CN108557634A - A kind of construction steel structure lifting conveyer method - Google Patents

A kind of construction steel structure lifting conveyer method Download PDF

Info

Publication number
CN108557634A
CN108557634A CN201810470072.0A CN201810470072A CN108557634A CN 108557634 A CN108557634 A CN 108557634A CN 201810470072 A CN201810470072 A CN 201810470072A CN 108557634 A CN108557634 A CN 108557634A
Authority
CN
China
Prior art keywords
wall
plate
clamping plate
pull rod
rack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810470072.0A
Other languages
Chinese (zh)
Inventor
陈海锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810470072.0A priority Critical patent/CN108557634A/en
Publication of CN108557634A publication Critical patent/CN108557634A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/22Rigid members, e.g. L-shaped members, with parts engaging the under surface of the loads; Crane hooks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/42Gripping members engaging only the external or internal surfaces of the articles
    • B66C1/44Gripping members engaging only the external or internal surfaces of the articles and applying frictional forces

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention discloses a kind of construction steel structures to lift conveyer method, the top and bottom end of the clamping plate inner wall are mounted on side plate, the outer wall of the side plate is connected with the inner wall of clamping plate, the inner wall of the side plate is equipped with pull rod, the outer wall of the pull rod is connected with the inner wall of side plate, the outer wall of the pull rod is equipped with support plate, and the inner wall of the support plate is connected with the outer wall of clamping plate, and the inner wall of the support plate and the outer wall of pull rod are movably connected.The construction steel structure lifts transfer device, pass through the cooperation between clamping plate, washer and side plate, under the action of pull rod, clamping plate grips steel construction piece, under the action of washer, increase the frictional force of clamping plate and steel construction piece, and then keep the connection of steel construction piece and clamping plate more secured, the product quality of construction steel structure lifting transfer device is improved, the purchase cost of undertaking of construction is saved, the wasting of resources for avoiding construction steel structure lifting transfer device, is suitble to promote the use of.

Description

A kind of construction steel structure lifting conveyer method
Technical field
The present invention relates to steel structure technology field, specially a kind of construction steel structure lifts conveyer method.
Background technology
Steel construction lifting gear is crane to realize at present, and connecting steel wire ropes on the hook of crane, steel member is put Under steel wire rope, in handling steel member, phenomena such as directly mill is cut, is hard curved can occur with steel member for steel wire, this is easy for Cause on steel wire rope finer wire occurs bending or is fractureed during component handling, and damage of steel cable is easy to steel member Handling generates security risk, in addition, the hook of crane is also dumb, in the prior art, such as application No. is 201420262880.5 patent of invention includes ontology, and steel construction ontology both ends are equipped with lifting gear, the lifting gear Include the fixed seat being fixedly connected with starter and rotatable support frame and steel wire rope, the rotatable support frame is by several connecting rods It is formed with universal shaft, the end of the rotatable support frame is provided with the connector of connecting steel wire ropes, and the connector has for side Reeded metal derby, the metal derby is cube structure, rectangular parallelepiped structure or ball structure, although the invention structure letter It is single, but there are many deficiencies and defect, in existing equipment, the design existing defects of connecting rod, in use, steel construction ontology Can downward bearing capacity be applied to fixed seat and rotatable support frame downwards because of dead weight, steel construction ontology due also to high-altitude by The cross shear that wind generates steel construction ontology causes the connection between connecting rod and fixed seat unstable situation occur very To causing connecting rod to be broken with fixed seat, construction speed is influenced, construction quality is reduced, increasing repair and replacing can revolve Turn the procurement funding of the equipment such as holder, and steel construction ontology lacks fixing device, steel when in connecting rod by lifting and transhipment Structural body easily slides from steel wire rope both sides, the security risk of use site is caused, in view of these situations, to avoid above-mentioned technology Problem lifts conveyer method to overcome the defect in the prior art it is necessory to provide a kind of construction steel structure.
Invention content
The purpose of the present invention is to provide a kind of construction steel structures to lift conveyer method, to solve in above-mentioned background technology The problem of proposition.
To achieve the above object, the present invention provides the following technical solutions:A kind of construction steel structure lifting conveyer method, packet Clamping plate is included, the top and bottom end of the clamping plate inner wall are mounted on side plate, and the outer wall of the side plate is connected with the inner wall of clamping plate, institute The inner wall for stating side plate is equipped with pull rod, and the outer wall of the pull rod is connected with the inner wall of side plate, and the outer wall of the pull rod is equipped with branch Plate, the inner wall of the support plate are connected with the outer wall of clamping plate, and the inner wall of the support plate and the outer wall of pull rod are movably connected, the clamping plate Inner wall bolt is installed, the outer wall of the bolt and the inner wall of clamping plate are movably connected, and the outer wall of the bolt installs fixed angles Code, the inner wall of the fixed corner code and the outer wall of bolt are movably connected, and the outer wall of the fixed corner code is equipped with top cover, the top The inner wall of set and the outer wall of fixed corner code are movably connected, and the inner wall of the top cover is equipped with loop bar, the outer wall of the loop bar and top The inner wall of set is connected, and the outer wall bottom end of the loop bar is equipped with bottom set, and the inner wall of the bottom set is connected with the outer wall of loop bar, described The lower surface of support plate outer wall is equipped with upright bar, and the upper surface of the upright bar is connected with the lower surface of support plate outer wall, the upright bar Bottom end is equipped with supporting plate, and the upper surface of the supporting plate is connected with the lower surface of upright bar, and the inner wall of the supporting plate is equipped with axis pin, institute The inner wall of the outer wall and supporting plate of stating axis pin is movably connected, and rack, the rack are mounted at left and right sides of the clamping plate outer wall Upper surface be connected with the lower surface of clamping plate, the outer wall of the rack and the inner wall of supporting plate are movably connected, the outer wall of the rack Fluted disc is installed, the inner wall of the fluted disc and the outer wall of rack are movably connected, and the inner wall of the fluted disc, which is equipped with, cranks arm, the song The outer wall of arm is connected with the inner wall of fluted disc, and the inner wall cranked arm is equipped with inserted link, the outer wall of the inserted link and the inner wall cranked arm Be connected, the outer wall of the inserted link is equipped with slide plate, and the inner wall of the slide plate and the outer wall of inserted link are movably connected, the slide plate it is interior Wall is equipped with steel wire rope, and the outer wall of the steel wire rope and the inner wall of slide plate are movably connected.
Preferably, the inner wall of the support plate is equipped with sunpender, and the outer wall of the sunpender and the inner wall of support plate are movably connected, institute The inner wall for stating sunpender is equipped with hanging ring, and the inner wall of the hanging ring is connected with the outer wall of sunpender, and the outer wall of the hanging ring is equipped with admittedly Reservation, the inner wall of the fixed seat and the outer wall of hanging ring are movably connected, and the inner wall of the fixed seat is equipped with shaft, the shaft Outer wall and the inner wall of fixed seat be movably connected, the inner wall of the fixed seat is movably connected by the inner wall of shaft and hanging ring, institute The junction of the outer wall and fixed seat inner wall of stating hanging ring is equipped with buckle closure, and the inner wall of the buckle closure is connected with the outer wall of hanging ring, institute The outer right wall for stating fixed seat is equipped with end cap, and the left side outer wall of the end cap is connected with the outer right wall of fixed seat, the end The inner wall of lid and the outer wall of shaft are movably connected.
Preferably, the inner wall of the clamping plate is equipped with washer, and the outer wall of the washer is connected with the inner wall of clamping plate.
Preferably, the upper surface of the slide plate inner wall is equipped with gasket, and the lower surface of the gasket is upper with slide plate inner wall Surface is connected.
Preferably, the outer wall of the fixed corner code and the junction of support plate inner wall are equipped with cushion rubber, the outer wall of the cushion rubber It is connected with the inner wall of support plate.
Compared with prior art, the beneficial effects of the invention are as follows:
1. the construction steel structure lifts transfer device, by the cooperation between clamping plate, washer and side plate, in the work of pull rod Under, clamping plate grips steel construction piece, under the action of washer, increases the frictional force of clamping plate and steel construction piece, and then make steel The connection of structural member and clamping plate is more secured.
2. the construction steel structure lifts transfer device, by the cooperation between rack and fluted disc, and then fluted disc can be The displacement distance for adjusting and cranking arm is moved left and right on rack, and then adjusts the quantity of gripping steel construction piece, under the action of steel wire rope, And then prevent steel construction piece from being fallen from slide plate and between cranking arm.
3. the construction steel structure lifts transfer device, by top cover, the cooperation between loop bar and bottom set, and top cover and loop bar Connection the connection with clamping plate of supporting plate is reinforced, prevent the bearing capacity of steel construction piece from causing deformation or the damage of clamping plate It is bad, due to overcome traditional architecture steel construction lifting transfer device in use, steel construction ontology can be because dead weight is downwards to solid Reservation and rotatable support frame apply downward bearing capacity, and steel construction ontology is due also to generate steel construction ontology by wind in high-altitude Cross shear, cause the connection between connecting rod and fixed seat unstable situation occur and even result in connecting rod and fixation Seat is broken, and is influenced construction speed, is reduced construction quality, is increased repair and is replaced the buying of the equipment such as rotatable support frame Funds.
4. the construction steel structure lifts transfer device, steel construction ontology lacks when in connecting rod by lifting and transhipment It the shortcomings that fixing device, steel construction ontology easily slides from steel wire rope both sides, causes the security risk of use site, overcomes existing Construction steel structure lifting transfer device by clamping body and tighten bolt and carry out the support of architectural engineering steel construction and solid Fixed processing, the single disadvantage of utility function improve the construction efficiency and construction quality of construction steel structure lifting transfer device, It avoids using steel construction ontology when in connecting rod by lifting and transhipment, lacks fixing device, steel construction ontology is easily from steel wire The shortcomings that rope both sides slide, cause the security risk of use site, also allows existing construction steel structure to lift transfer device energy More approvals are enough commercially available.
5. the construction steel structure lifts transfer device, the product matter of construction steel structure lifting transfer device is improved Amount, saves the purchase cost of undertaking of construction, avoids the wasting of resources of construction steel structure lifting transfer device, is suitble to promote It uses.
Description of the drawings
Fig. 1 is the annexation figure of clamping plate, side plate and pull rod;
Fig. 2 be the upright bar of Fig. 1, axis pin and supporting plate annexation figure;
Fig. 3 be the fixed seat of Fig. 1, hanging ring and sunpender side cutaway view.
In figure:1, clamping plate, 2, side plate, 3, pull rod, 4, support plate, 5, bolt, 6, upright bar, 7, axis pin, 8, supporting plate, 9, fluted disc, 10, inserted link, 11, slide plate, 12, steel wire rope, 13, crank arm, 14, rack, 15, washer, 16, gasket, 17, top cover, 18, loop bar, 19, Bottom covers, and 20, fixed corner code, 21, fixed seat, 22, hanging ring, 23, sunpender, 24, shaft, 25, buckle closure, 26, end cap, 27, cushion rubber.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
- 3 are please referred to Fig.1, the present invention provides a kind of technical solution:A kind of construction steel structure lifting conveyer method, including Clamping plate 1, for installing and fixing side plate 2, the inner wall of clamping plate 1 is equipped with washer 15, for increasing frictional force, make steel construction piece with The connection of clamping plate 1 is more secured, and the outer wall of washer 15 is connected with the inner wall of clamping plate 1, and the top and bottom end of 1 inner wall of clamping plate are respectively mounted There is side plate 2, for installing pull rod 3, the outer wall of side plate 2 is connected with the inner wall of clamping plate 1, and the inner wall of side plate 2 is equipped with pull rod 3, uses It is connected and fixed in by two clamping plates 1, the outer wall of pull rod 3 is connected with the inner wall of side plate 2, and the outer wall of pull rod 3 is equipped with branch Plate 4, for installing fixed corner code 20, the inner wall of support plate 4 is equipped with sunpender 23, for installing and fixing fixed seat 21, sunpender 23 The inner wall of outer wall and support plate 4 be movably connected, the inner wall of sunpender 23 is equipped with hanging ring 22, for being connect with hoisting machine, makes clamping plate 1 More secured with the connection of hoisting machine, the inner wall of hanging ring 22 is connected with the outer wall of sunpender 23, and the outer wall of hanging ring 22 is equipped with fixation Seat 21, for installing shaft 24, the outer wall of the inner wall and hanging ring 22 of fixed seat 21 is movably connected, and the inner wall of fixed seat 21 is equipped with Shaft 24, shaft 24 can adjust the rotation angle of clamping plate 1 and hoisting machine, the outer wall of shaft 24 and the inner wall activity of fixed seat 21 It is connected, the inner wall of fixed seat 21 is movably connected by shaft 24 and the inner wall of hanging ring 22, in the outer wall and fixed seat 21 of hanging ring 22 The junction of wall is equipped with buckle closure 25, for connecting and fixed rotating shaft 24, makes connection between shaft 24 and fixed seat 21 more Securely, the inner wall of buckle closure 25 is connected with the outer wall of hanging ring 22, and the outer right wall of fixed seat 21 is equipped with end cap 26, is hung for fixation Bar 23 keeps the connection between sunpender 23 and hanging ring 22 more secured, the outer right wall of the left side outer wall and fixed seat 21 of end cap 26 It is connected, the inner wall and the outer wall of shaft 24 of end cap 26 are movably connected, and the inner wall of support plate 4 is connected with the outer wall of clamping plate 1, support plate 4 The outer wall of inner wall and pull rod 3 is movably connected, and the inner wall of clamping plate 1 is equipped with bolt 5, for connecting and fixing fixed corner code 20, inserts The outer wall of pin 5 and the inner wall of clamping plate 1 are movably connected, and the outer wall of bolt 5 installs fixed corner code 20, is used for Fixed latches 5, fixed angles The junction of outer wall and 4 inner wall of support plate of code 20 is equipped with cushion rubber 27, for increase frictional force make fixed corner code 20 and bolt 5 it Between connection it is more secured, the outer wall of cushion rubber 27 is connected with the inner wall of support plate 4, the outer wall of the inner wall and bolt 5 of fixed corner code 20 It is movably connected, the outer wall of fixed corner code 20 is equipped with top cover 15, and top cover 15 is for installing loop bar 18, the inner wall of top cover 15 and fixation The outer wall of corner brace 20 is movably connected, and the inner wall of top cover 17 is equipped with loop bar 18, and loop bar 18 is used for 19 connection of top cover 15 and bottom set And it is fixed, the outer wall of loop bar 18 is connected with the inner wall of top cover 17, and the outer wall bottom end of loop bar 18 is equipped with bottom set 19, is used for connection clip Plate 1 keeps clamping plate 1 and the connection of supporting plate 8 more secured, and the inner wall of bottom set 19 is connected with the outer wall of loop bar 18, under 4 outer wall of support plate Surface is equipped with upright bar 6, and for connecting support plate 4 and supporting plate 8, the upper surface of upright bar 6 is connected with the lower surface of 4 outer wall of support plate, stands The bottom end of bar 6 is equipped with supporting plate 8, and for installing and fixing rack 14, the upper surface of supporting plate 8 is connected with the lower surface of upright bar 6, support The inner wall of plate 8 is equipped with axis pin 7, is used for strap 1 and supporting plate 8, and the inner wall of the outer wall and supporting plate 8 of axis pin 7 is movably connected, and presss from both sides Be mounted on rack 14 at left and right sides of 1 outer wall of plate, for band active toothed disk 9 moved on rack 14, the upper surface of rack 14 with The lower surface of clamping plate 1 is connected, and the inner wall of the outer wall and supporting plate 8 of rack 14 is movably connected, and the outer wall of rack 14 is equipped with fluted disc 9, For installing slide plate 11, the outer wall of the inner wall and rack 14 of fluted disc 9 is movably connected, and the inner wall of fluted disc 9, which is equipped with, cranks arm 13, is used for The distance of adjusting slider 11,13 outer wall of cranking arm are connected with the inner wall of fluted disc 9, and 13 inner wall of cranking arm is equipped with inserted link 10, is used for Slide plate 11 is fixed on and is cranked arm on 13, and can adjusting slider 11 in the position on 13 of cranking arm, the outer wall of inserted link 10 with crank arm 13 inner wall is connected, and the outer wall of inserted link 10 is equipped with slide plate 11, for capturing steel construction piece, the upper surface installation of 11 inner wall of slide plate There is gasket 16, increasing frictional force keeps slide plate 11 and the connection of steel construction piece more secured, in the lower surface of gasket 16 and slide plate 11 The upper surface of wall is connected, and the outer wall of the inner wall and inserted link 10 of slide plate 11 is movably connected, and the inner wall of slide plate 11 is equipped with steel wire rope 12, For preventing steel construction piece from being slid from both sides, the inner wall of the outer wall and slide plate 11 of steel wire rope 12 is movably connected, for making steel wire rope 12 is more secured with the connection of slide plate 11.
A kind of construction steel structure lifts conveyer method, the construction steel structure lift transfer device by clamping plate 1, side plate 2, Pull rod 3, support plate 4, bolt 5, upright bar 6, axis pin 7, supporting plate 8, fluted disc 9, inserted link 10, slide plate 11, steel wire rope 12,13, rack of cranking arm 14, the parts group such as washer 15, gasket 16, top cover 17, loop bar 18, bottom set 19, fixed corner code 20, fixed seat 21 and hanging ring 22 At, the main fit dimension of reply parts, is especially interference fitted size and phase closing precision is checked before assembling, and same zero When part is fastened with more than one piece screw (bolt), each screw (bolt) needs to intersect, symmetrically, gradually, uniformly tighten, and uses angle grinder and file Knife is to clamping plate 1, side plate 2, pull rod 3, support plate 4, bolt 5, upright bar 6, axis pin 7, supporting plate 8, fluted disc 9, inserted link 10, slide plate 11, steel wire Rope 12,13, rack 14 of cranking arm, washer 15, gasket 16, top cover 17, loop bar 18, bottom cover 19, fixed corner code 20, fixed seat 21 and hang Then the burr on the surfaces and junction such as ring 22 smears antirust paint on its surface and junction, firm welding must not have rosin joint leakage Phenomenon is welded, all parts need to clean with kerosene, and rolling bearing is cleaned with gasoline, and piece surface is not allow for any sundries, rack, The polishing of the external portions such as turntable surrounding, compactor bearing, scraped finish putty, surface spraying designated color, screw rod, connecting rod, pull rod, gear Bar, head cover etc., all oxidation (nigrescence) is handled all positioning compression devices, at each cooperation, at sealing, and screw connection lubrication Grease lubrication, green surface apply grey paint, inner surface coating Red paint, and adjustment rotates flexibly light, positioning reliable clamping, uses Expansion bolt is fixed on ground, and tooling manufacturer is responsible for mounting and adjusting to normally, and production and application must ensure can be upper and lower when stacking It exchanges, diagonal line deviation is within ± 3mm, and postwelding makees antirust treatment, and blue wash paints again, " factory's name ", " tooling number " and " case Number " it being sprayed in shown position with white paint, font is boldface type, in addition to front, left and right side and back 1.5mm thickness hot plate weldings Envelope, bottom surface are welded with 3.0mm thickness hot plates, and it is miscellaneous should to remove weldment surface iron rust, greasy dirt, moisture etc. for remaining 50X50X4.0 quarter bend before weldering Matter, welding rod have to dry, and air immerses welding section and causes stomata, crackle in order to prevent, reduce joint performance, should adopt as possible With short arc welding, heat affected area is unsuitable long in high-temperature residence time, in case coarse grains, when welding fillet weld, dock multilayer welding First of weld seam and mono-layer single-face weld seam to avoid deep and narrow groove type, it is more to prevent lack of penetration and slag inclusion defect When layer weldering, it should be continuously soldered last layer of weld seam, the thickness of every layer of weld metal is not more than 5mm, when the rigidity of weldment increases, The crackle tendency of weldment is consequently increased, therefore welds the big weldment of rigidity and weld preheating and postwelding is preferably used to eliminate at the heat of stress After reason measure is dried, distinguishes installation side plate 2 on the top of 1 inner wall of clamping plate and bottom end, pull rod 3 is mounted on to the side plate 2 on top On so that pull rod 3 is connected and fixed with support plate 4, and sunpender 23 and upright bar 6 are installed in the inside of support plate 4 so that upright bar 6 is by 4 He of support plate Supporting plate 8 links together, and installs fixed corner code 20 in the inside of supporting plate 8 so that fixed corner code 20 is by 18 phase of top cover 17 and loop bar Rack 14 is installed in connection in the side plate 2 of bottom end, installs fluted disc 9 in the inside of rack 14 so that fluted disc 9 can be in rack 14 On move left and right, the inside of fluted disc 9 using inserted link 10 slide plate 11 is fixed on crank arm 13 inside so that slide plate 11 can Crank arm 13 inside up and down adjustment, using steel wire rope 12 be mounted on slide plate 11 inside avoid steel for intercepting steel construction piece Structural member falls or slips, and completes the assembly working of construction steel structure lifting transfer device.
In the description of the present invention, it is to be understood that, term " coaxial ", " bottom ", " one end ", " top ", " middle part ", The orientation or positional relationship of the instructions such as " other end ", "upper", " side ", " top ", "inner", " front ", " center ", " both ends " is It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of description of the present invention and simplification of the description, rather than instruction or dark Show that signified device or element must have a particular orientation, with specific azimuth configuration and operation, therefore should not be understood as pair The limitation of the present invention.
In the present invention unless specifically defined or limited otherwise, term " installation ", " setting ", " connection ", " fixation ", Terms such as " being screwed on " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral;It can be with It is mechanical connection, can also be electrical connection;It can be directly connected, can also can be indirectly connected through an intermediary two The interaction relationship of connection or two elements inside a element, unless otherwise restricted clearly, for the common of this field For technical staff, the specific meanings of the above terms in the present invention can be understood according to specific conditions.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of variations, modification, replace And modification, the scope of the present invention is defined by the appended.

Claims (3)

1. a kind of construction steel structure lifts conveyer method, it is characterised in that:Using angle grinder and file to clamping plate 1, side plate 2, Pull rod 3, support plate 4, bolt 5, upright bar 6, axis pin 7, supporting plate 8, fluted disc 9, inserted link 10, slide plate 11, steel wire rope 12,13, rack of cranking arm 14, surfaces and the connection such as washer 15, gasket 16, top cover 17, loop bar 18, bottom set 19, fixed corner code 20, fixed seat 21 and hanging ring 22 Then the burr at place smears antirust paint on its surface and junction, firm welding must not have rosin joint solder skip phenomenon, all parts It need to be cleaned with kerosene, rolling bearing is cleaned with gasoline, and piece surface is not allow for any sundries, rack, turntable surrounding, compactor The polishing of the external portions such as bearing, scraped finish putty, surface spraying designated color, screw rod, connecting rod, pull rod, bar, head cover etc. own All oxidation (nigrescence) is handled positioning compression device, and at each cooperation, at sealing, screw connection grease lubrication is undressed Surface applies grey paint, inner surface coating Red paint, and adjustment rotates flexibly light, positioning reliable clamping, fixed with expansion bolt On ground, tooling manufacturer is responsible for mounting and adjusting and ensures to exchange up and down when stacking to palpus normally, is produced and used, and diagonal line is inclined Difference is within ± 3mm, and postwelding makees antirust treatment, and blue wash paints again, and " factory's name ", " tooling number " and " case number (CN) " are existed with white paint Shown position sprays, and font is boldface type, and in addition to front, left and right side and back 1.5mm thickness hot plate sealings, bottom surface is welded with It is necessary should to remove impurity, the welding rods such as weldment surface iron rust, greasy dirt, moisture for 3.0mm thickness hot plates, remaining 50X50X4.0 quarter bend before weldering It dries, air immerses welding section and causes stomata, crackle in order to prevent, reduces joint performance, should use short arc welding as possible, heat The zone of influence is unsuitable long in high-temperature residence time, in case coarse grains dock first of weld seam of multilayer welding when welding fillet weld Deep and narrow groove type is avoided with mono-layer single-face weld seam, it, should be continuous when multilayer welding to prevent lack of penetration and slag inclusion defect It is soldered last layer of weld seam, the thickness of every layer of weld metal is not more than 5mm, and when the rigidity of weldment increases, the crackle of weldment inclines To being consequently increased, therefore welds the big weldment of rigidity and weld preheating and the heat treatment measure of postwelding elimination stress preferably use to dry it Afterwards, distinguish installation side plate 2 on the top of 1 inner wall of clamping plate and bottom end, pull rod 3 is mounted on the side plate 2 on top so that pull rod 3 It is connected and fixed with support plate 4, sunpender 23 and upright bar 6 is installed in the inside of support plate 4 so that support plate 4 and supporting plate 8 are connected to by upright bar 6 Together, fixed corner code 20 is installed in the inside of supporting plate 8 so that top cover 17 is connected by fixed corner code 20 with loop bar 18, in bottom end Side plate 2 in install rack 14, rack 14 inside install fluted disc 9 so that fluted disc 9 can rack 14 it is upper left and right move It is dynamic, the inside of fluted disc 9 using inserted link 10 slide plate 11 is fixed on crank arm 13 inside so that slide plate 11 can crank arm 13 Internal up and down adjustment, the inside that slide plate 11 is mounted on using steel wire rope 12 avoid steel construction piece from falling for intercepting steel construction piece Or slip, complete the assembly working of construction steel structure lifting transfer device.
2. a kind of construction steel structure according to claim 1 lifts conveyer method, it is characterised in that:The clamping plate (1) The top and bottom end of inner wall are mounted on side plate (2), and the outer wall of the side plate (2) is connected with the inner wall of clamping plate (1), the side plate (2) inner wall is equipped with pull rod (3), and the outer wall of the pull rod (3) is connected with the inner wall of side plate (2), the outer wall of the pull rod (3) Support plate (4) is installed, the inner wall of the support plate (4) is connected with the outer wall of clamping plate (1), inner wall and the pull rod (3) of the support plate (4) Outer wall be movably connected, the inner wall of the clamping plate (1) is equipped with bolt (5), and the outer wall of the bolt (5) is interior with clamping plate (1) Wall is movably connected, the outer wall installation fixed corner code (20) of the bolt (5), inner wall and the bolt (5) of the fixed corner code (20) Outer wall be movably connected, the outer wall of the fixed corner code (20) is equipped with top cover (15), the inner wall of the top cover (15) and fixation The outer wall of corner brace (20) is movably connected, and the inner wall of the top cover (17) is equipped with loop bar (18), the outer wall of the loop bar (18) with The inner wall of top cover (17) is connected.
3. a kind of construction steel structure according to claim 1 lifts conveyer method, it is characterised in that:The loop bar (18) Outer wall bottom end bottom set (19) is installed, the inner wall of bottom set (19) is connected with the outer wall of loop bar (18), and the support plate (4) is outside The lower surface of wall is equipped with upright bar (6), and the upper surface of the upright bar (6) is connected with the lower surface of support plate (4) outer wall, the upright bar (6) bottom end is equipped with supporting plate (8), and the upper surface of the supporting plate (8) is connected with the lower surface of upright bar (6), the supporting plate (8) Inner wall is equipped with axis pin (7), and the inner wall of the outer wall and supporting plate (8) of the axis pin (7) is movably connected, clamping plate (1) outer wall The left and right sides is mounted on rack (14), and the upper surface of the rack (14) is connected with the lower surface of clamping plate (1), the rack (14) outer wall and the inner wall of supporting plate (8) are movably connected, and the outer wall of the rack (14) is equipped with fluted disc (9), the fluted disc (9) The outer wall of inner wall and rack (14) be movably connected, the inner wall of the fluted disc (9) is equipped with crank arm (13), crank arm (13) Outer wall is connected with the inner wall of fluted disc (9), and the inner wall for cranking arm (13) is equipped with inserted link (10), the outer wall of the inserted link (10) with Crank arm (13) inner wall be connected, the outer wall of the inserted link (10) is equipped with slide plate (11), the inner wall and inserted link of the slide plate (11) (10) outer wall is movably connected, and the inner wall of the slide plate (11) is equipped with steel wire rope (12), the outer wall of the steel wire rope (12) with The inner wall of slide plate (11) is movably connected.
CN201810470072.0A 2018-05-16 2018-05-16 A kind of construction steel structure lifting conveyer method Withdrawn CN108557634A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810470072.0A CN108557634A (en) 2018-05-16 2018-05-16 A kind of construction steel structure lifting conveyer method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810470072.0A CN108557634A (en) 2018-05-16 2018-05-16 A kind of construction steel structure lifting conveyer method

Publications (1)

Publication Number Publication Date
CN108557634A true CN108557634A (en) 2018-09-21

Family

ID=63538966

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810470072.0A Withdrawn CN108557634A (en) 2018-05-16 2018-05-16 A kind of construction steel structure lifting conveyer method

Country Status (1)

Country Link
CN (1) CN108557634A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112919310A (en) * 2021-02-18 2021-06-08 广东韶钢松山股份有限公司 Hoisting clamp and hoisting method for wheel of circular cooler
CN113562600A (en) * 2021-07-29 2021-10-29 泰州市祥泰设备配套有限公司 Lifting appliance for hoisting large-tonnage equipment
CN116177378A (en) * 2023-04-25 2023-05-30 晋中市汇安市政工程有限公司 Lifting type lifting frame for miniature pipe jacking operation
CN117208747A (en) * 2023-11-09 2023-12-12 中铁三局集团有限公司 Hanging device applied to super-long culvert construction by segmented prefabrication culvert section method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112919310A (en) * 2021-02-18 2021-06-08 广东韶钢松山股份有限公司 Hoisting clamp and hoisting method for wheel of circular cooler
CN112919310B (en) * 2021-02-18 2023-06-27 广东韶钢松山股份有限公司 Hoisting clamp and hoisting method for annular cooler locomotive wheel
CN113562600A (en) * 2021-07-29 2021-10-29 泰州市祥泰设备配套有限公司 Lifting appliance for hoisting large-tonnage equipment
CN116177378A (en) * 2023-04-25 2023-05-30 晋中市汇安市政工程有限公司 Lifting type lifting frame for miniature pipe jacking operation
CN116177378B (en) * 2023-04-25 2023-07-14 晋中市汇安市政工程有限公司 Lifting type lifting frame for miniature pipe jacking operation
CN117208747A (en) * 2023-11-09 2023-12-12 中铁三局集团有限公司 Hanging device applied to super-long culvert construction by segmented prefabrication culvert section method
CN117208747B (en) * 2023-11-09 2024-01-23 中铁三局集团有限公司 Hanging device applied to super-long culvert construction by segmented prefabrication culvert section method

Similar Documents

Publication Publication Date Title
CN108557634A (en) A kind of construction steel structure lifting conveyer method
CN108408579A (en) A kind of construction steel structure lifting transfer device
CN109048182A (en) A kind of method for turning for the long steel construction piece of mechanical grip
CN110055482B (en) Chain ring lifting and rotating device and method
CN109290726A (en) A kind of turnover device for the long steel construction piece of mechanical grip
CN202321980U (en) Lifting hook special for steel tube
CN108888358A (en) A kind of internal medicine detection fixture block formula fixture
CN201151607Y (en) Clamper for handling shell ring structural member
CN208069853U (en) A kind of Special cushion plate for transporting high-voltage switch cabinet with obstacle crossing function
CN108162047A (en) A kind of novel die-cutting machine with lifting platform twin shaft
CN108262194A (en) A kind of double transmit cools down cement mortar one compounding machine automatically
CN204162738U (en) The coupling device of converter body and backing ring
CN109292614B (en) Device for preventing thin steel coil from being clamped during hoisting
CN108190569A (en) A kind of twin shaft spinning and weaving workshop fabric suspension arrangement
CN208532043U (en) A kind of electric single beam crane
CN208072203U (en) A kind of support leg for operation of bridge inspection vehicle
CN208763197U (en) A kind of construction steel structure rotation cast steel supporter device
CN208763198U (en) A kind of construction steel structure rotation cast steel supporter device
CN108100064A (en) A kind of Special cushion plate for transporting high-voltage switch cabinet with obstacle crossing function
CN108693108A (en) A kind of tapestry brick adhesive strength detection device
CN108654976A (en) Integral type large size sundries removal device in a kind of steam power plant's fire coal
CN208100538U (en) A kind of novel die-cutting machine with lifting platform twin shaft
CN108643670A (en) A kind of architectural engineering steel structure earthquake-resistant way to play for time
CN108661186A (en) A kind of construction steel structure rotation cast steel method for supporting
CN208070899U (en) A kind of twin shaft spinning and weaving workshop fabric suspension arrangement

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20180921