CN108574636A - A kind of tunnel authorization information processing method and path-calculating element - Google Patents

A kind of tunnel authorization information processing method and path-calculating element Download PDF

Info

Publication number
CN108574636A
CN108574636A CN201710147063.3A CN201710147063A CN108574636A CN 108574636 A CN108574636 A CN 108574636A CN 201710147063 A CN201710147063 A CN 201710147063A CN 108574636 A CN108574636 A CN 108574636A
Authority
CN
China
Prior art keywords
tunnel
pce
pcc
mandate
authorization
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710147063.3A
Other languages
Chinese (zh)
Other versions
CN108574636B (en
Inventor
朱春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201710147063.3A priority Critical patent/CN108574636B/en
Priority to PCT/CN2018/077727 priority patent/WO2018166353A1/en
Publication of CN108574636A publication Critical patent/CN108574636A/en
Application granted granted Critical
Publication of CN108574636B publication Critical patent/CN108574636B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L45/00Routing or path finding of packets in data switching networks
    • H04L45/02Topology update or discovery
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L45/00Routing or path finding of packets in data switching networks
    • H04L45/30Routing of multiclass traffic
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L47/00Traffic control in data switching networks
    • H04L47/70Admission control; Resource allocation
    • H04L47/82Miscellaneous aspects
    • H04L47/825Involving tunnels, e.g. MPLS

Abstract

The invention discloses a kind of tunnel authorization information processing methods, including:Path-calculating element (PCE) receives the tunnel authorization request that at least one path calculating client (PCC) sends, to authorize established tunnel to the PCE;Judge whether preset tunnel authorization condition is met based on tunnel authorization request;When determining that the preset tunnel authorization condition is unmet, the first message for carrying the first key message is sent at least one PCC, so that at least one PCC knows the ability that the PCE receives the tunnel authorization request of itself;Wherein, first key message includes at least one following information:The mandate overloading information of the PCE, receivable mandate PCC identification informations, receivable mandate tunnel identification information.The present invention further simultaneously discloses a kind of PCE.

Description

A kind of tunnel authorization information processing method and path-calculating element
Technical field
The present invention relates to data communication technology field more particularly to a kind of tunnel authorization information processing method and path computings Unit (PCE, Path Compute Element).
Background technology
With the development of software defined network (SDN, Software Defined Network) technology, PCE is not only As concentrate calculate road serviced component, can also active to path calculating client (PCC, Path Computation Client the tunnel) having built up carries out Dynamic Programming and tuning work, i.e. the tunnel that PCC has been created can license to PCE, Then PCE can update the routing information in tunnel as needed.However, since PCC can not know that PCE can currently receive itself The case where tunnel authorization of transmission, result in PCE have rejected itself transmission tunnel authorization request after, can also repeat to this PCE authorizes established tunnel, thereby reduces the working efficiency of PCC and PCE.
Therefore it provides a kind of tunnel authorization information processing scheme, can make PCC learn that PCE can receive the tunnel of itself and award Weigh the ability of request, it has also become technical problem urgently to be resolved hurrily.
Invention content
A kind of tunnel authorization information processing method of offer of the embodiment of the present invention and PCE, solve at least and deposit in the prior art The problem of, PCC can be made to know the case where PCE currently can receive the tunnel authorization of itself, improve the work effect of PCC and PCE Rate.
What the technical solution of the embodiment of the present invention was realized in:
An embodiment of the present invention provides a kind of tunnel authorization information processing methods, are applied to PCE, the method includes:
Receive the tunnel authorization request that at least one PCC is sent;The tunnel authorization request is used at least one PCC Authorize established tunnel to the PCE;
Judge whether preset tunnel authorization condition is met based on tunnel authorization request;
When determining that the preset tunnel authorization condition is unmet, the first message for carrying the first key message is sent To at least one PCC, so that at least one PCC knows the ability that the PCE receives the tunnel authorization request of itself;
Wherein, first key message includes at least one following information:The mandate overloading information of the PCE can connect Mandate PCC identification informations, the receivable mandate tunnel identification information of receipts.
It is described to judge whether preset tunnel authorization condition is expired based on tunnel authorization request in said program Foot, including:
Obtain the currently received mandate tunnel numbers of the PCE;
Judge whether to reach the receivable mandate tunnels the PCE based on the currently received mandate tunnel numbers of the PCE Quantity threshold;
When determining the receivable mandate tunnel quantity thresholds of the not up to PCE, it is considered as preset tunnel authorization condition and obtains To satisfaction;Otherwise, it is unmet to be considered as preset tunnel authorization condition;
Correspondingly, when the determination preset tunnel authorization condition is unmet, sends and carry the first crucial letter The first message of breath gives at least one PCC, including:
It determines when reaching receivable the mandates tunnel quantity thresholds of the PCE, sends and carry the mandate overloading of the PCE and believe The first message of breath gives at least one PCC.
In said program, after the first message for sending the first key message of carrying is at least one PCC, institute The method of stating further includes:
Detection obtains the currently received mandate tunnel numbers of the PCE and is not up to the receivable mandate tunnel numbers of the PCE Mesh threshold value;
The second message for the mandate overloading releasing information for carrying the PCE is sent at least one PCC, so that described At least one PCC authorizes established tunnel to the PCE.
It is described to judge whether preset tunnel authorization condition is expired based on tunnel authorization request in said program Foot, including:
Extract the second key message in the tunnel authorization request;Second key message include following information at least One of:PCC identification informations, tunnel identification information;
Judge whether at least one PCC is that the PCE can receive tunnel authorization based on second key message Whether the tunnel that PCC or at least one PCC are authorized is the receivable tunnels the PCE;
Determine that at least one PCC is that the PCC or at least one PCC of the receivable tunnel authorizations of the PCE are awarded When the tunnel of power is the receivable tunnels the PCE, it is considered as preset tunnel authorization condition and is met;Otherwise, it is considered as default Tunnel authorization condition it is unmet.
In said program, after the first message for sending the first key message of carrying is at least one PCC, institute The method of stating further includes:
Receive tunnel authorization condition more new command;
Based on the tunnel authorization condition more new command, the preset tunnel authorization condition is updated;
When determining that updated tunnel authorization condition obtains meeting, the third message for carrying third key message is sent to institute At least one PCC is stated, so that at least one PCC authorizes established tunnel to the PCE;
Wherein, the third key message includes at least one following information:The mandate overloading releasing information of the PCE, Updated mandate PCC identification informations, updated mandate tunnel identification information.
The embodiment of the present invention additionally provides a kind of PCE, and the PCE includes:Receiving module, judgment module and sending module; Wherein,
The receiving module, the tunnel authorization request sent for receiving at least one path calculating client PCC;It is described Tunnel authorization request authorizes established tunnel to the PCE at least one PCC;
The judgment module judges whether preset tunnel authorization condition is expired for being based on the tunnel authorization request Foot, and trigger the sending module when the preset tunnel authorization condition is unmet;
The sending module, for sending the first message for carrying the first key message at least one PCC, so that At least one PCC knows the ability that the PCE receives the tunnel authorization request of itself;
Wherein, first key message includes at least one following information:The mandate overloading information of the PCE can connect Mandate PCC identification informations, the receivable mandate tunnel identification information of receipts.
In said program, the judgment module is additionally operable to obtain the currently received mandate tunnel numbers of the PCE;
Judge whether to reach the receivable mandate tunnels the PCE based on the currently received mandate tunnel numbers of the PCE Quantity threshold;
When determining the receivable mandate tunnel quantity thresholds of the not up to PCE, it is considered as preset tunnel authorization condition and obtains To satisfaction;Otherwise, it is unmet to be considered as preset tunnel authorization condition;
Correspondingly, the sending module, it is additionally operable to when reaching the receivable mandate tunnel quantity thresholds of the PCE, hair Send the first message for the mandate overloading information for carrying the PCE at least one PCC.
In said program, the judgment module is additionally operable to detection and obtains the currently received mandate tunnel numbers of the PCE not Reach the receivable mandate tunnel quantity thresholds of the PCE, triggers the sending module;
The sending module is additionally operable to send the second message for the mandate overloading releasing information for carrying the PCE to described At least one PCC, so that at least one PCC authorizes established tunnel to the PCE.
In said program, the judgment module is additionally operable to extract the second key message in the tunnel authorization request;Institute It includes at least one following information to state the second key message:PCC identification informations, tunnel identification information;
Judge whether at least one PCC is that the PCE can receive tunnel authorization based on second key message Whether the tunnel that PCC or at least one PCC are authorized is the receivable tunnels the PCE;
Determine that at least one PCC is that the PCC or at least one PCC of the receivable tunnel authorizations of the PCE are awarded When the tunnel of power is the receivable tunnels the PCE, it is considered as preset tunnel authorization condition and is met;Otherwise, it is considered as default Tunnel authorization condition it is unmet.
In said program, the PCE further includes update module, for receiving tunnel authorization condition more new command, and is based on The tunnel authorization condition more new command updates the preset tunnel authorization condition;
The judgment module triggers the transmission mould when being additionally operable to determine that updated tunnel authorization condition obtains meeting Block;
The sending module, is additionally operable to send the third message for carrying third key message at least one PCC, with At least one PCC is set to authorize established tunnel to the PCE;
Wherein, the third key message includes at least one following information:The mandate overloading releasing information of the PCE, Updated mandate PCC identification informations, updated mandate tunnel identification information.
In the embodiment of the present invention, the tunnel authorization request that at least one PCC is sent is received;The tunnel authorization request is used for At least one PCC authorizes established tunnel to the PCE;Judge that preset tunnel is awarded based on tunnel authorization request Whether power condition is met;When determining that the preset tunnel authorization condition is unmet, sends and carry the first crucial letter The first message of breath gives at least one PCC, so that at least one PCC knows that the PCE receives the tunnel of itself and awards Weigh the ability of request;Wherein, first key message includes at least one following information:The mandate overloading information of the PCE, Receivable mandate PCC identification informations, receivable mandate tunnel identification information.In this way, PCE carries the first key by sending The first message of information makes PCC pass through the first key message carried in first message and knows that PCE currently can receive certainly to PCC The case where tunnel authorization of body, and then when determining that PCE can not receive the tunnel authorization of itself, give the tunnel authorization of foundation to it Its PCE avoids the tunnel authorization repeated to the same PCE, while reducing PCC and PCE power consumptions, more improves The working efficiency of PCC and PCE.
Description of the drawings
Fig. 1 is the cross-domain network model schematic diagrames for calculating road of PCE;
Fig. 2 is the flow diagram one of tunnel authorization information processing method in the embodiment of the present invention;
Fig. 3 a are the coded format schematic diagram one of Notification objects in the embodiment of the present invention;
Fig. 3 b are the coded format schematic diagram two of Notification objects in the embodiment of the present invention;
Fig. 4 is the tunnel authorization networking schematic diagram between list PCC, list PCE in the embodiment of the present invention;
Fig. 5 is the flow diagram two of tunnel authorization information processing method in the embodiment of the present invention;
Fig. 6 is the tunnel authorization networking schematic diagram between list PCC, more PCE in the embodiment of the present invention;
Fig. 7 is the flow diagram three of tunnel authorization information processing method in the embodiment of the present invention;
Fig. 8 is the tunnel authorization networking schematic diagram between more PCC, more PCE in the embodiment of the present invention;
Fig. 9 is the flow diagram four of tunnel authorization information processing method in the embodiment of the present invention;
Figure 10 is the composed structure schematic diagram of PCE in the embodiment of the present invention.
Specific implementation mode
The present invention is further described in detail below with reference to the accompanying drawings and embodiments.It should be appreciated that described herein Specific embodiment is only used to explain the present invention, is not intended to limit the present invention.
Inventor has found in the course of the research, the calculation road mode of traditional Problem with Some Constrained Conditions that topology is collected based on equipment side Can be good at solving the tunnel building demand in some domain, however, due to can't see cross-domain topology information, for across Domain tunnel building demand often cannot be satisfied demand, still, need to carry out big topological, multiple domain calculation road in many scenes, this The whole network, cross-domain topology information are collected with regard to needing a special path computation equipment/component, to complete cross-domain path It calculates, PCE comes into being.
Traditional router device initiates to calculate road request, referred to as PCC to PCE as the party in request for calculating road request.PCC and Passage path computing unit communication protocol (PCEP, Path Computation Element Communication between PCE Protocol the foundation and communication of PCEP sessions are completed).It is as shown in Figure 1 the cross-domain network model schematic diagrames for calculating road of PCE, section Point Node1 and Node4 is belonging respectively to different domain (Domain), and PCE collects the topology information in two domains.When Node1 need to When Node4 establishes tunnel, Node1 (PCC role) sends a path computing request for arriving Node4 to PCE, and PCE is tied road is calculated Fruit (the i.e. routing information of Node1 to Node4:Node1->Node2->Node3->Node4 it) is sent to Node1, then Node1 According to the routing information that PCE is returned, pass through Resource Reservation Protocol (RSVP-TE, Resource based on Traffic Engineering extensions Reservation Protocol-Traffic Engineering Extension) signaling is accomplished to the tunnel of Node4 and builds It is vertical.
In basic PCEP session establishment flows, equipment side is as PCC role, passage path computation request message (PCReq, Path Computation Request) initiates to calculate road request to PCE, and PCE is according to the calculation carried in PCRep message Road destination address and constraint information carry out calculation road, then calculate response message (PCRep, Path road result passage path is calculated Computation Reply) equipment side is returned to, equipment lateral root is completed to pass according to specific routing information, by RSVP-TE agreements The foundation of the traffic engineering tunnel of system.
In the above scheme, when equipment establishes tunnel demand, it is not based on the network topology letter that this equipment was collected Breath carries out calculation road, but is sent to PCE road request is calculated, and carrying out the calculation road roads Bing Basuan result by PCE returns to equipment.Due to PCE is it can be seen that cross-domain topology information or can pass through the collaborative interactive between PCE and complete cross-domain calculation road.Therefore, this Mode can solve the problems, such as the cross-domain calculation road of traditional approach.
With the development of SDN technologies, draft-ietf-pce-stateful-pce drafts propose a kind of stateful PCE Model, i.e., for equipment side create tunnel can pass through PCRpt (Path Computation LSP State Report) Authorization of messages can remove the routing information in update tunnel as needed to PCE, then PCE.
For an equipment (as PCC), multiple PCE neighbours can be found by static configuration or automatically, PCC can With selection one or more PCE is given all tunnel authorizations locallyd create.Since on current protocol interaction, PCC can not Dynamic knows that each PCE can currently receive the performance in the tunnel authorized, and when there are multiple PCE, local PCC can only go selection to take turns The mode ask or be randomly assigned is come local tunnel authorization to different PCE, and a PCE also serves multiple PCC, and The ability of each PCE is also different, so PCC selections uniformly give multiple PCE local tunnel authorization, it is in most cases not Reasonably.
In embodiments of the present invention, PCE receives the tunnel authorization request that at least one PCC is sent;The tunnel authorization is asked It asks and authorizes established tunnel to the PCE at least one PCC;Judged based on tunnel authorization request preset Whether tunnel authorization condition is met;When determining that the preset tunnel authorization condition is unmet, sends and carry first The first message of key message gives at least one PCC, so that at least one PCC knows that the PCE receives itself The ability of tunnel authorization request;Wherein, first key message includes at least one following information:The mandate of the PCE is super Lotus information, receivable mandate PCC identification informations, receivable mandate tunnel identification information.
Embodiment one
Fig. 2 is the flow diagram one of tunnel authorization information processing method in the embodiment of the present invention, as shown in Fig. 2, this hair Tunnel authorization information processing method includes in bright embodiment:
Step 101:Receive the tunnel authorization request that at least one PCC is sent.
Here, the tunnel authorization request authorizes established tunnel to the PCE at least one PCC;Institute Stating tunnel authorization request can be sent by PCRpt message;Following information is carried in the tunnel authorization request (PCRpt message) At least one:PCC identification informations, tunnel identification information;Wherein, PCC identification informations send tunnel authorization request for identifying PCC, tunnel identification information such as identifies the type in the tunnel for identifying the tunnel that the PCC licenses to PCE.
In actual implementation, before PCE receives the tunnel authorization request that at least one PCC is sent, the method further includes:
The PECP session communications that PCE is established between at least one PCC connect.
Step 102:Judge whether preset tunnel authorization condition is met based on tunnel authorization request.
In practical applications, the preset tunnel authorization condition can be to judge whether to connect according to actual needs setting Receive the condition of the tunnel authorization request of PCC.
In one embodiment, the maximum that tunnel authorization condition can be born according to PCE authorizes the number in tunnel to set, The currently received mandate tunnel numbers of PCE described in the tunnel authorization acquisition request that PCE is sent based on PCC;
Judge whether to reach the receivable mandate tunnels the PCE based on the currently received mandate tunnel numbers of the PCE Quantity threshold;
When determining the receivable mandate tunnel quantity thresholds of the not up to PCE, it is considered as preset tunnel authorization condition and obtains To satisfaction;Otherwise, it is unmet to be considered as preset tunnel authorization condition.
Here, the receivable maximums for authorizing tunnel quantity threshold that can be born according to PCE of PCE authorize tunnel number to set Fixed, as set, PCE is receivable to authorize tunnel quantity threshold to be equal to the maximum mandate tunnel number that PCE can be born, alternatively, setting The receivable maximum mandate tunnel numbers for authorizing tunnel quantity threshold that can be born for the PCE of particular percentile of PCE are determined, such as institute It is 80% to state particular percentile.
In another embodiment, tunnel authorization condition can also be asked according to tunnel type (Tunnel Identifier) or tunnel authorization Sender, i.e. PCC sets, such as:Setting PCE only receives the mandate in the tunnel of some type, or only receives certain specific The tunnel authorization of PCC.
Correspondingly, PCE extracts PCC identification informations, the tunnel identification information etc. carried in the tunnel authorization request, it is based on The information of extraction judge at least one PCC whether be the PCE can receive tunnel authorization PCC or described at least one Whether the tunnel that a PCC is authorized is the receivable tunnels the PCE;Determine that at least one PCC is that the PCE can receive tunnel When the tunnel that the PCC of road mandate or at least one PCC are authorized is the receivable tunnels the PCE, it is considered as preset tunnel Road authorising conditional is met;Otherwise, it is unmet to be considered as preset tunnel authorization condition.
Step 103:When determining that the preset tunnel authorization condition is unmet, sends and carry the first key message First message gives at least one PCC, so that at least one PCC knows that the PCE receives the tunnel authorization of itself and asks The ability asked.
Here, first key message includes at least one following information:The mandate overloading information of the PCE can connect Mandate PCC identification informations, the receivable mandate tunnel identification information of receipts.
In actual implementation, the first key message can be different according to the difference of different tunnel authorization conditions, such as:When Judge whether the tunnel authorization condition is met, to judge whether the currently received mandate tunnel numbers of PCE reach described Corresponding when the receivable mandate tunnel quantity thresholds of PCE, first key message includes the mandate overloading letter of the PCE Breath;In this way, when the PCE mandate tunnel numbers received reach receivable the mandates tunnel quantity thresholds of the PCE, be considered as described in The tunnel authorization excess load that PCE is received can not receive tunnel authorization again, and mandate overloadings of the PCC based on the carrying PCE received is believed The first message of breath learns PCE excess loads, and then does not retransmit authorization requests to PCE, selects others PCE to be authorized, carries The high working efficiency of PCC and PCE.
In practical applications, the first message can be PCNtf (PCEP Notification) message, the PCNtf Message carries a Notification object, is as shown in Figure 3a the coded format schematic diagram of the Notification objects One, indicate that PCE can receive the tunnel that PCC is sent by expanded definition Notification Type and Notification Value The ability of road authorization requests, such as:Overloading is authorized to notify thing to characterize PCE by setting Notification Type (NT)=3 Part, setting Notification Value (NV)=1 characterization PCE mandate overloadings, and the Object- of Notification objects Class=12 and Object-Type (OT)=1 still use original definition in RF5440.It is sent when PCC receives PCE PCNtf message no longer can carry out tunnel authorization by PCE overloadings known to parsing to the PCE, but select other PCE, improve work efficiency.
In another embodiment, when judge the tunnel authorization condition whether obtain meet it is described at least one to judge Corresponding when whether PCC is the PCC that PCE can receive tunnel authorization, the first key message includes receivable mandate PCC marks Information;In this way, when the sender for the tunnel authorization request that PCE is received not can receive the row of PCC of tunnel authorization in PCE, just The PCC itself is notified not have the ability for receiving its tunnel authorization, and first carried by first message by first message Key message enables PCC learn that itself can receive the PCC of tunnel authorization.
In another embodiment, when judge the tunnel authorization condition whether obtain meet it is described at least one to judge When whether the tunnel that PCC is authorized is the receivable tunnels PCE, corresponding, the first key message includes the receivable mandate tunnels of PCE Road identification information;In this way, when tunnel that PCE is authorized to (i.e. the tunnel that identifies during the tunnel authorization of PCC is asked) be not itself can When the row in the mandate tunnel of reception, it will pass through first message and the PCC itself notified not have the ability for receiving its tunnel authorization, and PCC itself is notified to can receive the tunnel authorized by the first key message that first message carries.
Based on the above embodiment of the present invention, in practical applications, PCE is had found certainly based on the tunnel authorization request that PCC is sent The tunnel authorization condition of body is unmet, such as itself overloading (reaching the receivable mandate tunnel quantity thresholds of the PCE), It is rejected by the tunnel authorization request of the PCC, PCUpd (the Path Computation resetted by one authorization flag position of response LSP Update Request) message come identify refuse the PCC authorization requests;Correspondingly, the tunnel that PCE is sent based on PCC Authorization requests find that the tunnel authorization condition of itself is met, and such as itself non-overloading, the tunnel authorization that can receive the PCC is asked It asks, the authorization requests for receiving the PCC is identified by the PCUpd message of one authorization flag position of response position, certainly, in reality When implementation, if PCE has received the tunnel authorization request of PCC, the PCUpd message of the authorization flag position position can not be also sent, Acquiescence receives.
In one embodiment, when actual implementation, tunnel authorization to PCE before certain PCC can cancel to PCE results in The tunnel authorization condition of PCE is met (the not up to receivable mandate tunnel quantity thresholds of PCE), at this point, PCE can be sent out Send the second message for the mandate overloading releasing information for carrying PCE to PCC, so that PCC knows that the PCE receives the tunnel of itself and awards The ability of request is weighed, and then continues to carry out tunnel authorization to the PCE.Here second message can be PCNtf message, pass through expansion Notification Value (NV) characterizations for opening up the Notification objects that PCNtf message carries authorize overloading to release, such as It sets Notification Value (NV)=2 and characterizes PCE mandate overloading releasings, as shown in Figure 3b.
In one embodiment, when actual implementation, the tunnel authorization condition of PCE may be changed, such as:PCE is received The tunnel authorization condition more new command that user sends, is updated the tunnel authorization condition of itself based on the instruction, and updates Tunnel authorization condition afterwards will pass through message informing PCC when obtaining meeting, so that PCC knows that the PCE receives the tunnel of itself The ability of authorization requests, and then continue to carry out tunnel authorization to the PCE.
Using the embodiment of the present invention, after PCE receives the tunnel authorization request of PCC, the tunnel authorization condition of itself is judged Whether met, when unmet, by the message informing PCC, so that the PCC, which learns itself not have, receives its tunnel The ability of road mandate, and then PCC selection others PCE is made to carry out tunnel authorization, and when PCE detects the tunnel authorization item of itself When part obtains meeting, again by message informing PCC, the ability for making it learn itself but also with its tunnel authorization of reception, That is, PCC dynamic sensings PCE can be allowed to receive the capacity variations of PCC tunnel authorizations, to the tunnel authorization of rational decision local PCE, the problem for reducing authorization failure to the greatest extent and authorizing load sharing unreasonable improve the work effect of PCC and PCE Rate.
Embodiment two
Fig. 4 is the tunnel authorization networking schematic diagram between list PCC, list PCE in the embodiment of the present invention;As shown in figure 4, network section Point Node1 sets up PCEP as PCC role and PCE1 and connects, due to no other optional PCE, when NODE1 creates local Behind tunnel, PCE1 is directly licensed to.
Fig. 5 is the flow diagram two of tunnel authorization information processing method in the embodiment of the present invention, in conjunction with Fig. 4, Fig. 5 institute Show, tunnel authorization information processing method includes in the embodiment of the present invention:
Step 200:PCE1 establishes the PCEP session connections with PCC.
In the present embodiment, PCC, that is, Node1.
Step 201:PCE1 receives the tunnel authorization request that PCC is sent.
Here, tunnel authorization request is sent in the form of PCRpt message.
Step 202:Whether judgement currently reaches itself receivable mandate tunnel quantity threshold, if reaching itself can connect The mandate tunnel quantity threshold of receipts executes step 203;If not up to itself receivable mandate tunnel quantity threshold executes Step 206.
Here, the number in the mandate tunnel that PCE1 itself has currently been received based on the tunnel authorization acquisition request that PCC is sent And itself receivable mandate tunnel quantity threshold, to judge currently whether reach itself receivable mandate tunnel number threshold Value;Wherein, the receivable maximums for authorizing tunnel quantity threshold that can be born according to PCE1 of PCE1 authorize tunnel number to set, As in the present embodiment, the receivable maximums for authorizing tunnel quantity threshold that can be born equal to PCE1 of setting PCE1 authorize tunnel Number (such as 200).
Step 203:It sends and carries the first message for authorizing overloading information to PCC, so that PCC knows that PCE1 receives itself The ability of tunnel authorization request.
In actual implementation, the first message is PCNtf (NT=3, NV=1) message.
Based on the first message, PCC does not retransmit tunnel authorization and asks to PCE1, alternatively, being moved back using preset index Rule is kept away to attempt to initiate tunnel authorization request to PCE1, such as:Time of the tunnel authorization away from first time is initiated in second of trial of PCC For 10s, third time is attempted away from second of 20s, is attempted away from third time 30s for the 4th time, and so on.
Step 204:Whether detection currently reaches itself receivable mandate tunnel quantity threshold, if not up to itself can The mandate tunnel quantity threshold of reception executes step 205;It is no to then follow the steps 204.
Step 205:The second message for carrying and overloading being authorized to release information is sent to PCC.
In actual implementation, the PCC in addition to Node1 may cancel the tunnel authorization to PCE1, lead to the tunnel of PCE1 Road authorising conditional is met, i.e., the receivable mandate tunnel quantity thresholds of not up to PCE1, and then PCE1 passes through message informing Node1, so that Node1 knows the ability that PCE1 receives the tunnel authorization request of itself.In the present embodiment, the second message For PCNtf (NT=3, NV=2) message.After Node1 receives second message, it is known that PCE1 can receive the tunnel authorization of itself and ask It asks, and then continues to carry out tunnel authorization to PCE1.
Step 206:Tunnel authorization confirmation message is sent to PCC.
In the present embodiment, the tunnel authorization confirmation message is the PCUpd message of a mandate flag set;When So, in practical applications, this step can be ignored, i.e. PCE1 does not send confirmation message, but gives tacit consent to the tunnel authorization for receiving PCC Request.
Embodiment three
Fig. 6 is the tunnel authorization networking schematic diagram between list PCC, more PCE in the embodiment of the present invention;As shown in fig. 6, network section Point Node1 sets up PCEP as PCC role and PCE1, PCE2 and connects, and Node1 has been established according to local strategy local Tunnel authorization to PCE1, PCE2.
Fig. 7 is the flow diagram three of tunnel authorization information processing method in the embodiment of the present invention, in conjunction with Fig. 6, Fig. 7 institute Show, tunnel authorization information processing method includes in the embodiment of the present invention:
Step 301:PCE1 receives the tunnel authorization request that PCC is sent.
Here, tunnel authorization request is sent in the form of PCRpt message.
Based on the present embodiment, in practical applications, before this step, PCC is established and the PCEP sessions between PCE1, PCE2 connect It connects.
Step 302:It is asked based on the tunnel authorization, PCE1 judges whether tunnel authorization condition meets, if the tunnel Road authorising conditional does not meet, executes step 303;If the tunnel authorization condition meets, do not deal with.
Here, PCE1 judge tunnel authorization condition whether meet including:
PCE1 based on the tunnel authorization acquisition request that PCC is sent itself currently received mandate tunnel number and from The receivable mandate tunnel quantity threshold of body, to judge currently whether reach itself receivable mandate tunnel quantity threshold, when When reaching itself receivable mandate tunnel quantity threshold, determine that tunnel authorization condition does not meet, when not up to itself can receive Mandate tunnel quantity threshold when, determine tunnel authorization condition meet;
Wherein, the receivable maximum mandate tunnel numbers for authorizing tunnel quantity threshold that can be born according to PCE1 of PCE1 are come Setting, such as in the present embodiment, the receivable PCE1 for authorizing tunnel quantity threshold to be equal to particular percentile of setting PCE1 can The maximum mandate tunnel number born, if the particular percentile is that the maximum mandate tunnel number that 80%, PCE1 can be born is 200, then the receivable mandate tunnel quantity thresholds of PCE1 are 160.
Step 303:The first message for carrying the first key message is sent to PCC, so that PCC knows that PCE1 receives itself The ability of tunnel authorization request.
In actual implementation, first key message includes the mandate overloading information of the PCE1, the first message For PCNtf (NT=3, NV=1) message.
Based on the first message, PCC does not retransmit tunnel authorization and asks to PCE1, and due in the present embodiment, PCC (Node1) PECP session connections are also established with PCE2, and then PCC may be selected PCE2 and carry out tunnel authorization, to reduce to PCE1 carries out the mortality of tunnel authorization, improves work efficiency.
Step 304:Tunnel authorization condition more new command is received, and tunnel is updated based on tunnel authorization condition more new command Authorising conditional.
Here, the tunnel authorization condition more new command can be user's triggering, and the tunnel authorization condition update refers to Newer tunnel authorization conditional information can be carried in order, such as changed the receivable mandate tunnel quantity thresholds of PCE1, such as increased The receivable mandate tunnel quantity thresholds of PCE1.
Step 305:Judge whether current tunnel authorization condition meets, if the tunnel authorization condition meets, executes Step 306;If the tunnel authorization condition does not meet, step 305 is executed.
Here, in actual implementation, if updated tunnel authorization condition increases the receivable mandate tunnel numbers of PCE1 Mesh threshold value, then current tunnel authorization condition met, i.e. PCE1 have again receive PCC tunnel authorization ability.
Step 306:The third message for carrying third key message is sent to PCC.
In the present embodiment, the third key message includes that the mandate overloading of the PCE1 releases information, the third Message is PCNtf (NT=3, NV=2) message.After Node1 receives third message, it is known that PCE1 can receive the tunnel authorization of itself Request, and then can continue to carry out tunnel authorization to PCE1.
Step 307:Terminate this process flow.
Example IV
Fig. 8 is the tunnel authorization networking schematic diagram between more PCC, more PCE in the embodiment of the present invention;As shown in figure 8, network section Point Node1, Node2 sets up PCEP as PCC role and PCE1, PCE2 and connects, Node1, Node2 according to local strategy, Local established tunnel authorization to PCE1, PCE2.
Fig. 9 is the flow diagram four of tunnel authorization information processing method in the embodiment of the present invention, in conjunction with Fig. 8, Fig. 9 institute Show, tunnel authorization information processing method includes in the embodiment of the present invention:
Step 401:PCE1 receives the tunnel authorization request that Node1 is sent.
In the present embodiment, tunnel authorization request is sent in the form of PCRpt message.
Step 402:The second key message in tunnel authorization request is extracted, preset tunnel is judged based on the second key message Whether road authorising conditional is met, if unmet, executes step 403;It is not dealt with if obtaining meeting.
Here, the second key message includes:PCC identification informations, tunnel identification information;Wherein, PCC identification informations are for marking Know the PCC for sending tunnel authorization request, i.e. Node1, tunnel identification information is licensed to for identifying the PCC (Node1) The tunnel of PCE1 such as identifies the type in the tunnel.
Second key message that is based on judges whether preset tunnel authorization condition is met, including:
PCC identification informations, the tunnel identification information that PCE1 is obtained based on extraction, judge whether Node1 is that the PCE1 can Whether the tunnel for receiving PCC or the Node1 mandate of tunnel authorization is the receivable tunnels PCE1;
Determine Node1 be PCE1 can receive tunnel authorization PCC or Node1 authorize tunnel be PCE1 receivable When tunnel, it is considered as preset tunnel authorization condition and is met;Otherwise, it is unmet to be considered as preset tunnel authorization condition. Such as:The specified tunnel authorizations for receiving Node2 of PCE1, or the tunnel authorization that tunnel type is type one is received, and here, It is type two that Node1, which authorizes the tunnel type in tunnel, then PCE1 be based on PCC identification informations, tunnel identification information can determine neither Itself can receive the PCC of tunnel authorization, and also the tunnel of non-self receivable tunnel authorization, i.e. tunnel authorization condition are not expired Foot.
In the present embodiment, when PCE1 determines that preset tunnel authorization condition obtains meeting, acquiescence receives tunnel authorization Request, does not respond Node1.
Step 403:The first message for carrying the first key message is sent to Node1 so that Node1 know PCE1 received from The ability of the tunnel authorization request of body.
Here, in the present embodiment, the first key message includes:Receivable mandate PCC identification informations receivable are awarded Weigh tunnel identification information.When actual implementation, Node1 based on PCE1 known to the first key message carried in first message received from The ability of the tunnel authorization of body, what such as the first key message included is the mark of Node2 and the tunnel that tunnel type is type one Road identifies, then the tunnel type that PCE1 known to Node1 cannot receive itself transmission is the tunnel authorization of type two, and PCE2 may be selected Tunnel authorization is carried out, unnecessary power wastage is avoided.And correspondingly, for the tunnel authorization that Node2 is sent, then PCE1 can It receives.
When actual implementation, first message is PCNtf (NT=3, NV=1) message.
Step 404:Tunnel authorization condition more new command is received, and preset based on the update of tunnel authorization condition more new command Tunnel authorization condition.
Based on the above embodiment of the present invention, in practical applications, user may change the tunnel authorization of the PCE1 of setting Tunnel authorization condition is such as updated to only receive the tunnel authorization of Node1 by condition.
Step 405:Determine that updated tunnel authorization condition is met, the third for sending carrying third key message disappears It ceases to Node1, so that Node1 authorizes established tunnel to the PCE.
In the present embodiment, the third key message includes:Updated mandate PCC identification informations updated are awarded Weigh tunnel identification information.
When actual implementation, PCE1 detects the ability for itself having the tunnel authorization for receiving Node1, sends and carries third The third message of key message is to Node1, so that Node1 learns the ability that PCE1 has the tunnel authorization for receiving Node1, into And continue tunnel authorization to PCE1;Third key message includes:Updated mandate PCC identification informations, updated mandate tunnel Road identification information.
Step 406:Terminate this process flow.
Embodiment five
Figure 10 is the composed structure schematic diagram of PCE in the embodiment of the present invention, as shown in Figure 10, PCE in the embodiment of the present invention Including:Receiving module 11, judgment module 12 and sending module 13;Wherein,
The receiving module 11, the tunnel authorization request sent for receiving at least one path calculating client PCC;Institute State tunnel authorization request authorizes established tunnel to the PCE at least one PCC;
The judgment module 12 judges whether preset tunnel authorization condition obtains for being based on the tunnel authorization request Meet, and the sending module 13 is triggered when the preset tunnel authorization condition is unmet;
The sending module 13, for sending the first message of the first key message of carrying at least one PCC, with The ability for making at least one PCC know that the PCE receives the tunnel authorization request of itself;
Wherein, first key message includes at least one following information:The mandate overloading information of the PCE can connect Mandate PCC identification informations, the receivable mandate tunnel identification information of receipts.
In one embodiment, the judgment module 12 is additionally operable to obtain the currently received mandate tunnel numbers of the PCE;
Judge whether to reach the receivable mandate tunnels the PCE based on the currently received mandate tunnel numbers of the PCE Quantity threshold;
When determining the receivable mandate tunnel quantity thresholds of the not up to PCE, it is considered as preset tunnel authorization condition and obtains To satisfaction;Otherwise, it is unmet to be considered as preset tunnel authorization condition;
Correspondingly, the sending module 13, be additionally operable to send the first message of the mandate overloading information for carrying the PCE to At least one PCC.
In one embodiment, the judgment module 12 is additionally operable to detection and obtains the currently received mandate tunnel numbers of the PCE Mesh is not up to the receivable mandate tunnel quantity thresholds of the PCE, triggers the sending module;
The sending module 13 is additionally operable to send the second message for the mandate overloading releasing information for carrying the PCE to institute At least one PCC is stated, so that at least one PCC authorizes established tunnel to the PCE.
In one embodiment, the judgment module 12 is additionally operable to extract the second crucial letter in the tunnel authorization request Breath;Second key message includes at least one following information:PCC identification informations, tunnel identification information;
Judge whether at least one PCC is that the PCE can receive tunnel authorization based on second key message Whether the tunnel that PCC or at least one PCC are authorized is the receivable tunnels the PCE;
Determine that at least one PCC is that the PCC or at least one PCC of the receivable tunnel authorizations of the PCE are awarded When the tunnel of power is the receivable tunnels the PCE, it is considered as preset tunnel authorization condition and is met;Otherwise, it is considered as default Tunnel authorization condition it is unmet.
In one embodiment, the PCE further includes update module 14, for receiving tunnel authorization condition more new command, and Based on the tunnel authorization condition more new command, the preset tunnel authorization condition is updated;
The judgment module 12 triggers the transmission when being additionally operable to determine that updated tunnel authorization condition obtains meeting Module;
The sending module 13, is additionally operable to send the third message for carrying third key message at least one PCC, So that at least one PCC authorizes established tunnel to the PCE;
Wherein, the third key message includes at least one following information:The mandate overloading releasing information of the PCE, Updated mandate PCC identification informations, updated mandate tunnel identification information.
It need to be noted that be:Above is referred to the descriptions of PCE, are similar with above method description, with having for method Beneficial effect description, does not repeat.For undisclosed technical detail in PCE embodiments of the present invention, present invention side is please referred to The description of method embodiment.
It will be appreciated by those skilled in the art that:Realize that all or part of step of above method embodiment can pass through journey Sequence instructs relevant hardware to complete, and program above-mentioned can be stored in a computer read/write memory medium, which exists When execution, step including the steps of the foregoing method embodiments is executed;And storage medium above-mentioned includes:Movable storage device is deposited at random Access to memory (RAM, Random Access Memory), read-only memory (ROM, Read-Only Memory), magnetic disc or The various media that can store program code such as CD.
If alternatively, the above-mentioned integrated unit of the present invention is realized in the form of software function module and as independent product Sale in use, can also be stored in a computer read/write memory medium.Based on this understanding, the present invention is implemented The technical solution of example substantially in other words can be expressed in the form of software products the part that the relevant technologies contribute, The computer software product is stored in a storage medium, including some instructions are used so that computer equipment (can be with It is personal computer, server or network equipment etc.) execute all or part of each embodiment the method for the present invention. And storage medium above-mentioned includes:Movable storage device, RAM, ROM, magnetic disc or CD etc. are various can to store program code Medium.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any Those familiar with the art in the technical scope disclosed by the present invention, can easily think of the change or the replacement, and should all contain Lid is within protection scope of the present invention.Therefore, protection scope of the present invention should be based on the protection scope of the described claims.

Claims (10)

1. a kind of tunnel authorization information processing method, which is characterized in that it is applied to path-calculating element PCE, the method includes:
Receive the tunnel authorization request that at least one path calculating client PCC is sent;The tunnel authorization request is for described At least one PCC authorizes established tunnel to the PCE;
Judge whether preset tunnel authorization condition is met based on tunnel authorization request;
When determining that the preset tunnel authorization condition is unmet, the first message for carrying the first key message is sent to institute At least one PCC is stated, so that at least one PCC knows the ability that the PCE receives the tunnel authorization request of itself;
Wherein, first key message includes at least one following information:It is the mandate overloading information of the PCE, receivable Authorize PCC identification informations, receivable mandate tunnel identification information.
2. according to the method described in claim 1, it is characterized in that, described judge preset tunnel based on tunnel authorization request Whether road authorising conditional is met, including:
Obtain the currently received mandate tunnel numbers of the PCE;
Judge whether to reach the receivable mandate tunnel numbers of the PCE based on the currently received mandate tunnel numbers of the PCE Threshold value;
When determining the receivable mandate tunnel quantity thresholds of the not up to PCE, being considered as preset tunnel authorization condition is expired Foot;Otherwise, it is unmet to be considered as preset tunnel authorization condition;
Correspondingly, when the determination preset tunnel authorization condition is unmet, sends and carry the first key message First message gives at least one PCC, including:
It determines when reaching receivable the mandates tunnel quantity thresholds of the PCE, sends the mandate overloading information of the carrying PCE First message gives at least one PCC.
3. according to the method described in claim 2, it is characterized in that, it is described send carry the first key message first message to After at least one PCC, the method further includes:
Detection obtains the currently received mandate tunnel numbers of the PCE and is not up to the receivable mandate tunnel number thresholds of the PCE Value;
The second message of the mandates overloading releasing information for carrying the PCE is sent at least one PCC so that it is described at least One PCC authorizes established tunnel to the PCE.
4. according to the method described in claim 1, it is characterized in that, described judge preset tunnel based on tunnel authorization request Whether road authorising conditional is met, including:
Extract the second key message in the tunnel authorization request;Second key message include following information at least it One:PCC identification informations, tunnel identification information;
Based on second key message judge at least one PCC whether be the PCE can receive tunnel authorization PCC, Or whether the tunnel that at least one PCC is authorized is the receivable tunnels the PCE;
Determine that at least one PCC is that the PCC or at least one PCC of the receivable tunnel authorizations of the PCE are authorized When tunnel is the receivable tunnels the PCE, it is considered as preset tunnel authorization condition and is met;Otherwise, it is considered as preset tunnel Road authorising conditional is unmet.
5. according to the method described in claim 1, it is characterized in that, it is described send carry the first key message first message to After at least one PCC, the method further includes:
Receive tunnel authorization condition more new command;
Based on the tunnel authorization condition more new command, the preset tunnel authorization condition is updated;
When determining that updated tunnel authorization condition obtains meeting, send carry third key message third message to it is described extremely A few PCC, so that at least one PCC authorizes established tunnel to the PCE;
Wherein, the third key message includes at least one following information:The mandate overloading of the PCE releases information, update Mandate PCC identification informations, updated mandate tunnel identification information afterwards.
6. a kind of path-calculating element PCE, which is characterized in that the PCE includes:Receiving module, judgment module and sending module; Wherein,
The receiving module, the tunnel authorization request sent for receiving at least one path calculating client PCC;The tunnel Authorization requests authorize established tunnel to the PCE at least one PCC;
The judgment module judges whether preset tunnel authorization condition is met for being based on the tunnel authorization request, And trigger the sending module when the preset tunnel authorization condition is unmet;
The sending module, for sending the first message for carrying the first key message at least one PCC, so that described At least one PCC knows the ability that the PCE receives the tunnel authorization request of itself;
Wherein, first key message includes at least one following information:It is the mandate overloading information of the PCE, receivable Authorize PCC identification informations, receivable mandate tunnel identification information.
7. PCE according to claim 6, which is characterized in that
The judgment module is additionally operable to obtain the currently received mandate tunnel numbers of the PCE;
Judge whether to reach the receivable mandate tunnel numbers of the PCE based on the currently received mandate tunnel numbers of the PCE Threshold value;
When determining the receivable mandate tunnel quantity thresholds of the not up to PCE, being considered as preset tunnel authorization condition is expired Foot;Otherwise, it is unmet to be considered as preset tunnel authorization condition;
Correspondingly, the sending module, it is additionally operable to when reaching the receivable mandate tunnel quantity thresholds of the PCE, transmission is taken The first message of mandate overloading information with the PCE gives at least one PCC.
8. PCE according to claim 7, which is characterized in that
The judgment module is additionally operable to detection and obtains the currently received mandate tunnel numbers of the PCE and be not up to the PCE can connecing The mandate tunnel quantity threshold of receipts, triggers the sending module;
The sending module, be additionally operable to send the second message of the mandates overloading releasing information for carrying the PCE to it is described at least One PCC, so that at least one PCC authorizes established tunnel to the PCE.
9. PCE according to claim 6, which is characterized in that
The judgment module is additionally operable to extract the second key message in the tunnel authorization request;Second key message Including at least one following information:PCC identification informations, tunnel identification information;
Based on second key message judge at least one PCC whether be the PCE can receive tunnel authorization PCC, Or whether the tunnel that at least one PCC is authorized is the receivable tunnels the PCE;
Determine that at least one PCC is that the PCC or at least one PCC of the receivable tunnel authorizations of the PCE are authorized When tunnel is the receivable tunnels the PCE, it is considered as preset tunnel authorization condition and is met;Otherwise, it is considered as preset tunnel Road authorising conditional is unmet.
10. PCE according to claim 6, which is characterized in that the PCE further includes update module, is awarded for receiving tunnel Power condition more new command, and it is based on the tunnel authorization condition more new command, update the preset tunnel authorization condition;
The judgment module triggers the sending module when being additionally operable to determine that updated tunnel authorization condition obtains meeting;
The sending module is additionally operable to send the third message for carrying third key message at least one PCC, so that institute Stating at least one PCC authorizes established tunnel to the PCE;
Wherein, the third key message includes at least one following information:The mandate overloading of the PCE releases information, update Mandate PCC identification informations, updated mandate tunnel identification information afterwards.
CN201710147063.3A 2017-03-13 2017-03-13 Tunnel authorization information processing method and path calculation unit Active CN108574636B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201710147063.3A CN108574636B (en) 2017-03-13 2017-03-13 Tunnel authorization information processing method and path calculation unit
PCT/CN2018/077727 WO2018166353A1 (en) 2017-03-13 2018-03-01 Tunnel authorisation information processing method, path computation element and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710147063.3A CN108574636B (en) 2017-03-13 2017-03-13 Tunnel authorization information processing method and path calculation unit

Publications (2)

Publication Number Publication Date
CN108574636A true CN108574636A (en) 2018-09-25
CN108574636B CN108574636B (en) 2022-04-05

Family

ID=63522837

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710147063.3A Active CN108574636B (en) 2017-03-13 2017-03-13 Tunnel authorization information processing method and path calculation unit

Country Status (2)

Country Link
CN (1) CN108574636B (en)
WO (1) WO2018166353A1 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060101142A1 (en) * 2004-11-05 2006-05-11 Jean-Philippe Vasseur Technique for selecting a path computation element
CN1866852A (en) * 2005-05-20 2006-11-22 华为技术有限公司 Method for realizing path computation in network domain
CN101335692A (en) * 2007-06-27 2008-12-31 华为技术有限公司 Method for negotiating security capability between PCC and PCE and network system thereof
CN101986622A (en) * 2010-11-08 2011-03-16 中兴通讯股份有限公司 Method and system for automatically identifying state attribute of path computation element (PCE)
CN104380674A (en) * 2012-06-15 2015-02-25 思科技术公司 Distributed stateful path computation element overlay architecture
CN104579946A (en) * 2013-10-21 2015-04-29 华为技术有限公司 Method for determining path calculation unit and communication device

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10341300B2 (en) * 2015-03-01 2019-07-02 Cisco Technology, Inc. System, method, apparatus and machine-readable media for enterprise wireless calling
CN106130901B (en) * 2016-06-03 2020-04-03 华为技术有限公司 Data transmission method, device and system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060101142A1 (en) * 2004-11-05 2006-05-11 Jean-Philippe Vasseur Technique for selecting a path computation element
US8131873B2 (en) * 2004-11-05 2012-03-06 Cisco Technology, Inc. Technique for selecting a path computation element
CN1866852A (en) * 2005-05-20 2006-11-22 华为技术有限公司 Method for realizing path computation in network domain
CN101335692A (en) * 2007-06-27 2008-12-31 华为技术有限公司 Method for negotiating security capability between PCC and PCE and network system thereof
CN101986622A (en) * 2010-11-08 2011-03-16 中兴通讯股份有限公司 Method and system for automatically identifying state attribute of path computation element (PCE)
CN104380674A (en) * 2012-06-15 2015-02-25 思科技术公司 Distributed stateful path computation element overlay architecture
CN104579946A (en) * 2013-10-21 2015-04-29 华为技术有限公司 Method for determining path calculation unit and communication device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
E.CRABBE ET AL.: "PCEP Extensions for Stateful PCE draft-ietf-pce-stateful-pce-17", 《IETF》 *

Also Published As

Publication number Publication date
WO2018166353A1 (en) 2018-09-20
CN108574636B (en) 2022-04-05

Similar Documents

Publication Publication Date Title
CN104660507B (en) The control method and device of forwarding data flow routing
CN109587160A (en) A kind of data transfer device, device, readable storage medium storing program for executing and industrial equipment
CN105122741B (en) The business chain control method and device of Business Stream
US8767729B2 (en) System of path computation element protocol support for large-scale concurrent path computation
CN105610632A (en) Virtual network device and related method
CN104348722B (en) Determine content obtaining path, the methods, devices and systems of request processing
CN102845027A (en) Methods, systems, and computer readable media for inter-diameter-message processor routing
EP3136664B1 (en) Method for caching data, corresponding forwarding device and corresponding controller
CN110140331B (en) Path calculation method and device
CN106789537A (en) A kind of VPN construction method and system
CN105634952B (en) The quick notifying method of LSP message and device
CN108259238A (en) The method that network function service chaining maps in data center
CN107579838A (en) Data processing method and device
CN106161053A (en) A kind of SDN controller QoS manages system and method
CN106936712B (en) Method, server and router for establishing LSP
CN101834855A (en) Method and equipment for preventing serial number from being attacked
CN107623584A (en) The detection of multi-protocol exchange label, processing method, apparatus and system
CN101883052A (en) Method and system for realizing traffic optimization in peer-to-peer network
CN111327529A (en) Service forwarding method and system
Rahimi‐Farahani et al. Forced‐node route guidance system: incorporating both user equilibrium and system optimal benefits
CN108574636A (en) A kind of tunnel authorization information processing method and path-calculating element
CN105191227B (en) A kind of flow table item management method and equipment
CN106878202A (en) A kind of message processing method and device
CN105099939A (en) Method and device for implementing flow control among different data centers
CN108574615A (en) A kind of content transmission method, equipment and system based on multipath MPTCP

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant