- CN108547442A CN108547442A CN201810455360.9A CN201810455360A CN108547442A CN 108547442 A CN108547442 A CN 108547442A CN 201810455360 A CN201810455360 A CN 201810455360A CN 108547442 A CN108547442 A CN 108547442A
- Authority
- CN
- China
- Prior art keywords
- support
- buffer
- buffer board
- fixedly connected
- operation box
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/001—Safety or protective measures against falling down relating to scaffoldings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
- E04G5/046—Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Emergency Lowering Means (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
The invention discloses a kind of external wall of high-rise building construction safety devices, belong to high-rise building safe device field.A kind of external wall of high-rise building construction safety device, including fixed plate, the fixed plate is fixedly connected on wall, the fixed plate fixes support by fixing support rack and is connected with operation box, support long slab is slidably connected in the operation box, it is connected with support buffer board on the support long slab, symmetrical rotation buffer board is rotatably connected on the support buffer board, two rotation buffer board bottom sides are connected by shock-absorbing spring with support buffer board.It may be implemented when top has stone to fall accidentally; protective cloth covers above operation box; it is effective when preventing from stone from falling under on the second buffering pneumatic cushion bouncing again; caused by secondary whereabouts; to be effectively protected; energy is absorbed by multiple effective bumper and absorbing shock, stone is received, ensures that the safety of staff.
Description
Technical field
The present invention relates to high-rise building safe device fields, construct and use more specifically to a kind of external wall of high-rise building
Safety device.
Background technology
Skyscraper is the tier building more than certain altitude and the number of plies, is developed with the production and consumption in each city in the world
To a certain extent, global range has started the heat for improving the urban architecture number of plies;But at the same time, skyscraper is in terms of construction
There are troubling safety problem, skyscraper is also inevitable in the process for carrying out decoration of exterior wall, is often needed in height
Setting protection network plays protective action around layer building, in addition needs to place various devices in high-building construction.
When carrying out external wall construction, construction personnel needs station External Wall on scaffold to construct, and is easy out in work progress
Existing silt, stone, device trickle down phenomenon, are easy to endanger the safety of construction personnel.
Invention content
1. technical problems to be solved
For problems of the prior art, constructs the purpose of the present invention is to provide a kind of external wall of high-rise building and prevented with safety
Protection unit, it may be implemented effectively to receive silt, stone, device, it is ensured that the work safety of construction personnel.
2. technical solution
To solve the above problems, the present invention adopts the following technical scheme that.
A kind of external wall of high-rise building construction safety device, including fixed plate, the fixed plate are fixedly connected on wall
On body, the fixed plate fixes support by fixing support rack and is connected with operation box, and support is slidably connected in the operation box
Long slab is connected with support buffer board on the support long slab, and symmetrical rotation buffering is rotatably connected on the support buffer board
Plate, two rotation buffer board bottom sides are connected by shock-absorbing spring with support buffer board, the rotation buffer board and support
It is also associated with the first buffering pneumatic cushion between buffer board, link block is slidably connected on two rotation buffer boards, described in two
It is connected with elastic buffer net and the second buffering pneumatic cushion between link block, and the second buffering pneumatic cushion is located at the online side of elastic buffer, two
Third buffering pneumatic cushion is connected between a rotation buffer board, the support long slab bottom side both ends have been respectively fixedly connected with first
Bolster and the second bolster, operation box inner wall both sides have been respectively fixedly connected with first baffle and second baffle, and described
One bolster and the second bolster bottom end offset with first baffle and second baffle respectively, first bolster and the second buffering
The first kelly and the second kelly are connected with by the first sliding sleeve and the second sliding sleeve respectively on part, offered on the operation box and the
The corresponding mounting groove of one kelly, the operation box left side are connected with the first winding wheel, first are wound on first winding wheel
Traction rope, first traction rope upper end are fixedly connected with the first connecting plate, and the first connecting plate right side opening is equipped with and first
Corresponding first card slot of kelly, the operation box left upper end are rotatably connected to deflector roll, the operation box upper right side by rotation axis
It is connected with fixed pulley, first connecting plate upper end is connected with protective cloth, and the protective cloth upper end is around deflector roll and is fixedly connected
There is the second traction rope, the described one end of second traction rope far from protective cloth is around fixed pulley and is fixedly connected with the second connecting plate,
The second card slot corresponding with the second kelly is offered on second connecting plate, second connecting plate lower end, which is fixedly connected with, holds
Pouring weight stands and works in operation box, and when top has stone to fall accidentally, protective cloth covers above operation box, effectively
When preventing from stone from falling under on the second buffering pneumatic cushion bouncing again, caused by secondary whereabouts, to be effectively protected, warp
It crosses repeatedly effective bumper and absorbing shock and absorbs energy, receive stone, ensure that the safety of staff.
Preferably, the support long slab both ends are fixedly connected with position limiting slide block, offer on the operation box and are slided with limit
Block corresponding limit sliding chutes are rotatably connected to sliding block on the link block, are offered on the rotation buffer board corresponding with sliding block
Sliding slot.
Preferably, it is equipped with U-shaped buffer bar between the interior corner and the outer corner for supporting buffer board of the support long slab,
Pass through the first buffer spring and the second buffer spring and support buffer board bottom side and right side phase on the inside of the U-shaped buffer bar respectively
Even, pass through the side wall and bottom wall of third buffer spring and the 4th buffer spring and support long slab respectively on the outside of the U-shaped buffer bar
It is connected, the first bump rubber and the second bump rubber has been respectively fixedly connected on the side wall and bottom wall of the support long slab,
And first bump rubber and the second bump rubber offset with U-shaped buffer bar turning.
Preferably, first bolster includes bottom plate, is fixedly connected on the bottom plate and rigidly fixes bar and rigidly lead
Bar, it is described to rigidly fix bar and rigid guide upper end is fixedly connected with U-shaped rigid rod, it is connected on the U-shaped rigid rod flexible
Rigid rod, the bottom plate upper end are fixedly linked with support long slab, and first sliding sleeve is slidably connected on rigid guide, the bullet
Property rigid rod lower end offsets with first baffle.
Preferably, it is opened up on operation box inner wall both sides fluted.
Preferably, the operation box inner wall is connected with the second winding wheel, and being intertwined and connected on second winding wheel has protection
Net, the one end of the protection network far from the second winding wheel are connected with third traction rope, and the third traction rope is far from protection network
One end is connected with bearing block.
3. advantageous effect
Compared with the prior art, the advantage of the invention is that:
The operator station of this programme works in operation box, when top has stone to fall accidentally, protective cloth covering behaviour
Make above frame, when effectively preventing from stone from falling under on the second buffering pneumatic cushion bouncing again, caused by secondary whereabouts, into
Row is effectively protected, and is absorbed energy by multiple effective bumper and absorbing shock, is received stone, ensure that the peace of staff
Entirely.
Description of the drawings
One of Fig. 1 is the structural diagram of the present invention;
Fig. 2 is one of the structural schematic diagram of the present invention;
Fig. 3 is the structural schematic diagram at A in Fig. 1;
Fig. 4 is the structural schematic diagram at B in Fig. 2;
Fig. 5 is the structural schematic diagram at C in Fig. 3;
Fig. 6 is the structural schematic diagram at D in Fig. 3;
Fig. 7 is the structural schematic diagram of the second buffering pneumatic cushion and elastic buffer net of the present invention;
Fig. 8 is the structural schematic diagram of the first buffer element of the present invention.
Figure label explanation:
1. operation box, 2. fixed plates, 3. supporting racks, 4. walls, 5. second sliding sleeves, 6. second baffles, 7. third traction ropes, 8.
One baffle, 9. protection networks, 10. second winding wheels, 11. first bolsters, that 11-1. rigidly fixes bar, 11-2. bottom plates, 11-3. is rigid
Property guide rod, 11-4.U types rigid rod, 11-5. resilient stiffs bar, 12. first winding wheels, 13. first traction ropes, 14. first card
Slot, 15. first connecting plates, 16. mounting grooves, 17. first kellies, 18. first sliding sleeves, 19. support long slabs, 20. support buffer boards,
21. shock-absorbing spring, 22. rotation axis, 23. deflector rolls, 24. protective cloths, 25. second buffering pneumatic cushions, 26. elastic buffer nets, 27. thirds
Buffering pneumatic cushion, 28. rotation buffer boards, 29. fixed pulleys, 30. second traction ropes, 31. first buffering pneumatic cushions, 32. grooves, 33. the
Two draw-in groove, 34. second connecting plates, 35. bearing blocks, 36. second kellies, 37. second bolsters, 38. link blocks, 39. sliding blocks,
40. sliding slot, 41. position limiting slide blocks, 42. limit sliding chutes, 43. third buffer springs, 44. the 4th buffer springs, 45. second buffering rubbers
Blob of viscose, 46.U types buffer bar, 47. first buffer springs, 48. second buffer springs, 49. first bump rubbers.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention;Technical solution in the embodiment of the present invention carries out clear, complete
Site preparation describes;Obviously;Described embodiments are only a part of the embodiments of the present invention;Instead of all the embodiments.It is based on
Embodiment in the present invention;It is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment;It shall fall within the protection scope of the present invention.
Embodiment 1:
- 8 are please referred to Fig.1, a kind of external wall of high-rise building construction safety device, including fixed plate 2, fixed plate 2 fix company
It is connected on wall 4, fixed plate 2 fixes support by fixing support rack 3 and is connected with operation box 1, and branch is slidably connected in operation box 1
Long slab 19 is supportted, supports and is connected with support buffer board 20 on long slab 19, it is slow that symmetrical rotation is rotatably connected on support buffer board 20
Punching 28, two rotation buffer board 28 bottom sides are connected by shock-absorbing spring 21 with support buffer board 20, rotate buffer board 28 and
It is also associated with the first buffering pneumatic cushion 31 between support buffer board 20, link block 38 is slidably connected on two rotation buffer boards 28,
Elastic buffer net 26 and the second buffering pneumatic cushion 25 are connected between two link blocks 38, and the second buffering pneumatic cushion 25 is located at elasticity and delays
26 upside of net is rushed, third buffering pneumatic cushion 27 is connected between two rotation buffer boards 28,19 bottom side both ends of support long slab are solid respectively
Surely it is connected with the first bolster 11 and the second bolster 37,1 inner wall both sides of operation box have been respectively fixedly connected with first baffle 8 and
Two baffles 6, the first bolster 11 and 37 bottom end of the second bolster offset with first baffle 8 and second baffle 6 respectively, the first buffering
The first kelly 17 and the second kelly are connected with by the first sliding sleeve 18 and the second sliding sleeve 5 respectively on part 11 and the second bolster 37
36, mounting groove 16 corresponding with the first kelly 17 is offered on operation box 1,1 left side of operation box is connected with the first winding wheel 12, the
The first traction rope 13 is wound on one winding wheel 12,13 upper end of the first traction rope is fixedly connected with the first connecting plate 15, and first connects
15 right side opening of fishplate bar is equipped with first card slot 14 corresponding with the first kelly 17, and 1 left upper end of operation box is rotated by rotation axis 22 to be connected
It is connected to deflector roll 23,1 upper right side of operation box is connected with fixed pulley 29, and 15 upper end of the first connecting plate is connected with protective cloth 24, protective cloth
24 upper ends are around deflector roll 23 and are fixedly connected with the second traction rope 30, and second one end of traction rope 30 far from protective cloth 24 is around fixed
Pulley 29 is simultaneously fixedly connected with the second connecting plate 34, and second card slot corresponding with the second kelly 36 is offered on the second connecting plate 34
33,34 lower end of the second connecting plate is fixedly connected with bearing block 35, stands and works in operation box 1, when there is stone in top accidentally
When falling, protective cloth 24 covers 1 top of operation box, effectively prevents stone from being fallen under on the second buffering pneumatic cushion 25 and bounces again
When, caused by secondary whereabouts absorb energy to be effectively protected by multiple effective bumper and absorbing shock, receive stone,
Ensure that the safety of staff.
19 both ends of support long slab are fixedly connected with position limiting slide block 41, are offered on operation box 1 corresponding with position limiting slide block 41
Limit sliding chutes 42 are rotatably connected to sliding block 39 on link block 38, rotate and offer sliding slot corresponding with sliding block 39 on buffer board 28
40, position limiting slide block 41 and limit sliding chutes 42 ensure the Stable sliding for supporting long slab 19,40 company of ensuring of two sliding blocks 39 and sliding slot
Connect the sliding that block 38 is stablized on rotation buffer board 28.
It supports and is equipped with U-shaped buffer bar 46 between the interior corner of long slab 19 and the outer corner for supporting buffer board 20, it is U-shaped slow
46 inside of jumper bar is connected by the first buffer spring 47 and the second buffer spring 48 with support 20 bottom side of buffer board and right side respectively,
46 outside of U-shaped buffer bar passes through the side wall and bottom wall of third buffer spring 43 and the 4th buffer spring 44 and support long slab 19 respectively
It is connected, supports and be respectively fixedly connected with the first bump rubber 49 and the second bump rubber on the side wall and bottom wall of long slab 19
45, and the first bump rubber 49 and the second bump rubber 45 offset with 46 turning of U-shaped buffer bar, in support long slab 19 and branch
U-shaped buffer bar 46 is set between support buffer board 20, in the first buffer spring 47, the second buffer spring 48, third buffer spring 43
Under the collective effect of the 4th buffer spring 44, the first bump rubber 49 and the second bump rubber 45, to slow to supporting
Punching 20 further functions as buffering effect, further effective to absorb buffering energy.
First bolster 11 includes bottom plate 11-2, is fixedly connected on bottom plate 11-2 and rigidly fixes bar 11-1 and rigid guide
11-3, rigidly fixes bar 11-1 and the upper ends rigid guide 11-3 are fixedly connected with U-shaped rigid rod 11-4, on U-shaped rigid rod 11-4
It is connected with resilient stiff bar 11-5, U-shaped rigid rod 11-4, which is ensured, rigidly fixes bar 11-1, rigid guide 11-3 and resilient stiff
What bar 11-5 stablized is fixedly linked, and the upper ends bottom plate 11-2 are fixedly linked with support long slab 19, and the first sliding sleeve 18 is slidably connected at just
Property guide rod 11-3 on, rigid guide 11-3 drives the sliding of the first sliding sleeve 18, the resilient stiff lower ends bar 11-5 and 8 phase of first baffle
It supports, plays elastic buffer effect.
Operation box opens up fluted 32 on 1 inner wall both sides, it is ensured that the rotation buffering that rotation buffer board 28 is stablized.
1 inner wall of operation box is connected with the second winding wheel 10, and being intertwined and connected on the second winding wheel 10 has protection network 9, protection network 9
One end far from the second winding wheel 10 is connected with third traction rope 7, third traction rope 7 one end and bearing block far from protection network 9
35 are connected, and protection network 9 is pulled by third traction rope 7 when block 35 of weighing falls so that protection network 9 is unfolded, and increases peace again
Full guard performance, it is ensured that the safety of staff.
Operation principle:Operator station works in operation box 1, and when top has stone to fall accidentally, stone is fallen
Enter onto the second buffering pneumatic cushion 25, the second buffering pneumatic cushion 25 carries out buffering reduction of speed for the first time and absorbs, while the second buffering pneumatic cushion 25
Second of buffering reduction of speed of the progress of elastic buffer net 26 of bottom side absorbs, and at the same time link block 38 is downward on rotation buffer board 28
Sliding, at the same rotate buffer board 28 rotation, rotation buffer board 28 under the action of shock-absorbing spring 21 and the first buffering pneumatic cushion 31 again
Secondary to be absorbed into row buffering reduction of speed, in addition link block 38 moves down, and the third buffering between buffer board 28 is rotated at two
It is absorbed into row buffering reduction of speed under the action of air cushion 27, to effectively receive stone, prevents from that personnel is caused to injure, in addition support length
Plate 19 supports cushioning supportive plate 20, cushioning supportive plate 20 and support 19 slide downward of long slab, falls to further absorb stone
Energy carries out building absorption again, under the action of supporting the first bolster 11 and the second bolster 37 of 19 bottom side of long slab again
Secondary snubber, the first bolster 11 and the second bolster 37 drive the first kelly 17 and respectively while moving down
Two kellies 36 move, to which the first kelly 17 and the second kelly 36 are detached from the first card slot 14 and the second card slot 33 respectively, to this
When under the action of 35 gravity of bearing block, bearing block 35 pulls protective cloth 24 by the second traction rope 30, covers to protective cloth 24
The top of lid operation box 1, when effectively preventing from stone from falling under on the second buffering pneumatic cushion 25 bouncing again, caused by it is secondary under
It falls, to be effectively protected, absorbs energy by multiple effective bumper and absorbing shock, receive stone, ensure that work
The safety of personnel.
It is described above;It is merely preferred embodiments of the present invention;But scope of protection of the present invention is not limited thereto;
Any one skilled in the art is in the technical scope disclosed by the present invention;According to the technique and scheme of the present invention and its
It improves design and is subject to equivalent substitution or change;Should all it cover within the scope of the present invention.
Claims (6)
1. a kind of external wall of high-rise building construction safety device, including fixed plate(2), the fixed plate(2)It is fixedly connected
In wall(4)On, it is characterised in that:The fixed plate(2)Pass through fixing support rack(3)Fixed support is connected with operation box(1),
The operation box(1)Inside slidably connect support long slab(19), the support long slab(19)On be connected with support buffer board(20),
The support buffer board(20)On be rotatably connected to symmetrical rotation buffer board(28), two rotation buffer boards(28)Bottom side
Pass through shock-absorbing spring(21)With support buffer board(20)It is connected, the rotation buffer board(28)With support buffer board(20)Between
It is also associated with the first buffering pneumatic cushion(31), two rotation buffer boards(28)On slidably connect link block(38), two institutes
State link block(38)Between be connected with elastic buffer net(26)With the second buffering pneumatic cushion(25), and the second buffering pneumatic cushion(25)It is located at
Elastic buffer net(26)Upside, two rotation buffer boards(28)Between be connected with third buffering pneumatic cushion(27), the support
Long slab(19)Bottom side both ends have been respectively fixedly connected with the first bolster(11)With the second bolster(37), the operation box(1)It is interior
Wall both sides have been respectively fixedly connected with first baffle(8)And second baffle(6), first bolster(11)With the second bolster
(37)Bottom end respectively with first baffle(8)And second baffle(6)It offsets, first bolster(11)With the second bolster(37)
It is upper to pass through the first sliding sleeve respectively(18)With the second sliding sleeve(5)It is connected with the first kelly(17)With the second kelly(36), the operation
Frame(1)On offer and the first kelly(17)Corresponding mounting groove(16), the operation box(1)Left side is connected with the first winding wheel
(12), first winding wheel(12)On be wound with the first traction rope(13), first traction rope(13)Upper end is fixedly connected
There is the first connecting plate(15), first connecting plate(15)Right side opening is equipped with and the first kelly(17)Corresponding first card slot
(14), the operation box(1)Left upper end passes through rotation axis(22)It is rotatably connected to deflector roll(23), the operation box(1)Upper right side
It is connected with fixed pulley(29), first connecting plate(15)Upper end is connected with protective cloth(24), the protective cloth(24)Upper end around
Cross deflector roll(23)And it is fixedly connected with the second traction rope(30), second traction rope(30)Far from protective cloth(24)One end around
Cross fixed pulley(29)And it is fixedly connected with the second connecting plate(34), second connecting plate(34)On offer and the second kelly
(36)Corresponding second card slot(33), second connecting plate(34)Lower end is fixedly connected with bearing block(35).
2. a kind of external wall of high-rise building construction safety device according to claim 1, it is characterised in that:The branch
Support long slab(19)Both ends are fixedly connected with position limiting slide block(41), the operation box(1)On offer and position limiting slide block(41)It is corresponding
Limit sliding chutes(42), the link block(38)On be rotatably connected to sliding block(39), the rotation buffer board(28)On offer
With sliding block(39)Corresponding sliding slot(40).
3. a kind of external wall of high-rise building construction safety device according to claim 1, it is characterised in that:The branch
Support long slab(19)Interior corner with support buffer board(20)Outer corner between be equipped with U-shaped buffer bar(46), described U-shaped slow
Jumper bar(46)Inside passes through the first buffer spring respectively(47)With the second buffer spring(48)With support buffer board(20)Bottom side and
Right side is connected, the U-shaped buffer bar(46)Outside passes through third buffer spring respectively(43)With the 4th buffer spring(44)With branch
Support long slab(19)Side wall be connected with bottom wall, the support long slab(19)Side wall and bottom wall on to be respectively fixedly connected with first slow
Rush rubber block(49)With the second bump rubber(45), and the first bump rubber(49)With the second bump rubber(45)With U
Type buffer bar(46)Turning offsets.
4. a kind of external wall of high-rise building construction safety device according to claim 1, it is characterised in that:Described
One bolster(11)Including bottom plate(11-2), the bottom plate(11-2)On be fixedly connected with and rigidly fix bar(11-1)It is led with rigidity
Bar(11-3), described to rigidly fix bar(11-1)And rigid guide(11-3)Upper end is fixedly connected with U-shaped rigid rod(11-4), institute
State U-shaped rigid rod(11-4)On be connected with resilient stiff bar(11-5), the bottom plate(11-2)Upper end and support long slab(19)Gu
It is fixed to be connected, first sliding sleeve(18)It is slidably connected at rigid guide(11-3)On, the resilient stiff bar(11-5)Lower end with
First baffle(8)It offsets.
5. a kind of external wall of high-rise building construction safety device according to claim 1, it is characterised in that:The behaviour
Make frame(1)It is opened up on inner wall both sides fluted(32).
6. a kind of external wall of high-rise building construction safety device according to claim 1, it is characterised in that:The behaviour
Make frame(1)Inner wall is connected with the second winding wheel(10), second winding wheel(10)On be intertwined and connected and have protection network(9), described
Protection network(9)Far from the second winding wheel(10)One end be connected with third traction rope(7), the third traction rope(7)Far from anti-
Protecting wire net(9)One end and bearing block(35)It is connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810455360.9A CN108547442B (en) | 2018-05-14 | 2018-05-14 | Safety device is used in construction of high-rise building outer wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810455360.9A CN108547442B (en) | 2018-05-14 | 2018-05-14 | Safety device is used in construction of high-rise building outer wall |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108547442A true CN108547442A (en) | 2018-09-18 |
CN108547442B CN108547442B (en) | 2020-08-28 |
Family
ID=63494612
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810455360.9A Active CN108547442B (en) | 2018-05-14 | 2018-05-14 | Safety device is used in construction of high-rise building outer wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108547442B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110924660A (en) * | 2019-12-09 | 2020-03-27 | 靳春华 | Semi-rigid scaffold device of disk pin type arched portal frame for constructional engineering |
CN112439133A (en) * | 2019-09-03 | 2021-03-05 | 林勇 | Elastic anti-falling net |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106760583A (en) * | 2017-01-19 | 2017-05-31 | 黄河科技学院 | A kind of high-building construction multifunctional safety protection device |
CN206667792U (en) * | 2017-04-11 | 2017-11-24 | 张幸福 | A kind of architectural engineering protective stent |
CN206844699U (en) * | 2017-06-13 | 2018-01-05 | 沈丽娟 | A kind of Construction Safety protector |
CN206917308U (en) * | 2017-07-04 | 2018-01-23 | 詹夏丹 | A kind of novel building building site protection network |
CN207048287U (en) * | 2017-05-01 | 2018-02-27 | 皖西学院 | A kind of cradle for constructional engineering |
CN207131108U (en) * | 2017-07-24 | 2018-03-23 | 周婷 | A kind of fall arrest construction safety equipment |
-
2018
- 2018-05-14 CN CN201810455360.9A patent/CN108547442B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106760583A (en) * | 2017-01-19 | 2017-05-31 | 黄河科技学院 | A kind of high-building construction multifunctional safety protection device |
CN206667792U (en) * | 2017-04-11 | 2017-11-24 | 张幸福 | A kind of architectural engineering protective stent |
CN207048287U (en) * | 2017-05-01 | 2018-02-27 | 皖西学院 | A kind of cradle for constructional engineering |
CN206844699U (en) * | 2017-06-13 | 2018-01-05 | 沈丽娟 | A kind of Construction Safety protector |
CN206917308U (en) * | 2017-07-04 | 2018-01-23 | 詹夏丹 | A kind of novel building building site protection network |
CN207131108U (en) * | 2017-07-24 | 2018-03-23 | 周婷 | A kind of fall arrest construction safety equipment |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112439133A (en) * | 2019-09-03 | 2021-03-05 | 林勇 | Elastic anti-falling net |
CN110924660A (en) * | 2019-12-09 | 2020-03-27 | 靳春华 | Semi-rigid scaffold device of disk pin type arched portal frame for constructional engineering |
Also Published As
Publication number | Publication date |
---|---|
CN108547442B (en) | 2020-08-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108547442A (en) | A kind of external wall of high-rise building construction safety device | |
CN207618839U (en) | A kind of multiple damping emergency staircase | |
CN207404153U (en) | A kind of shock-absorbing type electromechanical equipment transports bearing | |
CN207435796U (en) | A kind of carpet finished surface scrap cleaning equipment | |
CN206426330U (en) | A kind of foam slab machine material-receiving device | |
CN210567188U (en) | Damping device for electronic mechanical equipment of machine room | |
CN206040091U (en) | City planning show stand | |
CN106956889A (en) | A kind of textile machine movable supporting frame | |
CN206375636U (en) | A kind of construction vertical lift device | |
CN216109792U (en) | Construction is with platform of unloading | |
CN115518360A (en) | Prevent wushu flight exercise device of tumble injury | |
CN106515605A (en) | On-board movable computer support | |
CN107237035B (en) | A kind of weaving loom damping device of good damping effect | |
CN209980168U (en) | Computer host case | |
CN210077079U (en) | Sports goods rack | |
CN208307665U (en) | A kind of tea processing crane | |
CN208055509U (en) | One kind being used for reeling machine scrap wire retracting device | |
CN207293447U (en) | A kind of defeated device for coal of ribbon conveyer | |
CN108438533B (en) | A kind of bearing loading attachment | |
CN207582754U (en) | A kind of building curtain wall support construction | |
CN110805250A (en) | Outdoor scaffold with rest platform | |
CN207484925U (en) | A kind of novel frame-type builds finished product stent | |
CN208005079U (en) | A kind of portable concrete wire pole welding support | |
CN208683428U (en) | A kind of integrated manipulator outer impact shell | |
CN209823922U (en) | Self-adaptive dynamic buffer device based on voice gateway |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20200723 Address after: No. 165, haihutun, yongdingmenwai, Fengtai District, Beijing 100068 Applicant after: THE FIRST CONSTRUCTION ENGINEERING COMPANY Ltd. OF CHINA CONSTRUCTION SECOND ENGINEERING BUREAU Address before: 232000 Jingtang Village, Anfeng Town, Shouxian County, Huainan City, Anhui Province Applicant before: Wu Dong |
|
GR01 | Patent grant | ||
GR01 | Patent grant |