CN108561945A - A kind of remote operation controller and method of accumulated electric heater - Google Patents

A kind of remote operation controller and method of accumulated electric heater Download PDF

Info

Publication number
CN108561945A
CN108561945A CN201810342014.XA CN201810342014A CN108561945A CN 108561945 A CN108561945 A CN 108561945A CN 201810342014 A CN201810342014 A CN 201810342014A CN 108561945 A CN108561945 A CN 108561945A
Authority
CN
China
Prior art keywords
electric heater
heat
temperature
heating
temperature control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810342014.XA
Other languages
Chinese (zh)
Other versions
CN108561945B (en
Inventor
马强
孙月芳
马昊卓凡
马羽卓凡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Xin Shun Technology Co Ltd
Original Assignee
Tianjin Xin Shun Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Xin Shun Technology Co Ltd filed Critical Tianjin Xin Shun Technology Co Ltd
Priority to CN201810342014.XA priority Critical patent/CN108561945B/en
Publication of CN108561945A publication Critical patent/CN108561945A/en
Application granted granted Critical
Publication of CN108561945B publication Critical patent/CN108561945B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D13/00Electric heating systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D19/00Details
    • F24D19/10Arrangement or mounting of control or safety devices
    • F24D19/1096Arrangement or mounting of control or safety devices for electric heating systems

Abstract

The present invention provides a kind of accumulated electric heater remote operation controller, which is characterized in that including with lower component:Cloud server, electric heater terminal;Accumulated electric heater, electric heater temperature control terminal.The accumulated electric heater includes accumulation of heat part, fan section, temperature measurement fraction, control assembly part, casing part, renewals, control device, display panel.The cloud server has high in the clouds calculator, high in the clouds memory.The present invention also provides a kind of accumulated electric heater remote control methods, and it makes use of the progress of foregoing accumulated electric heater remote operation controller, which is characterized in that includes the following steps:1) heat compensation information filling step:2) heat preparation programs making step;3) heating preparation programs verify step;4) heat preparation programs trouble-shoots step;5) step is replaced or is changed in adjustment;6) step is replaced in electric heater adjustment;7) heat Plan rescheduling step;(8) electric heater heating executes step.

Description

A kind of remote operation controller and method of accumulated electric heater
Technical field
The present invention relates to the remote of the technical field of accumulated electric heater remote control more particularly to a kind of accumulated electric heater Journey control device and a kind of remote control method of accumulated electric heater.
Background technology
With for air pollution attention and low ebb electricity price efficiently use, free of contamination accumulated electric heater is very good can To be directed to both of these problems, become one of the important selection of " coal changes electricity " of dispersion heating, but accumulated electric heater has it certainly The problem of body, that is, the accumulated electric heater of the prior art is typically all that live can only manipulate, and the charging time is reconciled at scene, goes out The parameters such as wind velocity can not be configured in advance, also unspecial long-range control method.
Existing accumulated electric heater does not propose or provides the remote control method for capableing of practice, this may The reason of it is very complicated, when most of technical staff may feel It is not necessary to, it is household that they, which may feel electric heater, makes With, scene reconcile just it is enough, second is that the remote control of accumulated electric heater implement can it is more complicated, in many cases may be used Setting target can be not achieved, from air-conditioning the case where is different.As in the prior art, North America have many families be assembled with air-conditioning or The remote control temperature controlling function of air-conditioning+air source heat pump, but air-conditioning or air-conditioning+air source heat pump execute within the scope of temperature control Power is strong, as long as the temperature condition of setting can execute, so the remote control generally coordinates air-conditioning or air indoors The control unit of a connection WIFI is arranged in source heat pump, such as hangs controller on the wall, but accumulated electric heater Situation is more complex, and the acceptable temperature control range of acquiescence is usually very small, and such as 16-20 DEG C, this, which is also general masses, needs The heat supply temperature wanted, if remotely located it is allowed super to go beyond the scope, it is likely that the case where appearance can not execute, still Increase now with the application scenario of accumulated electric heater and the setting demand of crowd's personalization, the temperature change needed and Temperature range greatly expands, such as it is not general shelter, such as corridor, storehouse, greenhouse place that accumulated electric heater, which appears in, All great changes have taken place for its temperature standard needed and alternating temperature degree, in this case, is only arranged without checking, a storage Hot type electric heater transfinite in practical applications so that can not executive plan heat-supplying mode be very universal, if employment Work detects and the mode of adjustment, can not be completed in reality, because the manpower needed in this way is too many, almost without the possibility of realization, But needed have in reality again as, this is a conclusive defect for applying accumulated electric heater in the prior art.
How aforementioned drawback solves, this is a restriction widely applied big problem of accumulated electric heater, because if Can't resolve this problem, the large-scale application of accumulated electric heater with regard to defective, can not such as air-conditioning can random temperature adjustment, but Be the characteristics of accumulated electric heater can efficiently use the balance power grid demand of trough-electricity and low ebb electricity price and high economy also without From performance.
Invention content
The first object of the present invention be solve the prior art in the presence of can not specific aim provide large batch of heat accumulating type The remote control of electric heater can not personalized the problem of realizing, for this situation dealt with without enough manpowers, provide one kind Can have specific aim and professional accumulated electric heater remote operation controller, under this device and method, many feelings Under condition user by instruction using the spare part in spare part box can self-changeable and repair, eliminate manpower and time, The case where being safeguarded using manpower is preferably minimized so that the maintenance team of small-scale can safeguard the accumulated electric heater of large area Temperature control situation be possibly realized, but also the remote control of large batch of accumulated electric heater is possibly realized, because effect is not achieved The remote control of fruit is not real remote control.Second purpose is to propose mating method so that recycles aforementioned dress Under the premise of setting, the remote control of large batch of accumulated electric heater can be realized easily, for ordinary user or repair people Member, it is only necessary to operate temperature control terminal PAD and replaced and safeguarded according to the suggestion of proposition, greatly save people Power.
A kind of remote operation controller of accumulated electric heater, which is characterized in that including with lower component:
Cloud server has high in the clouds calculator, high in the clouds memory and first network interface, has on the memory of high in the clouds thereon There are meteorogical phenomena database and accumulated electric heater configuration database, heat compensation database, the cloud server to pass through the first net Network interface connects internet.
Electric heater terminal comprising terminal microcontroller, terminal memory, power interface, power supply adaptor, the second network connect Mouth, the first communication interface, the second communication interface, the control that the electric heater terminal passes through the first communication interface and accumulated electric heater Device communication processed, the electric heater terminal connect internet by the second network interface.
Accumulated electric heater, including accumulation of heat part, fan section, temperature measurement fraction, control assembly part, casing part, standby Part part, control device, display panel.
The current room temperature data and current wind speed in room location where the meteorogical phenomena database, including accumulated electric heater Data also include in real time from the following room temperature data in room location and future where the collected accumulated electric heater in internet Air speed data.
The accumulated electric heater configuration database, including but not limited to each practical accumulated electric heater used Configuration information, configuration information include but not limited to using gitter brick specification and total amount of stored heat, the regenerator temperature upper limit, accumulation of heat brick Number, accumulation of heat heating rate upper limit value, accumulation of heat heating rate lower limiting value, per hour heat release upper limit value, per hour heat release lower limiting value, wind Machine upper wind velocity limit value, wind turbine wind speed lower limiting value.
The heat compensation database has the every small of the different area room under condition of different temperatures and under different wind speed When using heat supply temperature as standard heat lose average data.
Electric heater temperature control terminal, the temperature control terminal is PAD or smart mobile phone, has temperature control terminal memory, thereon It is installed with the special APP of temperature control, for from cloud server and electric heater terminal called data, the temperature control terminal to be with 3G/4G/ The mode of one of 5G/WIFI is connect with internet.
A kind of foregoing remote operation controller of accumulated electric heater, it is characterised in that:
The accumulated electric heater, one of power 1600W, 2400W, 3200W, 4000W.These heat-accumulating type electric-heatings The rate of attacking of device is common setting, disclosure satisfy that general room heat demand, the quantity of gitter brick therewith are also convenient for being arranged, Gitter brick and electric heater power can be customized as needed, this is not problem.
The renewals have spare part box, hold accumulated electric heater spare part in the spare part box, including gitter brick, U-shaped heating tube, control device, common cable, common maintenance tool.Above-mentioned spare part box can be compound in electric heating in a manner of attachment Below device or rear.Include at least four wheels being symmetrically installed below electric heater, so that it can be moved, but also going out Air port can be arranged below, so that can outlet air from below.
The accumulation of heat part of the accumulated electric heater includes metal-back, package asbestos cloth, 5-30 blocks gitter brick, U-shaped Heating tube, the U-shaped heating tube include at least the U-shaped portion of two disks folding.The metal-back has opening, while two sides in side Asbestos cloth does not also wrap up in side, and asbestos cloth is only wrapped up from upper and lower front and back four direction, so that side can be open for heating The light replacement of pipe and gitter brick, while the other side is conveniently connect with original papers such as thermometrics.
The fan section of the accumulated electric heater includes blower motor, running part, impeller, the blower motor position Side in accumulation of heat part, impeller quantity are at least two, are located at accumulation of heat beneath portions.
The temperature measurement fraction includes at least three probes, wherein the first probe is located at the package asbestos cloth for being close to metal-back Among, second probe be located at accumulation of heat partial lumen among, third probe positioned at some aforementioned impeller outlet air side, it is described at least Each of three probes is connected to adapter, and adapter is connected to data processor, and the data processor is connected to number According to bus, and the data processor is connected to the display panel of place accumulated electric heater.The probe can be general Thermocouple temperature measurement is popped one's head in or universal contact temperature-measuring probe, and surface is cased with stainless steel or the shell of other alloys.
The control assembly part includes power supply AC/DC conversion portions, direct current supply assembly, data/address bus.
The casing part includes stainless steel casing, liner asbestos cloth, and antirust is coated with inside and outside the stainless steel casing Coating, outer layer are also coated with white anticorrosive paint except rust-proof coating, and the casing part front has a square aperture, is used for The placement of the control device and display panel.
The spare part box, the rear part have at least four to protrude downward buckle, are used for and accumulated electric heater rear portion At least four protrude outward and the buckle slot communicated up and down matches, equipped with dedicated screwdriver, spare gitter brick, spare in the outer box U-shaped heating tube, spare asbestos cloth.The spare part box shell is easily switched, so that can be convenient for electric heater replacement portion Part.
The control device includes control single chip computer and button portion, and button portion includes adjusting in wind speed adjustment portion and charging time Portion.Control device further includes other necessary circuit connections.
The display panel be the liquid crystal display equipped with microcontroller, the liquid crystal display booting when show including but It is not limited to following information:Real time temperature, the wind turbine of desired temperature, charging duration, the first probe and the second probe and third probe Wind speed.
The present invention also provides a kind of remote control methods of accumulated electric heater, and it makes use of foregoing regenerative electrochemicals The remote operation controller of warmer, which is characterized in that steps are as follows:
1) heat compensation information filling step:In the heat compensation database, for having under condition of different temperatures and Average data is lost in different area room under different wind speed by the heat of standard of heat supply temperature per hour, and the heat is lost It loses average data to be acquired by the measured data in magnanimity room, ranging from -40 DEG C to 10 DEG C above freezing of above-mentioned condition of different temperatures, Ranging from 0-17m/s under above-mentioned difference wind speed, ranging from 0-40 square metres of above-mentioned different area room are above-mentioned to be with heat supply temperature Standard, ranging from 16 DEG C -25 DEG C of heat supply temperature, on this basis, has for what is collected under condition of different temperatures With being calculated per hour by the heat of standard loss average data of heat supply temperature for the different area room under different wind speed And register, for there are multiple data samples under same temperature, wind speed, room area, heat supply standard, its average value is sought, such as Fruit some specific temperature, wind speed, room area, there are one samples for lower of heat supply standard, then directly register, and generally form for often One A DEG C of specific temperature, each certain wind speed Bm/s, each particular room area Cm2, each specific heat supply standard D Heat compensation data standard at DEG C.
In step (1), ensure that all at least acquiring 3 under some specific temperature, wind speed, room area, heat supply standard has Sample is imitated, step (2) is entered back into.
2) heat preparation programs making step:Heating demands information is acquired by the special APP of temperature control in temperature control terminal, is generated Heat preparation programs, and the heating preparation programs only can be as unit of integral multiple for 24 hours, and temperature control target temperature is with per hour Control is limit in certain fixation degree Celsius, and the limits are 16 DEG C -25 DEG C, based on this generation heating preparation programs, storage In temperature control terminal memory.
In step (2), if described acquire the letter that heating demands information collection is arrived by the special APP of temperature control in temperature control terminal Breath is plural item, then selects a selection by high in the clouds calculator, or calculate average value by high in the clouds calculator, and by mean value calculation Heat preparation programs.
3) heating preparation programs verify step:Aforementioned heating preparation programs are sent to cloud server, from the accumulation of heat Formula electric heater configuration database is extracted from the configuration data of the extraction heating targeted electric heater of preparation programs from meteorogical phenomena database The following room temperature data in room location where electric heater and the following air speed data are verified in terms of heating preparation by every for unit for 24 hours It draws:Effectively gone out by electric heater hot lowest temperature be E DEG C on the basis of, the temperature control target temperature with each hour in the following 24H is Benchmark, and inner room for 24 hours is calculated according to meteorological data and always loses heat, the accumulation of heat heat that electric heater always needs is calculated, And the outlet air wind speed of each hour is calculated on the basis of the temperature control target temperature of each hour in the following 24H, obtain electric heater The heating preparation executive plan of each unit, merges the heating preparation executive plan of each unit, obtains the preparation execution that always heats Plan.
Described effectively to go out hot lowest temperature with electric heater in step (3), being the electric heater cannot effectively heat interior It is limited at a temperature of air, by adjusting to obtain according to measured result on the basis of experience value;It is described that electric heater is calculated is total The accumulation of heat heat needed is according to the ((ground in room where Σ (temperature control target temperature h- weather prognosis temperature h)) * Q24h=Σ Per the rooms square metre m2 heat capacity of air * number in the season room in area), it is calculated, Q24h is the accumulation of heat that interior electric heater always needs for 24 hours Heat, h=1~24.
4) heat preparation programs trouble-shoots step:According to include but not limited to using gitter brick specification and total amount of stored heat, The regenerator temperature upper limit, gitter brick block number, accumulation of heat heating rate upper limit value, accumulation of heat heating rate lower limiting value, per hour the heat release upper limit Value, per hour heat release lower limiting value, wind turbine upper wind velocity limit value, the electric heater configuration information of wind turbine wind speed lower limiting value are above-mentioned total to check Heat preparation programs, cannot execute above-mentioned total heating if there is because electric heater configures and prepare executive plan, then by information Temperature control terminal is fed back to, and the inexecutable situation of temperature control target temperature of which hour in the preparation programs that heat is fed back into cloud Server is held, is shown in temperature control terminal in the form shown;If total heating preparation executive plan executes no electric heater and matches The obstacle set then enters step (8).
It is described to be shown in temperature control terminal in the form shown in step (4), show temperature control curve in tangible temperature control terminal While, show that the temperature control of which section or those sections is irrealizable, the temperature control curve that can realize is shown in green, no The temperature control curve that can be realized is shown in red.
5) step is replaced or is changed in adjustment:What it is by affiliated temperature control terminal acquisition personnel's feedback is adjusted more to electric heater Change or be carry out heating change of plan clear information, if feedback be the information that replacement is adjusted to electric heater, (6) are entered step, if feedback is the information for carrying out heating change of plan, are entered step (7).
6) step is replaced in electric heater adjustment:According to aforementioned above-mentioned total heating cannot be executed in the presence of because electric heater configures in advance The information of standby executive plan carries out member replacing or integral replacing to accumulated electric heater, and member replacing includes but not limited to store Hot brick quantity, specification or type adjustment, blower motor are replaced into different capacity blower motor, and integral replacing is including but not limited to whole Body is changed to other power or the accumulated electric heater of model, category;After adjustment is replaced, confirm that the electric heater after replacing can be held The total heating preparation executive plan of row, then enter step (8).
In step (6), the information of the member replacing is first checked by the spare part box of high in the clouds calculator and the electric heater, such as Fruit spare part box can cope with the case where member replacing, then to the temperature control terminal of the user corresponding to the electric heater held Information is sent, user is reminded to replace, either integral replacing the case where the member replacing that cannot be coped with if it is spare part box The case where, then information is sent to the temperature control terminal of the maintenance personal corresponding to the electric heater held, maintenance personal is reminded to carry out It replaces.
7) heat Plan rescheduling step:Again heating demands information is acquired by the special APP of temperature control in temperature control terminal, generated Heating preparation programs after adjustment, the heating preparation programs only can be as unit of integral multiples for 24 hours, and temperature control target temperature Controlled per hour in certain fixation degree Celsius as limit, the limits are 16 DEG C -25 DEG C, based on this generation heating preparation meter It draws, is stored in temperature control terminal memory, and return to step (3) and continue to execute.
(8) electric heater heating executes step:Determine that heating preparation programs are the practical plan of heating in following N number of 24H, and The practical plan of heating is stored in the terminal memory of electric heater terminal, this is transferred by the terminal microcontroller in electric heater terminal Heating is actually planned and is executed.
In step (8), the heating actually plan can by other PC, smart mobile phone, PAD by internet via encryption Means, which are transferred, checks, and is printed.
The value of the A is -40 DEG C to 10 DEG C above freezing, and the value of the B is 0-17m/s, and the value of the C is flat for 0-40 The value of square rice, the D is 16 DEG C -25 DEG C, and the value of the E is 80-150.
Preferably, the value of the A is -10 DEG C to 5 DEG C above freezing, and the value of the B is 0-6m/s, and the value of the C is 5-20 square metres, the value of the D is 18 DEG C -20 DEG C, and the value of the E is 100-110.
It is an advantage of the invention that can be mainly divided at 2 points, first, by for the weak feelings of accumulated electric heater adaptive faculty Condition, the device can definitely arrange electric heater to carry out temperature control, for being unable to the case where adaptive temperature changes, in many cases User voluntarily, even if maintenance personal visits can also can predict replacement and maintenance mode so that adjustment is light very much, section Saved a large amount of manpower and materials, seen on the whole, the case where electric heater group is in insufficient temperature control, can also be minimized, reduce by The case where complaint, second is that being laid the foundation for the statistical information for obtaining electric heater, on the basis of the present invention, this makes electric heater Research and development improvement, the setting of Resolving probiems, model, category can more shoot the arrow at the target, avoid unordered Innovation Input, if The information is disclosed to the public, but also Public choice electric heater has adequate cause.The prior art has no similar techniques and can solve Certainly this problem will not reach similar technique effect, and the prior art is even all without clearly proposing being somebody's turn to do for accumulated electric heater Problem thinks that the problem is unworthy proposing in those skilled in the art's subconsciousness, but applicant does not so think, practice card This bright problem is to be worth proposition and soluble.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with Obtain other attached drawings according to these attached drawings.
Fig. 1 is the composition figure of the accumulated electric heater remote operation controller of the present invention;
The step of Fig. 2 is the accumulated electric heater remote control method of the present invention illustrates.
Reference numeral corresponding intrument is cloud server 1, high in the clouds calculator 2, high in the clouds memory 3, electric heater terminal 4, is stored Hot type electric heater 5, accumulation of heat part 6, fan section 7, temperature measurement fraction 8, control assembly part 9, casing part 10, renewals 11, control device 12, display panel 13, electric heater temperature control terminal 14.
Specific implementation mode
The preferred embodiment of the present invention is described in detail below in conjunction with the accompanying drawings, so that advantages and features of the invention energy It is easier to be readily appreciated by one skilled in the art, so as to make a clearer definition of the protection scope of the present invention.
Specific implementation mode
A kind of remote operation controller of accumulated electric heater, which is characterized in that including with lower component:
Cloud server has high in the clouds calculator, high in the clouds memory and first network interface, has on the memory of high in the clouds thereon There are meteorogical phenomena database and accumulated electric heater configuration database, heat compensation database, the cloud server to pass through the first net Network interface connects internet.The network interface is standard network interface or wireless WIFI module.
Electric heater terminal comprising terminal microcontroller, terminal memory, power interface, power supply adaptor, the second network connect Mouth, the first communication interface, the second communication interface, the control that the electric heater terminal passes through the first communication interface and accumulated electric heater Device communication processed, the electric heater terminal connect internet by the second network interface.The network interface is that standard network connects Mouth or wireless WIFI module.
Accumulated electric heater, including accumulation of heat part, fan section, temperature measurement fraction, control assembly part, casing part, standby Part part, control device, display panel.The accumulated electric heater, power 1600W, 2400W, 3200W, 4000W wherein it One.The rate of attacking of these accumulated electric heaters is common setting, disclosure satisfy that general room heat demand, gitter brick therewith Quantity is also convenient for being arranged, and can also customize gitter brick and electric heater power as needed, this is not problem.
The renewals have spare part box, hold accumulated electric heater spare part in the spare part box, including gitter brick, U-shaped heating tube, control device, common cable, common maintenance tool.Above-mentioned spare part box can be compound in electric heating in a manner of attachment Below device or rear.Include at least four wheels being symmetrically installed below electric heater, so that it can be moved, but also going out Air port can be arranged below, so that can outlet air from below.Above-mentioned wheel is universal wheel, can arbitrarily be pushed.
The accumulation of heat part of the accumulated electric heater includes metal-back, package asbestos cloth, 8 or 12 or 16 pieces of accumulation of heats Brick, U-shaped heating tube, the U-shaped heating tube include at least the U-shaped portion of two disks folding.The metal-back has opening in side, simultaneously Asbestos cloth is not also wrapped up in two sides, and asbestos cloth is only wrapped up from upper and lower front and back four direction, the use so that side can be open In the light replacement of heating tube and gitter brick, while the other side is conveniently connect with original papers such as thermometrics.
The fan section of the accumulated electric heater includes blower motor, running part, impeller, the blower motor position Side in accumulation of heat part, impeller quantity are two, and separately left and right is located at accumulation of heat beneath portions.It is provided with below electric heater vertical Directly the plane where the heating tube goes out hot opening, and described to go out heat opening at least 12 or more and to be mutually parallel, width is not less than 1cm, length are not less than 8cm.
The temperature measurement fraction includes at least three probes, wherein the first probe is located at the package asbestos cloth for being close to metal-back Among, second probe be located at accumulation of heat partial lumen among, third probe positioned at some aforementioned impeller outlet air side, it is described at least Each of three probes is connected to adapter, and adapter is connected to data processor, and the data processor is connected to number According to bus, and the data processor is connected to the display panel of place accumulated electric heater.The probe can be general Thermocouple temperature measurement is popped one's head in or universal contact temperature-measuring probe, and surface is cased with stainless steel or the shell of other alloys.
The control assembly part includes power supply AC/DC conversion portions, direct current supply assembly, data/address bus.
The casing part includes stainless steel casing, liner asbestos cloth, and antirust is coated with inside and outside the stainless steel casing Coating, outer layer are also coated with white anticorrosive paint except rust-proof coating, and the casing part front has a square aperture, is used for The placement of the control device and display panel.
The spare part box, the rear part have at least four to protrude downward buckle, are used for and accumulated electric heater rear portion At least four protrude outward and the buckle slot communicated up and down matches, equipped with dedicated screwdriver, spare gitter brick, spare in the outer box U-shaped heating tube, spare asbestos cloth.The spare part box shell is easily switched, so that can be convenient for electric heater replacement portion Part.
The control device includes control single chip computer and button portion, and button portion includes adjusting in wind speed adjustment portion and charging time Portion.Control device further includes other necessary circuit connections.
The display panel be the liquid crystal display equipped with microcontroller, the liquid crystal display booting when show including but It is not limited to following information:Real time temperature, the wind turbine of desired temperature, charging duration, the first probe and the second probe and third probe Wind speed.
The current room temperature data and current wind speed in room location where the meteorogical phenomena database, including accumulated electric heater Data also include in real time from the following room temperature data in room location and future where the collected accumulated electric heater in internet Air speed data.Here the collected data in internet at least acquire from five data sources that can actually acquire, and remove one A peak removes a minimum, other remaining data are averaged, the following room temperature as place room location Data and the following air speed data.
The accumulated electric heater configuration database, including but not limited to each practical accumulated electric heater used Configuration information, configuration information include but not limited to using gitter brick specification and total amount of stored heat, the regenerator temperature upper limit, accumulation of heat brick Number, accumulation of heat heating rate upper limit value, accumulation of heat heating rate lower limiting value, per hour heat release upper limit value, per hour heat release lower limiting value, wind Machine upper wind velocity limit value, wind turbine wind speed lower limiting value.The configuration information can as possible in detail, so that the monitoring and replacement of configuration are more Add with a definite target in view.It can also include the tolerance duration that gitter brick used is capable of normal use.
The heat compensation database has the every small of the different area room under condition of different temperatures and under different wind speed When using heat supply temperature as standard heat lose average data.
Electric heater temperature control terminal, the temperature control terminal is PAD, has temperature control terminal memory, is installed with temperature control thereon Special APP, for from cloud server and electric heater terminal called data, the temperature control terminal to be to be equipped with 4G communication modules Mode is connect with internet.
A kind of remote control method of accumulated electric heater, it makes use of the long-range behaviour of foregoing accumulated electric heater Control device, which is characterized in that steps are as follows:
1) heat compensation information filling step:In the heat compensation database, for having under condition of different temperatures and Average data is lost in different area room under different wind speed by the heat of standard of heat supply temperature per hour, and the heat is lost It loses average data to be acquired by the measured data in magnanimity room, ranging from -40 DEG C to 10 DEG C above freezing of above-mentioned condition of different temperatures, Ranging from 0-17m/s under above-mentioned difference wind speed, ranging from 0-40 square metres of above-mentioned different area room are above-mentioned to be with heat supply temperature Standard, ranging from 16 DEG C -25 DEG C of heat supply temperature, on this basis, has for what is collected under condition of different temperatures With being calculated per hour by the heat of standard loss average data of heat supply temperature for the different area room under different wind speed And register, for there are multiple data samples under same temperature, wind speed, room area, heat supply standard, its average value is sought, such as Fruit some specific temperature, wind speed, room area, there are one samples for lower of heat supply standard, then directly register, and generally form for often One A DEG C of specific temperature, each certain wind speed Bm/s, each particular room area Cm2, each specific heat supply standard D Heat compensation data standard at DEG C.Ensure all at least to acquire 3 under some specific temperature, wind speed, room area, heat supply standard A effective sample enters back into step (2).
2) heat preparation programs making step:Heating demands information is acquired by the special APP of temperature control in temperature control terminal, is generated Heat preparation programs, and the heating preparation programs only can be as unit of integral multiple for 24 hours, and temperature control target temperature is with per hour Control is limit in certain fixation degree Celsius, and the limits are 16 DEG C -25 DEG C, based on this generation heating preparation programs, storage In temperature control terminal memory.If described acquire the letter that heating demands information collection is arrived by the special APP of temperature control in temperature control terminal Breath is plural item, then calculates average value by high in the clouds calculator, and is heated preparation programs by mean value calculation.
3) heating preparation programs verify step:Aforementioned heating preparation programs are sent to cloud server, from the accumulation of heat Formula electric heater configuration database is extracted from the configuration data of the extraction heating targeted electric heater of preparation programs from meteorogical phenomena database The following room temperature data in room location where electric heater and the following air speed data are verified in terms of heating preparation by every for unit for 24 hours It draws:Effectively gone out by electric heater hot lowest temperature be E DEG C on the basis of, the temperature control target temperature with each hour in the following 24H is Benchmark, and inner room for 24 hours is calculated according to meteorological data and always loses heat, the accumulation of heat heat that electric heater always needs is calculated, And the outlet air wind speed of each hour is calculated on the basis of the temperature control target temperature of each hour in the following 24H, obtain electric heater The heating preparation executive plan of each unit, merges the heating preparation executive plan of each unit, obtains the preparation execution that always heats Plan.It is described effectively to go out hot lowest temperature with electric heater, it is that the electric heater cannot be effectively at a temperature of heating indoor air Limit, by adjusting to obtain according to measured result on the basis of experience value;The accumulation of heat heat that electric heater is calculated and always needs Amount is according to Q24h=Σ ((in the season room in the area in room where Σ (temperature control target temperature h- weather prognosis temperature h)) * Per the rooms square metre m2 heat capacity of air * numbers), calculated, Q24h be for 24 hours in the accumulation of heat heat that always needs of electric heater, h=1~ 24。
4) heat preparation programs trouble-shoots step:According to include but not limited to using gitter brick specification and total amount of stored heat, The regenerator temperature upper limit, gitter brick block number, accumulation of heat heating rate upper limit value, accumulation of heat heating rate lower limiting value, per hour the heat release upper limit Value, per hour heat release lower limiting value, wind turbine upper wind velocity limit value, the electric heater configuration information of wind turbine wind speed lower limiting value are above-mentioned total to check Heat preparation programs, cannot execute above-mentioned total heating if there is because electric heater configures and prepare executive plan, then by information Temperature control terminal is fed back to, and the inexecutable situation of temperature control target temperature of which hour in the preparation programs that heat is fed back into cloud Server is held, is shown in temperature control terminal in the form shown;If total heating preparation executive plan executes no electric heater and matches The obstacle set then enters step (8).It is described to be shown in temperature control terminal in the form shown, show control in tangible temperature control terminal While warm curve, show that the temperature control of which section or those sections is irrealizable, the temperature control curve that can be realized is shown as Green, the temperature control curve that can not be realized are shown in red.
5) step is replaced or is changed in adjustment:What it is by affiliated temperature control terminal acquisition personnel's feedback is adjusted more to electric heater Change or be carry out heating change of plan clear information, if feedback be the information that replacement is adjusted to electric heater, (6) are entered step, if feedback is the information for carrying out heating change of plan, are entered step (7).
6) step is replaced in electric heater adjustment:According to aforementioned above-mentioned total heating cannot be executed in the presence of because electric heater configures in advance The information of standby executive plan carries out member replacing or integral replacing to accumulated electric heater, and member replacing includes but not limited to store Hot brick quantity, specification or type adjustment, blower motor are replaced into different capacity blower motor, and integral replacing is including but not limited to whole Body is changed to other power or the accumulated electric heater of model, category;After adjustment is replaced, confirm that the electric heater after replacing can be held The total heating preparation executive plan of row, then enter step (8).In step (6), the information of the member replacing is first calculated by high in the clouds The spare part box of device and the electric heater is checked, if the case where spare part box can cope with the member replacing, to the electric heater The temperature control terminal of corresponding user held sends information, reminds user to replace, cannot be coped with if it is spare part box It is the case where the case where member replacing or integral replacing, then whole to the temperature control of the maintenance personal corresponding to the electric heater held End sends information, and maintenance personal is reminded to replace.
7) heat Plan rescheduling step:Again heating demands information is acquired by the special APP of temperature control in temperature control terminal, generated Heating preparation programs after adjustment, the heating preparation programs only can be as unit of integral multiples for 24 hours, and temperature control target temperature Controlled per hour in certain fixation degree Celsius as limit, the limits are 16 DEG C -25 DEG C, based on this generation heating preparation meter It draws, is stored in temperature control terminal memory, and return to step (3) and continue to execute.
(8) electric heater heating executes step:Determine that heating preparation programs are the practical plan of heating in following N number of 24H, and The practical plan of heating is stored in the terminal memory of electric heater terminal, this is transferred by the terminal microcontroller in electric heater terminal Heating is actually planned and is executed.
In step (8), the heating actually plan can by other PC, smart mobile phone, PAD by internet via encryption Means, which are transferred, checks, and is printed.
The value of the A is -40 DEG C to 10 DEG C above freezing, and the value of the B is 0-17m/s, and the value of the C is flat for 0-40 The value of square rice, the D is 16 DEG C -25 DEG C, and the value of the E is 80-150.
Preferably, the value of the A is -10 DEG C to 5 DEG C above freezing, and the value of the B is 0-6m/s, and the value of the C is 5-20 square metres, the value of the D is 18 DEG C -20 DEG C, and the value of the E is 100-110.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any The change or replacement expected without creative work, should be covered by the protection scope of the present invention.Therefore, of the invention Protection domain should be determined by the scope of protection defined in the claims.

Claims (5)

1. a kind of remote operation controller of accumulated electric heater, which is characterized in that including with lower component:
Cloud server has high in the clouds calculator, high in the clouds memory and first network interface, has gas on the memory of high in the clouds thereon Image data library and accumulated electric heater configuration database, heat compensation database, the cloud server are connect by first network Mouth connection internet;
Electric heater terminal comprising terminal microcontroller, terminal memory, power interface, power supply adaptor, the second network interface, First communication interface, the second communication interface, the control that the electric heater terminal passes through the first communication interface and accumulated electric heater Device communicates, and the electric heater terminal connects internet by the second network interface;
Accumulated electric heater, including accumulation of heat part, fan section, temperature measurement fraction, control assembly part, casing part, spare part portion Divide, control device, display panel;
The current room temperature data and current wind speed number in room location where the meteorogical phenomena database, including accumulated electric heater According to also including in real time from the following room temperature data in room location where the collected accumulated electric heater in internet and the following wind Fast data;
The accumulated electric heater configuration database, the including but not limited to configuration of each practical accumulated electric heater used Information, configuration information include but not limited to using gitter brick specification and total amount of stored heat, the regenerator temperature upper limit, gitter brick block number, storage Hot heating rate upper limit value, accumulation of heat heating rate lower limiting value, per hour heat release upper limit value, per hour heat release lower limiting value, wind turbine wind Fast upper limit value, wind turbine wind speed lower limiting value;
The heat compensation database, have under condition of different temperatures and different area room under different wind speed per hour with Heat supply temperature is that the heat of standard loses average data;
Electric heater temperature control terminal, the temperature control terminal is PAD or smart mobile phone, has temperature control terminal memory, installs thereon There is the special APP of temperature control, for from cloud server and electric heater terminal called data, the temperature control terminal to be with 3G/4G/5G/ The mode of one of WIFI is connect with internet.
2. a kind of remote operation controller of accumulated electric heater as described in claim 1, it is characterised in that:
The accumulated electric heater, one of power 1600W, 2400W, 3200W, 4000W;
The renewals have spare part box, hold accumulated electric heater spare part in the spare part box, including gitter brick, U-shaped Heating tube, control device, common cable, common maintenance tool;
The accumulation of heat part of the accumulated electric heater includes metal-back, package asbestos cloth, 5-30 blocks gitter brick, U-shaped heating Pipe, the U-shaped heating tube include at least the U-shaped portion of two disks folding;
The fan section of the accumulated electric heater includes blower motor, running part, impeller, and the blower motor, which is located at, to be stored The side of hot part, impeller quantity are at least two, are located at accumulation of heat beneath portions;
The temperature measurement fraction includes at least three probes, wherein the first probe be located at be close to the package of metal-back with asbestos cloth it In, the second probe is located among accumulation of heat partial lumen, and third, which is popped one's head in, is located at the outlet air side of some aforementioned impeller, and described at least three Each of a probe is connected to adapter, and adapter is connected to data processor, and the data processor is connected to data Bus, and the data processor is connected to the display panel of place accumulated electric heater;
The control assembly part includes power supply AC/DC conversion portions, direct current supply assembly, data/address bus;
The casing part includes stainless steel casing, liner asbestos cloth, and rust-proof coating is coated with inside and outside the stainless steel casing, Outer layer is also coated with white anticorrosive paint except rust-proof coating, and the casing part front has a square aperture, for described The installation of control device and display panel;
The spare part box, the rear part have at least four to protrude downward buckle, are used for accumulated electric heater rear portion at least Four protrude outward and the buckle slot communicated up and down matches, equipped with dedicated screwdriver, spare gitter brick, spare U-shaped in the outer box Heating tube, spare asbestos cloth;
The control device includes control single chip computer and button portion, and button portion includes wind speed adjustment portion and charging time adjustment portion;
The display panel be the liquid crystal display equipped with microcontroller, the liquid crystal display booting when show including but it is unlimited In following information:Real time temperature, the wind turbine wind speed of desired temperature, charging duration, the first probe and the second probe and third probe.
3. a kind of remote control method of accumulated electric heater, it makes use of accumulated electric heaters as claimed in claim 2 Remote operation controller, which is characterized in that steps are as follows:
1) heat compensation information filling step:In the heat compensation database, for having under condition of different temperatures and different Average data is lost in different area room under wind speed by the heat of standard of heat supply temperature per hour, and the heat is lost flat Equal data are acquired by the measured data in magnanimity room, and ranging from -40 DEG C to 10 DEG C above freezing of above-mentioned condition of different temperatures is above-mentioned Ranging from 0-17m/s under different wind speed, ranging from 0-40 square metres of above-mentioned different area room, it is above-mentioned with heat supply temperature be mark Standard, ranging from 16 DEG C -25 DEG C of heat supply temperature, on this basis, for having under condition of different temperatures of having collected and It different area room under different wind speed average data is lost as the heat of standard using heat supply temperature is per hour calculated simultaneously Registration seeks its average value for having multiple data samples under same temperature, wind speed, room area, heat supply standard, if There are one samples for lower of some specific temperature, wind speed, room area, heat supply standard, then directly register, generally form for each A DEG C of a specific temperature, each certain wind speed Bm/s, each particular room area Cm2, each specific D DEG C of heat supply standard Under heat compensation data standard;
2) heat preparation programs making step:Heating demands information is acquired by the special APP of temperature control in temperature control terminal, generates heating Preparation programs, the heating preparation programs only can be as unit of integral multiple for 24 hours, and temperature control target temperature to control per hour It is limit in certain fixation degree Celsius, the limits are 16 DEG C -25 DEG C, based on this generation heating preparation programs, are stored in control Warm terminal memory;
3) heating preparation programs verify step:Aforementioned heating preparation programs are sent to cloud server, from the regenerative electrochemical Warmer configuration database extracts electric heating from the configuration data of the extraction heating targeted electric heater of preparation programs from meteorogical phenomena database The following room temperature data in room location where device and the following air speed data verify heating preparation programs for unit for 24 hours with every:With Electric heater effectively go out hot lowest temperature be E DEG C on the basis of, on the basis of the temperature control target temperature of each hour in the following 24H, And inner room for 24 hours is calculated according to meteorological data and always loses heat, the accumulation of heat heat that electric heater always needs is calculated, and with not It is each single to obtain electric heater for the outlet air wind speed for carrying out on the basis of the temperature control target temperature of each hour 24H Nei to calculate each hour The heating preparation executive plan of member, merges the heating preparation executive plan of each unit, obtains the preparation executive plan that always heats;
4) heat preparation programs trouble-shoots step:According to including but not limited to using gitter brick specification and total amount of stored heat, accumulation of heat Temperature upper limit, gitter brick block number, accumulation of heat heating rate upper limit value, accumulation of heat heating rate lower limiting value, per hour heat release upper limit value, every Hour heat release lower limiting value, wind turbine upper wind velocity limit value, wind turbine wind speed lower limiting value electric heater configuration information check above-mentioned total heating Preparation programs cannot execute above-mentioned total heating and prepare executive plan, then feed back information if there is because electric heater configures High in the clouds clothes are fed back to temperature control terminal, and by the inexecutable situation of temperature control target temperature of which hour in the preparation programs that heat Business device, shows in temperature control terminal in the form shown;If total heating preparation executive plan executes no electric heater configuration Obstacle then enters step (8);
5) step is replaced or is changed in adjustment:By affiliated temperature control terminal obtain personnel feedback be to electric heater be adjusted replacement, The clear information of heating change of plan is either carried out, if feedback is the information for being adjusted replacement to electric heater, into Enter step (6), if feedback is the information for carrying out heating change of plan, enters step (7);
6) step is replaced in electric heater adjustment:It cannot execute above-mentioned total heating preparation in the presence of because electric heater configures according to aforementioned and hold The information of row plan, it includes but not limited to gitter brick to carry out member replacing or integral replacing, member replacing to accumulated electric heater Quantity, specification or type adjustment, blower motor are replaced into different capacity blower motor, and integral replacing includes but not limited to whole changes For other power or the accumulated electric heater of model, category;After adjustment is replaced, confirm that the electric heater after replacing is able to carry out always Heating preparation executive plan, then enter step (8);
7) heat Plan rescheduling step:Again heating demands information is acquired by the special APP of temperature control in temperature control terminal, generates adjustment Heating preparation programs afterwards, the heating preparation programs only can be as unit of integral multiple for 24 hours, and temperature control target temperature is with every Hour control is limit in certain fixation degree Celsius, and the limits are 16 DEG C -25 DEG C, is based on this generation heating preparation programs, It is stored in temperature control terminal memory, and returns to step (3) and continues to execute;
(8) electric heater heating executes step:Determine that heating preparation programs are the practical plan of heating in following N number of 24H, and will be for Warm practical plan is stored in the terminal memory of electric heater terminal, and the heating is transferred by the terminal microcontroller in electric heater terminal Actually plan and executes.
4. a kind of remote control method of accumulated electric heater as claimed in claim 3, it is characterised in that:
In step (1), ensure all at least to acquire 3 effective samples under some specific temperature, wind speed, room area, heat supply standard This, enters back into step (2);
In step (2), if it is described temperature control terminal by the special APP of temperature control acquire heating demands information collection to information be Plural item then selects a selection by high in the clouds calculator, or calculates average value by high in the clouds calculator, and is heated by mean value calculation Preparation programs;
In step (3), the electric heater effectively goes out hot lowest temperature, is that the electric heater cannot effective heating indoor air Lowest temperature, by adjusting to obtain according to measured result on the basis of experience value;It is described to be calculated what electric heater always needed Accumulation of heat heat is according to Q24h=Σ ((Σ(temperature control target temperature h- weather prognosis temperature h)) room where * area season room in per m2Air heat Hold * rooms square metre number) the heat compensation numerical value of-Σ each hours, it is calculated, interior electric heater always needs Q24h for 24 hours Accumulation of heat heat, h=1~24, the heat compensation numerical value of Σ each hours is then according to the air speed data of the following interior temperature for 24 hours The heat compensation mentioned in step (1) is inquired in data standard;
It is described to be shown in temperature control terminal in the form shown in step (4), show the same of temperature control curve in tangible temperature control terminal When, show that the temperature control of which section or those sections is irrealizable, the temperature control curve that can realize is shown in green, can not The temperature control curve of realization is shown in red;
In step (6), the information of the member replacing is first checked by the spare part box of high in the clouds calculator and the electric heater, if standby Part box can cope with the case where member replacing, then sent to the temperature control terminal of the user corresponding to the electric heater held The feelings of the case where information, reminds user to replace, the member replacing that cannot be coped with if it is spare part box either integral replacing Condition then sends information to the temperature control terminal of the maintenance personal corresponding to the electric heater held, maintenance personal is reminded to replace;
In step (8), the heating actually plan can by other PC, smart mobile phone, PAD by internet via cryptographic means It transfers and checks, and printed;
The value of the A is -40 DEG C to 10 DEG C above freezing, and the value of the B is 0-17m/s, and the value of the C is 0-40 squares The value of rice, the D is 16 DEG C -25 DEG C, and the value of the E is 80-150.
5. a kind of remote control method of accumulated electric heater as claimed in claim 4, it is characterised in that:
The value of the A is -10 DEG C to 5 DEG C above freezing, and the value of the B is 0-6m/s, and the value of the C is 5-20 square metres, The value of the D is 18 DEG C -20 DEG C, and the value of the E is 100-110.
CN201810342014.XA 2018-04-17 2018-04-17 Remote control device and method for heat accumulating type electric heater Active CN108561945B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810342014.XA CN108561945B (en) 2018-04-17 2018-04-17 Remote control device and method for heat accumulating type electric heater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810342014.XA CN108561945B (en) 2018-04-17 2018-04-17 Remote control device and method for heat accumulating type electric heater

Publications (2)

Publication Number Publication Date
CN108561945A true CN108561945A (en) 2018-09-21
CN108561945B CN108561945B (en) 2020-06-16

Family

ID=63535411

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810342014.XA Active CN108561945B (en) 2018-04-17 2018-04-17 Remote control device and method for heat accumulating type electric heater

Country Status (1)

Country Link
CN (1) CN108561945B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110793095A (en) * 2019-10-15 2020-02-14 北京嘉洁能科技股份有限公司 Carbon fiber intelligent heat supply method and system based on phase change heat storage building envelope heat insulation
CN113152805A (en) * 2021-04-27 2021-07-23 广东天濠建设工程有限公司 Building energy-saving roof heat insulation system and method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006311298A (en) * 2005-04-28 2006-11-09 Nippon Seiki Co Ltd Remote control apparatus
CN205664469U (en) * 2016-06-02 2016-10-26 南京金合能源材料有限公司 Heat storage type electric heater
CN106403005A (en) * 2016-09-22 2017-02-15 山东二十度智慧供热股份有限公司 Heating, measuring and charging method based on indoor temperature package of user
CN107246649A (en) * 2017-06-26 2017-10-13 上海驭宅信息科技有限公司 A kind of energy-saving domestic heating control system, mobile terminal and method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006311298A (en) * 2005-04-28 2006-11-09 Nippon Seiki Co Ltd Remote control apparatus
CN205664469U (en) * 2016-06-02 2016-10-26 南京金合能源材料有限公司 Heat storage type electric heater
CN106403005A (en) * 2016-09-22 2017-02-15 山东二十度智慧供热股份有限公司 Heating, measuring and charging method based on indoor temperature package of user
CN107246649A (en) * 2017-06-26 2017-10-13 上海驭宅信息科技有限公司 A kind of energy-saving domestic heating control system, mobile terminal and method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110793095A (en) * 2019-10-15 2020-02-14 北京嘉洁能科技股份有限公司 Carbon fiber intelligent heat supply method and system based on phase change heat storage building envelope heat insulation
CN113152805A (en) * 2021-04-27 2021-07-23 广东天濠建设工程有限公司 Building energy-saving roof heat insulation system and method
CN113152805B (en) * 2021-04-27 2022-08-05 广东天濠建设工程有限公司 Building energy-saving roof heat insulation system and method

Also Published As

Publication number Publication date
CN108561945B (en) 2020-06-16

Similar Documents

Publication Publication Date Title
CN108240679B (en) A kind of heat supply method based on building heating load prediction, device and system
US20190325097A1 (en) System And Method For Modeling Building Heating Energy Consumption With The Aid Of A Digital Computer
Sarto et al. Comparison between predicted and actual energy performance for winter heating in high-performance residential buildings in the Lombardy region (Italy)
US20120065791A1 (en) Home energy manager for providing energy projections
US20120150509A1 (en) Continuous optimization energy reduction process in commercial buildings
CN104571034B (en) Intelligent management and control equipment and control method thereof
CN103499136B (en) Ice storage control system with next-day energy consumption simulation function
CN108561945A (en) A kind of remote operation controller and method of accumulated electric heater
WO2013094350A1 (en) Remote monitoring control system and method of operating same
US20190120804A1 (en) System and method for monitoring occupancy of a building using a tracer gas concentration monitoring device
JP6928164B2 (en) Hot water supply system, cloud server, boiling schedule creation method and program
WO2020213222A1 (en) Energy prediction system, energy prediction method, program, recording medium, and management system
CN102413165B (en) Use the diagnosis of submeter device
CN110108004A (en) The method, apparatus and computer storage medium of airconditioning control
CN108758765A (en) A kind of the accumulated electric heater system and charging method of wireless charging
CN109565184A (en) Electrical equipment, consumption electric power cut down system, communication adapter and consumption electric power cutting method
Cherif et al. Enhancing crop yield in hydroponic greenhouses: Integrating latent heat storage and forced ventilation systems for improved thermal stratification
JP6846863B2 (en) Water heater management equipment, gateway equipment, water heater management system, and programs
CN206094290U (en) Heat supply management and control system with on -off control valve
AU2016324351A1 (en) Power analyser and method for the use thereof
CN108594899A (en) A kind of temperature control system and method based on feedback temperature adjustment
JP5830817B2 (en) Energy conversion device simulation method and energy conversion device simulation system
CN204287952U (en) A kind of cold and heat combined supply self-optimizing control equipment
CN207601660U (en) Concrete environmental control system and environmental control system
Moon et al. Continuous commissioning through real-time simulation with a building energy monitoring system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant