CN108589551A - 墩柱0#梁段现浇支架 - Google Patents
墩柱0#梁段现浇支架 Download PDFInfo
- Publication number
- CN108589551A CN108589551A CN201810581422.0A CN201810581422A CN108589551A CN 108589551 A CN108589551 A CN 108589551A CN 201810581422 A CN201810581422 A CN 201810581422A CN 108589551 A CN108589551 A CN 108589551A
- Authority
- CN
- China
- Prior art keywords
- support
- pier
- pier stud
- support post
- beam section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810581422.0A CN108589551A (zh) | 2018-06-07 | 2018-06-07 | 墩柱0#梁段现浇支架 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810581422.0A CN108589551A (zh) | 2018-06-07 | 2018-06-07 | 墩柱0#梁段现浇支架 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108589551A true CN108589551A (zh) | 2018-09-28 |
Family
ID=63627728
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810581422.0A Pending CN108589551A (zh) | 2018-06-07 | 2018-06-07 | 墩柱0#梁段现浇支架 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108589551A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109356036A (zh) * | 2018-11-26 | 2019-02-19 | 中铁六局集团有限公司 | 中墩墩旁托架及其施工方法 |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010059748A (ja) * | 2008-09-08 | 2010-03-18 | Sumitomo Mitsui Construction Co Ltd | 橋桁架設装置及び橋桁架設方法 |
CN102286925A (zh) * | 2011-07-08 | 2011-12-21 | 四川路航建设工程有限责任公司 | 桥梁独柱墩组拼箱形托架系统及其安装方法 |
KR101198376B1 (ko) * | 2012-06-04 | 2012-11-07 | 삼영엠텍(주) | 에프씨엠 교량의 주두부 시공방법 |
CN103669225A (zh) * | 2013-12-30 | 2014-03-26 | 中铁五局(集团)有限公司 | 一种连续梁0#块支架及安装方法 |
CN103866696A (zh) * | 2014-03-26 | 2014-06-18 | 中铁二十四局集团安徽工程有限公司 | 一种矮塔斜拉桥长悬臂零号节段现浇支架 |
CN204000618U (zh) * | 2014-06-16 | 2014-12-10 | 中交第二航务工程局有限公司 | 一种桁架式0#块现浇支架 |
CN106120568A (zh) * | 2016-08-18 | 2016-11-16 | 德州市公路工程总公司 | 跨河大桥主桥墩二次锁定临时固结结构及施工方法 |
CN206279453U (zh) * | 2016-11-23 | 2017-06-27 | 中铁五局集团有限公司 | 大跨度刚构连续梁0号段现浇支架支承托架结构 |
CN107524096A (zh) * | 2017-10-13 | 2017-12-29 | 中铁八局集团第工程有限公司 | 一种悬灌连续梁0#块现浇支架及搭设方法 |
CN208632968U (zh) * | 2018-06-07 | 2019-03-22 | 中交路桥华南工程有限公司 | 墩柱0#梁段现浇支架 |
-
2018
- 2018-06-07 CN CN201810581422.0A patent/CN108589551A/zh active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010059748A (ja) * | 2008-09-08 | 2010-03-18 | Sumitomo Mitsui Construction Co Ltd | 橋桁架設装置及び橋桁架設方法 |
CN102286925A (zh) * | 2011-07-08 | 2011-12-21 | 四川路航建设工程有限责任公司 | 桥梁独柱墩组拼箱形托架系统及其安装方法 |
KR101198376B1 (ko) * | 2012-06-04 | 2012-11-07 | 삼영엠텍(주) | 에프씨엠 교량의 주두부 시공방법 |
CN103669225A (zh) * | 2013-12-30 | 2014-03-26 | 中铁五局(集团)有限公司 | 一种连续梁0#块支架及安装方法 |
CN103866696A (zh) * | 2014-03-26 | 2014-06-18 | 中铁二十四局集团安徽工程有限公司 | 一种矮塔斜拉桥长悬臂零号节段现浇支架 |
CN204000618U (zh) * | 2014-06-16 | 2014-12-10 | 中交第二航务工程局有限公司 | 一种桁架式0#块现浇支架 |
CN106120568A (zh) * | 2016-08-18 | 2016-11-16 | 德州市公路工程总公司 | 跨河大桥主桥墩二次锁定临时固结结构及施工方法 |
CN206279453U (zh) * | 2016-11-23 | 2017-06-27 | 中铁五局集团有限公司 | 大跨度刚构连续梁0号段现浇支架支承托架结构 |
CN107524096A (zh) * | 2017-10-13 | 2017-12-29 | 中铁八局集团第工程有限公司 | 一种悬灌连续梁0#块现浇支架及搭设方法 |
CN208632968U (zh) * | 2018-06-07 | 2019-03-22 | 中交路桥华南工程有限公司 | 墩柱0#梁段现浇支架 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109356036A (zh) * | 2018-11-26 | 2019-02-19 | 中铁六局集团有限公司 | 中墩墩旁托架及其施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110331668B (zh) | 一种无背索斜拉桥双向倾斜v型桥塔施工方法 | |
CN108004928B (zh) | 一种非对称式刚构连续梁施工工艺 | |
CN213267529U (zh) | 一种装配式桥梁拼接盖梁安装支撑结构 | |
CN100519943C (zh) | 独塔无背索斜拉桥 | |
CN201933419U (zh) | 一种拱桥拱肋现浇支架 | |
CN105568870B (zh) | 用于跨线桥施工的三角挂篮法悬浇装置及其施工方法 | |
CN205857032U (zh) | 一种落地支架与三角托架相结合的钢混结合段施工支撑装置 | |
CN106638314A (zh) | 索塔横梁无落地支架及索塔横梁施工方法 | |
CN101691813B (zh) | 用于超高结构施工的标高同步补偿装置及方法 | |
CN108999085A (zh) | 海域现浇箱梁施工支架及海域现浇箱梁施工方法 | |
CN114781026A (zh) | 一种独斜塔斜拉桥施工控制方法 | |
CN208632968U (zh) | 墩柱0#梁段现浇支架 | |
CN209194353U (zh) | 一种适用于桥梁高墩0#块施工的骑跨一体式托架 | |
CN108589551A (zh) | 墩柱0#梁段现浇支架 | |
CN109629449A (zh) | 一种钢箱拱桥拱脚钢混结合段安装定位支架及对位方法 | |
CN211472207U (zh) | 一种用于预制节段箱梁吊装的悬挂梁系统 | |
CN215482366U (zh) | 一种双线连续梁托架结构 | |
CN110424246A (zh) | 一种大跨径系杆拱桥引桥顶升系统及顶升施工方法 | |
CN216040719U (zh) | 一种模板支架悬臂支撑结构 | |
CN100497834C (zh) | 整体顶托公路桥梁上部结构施工设备 | |
CN109778717A (zh) | 一种悬臂梁的力学状态被动调整方法 | |
CN110424243A (zh) | 一种大跨径系杆拱桥主桥顶升系统及顶升施工方法 | |
CN106087771B (zh) | 大跨度偏心斜靠式钢箱系杆拱桥浮拖架设施工工艺 | |
CN111005324B (zh) | 一种装配式节段箱梁无支架悬吊与锁定施工工法 | |
CN210104781U (zh) | 一种塔吊基础与支撑相连共用立柱桩的结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhang Hongyang Inventor after: Liu Huaigang Inventor after: Gao Shiqiang Inventor after: Xiao Xiangrong Inventor after: Zhao Shenghui Inventor after: Tao Po Inventor before: Liu Huaigang Inventor before: Zhang Hongyang Inventor before: Gao Shiqiang Inventor before: Xiao Xiangrong Inventor before: Zhao Shenghui Inventor before: Tao Po |
|
CB03 | Change of inventor or designer information |