CN108589919A - Outer ring plate type beam column connecting device and assembly type steel frame connecting method - Google Patents

Outer ring plate type beam column connecting device and assembly type steel frame connecting method Download PDF

Info

Publication number
CN108589919A
CN108589919A CN201810537918.8A CN201810537918A CN108589919A CN 108589919 A CN108589919 A CN 108589919A CN 201810537918 A CN201810537918 A CN 201810537918A CN 108589919 A CN108589919 A CN 108589919A
Authority
CN
China
Prior art keywords
ring plate
plate
column
steel pipe
square steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810537918.8A
Other languages
Chinese (zh)
Inventor
王燕
王修军
安琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao University of Technology
Original Assignee
Qingdao University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao University of Technology filed Critical Qingdao University of Technology
Priority to CN201810537918.8A priority Critical patent/CN108589919A/en
Publication of CN108589919A publication Critical patent/CN108589919A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2418Details of bolting
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2454Connections between open and closed section profiles

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

本发明提出一种外环板式梁柱连接装置及装配式钢框架连接方法,属于建筑工程技术领域,该外环板式梁柱连接装置在现场装配时全部通过高强螺栓连接,无需焊接,能够有效避免焊接过程的不可控因素对连接节点力学性能的影响。该外环板式梁柱连接装置包括方钢管柱、H型钢梁和传力组件;H型钢梁包括上翼缘板和下翼缘板,上翼缘板和下翼缘板之间设有腹板;传力组件包括套设于方钢管柱外周的两块环板,环板焊接于方钢管柱外壁,其中,位于上方的环板为上环板,位于下方的环板为下环板;上环板与上翼缘板通过高强螺栓连接,下环板与下翼缘板通过高强螺栓连接;传力组件还包括焊接于方钢管柱外壁的腹板拼接板,腹板拼接板与腹板通过高强螺栓连接。

The invention proposes an outer ring plate type beam-column connection device and an assembled steel frame connection method, which belong to the technical field of construction engineering. The outer ring plate type beam-column connection device is all connected by high-strength bolts during on-site assembly without welding, which can effectively avoid Influence of uncontrollable factors in the welding process on the mechanical properties of the joint. The outer ring plate type beam-column connection device includes a square steel pipe column, an H-shaped steel beam and a force transmission component; the H-shaped steel beam includes an upper flange plate and a lower flange plate, and a Web plate; the force transmission component includes two ring plates sleeved on the outer circumference of the square steel pipe column, and the ring plates are welded to the outer wall of the square steel pipe column. Among them, the upper ring plate is the upper ring plate, and the lower ring plate is the lower ring plate ;The upper ring plate and the upper flange plate are connected by high-strength bolts, and the lower ring plate and the lower flange plate are connected by high-strength bolts; The plates are connected by high-strength bolts.

Description

外环板式梁柱连接装置及装配式钢框架连接方法Outer ring plate beam-to-column connection device and assembly steel frame connection method

技术领域technical field

本发明属于建筑工程技术领域,涉及一种装配式钢框架梁柱连接装置,尤其涉及一种外环板式梁柱连接装置及装配式钢框架连接方法。The invention belongs to the technical field of construction engineering, and relates to an assembled steel frame beam-column connection device, in particular to an outer ring plate type beam-column connection device and an assembled steel frame connection method.

背景技术Background technique

在装配式钢框架结构中,梁柱连接节点具有传递轴力、剪力与弯矩的重要作用,其连接性能直接影响整体结构的性能,是钢框架结构的重要组成部分。In the prefabricated steel frame structure, the beam-column connection plays an important role in transmitting axial force, shear force and bending moment, and its connection performance directly affects the performance of the overall structure, which is an important part of the steel frame structure.

目前,钢框架方钢管柱与H型钢梁连接节点的常用连接形式,主要有内隔板式连接、隔板贯通式连接和外环板式连接等几种连接方式。其中,外环板式连接,通常是在钢管柱外壁与钢梁的上、下翼缘位置平齐处各焊接一块厚度不小于钢梁翼缘的环板,钢梁的上、下翼缘与环板通过对接焊缝连接,钢梁腹板通过高强螺栓连接。例如:专利CN106168055A公开了一种矩形钢管混凝土柱-H型钢梁平翼缘外肋环板节点,其在矩形钢管混凝土柱外焊接上外环板、下外环板以及腹板连接板,腹板连接板与H型钢梁之间通过高强螺栓连接,H型钢梁的上翼缘与上外环板用坡口焊焊接,其下翼缘与下外环板用坡口焊焊接。然而,该种连接形式在现场施工时需要大量焊接工作,施焊的焊缝质量不易保证,装配化程度较低,而且,在强震作用下,潜在的焊缝缺陷极易使连接节点处焊缝发生脆性破坏,进而导致节点的破坏。At present, the common connection forms of steel frame square steel pipe columns and H-shaped steel beam connection joints mainly include inner diaphragm connection, diaphragm through connection and outer ring plate connection. Among them, the outer ring plate connection is usually to weld a ring plate with a thickness not less than the flange of the steel beam at the position where the outer wall of the steel pipe column is flush with the upper and lower flanges of the steel beam. The upper and lower flanges of the steel beam and the ring plate pass through Butt weld connection, steel beam web is connected by high-strength bolts. For example: Patent CN106168055A discloses a rectangular steel tube concrete column-H-shaped steel beam flat flange outer rib ring plate joint, which welds the upper outer ring plate, lower outer ring plate and web connection plate outside the rectangular steel tube concrete column, and the web connection The plate and the H-shaped steel beam are connected by high-strength bolts. The upper flange of the H-shaped steel beam is welded to the upper outer ring plate by groove welding, and the lower flange of the H-shaped steel beam is welded to the lower outer ring plate by groove welding. However, this type of connection requires a lot of welding work during on-site construction, the quality of the welded seam is not easy to guarantee, and the degree of assembly is low. Moreover, under the action of strong earthquakes, the potential weld seam defects are very easy to cause the joints to be welded. The brittle failure of the seam will lead to the failure of the joint.

因而,如何改进装配式钢框架梁柱的外环板式连接方式,实现现场装配无焊接,从而避免焊缝焊接过程的不可控因素对连接节点力学性能的影响,这是当前急需解决的一项技术问题。Therefore, how to improve the outer ring plate connection method of the prefabricated steel frame beam-column to realize on-site assembly without welding, so as to avoid the influence of uncontrollable factors in the welding process on the mechanical properties of the connection joints, is a technology that needs to be solved urgently. question.

发明内容Contents of the invention

本发明针对上述现有外环板式梁柱连接结构存在的不足,提出一种外环板式梁柱连接装置及装配式钢框架连接方法,其现场装配时全部通过高强螺栓连接,无需焊接,能够有效避免焊接过程的不可控因素对连接节点力学性能的影响,而且,连接节点的整体性强,力学性能优越。The present invention aims at the deficiencies in the above-mentioned existing outer ring plate type beam-column connection structure, and proposes an outer ring plate type beam-column connection device and an assembled steel frame connection method, which are all connected by high-strength bolts during on-site assembly without welding, and can effectively It avoids the influence of uncontrollable factors in the welding process on the mechanical properties of the connecting nodes, and the connecting nodes have strong integrity and superior mechanical properties.

为了达到上述目的,本发明采用的技术方案为:In order to achieve the above object, the technical scheme adopted in the present invention is:

外环板式梁柱连接装置,包括方钢管柱、H型钢梁和连接在所述方钢管柱和H型钢梁之间的传力组件;所述H型钢梁包括平行设置的上翼缘板和下翼缘板,所述上翼缘板和下翼缘板之间设有腹板;所述传力组件包括套设于所述方钢管柱外周的两块环板,所述环板焊接于所述方钢管柱外壁,其中,位于上方的所述环板为上环板,位于下方的所述环板为下环板;所述上环板与上翼缘板通过高强螺栓连接,所述下环板与下翼缘板通过高强螺栓连接;所述传力组件还包括焊接于所述方钢管柱外壁的腹板拼接板,所述腹板拼接板与腹板通过高强螺栓连接。The outer ring plate type beam-column connection device includes a square steel pipe column, an H-shaped steel beam and a force transmission component connected between the square steel pipe column and the H-shaped steel beam; the H-shaped steel beam includes an upper flange arranged in parallel plate and the lower flange plate, there is a web between the upper flange plate and the lower flange plate; the force transmission component includes two ring plates sleeved on the outer periphery of the square steel pipe column, and the ring welded to the outer wall of the square steel pipe column, wherein the upper ring plate is the upper ring plate, and the lower ring plate is the lower ring plate; the upper ring plate and the upper flange plate are connected by high-strength bolts, The lower ring plate and the lower flange plate are connected by high-strength bolts; the force transmission component also includes a web splicing plate welded to the outer wall of the square steel pipe column, and the web splicing plate and the web are connected by high-strength bolts.

作为优选,所述环板的中部设有可穿过所述方钢管柱的管柱孔,所述管柱孔的边缘通过围焊与所述方钢管柱的外壁固定连接。Preferably, the middle part of the ring plate is provided with a pipe column hole that can pass through the square steel pipe column, and the edge of the pipe column hole is fixedly connected with the outer wall of the square steel pipe column by surrounding welding.

作为优选,所述环板具有用于与所述H型钢梁连接的连接部。Preferably, the ring plate has a connecting portion for connecting with the H-shaped steel beam.

作为优选,所述连接部的数量为两个或三个或四个。Preferably, the number of the connecting parts is two or three or four.

作为优选,相邻两个所述连接部之间呈圆弧过渡连接。Preferably, two adjacent connecting parts are connected in a circular arc transition.

作为优选,所述连接部设有多个可穿过所述高强螺栓的第一螺栓孔;所述上翼缘板的端部以及所述下翼缘板的端部对应于所述第一螺栓孔设有多个可穿过所述高强螺栓的第二螺栓孔。Preferably, the connecting portion is provided with a plurality of first bolt holes that can pass through the high-strength bolts; the end of the upper flange plate and the end of the lower flange plate correspond to the first bolt holes The hole is provided with a plurality of second bolt holes that can pass through the high-strength bolts.

作为优选,所述腹板的端部设有多个可穿过所述高强螺栓的第三螺栓孔,所述腹板拼接板对应于所述第三螺栓孔设有多个可穿过所述高强螺栓的第四螺栓孔。As a preference, the end of the web is provided with a plurality of third bolt holes that can pass through the high-strength bolts, and the web splicing plate is provided with a plurality of holes that can pass through the high-strength bolts corresponding to the third bolt holes. Fourth bolt hole for high-strength bolts.

作为优选,所述腹板拼接板通过双面角焊与所述方钢管柱的外壁固定连接。Preferably, the web splicing plate is fixedly connected to the outer wall of the square steel pipe column through double-sided fillet welding.

作为优选,所述腹板拼接板为矩形板或T形板。Preferably, the web splice plate is a rectangular plate or a T-shaped plate.

本发明还提供了一种利用上述任一项技术方案所述的外环板式梁柱连接装置连接装配式钢框架的连接方法,包括如下步骤:The present invention also provides a connection method for connecting assembled steel frames using the outer ring plate beam-column connection device described in any one of the above technical solutions, including the following steps:

在预制工厂内,将上环板、下环板和腹板拼接板焊接于方钢管柱外壁;In the prefabrication factory, the upper ring plate, lower ring plate and web splicing plate are welded to the outer wall of the square steel pipe column;

将焊接上环板、下环板和腹板拼接板后的方钢管柱吊装到预定安装位置并固定;Hoist the square steel pipe column after welding the upper ring plate, lower ring plate and web splicing plate to the predetermined installation position and fix it;

将H型钢梁吊装到预定安装位置,吊装后,作为角柱的方钢管柱的待连接侧有两根待连接H型钢梁,作为边柱的方钢管柱的待连接侧有三根待连接H型钢梁,作为中柱的方钢管柱的待连接侧有四根待连接H型钢梁;H型钢梁吊装到预定安装位置的具体状态为:H型钢梁的两端分别插入两侧方钢管柱焊接的上环板和下环板之间,且H型钢梁的腹板两端与两侧方钢管柱焊接的腹板拼接板相贴合;Hoist the H-shaped steel beams to the predetermined installation position. After hoisting, there are two H-shaped steel beams to be connected on the side of the square steel pipe column as a corner column, and three H-shaped steel beams to be connected on the side to be connected as a side column. There are four H-shaped steel beams to be connected on the side of the square steel pipe column used as the central column; the specific state of hoisting the H-shaped steel beams to the predetermined installation position is: the two ends of the H-shaped steel beams are respectively inserted into the two sides Between the upper ring plate and the lower ring plate welded by the square steel pipe column, and the two ends of the web plate of the H-shaped steel beam are attached to the web splicing plates welded by the square steel pipe column on both sides;

通过高强螺栓将H型钢梁的上翼缘板与对应的上环板紧固,通过高强螺栓将H型钢梁的下翼缘板与对应的下环板紧固,通过高强螺栓将H型钢梁的腹板与对应的腹板拼接板紧固,完成装配。Fasten the upper flange plate of the H-shaped steel beam to the corresponding upper ring plate with high-strength bolts, fasten the lower flange plate of the H-shaped steel beam to the corresponding lower ring plate with high-strength bolts, and fasten the H-shaped steel beam with high-strength bolts. The web of the steel beam is fastened with the corresponding web splicing plate to complete the assembly.

与现有技术相比,本发明的优点和有益效果在于:Compared with prior art, advantage and beneficial effect of the present invention are:

1、本发明提供的外环板式梁柱连接装置,其上环板、下环板和腹板拼接板均可在工厂内预先焊接在方钢管柱上,在进行现场装配时,仅需通过高强螺栓进行连接,无需焊接,能够有效避免焊接过程的不可控因素对连接节点力学性能的影响;1. In the outer ring plate type beam-column connection device provided by the present invention, the upper ring plate, lower ring plate and web splicing plate can all be pre-welded on the square steel pipe column in the factory. During on-site assembly, only high-strength Bolts are connected without welding, which can effectively avoid the influence of uncontrollable factors in the welding process on the mechanical properties of the connected joints;

2、本发明提供的外环板式梁柱连接装置的传力明确,连接节点的整体性强,其刚度大且承载力高,力学性能优越;2. The outer ring plate type beam-column connection device provided by the present invention has clear force transmission, strong integrity of connection nodes, high rigidity, high bearing capacity, and superior mechanical properties;

3、本发明提供的外环板式梁柱连接装置,安装方便,制作成本低,简洁美观。3. The outer ring plate type beam-column connecting device provided by the present invention is easy to install, low in production cost, simple and beautiful.

附图说明Description of drawings

图1为本发明实施例提供的外环板式梁柱连接装置的主视图;Fig. 1 is the front view of the outer ring plate type beam-column connecting device provided by the embodiment of the present invention;

图2为本发明实施例提供的外环板式梁柱连接装置的俯视图;Fig. 2 is a top view of the outer ring plate type beam-column connection device provided by the embodiment of the present invention;

图3为本发明实施例提供的用于角柱连接的环板的结构示意图;Fig. 3 is a structural schematic diagram of a ring plate used for corner column connection provided by an embodiment of the present invention;

图4为本发明实施例提供的用于边柱连接的环板的结构示意图;Fig. 4 is a structural schematic diagram of a ring plate used for side column connection provided by an embodiment of the present invention;

图5为本发明实施例提供的用于中柱连接的环板的结构示意图;Fig. 5 is a schematic structural view of the ring plate used for the connection of the center column provided by the embodiment of the present invention;

图6为本发明实施例提供的H型钢梁的结构示意图;Fig. 6 is the structural representation of the H-shaped steel beam provided by the embodiment of the present invention;

图7为本发明实施例提供的腹板拼接板的结构示意图;Fig. 7 is a schematic structural diagram of a web splicing plate provided by an embodiment of the present invention;

图8为采用本发明实施例提供的外环板式梁柱连接装置连接后的装配式钢框架的结构示意图;Fig. 8 is a schematic structural view of the assembled steel frame connected by the outer ring plate type beam-column connection device provided by the embodiment of the present invention;

图9为连接后的装配式钢框架中角柱处的连接结构示意图;Fig. 9 is a schematic diagram of the connection structure at the corner post in the assembled steel frame after connection;

图10为连接后的装配式钢框架中边柱处的连接结构示意图;Fig. 10 is a schematic diagram of the connection structure at the side column in the assembled steel frame after connection;

图11为连接后的装配式钢框架中中柱处的连接结构示意图;Fig. 11 is a schematic diagram of the connection structure at the middle column of the assembled steel frame after connection;

以上各图中:1、方钢管柱;2、H型钢梁;21、上翼缘板;22、下翼缘板;23、腹板;3、环板;31、上环板;32、下环板;33、管柱孔;34、连接部;4、腹板拼接板;5、高强螺栓;6、第一螺栓孔;7、第二螺栓孔;8、第三螺栓孔;9、第四螺栓孔。In the above figures: 1. Square steel pipe column; 2. H-shaped steel beam; 21. Upper flange plate; 22. Lower flange plate; 23. Web plate; 3. Ring plate; 31. Upper ring plate; 32. Lower ring plate; 33. Pipe column hole; 34. Connecting part; 4. Web splicing plate; 5. High-strength bolt; 6. First bolt hole; 7. Second bolt hole; 8. Third bolt hole; 9. Fourth bolt hole.

具体实施方式Detailed ways

下面,通过示例性的实施方式对本发明进行具体描述。然而应当理解,在没有进一步叙述的情况下,一个实施方式中的元件、结构和特征也可以有益地结合到其他实施方式中。In the following, the present invention will be specifically described through exemplary embodiments. It should be understood, however, that elements, structures and characteristics of one embodiment may be beneficially incorporated in other embodiments without further recitation.

在本发明的描述中,需要说明的是,竖向是指图1中的上下方向;术语“内”、“外”、“上”、“下”、“前”、“后”等指示的方位或位置关系为基于附图1所示的位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。此外,术语“第一”、“第二”、“第三”、“第四”仅用于描述目的,而不能理解为指示或暗示相对重要性。In the description of the present invention, it should be noted that the vertical direction refers to the up and down direction in Fig. 1; The orientation or positional relationship is based on the positional relationship shown in Figure 1, and is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation , and therefore cannot be construed as a limitation of the present invention. In addition, the terms "first", "second", "third", and "fourth" are used for descriptive purposes only, and should not be construed as indicating or implying relative importance.

如图1和图2所示,本发明涉及一种外环板式梁柱连接装置,包括方钢管柱1、H型钢梁2和连接在方钢管柱1和H型钢梁2之间的传力组件;H型钢梁2包括平行设置的上翼缘板21和下翼缘板22,上翼缘板21和下翼缘板22之间设有腹板23;传力组件包括套设于方钢管柱1外周的两块环板3,环板3焊接于方钢管柱1外壁,两块环板3相互平行设置,其中,位于上方的环板3为上环板31,位于下方的环板3为下环板32;上环板31的下表面与上翼缘板21的上表面相抵,上环板31与上翼缘板21通过高强螺栓5连接;下环板32的上表面与下翼缘板22的下表面相抵,下环板32与下翼缘板22通过高强螺栓5连接;传力组件还包括沿竖向焊接于方钢管柱1外壁的腹板拼接板4,腹板拼接板4与腹板23通过高强螺栓5连接。As shown in Figures 1 and 2, the present invention relates to an outer ring plate type beam-to-column connection device, which includes a square steel tube column 1, an H-shaped steel beam 2 and a transmission tube connected between the square steel tube column 1 and the H-shaped steel beam 2. Force assembly; the H-shaped steel beam 2 includes an upper flange plate 21 and a lower flange plate 22 arranged in parallel, and a web 23 is provided between the upper flange plate 21 and the lower flange plate 22; the force transmission assembly includes a set of The two ring plates 3 on the outer periphery of the square steel pipe column 1 are welded to the outer wall of the square steel pipe column 1, and the two ring plates 3 are arranged parallel to each other, wherein the upper ring plate 3 is the upper ring plate 31, and the lower ring plate Plate 3 is the lower ring plate 32; the lower surface of the upper ring plate 31 is against the upper surface of the upper flange plate 21, and the upper ring plate 31 and the upper flange plate 21 are connected by high-strength bolts 5; the upper surface of the lower ring plate 32 and the The lower surface of the lower flange plate 22 is offset, and the lower ring plate 32 and the lower flange plate 22 are connected by high-strength bolts 5; The splicing plate 4 and the web 23 are connected by high-strength bolts 5 .

在上述外环板式梁柱连接装置中,上环板31、下环板32和腹板拼接板4均可在工厂内预先焊接在方钢管柱1上,在进行现场装配时,仅需通过高强螺栓5将上环板31与H型钢梁2的上翼缘板21连接紧固,通过高强螺栓5将下环板32与H型钢梁2的下翼缘板22连接紧固,通过高强螺栓5将腹板拼接板4与H型钢梁2的腹板23连接紧固,即可构成稳固的连接节点,无需焊接,能够有效避免焊接过程的不可控因素对连接节点力学性能的影响。而且,这种外环板式梁柱连接装置的传力明确,具体的,H型钢梁2的上翼缘板21和下翼缘板22传递的拉力,通过上环板31和下环板32传递到方钢管柱1的侧壁,连接节点的水平剪力由上环板31、下环板32和方钢管柱1的侧壁共同承担,腹板拼接板4承担由H型钢梁2的梁端传递的剪力。因而,这种外环板式梁柱连接装置易于实现强柱弱梁、强节点弱构件的设计目的,连接节点的整体性强,其刚度大且承载力高,力学性能优越。In the above-mentioned outer ring plate type beam-column connection device, the upper ring plate 31, the lower ring plate 32 and the web splicing plate 4 can be pre-welded on the square steel pipe column 1 in the factory. Bolts 5 connect and fasten the upper ring plate 31 and the upper flange plate 21 of the H-shaped steel beam 2, connect and fasten the lower ring plate 32 and the lower flange plate 22 of the H-shaped steel beam 2 through high-strength bolts 5, and connect and fasten the lower ring plate 32 with the lower flange plate 22 of the H-shaped steel beam 2 through high-strength bolts The bolts 5 fasten the web splicing plate 4 and the web 23 of the H-shaped steel beam 2 to form a stable connection node without welding, which can effectively avoid the influence of uncontrollable factors in the welding process on the mechanical properties of the connection node. Moreover, the force transmission of this outer ring plate type beam-to-column connection device is clear. Specifically, the tension transmitted by the upper flange plate 21 and the lower flange plate 22 of the H-shaped steel beam 2 passes through the upper ring plate 31 and the lower ring plate 32. Transmitted to the side wall of the square steel pipe column 1, the horizontal shear force of the connecting node is jointly borne by the upper ring plate 31, the lower ring plate 32 and the side wall of the square steel pipe column 1, and the web splicing plate 4 is borne by the H-shaped steel beam 2 Shear forces transmitted at the beam ends. Therefore, this outer ring slab-type beam-column connection device is easy to achieve the design purpose of strong columns and weak beams, and strong nodes and weak members. The connection nodes have strong integrity, high rigidity, high bearing capacity, and superior mechanical properties.

为了保证环板3(即上环板31和下环板32)能够牢固连接于方钢管柱1的外周,作为一种优选,如图3-图5所示,环板3的中部设有可穿过方钢管柱1的管柱孔33,管柱孔33的边缘通过围焊与方钢管柱1的外壁固定连接,通过围焊的方式能够保证环板3与方钢管柱1连接牢固,有利于提高整个连接节点的力学性能。需要说明的是,管柱孔33的形状与方钢管柱1的横截面形状相匹配,在本实施例中,管柱孔33的形状具体为方形。In order to ensure that the ring plate 3 (that is, the upper ring plate 31 and the lower ring plate 32) can be firmly connected to the outer circumference of the square steel pipe column 1, as a preference, as shown in Figures 3-5, the middle part of the ring plate 3 is equipped with a Through the pipe column hole 33 of the square steel pipe column 1, the edge of the pipe column hole 33 is fixedly connected with the outer wall of the square steel pipe column 1 through surrounding welding. The way of surrounding welding can ensure that the ring plate 3 is firmly connected with the square steel pipe column 1. It is beneficial to improve the mechanical properties of the entire connection node. It should be noted that the shape of the pipe column hole 33 matches the cross-sectional shape of the square steel pipe column 1 , and in this embodiment, the shape of the pipe column hole 33 is specifically square.

进一步的,如图3-图5所示,环板3具有用于与H型钢梁2连接的连接部34,连接部34设有多个可穿过高强螺栓5的第一螺栓孔6;如图6所示,H型钢梁2的上翼缘板21的端部以及下翼缘板22的端部对应于第一螺栓孔6设有多个可穿过高强螺栓5的第二螺栓孔7。需要说明的是,第一螺栓孔6和第二螺栓孔7为同轴设置,以便于高强螺栓5穿过第一螺栓孔6和第二螺栓孔7,进而,通过高强螺栓5使H型钢梁2的上翼缘板21和下翼缘板22分别与上环板31和下环板32紧固在一起。Further, as shown in FIGS. 3-5 , the ring plate 3 has a connecting portion 34 for connecting with the H-shaped steel beam 2, and the connecting portion 34 is provided with a plurality of first bolt holes 6 through which high-strength bolts 5 can pass; As shown in Figure 6, the end of the upper flange plate 21 of the H-shaped steel beam 2 and the end of the lower flange plate 22 are provided with a plurality of second bolts that can pass through high-strength bolts 5 corresponding to the first bolt holes 6 Hole 7. It should be noted that the first bolt hole 6 and the second bolt hole 7 are coaxially arranged so that the high-strength bolt 5 passes through the first bolt hole 6 and the second bolt hole 7, and then the H-shaped steel The upper flange plate 21 and the lower flange plate 22 of the beam 2 are fastened together with the upper ring plate 31 and the lower ring plate 32 respectively.

由于在装配式钢框架结构中,方钢管柱1可能位于角柱、边柱或中柱的位置,因而,根据方钢管柱1周围待连接H型钢梁2的数量,对应设置环板3的连接部34数量,环板3的连接部34可以为多个。具体的,如图3所示,当方钢管柱1作为角柱时,环板3的连接部34为两个,两个连接部34位于管柱孔33的相邻两侧;如图4所示,当方钢管柱1作为边柱时,环板3的连接部34为三个,三个连接部34环绕于管柱孔33的三面;如图5所示,当方钢管柱1作为中柱时,环板3的连接部34为四个,四个连接部34环绕于管柱孔33的四周。Since in the fabricated steel frame structure, the square steel pipe column 1 may be located at the corner column, side column or center column, therefore, according to the number of H-shaped steel beams 2 to be connected around the square steel pipe column 1, the connection of the ring plate 3 is set correspondingly. The number of parts 34, the connecting part 34 of the ring plate 3 can be multiple. Specifically, as shown in Figure 3, when the square steel pipe column 1 is used as a corner column, there are two connecting parts 34 of the ring plate 3, and the two connecting parts 34 are located on adjacent sides of the column hole 33; as shown in Figure 4, When the square steel pipe column 1 is used as a side column, there are three connecting parts 34 of the ring plate 3, and the three connecting parts 34 surround the three sides of the column hole 33; as shown in Figure 5, when the square steel pipe column 1 is used as a center column, the ring There are four connecting parts 34 of the plate 3 , and the four connecting parts 34 surround the periphery of the column hole 33 .

进一步的,如图3-图5所示,相邻两个连接部34之间呈圆弧过渡连接,这样设置可节省建筑空间,而且,传力更明确。需要说明的是,连接部34的长度可根据高强螺栓5的数量确定。Further, as shown in FIGS. 3-5 , two adjacent connecting parts 34 are connected in a circular arc transition, which saves construction space and makes the force transmission clearer. It should be noted that the length of the connecting portion 34 can be determined according to the number of high-strength bolts 5 .

如图6所示,H型钢梁2的腹板23的端部设有多个可穿过高强螺栓5的第三螺栓孔8;如图7所示,腹板拼接板4对应于第三螺栓孔8设有多个可穿过高强螺栓5的第四螺栓孔9。需要说明的是,第三螺栓孔8和第四螺栓孔9为同轴设置,以便于高强螺栓5穿过第三螺栓孔8和第四螺栓孔9,进而,通过高强螺栓5使H型钢梁2的腹板23与腹板拼接板4紧固在一起。As shown in Figure 6, the end of the web 23 of the H-shaped steel beam 2 is provided with a plurality of third bolt holes 8 that can pass through the high-strength bolts 5; as shown in Figure 7, the web splicing plate 4 corresponds to the third The bolt holes 8 are provided with a plurality of fourth bolt holes 9 through which high-strength bolts 5 can pass. It should be noted that the third bolt hole 8 and the fourth bolt hole 9 are coaxially arranged so that the high-strength bolt 5 passes through the third bolt hole 8 and the fourth bolt hole 9, and then the H-shaped steel The web 23 of the beam 2 is fastened together with the web splice plate 4 .

为了保证腹板拼接板4能够牢固连接于方钢管柱1外周,作为一种优选,腹板拼接板4通过双面角焊与方钢管柱1的外壁固定连接,通过双面角焊的方式能够保证腹板拼接板4与方钢管柱1连接牢固,有利于提高整个连接节点的力学性能。需要说明的是,在本实施例中,如图7所示,腹板拼接板4为矩形板。可以理解的是,腹板拼接板4也可以采用T形板或其他形状的板材,只要便于与H型钢梁2的腹板23连接即可。In order to ensure that the web splicing plate 4 can be firmly connected to the outer circumference of the square steel pipe column 1, as a preferred method, the web splicing plate 4 is fixedly connected to the outer wall of the square steel pipe column 1 through double-sided fillet welding, and the double-sided fillet welding can be used. Ensuring that the web splicing plate 4 is firmly connected to the square steel pipe column 1 is conducive to improving the mechanical properties of the entire connection node. It should be noted that, in this embodiment, as shown in FIG. 7 , the web splicing plate 4 is a rectangular plate. It can be understood that the web splicing plate 4 can also be a T-shaped plate or other shaped plates, as long as it is convenient to connect with the web 23 of the H-shaped steel beam 2 .

此外,还需要说明的是,如图2所示,方钢管柱1为空心钢管柱,且为连续柱,其内部无其他装置,可为成品钢管,无需其他加工。In addition, it should be noted that, as shown in FIG. 2 , the square steel pipe column 1 is a hollow steel pipe column and is a continuous column without other devices inside. It can be a finished steel pipe without other processing.

本发明还提供了一种利用上述任一项实施例所述的外环板式梁柱连接装置连接装配式钢框架的连接方法,包括如下步骤:The present invention also provides a connection method for connecting assembled steel frames using the outer ring plate beam-column connection device described in any one of the above embodiments, including the following steps:

S1:在预制工厂内,将上环板31、下环板32和腹板拼接板4焊接于方钢管柱1外壁。具体的,对于作为装配式钢框架角柱的方钢管柱1,焊接时,在方钢管柱1相邻两侧外壁分别焊接一块腹板拼接板4,焊接的上环板31和下环板32均为具有两个连接部34的环板3,焊接时环板3的两个连接部34分别与两块腹板拼接板4同向;对于作为装配式钢框架边柱的方钢管柱1,焊接时,在方钢管柱1三面外壁分别焊接一块腹板拼接板4,焊接的上环板31和下环板32均为具有三个连接部34的环板3,焊接时环板3的三个连接部34分别与三块腹板拼接板4同向;对于作为装配式钢框架中柱的方钢管柱1,焊接时,在方钢管柱1四面外壁分别焊接一块腹板拼接板4,焊接的上环板31和下环板32均为具有四个连接部34的环板3,焊接时环板3的四个连接部34分别与四块腹板拼接板4同向。在本步骤中,需要说明的是,环板3焊接时采用开坡口完全焊接形式,将方钢管柱1穿过环板3的管柱孔33,管柱孔33的边缘距方钢管柱1外壁小于10mm,将管柱孔33的边缘通过围焊与方钢管柱1的外壁固定连接;腹板拼接板4焊接时采用双面角焊形式。S1: In the prefabrication factory, the upper ring plate 31 , the lower ring plate 32 and the web splicing plate 4 are welded to the outer wall of the square steel pipe column 1 . Specifically, for the square steel pipe column 1 as the corner column of the assembled steel frame, when welding, a web splicing plate 4 is respectively welded on the outer walls of the adjacent two sides of the square steel pipe column 1, and the welded upper ring plate 31 and lower ring plate 32 are both It is the ring plate 3 with two connecting parts 34, and the two connecting parts 34 of the ring plate 3 are respectively in the same direction as the two web splicing plates 4 during welding; At the same time, a web splicing plate 4 is respectively welded on the three outer walls of the square steel pipe column 1, and the welded upper ring plate 31 and the lower ring plate 32 are both ring plates 3 with three connecting parts 34. When welding, the three ring plates 3 The connecting parts 34 are respectively in the same direction as the three web splicing plates 4; for the square steel pipe column 1 as the middle column of the assembled steel frame, when welding, one web splicing plate 4 is respectively welded on the four outer walls of the square steel pipe column 1, and the welded Both the upper ring plate 31 and the lower ring plate 32 are ring plates 3 with four connecting portions 34 , and the four connecting portions 34 of the ring plate 3 are respectively in the same direction as the four web splicing plates 4 during welding. In this step, it should be noted that when the ring plate 3 is welded, the beveled complete welding method is adopted, and the square steel pipe column 1 is passed through the pipe column hole 33 of the ring plate 3, and the edge of the pipe column hole 33 is 1 The outer wall is less than 10mm, and the edge of the pipe column hole 33 is fixedly connected with the outer wall of the square steel pipe column 1 through surrounding welding; the web splicing plate 4 is welded in the form of double-sided fillet welding.

S2:将焊接上环板31、下环板32和腹板拼接板4后的方钢管柱1吊装到预定安装位置并固定。需要说明的是,固定方钢管柱1时,方钢管柱1沿竖向放置。S2: Lift the square steel pipe column 1 after welding the upper ring plate 31, the lower ring plate 32 and the web splicing plate 4 to the predetermined installation position and fix it. It should be noted that when the square steel pipe column 1 is fixed, the square steel pipe column 1 is placed vertically.

S3:将H型钢梁2吊装到预定安装位置,吊装后,作为角柱的方钢管柱1的待连接侧有两根待连接H型钢梁2,作为边柱的方钢管柱1的待连接侧有三根待连接H型钢梁2,作为中柱的方钢管柱1的待连接侧有四根待连接H型钢梁2;H型钢梁2吊装到预定安装位置的具体状态为:H型钢梁2的两端分别插入两侧方钢管柱1焊接的上环板31和下环板32之间,且H型钢梁2的腹板23两端与两侧方钢管柱1焊接的腹板拼接板4相贴合。S3: Hoist the H-shaped steel beam 2 to the predetermined installation position. After hoisting, there are two H-shaped steel beams 2 to be connected on the side to be connected of the square steel pipe column 1 as the corner column, and the to-be-connected side of the square steel pipe column 1 as the side column There are three H-shaped steel beams 2 to be connected on the side, and four H-shaped steel beams 2 to be connected on the side of the square steel pipe column 1 as the central column; the specific state of the H-shaped steel beams 2 hoisted to the predetermined installation position is: H The two ends of the shaped steel beam 2 are respectively inserted between the upper ring plate 31 and the lower ring plate 32 welded by the steel pipe columns 1 on both sides, and the two ends of the web 23 of the H-shaped steel beam 2 are welded to the steel pipe columns 1 on both sides. The web splicing plates 4 are fitted together.

S4:通过高强螺栓5将H型钢梁2的上翼缘板21与对应的上环板31紧固,通过高强螺栓5将H型钢梁2的下翼缘板22与对应的下环板32紧固,通过高强螺栓5将H型钢梁2的腹板23与对应的腹板拼接板4紧固,完成装配。连接后的装配式钢框架的结构如图8所示,其中,角柱连接节点的结构如图9所示,边柱连接节点的结构如图10所示,中柱连接节点的结构如图11所示。S4: Fasten the upper flange plate 21 of the H-shaped steel beam 2 to the corresponding upper ring plate 31 through high-strength bolts 5, and connect the lower flange plate 22 of the H-shaped steel beam 2 to the corresponding lower ring plate through high-strength bolts 5 32 fastening, the web 23 of the H-shaped steel beam 2 and the corresponding web splicing plate 4 are fastened by high-strength bolts 5 to complete the assembly. The structure of the assembled steel frame after connection is shown in Figure 8, among them, the structure of the corner column connection node is shown in Figure 9, the structure of the side column connection node is shown in Figure 10, and the structure of the center column connection node is shown in Figure 11 Show.

Claims (10)

1.外环板式梁柱连接装置,包括方钢管柱(1)、H型钢梁(2)和连接在所述方钢管柱(1)和H型钢梁(2)之间的传力组件;所述H型钢梁(2)包括平行设置的上翼缘板(21)和下翼缘板(22),所述上翼缘板(21)和下翼缘板(22)之间设有腹板(23);其特征在于:所述传力组件包括套设于所述方钢管柱(1)外周的两块环板(3),所述环板(3)焊接于所述方钢管柱(1)外壁,其中,位于上方的所述环板(3)为上环板(31),位于下方的所述环板(3)为下环板(32);所述上环板(31)与上翼缘板(21)通过高强螺栓(5)连接,所述下环板(32)与下翼缘板(22)通过高强螺栓(5)连接;所述传力组件还包括焊接于所述方钢管柱(1)外壁的腹板拼接板(4),所述腹板拼接板(4)与腹板(23)通过高强螺栓(5)连接。1. Outer ring plate type beam-column connection device, including a square steel pipe column (1), an H-shaped steel beam (2) and a force transmission component connected between the square steel pipe column (1) and the H-shaped steel beam (2) ; The H-shaped steel beam (2) includes an upper flange plate (21) and a lower flange plate (22) arranged in parallel, and the upper flange plate (21) and the lower flange plate (22) are arranged There is a web (23); it is characterized in that: the force transmission component includes two ring plates (3) sleeved on the outer periphery of the square steel pipe column (1), and the ring plates (3) are welded to the square steel pipe column (1). The outer wall of a steel pipe column (1), wherein the upper ring plate (3) is an upper ring plate (31), and the lower ring plate (3) is a lower ring plate (32); the upper ring plate (31) is connected with the upper flange plate (21) by high-strength bolts (5), and the lower ring plate (32) is connected with the lower flange plate (22) by high-strength bolts (5); the force transmission assembly also includes The web splicing plate (4) welded to the outer wall of the square steel pipe column (1), the web splicing plate (4) and the web (23) are connected by high-strength bolts (5). 2.根据权利要求1所述的外环板式梁柱连接装置,其特征在于:所述环板(3)的中部设有可穿过所述方钢管柱(1)的管柱孔(33),所述管柱孔(33)的边缘通过围焊与所述方钢管柱(1)的外壁固定连接。2. The outer ring plate type beam-column connection device according to claim 1, characterized in that: the middle part of the ring plate (3) is provided with a column hole (33) that can pass through the square steel tube column (1) , the edge of the column hole (33) is fixedly connected with the outer wall of the square steel column (1) by surrounding welding. 3.根据权利要求1或2所述的外环板式梁柱连接装置,其特征在于:所述环板(3)具有用于与所述H型钢梁(2)连接的连接部(34)。3. The outer ring plate type beam-to-column connection device according to claim 1 or 2, characterized in that: the ring plate (3) has a connecting portion (34) for connecting with the H-shaped steel beam (2) . 4.根据权利要求3所述的外环板式梁柱连接装置,其特征在于:所述连接部(34)的数量为两个或三个或四个。4. The outer ring plate type beam-to-column connection device according to claim 3, characterized in that: the number of the connection parts (34) is two or three or four. 5.根据权利要求4所述的外环板式梁柱连接装置,其特征在于:相邻两个所述连接部(34)之间呈圆弧过渡连接。5. The outer ring plate type beam-to-column connection device according to claim 4, characterized in that two adjacent connecting parts (34) are connected in a circular arc transition. 6.根据权利要求3所述的外环板式梁柱连接装置,其特征在于:所述连接部(34)设有多个可穿过所述高强螺栓(5)的第一螺栓孔(6);所述上翼缘板(21)的端部以及所述下翼缘板(22)的端部对应于所述第一螺栓孔(6)设有多个可穿过所述高强螺栓(5)的第二螺栓孔(7)。6. The outer ring plate type beam-to-column connection device according to claim 3, characterized in that: the connection part (34) is provided with a plurality of first bolt holes (6) that can pass through the high-strength bolts (5) ; The end of the upper flange plate (21) and the end of the lower flange plate (22) are provided with a plurality of high-strength bolts (5) that can pass through the first bolt hole (6) ) of the second bolt hole (7). 7.根据权利要求1或6所述的外环板式梁柱连接装置,其特征在于:所述腹板(23)的端部设有多个可穿过所述高强螺栓(5)的第三螺栓孔(8),所述腹板拼接板(4)对应于所述第三螺栓孔(8)设有多个可穿过所述高强螺栓(5)的第四螺栓孔(9)。7. The outer ring plate type beam-to-column connection device according to claim 1 or 6, characterized in that: the end of the web (23) is provided with a plurality of third bolts (5) that can pass through the high-strength bolts (5). Bolt holes (8), the web splicing plate (4) is provided with a plurality of fourth bolt holes (9) corresponding to the third bolt holes (8) that can pass through the high-strength bolts (5). 8.根据权利要求1所述的外环板式梁柱连接装置,其特征在于:所述腹板拼接板(4)通过双面角焊与所述方钢管柱(1)的外壁固定连接。8. The outer ring plate type beam-column connection device according to claim 1, characterized in that: the web splicing plate (4) is fixedly connected to the outer wall of the square steel pipe column (1) by double-sided fillet welding. 9.根据权利要求1或8所述的外环板式梁柱连接装置,其特征在于:所述腹板拼接板(4)为矩形板或T形板。9. The outer ring plate type beam-to-column connection device according to claim 1 or 8, characterized in that: the web splicing plate (4) is a rectangular plate or a T-shaped plate. 10.利用权利要求1-9任一项所述的外环板式梁柱连接装置连接装配式钢框架的连接方法,其特征在于,包括如下步骤:10. The connection method for connecting the assembled steel frame using the outer ring plate type beam-column connection device according to any one of claims 1-9, characterized in that it comprises the following steps: 在预制工厂内,将上环板(31)、下环板(32)和腹板拼接板(4)焊接于方钢管柱(1)外壁;In the prefabrication factory, the upper ring plate (31), the lower ring plate (32) and the web splicing plate (4) are welded to the outer wall of the square steel pipe column (1); 将焊接上环板(31)、下环板(32)和腹板拼接板(4)后的方钢管柱(1)吊装到预定安装位置并固定;hoisting the square steel pipe column (1) after welding the upper ring plate (31), the lower ring plate (32) and the web splicing plate (4) to the predetermined installation position and fixing it; 将H型钢梁(2)吊装到预定安装位置,吊装后,作为角柱的方钢管柱(1)的待连接侧有两根待连接H型钢梁(2),作为边柱的方钢管柱(1)的待连接侧有三根待连接H型钢梁(2),作为中柱的方钢管柱(1)的待连接侧有四根待连接H型钢梁(2);H型钢梁(2)吊装到预定安装位置的具体状态为:H型钢梁(2)的两端分别插入两侧方钢管柱(1)焊接的上环板(31)和下环板(32)之间,且H型钢梁(2)的腹板(23)两端与两侧方钢管柱(1)焊接的腹板拼接板(4)相贴合;Hoist the H-shaped steel beam (2) to the predetermined installation position. After hoisting, there are two H-shaped steel beams (2) to be connected on the side to be connected of the square steel pipe column (1) as the corner column, and the square steel pipe column as the side column There are three H-shaped steel beams (2) to be connected on the side to be connected of (1), and four H-shaped steel beams (2) to be connected are arranged on the side to be connected as the square steel pipe column (1) of the center column; (2) The specific state of hoisting to the predetermined installation position is: the two ends of the H-shaped steel beam (2) are respectively inserted between the upper ring plate (31) and the lower ring plate (32) welded by the steel pipe columns (1) on both sides , and the two ends of the web (23) of the H-shaped steel beam (2) fit together with the web splicing plates (4) welded by the steel pipe columns (1) on both sides; 通过高强螺栓(5)将H型钢梁(2)的上翼缘板(21)与对应的上环板(31)紧固,通过高强螺栓(5)将H型钢梁(2)的下翼缘板(22)与对应的下环板(32)紧固,通过高强螺栓(5)将H型钢梁(2)的腹板(23)与对应的腹板拼接板(4)紧固,完成装配。The upper flange plate (21) of the H-shaped steel beam (2) and the corresponding upper ring plate (31) are fastened by high-strength bolts (5), and the lower flange plate (21) of the H-shaped steel beam (2) is fastened by high-strength bolts (5). The flange plate (22) is fastened to the corresponding lower ring plate (32), and the web (23) of the H-shaped steel beam (2) is fastened to the corresponding web splicing plate (4) by high-strength bolts (5) , to complete the assembly.
CN201810537918.8A 2018-05-30 2018-05-30 Outer ring plate type beam column connecting device and assembly type steel frame connecting method Pending CN108589919A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810537918.8A CN108589919A (en) 2018-05-30 2018-05-30 Outer ring plate type beam column connecting device and assembly type steel frame connecting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810537918.8A CN108589919A (en) 2018-05-30 2018-05-30 Outer ring plate type beam column connecting device and assembly type steel frame connecting method

Publications (1)

Publication Number Publication Date
CN108589919A true CN108589919A (en) 2018-09-28

Family

ID=63629821

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810537918.8A Pending CN108589919A (en) 2018-05-30 2018-05-30 Outer ring plate type beam column connecting device and assembly type steel frame connecting method

Country Status (1)

Country Link
CN (1) CN108589919A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537726A (en) * 2018-12-29 2019-03-29 天津大学 Rectangle steel tubing string-H girder steel is bolted structures with semi-rigid joints and construction method entirely
CN110106985A (en) * 2019-05-23 2019-08-09 福州大学 A kind of prefabricated assembled SRC column-girder steel cross combined joint
CN111218985A (en) * 2020-02-16 2020-06-02 重庆大学 Novel assembly type cold-formed thick-wall section steel unilateral bolt connecting beam column joint
CN112112272A (en) * 2020-10-21 2020-12-22 西南科技大学 Full-assembly type square steel pipe beam column connecting node and construction method
CN113585467A (en) * 2021-08-09 2021-11-02 南通欧本建筑科技有限公司 Connection structure of crust roof beam and all kinds of steel columns
CN117107907A (en) * 2023-08-29 2023-11-24 天津大学 A kind of partition plate through-type light steel fast-growing wood composite beam-column connection node
CN119593508A (en) * 2025-02-06 2025-03-11 中建八局第二建设有限公司 An easy-to-install assembled H-shaped steel beam node and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11280148A (en) * 1998-03-30 1999-10-12 Nippon Steel Corp Joint structure of steel columns and beams
CN203808251U (en) * 2014-03-14 2014-09-03 武钢集团昆明钢铁股份有限公司 Ring plate type round-steel tubular column-H-shaped steel girder joint structure convenient to mount
CN107023076A (en) * 2017-06-06 2017-08-08 贵州大学 A kind of assembly concrete pole steel beam connecting node and preparation method thereof
CN208293763U (en) * 2018-05-30 2018-12-28 青岛理工大学 Outer ring plate type beam column connecting device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11280148A (en) * 1998-03-30 1999-10-12 Nippon Steel Corp Joint structure of steel columns and beams
CN203808251U (en) * 2014-03-14 2014-09-03 武钢集团昆明钢铁股份有限公司 Ring plate type round-steel tubular column-H-shaped steel girder joint structure convenient to mount
CN107023076A (en) * 2017-06-06 2017-08-08 贵州大学 A kind of assembly concrete pole steel beam connecting node and preparation method thereof
CN208293763U (en) * 2018-05-30 2018-12-28 青岛理工大学 Outer ring plate type beam column connecting device

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537726A (en) * 2018-12-29 2019-03-29 天津大学 Rectangle steel tubing string-H girder steel is bolted structures with semi-rigid joints and construction method entirely
CN109537726B (en) * 2018-12-29 2023-08-29 天津大学 Rectangular steel pipe column-H steel beam full-bolt connection semi-rigid joint and construction method
CN110106985A (en) * 2019-05-23 2019-08-09 福州大学 A kind of prefabricated assembled SRC column-girder steel cross combined joint
CN111218985A (en) * 2020-02-16 2020-06-02 重庆大学 Novel assembly type cold-formed thick-wall section steel unilateral bolt connecting beam column joint
CN111218985B (en) * 2020-02-16 2025-03-25 重庆大学 New assembled cold-formed thick-walled steel single-side bolted beam-column joint
CN112112272A (en) * 2020-10-21 2020-12-22 西南科技大学 Full-assembly type square steel pipe beam column connecting node and construction method
CN113585467A (en) * 2021-08-09 2021-11-02 南通欧本建筑科技有限公司 Connection structure of crust roof beam and all kinds of steel columns
CN117107907A (en) * 2023-08-29 2023-11-24 天津大学 A kind of partition plate through-type light steel fast-growing wood composite beam-column connection node
CN119593508A (en) * 2025-02-06 2025-03-11 中建八局第二建设有限公司 An easy-to-install assembled H-shaped steel beam node and construction method thereof

Similar Documents

Publication Publication Date Title
CN108589919A (en) Outer ring plate type beam column connecting device and assembly type steel frame connecting method
CN105569191A (en) Steel-encased concrete composite beam-steel pipe column connection joint
CN109537726B (en) Rectangular steel pipe column-H steel beam full-bolt connection semi-rigid joint and construction method
CN103015537B (en) Beam-column joint connecting device of assembled steel structure system
CN103967133B (en) Rectangular steel-tube concrete column and H profile steel beam bolted and welded connection node
CN110258795A (en) A fully bolted prefabricated beam-column joint
CN103114733B (en) Rectangular steel pipe concrete column steel beam lower bolt upper welding outer rib annular plate node construction method
CN108915083B (en) A new type of prefabricated cold-formed thick-walled steel frame-support structure system
CN105839788B (en) A kind of assembly method of steel pipe column and section steel beam
CN109629679B (en) An assembled joint of square steel tube column and H-section beam
WO2019100798A1 (en) Fabricated building structure having combined steel structure and concrete structure, and construction method
CN106812214A (en) A kind of assembling type steel structure beam column node connection device
CN105569184A (en) One-way bolt connection node between rectangular steel pipe concrete column and H-type girders
CN107327029A (en) A kind of concrete filled steel tube pole steel beam assembled space nodes
CN208293763U (en) Outer ring plate type beam column connecting device
CN108505621A (en) Inner sleeve type steel frame beam column connecting device
CN207176940U (en) A kind of concrete filled steel tube pole steel beam assembled space nodes
CN209854935U (en) Compound concrete-filled steel tube corner post-steel beam joint
CN211690817U (en) Beam column connecting piece and beam column frame
CN209585270U (en) Rectangle steel tubing string-H girder steel is bolted structures with semi-rigid joints entirely
CN212641738U (en) Modular multi-story high-rise fabricated steel structure frame body
CN212336340U (en) A beam-column edge node of an assembled concrete-filled steel tubular column-composite flange I-beam
CN112376697A (en) Splicing node of prefabricated I-steel main beam and double-side secondary beam
CN219316021U (en) Steel construction building plate body structure and connected node
CN103104034A (en) Connected node of end plate type H-shaped steel beam and rectangular pipe column split bolt

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180928

RJ01 Rejection of invention patent application after publication