A kind of bridge construction cementation of fissures ancillary equipment
Technical field
The present invention relates to a kind of bridge construction equipment more particularly to a kind of bridge construction cementation of fissures ancillary equipments.
Background technology
Bridge construction builds the process of bridge according to design content;Refer mainly to bridge Construction Technology and construction organization, construction
The contents such as management, construction quality.
The seam of bridge pavement cutting is referred to as ' contracting seam '.Concrete coagulation hardening process, hydrated cementitious will discharge amount of heat,
Concrete temperature is caused to increase;Most of hydrated reaction of cement terminates, and concrete temperature is begun to decline.In temperature-fall period, coagulation
Soil has condensed hardening, and the contraction of the generation that cools down can lead to concrete cracking, and fractuer direction seriously affects road than more random
Face quality and service life.Therefore, (must start to drop in concrete road surface temperature 8~12 hours generally after concreting
Before low), 4~6 meters of spacing will cut contracting seam, and depth of cut is about the one third of road surface plate thickness, can induce coagulation in this way
Native contraction fissure is generated along cutting seam, prevents stochastic crack.Then, pavement contraction joint wants asphalt reperfusion or fluid sealant to carry out close
Envelope, prevents rainwater snow-broth from entering roadbed.
At present to bridge pavement be irrigated pitch or fluid sealant usually manually hold thermic lance to joint-cutting carry out the cementation of fissures,
Artificial thermic lance of holding is easy to fill more to the joint-cutting progress cementation of fissures, and overflows joint-cutting, can so result in waste of resources, and the artificial cementation of fissures
Shi Rongyi fillings cause unsightly partially, therefore can economize on resources there is an urgent need for researching and developing one kind, can improve aesthetics, bridge easy to use
Beam construction cementation of fissures ancillary equipment.
Invention content
(1) technical problems to be solved
The present invention overflows joint-cutting more in order to overcome artificial thermic lance of holding to be easy to fill to the joint-cutting progress cementation of fissures, such meeting
It results in waste of resources, and is easy to fill when the artificial cementation of fissures to cause inaesthetic disadvantage partially, the technical problem to be solved by the present invention is to carry
It can economize on resources for one kind, aesthetics, bridge construction cementation of fissures ancillary equipment easy to use can be improved.
(2) technical solution
In order to solve the above technical problem, the present invention provides such a bridge construction cementation of fissures ancillary equipments, including
There is pedestal, support plate, transverse slat, the first sliding rail, the first sliding block, support plate, first bearing seat, lead screw, screw, first bevel gear, erect
Plate, connecting plate, babinet, L shaped plate, nut, T shapes screw rod, second bearing seat, arc fixture block, motor and second bevel gear, pedestal
Top is connected with support plate, and the top of support plate leading flank is connected with transverse slat, and the bottom of transverse slat is connected with the first sliding rail, and first slides
Rail is equipped with the first sliding block, and the transverse slat bottom at left and right sides of the first sliding rail is respectively connected with support plate, and the bottom of support plate is equipped with first
Bearing block is connected with lead screw between two first bearing seats, and lead screw is equipped with screw, and the right part of lead screw is connected with the first cone tooth
Wheel, the bottom of screw are connected with riser, and the bottom of riser is connected with connecting plate, and the right side of connecting plate is connected with babinet, babinet
The middle part of front and rear sides is provided with opening, and the babinet front and rear sides in the left side that is open are respectively connected with L shaped plate, and the right side of L shaped plate connects
It is connected to nut, is equipped with T shape screw rods in nut, the front ends of rear side T shape screw rods is equipped with second bearing seat, after the T shape screw rods of front side
End is also equipped with second bearing seat, and the leading flank of rear side second bearing seat is connected with arc fixture block, after the second bearing seat of front side
Side is also connected with arc fixture block, and the right side of transverse slat is equipped with motor, and the output shaft of motor is connected with second by shaft coupling
Bevel gear, second bevel gear are engaged with first bevel gear.
Preferably, further include have the second sliding rail, the second sliding block, fixed block, spring, connecting rod, hairbrush, electronic reel and
The left side of drawstring, connecting plate is connected with the second sliding rail, and the second sliding rail is equipped with the second sliding block, the rear portion of the second sliding rail left side
It is connected with fixed block, spring, the left side of the second sliding block are connected between the leading flank of fixed block and the trailing flank of the second sliding block
Be connected with connecting rod, the bottom end of connecting rod is connected with hairbrush, is equipped with electronic reel on rear side of the second sliding rail bottom, it is electronic around
Drawstring is wound in line wheel, the end of drawstring is connect with the top of connecting rod trailing flank.
Preferably, further include having mounting plate, air pump, air inlet pipe, escape pipe and nozzle, the right side of babinet is connected with installation
Plate, the right side at the top of mounting plate are equipped with air pump, air inlet pipe are connected on air pump, escape pipe is connected on air pump, escape pipe
End is connected with nozzle.
Preferably, further include having arc case, shell and heating wire, the left side at the top of mounting plate is connected with arc case, air inlet
The end of pipe is located in arc case, and the bottom at left and right sides of air inlet pipe in arc case is respectively connected with shell, and electric heating is equipped in shell
Silk.
Operation principle:When needing to carrying out the cementation of fissures at bridge joint-cutting, manually while turning two T shape screw rods clockwise makes
Two arc fixture blocks are separated from each other, then between thermic lance is manually placed into two arc fixture blocks, then artificial while counterclockwise
Two T shape screw rods are turned, can so make two arc fixture blocks that thermic lance is clamped fixation, then manually start pouring machine to cutting
Seam carries out the cementation of fissures, and manually starting motor makes second bevel gear rotate clockwise, and second bevel gear, which rotates clockwise, makes the first cone
Gear rotates counterclockwise, and first bevel gear, which rotates counterclockwise, drives lead screw to rotate counterclockwise, and lead screw, which rotates counterclockwise, can make silk
Mother is moved to the left through the first sliding block in the first sliding rail, and screw, which is moved to the left, drives riser to be moved to the left, and riser is moved to the left band
Dynamic connecting plate is moved to the left, connecting plate be moved to the left drive babinet be moved to the left, babinet be moved to the left can drive thermic lance to
It moves left, thermic lance, which is moved to the left, to carry out the cementation of fissures to joint-cutting.After the completion of the cementation of fissures, pouring machine and motor are closed.With descendant
Work, which starts motor, makes second bevel gear rotate counterclockwise, and to make thermic lance move right reset, is then shut off motor.Then again
The present invention is manually moved to next position for needing the cementation of fissures, and repeats aforesaid operations.So repeating aforesaid operations can be into
The row cementation of fissures takes out thermic lance after the completion of the cementation of fissures.So by the present invention in that thermic lance be moved to the left can be to joint-cutting
The cementation of fissures is carried out, therefore the present invention can economize on resources, can improve aesthetics, be easy to use.
Because further including having the second sliding rail, the second sliding block, fixed block, spring, connecting rod, hairbrush, electronic reel and drawing
The left side of rope, connecting plate is connected with the second sliding rail, and the second sliding rail is equipped with the second sliding block, and the rear portion of the second sliding rail left side connects
It is connected to fixed block, spring is connected between the leading flank of fixed block and the trailing flank of the second sliding block, the left side of the second sliding block connects
It is connected to connecting rod, the bottom end of connecting rod is connected with hairbrush, electronic reel, electronic coiling are equipped on rear side of the second sliding rail bottom
Drawstring is wound on wheel, the end of drawstring is connect with the top of connecting rod trailing flank.Electronic reel is manually started to withdraw and release
When withdrawing drawstring connecting rod can move backward through the second sliding block on the second sliding rail drawstring, and spring compresses therewith, when putting
It when going out drawstring, under the effect of spring force moves forward connecting rod and resets, connecting rod back-and-forth motion can make before and after hairbrush
Mobile, hairbrush back-and-forth motion can clean ground, can so clear up the sandstone in seam, so as to make filling
It stitches better, after the completion of the cementation of fissures, manually closes electronic reel.
Because further including having mounting plate, air pump, air inlet pipe, escape pipe and nozzle, the right side of babinet is connected with mounting plate,
Right side at the top of mounting plate is equipped with air pump, and air inlet pipe is connected on air pump, and escape pipe, the end of escape pipe are connected on air pump
It is connected with nozzle.When carrying out the cementation of fissures, manually starting air pump makes air inlet pipe draw outside air, is pushed away through escape pipe after
Enter in nozzle, air is finally sprayed on to by nozzle sewing on of having filled, the seam rapid draing that filling can so got well, so as to anti-
Only passing automobile takes away the cementation of fissures raw material in seam, after the completion of the cementation of fissures, manually closes air pump.
Because further including having arc case, shell and heating wire, the left side at the top of mounting plate is connected with arc case, air inlet pipe
End is located in arc case, and the bottom at left and right sides of air inlet pipe in arc case is respectively connected with shell, and heating wire is equipped in shell.People
Work starts heating wire and is heated, and the air that can be so drawn to air inlet pipe heats, so as to more efficiently right
The seam filled is dried, and after the completion of cementation of fissures drying, manually closes heating wire.
(3) advantageous effect
By the present invention in that thermic lance be moved to the left can to joint-cutting carry out the cementation of fissures, hairbrush move left and right can to ground into
Row cleans, and can clear up the sandstone in joint-cutting, and air is sprayed on sewing on of having filled, the seam that filling can so got well by nozzle
Rapid draing can economize on resources to reach, can improve aesthetics, effect easy to use.
Description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is the overlooking structure diagram of A of the present invention.
Fig. 3 is second of main structure diagram of the present invention.
Fig. 4 is the left view structural representation of B of the present invention.
Fig. 5 is the third main structure diagram of the present invention.
Fig. 6 is the 4th kind of main structure diagram of the present invention.
Label in attached drawing be:1- pedestals, 2- support plates, 3- transverse slats, the first sliding rails of 4-, the first sliding blocks of 5-, 6- support plates, 7-
First bearing seat, 8- lead screws, 9- screws, 10- first bevel gears, 11- risers, 12- connecting plates, 13- babinets, 14- openings, 15-L
Shape plate, 16- nuts, 17-T shape screw rods, 18- second bearing seats, 19- arc fixture blocks, 20- motors, 21- second bevel gears, 22-
Two sliding rails, the second sliding blocks of 23-, 24- fixed blocks, 25- springs, 26- connecting rods, 27- hairbrush, the electronic reels of 28-, 29- drawstrings,
30- mounting plates, 31- air pumps, 32- air inlet pipe, 33- escape pipes, 34- nozzles, 35- arc casees, 36- shells, 37- heating wire.
Specific implementation mode
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of bridge construction cementation of fissures ancillary equipment includes as shown in figures 1 to 6 pedestal 1, support plate 2, transverse slat 3, first
Sliding rail 4, the first sliding block 5, support plate 6, first bearing seat 7, lead screw 8, screw 9, first bevel gear 10, riser 11, connecting plate 12, case
Body 13, L shaped plate 15, nut 16, T shapes screw rod 17, second bearing seat 18, arc fixture block 19, motor 20 and second bevel gear 21, bottom
The top of seat 1 is connected with support plate 2, and the top of 2 leading flank of support plate is connected with transverse slat 3, and the bottom of transverse slat 3 is connected with the first cunning
Rail 4, the first sliding rail 4 are equipped with the first sliding block 5, and 3 bottom of transverse slat of 4 left and right sides of the first sliding rail is respectively connected with support plate 6, support plate 6
Bottom first bearing seat 7 is installed, be connected with lead screw 8 between two first bearing seats 7, lead screw 8 is equipped with screw 9, lead screw 8
Right part be connected with first bevel gear 10, the bottom of screw 9 is connected with riser 11, and the bottom of riser 11 is connected with connecting plate 12,
The right side of connecting plate 12 is connected with babinet 13, and the middle part of 13 front and rear sides of babinet is provided with opening 14, the case in 14 left side of opening
13 front and rear sides of body are respectively connected with L shaped plate 15, and the right side of L shaped plate 15 is connected with nut 16, T shape screw rods are equipped in nut 16
17, the front end of rear side T shapes screw rod 17 is equipped with second bearing seat 18, and the rear end of front side T shapes screw rod 17 is also equipped with second bearing
Seat 18, the leading flank of rear side second bearing seat 18 is connected with arc fixture block 19, and the trailing flank of front side second bearing seat 18 also connects
There are arc fixture block 19, the right side of transverse slat 3 that motor 20 is installed, the output shaft of motor 20 is connected with the second cone tooth by shaft coupling
Wheel 21, second bevel gear 21 is engaged with first bevel gear 10.
Embodiment 2
A kind of bridge construction cementation of fissures ancillary equipment includes as shown in figures 1 to 6 pedestal 1, support plate 2, transverse slat 3, first
Sliding rail 4, the first sliding block 5, support plate 6, first bearing seat 7, lead screw 8, screw 9, first bevel gear 10, riser 11, connecting plate 12, case
Body 13, L shaped plate 15, nut 16, T shapes screw rod 17, second bearing seat 18, arc fixture block 19, motor 20 and second bevel gear 21, bottom
The top of seat 1 is connected with support plate 2, and the top of 2 leading flank of support plate is connected with transverse slat 3, and the bottom of transverse slat 3 is connected with the first cunning
Rail 4, the first sliding rail 4 are equipped with the first sliding block 5, and 3 bottom of transverse slat of 4 left and right sides of the first sliding rail is respectively connected with support plate 6, support plate 6
Bottom first bearing seat 7 is installed, be connected with lead screw 8 between two first bearing seats 7, lead screw 8 is equipped with screw 9, lead screw 8
Right part be connected with first bevel gear 10, the bottom of screw 9 is connected with riser 11, and the bottom of riser 11 is connected with connecting plate 12,
The right side of connecting plate 12 is connected with babinet 13, and the middle part of 13 front and rear sides of babinet is provided with opening 14, the case in 14 left side of opening
13 front and rear sides of body are respectively connected with L shaped plate 15, and the right side of L shaped plate 15 is connected with nut 16, T shape screw rods are equipped in nut 16
17, the front end of rear side T shapes screw rod 17 is equipped with second bearing seat 18, and the rear end of front side T shapes screw rod 17 is also equipped with second bearing
Seat 18, the leading flank of rear side second bearing seat 18 is connected with arc fixture block 19, and the trailing flank of front side second bearing seat 18 also connects
There are arc fixture block 19, the right side of transverse slat 3 that motor 20 is installed, the output shaft of motor 20 is connected with the second cone tooth by shaft coupling
Wheel 21, second bevel gear 21 is engaged with first bevel gear 10.
Further include have the second sliding rail 22, the second sliding block 23, fixed block 24, spring 25, connecting rod 26, hairbrush 27, it is electronic around
The left side of line wheel 28 and drawstring 29, connecting plate 12 is connected with the second sliding rail 22, and the second sliding rail 22 is equipped with the second sliding block 23, the
The rear portion of two sliding rails, 22 left side is connected with fixed block 24, connects between the leading flank of fixed block 24 and the trailing flank of the second sliding block 23
It is connected to spring 25, the left side of the second sliding block 23 is connected with connecting rod 26, and the bottom end of connecting rod 26 is connected with hairbrush 27, and second slides
Electronic reel 28 is installed on rear side of 22 bottom of rail, drawstring 29, the end of drawstring 29 and connection are wound on electronic reel 28
The top of 26 trailing flank of bar connects.
Embodiment 3
A kind of bridge construction cementation of fissures ancillary equipment includes as shown in figures 1 to 6 pedestal 1, support plate 2, transverse slat 3, first
Sliding rail 4, the first sliding block 5, support plate 6, first bearing seat 7, lead screw 8, screw 9, first bevel gear 10, riser 11, connecting plate 12, case
Body 13, L shaped plate 15, nut 16, T shapes screw rod 17, second bearing seat 18, arc fixture block 19, motor 20 and second bevel gear 21, bottom
The top of seat 1 is connected with support plate 2, and the top of 2 leading flank of support plate is connected with transverse slat 3, and the bottom of transverse slat 3 is connected with the first cunning
Rail 4, the first sliding rail 4 are equipped with the first sliding block 5, and 3 bottom of transverse slat of 4 left and right sides of the first sliding rail is respectively connected with support plate 6, support plate 6
Bottom first bearing seat 7 is installed, be connected with lead screw 8 between two first bearing seats 7, lead screw 8 is equipped with screw 9, lead screw 8
Right part be connected with first bevel gear 10, the bottom of screw 9 is connected with riser 11, and the bottom of riser 11 is connected with connecting plate 12,
The right side of connecting plate 12 is connected with babinet 13, and the middle part of 13 front and rear sides of babinet is provided with opening 14, the case in 14 left side of opening
13 front and rear sides of body are respectively connected with L shaped plate 15, and the right side of L shaped plate 15 is connected with nut 16, T shape screw rods are equipped in nut 16
17, the front end of rear side T shapes screw rod 17 is equipped with second bearing seat 18, and the rear end of front side T shapes screw rod 17 is also equipped with second bearing
Seat 18, the leading flank of rear side second bearing seat 18 is connected with arc fixture block 19, and the trailing flank of front side second bearing seat 18 also connects
There are arc fixture block 19, the right side of transverse slat 3 that motor 20 is installed, the output shaft of motor 20 is connected with the second cone tooth by shaft coupling
Wheel 21, second bevel gear 21 is engaged with first bevel gear 10.
Further include have the second sliding rail 22, the second sliding block 23, fixed block 24, spring 25, connecting rod 26, hairbrush 27, it is electronic around
The left side of line wheel 28 and drawstring 29, connecting plate 12 is connected with the second sliding rail 22, and the second sliding rail 22 is equipped with the second sliding block 23, the
The rear portion of two sliding rails, 22 left side is connected with fixed block 24, connects between the leading flank of fixed block 24 and the trailing flank of the second sliding block 23
It is connected to spring 25, the left side of the second sliding block 23 is connected with connecting rod 26, and the bottom end of connecting rod 26 is connected with hairbrush 27, and second slides
Electronic reel 28 is installed on rear side of 22 bottom of rail, drawstring 29, the end of drawstring 29 and connection are wound on electronic reel 28
The top of 26 trailing flank of bar connects.
Further include having mounting plate 30, air pump 31, air inlet pipe 32, escape pipe 33 and nozzle 34, the right side connection of babinet 13
There are mounting plate 30, the right side at 30 top of mounting plate that air pump 31 is installed, air inlet pipe 32 is connected on air pump 31, is connected on air pump 31
There are escape pipe 33, the end of escape pipe 33 to be connected with nozzle 34.
Embodiment 4
A kind of bridge construction cementation of fissures ancillary equipment includes as shown in figures 1 to 6 pedestal 1, support plate 2, transverse slat 3, first
Sliding rail 4, the first sliding block 5, support plate 6, first bearing seat 7, lead screw 8, screw 9, first bevel gear 10, riser 11, connecting plate 12, case
Body 13, L shaped plate 15, nut 16, T shapes screw rod 17, second bearing seat 18, arc fixture block 19, motor 20 and second bevel gear 21, bottom
The top of seat 1 is connected with support plate 2, and the top of 2 leading flank of support plate is connected with transverse slat 3, and the bottom of transverse slat 3 is connected with the first cunning
Rail 4, the first sliding rail 4 are equipped with the first sliding block 5, and 3 bottom of transverse slat of 4 left and right sides of the first sliding rail is respectively connected with support plate 6, support plate 6
Bottom first bearing seat 7 is installed, be connected with lead screw 8 between two first bearing seats 7, lead screw 8 is equipped with screw 9, lead screw 8
Right part be connected with first bevel gear 10, the bottom of screw 9 is connected with riser 11, and the bottom of riser 11 is connected with connecting plate 12,
The right side of connecting plate 12 is connected with babinet 13, and the middle part of 13 front and rear sides of babinet is provided with opening 14, the case in 14 left side of opening
13 front and rear sides of body are respectively connected with L shaped plate 15, and the right side of L shaped plate 15 is connected with nut 16, T shape screw rods are equipped in nut 16
17, the front end of rear side T shapes screw rod 17 is equipped with second bearing seat 18, and the rear end of front side T shapes screw rod 17 is also equipped with second bearing
Seat 18, the leading flank of rear side second bearing seat 18 is connected with arc fixture block 19, and the trailing flank of front side second bearing seat 18 also connects
There are arc fixture block 19, the right side of transverse slat 3 that motor 20 is installed, the output shaft of motor 20 is connected with the second cone tooth by shaft coupling
Wheel 21, second bevel gear 21 is engaged with first bevel gear 10.
Further include have the second sliding rail 22, the second sliding block 23, fixed block 24, spring 25, connecting rod 26, hairbrush 27, it is electronic around
The left side of line wheel 28 and drawstring 29, connecting plate 12 is connected with the second sliding rail 22, and the second sliding rail 22 is equipped with the second sliding block 23, the
The rear portion of two sliding rails, 22 left side is connected with fixed block 24, connects between the leading flank of fixed block 24 and the trailing flank of the second sliding block 23
It is connected to spring 25, the left side of the second sliding block 23 is connected with connecting rod 26, and the bottom end of connecting rod 26 is connected with hairbrush 27, and second slides
Electronic reel 28 is installed on rear side of 22 bottom of rail, drawstring 29, the end of drawstring 29 and connection are wound on electronic reel 28
The top of 26 trailing flank of bar connects.
Further include having mounting plate 30, air pump 31, air inlet pipe 32, escape pipe 33 and nozzle 34, the right side connection of babinet 13
There are mounting plate 30, the right side at 30 top of mounting plate that air pump 31 is installed, air inlet pipe 32 is connected on air pump 31, is connected on air pump 31
There are escape pipe 33, the end of escape pipe 33 to be connected with nozzle 34.
Further include having arc case 35, shell 36 and heating wire 37, the left side at 30 top of mounting plate is connected with arc case 35, into
The end of tracheae 32 is located in arc case 35, and the bottom in 32 left and right sides arc case 35 of air inlet pipe is respectively connected with shell 36, shell
Heating wire 37 is equipped in body 36.
Operation principle:When needing to carrying out the cementation of fissures at bridge joint-cutting, manually while two T shapes screw rods 17 are turned clockwise
So that two arc fixture blocks 19 is separated from each other, then between thermic lance is manually placed into two arc fixture blocks 19, then it is artificial simultaneously
Two T shapes screw rods 17 are turned counterclockwise, can so make two arc fixture blocks 19 that thermic lance is clamped fixation, then manually start
Pouring machine carries out the cementation of fissures to joint-cutting, and manually starting motor 20 makes second bevel gear 21 rotate clockwise, and second bevel gear 21 is suitable
Hour hands rotation makes first bevel gear 10 rotate counterclockwise, and first bevel gear 10, which rotates counterclockwise, drives lead screw 8 to rotate counterclockwise, silk
Bar 8, which rotates counterclockwise, can be such that screw 9 is moved to the left in the first sliding rail 4 through the first sliding block 5, and it is perpendicular that screw 9 is moved to the left drive
Plate 11 is moved to the left, riser 11 be moved to the left drive connecting plate 12 be moved to the left, connecting plate 12 be moved to the left drive babinet 13 to
It moves left, babinet 13, which is moved to the left, to drive thermic lance to be moved to the left, and thermic lance, which is moved to the left, to carry out the cementation of fissures to joint-cutting.
After the completion of the cementation of fissures, pouring machine and motor 20 are closed.Then manually starting motor 20 makes second bevel gear 21 rotate counterclockwise, from
And thermic lance is made to move right reset, it is then shut off motor 20.Then manually the present invention is moved to again and next needs the cementation of fissures
Position, and repeat aforesaid operations.Such repetition aforesaid operations can carry out the cementation of fissures and take out thermic lance after the completion of the cementation of fissures
.So by the present invention in that thermic lance be moved to the left can to joint-cutting carry out the cementation of fissures, therefore the present invention can economize on resources,
Aesthetics, easy to use can be improved.
Because further including having the second sliding rail 22, the second sliding block 23, fixed block 24, spring 25, connecting rod 26, hairbrush 27, electricity
The left side of dynamic reel 28 and drawstring 29, connecting plate 12 is connected with the second sliding rail 22, and the second sliding rail 22 is equipped with the second sliding block
23, the rear portion of 22 left side of the second sliding rail is connected with fixed block 24, the trailing flank of the leading flank of fixed block 24 and the second sliding block 23
Between be connected with spring 25, the left side of the second sliding block 23 is connected with connecting rod 26, and the bottom end of connecting rod 26 is connected with hairbrush 27,
Electronic reel 28 is installed on rear side of second sliding rail, 22 bottom, drawstring 29, the end of drawstring 29 are wound on electronic reel 28
It is connect with the top of 26 trailing flank of connecting rod.It manually starts electronic reel 28 and withdraws and release drawstring 29, when withdrawal drawstring 29
When connecting rod 26 can be made to be moved backward on the second sliding rail 22 through the second sliding block 23, spring 25 compresses therewith, when release drawstring
It when 29, moves forward connecting rod 26 under the action of 25 elastic force of spring and resets, the back-and-forth motion of connecting rod 26 can make hairbrush 27
It being moved forward and backward, the back-and-forth motion of hairbrush 27 can clean ground, can so clear up the sandstone in seam, so as to
Enough make the cementation of fissures better, after the completion of the cementation of fissures, manually closes electronic reel 28.
Because further including having mounting plate 30, air pump 31, air inlet pipe 32, escape pipe 33 and nozzle 34, the right side of babinet 13
It is connected with mounting plate 30, the right side at 30 top of mounting plate is equipped with air pump 31, is connected with air inlet pipe 32 on air pump 31, on air pump 31
It is connected with escape pipe 33, the end of escape pipe 33 is connected with nozzle 34.When carrying out the cementation of fissures, manually starting air pump 31 makes air inlet pipe
32 pairs of outside airs are drawn, and are pushed into nozzle 34 through escape pipe 33 after, are finally sprayed on air by nozzle 34 and to have been filled
It sews on, the seam rapid draing that filling can so got well, so as to prevent passing automobile from taking away the cementation of fissures raw material in seam, when
It is artificial to close air pump 31 after the completion of the cementation of fissures.
Because further including having arc case 35, shell 36 and heating wire 37, the left side at 30 top of mounting plate is connected with arc case
35, the end of air inlet pipe 32 is located in arc case 35, and the bottom in 32 left and right sides arc case 35 of air inlet pipe is respectively connected with shell
36, shell 36 is interior to be equipped with heating wire 37.It manually starts heating wire 37 to be heated, the air that can so draw air inlet pipe 32
It is heated, so as to which more efficiently the seam filled is dried, after the completion of cementation of fissures drying, manually closes heating wire
37。
The preferred embodiment of the present invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously
Cannot the limitation to the scope of the claims of the present invention therefore be interpreted as.It should be pointed out that for those of ordinary skill in the art
For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair
Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.