CN108590231A - A kind of construction engineering cost budget practice device - Google Patents

A kind of construction engineering cost budget practice device Download PDF

Info

Publication number
CN108590231A
CN108590231A CN201810403373.1A CN201810403373A CN108590231A CN 108590231 A CN108590231 A CN 108590231A CN 201810403373 A CN201810403373 A CN 201810403373A CN 108590231 A CN108590231 A CN 108590231A
Authority
CN
China
Prior art keywords
tripod
engineering cost
cross bar
construction engineering
hydraulic pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810403373.1A
Other languages
Chinese (zh)
Inventor
陈霞
冒德明
沈小东
冒鹏飞
周峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Biaolong Construction Group Co Ltd
Original Assignee
Jiangsu Biaolong Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Biaolong Construction Group Co Ltd filed Critical Jiangsu Biaolong Construction Group Co Ltd
Priority to CN201810403373.1A priority Critical patent/CN108590231A/en
Publication of CN108590231A publication Critical patent/CN108590231A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • E04H1/1205Small buildings erected in the open air

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Special Chairs (AREA)

Abstract

The invention discloses a kind of construction engineering cost budget practice devices, including body and sliding seat, the internal body bottom end is provided with sliding rail, there are two tripods for the sliding seat lower end installation, one of them is short tripod, another is long tripod, the short tripod lower end is welded with pulley, long tripod lower end is welded with universal wheel, and long tripod centre position is provided with tool box, it is connected by cross bar between the tripod and tripod, and third hydraulic pump is provided on cross bar, third hydraulic pump upper end is equipped with chair plate, sliding plate is installed at the upper side corners of chair plate side, the body middle-end table top is equipped with operation console, display screen is installed above the operation console side, cross bar is installed above the display screen, and cross bar is fixedly mounted on the end wall of body.The present invention can place on building sites according to construction budget demand event, and placement is convenient, have budget convenient, be protected from light the characteristics such as take shelter from rain.

Description

A kind of construction engineering cost budget practice device
Technical field
The present invention relates to construction engineering technical field, specially a kind of construction engineering cost budget practice device.
Background technology
The straight meaning of project cost is exactly the construction price of engineering, the three elements that engineering is valuated, and amount, is taken valence, broadly engineering Cost covers construction engineering cost, highway engineering cost, marine traffic engineering cost, railway engineering cost, total construction cost of water project, electric power Project cost, communication engineering cost, Aerospace Engineering cost etc., project cost refer to carrying out a certain engineering construction to be spent Full payment, core content are investment estimates, estimation per design, correct budgetary estimate, working drawing budget, Engineering Settlement, budget needed for the completion of projects Etc., in order to facilitate being estimated in real time to project cost on people's architectural engineering building site, spy proposes a kind of construction engineering cost Budget practice device.
Invention content
The purpose of the present invention is to provide a kind of construction engineering cost budget practice devices, can be according to construction budget demand Activity is placed on building sites, and placement is convenient, has budget convenient, is protected from light the characteristics such as take shelter from rain.
To achieve the above object, the present invention provides the following technical solutions:A kind of construction engineering cost budget practice device, packet Body and sliding seat are included, the internal body bottom end is provided with sliding rail, and the sliding seat lower end is installed there are two tripod, In one be short tripod, another is long tripod, and the short tripod lower end is welded with pulley, and long tripod lower end is welded with universal Wheel, and long tripod centre position is provided with tool box, is connected by cross bar between the tripod and tripod, and be provided on cross bar Third hydraulic pump, third hydraulic pump upper end are equipped with chair plate, sliding plate are equipped at the upper side corners of chair plate side, The body middle-end table top is equipped with operation console, and display screen is equipped with above the operation console side, is pacified above the display screen Equipped with cross bar, and cross bar is fixedly mounted on the end wall of body, and the centre of the cross bar is equipped with headlamp, the internal body Upper end is equipped with the first hydraulic pump, and the first hydraulic pump fixes support, first hydraulic pressure by the crossbeam of internal body upper end Pump top is provided with telescopic rod, and telescopic rod lower end is connected with supporting rack, and described supporting rod one end is connected with baffle, described Telescopic rod one end is connected with the second hydraulic pump, and second hydraulic pump one end is provided with shaft, and the telescopic rod other end is equipped with Drainage plate.
Preferably, four corners of the body lower end are welded with universal wheel, and universal wheel both sides are provided with brake Piece.
Preferably, it is connected by adjustable spring between the tripod and chair plate.
Preferably, the body is slided by the steel wire that sliding plate and internal body are arranged with sliding seat upper end and is connected It connects.
Preferably, the body is slidably connected with sliding seat lower end by pulley and sliding rail.
Preferably, the internal body is correspondingly provided with PID controller and data storage, and data storage is stored with The case of construction engineering cost budget and relevant calculation formula, and PID controller, data storage, display screen and operation console Between be electrically connected.
Compared with prior art, beneficial effects of the present invention are as follows:
1, the present invention makes telescopic rod is flexible to drive supporting rack branch by the synergistic effect by the first hydraulic pump and the second hydraulic pump Baffle is propped up, reaches and peripheral light and raindrop is blocked, plays the role of blocking protection, while also providing for staff One safe and reliable working environment, it is convenient and practical.
2, the present invention ensure that the convenience of seat and the harmony and work of body entirety by the setting to sliding seat Property, operation of the height of seat completion to construction budget can be adjusted according to need of work by making it at work, high degree of humanity, It ensure that comfort level when staff's work.
3, the present invention facilitates carrying of the people to construction budget tool by the design in tool box.
Description of the drawings
Fig. 1 is agent structure schematic diagram of the present invention.
Fig. 2 is the structural schematic diagram of sliding seat of the present invention.
Fig. 3 is side view of the present invention.
Fig. 4 is shading of the present invention or work structure diagram of taking shelter from rain.
In figure:1- bodies;2- universal wheels;3- sliding rails;The first hydraulic pumps of 4-;5- shafts;The second hydraulic pumps of 6-;7- is supported Frame;8- telescopic rods;9- drainage plates;10- headlamps;11- cross bars;12- display screens;13- operation consoles;14- sliding seats;15- Three hydraulic pumps;The tool boxes 16-;17- pulleys;18- tripods;19- sliding plates;20- chair plates;21- cross bars;22- baffles.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
It please refers to Fig.1 to 4, a kind of embodiment provided by the invention:A kind of construction engineering cost budget practice device, including Body 1 and sliding seat 14,1 inner bottom of body are provided with sliding rail 3, are the pulley 17 under the short tripod in 14 lower end of sliding seat 18 Sliding rail is provided, there are two tripods 18 for the installation of 14 lower end of sliding seat, play a supportive role, one of them is short tripod 18, separately One is long tripod 18, and 18 lower end of short tripod is welded with pulley 17, plays sliding, and 18 lower end of long tripod is welded with universal wheel 2, Play sliding, and 18 centre position of long tripod is provided with tool box 16, for placing the pen and paper of engineering operation record, tripod It is connected, is play fixed supporting role by cross bar 21 between 18 and tripod 18, and be provided with third hydraulic pump 15 on cross bar 21, be chair The lifting of plate 20 provides power, and 15 upper end of third hydraulic pump is equipped with chair plate 20, plays cushion, 20 side upper side corners of chair plate Place is equipped with sliding plate 19, and sliding plate 19 plays flexible connection, and 1 middle-end table top of body is equipped with operation console 13, behaviour Make platform 13 and be used for inputting project data progress tool operation, display screen 12 is installed above 13 side of operation console, display screen 12 rises The effect that data are shown, 12 top of display screen is equipped with cross bar 11, and cross bar 11 is fixedly mounted on the end wall of body 1, to shine Bright lamp 10, which provides, places basis, and the centre of cross bar 11 is equipped with headlamp 10, plays a role in lighting, and 3 inner upper end of body is equipped with First hydraulic pump 4, and the first hydraulic pump 4 fixes support by the crossbeam of 1 inner upper end of body, be telescopic rod 8 rising or Decline and power output is provided, 4 top of the first hydraulic pump is provided with telescopic rod 8, plays telescopic action, and 8 lower end of telescopic rod is connected with Supporting rack 7 makes it pack up or open for slidably supporting baffle 22, and 7 one end of supporting rack is connected with baffle 22, rises and hides The effect of gear or drainage, 8 one end of telescopic rod are connected with the second hydraulic pump 6, and flexible power, and the second liquid are provided for telescopic rod 8 6 one end of press pump is provided with shaft 5, rises for telescopic rod 8 or decline provides rotation basis, facilitate rotation, 8 other end of telescopic rod Drainage plate 9 is installed, drainage is played.
Four corners of 1 lower end of body are welded with universal wheel 2, and 2 both sides of universal wheel are provided with brake block, play support It acts on sliding, is connected by adjustable spring between tripod 18 and chair plate 14, illustrate that the connection between tripod 18 and chair plate 14 is closed System, body 1 and 14 upper end of sliding seat are slidably connected by the steel wire that sliding plate 19 and 1 inside of body are arranged, body 1 with slide Dynamic 14 lower end of seat is slidably connected by pulley 17 and sliding rail 3, and directive function has been connected between body 1 and sliding seat 14, PID controller and data storage are correspondingly provided with inside body 1, and data storage is stored with construction engineering cost budget Case and relevant calculation formula, and be electrically connected between PID controller, data storage, display screen 12 and operation console 13, briefly The construction budget component for summarizing internal body plays brief description.
Operation principle:Construction engineering cost person when in use can be pre- by a kind of construction engineering cost according to requirement of engineering It calculates practice device and transports the live budget of progress in architectural engineering, transport to after outdoor, the mobile adjusting of universal wheel 2 can be passed through The position of practice device, is fixed by brake block, and after fixing, construction engineering cost person passes through the control to sliding seat 14 System, makes its sliding seat 14 slide pull-out under the action of pulley 17 and sliding rail 3, steel wire rope and sliding plate 19, according to building The height of project cost person, which adjusts third hydraulic pump 15, makes its oscilaltion, is fixed after reaching the height of construction engineering cost person, Then construction engineering cost person can be sitting on sliding seat 14 and start to work, and wherein be stored with architectural engineering in data storage The case of account valuation and relevant calculation formula, construction engineering cost person input the number of construction budget by operation console 13 According to, budget is completed under the action of the PID controller of internal body and data storage, is most shown afterwards through display screen 12, So that people refer to, if encountering light or rainy interference in construction site, construction engineering cost person can pass through the first liquid The synergistic effect of press pump 4 and the second hydraulic pump 6 makes its telescopic rod 8 is flexible supporting rack 7 is driven to support baffle 22, completes body 1 The interference of peripheral light or raindrop reaches the effect of blocking, and above is the operation principle of the present invention.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of variations, modification, replace And modification, the scope of the present invention is defined by the appended.

Claims (6)

1. a kind of construction engineering cost budget practice device, including body(1)And sliding seat(14), it is characterised in that:It is described Body(1)Inner bottom is provided with sliding rail(3), the sliding seat(14)There are two tripods for lower end installation(18), one of them For short tripod(18), another is long tripod(18), the short tripod(18)Lower end is welded with pulley(17), long tripod(18)Under End is welded with universal wheel(2), and long tripod(18)Centre position is provided with tool box(16), the tripod(18)With tripod(18) Between pass through cross bar(21)Connection, and cross bar(21)On be provided with third hydraulic pump(15), the third hydraulic pump(15)Upper end Chair plate is installed(20), the chair plate(20)Sliding plate is installed at the upper side corners of side(19), the body(1)Middle end stand Face is equipped with operation console(13), the operation console(13)Display screen is installed above side(12), the display screen(12)Top Cross bar is installed(11), and cross bar(11)It is fixedly mounted on body(1)End wall on, the cross bar(11)Centre photograph is installed Bright lamp(10), the body(3)Inner upper end is equipped with the first hydraulic pump(4), and the first hydraulic pump(4)Pass through body(1)It is interior The crossbeam of portion upper end fixes support, first hydraulic pump(4)Top is provided with telescopic rod(8), and telescopic rod(8)Lower end connects There is supporting rack(7), support frame as described above(7)One end is connected with baffle(22), the telescopic rod(8)One end is connected with the second liquid Press pump(6), and the second hydraulic pump(6)One end is provided with shaft(5), the telescopic rod(8)The other end is equipped with drainage plate(9).
2. a kind of construction engineering cost budget practice device according to claim 1, it is characterised in that:The body(1) Four corners of lower end are welded with universal wheel(2), and universal wheel(2)Both sides are provided with brake block.
3. a kind of construction engineering cost budget practice device according to claim 1, it is characterised in that:The tripod(18) With chair plate(14)Between connected by adjustable spring.
4. a kind of construction engineering cost budget practice device according to claim 1, it is characterised in that:The body(1) With sliding seat(14)Upper end passes through sliding plate(19)And body(1)The steel wire of inside setting is slidably connected.
5. a kind of construction engineering cost budget practice device according to claim 1, it is characterised in that:The body(1) With sliding seat(14)Lower end passes through pulley(17)And sliding rail(3)It is slidably connected.
6. a kind of construction engineering cost budget practice device according to claim 1, it is characterised in that:The body(1) Inside is correspondingly provided with PID controller and data storage, and data storage is stored with the case of construction engineering cost budget With relevant calculation formula, and PID controller, data storage, display screen(12)And operation console(13)Between be electrically connected.
CN201810403373.1A 2018-04-28 2018-04-28 A kind of construction engineering cost budget practice device Withdrawn CN108590231A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810403373.1A CN108590231A (en) 2018-04-28 2018-04-28 A kind of construction engineering cost budget practice device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810403373.1A CN108590231A (en) 2018-04-28 2018-04-28 A kind of construction engineering cost budget practice device

Publications (1)

Publication Number Publication Date
CN108590231A true CN108590231A (en) 2018-09-28

Family

ID=63619306

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810403373.1A Withdrawn CN108590231A (en) 2018-04-28 2018-04-28 A kind of construction engineering cost budget practice device

Country Status (1)

Country Link
CN (1) CN108590231A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114017642A (en) * 2021-11-26 2022-02-08 明庭果 Based on building engineering cost presentation device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114017642A (en) * 2021-11-26 2022-02-08 明庭果 Based on building engineering cost presentation device

Similar Documents

Publication Publication Date Title
CN203855516U (en) Glass superposition supporting platform
CN209038968U (en) A kind of equipment room with lifting platform
CN209618827U (en) A kind of hoistable platform convenient for aircraft wing Quick overhaul
CN108590231A (en) A kind of construction engineering cost budget practice device
CN209293244U (en) Wallboard mounting device
CN204611881U (en) Integrated kitchen range smoking stove plate lowering or hoisting gear
CN211998701U (en) Movable manned painting and calligraphy workbench
CN207249952U (en) A kind of construction engineering cost budget practice device
CN208168435U (en) A kind of movable working platform with sun-shading mechanism
CN106082044A (en) A kind of installation and maintenance adjustable lifting device
CN207959878U (en) A kind of architectural engineering lifting gear
CN217201846U (en) Material lifting device for building engineering
CN206328682U (en) A kind of highway bridge construction Support bracket
CN206621076U (en) A kind of enterprise's office document placing frame
CN213683344U (en) Supporting device for building engineering detection
CN209265513U (en) A kind of vehicle paying platform
CN210885083U (en) Cable trench cover carrying device
CN214006785U (en) Strutting arrangement is used in building engineering construction
CN211496793U (en) Lifting device for steel skeleton
CN206387080U (en) Water storage device and precision air conditioner
CN206979884U (en) A kind of portable fire fighting truck
CN207356466U (en) A kind of multi-functional shared gymnasium
CN221703068U (en) Scaffold pile-up protection frame for construction engineering construction
CN211447641U (en) Passive type in-place device for embedding outer window in window auxiliary frame
CN110385617A (en) Plate processing plate edging device in a kind of automotive frame

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20180928

WW01 Invention patent application withdrawn after publication