CN108589538A - A kind of bridge construction cementation of fissures ancillary equipment - Google Patents

A kind of bridge construction cementation of fissures ancillary equipment Download PDF

Info

Publication number
CN108589538A
CN108589538A CN201810371688.2A CN201810371688A CN108589538A CN 108589538 A CN108589538 A CN 108589538A CN 201810371688 A CN201810371688 A CN 201810371688A CN 108589538 A CN108589538 A CN 108589538A
Authority
CN
China
Prior art keywords
fissures
cementation
sliding rail
support plate
bearing seat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810371688.2A
Other languages
Chinese (zh)
Other versions
CN108589538B (en
Inventor
卢先富
宋振磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiangshui Fuxing Concrete Co., Ltd
Original Assignee
卢先富
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 卢先富 filed Critical 卢先富
Priority to CN201810371688.2A priority Critical patent/CN108589538B/en
Publication of CN108589538A publication Critical patent/CN108589538A/en
Application granted granted Critical
Publication of CN108589538B publication Critical patent/CN108589538B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • E01C23/09Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • E01C23/09Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges
    • E01C23/0906Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges for forming, opening-out, cleaning, drying or heating cuts, grooves, recesses or, excluding forming, cracks, e.g. cleaning by sand-blasting or air-jet ; for trimming paving edges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • E01C23/09Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges
    • E01C23/0966Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges for filling or priming, with or without working the surface of the filling or applying particulate material thereto, e.g. for filling the joints of stone-sett paving

Abstract

The present invention relates to a kind of bridge construction equipment more particularly to a kind of bridge construction cementation of fissures ancillary equipments.The technical problem to be solved in the present invention is to provide one kind to economize on resources, can improve aesthetics, bridge construction cementation of fissures ancillary equipment easy to use.The present invention provides such a bridge construction cementation of fissures ancillary equipments, include pedestal, support plate, transverse slat, the first sliding rail, the first sliding block, support plate, first bearing seat etc.;Support plate is connected at the top of pedestal, the top of support plate leading flank is connected with transverse slat, and the bottom of transverse slat is connected with the first sliding rail, and the first sliding rail is equipped with the first sliding block.By the present invention in that thermic lance, which is moved to the left, to carry out the cementation of fissures to joint-cutting, hairbrush, which moves left and right, to clean ground, sandstone in joint-cutting can be cleared up, air is sprayed on sewing on of having filled by nozzle, the seam rapid draing that filling can so got well can economize on resources to reach, can improve aesthetics, effect easy to use.

Description

A kind of bridge construction cementation of fissures ancillary equipment
Technical field
The present invention relates to a kind of bridge construction equipment more particularly to a kind of bridge construction cementation of fissures ancillary equipments.
Background technology
Bridge construction builds the process of bridge according to design content;Refer mainly to bridge Construction Technology and construction organization, construction The contents such as management, construction quality.
The seam of bridge pavement cutting is referred to as ' contracting seam '.Concrete coagulation hardening process, hydrated cementitious will discharge amount of heat, Concrete temperature is caused to increase;Most of hydrated reaction of cement terminates, and concrete temperature is begun to decline.In temperature-fall period, coagulation Soil has condensed hardening, and the contraction of the generation that cools down can lead to concrete cracking, and fractuer direction seriously affects road than more random Face quality and service life.Therefore, (must start to drop in concrete road surface temperature 8~12 hours generally after concreting Before low), 4~6 meters of spacing will cut contracting seam, and depth of cut is about the one third of road surface plate thickness, can induce coagulation in this way Native contraction fissure is generated along cutting seam, prevents stochastic crack.Then, pavement contraction joint wants asphalt reperfusion or fluid sealant to carry out close Envelope, prevents rainwater snow-broth from entering roadbed.
At present to bridge pavement be irrigated pitch or fluid sealant usually manually hold thermic lance to joint-cutting carry out the cementation of fissures, Artificial thermic lance of holding is easy to fill more to the joint-cutting progress cementation of fissures, and overflows joint-cutting, can so result in waste of resources, and the artificial cementation of fissures Shi Rongyi fillings cause unsightly partially, therefore can economize on resources there is an urgent need for researching and developing one kind, can improve aesthetics, bridge easy to use Beam construction cementation of fissures ancillary equipment.
Invention content
(1) technical problems to be solved
The present invention overflows joint-cutting more in order to overcome artificial thermic lance of holding to be easy to fill to the joint-cutting progress cementation of fissures, such meeting It results in waste of resources, and is easy to fill when the artificial cementation of fissures to cause inaesthetic disadvantage partially, the technical problem to be solved by the present invention is to carry It can economize on resources for one kind, aesthetics, bridge construction cementation of fissures ancillary equipment easy to use can be improved.
(2) technical solution
In order to solve the above technical problem, the present invention provides such a bridge construction cementation of fissures ancillary equipments, including There is pedestal, support plate, transverse slat, the first sliding rail, the first sliding block, support plate, first bearing seat, lead screw, screw, first bevel gear, erect Plate, connecting plate, babinet, L shaped plate, nut, T shapes screw rod, second bearing seat, arc fixture block, motor and second bevel gear, pedestal Top is connected with support plate, and the top of support plate leading flank is connected with transverse slat, and the bottom of transverse slat is connected with the first sliding rail, and first slides Rail is equipped with the first sliding block, and the transverse slat bottom at left and right sides of the first sliding rail is respectively connected with support plate, and the bottom of support plate is equipped with first Bearing block is connected with lead screw between two first bearing seats, and lead screw is equipped with screw, and the right part of lead screw is connected with the first cone tooth Wheel, the bottom of screw are connected with riser, and the bottom of riser is connected with connecting plate, and the right side of connecting plate is connected with babinet, babinet The middle part of front and rear sides is provided with opening, and the babinet front and rear sides in the left side that is open are respectively connected with L shaped plate, and the right side of L shaped plate connects It is connected to nut, is equipped with T shape screw rods in nut, the front ends of rear side T shape screw rods is equipped with second bearing seat, after the T shape screw rods of front side End is also equipped with second bearing seat, and the leading flank of rear side second bearing seat is connected with arc fixture block, after the second bearing seat of front side Side is also connected with arc fixture block, and the right side of transverse slat is equipped with motor, and the output shaft of motor is connected with second by shaft coupling Bevel gear, second bevel gear are engaged with first bevel gear.
Preferably, further include have the second sliding rail, the second sliding block, fixed block, spring, connecting rod, hairbrush, electronic reel and The left side of drawstring, connecting plate is connected with the second sliding rail, and the second sliding rail is equipped with the second sliding block, the rear portion of the second sliding rail left side It is connected with fixed block, spring, the left side of the second sliding block are connected between the leading flank of fixed block and the trailing flank of the second sliding block Be connected with connecting rod, the bottom end of connecting rod is connected with hairbrush, is equipped with electronic reel on rear side of the second sliding rail bottom, it is electronic around Drawstring is wound in line wheel, the end of drawstring is connect with the top of connecting rod trailing flank.
Preferably, further include having mounting plate, air pump, air inlet pipe, escape pipe and nozzle, the right side of babinet is connected with installation Plate, the right side at the top of mounting plate are equipped with air pump, air inlet pipe are connected on air pump, escape pipe is connected on air pump, escape pipe End is connected with nozzle.
Preferably, further include having arc case, shell and heating wire, the left side at the top of mounting plate is connected with arc case, air inlet The end of pipe is located in arc case, and the bottom at left and right sides of air inlet pipe in arc case is respectively connected with shell, and electric heating is equipped in shell Silk.
Operation principle:When needing to carrying out the cementation of fissures at bridge joint-cutting, manually while turning two T shape screw rods clockwise makes Two arc fixture blocks are separated from each other, then between thermic lance is manually placed into two arc fixture blocks, then artificial while counterclockwise Two T shape screw rods are turned, can so make two arc fixture blocks that thermic lance is clamped fixation, then manually start pouring machine to cutting Seam carries out the cementation of fissures, and manually starting motor makes second bevel gear rotate clockwise, and second bevel gear, which rotates clockwise, makes the first cone Gear rotates counterclockwise, and first bevel gear, which rotates counterclockwise, drives lead screw to rotate counterclockwise, and lead screw, which rotates counterclockwise, can make silk Mother is moved to the left through the first sliding block in the first sliding rail, and screw, which is moved to the left, drives riser to be moved to the left, and riser is moved to the left band Dynamic connecting plate is moved to the left, connecting plate be moved to the left drive babinet be moved to the left, babinet be moved to the left can drive thermic lance to It moves left, thermic lance, which is moved to the left, to carry out the cementation of fissures to joint-cutting.After the completion of the cementation of fissures, pouring machine and motor are closed.With descendant Work, which starts motor, makes second bevel gear rotate counterclockwise, and to make thermic lance move right reset, is then shut off motor.Then again The present invention is manually moved to next position for needing the cementation of fissures, and repeats aforesaid operations.So repeating aforesaid operations can be into The row cementation of fissures takes out thermic lance after the completion of the cementation of fissures.So by the present invention in that thermic lance be moved to the left can be to joint-cutting The cementation of fissures is carried out, therefore the present invention can economize on resources, can improve aesthetics, be easy to use.
Because further including having the second sliding rail, the second sliding block, fixed block, spring, connecting rod, hairbrush, electronic reel and drawing The left side of rope, connecting plate is connected with the second sliding rail, and the second sliding rail is equipped with the second sliding block, and the rear portion of the second sliding rail left side connects It is connected to fixed block, spring is connected between the leading flank of fixed block and the trailing flank of the second sliding block, the left side of the second sliding block connects It is connected to connecting rod, the bottom end of connecting rod is connected with hairbrush, electronic reel, electronic coiling are equipped on rear side of the second sliding rail bottom Drawstring is wound on wheel, the end of drawstring is connect with the top of connecting rod trailing flank.Electronic reel is manually started to withdraw and release When withdrawing drawstring connecting rod can move backward through the second sliding block on the second sliding rail drawstring, and spring compresses therewith, when putting It when going out drawstring, under the effect of spring force moves forward connecting rod and resets, connecting rod back-and-forth motion can make before and after hairbrush Mobile, hairbrush back-and-forth motion can clean ground, can so clear up the sandstone in seam, so as to make filling It stitches better, after the completion of the cementation of fissures, manually closes electronic reel.
Because further including having mounting plate, air pump, air inlet pipe, escape pipe and nozzle, the right side of babinet is connected with mounting plate, Right side at the top of mounting plate is equipped with air pump, and air inlet pipe is connected on air pump, and escape pipe, the end of escape pipe are connected on air pump It is connected with nozzle.When carrying out the cementation of fissures, manually starting air pump makes air inlet pipe draw outside air, is pushed away through escape pipe after Enter in nozzle, air is finally sprayed on to by nozzle sewing on of having filled, the seam rapid draing that filling can so got well, so as to anti- Only passing automobile takes away the cementation of fissures raw material in seam, after the completion of the cementation of fissures, manually closes air pump.
Because further including having arc case, shell and heating wire, the left side at the top of mounting plate is connected with arc case, air inlet pipe End is located in arc case, and the bottom at left and right sides of air inlet pipe in arc case is respectively connected with shell, and heating wire is equipped in shell.People Work starts heating wire and is heated, and the air that can be so drawn to air inlet pipe heats, so as to more efficiently right The seam filled is dried, and after the completion of cementation of fissures drying, manually closes heating wire.
(3) advantageous effect
By the present invention in that thermic lance be moved to the left can to joint-cutting carry out the cementation of fissures, hairbrush move left and right can to ground into Row cleans, and can clear up the sandstone in joint-cutting, and air is sprayed on sewing on of having filled, the seam that filling can so got well by nozzle Rapid draing can economize on resources to reach, can improve aesthetics, effect easy to use.
Description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is the overlooking structure diagram of A of the present invention.
Fig. 3 is second of main structure diagram of the present invention.
Fig. 4 is the left view structural representation of B of the present invention.
Fig. 5 is the third main structure diagram of the present invention.
Fig. 6 is the 4th kind of main structure diagram of the present invention.
Label in attached drawing be:1- pedestals, 2- support plates, 3- transverse slats, the first sliding rails of 4-, the first sliding blocks of 5-, 6- support plates, 7- First bearing seat, 8- lead screws, 9- screws, 10- first bevel gears, 11- risers, 12- connecting plates, 13- babinets, 14- openings, 15-L Shape plate, 16- nuts, 17-T shape screw rods, 18- second bearing seats, 19- arc fixture blocks, 20- motors, 21- second bevel gears, 22- Two sliding rails, the second sliding blocks of 23-, 24- fixed blocks, 25- springs, 26- connecting rods, 27- hairbrush, the electronic reels of 28-, 29- drawstrings, 30- mounting plates, 31- air pumps, 32- air inlet pipe, 33- escape pipes, 34- nozzles, 35- arc casees, 36- shells, 37- heating wire.
Specific implementation mode
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of bridge construction cementation of fissures ancillary equipment includes as shown in figures 1 to 6 pedestal 1, support plate 2, transverse slat 3, first Sliding rail 4, the first sliding block 5, support plate 6, first bearing seat 7, lead screw 8, screw 9, first bevel gear 10, riser 11, connecting plate 12, case Body 13, L shaped plate 15, nut 16, T shapes screw rod 17, second bearing seat 18, arc fixture block 19, motor 20 and second bevel gear 21, bottom The top of seat 1 is connected with support plate 2, and the top of 2 leading flank of support plate is connected with transverse slat 3, and the bottom of transverse slat 3 is connected with the first cunning Rail 4, the first sliding rail 4 are equipped with the first sliding block 5, and 3 bottom of transverse slat of 4 left and right sides of the first sliding rail is respectively connected with support plate 6, support plate 6 Bottom first bearing seat 7 is installed, be connected with lead screw 8 between two first bearing seats 7, lead screw 8 is equipped with screw 9, lead screw 8 Right part be connected with first bevel gear 10, the bottom of screw 9 is connected with riser 11, and the bottom of riser 11 is connected with connecting plate 12, The right side of connecting plate 12 is connected with babinet 13, and the middle part of 13 front and rear sides of babinet is provided with opening 14, the case in 14 left side of opening 13 front and rear sides of body are respectively connected with L shaped plate 15, and the right side of L shaped plate 15 is connected with nut 16, T shape screw rods are equipped in nut 16 17, the front end of rear side T shapes screw rod 17 is equipped with second bearing seat 18, and the rear end of front side T shapes screw rod 17 is also equipped with second bearing Seat 18, the leading flank of rear side second bearing seat 18 is connected with arc fixture block 19, and the trailing flank of front side second bearing seat 18 also connects There are arc fixture block 19, the right side of transverse slat 3 that motor 20 is installed, the output shaft of motor 20 is connected with the second cone tooth by shaft coupling Wheel 21, second bevel gear 21 is engaged with first bevel gear 10.
Embodiment 2
A kind of bridge construction cementation of fissures ancillary equipment includes as shown in figures 1 to 6 pedestal 1, support plate 2, transverse slat 3, first Sliding rail 4, the first sliding block 5, support plate 6, first bearing seat 7, lead screw 8, screw 9, first bevel gear 10, riser 11, connecting plate 12, case Body 13, L shaped plate 15, nut 16, T shapes screw rod 17, second bearing seat 18, arc fixture block 19, motor 20 and second bevel gear 21, bottom The top of seat 1 is connected with support plate 2, and the top of 2 leading flank of support plate is connected with transverse slat 3, and the bottom of transverse slat 3 is connected with the first cunning Rail 4, the first sliding rail 4 are equipped with the first sliding block 5, and 3 bottom of transverse slat of 4 left and right sides of the first sliding rail is respectively connected with support plate 6, support plate 6 Bottom first bearing seat 7 is installed, be connected with lead screw 8 between two first bearing seats 7, lead screw 8 is equipped with screw 9, lead screw 8 Right part be connected with first bevel gear 10, the bottom of screw 9 is connected with riser 11, and the bottom of riser 11 is connected with connecting plate 12, The right side of connecting plate 12 is connected with babinet 13, and the middle part of 13 front and rear sides of babinet is provided with opening 14, the case in 14 left side of opening 13 front and rear sides of body are respectively connected with L shaped plate 15, and the right side of L shaped plate 15 is connected with nut 16, T shape screw rods are equipped in nut 16 17, the front end of rear side T shapes screw rod 17 is equipped with second bearing seat 18, and the rear end of front side T shapes screw rod 17 is also equipped with second bearing Seat 18, the leading flank of rear side second bearing seat 18 is connected with arc fixture block 19, and the trailing flank of front side second bearing seat 18 also connects There are arc fixture block 19, the right side of transverse slat 3 that motor 20 is installed, the output shaft of motor 20 is connected with the second cone tooth by shaft coupling Wheel 21, second bevel gear 21 is engaged with first bevel gear 10.
Further include have the second sliding rail 22, the second sliding block 23, fixed block 24, spring 25, connecting rod 26, hairbrush 27, it is electronic around The left side of line wheel 28 and drawstring 29, connecting plate 12 is connected with the second sliding rail 22, and the second sliding rail 22 is equipped with the second sliding block 23, the The rear portion of two sliding rails, 22 left side is connected with fixed block 24, connects between the leading flank of fixed block 24 and the trailing flank of the second sliding block 23 It is connected to spring 25, the left side of the second sliding block 23 is connected with connecting rod 26, and the bottom end of connecting rod 26 is connected with hairbrush 27, and second slides Electronic reel 28 is installed on rear side of 22 bottom of rail, drawstring 29, the end of drawstring 29 and connection are wound on electronic reel 28 The top of 26 trailing flank of bar connects.
Embodiment 3
A kind of bridge construction cementation of fissures ancillary equipment includes as shown in figures 1 to 6 pedestal 1, support plate 2, transverse slat 3, first Sliding rail 4, the first sliding block 5, support plate 6, first bearing seat 7, lead screw 8, screw 9, first bevel gear 10, riser 11, connecting plate 12, case Body 13, L shaped plate 15, nut 16, T shapes screw rod 17, second bearing seat 18, arc fixture block 19, motor 20 and second bevel gear 21, bottom The top of seat 1 is connected with support plate 2, and the top of 2 leading flank of support plate is connected with transverse slat 3, and the bottom of transverse slat 3 is connected with the first cunning Rail 4, the first sliding rail 4 are equipped with the first sliding block 5, and 3 bottom of transverse slat of 4 left and right sides of the first sliding rail is respectively connected with support plate 6, support plate 6 Bottom first bearing seat 7 is installed, be connected with lead screw 8 between two first bearing seats 7, lead screw 8 is equipped with screw 9, lead screw 8 Right part be connected with first bevel gear 10, the bottom of screw 9 is connected with riser 11, and the bottom of riser 11 is connected with connecting plate 12, The right side of connecting plate 12 is connected with babinet 13, and the middle part of 13 front and rear sides of babinet is provided with opening 14, the case in 14 left side of opening 13 front and rear sides of body are respectively connected with L shaped plate 15, and the right side of L shaped plate 15 is connected with nut 16, T shape screw rods are equipped in nut 16 17, the front end of rear side T shapes screw rod 17 is equipped with second bearing seat 18, and the rear end of front side T shapes screw rod 17 is also equipped with second bearing Seat 18, the leading flank of rear side second bearing seat 18 is connected with arc fixture block 19, and the trailing flank of front side second bearing seat 18 also connects There are arc fixture block 19, the right side of transverse slat 3 that motor 20 is installed, the output shaft of motor 20 is connected with the second cone tooth by shaft coupling Wheel 21, second bevel gear 21 is engaged with first bevel gear 10.
Further include have the second sliding rail 22, the second sliding block 23, fixed block 24, spring 25, connecting rod 26, hairbrush 27, it is electronic around The left side of line wheel 28 and drawstring 29, connecting plate 12 is connected with the second sliding rail 22, and the second sliding rail 22 is equipped with the second sliding block 23, the The rear portion of two sliding rails, 22 left side is connected with fixed block 24, connects between the leading flank of fixed block 24 and the trailing flank of the second sliding block 23 It is connected to spring 25, the left side of the second sliding block 23 is connected with connecting rod 26, and the bottom end of connecting rod 26 is connected with hairbrush 27, and second slides Electronic reel 28 is installed on rear side of 22 bottom of rail, drawstring 29, the end of drawstring 29 and connection are wound on electronic reel 28 The top of 26 trailing flank of bar connects.
Further include having mounting plate 30, air pump 31, air inlet pipe 32, escape pipe 33 and nozzle 34, the right side connection of babinet 13 There are mounting plate 30, the right side at 30 top of mounting plate that air pump 31 is installed, air inlet pipe 32 is connected on air pump 31, is connected on air pump 31 There are escape pipe 33, the end of escape pipe 33 to be connected with nozzle 34.
Embodiment 4
A kind of bridge construction cementation of fissures ancillary equipment includes as shown in figures 1 to 6 pedestal 1, support plate 2, transverse slat 3, first Sliding rail 4, the first sliding block 5, support plate 6, first bearing seat 7, lead screw 8, screw 9, first bevel gear 10, riser 11, connecting plate 12, case Body 13, L shaped plate 15, nut 16, T shapes screw rod 17, second bearing seat 18, arc fixture block 19, motor 20 and second bevel gear 21, bottom The top of seat 1 is connected with support plate 2, and the top of 2 leading flank of support plate is connected with transverse slat 3, and the bottom of transverse slat 3 is connected with the first cunning Rail 4, the first sliding rail 4 are equipped with the first sliding block 5, and 3 bottom of transverse slat of 4 left and right sides of the first sliding rail is respectively connected with support plate 6, support plate 6 Bottom first bearing seat 7 is installed, be connected with lead screw 8 between two first bearing seats 7, lead screw 8 is equipped with screw 9, lead screw 8 Right part be connected with first bevel gear 10, the bottom of screw 9 is connected with riser 11, and the bottom of riser 11 is connected with connecting plate 12, The right side of connecting plate 12 is connected with babinet 13, and the middle part of 13 front and rear sides of babinet is provided with opening 14, the case in 14 left side of opening 13 front and rear sides of body are respectively connected with L shaped plate 15, and the right side of L shaped plate 15 is connected with nut 16, T shape screw rods are equipped in nut 16 17, the front end of rear side T shapes screw rod 17 is equipped with second bearing seat 18, and the rear end of front side T shapes screw rod 17 is also equipped with second bearing Seat 18, the leading flank of rear side second bearing seat 18 is connected with arc fixture block 19, and the trailing flank of front side second bearing seat 18 also connects There are arc fixture block 19, the right side of transverse slat 3 that motor 20 is installed, the output shaft of motor 20 is connected with the second cone tooth by shaft coupling Wheel 21, second bevel gear 21 is engaged with first bevel gear 10.
Further include have the second sliding rail 22, the second sliding block 23, fixed block 24, spring 25, connecting rod 26, hairbrush 27, it is electronic around The left side of line wheel 28 and drawstring 29, connecting plate 12 is connected with the second sliding rail 22, and the second sliding rail 22 is equipped with the second sliding block 23, the The rear portion of two sliding rails, 22 left side is connected with fixed block 24, connects between the leading flank of fixed block 24 and the trailing flank of the second sliding block 23 It is connected to spring 25, the left side of the second sliding block 23 is connected with connecting rod 26, and the bottom end of connecting rod 26 is connected with hairbrush 27, and second slides Electronic reel 28 is installed on rear side of 22 bottom of rail, drawstring 29, the end of drawstring 29 and connection are wound on electronic reel 28 The top of 26 trailing flank of bar connects.
Further include having mounting plate 30, air pump 31, air inlet pipe 32, escape pipe 33 and nozzle 34, the right side connection of babinet 13 There are mounting plate 30, the right side at 30 top of mounting plate that air pump 31 is installed, air inlet pipe 32 is connected on air pump 31, is connected on air pump 31 There are escape pipe 33, the end of escape pipe 33 to be connected with nozzle 34.
Further include having arc case 35, shell 36 and heating wire 37, the left side at 30 top of mounting plate is connected with arc case 35, into The end of tracheae 32 is located in arc case 35, and the bottom in 32 left and right sides arc case 35 of air inlet pipe is respectively connected with shell 36, shell Heating wire 37 is equipped in body 36.
Operation principle:When needing to carrying out the cementation of fissures at bridge joint-cutting, manually while two T shapes screw rods 17 are turned clockwise So that two arc fixture blocks 19 is separated from each other, then between thermic lance is manually placed into two arc fixture blocks 19, then it is artificial simultaneously Two T shapes screw rods 17 are turned counterclockwise, can so make two arc fixture blocks 19 that thermic lance is clamped fixation, then manually start Pouring machine carries out the cementation of fissures to joint-cutting, and manually starting motor 20 makes second bevel gear 21 rotate clockwise, and second bevel gear 21 is suitable Hour hands rotation makes first bevel gear 10 rotate counterclockwise, and first bevel gear 10, which rotates counterclockwise, drives lead screw 8 to rotate counterclockwise, silk Bar 8, which rotates counterclockwise, can be such that screw 9 is moved to the left in the first sliding rail 4 through the first sliding block 5, and it is perpendicular that screw 9 is moved to the left drive Plate 11 is moved to the left, riser 11 be moved to the left drive connecting plate 12 be moved to the left, connecting plate 12 be moved to the left drive babinet 13 to It moves left, babinet 13, which is moved to the left, to drive thermic lance to be moved to the left, and thermic lance, which is moved to the left, to carry out the cementation of fissures to joint-cutting. After the completion of the cementation of fissures, pouring machine and motor 20 are closed.Then manually starting motor 20 makes second bevel gear 21 rotate counterclockwise, from And thermic lance is made to move right reset, it is then shut off motor 20.Then manually the present invention is moved to again and next needs the cementation of fissures Position, and repeat aforesaid operations.Such repetition aforesaid operations can carry out the cementation of fissures and take out thermic lance after the completion of the cementation of fissures .So by the present invention in that thermic lance be moved to the left can to joint-cutting carry out the cementation of fissures, therefore the present invention can economize on resources, Aesthetics, easy to use can be improved.
Because further including having the second sliding rail 22, the second sliding block 23, fixed block 24, spring 25, connecting rod 26, hairbrush 27, electricity The left side of dynamic reel 28 and drawstring 29, connecting plate 12 is connected with the second sliding rail 22, and the second sliding rail 22 is equipped with the second sliding block 23, the rear portion of 22 left side of the second sliding rail is connected with fixed block 24, the trailing flank of the leading flank of fixed block 24 and the second sliding block 23 Between be connected with spring 25, the left side of the second sliding block 23 is connected with connecting rod 26, and the bottom end of connecting rod 26 is connected with hairbrush 27, Electronic reel 28 is installed on rear side of second sliding rail, 22 bottom, drawstring 29, the end of drawstring 29 are wound on electronic reel 28 It is connect with the top of 26 trailing flank of connecting rod.It manually starts electronic reel 28 and withdraws and release drawstring 29, when withdrawal drawstring 29 When connecting rod 26 can be made to be moved backward on the second sliding rail 22 through the second sliding block 23, spring 25 compresses therewith, when release drawstring It when 29, moves forward connecting rod 26 under the action of 25 elastic force of spring and resets, the back-and-forth motion of connecting rod 26 can make hairbrush 27 It being moved forward and backward, the back-and-forth motion of hairbrush 27 can clean ground, can so clear up the sandstone in seam, so as to Enough make the cementation of fissures better, after the completion of the cementation of fissures, manually closes electronic reel 28.
Because further including having mounting plate 30, air pump 31, air inlet pipe 32, escape pipe 33 and nozzle 34, the right side of babinet 13 It is connected with mounting plate 30, the right side at 30 top of mounting plate is equipped with air pump 31, is connected with air inlet pipe 32 on air pump 31, on air pump 31 It is connected with escape pipe 33, the end of escape pipe 33 is connected with nozzle 34.When carrying out the cementation of fissures, manually starting air pump 31 makes air inlet pipe 32 pairs of outside airs are drawn, and are pushed into nozzle 34 through escape pipe 33 after, are finally sprayed on air by nozzle 34 and to have been filled It sews on, the seam rapid draing that filling can so got well, so as to prevent passing automobile from taking away the cementation of fissures raw material in seam, when It is artificial to close air pump 31 after the completion of the cementation of fissures.
Because further including having arc case 35, shell 36 and heating wire 37, the left side at 30 top of mounting plate is connected with arc case 35, the end of air inlet pipe 32 is located in arc case 35, and the bottom in 32 left and right sides arc case 35 of air inlet pipe is respectively connected with shell 36, shell 36 is interior to be equipped with heating wire 37.It manually starts heating wire 37 to be heated, the air that can so draw air inlet pipe 32 It is heated, so as to which more efficiently the seam filled is dried, after the completion of cementation of fissures drying, manually closes heating wire 37。
The preferred embodiment of the present invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously Cannot the limitation to the scope of the claims of the present invention therefore be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (4)

1. a kind of bridge construction cementation of fissures ancillary equipment, which is characterized in that include pedestal (1), support plate (2), transverse slat (3), First sliding rail (4), the first sliding block (5), support plate (6), first bearing seat (7), lead screw (8), screw (9), first bevel gear (10), Riser (11), connecting plate (12), babinet (13), L shaped plate (15), nut (16), T shapes screw rod (17), second bearing seat (18), arc Clevis block (19), motor (20) and second bevel gear (21), are connected with support plate (2) at the top of pedestal (1), before support plate (2) The top of side is connected with transverse slat (3), and the bottom of transverse slat (3) is connected with the first sliding rail (4), and the first sliding rail (4) is equipped with first Sliding block (5), transverse slat (3) bottom at left and right sides of the first sliding rail (4) are respectively connected with support plate (6), and the bottom of support plate (6) is equipped with One bearing block (7) is connected with lead screw (8) between two first bearing seats (7), and lead screw (8) is equipped with screw (9), lead screw (8) Right part is connected with first bevel gear (10), and the bottom of screw (9) is connected with riser (11), and the bottom of riser (11) is connected with connection The right side of plate (12), connecting plate (12) is connected with babinet (13), and the middle part of babinet (13) front and rear sides is provided with opening (14), Babinet (13) front and rear sides on the left of opening (14) are respectively connected with L shaped plate (15), and the right side of L shaped plate (15) is connected with nut (16), T shapes screw rod (17) is equipped in nut (16), the front end of rear side T shapes screw rod (17) is equipped with second bearing seat (18), front side The rear end of T shapes screw rod (17) is also equipped with second bearing seat (18), and the leading flank of rear side second bearing seat (18) is connected with arc The trailing flank of fixture block (19), front side second bearing seat (18) is also connected with arc fixture block (19), and the right side of transverse slat (3) is equipped with The output shaft of motor (20), motor (20) is connected with second bevel gear (21), second bevel gear (21) and first by shaft coupling Bevel gear (10) engages.
2. a kind of bridge construction cementation of fissures ancillary equipment according to claim 1, which is characterized in that further include having the second cunning Rail (22), the second sliding block (23), fixed block (24), spring (25), connecting rod (26), hairbrush (27), electronic reel (28) and The left side of drawstring (29), connecting plate (12) is connected with the second sliding rail (22), and the second sliding rail (22) is equipped with the second sliding block (23), The rear portion of the second sliding rail (22) left side is connected with fixed block (24), after the leading flank and the second sliding block (23) of fixed block (24) Spring (25) is connected between side, the left side of the second sliding block (23) is connected with connecting rod (26), the bottom end of connecting rod (26) Be connected with hairbrush (27), electronic reel (28) be installed on rear side of the second sliding rail (22) bottom, on electronic reel (28) around There are drawstring (29), the end of drawstring (29) to be connect with the top of connecting rod (26) trailing flank.
3. a kind of bridge construction cementation of fissures ancillary equipment according to claim 2, which is characterized in that further include having mounting plate (30), air pump (31), air inlet pipe (32), escape pipe (33) and nozzle (34), the right side of babinet (13) are connected with mounting plate (30), the right side at the top of mounting plate (30) is equipped with air pump (31), is connected with air inlet pipe (32) on air pump (31), on air pump (31) It is connected with escape pipe (33), the end of escape pipe (33) is connected with nozzle (34).
4. a kind of bridge construction cementation of fissures ancillary equipment according to claim 3, which is characterized in that further include having arc case (35), shell (36) and heating wire (37), the left side at the top of mounting plate (30) are connected with arc case (35), the end of air inlet pipe (32) End is located in arc case (35), and the bottom at left and right sides of air inlet pipe (32) in arc case (35) is respectively connected with shell (36), shell (36) heating wire (37) is equipped in.
CN201810371688.2A 2018-04-24 2018-04-24 Crack pouring auxiliary equipment for bridge construction Active CN108589538B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810371688.2A CN108589538B (en) 2018-04-24 2018-04-24 Crack pouring auxiliary equipment for bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810371688.2A CN108589538B (en) 2018-04-24 2018-04-24 Crack pouring auxiliary equipment for bridge construction

Publications (2)

Publication Number Publication Date
CN108589538A true CN108589538A (en) 2018-09-28
CN108589538B CN108589538B (en) 2020-06-12

Family

ID=63614863

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810371688.2A Active CN108589538B (en) 2018-04-24 2018-04-24 Crack pouring auxiliary equipment for bridge construction

Country Status (1)

Country Link
CN (1) CN108589538B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111074735A (en) * 2020-01-20 2020-04-28 苏交科集团股份有限公司 Bridge pavement damage repair and detection equipment
CN112431105A (en) * 2020-11-30 2021-03-02 马征 Asphalt crack pouring device for pavement repair

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0540952A1 (en) * 1991-11-05 1993-05-12 TORKRET GmbH Apparatus for preparing concrete surfaces for glueing reinforcement strips, especially in the interior of box girder bridges
CN205420989U (en) * 2016-03-21 2016-08-03 公为财 Intelligent asphalt pavement pit slot repairing vehicle
CN107174773A (en) * 2017-04-19 2017-09-19 孔向峰 A kind of adjustable type fire-fighting spray gun fixing equipment
CN107457239A (en) * 2017-09-19 2017-12-12 谢斌 One kind generates electricity and uses photovoltaic solar panel cleaning device
CN107932232A (en) * 2017-11-14 2018-04-20 郭昌磊 Stainless-steel sheet deburring equipment is used in a kind of power distribution cabinet production
CN107931167A (en) * 2017-11-14 2018-04-20 饶胜智 A kind of highway communication cone cleaning device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0540952A1 (en) * 1991-11-05 1993-05-12 TORKRET GmbH Apparatus for preparing concrete surfaces for glueing reinforcement strips, especially in the interior of box girder bridges
CN205420989U (en) * 2016-03-21 2016-08-03 公为财 Intelligent asphalt pavement pit slot repairing vehicle
CN107174773A (en) * 2017-04-19 2017-09-19 孔向峰 A kind of adjustable type fire-fighting spray gun fixing equipment
CN107457239A (en) * 2017-09-19 2017-12-12 谢斌 One kind generates electricity and uses photovoltaic solar panel cleaning device
CN107932232A (en) * 2017-11-14 2018-04-20 郭昌磊 Stainless-steel sheet deburring equipment is used in a kind of power distribution cabinet production
CN107931167A (en) * 2017-11-14 2018-04-20 饶胜智 A kind of highway communication cone cleaning device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111074735A (en) * 2020-01-20 2020-04-28 苏交科集团股份有限公司 Bridge pavement damage repair and detection equipment
CN111074735B (en) * 2020-01-20 2021-07-02 苏交科集团股份有限公司 Bridge pavement damage repair and detection equipment
WO2021147242A1 (en) * 2020-01-20 2021-07-29 苏交科集团股份有限公司 Damage detection and repair apparatus for bridge road surface
CN112431105A (en) * 2020-11-30 2021-03-02 马征 Asphalt crack pouring device for pavement repair
CN112431105B (en) * 2020-11-30 2022-06-21 湖南书堂山建设有限公司 Asphalt crack pouring device for pavement repair

Also Published As

Publication number Publication date
CN108589538B (en) 2020-06-12

Similar Documents

Publication Publication Date Title
CN110359347A (en) A kind of municipal works road gap-grouting device of easy cleaning defective material
CN108589538A (en) A kind of bridge construction cementation of fissures ancillary equipment
CN210737319U (en) Road crack pouring device for municipal works convenient for cleaning residual materials
CN105887641B (en) A kind of application method of road-surface joint-grouting machine feeding device and its device
CN107791372A (en) A kind of concrete curing means
CN109653421B (en) Construction method for casting floor on site
CN112588742A (en) Concrete pouring pipeline cleaning equipment for building foundation
CN211446523U (en) Road maintenance is with slip casting pouring device
CN211547247U (en) Road cementation of fissures device for municipal works
CN206090267U (en) Highway is cementation of fissures device for engineering
CN112267468A (en) Grouting device for rectifying and reinforcing building
CN113134900B (en) Nail ring device is pulled out to package thick liquid foaming heated board rotation type
CN213896695U (en) Political affairs are with road surface repair with pouring machine
CN204325886U (en) A kind of road quick-restoring device
CN204435190U (en) Multifunction cement filling cut of asphaltum road surface caulking machine
CN208869333U (en) A kind of concrete waste water treatment facilities
CN213499957U (en) Concrete grouting pipe easy to clean
CN219157361U (en) Highway engineering maintenance is with portable watering device
CN216341151U (en) Grouting equipment for repairing wall leakage
CN216141867U (en) Maintenance device for cement-based road pavement
CN220620910U (en) Building wall plastering device
CN215289635U (en) Road patching material heating device
CN217536732U (en) Bridge expansion joint repairing device
CN214556028U (en) Concrete hopper with cleaning function
CN213563356U (en) Evaporate and press aerated concrete block curing means

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20200521

Address after: 325000 room 233, floor 2, Huachang building, Chezhan Avenue, Nanhui street, Lucheng District, Wenzhou City, Zhejiang Province

Applicant after: Wenzhou motailun Industrial Design Co., Ltd

Address before: 712100 Shaanxi city of Xianyang province Yangling District Tai Road No. 3

Applicant before: Lu Xianfu

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201116

Address after: Room 407-151, block B, software building, No.9 Xinghuo Road, Jiangbei new district, Nanjing, Jiangsu Province

Patentee after: Nanjing Kehuan Mingde Information Technology Co.,Ltd.

Address before: 325000 room 233, floor 2, Huachang building, Chezhan Avenue, Nanhui street, Lucheng District, Wenzhou City, Zhejiang Province

Patentee before: Wenzhou motailun Industrial Design Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201120

Address after: 224600 Chenjiagang Coastal Economic Development Zone, Xiangshui County, Yancheng City, Jiangsu Province

Patentee after: Xiangshui Fuxing Concrete Co., Ltd

Address before: Room 407-151, block B, software building, No.9 Xinghuo Road, Jiangbei new district, Nanjing, Jiangsu Province

Patentee before: Nanjing Kehuan Mingde Information Technology Co.,Ltd.

TR01 Transfer of patent right