CN108547336A - 一种适用于工业厂房独立桩基础的沉降加固顶升调平技术 - Google Patents

一种适用于工业厂房独立桩基础的沉降加固顶升调平技术 Download PDF

Info

Publication number
CN108547336A
CN108547336A CN201810385695.8A CN201810385695A CN108547336A CN 108547336 A CN108547336 A CN 108547336A CN 201810385695 A CN201810385695 A CN 201810385695A CN 108547336 A CN108547336 A CN 108547336A
Authority
CN
China
Prior art keywords
pile foundation
reinforced
slip casting
independence
grouting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810385695.8A
Other languages
English (en)
Other versions
CN108547336B (zh
Inventor
吴继光
崔腾跃
崔学栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Technology Co Ltd Beijing Hengxiang Hongye Foundation Reinforcement
Original Assignee
Technology Co Ltd Beijing Hengxiang Hongye Foundation Reinforcement
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Technology Co Ltd Beijing Hengxiang Hongye Foundation Reinforcement filed Critical Technology Co Ltd Beijing Hengxiang Hongye Foundation Reinforcement
Priority to CN201810385695.8A priority Critical patent/CN108547336B/zh
Publication of CN108547336A publication Critical patent/CN108547336A/zh
Application granted granted Critical
Publication of CN108547336B publication Critical patent/CN108547336B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D35/00Straightening, lifting, or lowering of foundation structures or of constructions erected on foundations
    • E02D35/005Lowering or lifting of foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • E02D3/123Consolidating by placing solidifying or pore-filling substances in the soil and compacting the soil

Abstract

本发明公开了一种适用于工业厂房独立桩基础的沉降加固顶升调平技术,先对桩周软弱土层进行压密注浆加固,加固深度由浅至深,分层向下,注浆压力由小到大,每次注浆段长0.5‑1.0m,注完第一注浆段后,继续钻进0.5‑1.0m,进行第二注浆段的注浆,逐段向下,直至完成压密注浆;桩周软弱土层加固完成12‑24h后,继续向下施钻,通过高压注浆,形成向上的反力,缓慢顶升桩基至设计允许偏差范围内。本发明采用加固顶升法对独立桩基础加固形成包裹状态,整体性好,稳定性高,既提高了整体地基承载力,同时能达到顶升调平的目的;采用钻注一体前进式注浆工艺可避免因钻进过程中土层遇水弱化土层导致二次沉降,浆液初凝时间短和扩散半径可控,胶结能力强,强度高,环保无污染。

Description

一种适用于工业厂房独立桩基础的沉降加固顶升调平技术
技术领域
本发明涉及桩基础加固技术领域,具体是一种适用于既有建筑无承台的独立桩基础沉降加固顶升调平技术。
背景技术
在建筑施工前,对存在较大深度的回填土层或软弱地基进行处理,在不具备天然地基的条件下,大多数建筑需打桩做基础,再施工上部建筑结构。由于地基处理不密实,地基土层具有较大的压缩性,地基承载力不足;或随着地下水的排泄条件的改变,形成地下水侵蚀现象,导致地基承载力降低;或由于桩端与基岩存在软弱夹层;或岩面倾斜度大,桩端入岩深度不够导致侧滑;或桩周土层松,软摩擦系数低等因素导致桩基础发生不均匀沉降。遇到这些情况,则需对桩端软弱土层进行加固处理和顶升调平,以期达到地基承载力要求和设计允许沉降偏差范围内,缩小建筑桩基础之间的高差,保证厂房的结构安全。
发明内容
针对上述问题,本发明提供一种适用于工业厂房独立桩基础的沉降加固顶升调平技术。
一种适用于工业厂房独立桩基础的沉降加固顶升调平技术,先对桩周软弱土层进行压密注浆加固,加固深度由浅至深,分层向下,注浆压力由小到大,每次注浆段长0.5-1.0m,注完第一注浆段后,继续钻进0.5-1.0m,进行第二注浆段的注浆,逐段向下,直至完成压密注浆;桩周软弱土层加固完成12-24h后,继续向下施钻,通过高压注浆,形成向上的反力,缓慢顶升桩基至设计允许偏差范围内。
优选的,注浆孔位对称布置,同时钻进,同时注浆;钻孔孔径42mm。
优选的,浆体采用高铝铁特种复合浆液;施工作业时,浆液初凝时间控制在15s~25s,浆液扩散半径控制在1.5m~2.0m。
本发明的有益效果:1.加固顶升法对独立桩基础加固形成包裹状态,整体性好,稳定性高,既提高了整体地基承载力,同时能达到顶升调平的目的;2.采用钻注一体前进式注浆工艺可避免因钻机过程中土层遇水弱化土层导致二次沉降,浆液初凝时间短和扩散半径可控,胶结能力强,强度高,环保无污染。
附图说明
图1为沉降加固顶升调平结构示意图,其中1-注浆孔,2-桩基础,3-桩周和桩端软弱土层加固,4-桩端高压注浆顶升。
具体实施方式
下面结合附图和具体实施方式对本发明作进一步详细的说明。本发明的实施例是为了示例和描述起见而给出的,而并不是无遗漏的或者将本发明限于所公开的形式。很多修改和变化对于本领域的普通技术人员而言是显而易见的。选择和描述实施例是为了更好说明本发明的原理和实际应用,并且使本领域的普通技术人员能够理解本发明从而设计适于特定用途的带有各种修改的各种实施例。
实施例1
一种适用于工业厂房独立桩基础的沉降加固顶升调平技术,如图1所示,先对桩周软弱土层进行压密注浆加固,加固深度由浅至深,分层向下,注浆压力由小到大,每次注浆段长0.5-1.0m,注完第一注浆段后,继续钻进0.5-1.0m,进行第二注浆段的注浆,逐段向下,直至完成压密注浆,这种钻注一体前进式分层注浆加固顶升方案可避免因钻机过程中土层遇水弱化土层导致二次沉降。对桩周软弱土层进行压密注浆加固,可提高桩周软弱土层的密实度和摩擦系数,分层向下至桩端,对桩端与基岩之间的缝隙和桩端持力层进行加固补强,对桩基形成凹字型复合地基,增加桩端持力层承载力,起到稳固基础不再下沉的目的。
桩周软弱土层加固完成12-24h后,继续向下施钻,通过高压注浆,形成向上的反力,缓慢顶升桩基至设计允许偏差范围内,达到稳固基础和调平的目的。
注浆孔位对称布置,同时钻进,同时注浆,避免在压力注浆时受力不均,导致桩基础偏移;钻孔孔径42mm,小孔径对室内地坪的破坏小,容易恢复,施工作业区域小,不影响正常运营。
浆体采用高铝铁特种复合浆液,该浆液渗透性强,能渗透到小的裂隙或空隙中;浆液初凝时间和浆液扩散半径可控;浆液凝结硬化后强度高,具有一定的抗压、抗剪强度,抗渗性好, 抗冲刷及耐久性好;浆液固化后不收缩,固化后与岩体和混凝土等有很好的粘结力;浆液对注浆设备、管道、混凝土结构物等无腐蚀性, 并容易清洗;浆液无毒、无臭、不污染环境, 对人体无害。
施工作业时,浆液初凝时间控制在15s~25s,浆液扩散半径控制在1.5m~2.0m,浆液胶结能力强,硬化后强度高,不收缩,可避免二次沉降问题;浆液环保无污染。
显然,所描述的实施例仅仅是本发明的一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域及相关领域的普通技术人员在没有作出创造性劳动的前提下所获得的所有其他实施例,都应属于本发明保护的范围。

Claims (5)

1.一种适用于工业厂房独立桩基础的沉降加固顶升调平技术,其特征在于,先对桩周软弱土层进行压密注浆加固,加固深度由浅至深,分层向下,注浆压力由小到大,每次注浆段长0.5-1.0m,注完第一注浆段后,继续钻进0.5-1.0m,进行第二注浆段的注浆,逐段向下,直至完成压密注浆;桩周软弱土层加固完成12-24h后,继续向下施钻,通过高压注浆,形成向上的反力,缓慢顶升桩基至设计允许偏差范围内。
2.根据权利要求1所述的适用于工业厂房独立桩基础的沉降加固顶升调平技术,其特征在于:注浆孔位对称布置,同时钻进,同时注浆。
3.根据权利要求2所述的适用于工业厂房独立桩基础的沉降加固顶升调平技术,其特征在于:钻孔孔径42mm。
4.根据权利要求1-3任意一项所述的适用于工业厂房独立桩基础的沉降加固顶升调平技术,其特征在于:浆体采用高铝铁特种复合浆液。
5.根据权利要求4所述的适用于工业厂房独立桩基础的沉降加固顶升调平技术,其特征在于:施工作业时,浆液初凝时间控制在15s~25s,浆液扩散半径控制在1.5m~2.0m。
CN201810385695.8A 2018-04-26 2018-04-26 一种适用于工业厂房独立桩基础的沉降加固顶升调平方法 Active CN108547336B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810385695.8A CN108547336B (zh) 2018-04-26 2018-04-26 一种适用于工业厂房独立桩基础的沉降加固顶升调平方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810385695.8A CN108547336B (zh) 2018-04-26 2018-04-26 一种适用于工业厂房独立桩基础的沉降加固顶升调平方法

Publications (2)

Publication Number Publication Date
CN108547336A true CN108547336A (zh) 2018-09-18
CN108547336B CN108547336B (zh) 2021-03-23

Family

ID=63512524

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810385695.8A Active CN108547336B (zh) 2018-04-26 2018-04-26 一种适用于工业厂房独立桩基础的沉降加固顶升调平方法

Country Status (1)

Country Link
CN (1) CN108547336B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112343104A (zh) * 2019-08-09 2021-02-09 北京恒祥宏业基础加固技术有限公司 一种高铁大型墩台的加固抬升方法
CN112343105A (zh) * 2019-08-09 2021-02-09 北京恒祥宏业基础加固技术有限公司 一种高铁桥墩加固抬升方法
CN112343078A (zh) * 2019-08-09 2021-02-09 北京恒祥宏业基础加固技术有限公司 一种厂房设备基础精密抬升方法
CN112663695A (zh) * 2019-10-15 2021-04-16 北京恒祥宏业基础加固技术有限公司 一种含砂质地层桩基础构筑物抬升纠偏的施工方法
CN114277776A (zh) * 2022-03-03 2022-04-05 北京恒祥宏业基础加固技术有限公司 一种针对无尘厂房地坪的精准水平抬升加固工艺

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009030338A (ja) * 2007-07-27 2009-02-12 Shusuke Ito 軟弱地盤の地耐力増強工法
CN101967794A (zh) * 2010-09-18 2011-02-09 余闯 一种处理桥头跳车现象的新工艺
CN106522292A (zh) * 2016-09-20 2017-03-22 中科院广州化灌工程有限公司 一种灌浆联合预应力锚杆静压桩纠偏加固方法
CN107435346A (zh) * 2017-08-18 2017-12-05 北京恒祥宏业基础加固技术有限公司 一种适用于高层建筑结构的注浆加固纠偏方法
CN107476360A (zh) * 2017-07-21 2017-12-15 广东洪实建设技术开发工程有限公司 一种基础加固地台围幕灌浆抬升纠偏工法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009030338A (ja) * 2007-07-27 2009-02-12 Shusuke Ito 軟弱地盤の地耐力増強工法
CN101967794A (zh) * 2010-09-18 2011-02-09 余闯 一种处理桥头跳车现象的新工艺
CN106522292A (zh) * 2016-09-20 2017-03-22 中科院广州化灌工程有限公司 一种灌浆联合预应力锚杆静压桩纠偏加固方法
CN107476360A (zh) * 2017-07-21 2017-12-15 广东洪实建设技术开发工程有限公司 一种基础加固地台围幕灌浆抬升纠偏工法
CN107435346A (zh) * 2017-08-18 2017-12-05 北京恒祥宏业基础加固技术有限公司 一种适用于高层建筑结构的注浆加固纠偏方法

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112343104A (zh) * 2019-08-09 2021-02-09 北京恒祥宏业基础加固技术有限公司 一种高铁大型墩台的加固抬升方法
CN112343105A (zh) * 2019-08-09 2021-02-09 北京恒祥宏业基础加固技术有限公司 一种高铁桥墩加固抬升方法
CN112343078A (zh) * 2019-08-09 2021-02-09 北京恒祥宏业基础加固技术有限公司 一种厂房设备基础精密抬升方法
WO2021027696A1 (zh) * 2019-08-09 2021-02-18 北京恒祥宏业基础加固技术有限公司 一种高铁大型墩台的加固抬升方法及加固抬升结构
US11739495B2 (en) 2019-08-09 2023-08-29 Beijing Hengxiang Hongye Foundation Reinforcement Technology Co., Ltd. Reinforcing and lifting method and reinforcing and lifting structure for large-scale piers of high-speed rail
US11746496B2 (en) 2019-08-09 2023-09-05 Beijing Hengxiang Hongye Foundation Reinforcement Technology Co., Ltd. Precise lifting method and lifting and reinforcing structure for plant equipment foundation
CN112663695A (zh) * 2019-10-15 2021-04-16 北京恒祥宏业基础加固技术有限公司 一种含砂质地层桩基础构筑物抬升纠偏的施工方法
CN114277776A (zh) * 2022-03-03 2022-04-05 北京恒祥宏业基础加固技术有限公司 一种针对无尘厂房地坪的精准水平抬升加固工艺

Also Published As

Publication number Publication date
CN108547336B (zh) 2021-03-23

Similar Documents

Publication Publication Date Title
CN108547336A (zh) 一种适用于工业厂房独立桩基础的沉降加固顶升调平技术
CN108343102B (zh) 一种桩基础沉降加固顶升调平结构及其施工方法
CN107503257A (zh) 一种傍山高填路堤稳定与变形控制结构及施工方法
CN105862721B (zh) 一种适用于高层建筑结构加固纠偏具有可调性预埋钢管的注浆复合地基及其施工方法
JP5243669B1 (ja) 構造物傾動及び地盤改良の工法
CN207109475U (zh) 傍山高填路堤稳定与变形控制结构
CN107794915A (zh) 适合岩溶地区桩基施工的溶洞处理方法
CN105714772A (zh) 岩溶地区嵌岩桩成孔复钻砼护壁方法
CN106368219A (zh) 一种深基坑的支护加固结构与施工方法
CN208501761U (zh) 一种适用于工业厂房独立桩基础的沉降加固顶升调平结构
CN103195060A (zh) 软土地基预应力锚杆加固结构及其用途
CN113445516A (zh) 一种钻孔灌注式水泥土桩及其施工方法
CN208501762U (zh) 一种桩基础沉降加固顶升调平结构
CN1313681C (zh) 捆绑式抗滑桩结构及施工方法
CN111005359A (zh) 一种建筑工程施工用防塌孔的地基加固结构及其加固方法
CN207846409U (zh) 一种固结砂层钢筋混凝土管节碎石桩
CN212336070U (zh) 一种岩溶地基变刚度子母桩
CN103790148A (zh) 一种湿陷性黄土地基的联合处理施工方法
CN110258507B (zh) 一种软土地基加固方法
JP2019100083A (ja) 地盤強化工法および注入管装置
KR100475443B1 (ko) 구조물 하부의 지반보강공법
JP5301059B1 (ja) 構造物傾動及び地盤改良の工法
CN113789779A (zh) 一种应用于软土地基和珊瑚砂地基的桩基结构及施工方法
CN104912084B (zh) 建筑密集区深基坑外封式静力压桩施工方法
CN214993745U (zh) 一种适用于人工挖孔桩基础桩周注浆加固组件

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant