CN108557230A - A kind of apparatus for placing and preparation method thereof with electrical integrated taiwan area complete set of equipments - Google Patents
A kind of apparatus for placing and preparation method thereof with electrical integrated taiwan area complete set of equipments Download PDFInfo
- Publication number
- CN108557230A CN108557230A CN201810402897.9A CN201810402897A CN108557230A CN 108557230 A CN108557230 A CN 108557230A CN 201810402897 A CN201810402897 A CN 201810402897A CN 108557230 A CN108557230 A CN 108557230A
- Authority
- CN
- China
- Prior art keywords
- wooden
- bearing
- fixed
- placing
- complete set
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65D—CONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
- B65D25/00—Details of other kinds or types of rigid or semi-rigid containers
- B65D25/02—Internal fittings
- B65D25/10—Devices to locate articles in containers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65D—CONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
- B65D25/00—Details of other kinds or types of rigid or semi-rigid containers
- B65D25/02—Internal fittings
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Patch Boards (AREA)
Abstract
本发明属于一体化配电台的辅助装置领域,涉及一种配电一体化台区成套设备的盛放装置及其制作方法,包括木质承载箱以及钢边箱;所述木质承载箱包括木质底托,所述木质底托上设置有固定架承载腔、抱箍配套螺栓承载腔、双头螺杆承载腔、第一变压器托担腔、第二变压器托担腔、木质底托上部的内部两端均设置有木质托柱,木质托柱的上部设置有避雷器固定架,避雷器固定架的中部设置有避雷器固定孔;钢边箱包括承载箱体,所述承载箱体的上、下均设置有两条承载滑道;所述上、下对应的承载滑道内设置有固定承载板;所述固定承载板上设置有三组跌落式熔断器。本发明提供的技术方案简单易懂、易于操作、方便工厂化加工及大批量生产制造。
The invention belongs to the field of auxiliary devices for an integrated power distribution station, and relates to a storage device for a complete set of equipment in a power distribution integrated station area and a manufacturing method thereof, including a wooden bearing box and a steel side box; the wooden bearing box includes a wooden bottom The wooden bottom bracket is provided with a fixed frame bearing cavity, a hoop matching bolt bearing cavity, a double-headed screw bearing cavity, a first transformer supporting cavity, a second transformer supporting cavity, and the inner two ends of the upper part of the wooden bottom bracket They are all provided with wooden supporting columns, the upper part of the wooden supporting columns is provided with a lightning arrester fixing frame, and the middle part of the lightning arrester fixing frame is provided with a lightning arrester fixing hole; the steel side box includes a bearing box, and the upper and lower sides of the bearing box are equipped with two The upper and lower corresponding bearing slides are provided with a fixed bearing plate; the fixed bearing plate is provided with three sets of drop-out fuses. The technical scheme provided by the invention is simple and easy to understand, easy to operate, convenient for factory processing and mass production.
Description
技术领域technical field
本发明属于一体化配电台的辅助装置领域,涉及配电变压器、JP柜中相关部件的盛放装置,尤其涉及一种配电一体化台区成套设备的盛放装置及其制作方法。The invention belongs to the field of auxiliary devices of an integrated power distribution station, and relates to a storage device for related components in a distribution transformer and a JP cabinet, in particular to a storage device for a complete set of equipment in an integrated power distribution station and a manufacturing method thereof.
背景技术Background technique
随着国家电网高压、特高压系统的逐步完善,形成“三纵三横”、“三交四直”的骨干输电线路,为中东部及沿海地区可靠供电提供了坚实后盾。但目前我国城村配网建设仍处于较低水平,2014年国网公司提出了实现“两个转变”,创建“世界一流电网、国际一流企业”的目标,着重强调了“加强城市配电网建设,推进电网智能化”的工作要求。配电变压器及其台区是低压配电网的主要设备,其安装建设及其运行稳定可靠性直接影响整个电力系统的经济效益和用户体验。With the gradual improvement of the high-voltage and ultra-high-voltage systems of the State Grid, the backbone transmission lines of "three vertical and three horizontal" and "three alternating and four direct" have been formed, providing a solid backing for reliable power supply in the central, eastern and coastal areas. However, at present, my country's urban and rural distribution network construction is still at a relatively low level. In 2014, the State Grid Corporation proposed the goal of realizing "two transformations" and creating "world-class power grids and international first-class enterprises", emphasizing "strengthening the construction of urban distribution networks" , promote the smart grid" work requirements. The distribution transformer and its station area are the main equipment of the low-voltage distribution network. Its installation, construction and operation stability and reliability directly affect the economic benefits and user experience of the entire power system.
随着智能配电一体化台区的推广,国家电网公司公布了配电网工程典型设计(2016版),促进配网标准化建设,其中10kV一体化柱上变台和配电一二次成套设备分册为配电网一体化台区建设提供了详细的解决方案。但在目前的配电台区建设中,绝大多数的物资、物料都是散装发货的,附件零散、且需在现场制作、安装,造成了台区建设时间长,现场工作量大,材料浪费严重。同时,由于附件杂乱无条理,在现场安装过程中附件随意堆放,带来了物资不宜管理与寻找,安装过程中物料匹配难度增加,较小、零散物件易丢失等问题。With the promotion of intelligent power distribution integrated station areas, the State Grid Corporation of China announced the typical design of distribution network engineering (2016 edition) to promote the standardized construction of distribution network, including 10kV integrated column substation and power distribution primary and secondary complete sets of equipment The sub-volume provides detailed solutions for the construction of distribution network integration. However, in the current construction of the distribution station area, most of the materials and materials are shipped in bulk, and the accessories are scattered and need to be produced and installed on site, resulting in a long construction time for the station area, heavy on-site workload, and materials Serious waste. At the same time, because the accessories are messy and unorganized, the accessories are randomly piled up during the on-site installation process, which brings problems such as unsuitable management and search of materials, increased difficulty in matching materials during the installation process, and small and scattered items are easy to lose.
发明内容Contents of the invention
本发明针对上述的问题,提供了一种配电一体化台区成套设备的盛放装置及其制作方法。Aiming at the above problems, the present invention provides a storage device for a complete set of equipment in an integrated power distribution station area and a manufacturing method thereof.
为了达到上述目的,本发明采用的技术方案为,In order to achieve the above object, the technical scheme adopted in the present invention is,
一种配电一体化台区成套设备的盛放装置,包括木质承载箱以及钢边箱;A storage device for a complete set of equipment in an integrated power distribution area, including a wooden carrying box and a steel side box;
所述木质承载箱包括木质底托,所述木质底托上部的中心部位的内部一端设置有用于承装杆上电缆固定架的固定架承载腔,所述固定架承载腔的一端设置有抱箍配套螺栓承载腔,所述抱箍配套螺栓承载腔的上部设置有双头螺杆承载腔,所述木质底托上部的中心部位的一侧设置有第一变压器托担腔,另一侧设置有第二变压器托担腔,所述第一变压器托担腔的中部设置有压板腔,所述第二变压器托担腔的中部设置有保护管腔,所述木质底托上部的内部两端均设置有木质托柱,所述木质托柱的上部设置有避雷器固定架,所述避雷器固定架的中部设置有避雷器固定孔;The wooden bearing box includes a wooden bottom bracket, and one end inside the central part of the upper part of the wooden bottom bracket is provided with a fixed frame bearing chamber for holding the cable fixing frame on the rod, and one end of the fixed frame bearing cavity is provided with a hoop The matching bolt bearing cavity, the upper part of the supporting bolt bearing cavity of the hoop is provided with a double-headed screw bearing cavity, one side of the center part of the upper part of the wooden base is provided with a first transformer supporting cavity, and the other side is provided with a second Two transformer supporting chambers, the middle part of the first transformer supporting chamber is provided with a pressure plate chamber, the middle part of the second transformer supporting chamber is provided with a protective tube chamber, and the inner two ends of the upper part of the wooden base are provided with A wooden support column, the upper part of the wooden support column is provided with a lightning arrester fixing frame, and the middle part of the lightning arrester fixing frame is provided with a lightning arrester fixing hole;
所述钢边箱包括承载箱体,所述承载箱体的上、下均设置有两条承载滑道;The steel side box includes a load-bearing box, and two load-bearing slides are arranged on the upper and lower sides of the load-bearing box;
所述上、下对应的承载滑道内设置有固定承载板;所述固定承载板上设置有三组跌落式熔断器,所述固定承载板的上部设置有用于容纳冷缩管的方形容纳孔。The upper and lower corresponding bearing slides are provided with a fixed bearing plate; the fixed bearing plate is provided with three sets of drop-out fuses, and the upper part of the fixed bearing plate is provided with a square accommodation hole for accommodating the cold shrinkable tube.
作为优选,所述避雷器固定架的两端设置有用于放置横担抱箍的固定座。Preferably, both ends of the lightning arrester fixing frame are provided with fixing seats for placing cross-arm hoops.
作为优选,所述木质底托上部的内部两端均设置有备品螺栓腔。Preferably, both inner ends of the upper part of the wooden base are provided with spare bolt cavities.
作为优选,所述木质底托的底部设置有支撑方柱,所述支撑方柱的个数为2-6个,均匀的设置在木质底托的底部。Preferably, the bottom of the wooden base is provided with supporting square columns, and the number of the supporting square columns is 2-6, which are evenly arranged on the bottom of the wooden base.
作为优选,所述木质底托的上部设置有与木质底托配合设置的密封盖。As a preference, the upper part of the wooden base is provided with a sealing cover cooperating with the wooden base.
一种制作权利要求1-5中任意一项所述的配电一体化台区成套设备的盛放装置的方法,具体包括一下步骤:A method for manufacturing the storage device for the complete set of equipment in the power distribution integrated station area described in any one of claims 1-5, specifically comprising the following steps:
1)该包装箱分上下两层结构,依据附件定位图,在包装箱底层绘制出定位图案;1) The packaging box is divided into upper and lower layers, and the positioning pattern is drawn on the bottom of the packaging box according to the positioning diagram attached;
2)将预制好的各附件依次放入定位图案所示位置,并通过固定木块加以固定;2) Put the prefabricated accessories into the positions shown in the positioning pattern in turn, and fix them with fixed wooden blocks;
3)将预制好的两支下火支撑横担、跌落式熔断器横担、避雷器横担放置在上层木料支撑架上;3) Place the prefabricated two lower fire support cross arms, drop fuse cross arms, and lightning arrester cross arms on the upper timber support frame;
4)将预制好的绝缘导线放置在上层横担的绝缘子上;4) Place the prefabricated insulated wire on the insulator of the upper cross arm;
5)利用绑扎带将绝缘导线和上层各横担,下层物料和木箱底座相固定;5) Use binding tape to fix the insulated wires and the upper cross arms, the lower material and the base of the wooden box;
6)将跌落式熔断器、避雷器、冷缩终端等固定在钢边箱内;6) Fix drop-out fuses, lightning arresters, cold shrink terminals, etc. in the steel side box;
7)在木箱、钢边箱箱体上印刷唛头、安全标识等各种信息;7) Print various information such as shipping marks and safety signs on wooden boxes and steel side boxes;
8)最后完成大包装箱、小钢边箱、变压器、JP柜成套配送。8) Complete the complete delivery of large packing boxes, small steel side boxes, transformers, and JP cabinets.
与现有技术相比,本发明的优点和积极效果在于,Compared with prior art, advantage and positive effect of the present invention are,
1、本发明提供的技术方案简单易懂、易于操作、方便工厂化加工及大批量生产制造。1. The technical solution provided by the present invention is simple and easy to understand, easy to operate, convenient for factory processing and mass production.
附图说明Description of drawings
为了更清楚地说明本发明实施例的技术方案,下面将对实施例描述中所需要使用的附图作一简单地介绍,显而易见地,下面描述中的附图是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following will briefly introduce the accompanying drawings that need to be used in the description of the embodiments. Obviously, the accompanying drawings in the following description are some embodiments of the present invention. For Those of ordinary skill in the art can also obtain other drawings based on these drawings without any creative effort.
图1为木质承载箱的立体结构示意图;Fig. 1 is the three-dimensional structure schematic diagram of wooden bearing box;
图2为木质承载箱的部分爆炸图;Figure 2 is a partial exploded view of the wooden bearing box;
图3为木质承载箱的俯视结构示意图;Fig. 3 is a top view structural schematic diagram of a wooden bearing box;
图4为钢边箱的立体结构示意图;Fig. 4 is a three-dimensional structural schematic diagram of a steel side box;
图5为跌落式熔断器的立体结构示意图;Fig. 5 is a schematic diagram of a three-dimensional structure of a dropout fuse;
以上各图中,1、木质底托;101、固定架承载腔;102、抱箍配套螺栓承载腔;103、双头螺杆承载腔;104、(第一、第二)变压器托担腔;105、备品螺栓腔;2、木质托柱;3、避雷器固定架;4、横担抱箍;5、避雷器;6、保护管腔;7、电缆固定架;8、双头螺栓;9、横担抱箍配套螺栓;10、JP柜压板;11、承载箱体;1101、承载滑道;12、跌落式熔断器;13、固定承载板;1301、方形容纳孔;14、冷缩管。In the above figures, 1. Wooden bottom bracket; 101, bearing chamber of fixed frame; 102, bearing chamber of supporting bolts for hoop; 103, bearing chamber of double-ended screw; 104, (first, second) transformer supporting chamber; 105 1. Spare bolt chamber; 2. Wooden support column; 3. Lightning arrester fixing frame; 4. Cross arm hoop; 5. Lightning arrester; 6. Protection tube cavity; 7. Cable fixing frame; 10. JP cabinet pressure plate; 11. Loading box; 1101. Loading slideway; 12. Drop-out fuse; 13. Fixed bearing plate; 1301. Square receiving hole;
具体实施方式Detailed ways
为了能够更清楚地理解本发明的上述目的、特征和优点,下面结合附图和实施例对本发明做进一步说明。需要说明的是,在不冲突的情况下,本申请的实施例及实施例中的特征可以相互组合。In order to more clearly understand the above objects, features and advantages of the present invention, the present invention will be further described below in conjunction with the accompanying drawings and embodiments. It should be noted that, in the case of no conflict, the embodiments of the present application and the features in the embodiments can be combined with each other.
在下面的描述中阐述了很多具体细节以便于充分理解本发明,但是,本发明还可以采用不同于在此描述的其他方式来实施,因此,本发明并不限于下面公开说明书的具体实施例的限制。In the following description, many specific details are set forth in order to fully understand the present invention. However, the present invention can also be implemented in other ways than described here. Therefore, the present invention is not limited to the specific embodiments disclosed below. limit.
实施例1,本发明提供了一种配电一体化台区成套设备的盛放装置,对于该木质盛放箱来说,实质上是一个工装箱,从图中可以看出,包括木质承载箱以及钢边箱。Embodiment 1, the present invention provides a storage device for a complete set of equipment in an integrated power distribution area. For the wooden storage box, it is essentially a tooling box. It can be seen from the figure that it includes a wooden carrying box and steel saddlebags.
下面先说一下木质承载箱的具体设置,其木质承载箱包括木质底托,该木质底托的主要作用则是用于承载相关部件,发明人将将该底托设计成了其木质的材料,也是为了降低整体的质量,其木质底托上部的中心位置的内部一端设置了用于承装杆上电缆固定架的固定架承载腔,其固定架承载腔的一端设置了抱箍配套螺栓承载腔,从图中可以看出,其抱箍配套螺栓承载腔也是包括了三部分的,方便盛放置不同型号的横担抱箍配套螺栓,发明人为了合理的利用空间,在抱箍配套螺栓承载腔的上部设置了双头螺杆承载腔,很明显,其双头螺栓承载腔也包括两部分,其目的是和抱箍配套螺栓承载腔一致的;从图2中可以看出,其木质底托上部的中心部位的一侧设置了第一变压器托担腔,另一侧设置了第二变压器托担腔,很明显,这两个托担腔是用来盛放变压器的,即将变压器担到两个腔体上,其第一变压器托担腔的中部设置了压板腔,第二变压器托担腔的中部设置了保护管腔,木质底托上部的内部两端均设置了木质托柱,木质托柱的上部设置了避雷器固定架,避雷器固定架的中部设置了避雷器固定孔,这里的设置也是比较好理解的,故不作详细的说明了,从图1和图2中可以看出,其避雷器固定架也是设置了三组,实现箱体的最大利用。Let me talk about the specific setting of the wooden bearing box first. Its wooden bearing box includes a wooden bottom bracket. The main function of the wooden bottom bracket is to carry related components. Also in order to reduce the overall quality, the inner end of the center position of the upper part of the wooden bottom bracket is provided with a fixed frame bearing cavity for the cable fixing frame on the rod, and one end of the fixed frame bearing cavity is provided with a hoop matching bolt bearing cavity , it can be seen from the figure that the hoop matching bolt bearing chamber also includes three parts, which are convenient for placing different types of cross-arm hoop supporting bolts. The upper part is provided with a double-ended screw bearing chamber, obviously, the stud bolt bearing chamber also includes two parts, and its purpose is to be consistent with the supporting bolt bearing chamber of the hoop; as can be seen from Figure 2, the upper part of the wooden bottom support One side of the central part of the transformer is provided with a first transformer supporting chamber, and the other side is provided with a second transformer supporting chamber. Obviously, these two supporting chambers are used to hold the transformer, that is, to carry the transformer to two On the cavity body, a pressure plate cavity is set in the middle of the first transformer supporting cavity, a protective tube cavity is set in the middle of the second transformer supporting cavity, and wooden support posts are set at both ends of the upper part of the wooden bottom support. The arrester fixing frame is set on the upper part of the arrester fixing frame, and the arrester fixing hole is set in the middle part of the arrester fixing frame. Three groups are also set up to realize the maximum utilization of the cabinet.
除了上述的设计之外,发明人还做了以下的具体设置:In addition to the above design, the inventor also made the following specific settings:
其避雷器固定架的两端设置有用于放置横担抱箍的固定座;The two ends of the lightning arrester fixing frame are provided with fixing seats for placing cross-arm hoops;
木质底托上部的内部两端均设置有备品螺栓腔;Spare bolt cavities are provided at both ends of the upper part of the wooden bottom bracket;
木质底托的底部设置有支撑方柱,所述支撑方柱的个数为2-6个,均匀的设置在木质底托的底部;The bottom of the wooden base is provided with supporting square columns, and the number of the supporting square columns is 2-6, which are evenly arranged on the bottom of the wooden base;
木质底托的上部设置有与木质底托配合设置的密封盖。The upper part of the wooden bottom support is provided with a sealing cover arranged in cooperation with the wooden bottom support.
如图4和图5所示,其钢边箱包括承载箱体,承载箱体的上、下均设置了有两条承载滑道,这里从图4中可以看出,其承载滑道在箱体内部的设置实质是4个,上下两两垂直对应,其上、下对应的承载滑道内设置了固定承载板;很明显,其承载箱体内设置了两个固定承载板;固定承载板上设置了三组跌落式熔断器,固定承载板的上部设置了用于容纳冷缩管的方形容纳孔,其跌落式熔断器是现有技术,故不作详细的说明了。As shown in Figure 4 and Figure 5, its steel side box includes a load-bearing box, and two load-bearing slideways are arranged on the upper and lower sides of the load-bearing box. There are essentially 4 settings inside the body, and the upper and lower sides are vertically corresponding in pairs. The upper and lower corresponding bearing slideways are equipped with fixed bearing plates; obviously, two fixed bearing plates are installed in the bearing box; the fixed bearing plate is set Three sets of drop-out fuses are provided, and the upper part of the fixed bearing plate is provided with a square accommodation hole for accommodating cold-shrinkable tubes. The drop-out fuses are prior art, so no detailed description will be given.
与现在包装方案相比,本发明的技术方案将安装过程中所需的物资物料按安装的逆向顺序摆放在木箱中,并将包装箱随变压器、JP柜等成套配送,可大幅度减少现场施工时间,降低施工难度,提高施工效率。Compared with the current packaging scheme, the technical scheme of the present invention places the materials and materials required in the installation process in wooden boxes in the reverse order of installation, and distributes the packaging boxes with transformers, JP cabinets, etc. in a complete set, which can greatly reduce On-site construction time is reduced, construction difficulty is reduced, and construction efficiency is improved.
为使本发明的上述目的、特征和优点能够更加明显易懂,下面就10kV纵向一体化台区、15米双杆的附件装箱及成套提供方案对本发明进一步详细说明:In order to make the above-mentioned purpose, features and advantages of the present invention more obvious and easy to understand, the present invention will be further described in detail below with regard to the 10kV vertically integrated platform area, the 15-meter double-pole accessory boxing and complete sets of supply schemes:
步骤一:首先进行电缆支撑架的预装工作,将所用固定架、固定架抱箍、卡抱等附件预组装成一个整体,且将配套的不需拆卸的螺栓进行固定。Step 1: First, pre-install the cable support frame, pre-assemble the used fixing frame, fixing frame hoop, clip and other accessories into a whole, and fix the matching bolts that do not need to be disassembled.
步骤二:进行下火支撑横担、跌落式熔断器横担、避雷器横担的预制工作,根据实际装配需要中所对应的尺寸、位置、方向将复合式绝缘子、横担抱箍固定在各横担上,保证固定牢靠不脱落。固定后应保证复合式绝缘子固定导线凹槽与各横担相垂直,横担抱箍所形成凹槽和横担折弯方向应一致且均朝向地面,防止雨雪堆积锈蚀附件。Step 2: Carry out the prefabrication work of the lower fire support cross arm, dropout fuse cross arm and lightning arrester cross arm, and fix the composite insulator and cross arm hoop on each cross arm according to the corresponding size, position and direction in the actual assembly needs Put it on to ensure that it is fixed firmly and does not fall off. After fixing, it should be ensured that the fixed wire groove of the composite insulator is perpendicular to each cross-arm, and the groove formed by the cross-arm hoop and the bending direction of the cross-arm should be consistent and face the ground to prevent rain and snow from accumulating and corroding the accessories.
步骤三:进行包装箱底层定位图绘制,按照下层物料摆放位置绘制区域图,方便操作人员进行摆放固定。Step 3: Draw the positioning map of the bottom layer of the packing box, and draw an area map according to the placement position of the lower layer of materials, so that the operator can place and fix it conveniently.
步骤四:根据步骤三中所绘制的位置图顺序摆放附件,主要包括变压器托担、杆上电缆固定架、变压器托担抱箍、避雷器横担抱箍、跌落式熔断器横担抱箍、绝缘子横担抱箍、变压器托担双头螺杆等。Step 4: Place the accessories in sequence according to the position diagram drawn in step 3, mainly including the transformer support, the cable fixing frame on the pole, the transformer support hoop, the lightning arrester cross-arm hoop, the drop-out fuse cross-arm hoop, Insulator cross-arm hoop, transformer supporting double-ended screw, etc.
步骤五:将各附件装配过程中用到的螺栓螺母按规格型号分类包装,放置在其所形成的空隙中,将备品螺栓螺母放置在木箱底层两端的间隔处。Step 5: Pack the bolts and nuts used in the assembly process of each accessory according to the specifications and models, and place them in the gap formed by them, and place the spare bolts and nuts at the interval between the two ends of the bottom of the wooden box.
步骤六:将预制好的三根变压器引接线、低压电缆保护管、变压器压板、JP柜压板放置在变压器托担的内槽中。Step 6: Place the prefabricated three transformer lead wires, low-voltage cable protection tube, transformer pressure plate, and JP cabinet pressure plate in the inner groove of the transformer support.
步骤七:将步骤二中预制好的下火支撑横担、跌落式熔断器横担、避雷器横担放置在上层木料支撑架的卡槽中。Step 7: Place the prefabricated lower fire support cross arm, drop fuse cross arm, and lightning arrester cross arm in the slot of the upper wood support frame.
步骤八:将预制好的绝缘导线、接地线分类放入步骤七中横担的绝缘子所形成的中心区域内。Step 8: Classify the prefabricated insulated conductors and grounding wires into the central area formed by the cross-arm insulators in Step 7.
步骤九:利用绑扎带将步骤七、步骤八中的绝缘导线、接地线、各横担等进行固定,防止在运输或搬送过程中物料发生碰撞。Step 9: Fix the insulated wires, grounding wires, cross-arms, etc. in steps 7 and 8 with binding ties to prevent collisions of materials during transportation or handling.
步骤十:利用绑扎带将步骤四中所摆放的附件与木箱底座相固定。Step 10: Fix the accessories placed in step 4 to the base of the wooden box with binding straps.
步骤十一:盖上木箱箱盖,利用气钉枪进行固定,完成木箱包装。Step 11: Put on the lid of the wooden box and fix it with an air nail gun to complete the wooden box packaging.
步骤十二:将避雷器、跌落式熔断器、冷缩终端放入钢边箱结构中,利用木箱内卡槽进行固定,并完成封箱。Step 12: Put the lightning arrester, dropout fuse, and cold-shrinkable terminal into the steel side box structure, fix it with the card slot in the wooden box, and complete the box sealing.
步骤十三:由变压器、JP柜、木箱与钢边箱四部分组成了整套变压器台区所需物资,实现成套提供解决方案。Step 13: Transformers, JP cabinets, wooden boxes and steel side boxes constitute a complete set of materials required for the transformer station area, and provide complete solutions.
以上所述,仅是本发明的较佳实施例而已,并非是对本发明作其它形式的限制,任何熟悉本专业的技术人员可能利用上述揭示的技术内容加以变更或改型为等同变化的等效实施例应用于其它领域,但是凡是未脱离本发明技术方案内容,依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与改型,仍属于本发明技术方案的保护范围。The above is only a preferred embodiment of the present invention, and is not intended to limit the present invention to other forms. Any skilled person who is familiar with this profession may use the technical content disclosed above to change or modify the equivalent of equivalent changes. The embodiments are applied to other fields, but any simple modifications, equivalent changes and modifications made to the above embodiments according to the technical essence of the present invention still belong to the protection scope of the technical solutions of the present invention without departing from the content of the technical solutions of the present invention.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810402897.9A CN108557230A (en) | 2018-04-28 | 2018-04-28 | A kind of apparatus for placing and preparation method thereof with electrical integrated taiwan area complete set of equipments |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810402897.9A CN108557230A (en) | 2018-04-28 | 2018-04-28 | A kind of apparatus for placing and preparation method thereof with electrical integrated taiwan area complete set of equipments |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN108557230A true CN108557230A (en) | 2018-09-21 |
Family
ID=63537222
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201810402897.9A Pending CN108557230A (en) | 2018-04-28 | 2018-04-28 | A kind of apparatus for placing and preparation method thereof with electrical integrated taiwan area complete set of equipments |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN108557230A (en) |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3187896U (en) * | 2013-10-10 | 2013-12-19 | 株式会社リングスター | Tray mounting structure for storage containers such as tool boxes |
| CN105197361A (en) * | 2015-11-05 | 2015-12-30 | 国网山东荣成市供电公司 | Container convenient to load and unload |
| CN106965140A (en) * | 2017-03-31 | 2017-07-21 | 王新朋 | A kind of electric power detects tool container |
| CN107298232A (en) * | 2017-08-24 | 2017-10-27 | 南京亚力电气有限公司 | Pole type transformer platform complete set of equipments integration packaging structure |
| CN206750424U (en) * | 2017-04-21 | 2017-12-15 | 南充隆固机械工业有限公司 | A kind of bogey for being easy to bent axle to transport over long distances |
| CN206937284U (en) * | 2017-04-19 | 2018-01-30 | 国网浙江嘉善县供电公司 | A kind of electric power facility suite pre-installs fixation multiple layer combination storage rack |
| CN207044132U (en) * | 2017-05-18 | 2018-02-27 | 新昌县羽林街道星捷轴承厂 | Tool box is rushed to repair in a kind of distribution |
| CN208731536U (en) * | 2018-04-28 | 2019-04-12 | 山东电工电气集团新能科技有限公司 | A kind of apparatus for placing with electrical integrated area's complete set of equipments |
-
2018
- 2018-04-28 CN CN201810402897.9A patent/CN108557230A/en active Pending
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3187896U (en) * | 2013-10-10 | 2013-12-19 | 株式会社リングスター | Tray mounting structure for storage containers such as tool boxes |
| CN105197361A (en) * | 2015-11-05 | 2015-12-30 | 国网山东荣成市供电公司 | Container convenient to load and unload |
| CN106965140A (en) * | 2017-03-31 | 2017-07-21 | 王新朋 | A kind of electric power detects tool container |
| CN206937284U (en) * | 2017-04-19 | 2018-01-30 | 国网浙江嘉善县供电公司 | A kind of electric power facility suite pre-installs fixation multiple layer combination storage rack |
| CN206750424U (en) * | 2017-04-21 | 2017-12-15 | 南充隆固机械工业有限公司 | A kind of bogey for being easy to bent axle to transport over long distances |
| CN207044132U (en) * | 2017-05-18 | 2018-02-27 | 新昌县羽林街道星捷轴承厂 | Tool box is rushed to repair in a kind of distribution |
| CN107298232A (en) * | 2017-08-24 | 2017-10-27 | 南京亚力电气有限公司 | Pole type transformer platform complete set of equipments integration packaging structure |
| CN208731536U (en) * | 2018-04-28 | 2019-04-12 | 山东电工电气集团新能科技有限公司 | A kind of apparatus for placing with electrical integrated area's complete set of equipments |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102700857A (en) | Disintegrating transportation method of transformer | |
| CN108557230A (en) | A kind of apparatus for placing and preparation method thereof with electrical integrated taiwan area complete set of equipments | |
| CN208731536U (en) | A kind of apparatus for placing with electrical integrated area's complete set of equipments | |
| CN208134947U (en) | A kind of wooden accommodating box for being installed to distribution accessory | |
| CN204117823U (en) | A kind of ring main unit dedicated potential transformer | |
| CN204577640U (en) | A kind of high-voltage prepayment switch-box outlet cable jockey | |
| CN205070266U (en) | Regional power grid emergency rescue equipment | |
| CN206937284U (en) | A kind of electric power facility suite pre-installs fixation multiple layer combination storage rack | |
| CN217769251U (en) | Distribution device arrangement structure for realizing rapid power supply conversion of ultrahigh voltage transformer substation | |
| CN2387620Y (en) | Amorphous alloy drying transformer | |
| CN110164268A (en) | A kind of power distribution network standardization power transformation platform teaching instrument | |
| CN212085635U (en) | Box-type substation cable stranding mechanism | |
| CN109888792B (en) | Dynamic contactless voltage and current regulator for low-voltage line of power distribution network | |
| CN203871171U (en) | Combined type mutual inductor | |
| CN108466752A (en) | A kind of wooden accommodating box for being installed to distribution accessory | |
| CN202663116U (en) | Vehicle-mounted capacity-regulating high-voltage power capacitor device | |
| CN203799859U (en) | Outdoor bus type current transformer | |
| CN222168072U (en) | Miniature energy-taking transformer and transformer application system | |
| CN210326570U (en) | Novel 10KV integrated transformer station complete equipment | |
| CN202586081U (en) | Movable-type combination distribution device | |
| CN203882763U (en) | Input and output reactor for medium voltage power electronic device | |
| CN207425566U (en) | A kind of folding stereo open core no-encapsulated-winding dry-type transformer | |
| CN204668722U (en) | With the gas insulation switch cabinet of overhead type current transformer structure | |
| CN224053724U (en) | A combined pole-mounted transformer system | |
| CN2470924Y (en) | 35KV-110KV charged-loading-unloading organic insulated zinc oxide lightning arrester |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| CB03 | Change of inventor or designer information | ||
| CB03 | Change of inventor or designer information |
Inventor after: Zhang Shuyuan Inventor after: Qi Yi Inventor after: Li Feng Inventor after: Zhang Fan Inventor after: Li Jun Inventor after: Fu Chunming Inventor after: Dong Qi Inventor after: Ma Pengcheng Inventor before: Zhang Shuyuan Inventor before: Li Feng Inventor before: Zhang Fan Inventor before: Li Jun Inventor before: Fu Chunming |
|
| TA01 | Transfer of patent application right | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20190612 Address after: 750011 1-3 floors of No.1 office building, Yingkangchen District, Baohu Middle Road, Jinfeng District, Yinchuan City, Ningxia Hui Autonomous Region Applicant after: State Grid Ningxia Electric Power Co., Ltd. Material Co. Applicant after: SHANDONG ELECTRICAL ENGINEERING & EQUIPMENT GROUP XINNENG TECHNOLOGY Co.,Ltd. Address before: 250100 Office Building 1/F 103, No. 16 Chonghua Road, Jinan High-tech Zone, Shandong Province Applicant before: SHANDONG ELECTRICAL ENGINEERING & EQUIPMENT GROUP XINNENG TECHNOLOGY Co.,Ltd. |
|
| WD01 | Invention patent application deemed withdrawn after publication | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180921 |