CN108583353A - A kind of new-energy automobile charge timing alert device - Google Patents

A kind of new-energy automobile charge timing alert device Download PDF

Info

Publication number
CN108583353A
CN108583353A CN201810696838.7A CN201810696838A CN108583353A CN 108583353 A CN108583353 A CN 108583353A CN 201810696838 A CN201810696838 A CN 201810696838A CN 108583353 A CN108583353 A CN 108583353A
Authority
CN
China
Prior art keywords
water
water tank
pedestal
new
energy automobile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810696838.7A
Other languages
Chinese (zh)
Inventor
朱娟娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810696838.7A priority Critical patent/CN108583353A/en
Publication of CN108583353A publication Critical patent/CN108583353A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/30Constructional details of charging stations
    • B60L53/31Charging columns specially adapted for electric vehicles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60SSERVICING, CLEANING, REPAIRING, SUPPORTING, LIFTING, OR MANOEUVRING OF VEHICLES, NOT OTHERWISE PROVIDED FOR
    • B60S3/00Vehicle cleaning apparatus not integral with vehicles
    • B60S3/04Vehicle cleaning apparatus not integral with vehicles for exteriors of land vehicles
    • B60S3/044Hand-held cleaning arrangements with liquid or gas distributing means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2250/00Driver interactions
    • B60L2250/10Driver interactions by alarm
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/7072Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/12Electric charging stations

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Power Engineering (AREA)
  • Transportation (AREA)
  • Details Of Rigid Or Semi-Rigid Containers (AREA)

Abstract

The invention discloses a kind of new-energy automobile charge timing alert devices; including pedestal; the pedestal interior welds have partition board, the upper surface of partition board to be equipped with the first water tank, the second water tank is equipped on the pedestal below partition board; the outer surface of pedestal is connected with buzzer; protective shell is installed, the side of first water tank is connected with water inlet pipe, inlet valve is equipped on water inlet pipe on the pedestal below buzzer; the bottom surface of first water tank is connected with water outlet, and water outlet runs through partition board.New-energy automobile charge timing alert device proposed by the present invention, it is provided with the first water tank and the second water tank, inlet valve is installed on the water inlet pipe of the first water tank, rotating handles are connect with straight-bar by drawstring, the second floating ball follows water level to move up, and the other end of straight-bar moves down, buzzer is pressed aloud using the buoyancy of water, drawstring is pulled simultaneously, is closed inlet valve, is prevented water waste.

Description

A kind of new-energy automobile charge timing alert device
Technical field
The present invention relates to technical field, more particularly to a kind of new-energy automobile charge timing alert device.
Background technology
New-energy automobile refer to using unconventional vehicle fuel as a source of power (or using conventional vehicle fuel, Using new vehicle-mounted power plant), the technical principle of the dynamic Control and the advanced technology in terms of driving of comprehensive vehicle, formation is first Into, the automobile with new technology, new construction.New-energy automobile includes four major types mixed power electric car (HEV), pure electric vehicle Automobile (BEV, including solar telephone), fuel cell electric vehicle (FCEV), other new energy (such as ultracapacitors, flywheel Etc. high-efficiency energy storage vehicles) automobile etc..Unconventional vehicle fuel refer to except gasoline, diesel oil, natural gas (NG), liquefied petroleum gas (LPG), Fuel except ethanol petrol (EG), methanol, dimethyl ether.
People often forget to pull out charging wire when charging to new-energy automobile, to which new-energy automobile can be caused to charge Overlong time although new-energy automobile has overshoot protection device at present turns to recharge for a long time after lamp that battery dehydration can be caused, Long-term so battery life can have a great impact.It especially so charges in the later stage in service life, battery is easy to thermal runaway, Ke Nengyin Dieseling is sent out, and overcharge can cause grid corrosion to accelerate, so that the service life of new-energy automobile can be shortened, therefore there is an urgent need for Research and develop one kind can timed reminding people, new energy car battery can be protected, can reduce that new-energy automobile spontaneous combustion occurs is existing As the new-energy automobile charge timing alarm set of the service life of new-energy automobile can be extended.
Invention content
Invention is designed to provide a kind of new-energy automobile charge timing alert device, can charge and determine to automobile When remind, complete timing after, can be automatically stopped, to solve the problems mentioned in the above background technology.
To achieve the above object, the present invention provides the following technical solutions:A kind of new-energy automobile charge timing alert device, Including pedestal, the pedestal interior welds have partition board, the upper surface of partition board to be equipped with the first water tank, pacify on the pedestal below partition board Equipped with the second water tank, the outer surface of pedestal is connected with buzzer, is equipped with protective shell on the pedestal below buzzer, and described The side of one water tank is connected with water inlet pipe, and inlet valve is equipped on water inlet pipe, and the bottom surface of the first water tank is connected with water outlet, goes out Partition board is run through at the mouth of a river, and the lower end of water outlet is connected with discharging device, valve ball is equipped with inside the inlet valve, is opened up on valve ball There are the through-hole through valve ball, the upper end of valve ball to be connected with rotating handles by turning round, one end of rotating handles offers circular hole, circular hole It is inside connected with drawstring, the upper end of the discharging device is connected with flowing water Valve, connects on the discharging device inner wall below flowing water Valve It is connected to raised circle, the lower end of discharging device is connected with leak pipe, and the lower end of leak pipe, which is connected with, slips through the net, and is placed in leak pipe One floating ball, leak pipe extend in the second water tank, and the bottom in second water tank is equipped with suction pump, the side wall of the second water tank On be connected with installation ear, install and shaft be installed on ear, be fixedly connected with straight-bar in shaft, one end of straight-bar is connected with the The other end of two floating balls, straight-bar is equipped with idler wheel, and the side of idler wheel is contacted with plate is started, and straight-bar is close to one end upper surface of idler wheel It is connected with fixed block, one end connection of fixed block and drawstring, the side for starting plate is connected with portable pillar, and portable pillar runs through base Frame outer wall, portable pillar are located at one end inside pedestal and are cased with spring, and the other end of portable pillar is placed in inside protective shell, protective shell Buzzer button is installed, one end of the suction pump is connected with drinking-water pipe, and drinking-water pipe is connected with back by triple valve on inner wall Pedestal and the first water tank are run through in one end of water pipe and hose, return pipe, and extend to the inside of the first water tank, and one end of hose connects It is connected to nozzle.
Preferably, the inlet valve is located at the surface of idler wheel, and drawstring runs through partition board.
Preferably, the buzzer is electrically connected with buzzer button.
Preferably, the portable pillar is located at one end face buzzer button inside protective shell.
Preferably, the diameter of first floating ball is less than the diameter of discharging device, is more than the diameter of protrusion circle.
Preferably, the tube wall of the leak pipe designs for engraved structure.
Compared with prior art, the beneficial effects of the invention are as follows:New-energy automobile charge timing proposed by the present invention is reminded Equipment is provided with the first water tank and the second water tank, and inlet valve is installed on the water inlet pipe of the first water tank, will be rotated by drawstring Handle is connect with straight-bar, and the second floating ball follows water level to move up, and the other end of straight-bar moves down, and is pressed buzzer using the buoyancy of water It rings, while pulling drawstring, close inlet valve, prevent water waste;Discharging device is installed on the outlet pipe of the first water tank, The lower end of discharging device is equipped with floating ball, and also with the buoyancy of water, floating ball follows water level to rise, when floating ball is moved to raised circle When, protrusion circle is blocked, prevents the water source in the first water tank to enter in the second water tank in time, the second Water in Water Tanks body is avoided to cross spill-over Go out.
Description of the drawings
Fig. 1 is the overall structure figure of the present invention;
Fig. 2 is the inlet valve structure chart of the present invention;
Fig. 3 is the straight-bar installation diagram of the present invention;
Fig. 4 is the discharging device structure chart of the present invention;
Fig. 5 is the discharging device vertical view of the present invention.
In figure:1, pedestal;11, partition board;2, the first water tank;21, water inlet pipe;22, inlet valve;221, valve ball;222, lead to Hole;223, axis is turned round;224, rotating handles;225, circular hole;23, water outlet;3, the second water tank;31, ear is installed;32, shaft; 33, straight-bar;34, the second floating ball;35, idler wheel;36, fixed block;4, buzzer;5, protective shell;51, start plate;52, portable pillar; 53, spring;54, buzzer button;6, discharging device;61, flowing water Valve;62, protrusion circle;63, leak pipe;64, it slips through the net;65、 First floating ball;7, drawstring;8, suction pump;81, drinking-water pipe;82, triple valve;83, return pipe;84, hose;85, nozzle.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
- 5 are please referred to Fig.1, a kind of new-energy automobile charge timing alert device, including pedestal 1,1 interior welds of pedestal have The upper surface of partition board 11, partition board 11 is equipped with the first water tank 2, and the second water tank 3, pedestal 1 are equipped on the pedestal 1 of 11 lower section of partition board Outer surface be connected with buzzer 4, protective shell 5, the side connection of the first water tank 2 are installed on the pedestal 1 of 4 lower section of buzzer There is water inlet pipe 21, inlet valve 22 is installed on water inlet pipe 21, the bottom surface of the first water tank 2 is connected with water outlet 23, water outlet 23 Through partition board 11, the lower end of water outlet 23 is connected with discharging device 6, and valve ball 221, valve ball 221 are equipped with inside inlet valve 22 On offer through-hole 222 through valve ball 221, the upper end of valve ball 221 is connected with rotating handles 224 by turning round axis 223, rotates handle One end of hand 224 offers circular hole 225, and drawstring 7 is connected in circular hole 225, by rotating rotating handles 224, drives valve ball 221 Rotation, when through-hole 222 is consistent with the direction of 22 both ends nozzle of inlet valve, inlet valve 22 open, at this time rotating handles 224 and Inlet valve 22 is parallel, and water body is entered by water inlet pipe 21 in the first water tank 2, and the upper end of discharging device 6 is connected with flowing water Valve 61, protrusion circle 62 is connected on 6 inner wall of discharging device of the lower section of flowing water Valve 61, and the lower end of discharging device 6 is connected with leak pipe 63, the lower end of leak pipe 63, which is connected with, slips through the net 64, the first floating ball 65 is placed in leak pipe 63, the diameter of the first floating ball 65 is less than The diameter of discharging device 6 is more than the diameter of protrusion circle 62, and leak pipe 63 extends in the second water tank 3, opens flowing water Valve 61, Water body in first water tank 2 is entered by water outlet 23 in the second water tank 3, and the tube wall of leak pipe 63 designs for engraved structure, no Flow can be obstructed, when the water in the second water tank 3 gradually increases, and water level rises to the position of the first floating ball 65, the first floating ball 65 Under the action of buoyancy, water level is followed to go up, until the first floating ball 65 goes up to protrusion circle 62, it is straight due to the first floating ball 65 Diameter is more than the diameter of protrusion circle 62, therefore the first floating ball 65 62 blocks protrusion circle, and the water body in the first water tank 2 cannot enter the In two water tanks 3, prevents the water body overfill in the second water tank 3 from overflowing, water waste, the bottom in the second water tank 3 is caused to be equipped with Suction pump 8 is connected with installation ear 31 on the side wall of second water tank 3, installs and is equipped with shaft 32 on ear 31, solid in shaft 32 Surely it is connected with straight-bar 33, one end of straight-bar 33 is connected with the second floating ball 34, and the other end of straight-bar 33 is equipped with idler wheel 35, idler wheel 35 Side contacted with plate 51 is started, straight-bar 33 is connected with fixed block 36 close to one end upper surface of idler wheel 35, fixed block 36 with draw One end connection of rope 7, inlet valve 22 are located at the surface of idler wheel 35, and drawstring 7 runs through partition board 11, start the side connection of plate 51 There are portable pillar 52, portable pillar 52 to run through 1 outer wall of pedestal, one end that portable pillar 52 is located inside pedestal 1 is cased with spring 53, portable pillar 52 other end is placed in inside protective shell 5, and buzzer button 54 is equipped on the inner wall of protective shell 5, and buzzer 4 is pressed with buzzer Button 54 is electrically connected, and portable pillar 52 is located at one end face buzzer button 54 inside protective shell 5, the water level in the second water tank 3 When rise, the second floating ball 34 is driven to move up, the idler wheel 35 of 33 other end of straight-bar moves down, started by press plate 51, in the work of spring 53 Under, portable pillar 52 is moved to the direction of buzzer button 54, is pressed into buzzer button 54, and buzzer 4 sends out alarm, is prompted Charging complete, idler wheel 35 move down simultaneously, and drawstring 7 moves down, and pull rotating handles 224, until rotating handles 224 and inlet valve 22 Vertically, inlet valve 22 is closed, the no longer water inlet in the first water tank 2 of water inlet pipe 21, ensures to facilitate weight in the first water tank 2 for sky The water source in the second water tank 3, one end of suction pump 8 is utilized to be connected with drinking-water pipe 81 again, drinking-water pipe 81 is connected by triple valve 82 There are return pipe 83 and hose 84, pedestal 1 and the first water tank 2 are run through in one end of return pipe 83, and extend to the interior of the first water tank 2 The one end in portion, hose 84 is connected with nozzle 85, and the water source in the second water tank 3 can be pumped into the first water tank 2 by suction pump 8, Recycling, can also be by nozzle 85 for rinsing vehicle.
The course of work:By rotating rotating handles 224, valve ball 221 is driven to rotate, through-hole 222 and 22 both ends of inlet valve When the direction of nozzle is consistent, inlet valve 22 is opened, and rotating handles 224 are parallel with inlet valve 22 at this time, opens flowing water Valve 61, water body is entered by water inlet pipe 21 in the first water tank 2, and the water body in the first water tank 2 enters the second water tank 3 by water outlet 23 It is interior, when the water level in the second water tank 3 goes up, drive the second floating ball 34 to move up, the idler wheel 35 of 33 other end of straight-bar moves down, and pressing is opened Movable plate 51, under the action of spring 53, portable pillar 52 is moved to the direction of buzzer button 54, is pressed into buzzer button 54, Buzzer 4 sends out alarm, and charging complete, idler wheel 35 is prompted to move down simultaneously, and drawstring 7 moves down, and pulls rotating handles 224, until rotation Handle hand 224 is vertical with inlet valve 22, and inlet valve 22 is closed, the no longer water inlet in the first water tank 2 of water inlet pipe 21, leak pipe 63 tube wall designs for engraved structure, will not obstruct flow, and when the water in the second water tank 3 gradually increases, water level rises to first When the position of floating ball 65, the first floating ball 65 follows water level to go up under the action of buoyancy, until the first floating ball 65 goes up to protrusion It encloses at 62, since the diameter of the first floating ball 65 is more than the diameter of protrusion circle 62, the first floating ball 65 blocks protrusion circle 62, the Water body in one water tank 2 cannot enter in the second water tank 3, prevent the water body overfill in the second water tank 3 from overflowing, and cause water source unrestrained Take, the water source in second water tank 3 can be pumped into the first water tank 2 by suction pump 8, recycling can also pass through nozzle 85 For rinsing vehicle.
In conclusion new-energy automobile charge timing alert device proposed by the present invention, is provided with the first water tank 2 and second Water tank 3 installs inlet valve 22 on the water inlet pipe 21 of the first water tank 2, is connected rotating handles 224 and straight-bar 33 by drawstring 7 It connects, the second floating ball 34 follows water level to move up, and the other end of straight-bar 33 moves down, and presses buzzer 4 aloud using the buoyancy of water, draws simultaneously Dynamic drawstring 7, closes inlet valve 22, prevents water waste;Discharging device 6 is installed on the water outlet 23 of the first water tank 2, is gone out The lower end of water installations 6 is equipped with the first floating ball 65, and also with the buoyancy of water, the first floating ball 65 follows water level to rise, when first When floating ball 65 is moved to protrusion circle 62, protrusion circle 62 is blocked, the water source in the first water tank 2 is prevented to enter in the second water tank 3 in time, Water body overfill in the second water tank 3 is avoided to overflow.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Any one skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (6)

1. a kind of new-energy automobile charge timing alert device, including pedestal (1), it is characterised in that:Weldering inside the pedestal (1) It is connected to partition board (11), the upper surface of partition board (11) is equipped with the first water tank (2), is equipped on the pedestal (1) below partition board (11) The outer surface of second water tank (3), pedestal (1) is connected with buzzer (4), and guarantor is equipped on the pedestal (1) below buzzer (4) The side of protective case (5), first water tank (2) is connected with water inlet pipe (21), and inlet valve (22) is equipped on water inlet pipe (21), The bottom surface of first water tank (2) is connected with water outlet (23), and water outlet (23) runs through partition board (11), and the lower end of water outlet (23) connects There is discharging device (6), valve ball (221) is installed inside the inlet valve (22), valve ball offers on (221) through valve ball (221) upper end of through-hole (222), valve ball (221) is connected with rotating handles (224), rotating handles by turning round axis (223) (224) one end offers circular hole (225), and drawstring (7), the upper end connection of the discharging device (6) are connected in circular hole (225) There is flowing water Valve (61), protrusion circle (62), discharging device are connected on discharging device (6) inner wall below flowing water Valve (61) (6) lower end is connected with leak pipe (63), and the lower end of leak pipe (63) is connected with slip through the net (64), and the is placed in leak pipe (63) One floating ball (65), leak pipe (63) extend in the second water tank (3), and the bottom in second water tank (3) is equipped with suction pump (8), it is connected with installation ear (31) on the side wall of the second water tank (3), shaft (32), shaft are installed on installation ear (31) (32) straight-bar (33) is fixedly connected on, one end of straight-bar (33) is connected with the second floating ball (34), the other end peace of straight-bar (33) Equipped with idler wheel (35), the side of idler wheel (35) is contacted with plate (51) is started, and straight-bar (33) is close to one end upper surface of idler wheel (35) It is connected with fixed block (36), fixed block (36) is connect with one end of drawstring (7), and the side for starting plate (51) is connected with activity Column (52), portable pillar (52) run through pedestal (1) outer wall, and portable pillar (52) is located at the internal one end of pedestal (1) and is cased with spring (53), The other end of portable pillar (52) is placed in protective shell (5) inside, and buzzer button (54), institute are equipped on the inner wall of protective shell (5) The one end for stating suction pump (8) is connected with drinking-water pipe (81), drinking-water pipe (81) by triple valve (82) be connected with return pipe (83) and Pedestal (1) and the first water tank (2) are run through in one end of hose (84), return pipe (83), and extend to the inside of the first water tank (2), One end of hose (84) is connected with nozzle (85).
2. a kind of new-energy automobile charge timing alert device according to claim 1, it is characterised in that:The inlet valve Door (22) is located at the surface of idler wheel (35), and drawstring (7) runs through partition board (11).
3. a kind of new-energy automobile charge timing alert device according to claim 1, it is characterised in that:The buzzer (4) it is electrically connected with buzzer button (54).
4. a kind of new-energy automobile charge timing alert device according to claim 1, it is characterised in that:The portable pillar (52) it is located at the internal one end face buzzer button (54) of protective shell (5).
5. a kind of new-energy automobile charge timing alert device according to claim 1, it is characterised in that:Described first is floating The diameter of ball (65) is less than the diameter of discharging device (6), is more than the diameter of protrusion circle (62).
6. a kind of new-energy automobile charge timing alert device according to claim 1, it is characterised in that:The leak pipe (63) tube wall designs for engraved structure.
CN201810696838.7A 2018-06-29 2018-06-29 A kind of new-energy automobile charge timing alert device Withdrawn CN108583353A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810696838.7A CN108583353A (en) 2018-06-29 2018-06-29 A kind of new-energy automobile charge timing alert device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810696838.7A CN108583353A (en) 2018-06-29 2018-06-29 A kind of new-energy automobile charge timing alert device

Publications (1)

Publication Number Publication Date
CN108583353A true CN108583353A (en) 2018-09-28

Family

ID=63634516

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810696838.7A Withdrawn CN108583353A (en) 2018-06-29 2018-06-29 A kind of new-energy automobile charge timing alert device

Country Status (1)

Country Link
CN (1) CN108583353A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109466355A (en) * 2018-12-04 2019-03-15 贺基乾 A kind of new-energy automobile with charge reminder function

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109466355A (en) * 2018-12-04 2019-03-15 贺基乾 A kind of new-energy automobile with charge reminder function

Similar Documents

Publication Publication Date Title
CN206471863U (en) A kind of quick charge stake of electric automobile
CN206344701U (en) A kind of electric automobile charging pile based on Internet of Things
CN209521566U (en) A kind of intelligent charging spot of automatic protection
CN208665001U (en) A kind of Multifunctional new energy automobile charging pile
CN108583353A (en) A kind of new-energy automobile charge timing alert device
CN112078402B (en) Electric automobile fills electric pile with rolling function
CN211442001U (en) Pull formula car fills electric pile
CN208498279U (en) A kind of New-type charge stake
CN201742126U (en) Waterproof anti-unplugging device for charging plug of charging pile of electric vehicle
CN201160093Y (en) Automatic liquid feeding accumulator
CN207241455U (en) A kind of outdoor multifunctional DC intelligent charging pile
CN206865170U (en) A kind of compound charging device of electric automobile
CN115257427A (en) New energy automobile fills electric pile
CN206719012U (en) A kind of new-energy automobile charge timing alarm set
CN201397855Y (en) Automatic liquid feeding and draining accumulator cell
CN202863136U (en) Anti-theft anti-overflowing oil tank
CN110027422A (en) Electric car special intelligent charging berth
CN210234705U (en) Temperature monitoring and automatic fire extinguishing's electric pile that fills
CN206353659U (en) A kind of charging pile direct-current power distribution cabinet
CN206349773U (en) A kind of environment-friendly type charging pile for being easy to collect rainwater
CN2311731Y (en) Automatic water supplying device for solar energy water heater
CN108777274A (en) A kind of Multifunctional vehicle-borne battery explosion-proof tank
CN212046980U (en) New energy charging pile
CN212098505U (en) Novel fill electric pile
CN218562532U (en) Safety well lid for road

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20180928

WW01 Invention patent application withdrawn after publication