CN108560879A - House decoration construction technology - Google Patents

House decoration construction technology Download PDF

Info

Publication number
CN108560879A
CN108560879A CN201810368153.XA CN201810368153A CN108560879A CN 108560879 A CN108560879 A CN 108560879A CN 201810368153 A CN201810368153 A CN 201810368153A CN 108560879 A CN108560879 A CN 108560879A
Authority
CN
China
Prior art keywords
construction technology
water pipe
construction
house decoration
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810368153.XA
Other languages
Chinese (zh)
Inventor
王震
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810368153.XA priority Critical patent/CN108560879A/en
Publication of CN108560879A publication Critical patent/CN108560879A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Sewage (AREA)

Abstract

The present invention relates to building decoration areas, disclose a kind of house decoration construction technology, are characterized in that:Including construction of cable run technique and water route construction technology, wherein construction of cable run technique includes fluting, and fluting is cut on wall;Covering, covers stainless steel material on conduit;Switch socket magazine is arranged, and switch socket magazine is arranged in each room;Circuit connects, and switch socket box and conduit are attached, and water route construction technology includes fluting, and fluting is cut on wall;Covering, covers stainless steel material on water pipe;It is laid with water pipe, water pipe is laid in each room;Independent water check valve is set, independent water check valve is added on household water pipe, existing house decoration construction is solved without fixed flow, especially for water route construction and this block of construction of cable run, the decoration construction of unfixed flow, it is abnormal in the presence of higher probability after causing water route and circuit to be laid with use, and follow-up maintenance is of high cost, the problem of maintenance period length.

Description

House decoration construction technology
Technical field
The present invention relates to building decoration areas, are concretely house decoration construction technologies.
Background technology
The house of user's purchase is mostly rough house, needs to carry out building decoration and fitment before normal use, be built for protection The use function and beautifying constructure built the agent structure of object, improve building, using decorating and renovating material or jewelry, to building The various processing that the surfaces externally and internally of object and space carry out.
Existing house decoration construction is not solid especially for water route construction and this block of construction of cable run without fixed flow The decoration construction of constant current journey is abnormal after causing water route and circuit to be laid with use in the presence of higher probability, and follow-up maintenance cost Height, maintenance period are long.
Accordingly, it is desirable to provide the house decoration in water route and construction of cable run fixation flow is applied when a kind of construction for house decoration Work technique.
Invention content
The present invention for existing house decoration construction without fixed flow, especially for water route construction and construction of cable run this Block, the decoration construction of unfixed flow, is abnormal after causing water route and circuit to be laid with use in the presence of higher probability, and follow-up Maintenance cost is high, and the problem of maintenance period length provides house decoration construction technology.
The present invention solves above-mentioned technical problem, the technical solution adopted is that, a kind of house decoration construction technology includes circuit Construction technology and water route construction technology.
Further, construction of cable run technique includes the following steps:
The first step, fluting cut fluting on wall, conduit are put into groove body and is fixed by pipe clamp;
Second step, covering, covers stainless steel material on conduit;
Third walks, the setting of switch socket magazine, and switch socket magazine is arranged in each room;
4th step, circuit connection, switch socket box and conduit are attached.
Further, the first step, groove depth be 20~30mm, width be 15~20mm, adjacent pipe clamp spacing be 400~ 600mm。
Further, the first step is provided with the electric wire box for converging electric wire on conduit, and conduit includes forceful electric power spool With light current spool, electric wire box includes forceful electric power wire box and light current wire box, and forceful electric power spool and the spacing of light current spool are more than 200mm, by force The spacing of electric wire box and light current wire box is more than 200mm.
Further, the first step, forceful electric power spool are red, and light current spool is blue, and chamber electric wire box is red, light current wire box For blue, forceful electric power spool is wrapped up with light current spool cross-reference masking foil.
Further, third walks, and the liftoff 200~250mm of finished surface of mouth under video wall region jack magazine, air conditioning area is inserted Liftoff 1600~the 1800mm of finished surface of mouth, the liftoff 800~1000mm of finished surface of mouth under the socket cassette of kitchen area under seat magazine.
The purpose designed in this way is, is arranged by fluting, covering, switch socket magazine and is connected with circuit so that house Construction of cable run flow is fixed in decoration construction, can effectively reduce in arbitrarily construction and conduit is caused to damage.
Meanwhile mechanical slotting is used when fluting, and it avoiding artificial fluting and be easy to cause the damage of wall ground, groove body is irregular, It sunkens cord and is easily bent, damage pipeline.
Moreover forceful electric power spool and light current spool, forceful electric power wire box and light current wire box are marked by different colours so that Pipeline is clearly demarcated, and strong and weak conduit is avoided to mix pipe arrangement, strong and weak conduit cross-reference masking foil wrapping, effective solution strong and weak electricity The influence of cross-pair weak electric signal.
Meanwhile switch socket magazine is arranged to each room, each room electrical problem can be effectively solved, is set based on each electricity consumption It applies to power reguirements difference, the conduit main road registered one's residence uses 6 squares and the above copper core cable, switch socket magazine position to use 4 squares and the above copper core cable, illuminating line use 2.5 squares or more copper core cables.
Moreover forceful electric power line pipe joint is connected with boiling hot tin by WAGO special connectors and is used cooperatively, 6 squares or more of circuit It is linked with boiling hot process of tin, 6 squares or less circuits are coupled using WAGO connectors, can effectively reduce forceful electric power spool after construction of cable run It is abnormal probability.
Further, water route construction technology includes the following steps:
The first step, fluting cut fluting on wall, water pipe are put into groove body and is fixed by pipe clamp;
Second step, covering, covers stainless steel material on water pipe;
Third walks, and is laid with water pipe, and water pipe is laid in each room;
4th step, is arranged independent water check valve, and independent water check valve is added on household water pipe.
Further, the first step, groove depth be 20~30mm, width be 20~30mm, adjacent pipe clamp spacing be 600~ 800mm。
Further, second step, after covering stainless steel material on water pipe, then in metope slotting position with 200~300mm Anti-crack net linked network anticracking.
Further, third walks, and water pipe infall uses 2~2.5 φ bridge elbows, and cold water pipe and hot-water line parallel spacing are big In 200mm, kitchen and toilet use 20~25 φ water pipes, and when laying is laid with from kitchen and toilet furred ceiling, be located at kitchen and Toilet furred ceiling is laid with downcomer by the way that undercut is arranged in metope.
The purpose designed in this way is, when fluting uses mechanical slotting, avoids artificial fluting and be easy to cause wall ground damage Bad, groove body is irregular, sunkens cord and is easily bent, and damages pipeline.
Meanwhile water pipe infall uses 2~2.5 φ bridge elbows, situations such as avoiding water pipe infall cracky easily rupturable to send out It is raw.
Moreover cold water pipe is more than 200mm with hot-water line parallel spacing, and existing list is abandoned at mixing tap water outlet joint Body inner thread elbow uses hot and cold water disjunctor inner thread elbow instead, it is entirely avoided mixing tap is uneven, and spacing is not enough etc. a series of Problem.
Beneficial effects of the present invention are at least following one:
1. water route and construction of cable run fix flow when by providing a kind of construction for house decoration, solves existing house dress Construction is repaiied without fixed flow, especially for water route construction and this block of construction of cable run, the decoration construction of unfixed flow is led It is abnormal in the presence of higher probability after causing water route and circuit to be laid with use, and follow-up maintenance is of high cost, the problem of maintenance period length.
It is connected with circuit 2. being arranged by fluting, covering, switch socket magazine so that circuit is applied in house decoration construction Work flow is fixed, and can effectively reduce in arbitrarily construction and conduit is caused to damage.
3. by forceful electric power spool and light current spool, forceful electric power wire box and light current wire box are marked by different colours so that pipe Line is clearly demarcated, and strong and weak conduit is avoided to mix pipe arrangement, strong and weak conduit cross-reference masking foil wrapping, and effective solution strong and weak electricity is handed over Pitch the influence to weak electric signal.
4. forceful electric power line pipe joint is connected with boiling hot tin by WAGO special connectors and is used cooperatively, 6 squares or more of circuit is used Process of tin link is scalded, 6 squares or less circuits are coupled using WAGO connectors, and forceful electric power spool is sent out after can effectively reducing construction of cable run Raw exception probability.
5. water pipe infall uses 2~2.5 φ bridge elbows, situations such as avoiding water pipe infall cracky easily rupturable to occur.
6. cold water pipe is more than 200mm with hot-water line parallel spacing, existing monomer is abandoned at mixing tap water outlet joint Inner thread elbow uses hot and cold water disjunctor inner thread elbow instead, it is entirely avoided mixing tap is uneven, and spacing is not enough etc. a series of to ask Topic.
Specific implementation mode
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to embodiments to the present invention It is described in further detail.It should be appreciated that specific embodiment described herein is used only for explaining the present invention, it is not used to limit The fixed present invention.
Embodiment 1
House decoration construction technology includes construction of cable run technique and water route construction technology;
Wherein, construction of cable run technique includes the following steps:
The first step, fluting cut fluting on wall, conduit are put into groove body and is fixed by pipe clamp;
Second step, covering, covers stainless steel material on conduit;
Third walks, the setting of switch socket magazine, and switch socket magazine is arranged in each room;
4th step, circuit connection, switch socket box and conduit are attached.
Water route construction technology includes the following steps:
The first step, fluting cut fluting on wall, water pipe are put into groove body and is fixed by pipe clamp;
Second step, covering, covers stainless steel material on water pipe;
Third walks, and is laid with water pipe, and water pipe is laid in each room;
4th step, is arranged independent water check valve, and independent water check valve is added on household water pipe.
It is connected with circuit in use, being arranged by fluting, covering, switch socket magazine so that electricity in house decoration construction Road construction process is fixed, and can effectively reduce in arbitrarily construction and conduit is caused to damage, and solves existing house decoration construction and does not have Have fixed flow, especially for water route construction and construction of cable run this block, the decoration construction of unfixed flow, cause water route and Circuit is abnormal after being laid with use in the presence of higher probability, and follow-up maintenance is of high cost, the problem of maintenance period length.
Embodiment 2
Based on embodiment 1, house decoration construction technology includes construction of cable run technique and water route construction technology;
Wherein, construction of cable run technique includes the following steps:
The first step, fluting cut fluting on wall, conduit are put into groove body and is fixed by pipe clamp, and fluting is deep Degree is 20mm, and width 15mm, adjacent pipe clamp spacing is 400mm;
Second step, covering, covers stainless steel material on conduit;
Third walks, the setting of switch socket magazine, and switch socket magazine is arranged in each room, under video wall region jack magazine mouth from Ground finished surface 200mm, the liftoff finished surface 1600mm of mouth under air conditioning area socket cassette, mouth is liftoff complete under the socket cassette of kitchen area At face 800mm;
4th step, circuit connection, switch socket box and conduit are attached.
Water route construction technology includes the following steps:
The first step, fluting cut fluting on wall, water pipe are put into groove body and is fixed by pipe clamp, groove depth For 20mm, width 20mm, adjacent pipe clamp spacing is 600mm;
Second step, covering, covers stainless steel material, then in metope slotting position 200mm anti-crack net linked network anticrackings on water pipe;
Third walks, and is laid with water pipe, is laid with water pipe in each room, water pipe infall uses 2 φ bridge elbows, cold water pipe flat with hot-water line Line space is more than 200mm, and kitchen and toilet use 20 φ water pipes, and when laying is laid with from kitchen and toilet furred ceiling, is located at kitchen Room and toilet furred ceiling are laid with downcomer by the way that undercut is arranged in metope;
4th step, is arranged independent water check valve, and independent water check valve is added on household water pipe.
It is connected with circuit in use, being arranged by fluting, covering, switch socket magazine so that electricity in house decoration construction Road construction process is fixed, and can effectively reduce in arbitrarily construction and conduit is caused to damage, and solves existing house decoration construction and does not have Have fixed flow, especially for water route construction and construction of cable run this block, the decoration construction of unfixed flow, cause water route and Circuit is abnormal after being laid with use in the presence of higher probability, and follow-up maintenance is of high cost, the problem of maintenance period length.
Meanwhile mechanical slotting is used when fluting, and it avoiding artificial fluting and be easy to cause the damage of wall ground, groove body is irregular, It sunkens cord and is easily bent, damage pipeline.
Moreover forceful electric power spool and light current spool, forceful electric power wire box and light current wire box are marked by different colours so that Pipeline is clearly demarcated, and strong and weak conduit is avoided to mix pipe arrangement, strong and weak conduit cross-reference masking foil wrapping, effective solution strong and weak electricity The influence of cross-pair weak electric signal.
Embodiment 3
Based on embodiment 1, house decoration construction technology includes construction of cable run technique and water route construction technology,
Wherein, construction of cable run technique includes the following steps:
The first step, fluting cut fluting on wall, conduit are put into groove body and is fixed by pipe clamp, and fluting is deep Degree is 30mm, and width 20mm, adjacent pipe clamp spacing is 600mm;
Second step, covering, covers stainless steel material on conduit;
Third walks, the setting of switch socket magazine, and switch socket magazine is arranged in each room, under video wall region jack magazine mouth from Ground finished surface 200mm, the liftoff finished surface 1800mm of mouth under air conditioning area socket cassette, mouth is liftoff complete under the socket cassette of kitchen area At face 1000mm;
4th step, circuit connection, switch socket box and conduit are attached.
Water route construction technology includes the following steps:
The first step, fluting cut fluting on wall, water pipe are put into groove body and is fixed by pipe clamp, groove depth For 30mm, width 30mm, adjacent pipe clamp spacing is 800mm;
Second step, covering, covers stainless steel material, then in metope slotting position 200mm anti-crack net linked network anticrackings on water pipe;
Third walks, and is laid with water pipe, is laid with water pipe in each room, water pipe infall uses 2.5 φ bridge elbows, cold water pipe and hot-water line Parallel spacing is more than 200mm, and kitchen and toilet use 25 φ water pipes, and when laying is laid with from kitchen and toilet furred ceiling, is located at Kitchen and toilet furred ceiling are laid with downcomer by the way that undercut is arranged in metope;
4th step, is arranged independent water check valve, and independent water check valve is added on household water pipe.
It is connected with circuit in use, being arranged by fluting, covering, switch socket magazine so that electricity in house decoration construction Road construction process is fixed, and can effectively reduce in arbitrarily construction and conduit is caused to damage, and solves existing house decoration construction and does not have Have fixed flow, especially for water route construction and construction of cable run this block, the decoration construction of unfixed flow, cause water route and Circuit is abnormal after being laid with use in the presence of higher probability, and follow-up maintenance is of high cost, the problem of maintenance period length.
Meanwhile mechanical slotting is used when fluting, and it avoiding artificial fluting and be easy to cause the damage of wall ground, groove body is irregular, It sunkens cord and is easily bent, damage pipeline.
Moreover forceful electric power spool and light current spool, forceful electric power wire box and light current wire box are marked by different colours so that Pipeline is clearly demarcated, and strong and weak conduit is avoided to mix pipe arrangement, strong and weak conduit cross-reference masking foil wrapping, effective solution strong and weak electricity The influence of cross-pair weak electric signal.

Claims (10)

1. house decoration construction technology, it is characterised in that:Including construction of cable run technique and water route construction technology.
2. house decoration construction technology according to claim 1, which is characterized in that the construction of cable run technique includes following Step:
The first step, fluting cut fluting on wall, conduit are put into groove body and is fixed by pipe clamp;
Second step, covering, covers stainless steel material on conduit;
Third walks, the setting of switch socket magazine, and switch socket magazine is arranged in each room;
4th step, circuit connection, switch socket box and conduit are attached.
3. house decoration construction technology according to claim 2, it is characterised in that:The first step, groove depth 20 ~30mm, width are 15~20mm, and adjacent pipe clamp spacing is 400~600mm.
4. house decoration construction technology according to claim 3, it is characterised in that:The first step is arranged on conduit It is useful for the electric wire box of convergence electric wire, conduit includes forceful electric power spool and light current spool, and electric wire box includes forceful electric power wire box and light current Wire box, the spacing of forceful electric power spool and light current spool are more than 200mm, and the spacing of forceful electric power wire box and light current wire box is more than 200mm.
5. house decoration construction technology according to claim 4, it is characterised in that:The first step, forceful electric power spool are red Color, light current spool are blue, and chamber electric wire box is red, and light current wire box is blue, forceful electric power spool and light current spool cross-reference tin Foil paper is wrapped up.
6. house decoration construction technology according to claim 5, it is characterised in that:The third step, TV wall zone are inserted Liftoff 200~the 250mm of finished surface of mouth under seat magazine, the liftoff 1600~1800mm of finished surface of mouth under air conditioning area socket cassette, kitchen Liftoff 800~the 1000mm of finished surface of mouth under room region jack magazine.
7. house decoration construction technology according to claim 1, it is characterised in that:The water route construction technology includes following Step:
The first step, fluting cut fluting on wall, water pipe are put into groove body and is fixed by pipe clamp;
Second step, covering, covers stainless steel material on water pipe;
Third walks, and is laid with water pipe, and water pipe is laid in each room;
4th step, is arranged independent water check valve, and independent water check valve is added on household water pipe.
8. house decoration construction technology according to claim 7, it is characterised in that:The first step, groove depth 20 ~30mm, width are 20~30mm, and adjacent pipe clamp spacing is 600~800mm.
9. house decoration construction technology according to claim 8, it is characterised in that:The second step, covers on water pipe After stainless steel material, then in metope slotting position 200~300mm anti-crack net linked networks.
10. house decoration construction technology according to claim 9, it is characterised in that:The third step, water pipe infall make With 2~2.5 φ bridge elbows, cold water pipe is more than 200mm with hot-water line parallel spacing, and kitchen and toilet use 20~25 φ water Pipe is laid with from kitchen and toilet furred ceiling when laying, be located at kitchen and toilet furred ceiling passed through with downcomer it is dark in metope setting Slot is laid with.
CN201810368153.XA 2018-04-23 2018-04-23 House decoration construction technology Pending CN108560879A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810368153.XA CN108560879A (en) 2018-04-23 2018-04-23 House decoration construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810368153.XA CN108560879A (en) 2018-04-23 2018-04-23 House decoration construction technology

Publications (1)

Publication Number Publication Date
CN108560879A true CN108560879A (en) 2018-09-21

Family

ID=63535969

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810368153.XA Pending CN108560879A (en) 2018-04-23 2018-04-23 House decoration construction technology

Country Status (1)

Country Link
CN (1) CN108560879A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110185287A (en) * 2019-06-05 2019-08-30 天津知齐家具有限公司 A kind of no dead angle kitchen construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101114760A (en) * 2006-07-27 2008-01-30 北京阔达建筑装饰工程有限责任公司 Family fitment engineering circuit improvement single-tube single-wire system construction material and method
CN104882835A (en) * 2015-06-15 2015-09-02 杭州圣都装饰设计工程有限公司 Circuit line pipe installation technology of multi-line separation type
CN105239749A (en) * 2015-10-30 2016-01-13 重庆工商职业学院 Assembling type integrating structure of building
CN106958267A (en) * 2017-03-28 2017-07-18 深圳市名雕装饰股份有限公司 Water power walks smallpox construction technology

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101114760A (en) * 2006-07-27 2008-01-30 北京阔达建筑装饰工程有限责任公司 Family fitment engineering circuit improvement single-tube single-wire system construction material and method
CN104882835A (en) * 2015-06-15 2015-09-02 杭州圣都装饰设计工程有限公司 Circuit line pipe installation technology of multi-line separation type
CN105239749A (en) * 2015-10-30 2016-01-13 重庆工商职业学院 Assembling type integrating structure of building
CN106958267A (en) * 2017-03-28 2017-07-18 深圳市名雕装饰股份有限公司 Water power walks smallpox construction technology

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈雪杰、张峰: "《室内装饰施工》", 31 August 2011 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110185287A (en) * 2019-06-05 2019-08-30 天津知齐家具有限公司 A kind of no dead angle kitchen construction method
CN110185287B (en) * 2019-06-05 2021-01-15 天津知齐家具有限公司 Dead-corner-free kitchen construction method

Similar Documents

Publication Publication Date Title
MX2009012003A (en) Water manifold system and method.
CN108560879A (en) House decoration construction technology
CN106958267A (en) Water power walks smallpox construction technology
CN204901944U (en) Timesharing subregion heating temperature controller system
CN101760206A (en) Method for installing coke dry quenching electric distribution pipes and penetrating leads through electric distribution pipes
CN104659703A (en) Construction and mounting method for dry quenching coke electric line pipe
CN205666582U (en) Five metals threading pipe for building
CN209723097U (en) The water circuit system in parallel of uniform flow
KR100379752B1 (en) Method of distributing wires for a building
CN206422489U (en) A kind of bus duct water-tight device
CN206128184U (en) Indoor water injection mandrel water supply system
CN105465482A (en) Multi-functional pipeline positioning device
CN206422488U (en) A kind of bus duct with water-proof function
CN2577198Y (en) Anti-leakage apparatus of electric water-heater
CN216108795U (en) House water supply system
CN210946991U (en) Centralized distributor
CN108203938A (en) Rail traffic side platform overhead station compound pipeline complex pipeline system
CN204728624U (en) A kind of heating floor
CN215343739U (en) Construction wiring pipeline and transmission line based on IT system
FR2813089A1 (en) Insulated multi-layer floor has lower layer with molded channels to contain electrical cables and water pipes
CN211719291U (en) Fire-resistant power cable
RU9620U1 (en) WATER SUPPLY SYSTEM OF MULTI-STOREY BUILDING
CN203274226U (en) Instant electric water heater
CN103225873B (en) Instant electric water heater
CN218494376U (en) Warm logical sleeve pipe device of reserving of plumbing of building plumbing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180921