CN108563207A - With network managing and control system adjust routes information frames by intelligent electric power Dispatching Control System - Google Patents

With network managing and control system adjust routes information frames by intelligent electric power Dispatching Control System Download PDF

Info

Publication number
CN108563207A
CN108563207A CN201810396003.XA CN201810396003A CN108563207A CN 108563207 A CN108563207 A CN 108563207A CN 201810396003 A CN201810396003 A CN 201810396003A CN 108563207 A CN108563207 A CN 108563207A
Authority
CN
China
Prior art keywords
frame
control system
information
network managing
harvesters
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810396003.XA
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou Love Education Science And Technology Co Ltd
Original Assignee
Changzhou Love Education Science And Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhou Love Education Science And Technology Co Ltd filed Critical Changzhou Love Education Science And Technology Co Ltd
Priority to CN201810396003.XA priority Critical patent/CN108563207A/en
Publication of CN108563207A publication Critical patent/CN108563207A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • G05B19/41865Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM] characterised by job scheduling, process planning, material flow
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L1/00Arrangements for detecting or preventing errors in the information received
    • H04L1/0078Avoidance of errors by organising the transmitted data in a format specifically designed to deal with errors, e.g. location
    • H04L1/0083Formatting with frames or packets; Protocol or part of protocol for error control
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L1/00Arrangements for detecting or preventing errors in the information received
    • H04L1/0001Systems modifying transmission characteristics according to link quality, e.g. power backoff
    • H04L1/0006Systems modifying transmission characteristics according to link quality, e.g. power backoff by adapting the transmission format
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L1/00Arrangements for detecting or preventing errors in the information received
    • H04L1/0078Avoidance of errors by organising the transmitted data in a format specifically designed to deal with errors, e.g. location
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L1/00Arrangements for detecting or preventing errors in the information received
    • H04L1/12Arrangements for detecting or preventing errors in the information received by using return channel
    • H04L1/16Arrangements for detecting or preventing errors in the information received by using return channel in which the return channel carries supervisory signals, e.g. repetition request signals
    • H04L1/18Automatic repetition systems, e.g. Van Duuren systems
    • H04L1/1829Arrangements specially adapted for the receiver end
    • H04L1/1861Physical mapping arrangements
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/25Pc structure of the system
    • G05B2219/25314Modular structure, modules
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Quality & Reliability (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)
  • Small-Scale Networks (AREA)

Abstract

With network managing and control system adjust routes information frames by intelligent electric power Dispatching Control System, include for acquire plant stand safety one region device data safety one area's harvester, information management great Qu harvesters, for acquire plant stand safety two region device datas safety two area's harvesters, network managing and control system;The host side of the network managing and control system and the host side of other network managing and control systems form host side group and are mounted in cabinet, and frame is frequently occurred during avoiding the upload or download of information frame in the prior art in conjunction with its method and omits that phenomenon, heat can be in the defect that some areas are drastically increased in cabinet.

Description

With network managing and control system adjust routes information frames by intelligent electric power Dispatching Control System
Technical field
The invention belongs to power automation control technology fields, and in particular to network managing and control system adjust routes information frames by Intelligent electric power Dispatching Control System.
Background technology
In order to apply big data technology, the electric power monitoring system network of provincial range, secondary safety are collected, arranged, analyzing The differences such as physical features, real time status, O&M operation, asset management, life cycle management, the data traffic of protection and other equipment Attribute data is combined with integration control platform, carries out comprehensive analysis to the operating condition of the whole province's Dispatching Control System, realizes to saving The excellent support of the integrated control platform of grade.A kind of power dispatching automation control system is just proposed, including is used to acquire factory Stand safety one region device data safety one area's harvester, information management great Qu harvesters, for acquire plant stand safety two Two area's harvesters of safety, the network managing and control system of region device data.
And the high speed of the upload or download of information is realized between information management great Qu harvesters and network managing and control system Timely demand is usually only transmitted information frame using disposable, however, during the upload or download of information frame, usually met with To the puzzlement of telecommunication media and communication overload problem, the problem of omission of frame can occur for some information frames, that is, information frame occurs Frame omits phenomenon.
Therefore, it during the upload of information frame or download, how towards numerous and complicated communication environment, reduces frame and omits phenomenon pair The effect of communication is more and more important.
Usually in general the host side of other network managing and control system is all the master with the other network managing and control systems in scene Generator terminal is mounted in cabinet, and such isolation condition can cause heat in cabinet that can drastically increase in some areas, cause to reduce The runnability and service life of the host side of network managing and control system and the host side of other network managing and control systems, so via Cold airflow is introduced to carry out in real time the host side of the network managing and control system in cabinet and the host side of other network managing and control systems Cooling, removing heat in cabinet can be the problem of some areas be drastically increased, it is ensured that host side equipped with network managing and control system and The host side of other network managing and control systems operates under normal temperature range, can improve at a high speed equipped with network managing and control system The runnability and service life of host side and the host side of other network managing and control systems, and cabinet how is built to allow cold airflow Better cooling efficiency can be obtained in cabinet, strictly one reluctant problem for a long time.
Invention content
It is an object of the invention to provide a kind of intelligent electric power Dispatching Control Systems, avoid the upload of information frame in the prior art Or frame is frequently occurred during downloading and omits that phenomenon, heat can be in the defect that some areas are drastically increased in cabinet.
A kind of solution party of intelligent electric power Dispatching Control System in order to overcome the deficiencies in the prior art, the present invention provides Case, it is specific as follows:
Intelligent electric power Dispatching Control System includes one area of the safety acquisition for acquiring plant stand one region device data of safety Machine, information management great Qu harvesters, two area's harvesters of safety, network pipe for acquiring plant stand two region device datas of safety Control system;One area's harvester of safety acquires plant stand one region device data of safety, 2nd area of safety by real-time virtual private network It acquires and passes through non real-time Virtual Private Network and acquire plant stand two region device datas of safety, one area's harvester of safety and safe two Collected data are sent to management information great Qu harvesters by area's harvester by positive isolating device;
The host side of the network managing and control system and the host side of other network managing and control systems form host side group and are mounted on cabinet In, the cabinet include have with the porous plate S1 of several through holes, guide plate S2, host side group S3, top it is rectangular Operating room S4, the ventilator S5 of body shape groove and the rectangular-shape groove on the tops overhead guard S6, the operating room S4 are by overhead guard S6 It covers, the overhead guard S6 is connected between operating room S4 via bolt, and porous plate S1, institute are carried in the head of the operating room S4 Some particulate contaminants in air-flow can be screened out by stating porous plate S1, and the edge of the porous plate S1 carries scarf joint, described embedding Connector rabbets into the interlocking mouth being provided on the operating room S4 walls, has the function that cleaning dirt is dismantled in timing with this;In institute A pair of of the edge for stating porous plate S1 respectively sets up and draws described in the vertical equity span ratio of a pair of of guide plate S2, the operating room S4 The vertical equity span of guide card S2 is big, and the head of the guide plate S2 connects with a pair of of edge of the porous plate S1, described The back of guide plate S2 maintains interval between the back with operating room S4, the guide plate S2 and operating room S4 is whole punching press system At, its purpose is that head lead into cold wind be directed at edge and rear portion heat gathers place, reach guiding purpose;The guide plate The transverse horizontal span of S2 isolates one with the vertical the same to span of operating room S4, the pair of guide plate S2 by porous plate S1 Host side group is separated into Liang Ge branches by a bleed chamber road between, porous in the distance of a pair of of side wall of the operating room S4 Plate S1 closer to one be respectively provided with a pair of of through slot, ventilator S5 is set up in the through slot, the pair of through slot is Vertically to distribution, scavenging action is taken for the gas in cabinet, the gas for gathering heat in cabinet can be sent out, be reached The purpose of active cooling;
Band is useful for the information frame communication module of information management great Qu harvesters in described information management great Qu harvesters;
Band is useful for the information frame communication module of network managing and control system in the network managing and control system.
The method of the power dispatching automation control system, it is specific as follows:
The device data received is sent to network managing and control system by management information great Qu harvesters, and network managing and control system is again by pre- If program carries out data processing to the information being collected into;
And information management great Qu harvesters to network managing and control system output information when, carry out in the following manner:
Step 1:When information management great Qu harvesters are to network managing and control system output information frame, described information frame contains frame volume Number:
Be exactly specifically information management great Qu harvesters it is by information frame format come output information to network managing and control system, Frame stem of the described information frame with setting, described information frame also carry out the output order of expressing information frame containing frame number;
Step 2:Described information manages the percentage that great Qu harvesters obtain the omission frame for transmitting to come from network managing and control system, described The percentage for omitting frame is that the network managing and control system is obtained by the frame number that the information frame being included in carries:Specifically It is after the information frame that network managing and control system gets self-information management great Qu harvesters output, the frame for obtaining described information frame is compiled Number, and the frame number is stored, it is used for frame of the information frame communication module to obtained described information frame of network managing and control system in this way The quantity of number is counted, described to be used for network when the quantity of the frame number of described information frame is the critical value of setting The information frame communication module of managing and control system can rely on the quantity of the frame number of the described information frame of statistics to omit the hundred of frame to export Divide ratio, and the percentage for omitting frame is transmitted to described information and manages great Qu harvesters, the percentage for omitting frame is After the quantity for the information frame that the quantity for the information frame that network managing and control system obtains is exported with information management great Qu harvesters is divided by As a result, namely being executed by setting the queue of length scale;The queue of the setting length scale includes the letter that storage obtains The queue and the storage unit for statistics for ceasing the frame number of frame are constituted, i.e., the queue of the described setting length scale can be deposited in In the queue of the frame number of the information frame arrived, when the frame number queue of the information frame of storage does not accommodate, count to obtain Information frame quantity and deposit in the storage unit of statistics, then the quantity of obtained information frame is adopted with information management great Qu The quantity of the information frame of collection machine output be divided by after result as the percentage for omitting frame, then empty the obtained letter of storage Cease the queue of the frame number of frame;
Step 3:The information frame communication module for information management great Qu harvesters in described information management great Qu harvesters exists In mapping table of the percentage of the omission frame of setting with information frame communication mode, percentage phase of the retrieval with the omission frame being transmitted to The information frame communication mode of mapping, and realize information frame traffic according to the information frame communication mode:Namely information management great Qu Harvester is that the percentage of the omission frame in each section maps corresponding information frame communication mode in advance, is also deposited as mapping table The mapping relations for putting the percentage and information frame communication mode of omitting frame obtain in described information management great Qu harvesters and come from net When the percentage of the omission frame of network managing and control system, in the corresponding information frame traffic of percentage for retrieving same omission frame in mapping table Mode carrys out the output of execution information frame according to retrieved message frame traffic mode also in the output of next information frame, then Specifically, when the percentage for omitting frame is no more than 1 percent, described information management great Qu harvesters continue to The information frame communication mode used carries out the output of information frame;It is more than 1 percent in the percentage for omitting frame and is less than percent When four section, described information manage great Qu acquisition function same information frame output double, and double information frame when Between gap be 4 microseconds;When the percentage for omitting frame is more than 4 percent and the section less than 9 percent, described information pipe The areas Li great harvester can export same information frame four parts, and the time slot between four parts of information frames is 4 microseconds;It is losing When the percentage of leakage frame is more than 9 percent, described information manages the routing that great Qu acquisition functions adjust output information frame.
Framework through the invention, cold airflow are led by porous plate S1 into cabinet, and cold airflow is by guide plate S2 separation The bleed chamber road that goes out and the back for reaching guide plate S2, because the vertical equity span of the operating room S4 is than the guide plate S2 Vertical equity span it is big, cold airflow will be moved to the both sides of the cabinet residing for host side, be incorporated into the operating room S4 A pair of of side wall apart from porous plate S1 closer to one be respectively provided in a pair of of through slot and the through slot and set up ventilation The structure of machine S5 implements ventilation towards the gas in cabinet, and air-flow will carry the metapyretic air-flow of host side from ventilation The position of machine S5 exports, and after introducing the guide plate S2, cold airflow in cabinet by exaggerating bigger, with the work of host side With also more completely, being easy to take away than hot-fluids a greater amount of in the past, in addition because the scavenging performance of ventilator S5, improves in cabinet The efficiency of air-flow, the heat that produces can more efficient submitting cabinet when allowing host side to run, it is ensured that host side is in more preferably environment Middle operation.
The method of the present invention is the described information when information management great Qu harvesters are to network managing and control system output information frame Frame contains frame number, and described information manages the percentage that great Qu harvesters obtain the omission frame for transmitting to come from network managing and control system, The percentage for omitting frame is that the network managing and control system obtains, the letter by the frame number that the information frame being included in carries Cease the hundred of the omission frame for managing the information frame communication module for information management great Qu harvesters in great Qu harvesters in setting Divide the information frame traffic than in the mapping table with information frame communication mode, retrieving the percentage maps mutually with the omission frame being transmitted to Mode, and realize information frame traffic according to the information frame communication mode, such information management great Qu harvesters are according to the something lost returned The information frame traffic for leaking the percentage of frame to select information frame communication mode to execute subsequent, thus can be via timely selection Information frame communication mode reduces the percentage of telecommunication media and the omission frame of the information frame traffic under the puzzlement of communication overload problem Than.
Description of the drawings
Fig. 1 is the schematic diagram of the intelligent electric power Dispatching Control System of the present invention;
Fig. 2 is the structural schematic diagram of the cabinet of the present invention;
Fig. 3 is the structural schematic diagram of the overhead guard of the present invention;
Fig. 4 is the structural schematic diagram of the operating room of the present invention;
Fig. 5 is the structural schematic diagram of the porous plate of the present invention.
Specific implementation mode
Invention content is described further with reference to the accompanying drawings and examples:
As Figure 1-Figure 5, intelligent electric power Dispatching Control System includes for acquiring plant stand one region device data of safety One area's harvester of safety, information management great Qu harvesters, 2nd area of safety for acquiring plant stand two region device datas of safety Harvester, network managing and control system;One area's harvester of safety acquires plant stand one region equipment of safety by real-time virtual private network Data, 2nd area of safety acquire and pass through non real-time Virtual Private Network and acquire plant stand two region device datas of safety, one area of safety Collected data are sent to management information great Qu harvesters by harvester and two area's harvesters of safety by positive isolating device;
The host side of the network managing and control system and the host side of other network managing and control systems form host side group and are mounted on cabinet In, the cabinet include have with the porous plate S1 of several through holes, guide plate S2, host side group S3, top it is rectangular Operating room S4, the ventilator S5 of body shape groove and the rectangular-shape groove on the tops overhead guard S6, the operating room S4 are by overhead guard S6 It covers, the overhead guard S6 is connected between operating room S4 via bolt, and porous plate S1, institute are carried in the head of the operating room S4 Some particulate contaminants in air-flow can be screened out by stating porous plate S1, and the edge of the porous plate S1 carries scarf joint, described embedding Connector rabbets into the interlocking mouth being provided on the operating room S4 walls, has the function that cleaning dirt is dismantled in timing with this;In institute A pair of of the edge for stating porous plate S1 respectively sets up and draws described in the vertical equity span ratio of a pair of of guide plate S2, the operating room S4 The vertical equity span of guide card S2 is big, and the head of the guide plate S2 connects with a pair of of edge of the porous plate S1, described The back of guide plate S2 maintains interval between the back with operating room S4, the guide plate S2 and operating room S4 is whole punching press system At, its purpose is that head lead into cold wind be directed at edge and rear portion heat gathers place, reach guiding purpose;The guide plate The transverse horizontal span of S2 isolates one with the vertical the same to span of operating room S4, the pair of guide plate S2 by porous plate S1 Host side group is separated into Liang Ge branches by a bleed chamber road between, porous in the distance of a pair of of side wall of the operating room S4 Plate S1 closer to one be respectively provided with a pair of of through slot, ventilator S5 is set up in the through slot, the pair of through slot is Vertically to distribution, scavenging action is taken for the gas in cabinet, the gas for gathering heat in cabinet can be sent out, be reached The purpose of active cooling;
Band is useful for the information frame communication module of information management great Qu harvesters in described information management great Qu harvesters;
Band is useful for the information frame communication module of network managing and control system in the network managing and control system.
Framework through the invention, cold airflow are led by porous plate S1 into cabinet, and cold airflow is by guide plate S2 separation The bleed chamber road that goes out and the back for reaching guide plate S2, because the vertical equity span of the operating room S4 is than the guide plate S2 Vertical equity span it is big, cold airflow will be moved to the both sides of the cabinet residing for host side, be incorporated into the operating room S4 A pair of of side wall apart from porous plate S1 closer to one be respectively provided in a pair of of through slot and the through slot and set up ventilation The structure of machine S5 implements ventilation towards the gas in cabinet, and air-flow will carry the metapyretic air-flow of host side from ventilation The position of machine S5 exports, and after introducing the guide plate S2, cold airflow in cabinet by exaggerating bigger, with the work of host side With also more completely, being easy to take away than hot-fluids a greater amount of in the past, in addition because the scavenging performance of ventilator S5, improves in cabinet The efficiency of air-flow, the heat that produces can more efficient submitting cabinet when allowing host side to run, it is ensured that host side is in more preferably environment Middle operation.
Such design, via it was verified that compared with Technical comparing, maximum warm spot when host side group runs in cabinet Reduce 7 degree or so so that heat convergency space eliminates, and the running temperature of host side group is maintained at 19-32 degree, between host side Temperature difference reduce 6 degree, such cooling effect is very good.
By it was verified that the gap size kept between back of the back with operating room S4 of the guide plate S2 is 5cm Optimum cools down.
The method of the power dispatching automation control system, it is specific as follows:
The device data received is sent to network managing and control system by management information great Qu harvesters, and network managing and control system is again by pre- If program carries out data processing to the information being collected into;
And information management great Qu harvesters to network managing and control system output information when, carry out in the following manner:
Step 1:When information management great Qu harvesters are to network managing and control system output information frame, described information frame contains frame volume Number:
Be exactly specifically information management great Qu harvesters it is by information frame format come output information to network managing and control system, Frame stem of the described information frame with setting, described information frame also carry out the output order of expressing information frame containing frame number;
Step 2:Described information manages the percentage that great Qu harvesters obtain the omission frame for transmitting to come from network managing and control system, described The percentage for omitting frame is that the network managing and control system is obtained by the frame number that the information frame being included in carries:Specifically It is after the information frame that network managing and control system gets self-information management great Qu harvesters output, the frame for obtaining described information frame is compiled Number, and the frame number is stored, it is used for frame of the information frame communication module to obtained described information frame of network managing and control system in this way The quantity of number is counted, described to be used for network when the quantity of the frame number of described information frame is the critical value of setting The information frame communication module of managing and control system can rely on the quantity of the frame number of the described information frame of statistics to omit the hundred of frame to export Divide ratio, and the percentage for omitting frame is transmitted to described information and manages great Qu harvesters, the percentage for omitting frame is After the quantity for the information frame that the quantity for the information frame that network managing and control system obtains is exported with information management great Qu harvesters is divided by As a result, namely being executed by setting the queue of length scale;The queue of the setting length scale includes the letter that storage obtains The queue and the storage unit for statistics for ceasing the frame number of frame are constituted, i.e., the queue of the described setting length scale can be deposited in In the queue of the frame number of the information frame arrived, when the frame number queue of the information frame of storage does not accommodate, count to obtain Information frame quantity and deposit in the storage unit of statistics, then the quantity of obtained information frame is adopted with information management great Qu The quantity of the information frame of collection machine output be divided by after result as the percentage for omitting frame, then empty the obtained letter of storage Cease the queue of the frame number of frame;
Step 3:The information frame communication module for information management great Qu harvesters in described information management great Qu harvesters exists In mapping table of the percentage of the omission frame of setting with information frame communication mode, percentage phase of the retrieval with the omission frame being transmitted to The information frame communication mode of mapping, and realize information frame traffic according to the information frame communication mode:Namely information management great Qu Harvester is that the percentage of the omission frame in each section maps corresponding information frame communication mode in advance, is also deposited as mapping table The mapping relations for putting the percentage and information frame communication mode of omitting frame obtain in described information management great Qu harvesters and come from net When the percentage of the omission frame of network managing and control system, in the corresponding information frame traffic of percentage for retrieving same omission frame in mapping table Mode carrys out the output of execution information frame according to retrieved message frame traffic mode also in the output of next information frame, then Specifically, when the percentage for omitting frame is no more than 1 percent, described information management great Qu harvesters continue to The information frame communication mode used carries out the output of information frame;It is more than 1 percent in the percentage for omitting frame and is less than percent When four section, described information manage great Qu acquisition function same information frame output double, and double information frame when Between gap be 4 microseconds;When the percentage for omitting frame is more than 4 percent and the section less than 9 percent, described information pipe The areas Li great harvester can export same information frame four parts, and the time slot between four parts of information frames is 4 microseconds;It is losing When the percentage of leakage frame is more than 9 percent, described information manages the routing that great Qu acquisition functions adjust output information frame.
The method of the present invention is the described information when information management great Qu harvesters are to network managing and control system output information frame Frame contains frame number, and described information manages the percentage that great Qu harvesters obtain the omission frame for transmitting to come from network managing and control system, The percentage for omitting frame is that the network managing and control system obtains, the letter by the frame number that the information frame being included in carries Cease the hundred of the omission frame for managing the information frame communication module for information management great Qu harvesters in great Qu harvesters in setting Divide the information frame traffic than in the mapping table with information frame communication mode, retrieving the percentage maps mutually with the omission frame being transmitted to Mode, and realize information frame traffic according to the information frame communication mode, such information management great Qu harvesters are according to the something lost returned The information frame traffic for leaking the percentage of frame to select information frame communication mode to execute subsequent, thus can be via timely selection Information frame communication mode reduces the percentage of telecommunication media and the omission frame of the information frame traffic under the puzzlement of communication overload problem Than.
When additionally including network managing and control system to information management great Qu harvester output informations, in the following manner into Row:
Step 4:When network managing and control system is to information management great Qu harvester output information frames, described information frame contains frame volume Number:
Be exactly specifically network managing and control system it is by information frame format come output information to information management great Qu harvesters, Frame stem of the described information frame with setting, described information frame also carry out the output order of expressing information frame containing frame number;
Step 5:The network managing and control system obtains the percentage for the omission frame for transmitting to come from information management great Qu harvesters, described The percentage for omitting frame is that information management great Qu harvesters are obtained by the frame number that the information frame being included in carries:Specifically For be exactly information management great Qu harvesters get automatic network managing and control system output information frame after, obtain described information frame Frame number, and store the frame number is used for the information frame communication modules of information management great Qu harvesters to described in obtaining in this way The quantity of the frame number of information frame is counted, when the quantity of the frame number of described information frame is the critical value of setting, institute State the quantity of the frame number for the described information frame that can rely on statistics for the information frame communication module of information management great Qu harvesters To export the percentage for omitting frame, and the percentage for omitting frame is transmitted to the network managing and control system, the omission frame Percentage be the information frame that information management great Qu harvesters obtain the number of information frame that is exported with network managing and control system of quantity Measure after being divided by as a result, namely being executed by setting the queue of length scale;The queue of the setting length scale includes depositing The queue of the frame number for the information frame put is constituted with the storage unit for statistics, i.e., the queue of the described setting length scale In the queue of the frame number for the information frame that can be deposited in, when the frame number queue of the information frame of storage does not accommodate, The quantity of the information frame counted and the storage unit for depositing in statistics, then the same information of quantity of obtained information frame Management great Qu harvesters output information frame quantity be divided by after result as it is described omit frame percentage, then empty and deposit The queue of the frame number for the information frame put;
Step 6:The omission frame of the information frame communication module for network managing and control system in the network managing and control system in setting Mapping table of the percentage with information frame communication mode in, information frame of the retrieval with the percentage maps mutually for the omission frame being transmitted to Communication mode, and realize information frame traffic according to the information frame communication mode:Namely network managing and control system is each area in advance Between the percentage of omission frame map corresponding information frame communication mode, also as mapping table come store omit frame percentage and The mapping relations of information frame communication mode obtain the omission frame from information management great Qu harvesters in the network managing and control system Percentage when, in mapping table retrieve with omit frame the corresponding information frame communication mode of percentage, also in next In information frame output, the output of execution information frame is carried out according to retrieved message frame traffic mode, then specifically, omitting frame Percentage no more than when 1 percent, the network managing and control system continues to information frame communication mode currently in use and carries out The output of information frame;When the percentage for omitting frame is more than 1 percent and the section less than 4 percent, the network pipe Control system can export same information frame double, and the time slot of double information frame is 4 microseconds;In the percentage for omitting frame When section more than 4 percent and less than 9 percent, same information frame can be exported four by the network managing and control system Part, and the time slot between four parts of information frames is 4 microseconds;When the percentage for omitting frame is more than 9 percent, the net Network managing and control system can adjust the routing of output information frame.
The method of the present invention is the described information when network managing and control system is to information management great Qu harvester output information frames Frame contains frame number, and the network managing and control system obtains the percentage for the omission frame for transmitting to come from information management great Qu harvesters, The percentage for omitting frame is that information management great Qu harvesters are obtained by the frame number that the information frame being included in carries, Described information manage great Qu harvesters in the information frame communication module for network managing and control system setting omit frame hundred Divide the information frame traffic than in the mapping table with information frame communication mode, retrieving the percentage maps mutually with the omission frame being transmitted to Mode, and realize information frame traffic according to the information frame communication mode, such network managing and control system is according to the omission frame returned Percentage, thus can be via timely selection information frame come the information frame traffic for selecting information frame communication mode to execute subsequent Communication mode reduces the percentage of telecommunication media and the omission frame of the information frame traffic under the puzzlement of communication overload problem.
The above described is only a preferred embodiment of the present invention, be not intended to limit the present invention in any form, though So the present invention has been disclosed as a preferred embodiment, and however, it is not intended to limit the invention, any technology people for being familiar with this profession Member, without departing from the scope of the present invention, when the technology contents using the disclosure above make a little change or modification For the equivalent embodiment of equivalent variations, as long as be without departing from technical solution of the present invention content, according to the technical essence of the invention, Within the spirit and principles in the present invention, to any simple modification, equivalent replacement and improvement etc. made by above example, still Belong within the protection domain of technical solution of the present invention.

Claims (1)

1. intelligent electric power Dispatching Control System, it is characterised in that include the peace for acquiring plant stand one region device data of safety Full area harvester, information management great Qu harvesters are adopted for acquiring 2nd area of safety of plant stand two region device datas of safety Collection machine, network managing and control system;One area's harvester of safety acquires plant stand one region number of devices of safety by real-time virtual private network According to 2nd area of safety acquire and acquire plant stand two region device datas of safety by non real-time Virtual Private Network, and one area of safety is adopted Collected data are sent to management information great Qu harvesters by collection machine and two area's harvesters of safety by positive isolating device;
The host side of the network managing and control system and the host side of other network managing and control systems form host side group and are mounted on cabinet In, the cabinet includes having rectangular-shape recessed with the porous plates of several through holes, guide plate, host side group, top The rectangular-shape groove of operating room, ventilator and the overhead guard of slot, the operating room top is covered by overhead guard, the same work of overhead guard Make to be connected via bolt between room, carries porous plate in the head of the operating room, the porous plate can screen out in air-flow Particulate contaminant, the edge of the porous plate carry scarf joint, and the scarf joint is rabbeted embedding into being provided on the chamber wall Interface clears up dirt with this to have the function that timing is dismantled;A pair is respectively set up in a pair of of edge of the porous plate to draw The vertical equity span of guide card, the operating room is bigger than the vertical equity span of the guide plate, the head of the guide plate A pair of of edge with the porous plate connects, and the back of the guide plate is described to draw with maintaining interval between the back of operating room Guide card and operating room are made of whole punching press, its purpose is that head lead into cold wind be directed at edge and rear portion heat gathers it Place, reaches guiding purpose;The transverse horizontal span of the guide plate is the same as the vertical the same to span of operating room, the pair of guiding Piece isolates a bleed chamber road by porous plate, and host side group is separated into Liang Ge branches between, and one in the operating room To side wall apart from porous plate closer to one be respectively provided with a pair of of through slot, set up ventilator in the through slot, it is described A pair of of through slot is to take scavenging action for the gas in cabinet vertically to distribution, can be the heat that gathers in cabinet Gas is sent out, and achievees the purpose that active cooling;
Band is useful for the information frame communication module of information management great Qu harvesters in described information management great Qu harvesters;The net Band is useful for the information frame communication module of network managing and control system in network managing and control system;
The back of the guide plate is 5cm with the gap size kept between the back of operating room;
The device data received is sent to network managing and control system by management information great Qu harvesters, and network managing and control system is again by pre- If program carries out data processing to the information being collected into.
CN201810396003.XA 2016-05-18 2016-05-18 With network managing and control system adjust routes information frames by intelligent electric power Dispatching Control System Pending CN108563207A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810396003.XA CN108563207A (en) 2016-05-18 2016-05-18 With network managing and control system adjust routes information frames by intelligent electric power Dispatching Control System

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201610327864.3A CN105843194B (en) 2016-05-18 2016-05-18 Intelligent electric power Dispatching Control System
CN201810396003.XA CN108563207A (en) 2016-05-18 2016-05-18 With network managing and control system adjust routes information frames by intelligent electric power Dispatching Control System

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201610327864.3A Division CN105843194B (en) 2016-05-18 2016-05-18 Intelligent electric power Dispatching Control System

Publications (1)

Publication Number Publication Date
CN108563207A true CN108563207A (en) 2018-09-21

Family

ID=56593668

Family Applications (6)

Application Number Title Priority Date Filing Date
CN201810396002.5A Pending CN108490903A (en) 2016-05-18 2016-05-18 Adjustable routes information frames by intelligent electric power Dispatching Control System working method
CN201810408929.6A Pending CN108833054A (en) 2016-05-18 2016-05-18 Method of the management information great Qu harvester to network managing and control system output information
CN201810336482.6A Withdrawn CN108490901A (en) 2016-05-18 2016-05-18 Intelligent electric power Dispatching Control System
CN201810395320.XA Pending CN108508859A (en) 2016-05-18 2016-05-18 The information management great Qu harvesters of intelligent electric power Dispatching Control System
CN201810396003.XA Pending CN108563207A (en) 2016-05-18 2016-05-18 With network managing and control system adjust routes information frames by intelligent electric power Dispatching Control System
CN201610327864.3A Active CN105843194B (en) 2016-05-18 2016-05-18 Intelligent electric power Dispatching Control System

Family Applications Before (4)

Application Number Title Priority Date Filing Date
CN201810396002.5A Pending CN108490903A (en) 2016-05-18 2016-05-18 Adjustable routes information frames by intelligent electric power Dispatching Control System working method
CN201810408929.6A Pending CN108833054A (en) 2016-05-18 2016-05-18 Method of the management information great Qu harvester to network managing and control system output information
CN201810336482.6A Withdrawn CN108490901A (en) 2016-05-18 2016-05-18 Intelligent electric power Dispatching Control System
CN201810395320.XA Pending CN108508859A (en) 2016-05-18 2016-05-18 The information management great Qu harvesters of intelligent electric power Dispatching Control System

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201610327864.3A Active CN105843194B (en) 2016-05-18 2016-05-18 Intelligent electric power Dispatching Control System

Country Status (1)

Country Link
CN (6) CN108490903A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004214856A (en) * 2002-12-27 2004-07-29 Daikin Ind Ltd System and method for transmitting/receiving data
CN1522006A (en) * 2003-01-28 2004-08-18 ��Ϊ�������޹�˾ System and method for switchingin and transmission of different data frames in digital transmission network
CN1964292A (en) * 2006-09-29 2007-05-16 Ut斯达康通讯有限公司 A method used to detect and feedback frame loss ratio of lub FP frame based on IP transmission
CN103391603A (en) * 2013-07-04 2013-11-13 苏州博联科技有限公司 Low power consumption transmission method for large data information in wireless sensor network
CN205003592U (en) * 2015-09-24 2016-01-27 益华惠(天津)科技有限公司 High density rack -type safety all -in -one
CN205212854U (en) * 2015-12-25 2016-05-04 江苏泽宇电力设计有限公司 Electric power dispatching automation control system

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6115390A (en) * 1997-10-14 2000-09-05 Lucent Technologies, Inc. Bandwidth reservation and collision resolution method for multiple access communication networks where remote hosts send reservation requests to a base station for randomly chosen minislots
US6665283B2 (en) * 2001-08-10 2003-12-16 Motorola, Inc. Method and apparatus for transmitting data in a packet data communication system
CN100493002C (en) * 2007-03-29 2009-05-27 北京中星微电子有限公司 A method for computing the data loss in the network transfer
CN102468941B (en) * 2010-11-18 2014-07-30 华为技术有限公司 Network packet loss processing method and device
CN202205137U (en) * 2011-09-07 2012-04-25 杭州精尚投资管理有限公司 Mobile thermostatic dustproof type computer cluster system
CN202472502U (en) * 2012-02-16 2012-10-03 杭州精尚投资管理有限公司 Constant-temperature dehumidifying computer clustering system
US20130322012A1 (en) * 2012-05-29 2013-12-05 Birchbridge Incorporated Scalable Brain Boards For Data Networking, Processing And Storage
CN103025094B (en) * 2012-11-08 2016-06-22 杭州精尚投资管理有限公司 High safe integration constant temperature dehumidification energy conservation server machine cabinet
CN105100886B (en) * 2014-04-22 2019-03-15 腾讯科技(北京)有限公司 Distribution control method and device, the server and system of network media information
CN104539917A (en) * 2015-02-03 2015-04-22 成都金本华科技股份有限公司 Method for improving definition of video image
CN205179559U (en) * 2015-08-06 2016-04-20 孙久仓 Power scheduling rack
CN204968320U (en) * 2015-08-26 2016-01-13 山东鲁能软件技术有限公司 All -in -one heat dissipation rack and rack group based on power equipment monitoring
CN204994205U (en) * 2015-09-28 2016-01-20 浙江荣励电子科技有限公司 Ware rack is served to intelligence constant temperature

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004214856A (en) * 2002-12-27 2004-07-29 Daikin Ind Ltd System and method for transmitting/receiving data
CN1522006A (en) * 2003-01-28 2004-08-18 ��Ϊ�������޹�˾ System and method for switchingin and transmission of different data frames in digital transmission network
CN1964292A (en) * 2006-09-29 2007-05-16 Ut斯达康通讯有限公司 A method used to detect and feedback frame loss ratio of lub FP frame based on IP transmission
CN103391603A (en) * 2013-07-04 2013-11-13 苏州博联科技有限公司 Low power consumption transmission method for large data information in wireless sensor network
CN205003592U (en) * 2015-09-24 2016-01-27 益华惠(天津)科技有限公司 High density rack -type safety all -in -one
CN205212854U (en) * 2015-12-25 2016-05-04 江苏泽宇电力设计有限公司 Electric power dispatching automation control system

Also Published As

Publication number Publication date
CN108490903A (en) 2018-09-04
CN105843194A (en) 2016-08-10
CN108490901A (en) 2018-09-04
CN105843194B (en) 2018-08-07
CN108833054A (en) 2018-11-16
CN108508859A (en) 2018-09-07

Similar Documents

Publication Publication Date Title
CN103269355B (en) Intelligent skynet application platform
CN107945053A (en) A kind of multiple source power distribution network data convergence analysis platform and its control method
CN103902537A (en) Multi-service log data storage processing and inquiring system and method thereof
CN205212854U (en) Electric power dispatching automation control system
CN114384826A (en) Intelligent agricultural monitoring system based on AI simulation
CN109952948A (en) A kind of remote visualization Intelligent irrigation system based on Internet of Things
CN103106629B (en) Stand district's passenger flow density acquisition system
Wenshun et al. Design and implementation of sunlight greenhouse service platform based on IOT and cloud computing
CN206162182U (en) Long -range energy monitoring platform of ground source heat pump system
CN108334938A (en) A kind of mosquito matchmaker's automatic monitoring system based on image recognition
CN105843194B (en) Intelligent electric power Dispatching Control System
CN205608824U (en) Natural gas line subregion system of patrolling and examining
CN103763150B (en) Data collecting system
CN108549285A (en) A kind of pipe gallery automatic tour inspection system
CN105867193A (en) Intelligent family disease prevention and treatment equipment, system and method
CN109462283A (en) Intelligent substation individual equipment flux monitoring method and system
CN214339546U (en) Tea tree plant diseases and insect pests monitoring devices
CN202309216U (en) Unattended transformer station remote patrol system
CN206710882U (en) Based on cloud platform factory internet of things equipment management intelligence system
CN206698256U (en) A kind of earth-source hot-pump system operation maintenance remote internet of things monitoring system
CN107872518A (en) Power information acquisition terminal maintaining method based on remote wireless communication module
CN204423369U (en) Based on the distributed photovoltaic power station data base management system of MongoDB
CN105827465B (en) The method of power dispatching automation control system
CN106026385B (en) Cooling type power dispatching automation control system and method
CN112507272A (en) Intelligent community property intelligent management information publishing and bulletin platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180921

WD01 Invention patent application deemed withdrawn after publication