A kind of remote operation controller and method of accumulated electric heater Download PDFInfo
- Publication number
- CN108561945A CN108561945A CN201810342014.XA CN201810342014A CN108561945A CN 108561945 A CN108561945 A CN 108561945A CN 201810342014 A CN201810342014 A CN 201810342014A CN 108561945 A CN108561945 A CN 108561945A
- Authority
- CN
- China
- Prior art keywords
- electric heater
- heat
- temperature
- heating
- temperature control
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24D—DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
- F24D13/00—Electric heating systems
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24D—DOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
- F24D19/00—Details
- F24D19/10—Arrangement or mounting of control or safety devices
- F24D19/1096—Arrangement or mounting of control or safety devices for electric heating systems
Abstract
The present invention provides a kind of accumulated electric heater remote operation controller, which is characterized in that including with lower component:Cloud server, electric heater terminal;Accumulated electric heater, electric heater temperature control terminal.The accumulated electric heater includes accumulation of heat part, fan section, temperature measurement fraction, control assembly part, casing part, renewals, control device, display panel.The cloud server has high in the clouds calculator, high in the clouds memory.The present invention also provides a kind of accumulated electric heater remote control methods, and it makes use of the progress of foregoing accumulated electric heater remote operation controller, which is characterized in that includes the following steps:1) heat compensation information filling step:2) heat preparation programs making step;3) heating preparation programs verify step;4) heat preparation programs trouble-shoots step;5) step is replaced or is changed in adjustment;6) step is replaced in electric heater adjustment;7) heat Plan rescheduling step;(8) electric heater heating executes step.
Description
Technical field
The present invention relates to the remote of the technical field of accumulated electric heater remote control more particularly to a kind of accumulated electric heater
Journey control device and a kind of remote control method of accumulated electric heater.
Background technology
With for air pollution attention and low ebb electricity price efficiently use, free of contamination accumulated electric heater is very good can
To be directed to both of these problems, become one of the important selection of " coal changes electricity " of dispersion heating, but accumulated electric heater has it certainly
The problem of body, that is, the accumulated electric heater of the prior art is typically all that live can only manipulate, and the charging time is reconciled at scene, goes out
The parameters such as wind velocity can not be configured in advance, also unspecial long-range control method.
Existing accumulated electric heater does not propose or provides the remote control method for capableing of practice, this may
The reason of it is very complicated, when most of technical staff may feel It is not necessary to, it is household that they, which may feel electric heater, makes
With, scene reconcile just it is enough, second is that the remote control of accumulated electric heater implement can it is more complicated, in many cases may be used
Setting target can be not achieved, from air-conditioning the case where is different.As in the prior art, North America have many families be assembled with air-conditioning or
The remote control temperature controlling function of air-conditioning+air source heat pump, but air-conditioning or air-conditioning+air source heat pump execute within the scope of temperature control
Power is strong, as long as the temperature condition of setting can execute, so the remote control generally coordinates air-conditioning or air indoors
The control unit of a connection WIFI is arranged in source heat pump, such as hangs controller on the wall, but accumulated electric heater
Situation is more complex, and the acceptable temperature control range of acquiescence is usually very small, and such as 16-20 DEG C, this, which is also general masses, needs
The heat supply temperature wanted, if remotely located it is allowed super to go beyond the scope, it is likely that the case where appearance can not execute, still
Increase now with the application scenario of accumulated electric heater and the setting demand of crowd's personalization, the temperature change needed and
Temperature range greatly expands, such as it is not general shelter, such as corridor, storehouse, greenhouse place that accumulated electric heater, which appears in,
All great changes have taken place for its temperature standard needed and alternating temperature degree, in this case, is only arranged without checking, a storage
Hot type electric heater transfinite in practical applications so that can not executive plan heat-supplying mode be very universal, if employment
Work detects and the mode of adjustment, can not be completed in reality, because the manpower needed in this way is too many, almost without the possibility of realization,
But needed have in reality again as, this is a conclusive defect for applying accumulated electric heater in the prior art.
How aforementioned drawback solves, this is a restriction widely applied big problem of accumulated electric heater, because if
Can't resolve this problem, the large-scale application of accumulated electric heater with regard to defective, can not such as air-conditioning can random temperature adjustment, but
Be the characteristics of accumulated electric heater can efficiently use the balance power grid demand of trough-electricity and low ebb electricity price and high economy also without
From performance.
Invention content
The first object of the present invention be solve the prior art in the presence of can not specific aim provide large batch of heat accumulating type
The remote control of electric heater can not personalized the problem of realizing, for this situation dealt with without enough manpowers, provide one kind
Can have specific aim and professional accumulated electric heater remote operation controller, under this device and method, many feelings
Under condition user by instruction using the spare part in spare part box can self-changeable and repair, eliminate manpower and time,
The case where being safeguarded using manpower is preferably minimized so that the maintenance team of small-scale can safeguard the accumulated electric heater of large area
Temperature control situation be possibly realized, but also the remote control of large batch of accumulated electric heater is possibly realized, because effect is not achieved
The remote control of fruit is not real remote control.Second purpose is to propose mating method so that recycles aforementioned dress
Under the premise of setting, the remote control of large batch of accumulated electric heater can be realized easily, for ordinary user or repair people
Member, it is only necessary to operate temperature control terminal PAD and replaced and safeguarded according to the suggestion of proposition, greatly save people
Power.
A kind of remote operation controller of accumulated electric heater, which is characterized in that including with lower component:
Cloud server has high in the clouds calculator, high in the clouds memory and first network interface, has on the memory of high in the clouds thereon
There are meteorogical phenomena database and accumulated electric heater configuration database, heat compensation database, the cloud server to pass through the first net
Network interface connects internet.
Electric heater terminal comprising terminal microcontroller, terminal memory, power interface, power supply adaptor, the second network connect
Mouth, the first communication interface, the second communication interface, the control that the electric heater terminal passes through the first communication interface and accumulated electric heater
Device communication processed, the electric heater terminal connect internet by the second network interface.
Accumulated electric heater, including accumulation of heat part, fan section, temperature measurement fraction, control assembly part, casing part, standby
Part part, control device, display panel.
The current room temperature data and current wind speed in room location where the meteorogical phenomena database, including accumulated electric heater
Data also include in real time from the following room temperature data in room location and future where the collected accumulated electric heater in internet
Air speed data.
The accumulated electric heater configuration database, including but not limited to each practical accumulated electric heater used
Configuration information, configuration information include but not limited to using gitter brick specification and total amount of stored heat, the regenerator temperature upper limit, accumulation of heat brick
Number, accumulation of heat heating rate upper limit value, accumulation of heat heating rate lower limiting value, per hour heat release upper limit value, per hour heat release lower limiting value, wind
Machine upper wind velocity limit value, wind turbine wind speed lower limiting value.
The heat compensation database has the every small of the different area room under condition of different temperatures and under different wind speed
When using heat supply temperature as standard heat lose average data.
Electric heater temperature control terminal, the temperature control terminal is PAD or smart mobile phone, has temperature control terminal memory, thereon
It is installed with the special APP of temperature control, for from cloud server and electric heater terminal called data, the temperature control terminal to be with 3G/4G/
The mode of one of 5G/WIFI is connect with internet.
A kind of foregoing remote operation controller of accumulated electric heater, it is characterised in that:
The accumulated electric heater, one of power 1600W, 2400W, 3200W, 4000W.These heat-accumulating type electric-heatings
The rate of attacking of device is common setting, disclosure satisfy that general room heat demand, the quantity of gitter brick therewith are also convenient for being arranged,
Gitter brick and electric heater power can be customized as needed, this is not problem.
The renewals have spare part box, hold accumulated electric heater spare part in the spare part box, including gitter brick,
U-shaped heating tube, control device, common cable, common maintenance tool.Above-mentioned spare part box can be compound in electric heating in a manner of attachment
Below device or rear.Include at least four wheels being symmetrically installed below electric heater, so that it can be moved, but also going out
Air port can be arranged below, so that can outlet air from below.
The accumulation of heat part of the accumulated electric heater includes metal-back, package asbestos cloth, 5-30 blocks gitter brick, U-shaped
Heating tube, the U-shaped heating tube include at least the U-shaped portion of two disks folding.The metal-back has opening, while two sides in side
Asbestos cloth does not also wrap up in side, and asbestos cloth is only wrapped up from upper and lower front and back four direction, so that side can be open for heating
The light replacement of pipe and gitter brick, while the other side is conveniently connect with original papers such as thermometrics.
The fan section of the accumulated electric heater includes blower motor, running part, impeller, the blower motor position
Side in accumulation of heat part, impeller quantity are at least two, are located at accumulation of heat beneath portions.
The temperature measurement fraction includes at least three probes, wherein the first probe is located at the package asbestos cloth for being close to metal-back
Among, second probe be located at accumulation of heat partial lumen among, third probe positioned at some aforementioned impeller outlet air side, it is described at least
Each of three probes is connected to adapter, and adapter is connected to data processor, and the data processor is connected to number
According to bus, and the data processor is connected to the display panel of place accumulated electric heater.The probe can be general
Thermocouple temperature measurement is popped one's head in or universal contact temperature-measuring probe, and surface is cased with stainless steel or the shell of other alloys.
The control assembly part includes power supply AC/DC conversion portions, direct current supply assembly, data/address bus.
The casing part includes stainless steel casing, liner asbestos cloth, and antirust is coated with inside and outside the stainless steel casing
Coating, outer layer are also coated with white anticorrosive paint except rust-proof coating, and the casing part front has a square aperture, is used for
The placement of the control device and display panel.
The spare part box, the rear part have at least four to protrude downward buckle, are used for and accumulated electric heater rear portion
At least four protrude outward and the buckle slot communicated up and down matches, equipped with dedicated screwdriver, spare gitter brick, spare in the outer box
U-shaped heating tube, spare asbestos cloth.The spare part box shell is easily switched, so that can be convenient for electric heater replacement portion
Part.
The control device includes control single chip computer and button portion, and button portion includes adjusting in wind speed adjustment portion and charging time
Portion.Control device further includes other necessary circuit connections.
The display panel be the liquid crystal display equipped with microcontroller, the liquid crystal display booting when show including but
It is not limited to following information:Real time temperature, the wind turbine of desired temperature, charging duration, the first probe and the second probe and third probe
Wind speed.
The present invention also provides a kind of remote control methods of accumulated electric heater, and it makes use of foregoing regenerative electrochemicals
The remote operation controller of warmer, which is characterized in that steps are as follows:
1) heat compensation information filling step:In the heat compensation database, for having under condition of different temperatures and
Average data is lost in different area room under different wind speed by the heat of standard of heat supply temperature per hour, and the heat is lost
It loses average data to be acquired by the measured data in magnanimity room, ranging from -40 DEG C to 10 DEG C above freezing of above-mentioned condition of different temperatures,
Ranging from 0-17m/s under above-mentioned difference wind speed, ranging from 0-40 square metres of above-mentioned different area room are above-mentioned to be with heat supply temperature
Standard, ranging from 16 DEG C -25 DEG C of heat supply temperature, on this basis, has for what is collected under condition of different temperatures
With being calculated per hour by the heat of standard loss average data of heat supply temperature for the different area room under different wind speed
And register, for there are multiple data samples under same temperature, wind speed, room area, heat supply standard, its average value is sought, such as
Fruit some specific temperature, wind speed, room area, there are one samples for lower of heat supply standard, then directly register, and generally form for often
One A DEG C of specific temperature, each certain wind speed Bm/s, each particular room area Cm2, each specific heat supply standard D
Heat compensation data standard at DEG C.
In step (1), ensure that all at least acquiring 3 under some specific temperature, wind speed, room area, heat supply standard has
Sample is imitated, step (2) is entered back into.
2) heat preparation programs making step:Heating demands information is acquired by the special APP of temperature control in temperature control terminal, is generated
Heat preparation programs, and the heating preparation programs only can be as unit of integral multiple for 24 hours, and temperature control target temperature is with per hour
Control is limit in certain fixation degree Celsius, and the limits are 16 DEG C -25 DEG C, based on this generation heating preparation programs, storage
In temperature control terminal memory.
In step (2), if described acquire the letter that heating demands information collection is arrived by the special APP of temperature control in temperature control terminal
Breath is plural item, then selects a selection by high in the clouds calculator, or calculate average value by high in the clouds calculator, and by mean value calculation
Heat preparation programs.
3) heating preparation programs verify step:Aforementioned heating preparation programs are sent to cloud server, from the accumulation of heat
Formula electric heater configuration database is extracted from the configuration data of the extraction heating targeted electric heater of preparation programs from meteorogical phenomena database
The following room temperature data in room location where electric heater and the following air speed data are verified in terms of heating preparation by every for unit for 24 hours
It draws:Effectively gone out by electric heater hot lowest temperature be E DEG C on the basis of, the temperature control target temperature with each hour in the following 24H is
Benchmark, and inner room for 24 hours is calculated according to meteorological data and always loses heat, the accumulation of heat heat that electric heater always needs is calculated,
And the outlet air wind speed of each hour is calculated on the basis of the temperature control target temperature of each hour in the following 24H, obtain electric heater
The heating preparation executive plan of each unit, merges the heating preparation executive plan of each unit, obtains the preparation execution that always heats
Plan.
Described effectively to go out hot lowest temperature with electric heater in step (3), being the electric heater cannot effectively heat interior
It is limited at a temperature of air, by adjusting to obtain according to measured result on the basis of experience value;It is described that electric heater is calculated is total
The accumulation of heat heat needed is according to the ((ground in room where Σ (temperature control target temperature h- weather prognosis temperature h)) * Q24h=Σ
Per the rooms square metre m2 heat capacity of air * number in the season room in area), it is calculated, Q24h is the accumulation of heat that interior electric heater always needs for 24 hours
Heat, h=1~24.
4) heat preparation programs trouble-shoots step:According to include but not limited to using gitter brick specification and total amount of stored heat,
The regenerator temperature upper limit, gitter brick block number, accumulation of heat heating rate upper limit value, accumulation of heat heating rate lower limiting value, per hour the heat release upper limit
Value, per hour heat release lower limiting value, wind turbine upper wind velocity limit value, the electric heater configuration information of wind turbine wind speed lower limiting value are above-mentioned total to check
Heat preparation programs, cannot execute above-mentioned total heating if there is because electric heater configures and prepare executive plan, then by information
Temperature control terminal is fed back to, and the inexecutable situation of temperature control target temperature of which hour in the preparation programs that heat is fed back into cloud
Server is held, is shown in temperature control terminal in the form shown;If total heating preparation executive plan executes no electric heater and matches
The obstacle set then enters step (8).
It is described to be shown in temperature control terminal in the form shown in step (4), show temperature control curve in tangible temperature control terminal
While, show that the temperature control of which section or those sections is irrealizable, the temperature control curve that can realize is shown in green, no
The temperature control curve that can be realized is shown in red.
5) step is replaced or is changed in adjustment:What it is by affiliated temperature control terminal acquisition personnel's feedback is adjusted more to electric heater
Change or be carry out heating change of plan clear information, if feedback be the information that replacement is adjusted to electric heater,
(6) are entered step, if feedback is the information for carrying out heating change of plan, are entered step (7).
6) step is replaced in electric heater adjustment:According to aforementioned above-mentioned total heating cannot be executed in the presence of because electric heater configures in advance
The information of standby executive plan carries out member replacing or integral replacing to accumulated electric heater, and member replacing includes but not limited to store
Hot brick quantity, specification or type adjustment, blower motor are replaced into different capacity blower motor, and integral replacing is including but not limited to whole
Body is changed to other power or the accumulated electric heater of model, category;After adjustment is replaced, confirm that the electric heater after replacing can be held
The total heating preparation executive plan of row, then enter step (8).
In step (6), the information of the member replacing is first checked by the spare part box of high in the clouds calculator and the electric heater, such as
Fruit spare part box can cope with the case where member replacing, then to the temperature control terminal of the user corresponding to the electric heater held
Information is sent, user is reminded to replace, either integral replacing the case where the member replacing that cannot be coped with if it is spare part box
The case where, then information is sent to the temperature control terminal of the maintenance personal corresponding to the electric heater held, maintenance personal is reminded to carry out
It replaces.
7) heat Plan rescheduling step:Again heating demands information is acquired by the special APP of temperature control in temperature control terminal, generated
Heating preparation programs after adjustment, the heating preparation programs only can be as unit of integral multiples for 24 hours, and temperature control target temperature
Controlled per hour in certain fixation degree Celsius as limit, the limits are 16 DEG C -25 DEG C, based on this generation heating preparation meter
It draws, is stored in temperature control terminal memory, and return to step (3) and continue to execute.
(8) electric heater heating executes step:Determine that heating preparation programs are the practical plan of heating in following N number of 24H, and
The practical plan of heating is stored in the terminal memory of electric heater terminal, this is transferred by the terminal microcontroller in electric heater terminal
Heating is actually planned and is executed.
In step (8), the heating actually plan can by other PC, smart mobile phone, PAD by internet via encryption
Means, which are transferred, checks, and is printed.
The value of the A is -40 DEG C to 10 DEG C above freezing, and the value of the B is 0-17m/s, and the value of the C is flat for 0-40
The value of square rice, the D is 16 DEG C -25 DEG C, and the value of the E is 80-150.
Preferably, the value of the A is -10 DEG C to 5 DEG C above freezing, and the value of the B is 0-6m/s, and the value of the C is
5-20 square metres, the value of the D is 18 DEG C -20 DEG C, and the value of the E is 100-110.
It is an advantage of the invention that can be mainly divided at 2 points, first, by for the weak feelings of accumulated electric heater adaptive faculty
Condition, the device can definitely arrange electric heater to carry out temperature control, for being unable to the case where adaptive temperature changes, in many cases
User voluntarily, even if maintenance personal visits can also can predict replacement and maintenance mode so that adjustment is light very much, section
Saved a large amount of manpower and materials, seen on the whole, the case where electric heater group is in insufficient temperature control, can also be minimized, reduce by
The case where complaint, second is that being laid the foundation for the statistical information for obtaining electric heater, on the basis of the present invention, this makes electric heater
Research and development improvement, the setting of Resolving probiems, model, category can more shoot the arrow at the target, avoid unordered Innovation Input, if
The information is disclosed to the public, but also Public choice electric heater has adequate cause.The prior art has no similar techniques and can solve
Certainly this problem will not reach similar technique effect, and the prior art is even all without clearly proposing being somebody's turn to do for accumulated electric heater
Problem thinks that the problem is unworthy proposing in those skilled in the art's subconsciousness, but applicant does not so think, practice card
This bright problem is to be worth proposition and soluble.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with
Obtain other attached drawings according to these attached drawings.
Fig. 1 is the composition figure of the accumulated electric heater remote operation controller of the present invention;
The step of Fig. 2 is the accumulated electric heater remote control method of the present invention illustrates.
Reference numeral corresponding intrument is cloud server 1, high in the clouds calculator 2, high in the clouds memory 3, electric heater terminal 4, is stored
Hot type electric heater 5, accumulation of heat part 6, fan section 7, temperature measurement fraction 8, control assembly part 9, casing part 10, renewals
11, control device 12, display panel 13, electric heater temperature control terminal 14.
Specific implementation mode
The preferred embodiment of the present invention is described in detail below in conjunction with the accompanying drawings, so that advantages and features of the invention energy
It is easier to be readily appreciated by one skilled in the art, so as to make a clearer definition of the protection scope of the present invention.
Specific implementation mode
A kind of remote operation controller of accumulated electric heater, which is characterized in that including with lower component:
Cloud server has high in the clouds calculator, high in the clouds memory and first network interface, has on the memory of high in the clouds thereon
There are meteorogical phenomena database and accumulated electric heater configuration database, heat compensation database, the cloud server to pass through the first net
Network interface connects internet.The network interface is standard network interface or wireless WIFI module.
Electric heater terminal comprising terminal microcontroller, terminal memory, power interface, power supply adaptor, the second network connect
Mouth, the first communication interface, the second communication interface, the control that the electric heater terminal passes through the first communication interface and accumulated electric heater
Device communication processed, the electric heater terminal connect internet by the second network interface.The network interface is that standard network connects
Mouth or wireless WIFI module.
Accumulated electric heater, including accumulation of heat part, fan section, temperature measurement fraction, control assembly part, casing part, standby
Part part, control device, display panel.The accumulated electric heater, power 1600W, 2400W, 3200W, 4000W wherein it
One.The rate of attacking of these accumulated electric heaters is common setting, disclosure satisfy that general room heat demand, gitter brick therewith
Quantity is also convenient for being arranged, and can also customize gitter brick and electric heater power as needed, this is not problem.
The renewals have spare part box, hold accumulated electric heater spare part in the spare part box, including gitter brick,
U-shaped heating tube, control device, common cable, common maintenance tool.Above-mentioned spare part box can be compound in electric heating in a manner of attachment
Below device or rear.Include at least four wheels being symmetrically installed below electric heater, so that it can be moved, but also going out
Air port can be arranged below, so that can outlet air from below.Above-mentioned wheel is universal wheel, can arbitrarily be pushed.
The accumulation of heat part of the accumulated electric heater includes metal-back, package asbestos cloth, 8 or 12 or 16 pieces of accumulation of heats
Brick, U-shaped heating tube, the U-shaped heating tube include at least the U-shaped portion of two disks folding.The metal-back has opening in side, simultaneously
Asbestos cloth is not also wrapped up in two sides, and asbestos cloth is only wrapped up from upper and lower front and back four direction, the use so that side can be open
In the light replacement of heating tube and gitter brick, while the other side is conveniently connect with original papers such as thermometrics.
The fan section of the accumulated electric heater includes blower motor, running part, impeller, the blower motor position
Side in accumulation of heat part, impeller quantity are two, and separately left and right is located at accumulation of heat beneath portions.It is provided with below electric heater vertical
Directly the plane where the heating tube goes out hot opening, and described to go out heat opening at least 12 or more and to be mutually parallel, width is not less than
1cm, length are not less than 8cm.
The temperature measurement fraction includes at least three probes, wherein the first probe is located at the package asbestos cloth for being close to metal-back
Among, second probe be located at accumulation of heat partial lumen among, third probe positioned at some aforementioned impeller outlet air side, it is described at least
Each of three probes is connected to adapter, and adapter is connected to data processor, and the data processor is connected to number
According to bus, and the data processor is connected to the display panel of place accumulated electric heater.The probe can be general
Thermocouple temperature measurement is popped one's head in or universal contact temperature-measuring probe, and surface is cased with stainless steel or the shell of other alloys.
The control assembly part includes power supply AC/DC conversion portions, direct current supply assembly, data/address bus.
The casing part includes stainless steel casing, liner asbestos cloth, and antirust is coated with inside and outside the stainless steel casing
Coating, outer layer are also coated with white anticorrosive paint except rust-proof coating, and the casing part front has a square aperture, is used for
The placement of the control device and display panel.
The spare part box, the rear part have at least four to protrude downward buckle, are used for and accumulated electric heater rear portion
At least four protrude outward and the buckle slot communicated up and down matches, equipped with dedicated screwdriver, spare gitter brick, spare in the outer box
U-shaped heating tube, spare asbestos cloth.The spare part box shell is easily switched, so that can be convenient for electric heater replacement portion
Part.
The control device includes control single chip computer and button portion, and button portion includes adjusting in wind speed adjustment portion and charging time
Portion.Control device further includes other necessary circuit connections.
The display panel be the liquid crystal display equipped with microcontroller, the liquid crystal display booting when show including but
It is not limited to following information:Real time temperature, the wind turbine of desired temperature, charging duration, the first probe and the second probe and third probe
Wind speed.
The current room temperature data and current wind speed in room location where the meteorogical phenomena database, including accumulated electric heater
Data also include in real time from the following room temperature data in room location and future where the collected accumulated electric heater in internet
Air speed data.Here the collected data in internet at least acquire from five data sources that can actually acquire, and remove one
A peak removes a minimum, other remaining data are averaged, the following room temperature as place room location
Data and the following air speed data.
The accumulated electric heater configuration database, including but not limited to each practical accumulated electric heater used
Configuration information, configuration information include but not limited to using gitter brick specification and total amount of stored heat, the regenerator temperature upper limit, accumulation of heat brick
Number, accumulation of heat heating rate upper limit value, accumulation of heat heating rate lower limiting value, per hour heat release upper limit value, per hour heat release lower limiting value, wind
Machine upper wind velocity limit value, wind turbine wind speed lower limiting value.The configuration information can as possible in detail, so that the monitoring and replacement of configuration are more
Add with a definite target in view.It can also include the tolerance duration that gitter brick used is capable of normal use.
The heat compensation database has the every small of the different area room under condition of different temperatures and under different wind speed
When using heat supply temperature as standard heat lose average data.
Electric heater temperature control terminal, the temperature control terminal is PAD, has temperature control terminal memory, is installed with temperature control thereon
Special APP, for from cloud server and electric heater terminal called data, the temperature control terminal to be to be equipped with 4G communication modules
Mode is connect with internet.
A kind of remote control method of accumulated electric heater, it makes use of the long-range behaviour of foregoing accumulated electric heater
Control device, which is characterized in that steps are as follows:
1) heat compensation information filling step:In the heat compensation database, for having under condition of different temperatures and
Average data is lost in different area room under different wind speed by the heat of standard of heat supply temperature per hour, and the heat is lost
It loses average data to be acquired by the measured data in magnanimity room, ranging from -40 DEG C to 10 DEG C above freezing of above-mentioned condition of different temperatures,
Ranging from 0-17m/s under above-mentioned difference wind speed, ranging from 0-40 square metres of above-mentioned different area room are above-mentioned to be with heat supply temperature
Standard, ranging from 16 DEG C -25 DEG C of heat supply temperature, on this basis, has for what is collected under condition of different temperatures
With being calculated per hour by the heat of standard loss average data of heat supply temperature for the different area room under different wind speed
And register, for there are multiple data samples under same temperature, wind speed, room area, heat supply standard, its average value is sought, such as
Fruit some specific temperature, wind speed, room area, there are one samples for lower of heat supply standard, then directly register, and generally form for often
One A DEG C of specific temperature, each certain wind speed Bm/s, each particular room area Cm2, each specific heat supply standard D
Heat compensation data standard at DEG C.Ensure all at least to acquire 3 under some specific temperature, wind speed, room area, heat supply standard
A effective sample enters back into step (2).
2) heat preparation programs making step:Heating demands information is acquired by the special APP of temperature control in temperature control terminal, is generated
Heat preparation programs, and the heating preparation programs only can be as unit of integral multiple for 24 hours, and temperature control target temperature is with per hour
Control is limit in certain fixation degree Celsius, and the limits are 16 DEG C -25 DEG C, based on this generation heating preparation programs, storage
In temperature control terminal memory.If described acquire the letter that heating demands information collection is arrived by the special APP of temperature control in temperature control terminal
Breath is plural item, then calculates average value by high in the clouds calculator, and is heated preparation programs by mean value calculation.
3) heating preparation programs verify step:Aforementioned heating preparation programs are sent to cloud server, from the accumulation of heat
Formula electric heater configuration database is extracted from the configuration data of the extraction heating targeted electric heater of preparation programs from meteorogical phenomena database
The following room temperature data in room location where electric heater and the following air speed data are verified in terms of heating preparation by every for unit for 24 hours
It draws:Effectively gone out by electric heater hot lowest temperature be E DEG C on the basis of, the temperature control target temperature with each hour in the following 24H is
Benchmark, and inner room for 24 hours is calculated according to meteorological data and always loses heat, the accumulation of heat heat that electric heater always needs is calculated,
And the outlet air wind speed of each hour is calculated on the basis of the temperature control target temperature of each hour in the following 24H, obtain electric heater
The heating preparation executive plan of each unit, merges the heating preparation executive plan of each unit, obtains the preparation execution that always heats
Plan.It is described effectively to go out hot lowest temperature with electric heater, it is that the electric heater cannot be effectively at a temperature of heating indoor air
Limit, by adjusting to obtain according to measured result on the basis of experience value;The accumulation of heat heat that electric heater is calculated and always needs
Amount is according to Q24h=Σ ((in the season room in the area in room where Σ (temperature control target temperature h- weather prognosis temperature h)) *
Per the rooms square metre m2 heat capacity of air * numbers), calculated, Q24h be for 24 hours in the accumulation of heat heat that always needs of electric heater, h=1~
24。
4) heat preparation programs trouble-shoots step:According to include but not limited to using gitter brick specification and total amount of stored heat,
The regenerator temperature upper limit, gitter brick block number, accumulation of heat heating rate upper limit value, accumulation of heat heating rate lower limiting value, per hour the heat release upper limit
Value, per hour heat release lower limiting value, wind turbine upper wind velocity limit value, the electric heater configuration information of wind turbine wind speed lower limiting value are above-mentioned total to check
Heat preparation programs, cannot execute above-mentioned total heating if there is because electric heater configures and prepare executive plan, then by information
Temperature control terminal is fed back to, and the inexecutable situation of temperature control target temperature of which hour in the preparation programs that heat is fed back into cloud
Server is held, is shown in temperature control terminal in the form shown;If total heating preparation executive plan executes no electric heater and matches
The obstacle set then enters step (8).It is described to be shown in temperature control terminal in the form shown, show control in tangible temperature control terminal
While warm curve, show that the temperature control of which section or those sections is irrealizable, the temperature control curve that can be realized is shown as
Green, the temperature control curve that can not be realized are shown in red.
5) step is replaced or is changed in adjustment:What it is by affiliated temperature control terminal acquisition personnel's feedback is adjusted more to electric heater
Change or be carry out heating change of plan clear information, if feedback be the information that replacement is adjusted to electric heater,
(6) are entered step, if feedback is the information for carrying out heating change of plan, are entered step (7).
6) step is replaced in electric heater adjustment:According to aforementioned above-mentioned total heating cannot be executed in the presence of because electric heater configures in advance
The information of standby executive plan carries out member replacing or integral replacing to accumulated electric heater, and member replacing includes but not limited to store
Hot brick quantity, specification or type adjustment, blower motor are replaced into different capacity blower motor, and integral replacing is including but not limited to whole
Body is changed to other power or the accumulated electric heater of model, category;After adjustment is replaced, confirm that the electric heater after replacing can be held
The total heating preparation executive plan of row, then enter step (8).In step (6), the information of the member replacing is first calculated by high in the clouds
The spare part box of device and the electric heater is checked, if the case where spare part box can cope with the member replacing, to the electric heater
The temperature control terminal of corresponding user held sends information, reminds user to replace, cannot be coped with if it is spare part box
It is the case where the case where member replacing or integral replacing, then whole to the temperature control of the maintenance personal corresponding to the electric heater held
End sends information, and maintenance personal is reminded to replace.
7) heat Plan rescheduling step:Again heating demands information is acquired by the special APP of temperature control in temperature control terminal, generated
Heating preparation programs after adjustment, the heating preparation programs only can be as unit of integral multiples for 24 hours, and temperature control target temperature
Controlled per hour in certain fixation degree Celsius as limit, the limits are 16 DEG C -25 DEG C, based on this generation heating preparation meter
It draws, is stored in temperature control terminal memory, and return to step (3) and continue to execute.
(8) electric heater heating executes step:Determine that heating preparation programs are the practical plan of heating in following N number of 24H, and
The practical plan of heating is stored in the terminal memory of electric heater terminal, this is transferred by the terminal microcontroller in electric heater terminal
Heating is actually planned and is executed.
In step (8), the heating actually plan can by other PC, smart mobile phone, PAD by internet via encryption
Means, which are transferred, checks, and is printed.
The value of the A is -40 DEG C to 10 DEG C above freezing, and the value of the B is 0-17m/s, and the value of the C is flat for 0-40
The value of square rice, the D is 16 DEG C -25 DEG C, and the value of the E is 80-150.
Preferably, the value of the A is -10 DEG C to 5 DEG C above freezing, and the value of the B is 0-6m/s, and the value of the C is
5-20 square metres, the value of the D is 18 DEG C -20 DEG C, and the value of the E is 100-110.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any
The change or replacement expected without creative work, should be covered by the protection scope of the present invention.Therefore, of the invention
Protection domain should be determined by the scope of protection defined in the claims.
Claims (5)
1. a kind of remote operation controller of accumulated electric heater, which is characterized in that including with lower component:
Cloud server has high in the clouds calculator, high in the clouds memory and first network interface, has gas on the memory of high in the clouds thereon
Image data library and accumulated electric heater configuration database, heat compensation database, the cloud server are connect by first network
Mouth connection internet;
Electric heater terminal comprising terminal microcontroller, terminal memory, power interface, power supply adaptor, the second network interface,
First communication interface, the second communication interface, the control that the electric heater terminal passes through the first communication interface and accumulated electric heater
Device communicates, and the electric heater terminal connects internet by the second network interface;
Accumulated electric heater, including accumulation of heat part, fan section, temperature measurement fraction, control assembly part, casing part, spare part portion
Divide, control device, display panel;
The current room temperature data and current wind speed number in room location where the meteorogical phenomena database, including accumulated electric heater
According to also including in real time from the following room temperature data in room location where the collected accumulated electric heater in internet and the following wind
Fast data;
The accumulated electric heater configuration database, the including but not limited to configuration of each practical accumulated electric heater used
Information, configuration information include but not limited to using gitter brick specification and total amount of stored heat, the regenerator temperature upper limit, gitter brick block number, storage
Hot heating rate upper limit value, accumulation of heat heating rate lower limiting value, per hour heat release upper limit value, per hour heat release lower limiting value, wind turbine wind
Fast upper limit value, wind turbine wind speed lower limiting value;
The heat compensation database, have under condition of different temperatures and different area room under different wind speed per hour with
Heat supply temperature is that the heat of standard loses average data;
Electric heater temperature control terminal, the temperature control terminal is PAD or smart mobile phone, has temperature control terminal memory, installs thereon
There is the special APP of temperature control, for from cloud server and electric heater terminal called data, the temperature control terminal to be with 3G/4G/5G/
The mode of one of WIFI is connect with internet.
2. a kind of remote operation controller of accumulated electric heater as described in claim 1, it is characterised in that:
The accumulated electric heater, one of power 1600W, 2400W, 3200W, 4000W;
The renewals have spare part box, hold accumulated electric heater spare part in the spare part box, including gitter brick, U-shaped
Heating tube, control device, common cable, common maintenance tool;
The accumulation of heat part of the accumulated electric heater includes metal-back, package asbestos cloth, 5-30 blocks gitter brick, U-shaped heating
Pipe, the U-shaped heating tube include at least the U-shaped portion of two disks folding;
The fan section of the accumulated electric heater includes blower motor, running part, impeller, and the blower motor, which is located at, to be stored
The side of hot part, impeller quantity are at least two, are located at accumulation of heat beneath portions;
The temperature measurement fraction includes at least three probes, wherein the first probe be located at be close to the package of metal-back with asbestos cloth it
In, the second probe is located among accumulation of heat partial lumen, and third, which is popped one's head in, is located at the outlet air side of some aforementioned impeller, and described at least three
Each of a probe is connected to adapter, and adapter is connected to data processor, and the data processor is connected to data
Bus, and the data processor is connected to the display panel of place accumulated electric heater;
The control assembly part includes power supply AC/DC conversion portions, direct current supply assembly, data/address bus;
The casing part includes stainless steel casing, liner asbestos cloth, and rust-proof coating is coated with inside and outside the stainless steel casing,
Outer layer is also coated with white anticorrosive paint except rust-proof coating, and the casing part front has a square aperture, for described
The installation of control device and display panel;
The spare part box, the rear part have at least four to protrude downward buckle, are used for accumulated electric heater rear portion at least
Four protrude outward and the buckle slot communicated up and down matches, equipped with dedicated screwdriver, spare gitter brick, spare U-shaped in the outer box
Heating tube, spare asbestos cloth;
The control device includes control single chip computer and button portion, and button portion includes wind speed adjustment portion and charging time adjustment portion;
The display panel be the liquid crystal display equipped with microcontroller, the liquid crystal display booting when show including but it is unlimited
In following information:Real time temperature, the wind turbine wind speed of desired temperature, charging duration, the first probe and the second probe and third probe.
3. a kind of remote control method of accumulated electric heater, it makes use of accumulated electric heaters as claimed in claim 2
Remote operation controller, which is characterized in that steps are as follows:
1) heat compensation information filling step:In the heat compensation database, for having under condition of different temperatures and different
Average data is lost in different area room under wind speed by the heat of standard of heat supply temperature per hour, and the heat is lost flat
Equal data are acquired by the measured data in magnanimity room, and ranging from -40 DEG C to 10 DEG C above freezing of above-mentioned condition of different temperatures is above-mentioned
Ranging from 0-17m/s under different wind speed, ranging from 0-40 square metres of above-mentioned different area room, it is above-mentioned with heat supply temperature be mark
Standard, ranging from 16 DEG C -25 DEG C of heat supply temperature, on this basis, for having under condition of different temperatures of having collected and
It different area room under different wind speed average data is lost as the heat of standard using heat supply temperature is per hour calculated simultaneously
Registration seeks its average value for having multiple data samples under same temperature, wind speed, room area, heat supply standard, if
There are one samples for lower of some specific temperature, wind speed, room area, heat supply standard, then directly register, generally form for each
A DEG C of a specific temperature, each certain wind speed Bm/s, each particular room area Cm2, each specific D DEG C of heat supply standard
Under heat compensation data standard;
2) heat preparation programs making step:Heating demands information is acquired by the special APP of temperature control in temperature control terminal, generates heating
Preparation programs, the heating preparation programs only can be as unit of integral multiple for 24 hours, and temperature control target temperature to control per hour
It is limit in certain fixation degree Celsius, the limits are 16 DEG C -25 DEG C, based on this generation heating preparation programs, are stored in control
Warm terminal memory;
3) heating preparation programs verify step:Aforementioned heating preparation programs are sent to cloud server, from the regenerative electrochemical
Warmer configuration database extracts electric heating from the configuration data of the extraction heating targeted electric heater of preparation programs from meteorogical phenomena database
The following room temperature data in room location where device and the following air speed data verify heating preparation programs for unit for 24 hours with every:With
Electric heater effectively go out hot lowest temperature be E DEG C on the basis of, on the basis of the temperature control target temperature of each hour in the following 24H,
And inner room for 24 hours is calculated according to meteorological data and always loses heat, the accumulation of heat heat that electric heater always needs is calculated, and with not
It is each single to obtain electric heater for the outlet air wind speed for carrying out on the basis of the temperature control target temperature of each hour 24H Nei to calculate each hour
The heating preparation executive plan of member, merges the heating preparation executive plan of each unit, obtains the preparation executive plan that always heats;
4) heat preparation programs trouble-shoots step:According to including but not limited to using gitter brick specification and total amount of stored heat, accumulation of heat
Temperature upper limit, gitter brick block number, accumulation of heat heating rate upper limit value, accumulation of heat heating rate lower limiting value, per hour heat release upper limit value, every
Hour heat release lower limiting value, wind turbine upper wind velocity limit value, wind turbine wind speed lower limiting value electric heater configuration information check above-mentioned total heating
Preparation programs cannot execute above-mentioned total heating and prepare executive plan, then feed back information if there is because electric heater configures
High in the clouds clothes are fed back to temperature control terminal, and by the inexecutable situation of temperature control target temperature of which hour in the preparation programs that heat
Business device, shows in temperature control terminal in the form shown;If total heating preparation executive plan executes no electric heater configuration
Obstacle then enters step (8);
5) step is replaced or is changed in adjustment:By affiliated temperature control terminal obtain personnel feedback be to electric heater be adjusted replacement,
The clear information of heating change of plan is either carried out, if feedback is the information for being adjusted replacement to electric heater, into
Enter step (6), if feedback is the information for carrying out heating change of plan, enters step (7);
6) step is replaced in electric heater adjustment:It cannot execute above-mentioned total heating preparation in the presence of because electric heater configures according to aforementioned and hold
The information of row plan, it includes but not limited to gitter brick to carry out member replacing or integral replacing, member replacing to accumulated electric heater
Quantity, specification or type adjustment, blower motor are replaced into different capacity blower motor, and integral replacing includes but not limited to whole changes
For other power or the accumulated electric heater of model, category;After adjustment is replaced, confirm that the electric heater after replacing is able to carry out always
Heating preparation executive plan, then enter step (8);
7) heat Plan rescheduling step:Again heating demands information is acquired by the special APP of temperature control in temperature control terminal, generates adjustment
Heating preparation programs afterwards, the heating preparation programs only can be as unit of integral multiple for 24 hours, and temperature control target temperature is with every
Hour control is limit in certain fixation degree Celsius, and the limits are 16 DEG C -25 DEG C, is based on this generation heating preparation programs,
It is stored in temperature control terminal memory, and returns to step (3) and continues to execute;
(8) electric heater heating executes step:Determine that heating preparation programs are the practical plan of heating in following N number of 24H, and will be for
Warm practical plan is stored in the terminal memory of electric heater terminal, and the heating is transferred by the terminal microcontroller in electric heater terminal
Actually plan and executes.
4. a kind of remote control method of accumulated electric heater as claimed in claim 3, it is characterised in that:
In step (1), ensure all at least to acquire 3 effective samples under some specific temperature, wind speed, room area, heat supply standard
This, enters back into step (2);
In step (2), if it is described temperature control terminal by the special APP of temperature control acquire heating demands information collection to information be
Plural item then selects a selection by high in the clouds calculator, or calculates average value by high in the clouds calculator, and is heated by mean value calculation
Preparation programs;
In step (3), the electric heater effectively goes out hot lowest temperature, is that the electric heater cannot effective heating indoor air
Lowest temperature, by adjusting to obtain according to measured result on the basis of experience value;It is described to be calculated what electric heater always needed
Accumulation of heat heat is according to Q24h=Σ ((Σ(temperature control target temperature h- weather prognosis temperature h)) room where * area season room in per m2Air heat
Hold * rooms square metre number) the heat compensation numerical value of-Σ each hours, it is calculated, interior electric heater always needs Q24h for 24 hours
Accumulation of heat heat, h=1~24, the heat compensation numerical value of Σ each hours is then according to the air speed data of the following interior temperature for 24 hours
The heat compensation mentioned in step (1) is inquired in data standard;
It is described to be shown in temperature control terminal in the form shown in step (4), show the same of temperature control curve in tangible temperature control terminal
When, show that the temperature control of which section or those sections is irrealizable, the temperature control curve that can realize is shown in green, can not
The temperature control curve of realization is shown in red;
In step (6), the information of the member replacing is first checked by the spare part box of high in the clouds calculator and the electric heater, if standby
Part box can cope with the case where member replacing, then sent to the temperature control terminal of the user corresponding to the electric heater held
The feelings of the case where information, reminds user to replace, the member replacing that cannot be coped with if it is spare part box either integral replacing
Condition then sends information to the temperature control terminal of the maintenance personal corresponding to the electric heater held, maintenance personal is reminded to replace;
In step (8), the heating actually plan can by other PC, smart mobile phone, PAD by internet via cryptographic means
It transfers and checks, and printed;
The value of the A is -40 DEG C to 10 DEG C above freezing, and the value of the B is 0-17m/s, and the value of the C is 0-40 squares
The value of rice, the D is 16 DEG C -25 DEG C, and the value of the E is 80-150.
5. a kind of remote control method of accumulated electric heater as claimed in claim 4, it is characterised in that:
The value of the A is -10 DEG C to 5 DEG C above freezing, and the value of the B is 0-6m/s, and the value of the C is 5-20 square metres,
The value of the D is 18 DEG C -20 DEG C, and the value of the E is 100-110.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810342014.XA CN108561945B (en) | 2018-04-17 | 2018-04-17 | Remote control device and method for heat accumulating type electric heater |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810342014.XA CN108561945B (en) | 2018-04-17 | 2018-04-17 | Remote control device and method for heat accumulating type electric heater |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108561945A true CN108561945A (en) | 2018-09-21 |
CN108561945B CN108561945B (en) | 2020-06-16 |
Family
ID=63535411
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810342014.XA Active CN108561945B (en) | 2018-04-17 | 2018-04-17 | Remote control device and method for heat accumulating type electric heater |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108561945B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110793095A (en) * | 2019-10-15 | 2020-02-14 | 北京嘉洁能科技股份有限公司 | Carbon fiber intelligent heat supply method and system based on phase change heat storage building envelope heat insulation |
CN113152805A (en) * | 2021-04-27 | 2021-07-23 | 广东天濠建设工程有限公司 | Building energy-saving roof heat insulation system and method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006311298A (en) * | 2005-04-28 | 2006-11-09 | Nippon Seiki Co Ltd | Remote control apparatus |
CN205664469U (en) * | 2016-06-02 | 2016-10-26 | 南京金合能源材料有限公司 | Heat storage type electric heater |
CN106403005A (en) * | 2016-09-22 | 2017-02-15 | 山东二十度智慧供热股份有限公司 | Heating, measuring and charging method based on indoor temperature package of user |
CN107246649A (en) * | 2017-06-26 | 2017-10-13 | 上海驭宅信息科技有限公司 | A kind of energy-saving domestic heating control system, mobile terminal and method |
-
2018
- 2018-04-17 CN CN201810342014.XA patent/CN108561945B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006311298A (en) * | 2005-04-28 | 2006-11-09 | Nippon Seiki Co Ltd | Remote control apparatus |
CN205664469U (en) * | 2016-06-02 | 2016-10-26 | 南京金合能源材料有限公司 | Heat storage type electric heater |
CN106403005A (en) * | 2016-09-22 | 2017-02-15 | 山东二十度智慧供热股份有限公司 | Heating, measuring and charging method based on indoor temperature package of user |
CN107246649A (en) * | 2017-06-26 | 2017-10-13 | 上海驭宅信息科技有限公司 | A kind of energy-saving domestic heating control system, mobile terminal and method |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110793095A (en) * | 2019-10-15 | 2020-02-14 | 北京嘉洁能科技股份有限公司 | Carbon fiber intelligent heat supply method and system based on phase change heat storage building envelope heat insulation |
CN113152805A (en) * | 2021-04-27 | 2021-07-23 | 广东天濠建设工程有限公司 | Building energy-saving roof heat insulation system and method |
CN113152805B (en) * | 2021-04-27 | 2022-08-05 | 广东天濠建设工程有限公司 | Building energy-saving roof heat insulation system and method |
Also Published As
Publication number | Publication date |
---|---|
CN108561945B (en) | 2020-06-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108240679B (en) | A kind of heat supply method based on building heating load prediction, device and system | |
US20190325097A1 (en) | System And Method For Modeling Building Heating Energy Consumption With The Aid Of A Digital Computer | |
Sarto et al. | Comparison between predicted and actual energy performance for winter heating in high-performance residential buildings in the Lombardy region (Italy) | |
US20120065791A1 (en) | Home energy manager for providing energy projections | |
US20120150509A1 (en) | Continuous optimization energy reduction process in commercial buildings | |
CN104571034B (en) | Intelligent management and control equipment and control method thereof | |
CN103499136B (en) | Ice storage control system with next-day energy consumption simulation function | |
CN108561945A (en) | A kind of remote operation controller and method of accumulated electric heater | |
WO2013094350A1 (en) | Remote monitoring control system and method of operating same | |
US20190120804A1 (en) | System and method for monitoring occupancy of a building using a tracer gas concentration monitoring device | |
JP6928164B2 (en) | Hot water supply system, cloud server, boiling schedule creation method and program | |
WO2020213222A1 (en) | Energy prediction system, energy prediction method, program, recording medium, and management system | |
CN102413165B (en) | Use the diagnosis of submeter device | |
CN110108004A (en) | The method, apparatus and computer storage medium of airconditioning control | |
CN108758765A (en) | A kind of the accumulated electric heater system and charging method of wireless charging | |
CN109565184A (en) | Electrical equipment, consumption electric power cut down system, communication adapter and consumption electric power cutting method | |
Cherif et al. | Enhancing crop yield in hydroponic greenhouses: Integrating latent heat storage and forced ventilation systems for improved thermal stratification | |
JP6846863B2 (en) | Water heater management equipment, gateway equipment, water heater management system, and programs | |
CN206094290U (en) | Heat supply management and control system with on -off control valve | |
AU2016324351A1 (en) | Power analyser and method for the use thereof | |
CN108594899A (en) | A kind of temperature control system and method based on feedback temperature adjustment | |
JP5830817B2 (en) | Energy conversion device simulation method and energy conversion device simulation system | |
CN204287952U (en) | A kind of cold and heat combined supply self-optimizing control equipment | |
CN207601660U (en) | Concrete environmental control system and environmental control system | |
Moon et al. | Continuous commissioning through real-time simulation with a building energy monitoring system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |