, idler wheel;
120, fixed mechanism;121, fixed block;121a, connection bump a;121b, fixed lobe;122, movable part;122a, it leads
Bar;122b, movable support;122c, roller bearing;122d, spring is rolled;
130, footstep mechanism;131, foot pedal;132, limited spring;133, connecting rod;
200, lifting body;210, guide post;220, jacking post;230, handle;240, supporting plate;250, buffer spring;
300, lifting-up support;310, vertical section a;320, horizontal segment;330, vertical section b;331, guide sleeve;340, positioning member;
400, retaining mechanism;410, locking slot;420, latch segment;430, locking spring;
500, be slidably connected mechanism;510, connecting elements;511, sliding sleeve;512, connector sleeve a;513, connector sleeve b;514, connector sleeve
c;520, clamping screw;
600, plummet mechanism;610, fixed link;620, measurement plate;630, measuring rod;640, weighted spherical ball.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
Based on the embodiments of the present invention, obtained by those of ordinary skill in the art without making creative efforts all
Other embodiment shall fall within the protection scope of the present invention.
(First embodiment)
As shown in figs. 1-11, the suspended ceiling drilling equipment of building construction or interior decoration, including electric drill, support moving device are used for
100, jacking apparatus, the jacking apparatus include that lifting body 200, lifting-up support 300 and lifting body 200 are installed on top
Ascending branch frame 300 is provided be slidably connected mechanism 500 and electric drill and passes through the company of sliding between the electric drill and lifting-up support 300
Connection mechanism 500 is installed on lifting-up support 300, and the lifting body 200 is used to provide drilling required climbing power for electric drill, institute
The support moving device 100 stated is connect with lifting body 200, and support moving device 100 is for moving this drilling device and right
Lifting body 200 plays a supportive role.
As in Figure 2-4, above-mentioned lifting-up support 300 can be divided into three parts and respectively vertical section a310, horizontal segment
320, vertical section b330, specifically, one end of the horizontal segment 320 is fixedly connected with vertical section a310, the other end with it is vertical
Section b330 is fixedly connected, and the extending direction of horizontal segment 320 is parallel to ground, the extending direction of vertical section a310 and vertical section b330
It is each perpendicular to ground and vertical section a310 is opposite with the extending direction of vertical section b330 and vertical section b330 is located at vertical section
Above a310, the perforating for being axially perpendicular to ground is offered on the horizontal segment 320, is arranged on the vertical section b330
There are the guide sleeve 331 for being axially perpendicular to ground and guide sleeve 331 to be located at vertical section b330 towards the side of horizontal segment 320, it is excellent
Choosing, there are two the settings of guide sleeve 331.
The lifting body 200 includes guide post 210, jacking post 220, supporting plate 240, the guide post 210, jacking post
220 be the tube structure of both ends open and the axial direction of the two is each perpendicular to ground, and 220 pivot bush unit of jacking post is in guide post
In the 210 and open end of guide post 210 and the periphery of jacking post 220 constitute support level, specifically, the guide post 210
It is fixedly installed in horizontal segment 320 and the lower section positioned at horizontal segment 320, an open end of the jacking post 220 is located at level
320 top of section, another open end pass through perforating and in guide post 210, the supporting plate 240 is fixedly installed in jacking post
220 are located at the open end of 320 top of horizontal segment, and face of the supporting plate 240 far from jacking post 220 is arcwall face and arcwall face court deviates from
220 direction of jacking post is bent.
The lifting body 200 further includes handle 230, and the periphery of the jacking post 220 is provided through it directly
The periphery of the mounting hole of diameter, the guide post 210 is provided through the avoid holes of its diameter, and the aperture of the avoid holes is big
It is overlapped with the aperture of mounting hole in the aperture of mounting hole and the aperture of avoid holes, one end of the handle 230 is hinged end
And it is hinged with vertical section a310 and is hinged shaft core line and be force side and wear perpendicular to extending direction, the other end of vertical section a310
Avoid holes and mounting hole are crossed, the hole wall that handle 230 is located at part and mounting hole in mounting hole is hinged, and handle 230, installation
Hinged shaft core line between hole is parallel to the hinged shaft core line between handle 230, vertical section a310.
At articulated shaft at articulated shaft between the handle 230, mounting hole between handle 230, vertical section a310
It is both provided with sliding slot.
As Figure 7-8, above-mentioned support moving device 100 includes support column, idler wheel 110, and the support column is two
End opening and be axially perpendicular to ground tube structure and 210 pivot bush unit of guide post in support column, guide post 210 is along support
Axis of a cylinder when moving up and down to driving jacking apparatus to move synchronously, and the idler wheel 110 is located at below support column and idler wheel 110 is lived
Dynamic to be installed on support column, idler wheel 110 drives this drilling device synchronizing moving when rolling.
The locking machine for being fixed on guide post 210 in support column is additionally provided between the support column and guide post 210
Structure 400, the retaining mechanism 400 include the locking slot 410 for being set to 210 periphery of guide post, are set to support column periphery
And the locking member to match with locking slot 410.
It is in uniform intervals that the locking slot 410, which is provided with several and several locking slot 410 along the axial direction of guide post 210,
It is distributed and several locking slots 410 is located parallel on the same straight line of 210 axis of guide post, locking slot 410 is along guide post 210
Axial and cell wall close to ground is inclined-plane, the distance between the inclined-plane and 210 periphery of guide post along 210 axial direction of guide post by down toward
It is upper to be incremented by.
The periphery of the support column be provided in both ends open structure and be axially perpendicular to support column it is axial and with
The locking post that support column inner cavity is connected, the locking member includes latch segment 420, locking spring 430, the latch segment
420 are set in locking post, specifically, one end of latch segment 420 is press-side and the outer, other end is and locking positioned at locking post
Locking end that slot 410 matches simultaneously is located at across locking post inner cavity in locking slot 410, and latch segment 420 is located at the portion in locking post
Divide hinged with the inner cavity cavity wall of locking post and is hinged axial direction of the shaft core line perpendicular to support column, the periphery of the support column
It is additionally provided with accommodating hole, one end of the locking spring 430 connect with accommodating hole bottom hole, the other end and latch segment 420 are pressed
The elastic force of press bond, locking spring 430 makes the press-side of latch segment 420 do the movement of separate support column, make latch segment 420
Locking end does the movement close to locking slot 410;Retaining mechanism 400 is embodied in the fixation procedure of guide post 210:To moving up
Dynamic guide post 210, guide post 210 moves upwards and jacking apparatus is driven to move synchronously, in motion process, since locking slot 410 is along leading
The axial and cell wall close to ground of column 210 is inclined-plane, which generates extruding force, latch segment 420 to the locking end of latch segment 420
Locking end the movement far from locking slot 410 slot bottom is done in the case where squeezing force effect until locking end is detached from locking slot 410, press simultaneously
Pressure side does the movement close to support column, and locking spring 430 is in compressive state, and guide post 210 continues to rise up to latch segment 420
When locking end is located at next 410 notch of locking slot, the elastic force of locking spring 430 makes the press-side of latch segment 420 do far from support
The movement of column makes locking end do the movement close to 410 slot bottom of locking slot, until locking end is located in locking slot 410, it is so past
Multiple, when jacking apparatus is located at suitable position, guide post 210 stops rising, and retaining mechanism 400 limits guide post 210 in gravity at this time
The effects that under move downward.
As Figure 4-Figure 6, the above-mentioned mechanism 500 that is slidably connected includes connecting elements 510, and the connecting elements 510 is used
Being slidably connected between electric drill and lifting-up support 300.
The connecting elements 510 includes sliding sleeve 511, connector sleeve a512, connector sleeve b513, connector sleeve c514, described
Sliding sleeve 511 be both ends open rectangular cylinder structure and 511 pivot bush unit of sliding sleeve outside vertical section b330, the connection
Set a512 is for fixing shell of the electric drill close to its output end, specifically, shell fixing sleeve of the electric drill close to its output end
It is connected in connector sleeve a512, connecting rod a, one end and the sliding sleeve 511 of connecting rod a is provided between connector sleeve a512 and sliding sleeve 511
It is fixedly connected, the other end is fixedly connected with connector sleeve a512, motor housings of the connector sleeve b513 for fixing electric drill, tool
Body, the motor housing of electric drill is fixedly sheathed in connector sleeve b513, and connecting rod is provided between connector sleeve b513 and sliding sleeve 511
One end of b, connecting rod b are fixedly connected with sliding sleeve 511, the other end is fixedly connected with connector sleeve b513, the connector sleeve c514
Motor handle for fixing electric drill, specifically, the motor handle of electric drill is fixedly sheathed in connector sleeve c514 and motor handle
Hand is contacted with supporting plate 240, and connecting rod c is provided between connector sleeve c514 and sliding sleeve 511, and one end of connecting rod c and sliding sleeve 511 are solid
Fixed connection, the other end are fixedly connected with connector sleeve c514, the motor of the electric drill by connector sleeve a512, connector sleeve b513,
Connector sleeve c514 is fixedly installed in sliding sleeve 511, to realize moving synchronously between sliding sleeve 511 and electric drill motor.
The electric drill further includes transmission shaft, drill bit, and the transmission shaft and motor output shaft are coaxially connected, specifically,
The power intake of the transmission shaft is fixedly connected with the power output end of motor output shaft, and the power output end of transmission shaft is worn
The guide sleeve 331 for being set to vertical section b330 and coaxially connected with drill bit is crossed, and transmission shaft can axially move up and down along itself,
Motor output shaft rotation and drawing transmission shaft, drill bit synchronous rotation;The boring procedure of electric drill, is embodied in:Shifting roller 110
And the drill bit of electric drill is made to be located at drilled point lower section, guide post 210 is moved up, guide post 210 moves upwards and electric drill is driven to synchronize fortune
Dynamic, in motion process, since the cell wall axial and close to ground along guide post 210 of locking slot 410 is inclined-plane, the inclined-plane is to latch segment
420 locking end generates extruding force, and the locking end of latch segment 420 does the fortune far from 410 slot bottom of locking slot in the case where squeezing force effect
It moves until locking end is detached from locking slot 410, while press-side does the movement close to support column, locking spring 430, which is in, compresses shape
State, guide post 210 continue to rise when the locking end of latch segment 420 is located at next 410 notch of locking slot, locking spring 430
Elastic force makes the press-side of latch segment 420 do the movement of separate support column, locking end is made to do the movement close to 410 slot bottom of locking slot,
Until locking end is located in locking slot 410, and so on, when the drill bit of electric drill rises to and drilled point contact, i.e. completion alignment
When, guide post 210 stops rising, and retaining mechanism 400 moves downward under limiting guide post 210 the gravity the effects that at this time;To handle 230
Force side exert a force and it made to move upwards, handle 230 moves upwards and jacking post 220 is driven to move synchronously, and then makes electricity
Brill moves upwards, and electric drill starts boring work.
More optimize, electric drill will produce larger vibration in boring procedure, which can produce the boring work of electric drill
Raw to influence, in order to solve this problem, the periphery of the jacking post 220 is socketed with buffer spring 250, the buffering elastic
One end of spring 250 is contradicted with supporting plate 240, the other end and horizontal segment 320 contradict, and the elastic force of buffer spring 250 makes supporting plate 240 do far
The cushioning effect of movement from horizontal segment 320, buffer spring 250 can effectively reduce influence of the vibration to electric drill boring work.
More optimize, electric drill is in boring work, by operating personnel pierce the length in furred ceiling by observing drill bit
Judge to drill and whether reach necessary requirement, not only aggravated the operation difficulty of operating personnel, but also the precision to be drilled is relatively low,
In order to solve this problem, scale value is provided on the vertical section b330, the outside of vertical section b330 is socketed with positioning structure
Part 340, the positioning member 340 include locating ring, positioning bolt, and the locating ring is loop configuration and is socketed on perpendicular
The side of the outside of straight section b330, locating ring is provided with location hole, and the positioning bolt is set in location hole and the two
Between connection type be to be threadedly coupled, rotational positioning bolt makes positioning bolt is contradicted/cancelled to contradict vertical section b330's
Movement is fixed on vertical section b330 to which locating ring to be fixed on/cancel;Electric drill is before boring work, and rotational positioning bolt is simultaneously
It is set to cancel the conflict between vertical section b330, running fix ring simultaneously makes the distance between locating ring and sliding sleeve 511 be equal to institute
The hole depth of drilling reversely rotates positioning bolt and it is made closely to be contradicted with vertical section b330 at this time, and locating ring is fixed in vertically
Section b330, during electric drill carries out boring work, when sliding sleeve 511 is contacted with locating ring, the hole depth to be drilled at this time reaches institute
It needs to ask, electric drill stops boring work.
Idler wheel can be transmitted downwards and be transferred to the vibration that electric drill generates in implementing boring procedure, due to idler wheel and ground it
Between to roll cooperation, the rolling that idler wheel occurs will cause drilling device run-off the straight, and will result directly in borehole failure and can
The structure of roof surface can be damaged, it is serious also the drill bit of electric drill to be made to be broken, in order to solve this problem,
The support moving device 100 further includes fixed mechanism 120, and when electric drill works, the fixed mechanism 120 is for fixing this
Drilling device.
As shown in figs. 9-10, above-mentioned fixed mechanism 120 includes fixed block 121, movable part 122, the fixed block
121 for being fixed this drilling device, and the movable part 122 is used to idler wheel 110 being movably installed in fixed block
121。
The fixed block 121 includes in connection that is horizontally disposed and being fixedly connected close to the open end on ground with support column
Plate, the fixed plate for being respectively arranged at connecting plate both ends and extending towards ground direction, connecting plate and two fixed plates constitute U-shaped knot
Structure, the end face on the fixed plate towards ground are the tip of v-shaped structure and fixed plate towards ground.
The top surface of the connecting plate is provided with the intermediolateral column extended towards 210 direction of guide post, and the intermediolateral column is two
End opening and the tube structure coaxially arranged with support column and intermediolateral column are used to support the connection between column inner cavity and the external world, in
Built-in step is provided in studding, the movable part 122 includes guide rod 122a, movable support 122b, rolls spring 122d,
The movable support 122b is set between two fixed plates of fixed block 121, and one end and the activity of the guide rod 122a are propped up
Frame 122b is fixedly connected, the other end passes through built-in step, the rolling spring 122d to be socketed on outside guide rod 122a, rolls bullet
One end of spring 122d is contradicted with built-in step, the other end and movable support 122b contradict, and the elastic force for rolling spring 122d to live
Dynamic holder 122b does the movement close to ground, and the elastic force for rolling spring 122d is moved upwards less than electric drill(Drilling)Required power,
The elastic force for rolling spring 122d is more than the gravity of this drilling device.
The movable support 122b takes the shape of the letter U structure, and movable support 122b includes the centre being fixedly connected with guide rod 122a
Plate, the mounting plate for being respectively arranged at intermediate plate both ends and extending towards ground direction are both provided with through-hole on two mounting plates, described
Fixed block 121 two fixed plates on be both provided with pilot hole of the guide direction perpendicular to ground, the both ends of the idler wheel 110
It is coaxially arranged with roller bearing 122c, the idler wheel 110 is movably installed in fixed block 121 by roller bearing 122c, specifically, idler wheel
110 are set between two mounting plates, and a roller bearing 122c passes through the through-hole of a mounting plate and in the pilot hole of a fixed plate, separately
One roller bearing 122c passes through the through-hole of another mounting plate and in the pilot hole of another fixed plate;Fixed mechanism 120 it is worked
Journey is embodied in:During moving up handle 230 and electric drill being made to move upwards, the force side of handle 230 is by direction
Upward climbing power, while the hinged end of handle 230 applies direction downward reaction force to vertical section a310, due to leading at this time
The fixed and reaction force is more than the elastic force for rolling spring 122d between column 210 and support column, so that the point of fixed plate
End is closely contradicted with ground, and then this drilling device is made to be fixed in ground, after electric drill drills, due to rolling spring 122d
Elastic force be more than the gravity of this drilling device so that the tip of fixed plate is detached from contact with ground, this drilling at this time is set
Ground is fixed in standby revocation, and the movement of idler wheel 110 can drive this drilling device to move synchronously.
As shown in figure 9, when electric drill works, in order to make this drilling device it is more firm be fixed on ground, the support
Mobile device 100 further includes footstep mechanism 130.
The footstep mechanism 130 includes foot pedal 131, limited spring 132, and the state of the foot pedal 131 is divided into
Extending direction is parallel to ground and the foot-operated state contacted with ground, the collapsed state for extending perpendicularly to ground, foot pedal
Be provided with connecting rod 133 between 131 and fixed plate, one end of connecting rod 133 is fixedly connected with foot pedal 131, the other end with it is solid
The axial direction of the separate idler wheel 121 of fixed board being hinged at and be hinged shaft core line perpendicular to support column, in the connecting rod 133
Restricted bar is set, the limitation bar extends towards the direction far from foot pedal 131 and limitation bar is located at below connecting rod 133,
And the hinged end for limiting bar and connecting rod 133 constitutes v-shaped structure, the side setting of the separate idler wheel 121 of the fixed plate
There are connection bump a121a, fixed lobe 121b, the free end of the limitation bar to be provided with connection bump b, the fixation is convex
Play the junction that 121b is set between limitation bar, connecting rod and the company between fixed lobe 121b and limitation bar, connecting rod
It meets place to contradict, one end of the limited spring 132 connect with connection bump a121a, the other end and connection bump b connections, foot
When pedal 131 is in foot-operated state, the elastic force of limited spring 132 makes foot pedal 131 do close to ground by limitation bar, connecting rod
Relative motion, at this time foot pedal 131 closely contradicted with ground, when foot pedal 131 is in collapsed state, limited spring 132
Elastic force is by limiting bar, connecting rod makes foot pedal 131 do the movement close to idler wheel 121, and foot pedal 131 is stowed away at this time.
When electric drill carries out boring work, not only needs to ensure that the drill bit of electric drill is aligned with drilled point, also need to ensure drill bit and quilt
It is vertical to bore furred ceiling face, that is, ensure to drill will not run-off the straight phenomenon, in order to solve this problem, on the vertical section b330
It is provided with plummet mechanism 600, whether the plummet mechanism 600 is vertical with drilled furred ceiling face for detecting drill bit.
As shown in figure 11, above-mentioned plummet mechanism 600 includes fixed link 610, measurement plate 620, measuring rod 630, weighted spherical ball
640, what the fixed link 610 was fixedly installed in vertical section b330 and fixed link 610 is axially perpendicular to vertical section b330's
Extending direction, the measurement plate 620 is movably connected on the free end of fixed link 610 by bolt and measurement plate 620 can be around
The axial rotation of fixed link 610, the measuring rod 630 are vertically disposed to extend, one end of measuring rod 630 and measurement plate
620 is hinged and be hinged shaft core line and be fixedly connected with weighted spherical ball 640 perpendicular to extending direction, the other end of fixed link 610;Plummet
The measurement process of component 600, is in particular in:The extending direction of bar 630 is observed and measured, if the extending direction of measuring rod 630 is flat
Row in the extending direction of vertical section b433, then drill bit is vertical with drilled furred ceiling face, drill will not run-off the straight phenomenon, if measurement
There are angle, then drilled run-off the straights between the extending direction and the extending direction of vertical section b433 of bar 630.
A method of suspended ceiling drilling being carried out to house, market, step is:
S1:Move up jacking apparatus and make the drill bit of electric drill close to furred ceiling face, mobile support moving device 100 and make drill bit with
Drilled point completes alignment;The jacking apparatus includes lifting body 200, lifting-up support 300, and the lifting-up support 300 can
Be divided into three parts and respectively vertical section a310, horizontal segment 320, vertical section b330, one end of the horizontal segment 320 with it is perpendicular
Straight section a310 is fixedly connected, the other end is fixedly connected with vertical section b330, and the extending direction of horizontal segment 320 is parallel to ground, is erected
The extending direction of straight section a310 and vertical section b330 is each perpendicular to the extending direction of ground and vertical section a310 and vertical section b330
On the contrary and vertical section b330 is located above vertical section a310, is offered on the horizontal segment 320 and is axially perpendicular to ground
Perforating, be provided with the guide sleeve 331 for being axially perpendicular to ground on the vertical section b330 and guide sleeve 331 be located at it is vertical
For section b330 towards the side of horizontal segment 320, the lifting body 200 includes guide post 210, jacking post 220, handle 230, supporting plate
240, the guide post 210, jacking post 220 are the tube structure of both ends open and the axial direction of the two is each perpendicular to ground,
220 pivot bush unit of jacking post is in guide post 210 and the open end of guide post 210 and the periphery of jacking post 220 constitute supporting table
Rank, the guide post 210 are fixedly installed in horizontal segment 320 and the lower section positioned at horizontal segment 320, the jacking post 220
One open end is located at 320 top of horizontal segment, another open end passes through perforating and in guide post 210, the supporting plate 240 is solid
Dingan County is located at the open end of the top of horizontal segment 320 loaded on jacking post 220, face of the supporting plate 240 far from jacking post 220 for arcwall face simultaneously
And arcwall face is bent towards away from 220 direction of jacking post, the periphery of the jacking post 220 is provided through the installation of its diameter
The periphery in hole, the guide post 210 is provided through the avoid holes of its diameter, and the aperture of the avoid holes is more than mounting hole
Aperture and the aperture of avoid holes overlapped with the aperture of mounting hole, one end of the handle 230 be hinged end and with it is vertical
Section a310 is hinged and is hinged shaft core line to be force side and passes through avoid holes perpendicular to extending direction, the other end of vertical section a310
And mounting hole, the hole wall that handle 230 is located at part and mounting hole in mounting hole are hinged, and between handle 230, mounting hole
Hinged shaft core line is parallel to the hinged shaft core line between handle 230, vertical section a310, between the handle 230, mounting hole
Sliding slot, the support moving device 100 are both provided at articulated shaft at articulated shaft between handle 230, vertical section a310
Including support column, idler wheel 110, the support column is both ends open and is axially perpendicular to the tube structure and guide post on ground
For 210 pivot bush units in support column, guide post 210 drives jacking apparatus to move synchronously when axially moving up and down along support column, described
Idler wheel 110 be located at below support column and idler wheel 110 is movably installed in support column, between the support column and guide post 210
It is additionally provided with the retaining mechanism 400 for being fixed on guide post 210 in support column, the electric drill passes through the mechanism that is slidably connected
500 are movably installed in lifting-up support 300;It moves up guide post 210 and drives electric drill to synchronize upward fortune by lifting-up support 300
Dynamic, until stopping mobile guide post 210 when the drill bit of electric drill is close to furred ceiling face, shifting roller 110, idler wheel 110 moves and drives electricity
Bore synchronizing moving, until stopping shifting roller 110 when drill bit is completed be directed at drilled point, continue to move up guide post 210 up to
Drill bit completes alignment work with the mobile guide post 210 of stopping when drilled point contact, at this time electric drill;
S2:Adjustment footstep mechanism 130 simultaneously makes foot pedal 131 be in foot-operated state;The support moving device 100 further includes solid
Determine mechanism 120, footstep mechanism 130, the fixed mechanism 120 includes fixed block 121, movable part 122, the fixed block
121 include in connecting plate that is horizontally disposed and being fixedly connected close to the open end on ground with support column, be respectively arranged at connecting plate
Both ends and the fixed plate extended towards ground direction, connecting plate and two fixed plates constitute U-shaped structure, fixed plate direction ground
The end face in face is the tip of v-shaped structure and fixed plate towards ground, and the movable part 122 is used for 110 activity of idler wheel
It is installed on fixed block 121, the footstep mechanism 130 includes foot pedal 131, limited spring 132, the foot pedal 131
State is divided into the foot-operated state that extending direction is parallel to ground and contacted with ground, extend perpendicularly to ground pack up shape
State, is provided with connecting rod 133 between foot pedal 131 and fixed plate, one end of connecting rod 133 is fixedly connected, separately with foot pedal 131
The axial direction of the separate idler wheel 121 of one end and fixed plate being hinged at and be hinged shaft core line perpendicular to support column, the company
Restricted bar is set on extension bar 133, and the limitation bar extends towards the direction far from foot pedal 131 and limitation bar is located at connection
Below bar 133 and limit hinged end composition v-shaped structure of the bar with connecting rod 133, the separate idler wheel 121 of the fixed plate
Side be provided with connection bump a121a, fixed lobe 121b, the free end of the limitation bar is provided with connection bump b, institute
The fixed lobe 121b stated is set to limitation bar, the junction between connecting rod and fixed lobe 121b and limits bar, connect
Junction between bar contradicts, one end of the limited spring 132 connect with connection bump a121a, the other end with connect it is convex
B connections are played, when foot pedal 131 is in foot-operated state, the elastic force of limited spring 132 makes foot pedal 131 by limitation bar, connecting rod
The relative motion close to ground is done, foot pedal 131 is closely contradicted with ground at this time, when foot pedal 131 is in collapsed state, limitation
The elastic force of spring 132 is by limiting bar, connecting rod makes foot pedal 131 do the movement close to idler wheel 121, at this time 131 quilt of foot pedal
It packs up;It moves down foot pedal 131 and foot pedal 131 is made to be contacted with ground, foot pedal 131 is in foot-operated state, operation at this time
Personnel can trample foot pedal 131, this drilling device is fixed;
S3:Scale value is provided on the vertical section b330, the outside of vertical section b330 is socketed with positioning member 340, described
Positioning member 340 include locating ring, positioning bolt, the locating ring is loop configuration and to be socketed on vertical section b330's
The side of outside, locating ring is provided with location hole, and the positioning bolt is set in location hole and connection between the two
Mode is to be threadedly coupled, and rotational positioning bolt makes positioning bolt contradict/cancel the movement for contradicting vertical section b330, thus will
Locating ring, which is fixed on/cancels, is fixed on vertical section b330;Rotational positioning bolt simultaneously makes it cancel supporting between vertical section b330
It touches, running fix ring simultaneously makes locating ring be equal to drilled hole depth with the distance between the mechanism 500 that is slidably connected, reversed rotation at this time
Turn positioning bolt and it is made closely to be contradicted with vertical section b330, locating ring is fixed in vertical section b330;
S4:It exerts a force to the force side of handle 230 and it is made to move upwards, handle 230 moves upwards and drives jacking post 220 same
Step moves upwards, and then electric drill is made to move upwards, and electric drill starts boring work, until the mechanism 500 that is slidably connected connects with locating ring
When touching, the depth to be drilled reaches requirement, during electric drill completes boring work, while the force side of handle 230 moves upwards,
The hinged end of handle 230 applies direction downward reaction force to vertical section a310, due at this time between guide post 210 and support column
It is fixed by retaining mechanism 400, so that the tip of fixed plate is closely contradicted with ground, and then makes this drilling device quilt
It is fixed on ground, this drilling device is fixed in ground under fixed plate, the collective effect of foot pedal 131;
S5:After electric drill completes boring work, revocation retaining mechanism 400 limits the fixed of guide post 210, moves down guide post 210,
Guide post 210 is moved downward and is synchronized by the traction electric drill of lifting body 200 and moved downward, and the drill bit of electric drill is detached from drilling.
(Second embodiment)
The difference of the present embodiment and first embodiment essentially consists between guide post 210, jacking post 220,320 three of horizontal segment
The difference of connection relation between the difference and sliding sleeve 511 and vertical section b330 of connection relation.
The jacking post 220 is fixedly sheathed in guide post 210, specifically, the guide post 210 is located at horizontal segment 320
One end of lower section and guide post 210 and the conflict of horizontal segment 320, the jacking post 220 is located at 320 top of horizontal segment, the other end
Across perforating and it is fixedly sheathed in guide post 210, horizontal segment 320 is slidably socketed in jacking post 220, and the one of buffer spring 250
End contradicts supporting plate 240, the other end contradicts horizontal segment 320 and pushes horizontal segment 320 against guide post 210,220 junction structure of jacking post
At support level.
The sliding sleeve 511 is fixedly sheathed in outside vertical section b330, i.e., electric drill fixes peace by the mechanism 500 that is slidably connected
Outside vertical section b330.
A kind of suspended ceiling drilling method to building roof, step are:
S1:Move up jacking apparatus and make the drill bit of electric drill close to furred ceiling face, mobile support moving device 100 and make drill bit with
Drilled point completes alignment;The jacking apparatus includes lifting body 200, lifting-up support 300, and the lifting-up support 300 can
Be divided into three parts and respectively vertical section a310, horizontal segment 320, vertical section b330, one end of the horizontal segment 320 with it is perpendicular
Straight section a310 is fixedly connected, the other end is fixedly connected with vertical section b330, and the extending direction of horizontal segment 320 is parallel to ground, is erected
The extending direction of straight section a310 and vertical section b330 is each perpendicular to the extending direction of ground and vertical section a310 and vertical section b330
On the contrary and vertical section b330 is located above vertical section a310, is offered on the horizontal segment 320 and is axially perpendicular to ground
Perforating, be provided with the guide sleeve 331 for being axially perpendicular to ground on the vertical section b330 and guide sleeve 331 be located at it is vertical
For section b330 towards the side of horizontal segment 320, the lifting body 200 includes guide post 210, jacking post 220, handle 230, supporting plate
240, the guide post 210, jacking post 220 are the tube structure of both ends open and the axial direction of the two is each perpendicular to ground,
Jacking post 220 is fixedly sheathed in the guide post 210 and open end of guide post 210 and the periphery of jacking post 220 constitutes supporting table
Rank, the guide post 210 is located at 320 lower section of horizontal segment and guide post 210 is contradicted with horizontal segment 320, the jacking post 220
One end is located at 320 top of horizontal segment, the other end passes through perforating and is fixedly sheathed in guide post 210, and horizontal segment 320 is slidably socketed
In jacking post 220, one end of buffer spring 250 contradicts supporting plate 240, the other end contradicts horizontal segment 320 and horizontal segment 320 is pushed to support
The support level constituted to guide post 210,220 junction of jacking post, the supporting plate 240 are fixedly installed in jacking post 220 and are located at
The open end of 320 top of horizontal segment, face of the supporting plate 240 far from jacking post 220 is arcwall face and arcwall face court deviates from jacking post
220 directions are bent, and the periphery of the jacking post 220 is provided through the mounting hole of its diameter, the guide post 210 it is outer
Disc is provided through the avoid holes of its diameter, and the aperture of the avoid holes is more than the aperture of mounting hole and the hole of avoid holes
Mouth is overlapped with the aperture of mounting hole, and one end of the handle 230 is hinged end and and articulated shaft hinged with vertical section a310
Core wire is force side and avoid holes and mounting hole, handle 230 is passed through to be located at perpendicular to extending direction, the other end of vertical section a310
Part and the hole wall of mounting hole in mounting hole is hinged, and the hinged shaft core line between handle 230, mounting hole is parallel to handle
230, the hinged shaft core line between vertical section a310, at the articulated shaft between the handle 230, mounting hole with handle 230, perpendicular
Sliding slot is both provided at articulated shaft between straight section a310, the support moving device 100 includes support column, idler wheel 110, institute
The support column stated is both ends open and is axially perpendicular to the tube structure on ground and 210 pivot bush unit of guide post is in support column,
Guide post 210 drives jacking apparatus to move synchronously when axially moving up and down along support column, and the idler wheel 110 is located at below support column
And idler wheel 110 is movably installed in support column, is additionally provided between the support column and guide post 210 for consolidating guide post 210
Due to the retaining mechanism 400 in support column, the electric drill is fixedly installed in lifting-up support 300 by the mechanism 500 that is slidably connected;
It moves up guide post 210 and drives electric drill to synchronize by lifting-up support 300 and move upwards, until the drill bit of electric drill is close to furred ceiling face
When stop mobile guide post 210, shifting roller 110, idler wheel 110, which moves, simultaneously drives electric drill synchronizing moving, until drill bit and drilled point
It completes to stop shifting roller 110 when alignment, continues to move up guide post 210 until drill bit is led with stopping movement when drilled point contact
Column 210, the alignment work of electric drill completion at this time;
S2:Adjustment footstep mechanism 130 simultaneously makes foot pedal 131 be in foot-operated state;The support moving device 100 further includes solid
Determine mechanism 120, footstep mechanism 130, the fixed mechanism 120 includes fixed block 121, movable part 122, the fixed block
121 include in connecting plate that is horizontally disposed and being fixedly connected close to the open end on ground with support column, be respectively arranged at connecting plate
Both ends and the fixed plate extended towards ground direction, connecting plate and two fixed plates constitute U-shaped structure, fixed plate direction ground
The end face in face is the tip of v-shaped structure and fixed plate towards ground, and the movable part 122 is used for 110 activity of idler wheel
It is installed on fixed block 121, the footstep mechanism 130 includes foot pedal 131, limited spring 132, the foot pedal 131
State is divided into the foot-operated state that extending direction is parallel to ground and contacted with ground, extend perpendicularly to ground pack up shape
State, is provided with connecting rod 133 between foot pedal 131 and fixed plate, one end of connecting rod 133 is fixedly connected, separately with foot pedal 131
The axial direction of the separate idler wheel 121 of one end and fixed plate being hinged at and be hinged shaft core line perpendicular to support column, the company
Restricted bar is set on extension bar 133, and the limitation bar extends towards the direction far from foot pedal 131 and limitation bar is located at connection
Below bar 133 and limit hinged end composition v-shaped structure of the bar with connecting rod 133, the separate idler wheel 121 of the fixed plate
Side be provided with connection bump a121a, fixed lobe 121b, the free end of the limitation bar is provided with connection bump b, institute
The fixed lobe 121b stated is set to limitation bar, the junction between connecting rod and fixed lobe 121b and limits bar, connect
Junction between bar contradicts, one end of the limited spring 132 connect with connection bump a121a, the other end with connect it is convex
B connections are played, when foot pedal 131 is in foot-operated state, the elastic force of limited spring 132 makes foot pedal 131 by limitation bar, connecting rod
The relative motion close to ground is done, foot pedal 131 is closely contradicted with ground at this time, when foot pedal 131 is in collapsed state, limitation
The elastic force of spring 132 is by limiting bar, connecting rod makes foot pedal 131 do the movement close to idler wheel 121, at this time 131 quilt of foot pedal
It packs up;It moves down foot pedal 131 and foot pedal 131 is made to be contacted with ground, foot pedal 131 is in foot-operated state, operation at this time
Personnel can trample foot pedal 131, this drilling device is fixed;
S3:Exert a force to the force side of handle 230 and it made to move downward, due to guide post 210 be located at the lower section of horizontal segment 320 and
Guide post 210 is contradicted with horizontal segment 320, and one end of jacking post 220 is located at 320 top of horizontal segment, the other end passes through perforating and solid
Surely it is socketed in guide post 210 so that the hinged end of handle 230 applies the upward reaction force in direction to vertical section a310, this is anti-
Active force makes lifting-up support 300 be moved upwards along the axial direction of jacking post 220, and then electric drill is made to move upwards, and electric drill starts
Boring work, while during the force side of handle 230 moves downward, due to passing through lock between guide post 210 and support column at this time
Tight mechanism 400 is fixed, so that the tip of fixed plate is closely contradicted with ground, and then this drilling device is made to be fixed in
Ground, this drilling device are fixed in ground under fixed plate, the collective effect of foot pedal 131;
S4:After electric drill completes boring work, revocation retaining mechanism 400 limits the fixed of guide post 210, moves down guide post 210,
Axial direction of the lifting-up support 300 under the effect of gravity along jacking post 220 moves downward at this time, and lifting-up support 300 moves downward simultaneously
It drives electric drill to synchronize to move downward, the drill bit of electric drill is detached from drilling.
(3rd embodiment)
The difference of the present embodiment and first embodiment essentially consists between guide post 210, jacking post 220,320 three of horizontal segment
The difference of connection relation.
220 pivot bush unit of jacking post is in guide post 210, specifically, the guide post 210 is located at horizontal segment 320
Lower section and guide post 210 and the conflict of horizontal segment 320, an open end of the jacking post 220 are located above horizontal segment 320, are another
One open end passes through perforating and pivot bush unit in guide post 210, and horizontal segment 320 is slidably socketed in jacking post 220, buffering
One end of spring 250 contradicts supporting plate 240, the other end contradicts horizontal segment 320 and pushes horizontal segment 320 against guide post 210, jacking post
The support level that 220 junctions are constituted.
The method of the high-precision borehole of building furred ceiling, step are:
S1:Move up jacking apparatus and make the drill bit of electric drill close to furred ceiling face, mobile support moving device 100 and make drill bit with
Drilled point completes alignment;The jacking apparatus includes lifting body 200, lifting-up support 300, and the lifting-up support 300 can
Be divided into three parts and respectively vertical section a310, horizontal segment 320, vertical section b330, one end of the horizontal segment 320 with it is perpendicular
Straight section a310 is fixedly connected, the other end is fixedly connected with vertical section b330, and the extending direction of horizontal segment 320 is parallel to ground, is erected
The extending direction of straight section a310 and vertical section b330 is each perpendicular to the extending direction of ground and vertical section a310 and vertical section b330
On the contrary and vertical section b330 is located above vertical section a310, is offered on the horizontal segment 320 and is axially perpendicular to ground
Perforating, be provided with the guide sleeve 331 for being axially perpendicular to ground on the vertical section b330 and guide sleeve 331 be located at it is vertical
For section b330 towards the side of horizontal segment 320, the lifting body 200 includes guide post 210, jacking post 220, handle 230, supporting plate
240, the guide post 210, jacking post 220 are the tube structure of both ends open and the axial direction of the two is each perpendicular to ground,
220 pivot bush unit of jacking post is in guide post 210 and the open end of guide post 210 and the periphery of jacking post 220 constitute supporting table
Rank, the guide post 210 is located at 320 lower section of horizontal segment and guide post 210 is contradicted with horizontal segment 320, the jacking post 220
One open end is located at the top of horizontal segment 320, another open end passes through perforating and pivot bush unit is in guide post 210, and horizontal
Section 320 is slidably socketed in jacking post 220, and one end of buffer spring 250 contradicts supporting plate 240, the other end contradicts horizontal segment 320 and pushes away
The support level that dynamic horizontal segment 320 is constituted against guide post 210,220 junction of jacking post, the supporting plate 240 are fixedly installed in
Jacking post 220 is located at the open end of 320 top of horizontal segment, and face of the supporting plate 240 far from jacking post 220 is arcwall face and arcwall face
It is bent towards away from 220 direction of jacking post, the periphery of the jacking post 220 is provided through the mounting hole of its diameter, described
The periphery of guide post 210 be provided through the avoid holes of its diameter, the aperture of the avoid holes is more than the aperture of mounting hole
And the aperture of avoid holes is overlapped with the aperture of mounting hole, one end of the handle 230 be hinged end and with vertical section a310
It is hinged and is hinged shaft core line and be force side and pass through avoid holes and installation perpendicular to extending direction, the other end of vertical section a310
Hole, the hole wall that handle 230 is located at part and mounting hole in mounting hole is hinged, and the articulated shaft between handle 230, mounting hole
Core wire is parallel to the hinged shaft core line between handle 230, vertical section a310, the articulated shaft between the handle 230, mounting hole
Sliding slot is both provided at articulated shaft between place and handle 230, vertical section a310, the support moving device 100 includes branch
Dagger, idler wheel 110, the support column are both ends open and are axially perpendicular to the tube structure on ground and 210 activity of guide post
It is socketed in support column, guide post 210 drives jacking apparatus to move synchronously when axially moving up and down along support column, the idler wheel
110 below support column and idler wheel 110 is movably installed in support column, is also set up between the support column and guide post 210
Be useful for the retaining mechanism 400 guide post 210 being fixed in support column, the electric drill passes through 500 activity of mechanism that is slidably connected
It is installed on lifting-up support 300;It moves up guide post 210 and drives electric drill to synchronize by lifting-up support 300 and move upwards, until electricity
Stop mobile guide post 210, shifting roller 110 when the drill bit of brill is close to furred ceiling face, idler wheel 110 moves and electric drill is driven to synchronize and moves
It is dynamic, until drill bit stops shifting roller 110 when completing to be aligned with drilled point, guide post 210 is continued to move up until drill bit and quilt
Stop mobile guide post 210 when boring point contact, electric drill completes alignment work at this time;
S2:Adjustment footstep mechanism 130 simultaneously makes foot pedal 131 be in foot-operated state;The support moving device 100 further includes solid
Determine mechanism 120, footstep mechanism 130, the fixed mechanism 120 includes fixed block 121, movable part 122, the fixed block
121 include in connecting plate that is horizontally disposed and being fixedly connected close to the open end on ground with support column, be respectively arranged at connecting plate
Both ends and the fixed plate extended towards ground direction, connecting plate and two fixed plates constitute U-shaped structure, fixed plate direction ground
The end face in face is the tip of v-shaped structure and fixed plate towards ground, and the movable part 122 is used for 110 activity of idler wheel
It is installed on fixed block 121, the footstep mechanism 130 includes foot pedal 131, limited spring 132, the foot pedal 131
State is divided into the foot-operated state that extending direction is parallel to ground and contacted with ground, extend perpendicularly to ground pack up shape
State, is provided with connecting rod 133 between foot pedal 131 and fixed plate, one end of connecting rod 133 is fixedly connected, separately with foot pedal 131
The axial direction of the separate idler wheel 121 of one end and fixed plate being hinged at and be hinged shaft core line perpendicular to support column, the company
Restricted bar is set on extension bar 133, and the limitation bar extends towards the direction far from foot pedal 131 and limitation bar is located at connection
Below bar 133 and limit hinged end composition v-shaped structure of the bar with connecting rod 133, the separate idler wheel 121 of the fixed plate
Side be provided with connection bump a121a, fixed lobe 121b, the free end of the limitation bar is provided with connection bump b, institute
The fixed lobe 121b stated is set to limitation bar, the junction between connecting rod and fixed lobe 121b and limits bar, connect
Junction between bar contradicts, one end of the limited spring 132 connect with connection bump a121a, the other end with connect it is convex
B connections are played, when foot pedal 131 is in foot-operated state, the elastic force of limited spring 132 makes foot pedal 131 by limitation bar, connecting rod
The relative motion close to ground is done, foot pedal 131 is closely contradicted with ground at this time, when foot pedal 131 is in collapsed state, limitation
The elastic force of spring 132 is by limiting bar, connecting rod makes foot pedal 131 do the movement close to idler wheel 121, at this time 131 quilt of foot pedal
It packs up;It moves down foot pedal 131 and foot pedal 131 is made to be contacted with ground, foot pedal 131 is in foot-operated state, operation at this time
Personnel can trample foot pedal 131, this drilling device is fixed;
S3:Scale value is provided on the vertical section b330, the outside of vertical section b330 is socketed with positioning member 340, described
Positioning member 340 include locating ring, positioning bolt, the locating ring is loop configuration and to be socketed on vertical section b330's
The side of outside, locating ring is provided with location hole, and the positioning bolt is set in location hole and connection between the two
Mode is to be threadedly coupled, and rotational positioning bolt makes positioning bolt contradict/cancel the movement for contradicting vertical section b330, thus will
Locating ring, which is fixed on/cancels, is fixed on vertical section b330;Rotational positioning bolt simultaneously makes it cancel supporting between vertical section b330
It touches, running fix ring simultaneously makes locating ring be equal to drilled hole depth with the distance between the mechanism 500 that is slidably connected, reversed rotation at this time
Turn positioning bolt and it is made closely to be contradicted with vertical section b330, locating ring is fixed in vertical section b330;
S4:It exerts a force to the force side of handle 230 and it is made to move upwards, handle 230 moves upwards and drives jacking post 220 same
Step moves upwards, and then electric drill is made to move upwards, and electric drill starts boring work, until the mechanism 500 that is slidably connected connects with locating ring
When touching, the depth to be drilled reaches requirement, during electric drill completes boring work, while the force side of handle 230 moves upwards,
The hinged end of handle 230 applies direction downward reaction force to vertical section a310, since guide post 210 and horizontal segment 320 contradict,
The reaction force makes horizontal segment 320 apply the downward power in direction to guide post 210, due at this time between guide post 210 and support column
It is fixed by retaining mechanism 400, which makes the tip of fixed plate closely be contradicted with ground, and then makes this drilling device quilt
It is fixed on ground, this drilling device is fixed in ground under fixed plate, the collective effect of foot pedal 131;
S5:After electric drill completes boring work, revocation retaining mechanism 400 limits the fixed of guide post 210, moves down guide post 210,
Guide post 210 is moved downward and is synchronized by the traction electric drill of lifting body 200 and moved downward, and the drill bit of electric drill is detached from drilling.
Specific case is applied in the present invention, and principle and implementation of the present invention are described, above example
Illustrate the method and its core concept for being merely used to help understand the present invention;Meanwhile for those of ordinary skill in the art, according to
According to the thought of the present invention, there will be changes in the specific implementation manner and application range.In conclusion the content of the present specification
It should not be construed as limiting the invention.
Claims (5)
1. the suspended ceiling drilling equipment for building construction or interior decoration, which is characterized in that it includes electric drill, the mobile dress of support
It sets, jacking apparatus, the jacking apparatus includes that lifting body, lifting-up support and lifting body are installed on lifting-up support, institute
It is provided between the electric drill and lifting-up support stated and is slidably connected mechanism and electric drill is movably installed in top by the mechanism that is slidably connected
Ascending branch frame, the lifting body are used to provide drilling required climbing power for electric drill, the support moving device and jacking
Mechanism connects, and support moving device is for moving this drilling device and playing a supportive role to lifting body;
The support moving device includes support column, idler wheel, fixed mechanism, and the support column is for fixed mechanism and jacking
Connection between device, the fixed mechanism include fixed block, movable part, and the fixed block is used for this drilling device
It is fixed, the movable part is used to idler wheel being movably installed in fixed block, and the idler wheel is set for moving this drilling
Standby, the fixed block includes in connecting plate that is horizontally disposed and being fixedly connected close to the open end on ground with support column, respectively
The fixed plate for being set to connecting plate both ends and extending towards ground direction, connecting plate and two fixed plates constitute U-shaped structure, described
The end face on fixed plate towards ground is the tip of v-shaped structure and fixed plate towards ground.
2. the suspended ceiling drilling equipment according to claim 1 for building construction or interior decoration, which is characterized in that on
The lifting-up support stated can be divided into three parts and respectively vertical section a, horizontal segment, vertical section b, one end of the horizontal segment with
Vertical section a is fixedly connected, the other end is fixedly connected with vertical section b, and the extending direction of horizontal segment is parallel to ground, vertical section a with
The extending direction of vertical section b is each perpendicular to ground and vertical section a is opposite with the extending direction of vertical section b and vertical section b is located at
Above vertical section a, the perforating for being axially perpendicular to ground is offered on the horizontal segment, is provided on the vertical section b
It is axially perpendicular to the guide sleeve on ground and guide sleeve is located at vertical section b towards the side of horizontal segment, the electric drill passes through cunning
Dynamic bindiny mechanism is movably installed in vertical section b;
The lifting body includes guide post, jacking post, supporting plate, handle, and the guide post, jacking post are the cylinder of both ends open
The axial direction of body structure and the two is each perpendicular to ground, and jacking post pivot bush unit is in the guide post and open end of guide post and jacking
The periphery of column constitutes support level, and the guide post is fixedly installed in horizontal segment and guide post is located at the lower section of horizontal segment, institute
One open end of the jacking post stated is located above horizontal segment, another open end passes through perforating and is located in guide post, the support
Plate is fixedly installed in the open end that jacking post is located above horizontal segment, and face of the supporting plate far from jacking post is arcwall face and arcwall face
It is bent towards away from jacking post direction;
The periphery of the jacking post is provided through the mounting hole of its diameter, and the periphery of the guide post is provided through
The avoid holes of its diameter, the apertures of the avoid holes are more than the aperture of mounting hole and the aperture of avoid holes and the hole of mounting hole
One end of salty conjunction, the handle is hinged end and is hinged with vertical section a and is hinged shaft core line prolonging perpendicular to vertical section a
Stretch direction, the other end is force side and avoid holes and mounting hole, handle is passed through to be located at the hole of the part and mounting hole in mounting hole
Wall is hinged, and the hinged shaft core line between handle, mounting hole is parallel to the hinged shaft core line between handle, vertical section a, described
Handle, be both provided with sliding slot at the articulated shaft at the articulated shaft between mounting hole between handle, vertical section a.
3. the suspended ceiling drilling equipment according to claim 1 or 2 for building construction or interior decoration, feature exists
In for above-mentioned guide post pivot bush unit in support column, an open end of the guide post is fixedly installed in horizontal segment, another opening
End pivot bush unit is in being provided in support column and between the two the retaining mechanism for being fixed on guide post in support column;
The top surface of the connecting plate is provided with the intermediolateral column extended towards guide post direction, the intermediolateral column be both ends open and
Coaxially arranged tube structure and intermediolateral column are used to support the connection between column inner cavity and the external world with support column, are set in intermediolateral column
It is equipped with built-in step, the movable part includes guide rod, movable support, rolls spring, and the movable support is set to solid
Between two fixed plates for determining block, one end of the guide rod is fixedly connected with movable support, the other end passes through built-in step, described
Rolling spring be socketed on outside guide rod, roll that one end of spring is contradicted with built-in step, the other end and movable support contradict, rolling
The elastic force of spring of moving makes movable support do the movement close to ground, roll spring elastic force moved upwards less than electric drill it is required
Power, the elastic force for rolling spring are more than the gravity of this drilling device;
The movable support takes the shape of the letter U structure, and movable support includes the intermediate plate being fixedly connected with guide rod, is respectively arranged at centre
Plate both ends and the mounting plate extended towards ground direction, are both provided with through-hole, two fixations of the fixed block on two mounting plates
Pilot hole of the guide direction perpendicular to ground is both provided on plate, the both ends of the idler wheel are coaxially arranged with roller bearing, described
Idler wheel fixed block is movably installed in by roller bearing, idler wheel is set between two mounting plates, and a roller bearing passes through the logical of a mounting plate
Hole is simultaneously located in the pilot hole of a fixed plate, and another roller bearing passes through the through-hole of another mounting plate and the guiding positioned at another fixed plate
In hole.
4. the suspended ceiling drilling equipment according to claim 3 for building construction or interior decoration, which is characterized in that on
The support moving device stated further includes footstep mechanism, and the footstep mechanism includes foot pedal, limited spring, the foot pedal
State be divided into foot-operated state that extending direction is parallel to ground and contacted with ground, extend perpendicularly to ground pack up shape
State, is provided with connecting rod between foot pedal and fixed plate, one end of connecting rod is fixedly connected with foot pedal, the other end and fixed plate
Separate idler wheel the axial direction being hinged at and be hinged shaft core line perpendicular to support column, be arranged in the connecting rod restricted
Bar, the limitation bar extends towards the direction far from foot pedal and limitation bar is located at below connecting rod and limits bar and connect
The hinged end of bar constitutes v-shaped structure, and the side of the separate idler wheel of the fixed plate is provided with connection bump a, fixed lobe, institute
The free end for the limitation bar stated is provided with connection bump b, and the fixed lobe is set to the connection between limitation bar, connecting rod
Junction between place and fixed lobe and limitation bar, connecting rod contradicts, one end and the connection bump a of the limited spring
Connection, the other end and connection bump b connections, when foot pedal is in foot-operated state, the elastic force of limited spring is by limiting bar, connection
Bar makes foot pedal do the relative motion close to ground, when foot pedal be in collapsed state, the elastic force of limited spring by limitation bar,
Connecting rod makes foot pedal do the movement close to idler wheel.
5. the suspended ceiling drilling equipment according to claim 2 for building construction or interior decoration, which is characterized in that on
Scale value is provided on the vertical section b stated, the outside of vertical section b is socketed with positioning member, and the positioning member includes positioning
Ring, positioning bolt, the locating ring is loop configuration and is socketed on the outside of vertical section b, and the side of locating ring is provided with
Location hole, it is to be threadedly coupled that the positioning bolt, which is set to connection type in location hole and between the two,.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810327571.4A CN108590519A (en) | 2018-04-12 | 2018-04-12 | Suspended ceiling drilling equipment for building construction or interior decoration |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810327571.4A CN108590519A (en) | 2018-04-12 | 2018-04-12 | Suspended ceiling drilling equipment for building construction or interior decoration |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108590519A true CN108590519A (en) | 2018-09-28 |
Family
ID=63621971
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810327571.4A Pending CN108590519A (en) | 2018-04-12 | 2018-04-12 | Suspended ceiling drilling equipment for building construction or interior decoration |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108590519A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3922611A1 (en) * | 1989-07-10 | 1991-01-17 | Volker Ehrichs | Support for power drill making holes in ceiling - consists of telescopic strut with lever to press drill upwards |
DE202006010017U1 (en) * | 2006-06-26 | 2006-09-07 | Navakovic, Christine | Stand for use of power drill at ceiling or wall, comprising base and adjustable column |
CN103015891A (en) * | 2012-12-27 | 2013-04-03 | 歌山建设集团有限公司 | Movable roof expansion bolt punching device |
CN203109297U (en) * | 2013-02-25 | 2013-08-07 | 山东轻工业学院 | Electric drill auxiliary hole puncher |
CN204877287U (en) * | 2015-07-03 | 2015-12-16 | 中建一局集团安装工程有限公司 | Height -adjustable removes assembled roof construction auxiliary device |
-
2018
- 2018-04-12 CN CN201810327571.4A patent/CN108590519A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3922611A1 (en) * | 1989-07-10 | 1991-01-17 | Volker Ehrichs | Support for power drill making holes in ceiling - consists of telescopic strut with lever to press drill upwards |
DE202006010017U1 (en) * | 2006-06-26 | 2006-09-07 | Navakovic, Christine | Stand for use of power drill at ceiling or wall, comprising base and adjustable column |
CN103015891A (en) * | 2012-12-27 | 2013-04-03 | 歌山建设集团有限公司 | Movable roof expansion bolt punching device |
CN203109297U (en) * | 2013-02-25 | 2013-08-07 | 山东轻工业学院 | Electric drill auxiliary hole puncher |
CN204877287U (en) * | 2015-07-03 | 2015-12-16 | 中建一局集团安装工程有限公司 | Height -adjustable removes assembled roof construction auxiliary device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108543992A (en) | A method of suspended ceiling drilling is carried out to house, market | |
CN107466801B (en) | Suspension type tapping device and mechanized tapping method | |
CN205437222U (en) | Synchronous drilling equipment of many actuating mechanism of steel pipe | |
CN103521807A (en) | Liftable laser positioning high-space suspender perforation mounting device and operation method | |
CN108284239A (en) | A kind of metal plate drilling device | |
CN206717092U (en) | A kind of drilling machine executing agency | |
CN108237243A (en) | For the suspended ceiling drilling equipment of building roof | |
CN203696028U (en) | Liftable laser-positioning high-space suspender punching device | |
CN102654021B (en) | Tunnel drilling machine | |
CN108543964A (en) | High-precision borehole equipment for building furred ceiling | |
CN206717063U (en) | A kind of tapping machine | |
CN211306209U (en) | Percussion drill roof drilling device | |
CN108590519A (en) | Suspended ceiling drilling equipment for building construction or interior decoration | |
CN215356298U (en) | A accurate perforating device for bathroom cabinet | |
CN104827080A (en) | Drilling machine for ceiling construction in buildings | |
CN208902665U (en) | Multi-functional hollowing measures automatic device | |
CN209068093U (en) | A kind of bracket of mapping equipment | |
CN110065034A (en) | A kind of impact drill boring device of top plate | |
CN207480144U (en) | A kind of drill press workpiece clamping tooling | |
CN109917403A (en) | Drilling tool precise measurement positioning device and rotary drilling rig and operating method | |
CN210033485U (en) | Underground factory building rock anchor beam drilling positioning device | |
CN213515392U (en) | Building material length detection device | |
CN208067378U (en) | A kind of architectural engineering drilling equipment | |
CN214687047U (en) | Drilling auxiliary device for wood board processing | |
CN206047164U (en) | Electric drill support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180928 |