CN108561137A - A kind of rectangular top tube top iron construction to retract and application method - Google Patents

A kind of rectangular top tube top iron construction to retract and application method Download PDF

Info

Publication number
CN108561137A
CN108561137A CN201810263090.1A CN201810263090A CN108561137A CN 108561137 A CN108561137 A CN 108561137A CN 201810263090 A CN201810263090 A CN 201810263090A CN 108561137 A CN108561137 A CN 108561137A
Authority
CN
China
Prior art keywords
iron
top iron
oil cylinder
rectangular
jacking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810263090.1A
Other languages
Chinese (zh)
Inventor
闫晓东
郑水林
刘习生
卢龙华
钱琨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Civil Engineering Co Ltd of CREC
Huahai Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Original Assignee
Shanghai Civil Engineering Co Ltd of CREC
Huahai Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Civil Engineering Co Ltd of CREC, Huahai Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC filed Critical Shanghai Civil Engineering Co Ltd of CREC
Priority to CN201810263090.1A priority Critical patent/CN108561137A/en
Publication of CN108561137A publication Critical patent/CN108561137A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/03Driving non-circular tunnels

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a kind of rectangular top tube top iron construction to retract and application methods, it is characterized in that, rectangular top iron and the end face of U-shaped top iron are welded as entirety using several iron blocks, the other end of U-shaped top iron is connected by screw bolts with jacking oil cylinder as entirety, realize rectangular top iron, U-shaped top iron and jacking oil cylinder three linkage, rectangular top iron and U-shaped top iron are connected as entirety on ground, lifted on the guide rail of active well;In rollback jacking oil cylinder, drive rectangular top iron and U-shaped top iron whole along guide rail rollback.The present invention avoid in existing rectangular top pipe construction process every section tube top into after, repeatedly lifting and lower caving iron will waste a large amount of construction time.And the top iron construction that can be retracted considers rectangular top iron, U-shaped top iron and jacking oil cylinder to be connected as entirety, whole rollback rectangular top iron, U-shaped top iron and jacking oil cylinder, to improve construction efficiency.

Description

A kind of rectangular top tube top iron construction to retract and application method
Technical field
The invention belongs to no-dig technique underground engineering field, the rectangular top tube top iron for being related to retract is to be used for high efficiency push pipe The auxiliary construction technology of jacking.
Background technology
Rectangular top pipe as a kind of important trenchless technology be widely used in Urban Underground Passage, subway entrance, The underground engineering constructions such as pipe gallery field, since its excavation area is small, overall cost is low, construction efficiency is high, rectangular cross section is sharp With the high advantage of rate, there is vast potential for future development in urban underground engineering construction field.
But since rectangular top pipe jacking construction is that each section of prefabricated tube coupling one saves land jacking forward, on the fixed top in rear end Into oil cylinder per one stroke of jacking forward after, it is necessary to retract oil cylinder, and bulky rectangular top iron and U-shaped is sling and transferred again with crane Iron is pushed up, is provided for next section section of jurisdiction and places space.This will occupy a large amount of construction time, reduce jacking construction efficiency, cause Construction cost increases.
Invention content
The purpose of the present invention is to provide a kind of rectangular top tube top iron construction to retract and application methods;It avoids existing Rectangular top pipe engineering construction every section tube top into after, repeatedly lifting and lower caving iron will waste a large amount of construction time. And the top iron construction that can be retracted considers rectangular top iron, U-shaped top iron and jacking oil cylinder to be connected as entirety, whole rollback rectangular top Iron, U-shaped top iron and jacking oil cylinder, to improve construction efficiency.
To achieve the above object, a kind of rectangular top tube top iron construction to retract is designed, which is characterized in that by iron block 1, square Shape top iron 2, U-shaped top iron 3, the jacking oil cylinder 4 with spherical hinge and guide rail 10 form, the end face of rectangular top iron 2 and U-shaped top iron 3 It is welded as entirety using several iron blocks 1, the other end of U-shaped top iron 3 is connected as entirety using bolt 8 with jacking oil cylinder 4, realizes Rectangular top iron 2, U-shaped top iron 3 and 4 three of jacking oil cylinder linkage, are connected as rectangular top iron 2 and U-shaped top iron 3 on ground whole Body lifts on the guide rail 10 of active well 6;In rollback jacking oil cylinder 4, rectangular top iron 2 and the whole edge of U-shaped top iron 3 is driven to lead Rail 10 retracts.
Lifting jacking oil cylinder 4 and cylinder rack 5 are placed in 7 front end of rear parados.
Jacking oil cylinder 4 needs rollback oil cylinder vacating space to place next section section of jurisdiction when jacking reaches a stroke forward 9。
Welding position of the iron block 1 on two top iron is each two of top iron both sides welding, welding two above iron is pushed up, if top Iron weight is little, and rectangular top iron 2 and U-shaped top iron 3 can be used and directly carries out spot welding company within each one week in contact interface outer ring and inner ring The mode connect.
U-shaped top iron 3 is connect using direct welding manner in active well 6 with jacking oil cylinder 4 or bolt 8 connects, 8 specification of bolt For Φ 20,4 end of jacking oil cylinder is arranged symmetrically 4 bolts 8 up and down.
The end of jacking oil cylinder 4 is a spherical hinge, ensures that there are certain degree of freedom at this in rollback oil cylinder;With it is U-shaped It pushes up the jacking oil cylinder 4 that iron 3 connects to ensure to arrange with jacking axis longitudinal direction vertical guide symmetry principle, and is arranged since least significant end; When rectangular top iron is smaller with U-shaped top iron weight, it respectively can arrange one on jacking axis longitudinal direction vertical guide both sides and be connect with U-shaped top iron Jacking oil cylinder, when rectangular top iron and U-shaped top iron weight are larger, can jacking axis longitudinal direction vertical guide both sides respectively arrangement two and The jacking oil cylinder of U-shaped top iron connection.
The rectangular top tube top iron construction application method that can be retracted, lifting jacking oil cylinder 4 and cylinder rack 5 are placed in rear parados 7 Front end.Rectangular top iron 2 and U-shaped top iron 3 are connected as entirety on ground, lifted on the guide rail 10 of active well 6.U-shaped top iron with Band spherical hinge jacking oil cylinder 4 uses bolt 8 to connect, and jacking cylinder movement drives rectangular top iron 2 and the whole front and back shifting of U-shaped top iron 3 It is dynamic, to realize the rectangular top tube top iron construction that can be retracted.
Underground engineering construction is carried out in city, surrounding traffic and trip will unavoidably be impacted, so underground Engineering construction is very high to construction period, and the reduction of duration will directly or indirectly reduce the cost of engineering.Existing rectangular top pipe Engineering construction every section tube top into after, lift by crane rectangular top iron and U-shaped top iron, rollback jacking oil cylinder, for next section tube coupling Transfer vacating space.Lifting and lower caving iron will waste a large amount of construction time repeatedly, the construction period be increased, to improve Construction cost.And the top iron construction that can be retracted considers rectangular top iron, U-shaped top iron and jacking oil cylinder to be connected as entirety, reduces every Secondary lifting and two class top iron the time it takes of decentralization.
Compared with prior art, the present invention mainly there is following advantage:
1. construction efficiency is high.It has saved each lifting and has transferred bulky rectangular top iron and U-shaped top iron the time it takes, to Improve construction efficiency.
2. simple in structure.Only with simple iron block and the modes such as it is bolted and makes rectangular top iron, U-shaped top iron and jacking Oil cylinder forms an entirety, so the structure and construction method are simple.
3. cost-effective.The labor and time cost that furred ceiling iron is spent has been reduced, efficiency is improved, to be construction Unit and society reduce cost.
4. wide adaptability.Suitable for rectangular top pipe jacking construction under all operating modes.
Description of the drawings
The rectangular top tube top iron construction figure that Fig. 1 can retract(Jacking oil cylinder reaches one stroke).
The rectangular top tube top iron construction figure that Fig. 2 can retract(Jacking oil cylinder drives top iron to retract).
The U-shaped top iron of Fig. 3 is bolted front view with rectangular top iron iron plate.
The U-shaped top iron of Fig. 4 connect partial enlarged view with spherical hinge jacking oil cylinder.
Description of symbols in figure
After 1 iron block, 2 rectangular top iron, 3 U-shaped top iron 4 is with 5 cylinder rack of spherical hinge jacking oil cylinder, 6 active well 7 8 bolt of parados, 9 section of jurisdiction, 10 guide rail 11 connects bolt.
Specific implementation mode
It is clear to make the object of the invention, principle and construction become apparent from, make below in conjunction with drawings and the specific embodiments further It illustrates.
As shown in Figure 1, Figure 2, Fig. 3, Fig. 4, the top iron construction that can retract is by iron block 1, rectangular top iron 2, U-shaped top iron 3, band spherical hinge Jacking oil cylinder 4, connection bolt 8 and guide rail 10, connection bolt 11 form.
As Fig. 1 needs rollback oil cylinder vacating space to place down when jacking reaches a stroke to jacking oil cylinder 4 forward One section section of jurisdiction 9.This can retract top iron construction be:Rectangular top iron 2 and U-shaped top iron 3 use iron block 1 are welded as entirety, and U-shaped top iron 3 are connected by screw bolts with jacking oil cylinder 4 as entirety.Then, in rollback jacking oil cylinder 4, rectangular top iron 2 and U-shaped top iron 3 are driven It is whole to retract along guide rail 10, such as Fig. 2.To be next 9 vacating space of section section of jurisdiction, avoid lifting rectangular top iron 2 and U-shaped top repeatedly 3 the time it takes of iron.
Embodiment one:The rectangular top tube top iron construction application method that can be retracted.
1, rectangular top iron 2 and U-shaped top iron 3 are welded as entirety on ground.Iron block 1 and rectangular top iron 2, iron block 1 and U-shaped top 3 welding method of iron is arc welding, and 1 size of iron block is 20cm × 10cm, and the iron block on two top iron is connected using bolt 11, bolt 11 Specification is Φ 50.As shown in figure 3, welding position of the iron block 1 on two top iron is each two of top iron both sides welding, weldering above the iron of top Connect two.If top iron weight it is little, can rectangular top iron 2 and it is U-shaped top iron 3 welding manner can be directly in contact interface outer ring It is connected using spot welding within each one week with inner ring.
2, top iron and the connection with spherical hinge jacking oil cylinder 4.First, band spherical hinge jacking oil cylinder 4 is hung in and is placed in In cylinder rack 5,3 entirety of rectangular top iron 2 and U-shaped top iron being welded is hung on the guide rail 10 of active well 6.If rectangular top iron 2 and U-shaped top iron 3 it is whole weight it is little, U-shaped top iron 3 also can be in active well 6 using direct welding manner company with jacking oil cylinder 4 It connects;If the weight of rectangular top iron 2 and U-shaped 3 entirety of top iron is larger, U-shaped top iron 3 is adopted with jacking oil cylinder 4 in active well 6 It is connected with bolt 8,8 specification of bolt is Φ 20, and 4 end of jacking oil cylinder is arranged symmetrically 4 bolts 8 up and down.
3, the end of jacking oil cylinder 4 is a spherical hinge, ensures that there are certain degree of freedom at this in rollback oil cylinder.With U The jacking oil cylinder 4 that type top iron 3 connects ensures to arrange with jacking axis longitudinal direction vertical guide symmetry principle, and the cloth since least significant end It sets.When rectangular top iron 2 is smaller with 3 weight of U-shaped top iron, one and U-shaped top can be respectively arranged on jacking axis longitudinal direction vertical guide both sides The jacking oil cylinder 4 that iron 3 connects can be each on jacking axis longitudinal direction vertical guide both sides when rectangular top iron 2 is larger with 3 weight of U-shaped top iron Two jacking oil cylinders 4 being connect with U-shaped top iron 3 of arrangement.

Claims (10)

1. a kind of rectangular top tube top iron construction to retract, which is characterized in that by iron block(1), rectangular top iron(2), U-shaped top iron (3), jacking oil cylinder with spherical hinge(4)And guide rail(10)Composition, rectangular top iron(2)With U-shaped top iron(3)End face use Several iron blocks(1)It is welded as entirety, U-shaped top iron(3)Other end and jacking oil cylinder(4)Using bolt(8)Entirety is connected as, Realize rectangular top iron(2), U-shaped top iron(3)And jacking oil cylinder(4)Three links, on ground rectangular top iron(2)And U-shaped top Iron(3)It is connected as entirety, is lifted into active well(6)Guide rail(10)On;In rollback jacking oil cylinder(4)When, drive rectangular top iron (2)And U-shaped top iron(3)Entirety is along guide rail(10)It retracts.
2. a kind of rectangular top tube top iron construction to retract as described in claim 1, which is characterized in that lifting jacking oil cylinder (4)And cylinder rack(5)It is placed in rear parados(7)Front end.
3. a kind of rectangular top tube top iron construction to retract as described in claim 1, which is characterized in that jacking oil cylinder 4 is forward When jacking reaches a stroke, rollback oil cylinder vacating space is needed to place next section section of jurisdiction(9).
4. a kind of rectangular top tube top iron construction to retract as described in claim 1, which is characterized in that iron block(1)In Liang Ding Welding position on iron is each two of top iron both sides welding, pushes up welding two above iron, if top iron weight is little, rectangular top iron (2)And U-shaped top iron(3)The mode for directly carrying out spot welding with inner ring in contact interface outer ring and connecting for each one week can be used.
5. a kind of rectangular top tube top iron construction to retract as described in claim 1, which is characterized in that U-shaped top iron(3)With top Into oil cylinder(4)In active well(6)Using the connection of direct welding manner or bolt(8)Connection, bolt(8)Specification is Φ 20, jacking Oil cylinder(4)End is arranged symmetrically 4 bolts up and down(8).
6. a kind of rectangular top tube top iron construction to retract as described in claim 1, which is characterized in that jacking oil cylinder(4)'s End is a spherical hinge, ensures that there are certain degree of freedom at this in rollback oil cylinder;With U-shaped top iron(3)The jacking oil of connection Cylinder(4)Ensure to arrange with jacking axis longitudinal direction vertical guide symmetry principle, and is arranged since least significant end;Rectangular top iron and U-shaped top When iron weight is smaller, a jacking oil cylinder being connect with U-shaped top iron, rectangle can be respectively arranged on jacking axis longitudinal direction vertical guide both sides It, can be on the jacking axis longitudinal direction vertical guide both sides tops that respectively arrangement two and U-shaped top iron are connect when pushing up iron and larger U-shaped top iron weight Into oil cylinder.
7. a kind of application method of the rectangular top tube top iron construction to retract, which is characterized in that lifting jacking oil cylinder(4)And oil cylinder Frame(5)It is placed in rear parados(7)Front end;On ground rectangular top iron(2)And U-shaped top iron(3)It is connected as entirety, is lifted into work Well(6)Guide rail(10)On;U-shaped top iron with spherical hinge jacking oil cylinder(4)Using bolt(8)Connection, jacking cylinder movement band Dynamic rectangular top iron(2)And U-shaped top iron(3)It is whole to be moved forward and backward, it is next to realize the rectangular top tube top iron construction that can be retracted Save section of jurisdiction(9)Vacating space avoids lifting rectangular top iron repeatedly(2)And U-shaped top iron(3)The time it takes.
8. a kind of application method of the rectangular top tube top iron construction to retract as claimed in claim 7, which is characterized in that on ground Rectangular top iron and U-shaped top iron are welded as entirety;Iron block is arc welding, iron with rectangular top iron, iron block and U-shaped top iron welding method Block size is 20cm × 10cm, and the iron block on two top iron is connected by screw bolts, and bolt specification is Φ 50;Iron block is on two top iron Welding position is each two of top iron both sides welding, top iron top welding two;If top iron weight is little, rectangular top iron and U-shaped The mode for directly carrying out spot welding with inner ring in contact interface outer ring and connecting for each one week can be used in top iron.
9. a kind of application method of the rectangular top tube top iron construction to retract as claimed in claim 7, which is characterized in that top iron with Connection Step with spherical hinge jacking oil cylinder;First, band spherical hinge jacking oil cylinder is hung in and is placed in cylinder rack, welding Good rectangular top iron and U-shaped top iron is integrally hung on the guide rail of active well;If the weight of rectangular top iron and U-shaped top iron entirety is not Greatly, U-shaped top iron can also be connect in active well using direct welding manner with jacking oil cylinder;If rectangular top iron and U-shaped top iron are whole When the weight of body is larger, U-shaped top iron is connected by screw bolts with jacking oil cylinder in active well, bolt specification is Φ 20, jacking Oil cylinder end is arranged symmetrically 4 bolts up and down.
10. a kind of application method of the rectangular top tube top iron construction to retract as claimed in claim 7, which is characterized in that jacking The end of oil cylinder is a spherical hinge, ensures that there are certain degree of freedom at this in rollback oil cylinder;The jacking being connect with U-shaped top iron Oil cylinder ensures to arrange with jacking axis longitudinal direction vertical guide symmetry principle, and is arranged since least significant end;Rectangular top iron and U-shaped top iron When weight is smaller, a jacking oil cylinder being connect with U-shaped top iron, rectangular top can be respectively arranged on jacking axis longitudinal direction vertical guide both sides It, can be in respectively two jackings being connect with U-shaped top iron of arrangement of jacking axis longitudinal direction vertical guide both sides when iron is larger with U-shaped top iron weight Oil cylinder.
CN201810263090.1A 2018-03-28 2018-03-28 A kind of rectangular top tube top iron construction to retract and application method Pending CN108561137A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810263090.1A CN108561137A (en) 2018-03-28 2018-03-28 A kind of rectangular top tube top iron construction to retract and application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810263090.1A CN108561137A (en) 2018-03-28 2018-03-28 A kind of rectangular top tube top iron construction to retract and application method

Publications (1)

Publication Number Publication Date
CN108561137A true CN108561137A (en) 2018-09-21

Family

ID=63533552

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810263090.1A Pending CN108561137A (en) 2018-03-28 2018-03-28 A kind of rectangular top tube top iron construction to retract and application method

Country Status (1)

Country Link
CN (1) CN108561137A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109339813A (en) * 2018-11-27 2019-02-15 中国水利水电第四工程局有限公司 A kind of pipe jacking tunnelling machine
CN109630151A (en) * 2018-11-07 2019-04-16 中衡设计集团工程咨询有限公司 Rectangular top pipe tunneling construction method
CN110761807A (en) * 2019-12-11 2020-02-07 北京中岩智泊科技有限公司 Assembling system and assembling method for prefabricated assembled jacking pipe
CN111795207A (en) * 2020-07-17 2020-10-20 中铁十二局集团有限公司 Construction method for oversized starting well top pipe
CN113357437A (en) * 2021-07-14 2021-09-07 中国建筑第八工程局有限公司 Prefabricated back wall with adjustable pipe jacking construction

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101285387A (en) * 2008-05-22 2008-10-15 清华大学 Propelling plant for earth pressure balancing shield
CN202195160U (en) * 2011-09-05 2012-04-18 天津第六市政公路工程有限公司 Assembled jacking iron for large-caliber pipe jacking construction
CN102568293A (en) * 2010-12-14 2012-07-11 上海市机械施工有限公司 Rectangular tunnel boring machine teaching system
CN202531174U (en) * 2012-02-13 2012-11-14 盾建重工制造有限公司 Compound double actively hinging devices of shield machine
CN103046638A (en) * 2011-04-28 2013-04-17 朱奎 Pipe jacking construction method
CN105465481A (en) * 2016-01-25 2016-04-06 杭州江润科技有限公司 Construction method for jacking structure of pipe jacking work well
CN105545317A (en) * 2015-12-31 2016-05-04 成都泽翰科技有限公司 Urban underground pipe gallery drilling and laying machine
CN105570534A (en) * 2016-02-22 2016-05-11 中国水利水电第十一工程局有限公司 Shallow-burial-depth pipe-jacking equipment capable of controlling ground structural deformation and construction method
CN205479706U (en) * 2016-01-25 2016-08-17 浙江宝田环境建设有限公司 Push pipe work jing ding advances structure
CN206111189U (en) * 2016-10-30 2017-04-19 成都建工路桥建设有限公司 Rectangular shield digs jacking force delivery system in top
CN206368709U (en) * 2016-12-29 2017-08-01 中船重型装备有限公司 Rectangular pipe jacking machine inwall shockproof structure
CN208587160U (en) * 2018-03-28 2019-03-08 中铁上海工程局集团有限公司 A kind of rectangular top tube top iron construction to retract

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101285387A (en) * 2008-05-22 2008-10-15 清华大学 Propelling plant for earth pressure balancing shield
CN102568293A (en) * 2010-12-14 2012-07-11 上海市机械施工有限公司 Rectangular tunnel boring machine teaching system
CN103046638A (en) * 2011-04-28 2013-04-17 朱奎 Pipe jacking construction method
CN202195160U (en) * 2011-09-05 2012-04-18 天津第六市政公路工程有限公司 Assembled jacking iron for large-caliber pipe jacking construction
CN202531174U (en) * 2012-02-13 2012-11-14 盾建重工制造有限公司 Compound double actively hinging devices of shield machine
CN105545317A (en) * 2015-12-31 2016-05-04 成都泽翰科技有限公司 Urban underground pipe gallery drilling and laying machine
CN105465481A (en) * 2016-01-25 2016-04-06 杭州江润科技有限公司 Construction method for jacking structure of pipe jacking work well
CN205479706U (en) * 2016-01-25 2016-08-17 浙江宝田环境建设有限公司 Push pipe work jing ding advances structure
CN105570534A (en) * 2016-02-22 2016-05-11 中国水利水电第十一工程局有限公司 Shallow-burial-depth pipe-jacking equipment capable of controlling ground structural deformation and construction method
CN206111189U (en) * 2016-10-30 2017-04-19 成都建工路桥建设有限公司 Rectangular shield digs jacking force delivery system in top
CN206368709U (en) * 2016-12-29 2017-08-01 中船重型装备有限公司 Rectangular pipe jacking machine inwall shockproof structure
CN208587160U (en) * 2018-03-28 2019-03-08 中铁上海工程局集团有限公司 A kind of rectangular top tube top iron construction to retract

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吴圣贤;: "某地铁过街通道大断面矩形顶管工程设计", no. 03 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109630151A (en) * 2018-11-07 2019-04-16 中衡设计集团工程咨询有限公司 Rectangular top pipe tunneling construction method
CN109339813A (en) * 2018-11-27 2019-02-15 中国水利水电第四工程局有限公司 A kind of pipe jacking tunnelling machine
CN110761807A (en) * 2019-12-11 2020-02-07 北京中岩智泊科技有限公司 Assembling system and assembling method for prefabricated assembled jacking pipe
CN111795207A (en) * 2020-07-17 2020-10-20 中铁十二局集团有限公司 Construction method for oversized starting well top pipe
CN113357437A (en) * 2021-07-14 2021-09-07 中国建筑第八工程局有限公司 Prefabricated back wall with adjustable pipe jacking construction

Similar Documents

Publication Publication Date Title
CN108561137A (en) A kind of rectangular top tube top iron construction to retract and application method
CN201647947U (en) Tunnel overhaul work extension platform
CN203145950U (en) Support for monolithic horizontal movement station-crossing of shield tunneling machine
CN104499416A (en) Full-hydraulic crawler-type self-moving trestle
CN110552709A (en) self-propelled integral station-crossing method and device suitable for large-diameter shield machine
CN203213092U (en) Self-moving crawler-type hydraulic high-speed rammer compactor
CN208587160U (en) A kind of rectangular top tube top iron construction to retract
CN101864976A (en) Airborne hydraulic multifunctional temporary support machine
CN110158973B (en) Pipe erecting equipment and synchronous operation type pipe erecting construction method
CN204371384U (en) Anchor Agent boost motor
CN210563476U (en) Pipe erecting equipment
CN202466543U (en) Hydraulic movable ingot locking device for plane gate
CN215444095U (en) Subway tunnel inner supporting structure
CN207632432U (en) A kind of underground moving hydraulic support to supporting point device
CN216072862U (en) Heavy jack translation device for narrow space operation
CN201932887U (en) Crawler-typed moving lifting platform special for greenhouse
CN211549698U (en) Jacking working pit
CN209040849U (en) A kind of negative endless tube sheet connecting apparatus of shield tunnel construction
CN215826857U (en) Climbing mechanism for pipeline transportation and installation robot
CN203668940U (en) Shoring mechanism for preventing row piles in foundation pit from deforming
CN208650890U (en) Can Fast Installation heavy section steel support it is hydraulic from move support platform
CN203558470U (en) Intermittence push-pull moving device of hydraulic clamping rail
CN208203273U (en) Multifunctional shield machine originating station
CN206397502U (en) The mechanism that misses the stop is walked in the straight trip of shield machine main unit hydraulic walking
CN201874596U (en) Roadheader-borne hydraulic multifunctional temporary supporting machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination