CN108543639A - High-voltage line erection construction steelframe antirust paint painting device - Google Patents

High-voltage line erection construction steelframe antirust paint painting device Download PDF

Info

Publication number
CN108543639A
CN108543639A CN201810382842.6A CN201810382842A CN108543639A CN 108543639 A CN108543639 A CN 108543639A CN 201810382842 A CN201810382842 A CN 201810382842A CN 108543639 A CN108543639 A CN 108543639A
Authority
CN
China
Prior art keywords
belt
spraying machine
liquid
paint spraying
belt pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810382842.6A
Other languages
Chinese (zh)
Other versions
CN108543639B (en
Inventor
杨力
严立宏
陈丰林
杨斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENGZHOU CITY GUANGYU INDUSTRY Co.,Ltd.
Shaoxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Shengzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
杨力
严立宏
陈丰林
杨斌
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 杨力, 严立宏, 陈丰林, 杨斌 filed Critical 杨力
Priority to CN201810382842.6A priority Critical patent/CN108543639B/en
Publication of CN108543639A publication Critical patent/CN108543639A/en
Application granted granted Critical
Publication of CN108543639B publication Critical patent/CN108543639B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B9/00Spraying apparatus for discharge of liquids or other fluent material, without essentially mixing with gas or vapour
    • B05B9/007At least a part of the apparatus, e.g. a container, being provided with means, e.g. wheels, for allowing its displacement relative to the ground
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B15/00Details of spraying plant or spraying apparatus not otherwise provided for; Accessories
    • B05B15/20Arrangements for agitating the material to be sprayed, e.g. for stirring, mixing or homogenising
    • B05B15/25Arrangements for agitating the material to be sprayed, e.g. for stirring, mixing or homogenising using moving elements, e.g. rotating blades
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B9/00Spraying apparatus for discharge of liquids or other fluent material, without essentially mixing with gas or vapour
    • B05B9/03Spraying apparatus for discharge of liquids or other fluent material, without essentially mixing with gas or vapour characterised by means for supplying liquid or other fluent material
    • B05B9/04Spraying apparatus for discharge of liquids or other fluent material, without essentially mixing with gas or vapour characterised by means for supplying liquid or other fluent material with pressurised or compressible container; with pump
    • B05B9/047Spraying apparatus for discharge of liquids or other fluent material, without essentially mixing with gas or vapour characterised by means for supplying liquid or other fluent material with pressurised or compressible container; with pump supply being effected by follower in container, e.g. membrane or floating piston, or by deformation of container
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05DPROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05D3/00Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials
    • B05D3/04Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials by exposure to gases
    • B05D3/0406Pretreatment of surfaces to which liquids or other fluent materials are to be applied; After-treatment of applied coatings, e.g. intermediate treating of an applied coating preparatory to subsequent applications of liquids or other fluent materials by exposure to gases the gas being air

Abstract

The invention discloses high-voltage line erection construction steelframe antirust paint painting device, structure paint spraying machine, idler wheel, lacquer-ejecting valve, support column, foot pedal, drive link, front tension bar, outlet tube, inlet tube, back stays;Paint spraying machine is made of tank body, driving mechanism, transmission mechanism, rabbling mechanism, storage liquid frame, liquid delivery tube, check valve, propulsive liquid mechanism, liquid valve, drying mechanism, the present invention drives drive link movement that driving mechanism is driven to work using foot pedal, driving mechanism drives transmission mechanism operating, transmission mechanism is stirred using rabbling mechanism to storing the paint in liquid frame, transmission mechanism will be painted from liquid delivery tube by propulsive liquid mechanism again to be pushed out, and is made paint spraying machine time saving and energy saving and is improved painting efficiency, to accelerate the efficiency of high-voltage line erection.

Description

High-voltage line erection construction steelframe antirust paint painting device
Technical field
The present invention relates to high-voltage line erection construction steelframe antirust paint painting device fields, particularly with regard to high voltage plane Facility work steelframe antirust paint painting device.
Background technology
High-voltage line is commonly referred to as the transmission line of electricity of conveying 10kV or more voltages.According to GB/T2900.50-2008, definition It is provided in 2.1, high pressure is typically free of 1000V.The voltage class of domestic high-voltage transmission lines of China is generally divided into:35kV、 110kV, 220kV, 330kV, 500kV, 750kV etc..
Then channel steel straightening is processed basic steelframe, and brush by the man-hour requirement of high voltage plane facility therewith by drawing Antirust paint, at present usually artificial one portable paint can hold hairbrush on the other hand and antirust paint brushing carried out to high-voltage line steelframe, so Time-consuming and laborious and painting efficiency is low, to reduce the efficiency of high-voltage line erection, thus need to research and develop one kind can it is time saving and energy saving, Painting efficiency can be improved, the high-voltage line erection construction steelframe antirust paint painting device that high-voltage line sets up efficiency can be improved.
Invention content
In view of the deficiencies of the prior art, the present invention is to realize by the following technical solutions:High-voltage line erection construction is used Steelframe antirust paint painting device, structure paint spraying machine, lacquer-ejecting valve, support column, foot pedal, drive link, front tension bar, go out liquid at idler wheel Pipe, inlet tube, back stay;
The paint spraying machine has idler wheel, and the paint spraying machine and idler wheel are gap-matched, in the paint spraying machine bottom end Between position be equipped with lacquer-ejecting valve, the paint spraying machine and lacquer-ejecting valve are threadedly coupled, and the paint spraying machine right end is equipped with front tension bar, The paint spraying machine and front tension bar welding, the paint spraying machine left end are equipped with back stay, and the paint spraying machine and back stay are solid Fixed connection, the paint spraying machine top are equipped with inlet tube, and the paint spraying machine and inlet tube are integrated, the spray Paint machine is equipped with outlet tube, and the paint spraying machine is connected with outlet tube, and the paint spraying machine has support column, the spray Paint machine and support column welding, the support column are equipped with foot pedal, and the support column and foot pedal match, the foot Pedal is equipped with drive link, and the foot pedal and paint spraying machine are sequentially connected by drive link;
The paint spraying machine by tank body, driving mechanism, transmission mechanism, rabbling mechanism, store liquid frame, liquid delivery tube, check valve, push away Liquid mechanism, liquid valve, drying mechanism composition, the tank interior are equipped with driving mechanism, the tank body and driving mechanism phase Connection, the driving mechanism are equipped with drying mechanism, and the driving mechanism and drying mechanism are meshed, the driving machine Transmission mechanism is equipped on the left of structure, the driving mechanism and transmission mechanism flexible connection, the transmission mechanism are equipped with propulsive liquid Mechanism, the transmission mechanism are connected with propulsive liquid mechanism driving, and the tank interior, which is equipped with, stores liquid frame, the tank body and storage Liquid frame is integrated, and the storage liquid frame right end is equipped with liquid delivery tube, the storage liquid frame and liquid delivery tube phase Connection, the storage liquid frame are internally provided with rabbling mechanism, and the transmission mechanism and rabbling mechanism are meshed, and the liquid is defeated It send and is equipped with check valve and liquid valve in pipe, the check valve and liquid valve are gap-matched with liquid delivery tube.
As advanced optimizing for the technical program, the driving mechanism includes pipe sleeve, shaft, axle sleeve, active conical tooth Wheel, the pipe sleeve is interior to be equipped with shaft, and the pipe sleeve is connected with shaft, and the shaft left end is equipped with active conical tooth Wheel, the shaft and drive bevel gear welding, the shaft surface are equipped with axle sleeve, and the shaft and axle sleeve match It closes, the drive bevel gear and transmission mechanism are sequentially connected, and the drive bevel gear and drying mechanism are meshed.
As advanced optimizing for the technical program, the transmission mechanism includes worm screw, the first belt pulley, from mantle tooth Wheel, the first belt, the first Double-skin belt wheel, the second belt, the second Double-skin belt wheel, third belt, the second belt pulley, cam, The worm screw is equipped with the first belt pulley, and the worm screw is connected with the first belt pulley, and the worm screw right end is equipped with Driven wheel of differential, the worm screw and driven wheel of differential welding, first belt pulley right side are equipped with the first double belt Wheel, first belt pulley and the first Double-skin belt wheel are connected by the first belt transmission, the first Double-skin belt wheel Top is equipped with the second Double-skin belt wheel, the first Double-skin belt wheel and the second Double-skin belt wheel and is connected by the second belt It connects, the second Double-skin belt wheel left is equipped with the second belt pulley, and the second Double-skin belt wheel and the second belt pulley are logical It crosses third belt to match, second belt pulley is equipped with cam, and second belt pulley is fixedly connected with cam, institute Cam and propulsive liquid the mechanism slips cooperation stated, the worm screw and rabbling mechanism are meshed.
As advanced optimizing for the technical program, the rabbling mechanism includes first gear, third belt pulley, slides calmly Wheel, the 4th belt, the 4th belt pulley, agitating shaft, the first gear centre position are equipped with third belt pulley, and described the One gear and third belt pulley mechanical connection, the third belt pulley left side are equipped with the 4th belt pulley, the third skin Belt wheel and the 4th belt pulley are connected by the 4th belt transmission, and the 4th belt is equipped with fixed pulley, the 4th skin Band and fixed pulley are slidably matched, and the 4th belt pulley top is equipped with agitating shaft, the 4th belt pulley and agitating shaft It is fixedly connected.
As advanced optimizing for the technical program, the propulsive liquid mechanism include sliding bar, locating shaft, briquetting, pressing plate, Spring, injection rod, the sliding bar left end are equipped with briquetting, and the sliding bar and briquetting match, in the briquetting Between position be equipped with locating shaft, the briquetting and locating shaft be gap-matched, and described briquetting one end is equipped with pressing plate, institute Briquetting and the pressing plate flexible connection stated, the pressing plate are equipped with injection rod, and the pressing plate is fixedly connected with injection rod, described Injection rod be equipped with spring, the injection rod is connected with spring.
As advanced optimizing for the technical program, the drying mechanism include second gear, rotary shaft, drying frame, Flabellum, the rotary shaft are vertically installed on second gear top, and described rotary shaft one end is set to inside drying frame, described Rotary shaft be connected with drying frame, described rotary shaft one end is equipped with flabellum, and the rotary shaft and flabellum use interference Cooperation.
As advanced optimizing for the technical program, the axle sleeve further includes operating lever, and the axle sleeve is equipped with behaviour Make bar, the axle sleeve is fixedly connected with operating lever.
As advanced optimizing for the technical program, the worm screw and first gear are meshed, the cam and cunning Lever is slidably matched.
As advanced optimizing for the technical program, the injection rod is connected with check valve.
Advantageous effect
High-voltage line erection construction of the present invention steelframe antirust paint painting device, is stepped on when user wants using the present invention with foot Pedal strip moves drive link movement so that drive link drives shaft rotation, and shaft and second gear pass through drive bevel gear phase Engagement is dried up using wind energy and is painted so second gear drives flabellum to generate wind energy by rotary shaft, will behaviour when spray painting Make bar to slide to the left, allows drive bevel gear to drive worm screw rotation, worm screw and first gear to be meshed by driven wheel of differential, third Belt pulley drives the 4th belt pulley to rotate using the 4th belt, and the 4th belt pulley is fixedly connected with agitating shaft, allows agitating shaft to storing Liquid in liquid frame is stirred, and liquid is avoided to solidify, and worm screw is equipped with the first belt pulley, and the first belt pulley passes through the first belt The first Double-skin belt wheel is driven to rotate, and the first Double-skin belt wheel drives the second Double-skin belt wheel to operate further through the second belt, Second Double-skin belt wheel drives the second belt pulley to rotate using third belt, and the second belt pulley is connected with cam mechanism, and cam is logical Crossing rotation drives sliding bar to move left and right, and while sliding bar is moved to the left, drives briquetting one end to turn left swing so that briquetting is another One end pushes injection rod to release paint spraying machine from liquid delivery tube by the liquid in liquid frame is stored using pressing plate, by outlet tube to high pressure Line steelframe paints, and improves working efficiency.
For the prior art, the present invention drives drive link movement that driving mechanism is driven to work using foot pedal, drives Motivation structure drives transmission mechanism operating, transmission mechanism to be stirred using rabbling mechanism to storing the paint in liquid frame, transmission mechanism To be painted by propulsive liquid mechanism and pushed out from liquid delivery tube again, make paint spraying machine time saving and energy saving and improve painting efficiency, to Accelerate the efficiency that high-voltage line is set up.
Description of the drawings
Upon reading the detailed description of non-limiting embodiments with reference to the following drawings, other feature of the invention, Objects and advantages will become more apparent upon:
Fig. 1 is the structural schematic diagram of high-voltage line erection construction steelframe antirust paint painting device of the present invention.
Fig. 2 is the sectional view of high-voltage line erection construction steelframe antirust paint painting device of the present invention.
Fig. 3 is the working state structure schematic diagram of high-voltage line erection construction steelframe antirust paint painting device of the present invention.
Fig. 4 is the enlarged drawing of high-voltage line erection construction steelframe antirust paint painting device A of the present invention.
In figure:Paint spraying machine -1, lacquer-ejecting valve -3, support column -4, foot pedal -5, drive link -6, front tension bar -7, goes out idler wheel -2 Liquid pipe -8, back stay -10, tank body -101, driving mechanism -102, transmission mechanism -103, rabbling mechanism -104, stores inlet tube -9 Liquid frame -105, liquid delivery tube -106, check valve -107, propulsive liquid mechanism -108, liquid valve -109, drying mechanism -1010, pipe Set -1021, shaft -1022, axle sleeve -1023, drive bevel gear -1024, operating lever -10231, worm screw -1031, the first belt Wheel -1032, driven wheel of differential -1033, the first belt -1034, the first Double-skin belt wheel -1035, the second belt -1036, second Double-skin belt wheel -1037, third belt -1038, the second belt pulley -1039, cam -10310, first gear -1041, third skin Belt wheel -1042, fixed pulley -1043, the 4th belt -1044, the 4th belt pulley -1045, agitating shaft -1046, sliding bar -1081, Locating shaft -1082, briquetting -1083, pressing plate -1084, spring -1085, injection rod -1086, second gear -10101, rotary shaft - 10102, frame -10103, flabellum -10104 are dried.
Specific implementation mode
To make the technical means, the creative features, the aims and the efficiencies achieved by the present invention be easy to understand, with reference to Specific implementation mode and description of the drawings, the preferred embodiment that the present invention is further explained.
Embodiment
- Fig. 4 is please referred to Fig.1, the present invention provides high-voltage line erection construction steelframe antirust paint painting device, structure spray painting Machine 1, idler wheel 2, lacquer-ejecting valve 3, support column 4, foot pedal 5, drive link 6, front tension bar 7, outlet tube 8, inlet tube 9, back stay 10;
The paint spraying machine 1 has idler wheel 2, and the paint spraying machine 1 and idler wheel 2 are gap-matched, 1 bottom of paint spraying machine Centre position is held to be equipped with lacquer-ejecting valve 3, the paint spraying machine 1 and lacquer-ejecting valve 3 are threadedly coupled, are set on 1 right end of paint spraying machine There are front tension bar 7, the paint spraying machine 1 and front tension bar 7 to weld, 1 left end of paint spraying machine is equipped with back stay 10, the spray Paint machine 1 is fixedly connected with back stay 10, and 1 top of paint spraying machine is equipped with inlet tube 9, the paint spraying machine 1 and inlet tube 9 It is integrated, the paint spraying machine 1 is equipped with outlet tube 8, and the paint spraying machine 1 is connected with outlet tube 8, the spray Paint machine 1 has support column 4, and the paint spraying machine 1 and support column 4 weld, and the support column 4 is equipped with foot pedal 5, described Support column 4 and foot pedal 5 match, the foot pedal 5 is equipped with drive link 6, and the foot pedal 5 and paint spraying machine 1 are logical Cross the drive connection of drive link 6;
The paint spraying machine 1 is by tank body 101, driving mechanism 102, transmission mechanism 103, rabbling mechanism 104, storage liquid frame 105, liquid Delivery pipe 106, check valve 107, propulsive liquid mechanism 108, liquid valve 109, drying mechanism 1010 form, inside the tank body 101 Equipped with driving mechanism 102, the tank body 101 is connected with driving mechanism 102, and the driving mechanism 102 is equipped with drying Mechanism 1010, the driving mechanism 102 and drying mechanism 1010 are meshed, and 102 left side of driving mechanism is equipped with transmission Mechanism 103, the driving mechanism 102 and transmission mechanism 103 are flexibly connected, and the transmission mechanism 103 is equipped with propulsive liquid machine Structure 108, the transmission mechanism 103 and propulsive liquid mechanism 108 are sequentially connected, and the tank body 101, which is internally provided with, stores liquid frame 105, The tank body 101 and storage liquid frame 105 is integrated, and 105 right end of storage liquid frame is equipped with liquid delivery tube 106, The storage liquid frame 105 is connected with liquid delivery tube 106, and the storage liquid frame 105 is internally provided with rabbling mechanism 104, described Transmission mechanism 103 and rabbling mechanism 104 be meshed, check valve 107 and liquid valve are equipped in the liquid delivery tube 106 109, the check valve 107 and liquid valve 109 are gap-matched with liquid delivery tube 106;
The driving mechanism 102 includes pipe sleeve 1021, shaft 1022, axle sleeve 1023, drive bevel gear 1024, the pipe sleeve Shaft 1022 is equipped in 1021, the pipe sleeve 1021 is connected with shaft 1022, and 1022 left end of shaft is equipped with master Dynamic bevel gear 1024, the shaft 1022 and drive bevel gear 1024 are welded, and 1022 surface of shaft is equipped with axle sleeve 1023, the shaft 1022 and axle sleeve 1023 match, and the drive bevel gear 1024 and the transmission of transmission mechanism 103 connect It connects, the drive bevel gear 1024 and drying mechanism 1010 are meshed;
The transmission mechanism 103 include worm screw 1031, the first belt pulley 1032, driven wheel of differential 1033, the first belt 1034, First Double-skin belt wheel 1035, the second belt 1036, the second Double-skin belt wheel 1037, third belt 1038, the second belt pulley 1039, cam 10310, the worm screw 1031 are equipped with the first belt pulley 1032, the worm screw 1031 and the first belt pulley 1032 are connected, and 1031 right end of worm screw is equipped with driven wheel of differential 1033, the worm screw 1031 and driven wheel of differential 1033 welding, 1032 right side of the first belt pulley are equipped with the first Double-skin belt wheel 1035, first belt pulley 1032 and first Double-skin belt wheel 1035 be sequentially connected by the first belt 1034, the first Double-skin belt wheel, 1035 top Equipped with the second Double-skin belt wheel 1037, the first Double-skin belt wheel 1035 and the second Double-skin belt wheel 1037 pass through the second skin Band 1036 is connected, and 1037 left of the second Double-skin belt wheel is equipped with the second belt pulley 1039, second Double-skin Belt wheel 1037 and the second belt pulley 1039 are matched by third belt 1038, and second belt pulley 1039 is equipped with cam 10310, second belt pulley 1039 is fixedly connected with cam 10310, and the cam 10310 and propulsive liquid mechanism 108 are slided Dynamic cooperation, the worm screw 1031 and rabbling mechanism 104 are meshed;
The rabbling mechanism 104 include first gear 1041, third belt pulley 1042, fixed pulley 1043, the 4th belt 1044, 4th belt pulley 1045, agitating shaft 1046,1041 centre position of first gear is equipped with third belt pulley 1042, described First gear 1041 and third belt pulley 1042 be mechanically connected, 1042 left side of the third belt pulley is equipped with the 4th belt Wheel 1045, the third belt pulley 1042 and the 4th belt pulley 1045 are sequentially connected by the 4th belt 1044, and described the Four belts 1044 are equipped with fixed pulley 1043, and the 4th belt 1044 and fixed pulley 1043 are slidably matched, and the described the 4th 1045 top of belt pulley is equipped with agitating shaft 1046, and the 4th belt pulley 1045 is fixedly connected with agitating shaft 1046;
The propulsive liquid mechanism 108 includes sliding bar 1081, locating shaft 1082, briquetting 1083, pressing plate 1084, spring 1085, note Bar 1086 is penetrated, 1081 left end of sliding bar is equipped with briquetting 1083, and the sliding bar 1081 and briquetting 1083 match, 1083 centre position of briquetting is equipped with locating shaft 1082, the briquetting 1083 and locating shaft 1082 and is matched using gap It closes, described 1083 one end of briquetting is equipped with pressing plate 1084, and the briquetting 1083 and pressing plate 1084 are flexibly connected, the pressure Plate 1084 is equipped with injection rod 1086, and the pressing plate 1084 is fixedly connected with injection rod 1086, on the injection rod 1086 Equipped with spring 1085, the injection rod 1086 is connected with spring 1085;
The drying mechanism 1010 includes second gear 10101, rotary shaft 10102, drying frame 10103, flabellum 10104, institute The rotary shaft 10102 stated is vertically installed on 10101 top of second gear, and described 10102 one end of rotary shaft is set to drying frame Inside 10103, the rotary shaft 10102 is connected with drying frame 10103, and described 10102 one end of rotary shaft is equipped with fan Leaf 10104, the rotary shaft 10102 and flabellum 10104 are using interference fit;
The axle sleeve 1023 further includes operating lever 10231, and the axle sleeve 1023 is equipped with operating lever 10231, the axis Set 1023 is fixedly connected with operating lever 10231, and the worm screw 1031 and first gear 1041 are meshed, the cam 10310 and sliding bar 1081 be slidably matched, the injection rod 1086 is connected with check valve 107.
The principle of the present invention:Trampling foot pedal 5 with foot when user wants using the present invention drives drive link 6 to transport It is dynamic so that drive link 6 drives shaft 1022 to rotate, and shaft 1022 is mutually nibbled with second gear 10101 by drive bevel gear 1024 It closes, so second gear 10101 drives flabellum 10104 to generate wind energy by rotary shaft 10102, is dried up and painted using wind energy, Operating lever 10231 is slided to the left when spray painting, drive bevel gear 1024 is allowed to drive worm screw by driven wheel of differential 1033 1031 rotations, worm screw 1031 and first gear 1041 are meshed, and third belt pulley 1042 drives the 4th using the 4th belt 1044 Belt pulley 1045 rotates, and the 4th belt pulley 1045 is fixedly connected with agitating shaft 1046, allows agitating shaft 1046 to storing in liquid frame 105 Liquid is stirred, and liquid is avoided to solidify, and worm screw 1031 is equipped with the first belt pulley 1032, and the first belt pulley 1032 passes through first Belt 1034 drives the rotation of the first Double-skin belt wheel 1035, and the first Double-skin belt wheel 1035 drives further through the second belt 1036 Second Double-skin belt wheel 1037 operates, and the second Double-skin belt wheel 1037 drives the second belt pulley 1039 to revolve using third belt 1038 Turning, the second belt pulley 1039 and cam 10310 are mechanically connected, and cam 10310 drives sliding bar 1081 to move left and right by rotation, While sliding bar 1081 is moved to the left, briquetting 1083 one end is driven to turn left swings so that 1083 other end of briquetting utilizes pressing plate 1084 push injection rod 1086 that will store the liquid in liquid frame 105 releases paint spraying machine 1 from liquid delivery tube 106, right by outlet tube 8 High-voltage line steelframe paints, and improves working efficiency.
Foot pedal 5 of the present invention is that one kind pulls drive link to carry out driving mechanism operation by moving up and down.
Problems solved by the invention be time-consuming and laborious and painting efficiency it is low, to can reduce high-voltage line erection efficiency, this Invention is combined with each other by above-mentioned component, and the present invention drives the movement of drive link 6 to drive driving mechanism 102 using foot pedal 5 Work, driving mechanism 102 drive transmission mechanism 103 to operate, and transmission mechanism 103 is using rabbling mechanism 104 to storing in liquid frame 105 Paint is stirred, and transmission mechanism 103 will be painted by propulsive liquid mechanism 108 again to be pushed out from liquid delivery tube 106, allows spray painting Machine 1 is time saving and energy saving and improves painting efficiency, to accelerate the efficiency of high-voltage line erection.
The basic principles, main features and advantages of the present invention have been shown and described above, the technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this The principle of invention can not only be realized in other specific forms under the premise of not departing from spirit of that invention or essential characteristic The present invention will also have various changes and improvements, these changes and improvements both fall within scope of the claimed invention, therefore this hair Bright claimed range is defined by appended claims and its equivalent, rather than above description limits.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiment being appreciated that.

Claims (8)

1. high-voltage line erection construction steelframe antirust paint painting device, structure paint spraying machine(1), idler wheel(2), lacquer-ejecting valve(3), branch Dagger(4), foot pedal(5), drive link(6), front tension bar(7), outlet tube(8), inlet tube(9), back stay(10), feature exists In:
The paint spraying machine(1)Have idler wheel(2), the paint spraying machine(1)And idler wheel(2)It is gap-matched, it is described Paint spraying machine(1)Bottom end centre position is equipped with lacquer-ejecting valve(3), the paint spraying machine(1)And lacquer-ejecting valve(3)It is threadedly coupled, it is described Paint spraying machine(1)Right end is equipped with front tension bar(7), the paint spraying machine(1)And front tension bar(7)Welding, the paint spraying machine(1) Left end is equipped with back stay(10), the paint spraying machine(1)And back stay(10)It is fixedly connected, the paint spraying machine(1)Top It is equipped with inlet tube(9), the paint spraying machine(1)And inlet tube(9)It is integrated, the paint spraying machine(1)It is equipped with Outlet tube(8), the paint spraying machine(1)And outlet tube(8)It is connected, the paint spraying machine(1)Have support column(4), institute The paint spraying machine stated(1)And support column(4)Welding, the support column(4)It is equipped with foot pedal(5), the support column(4)With Foot pedal(5)It matches, the foot pedal(5)It is equipped with drive link(6), the foot pedal(5)And paint spraying machine(1)Pass through Drive link(6)It is sequentially connected;
The paint spraying machine(1)By tank body(101), driving mechanism(102), transmission mechanism(103), rabbling mechanism(104), store liquid Frame(105), liquid delivery tube(106), check valve(107), propulsive liquid mechanism(108), liquid valve(109), drying mechanism(1010) Composition, the tank body(101)It is internally provided with driving mechanism(102), the tank body(101)And driving mechanism(102)It is connected It connects, the driving mechanism(102)It is equipped with drying mechanism(1010), the driving mechanism(102)And drying mechanism (1010)It is meshed, the driving mechanism(102)Left side is equipped with transmission mechanism(103), the driving mechanism(102)And biography Motivation structure(103)Flexible connection, the transmission mechanism(103)It is equipped with propulsive liquid mechanism(108), the transmission mechanism (103)With propulsive liquid mechanism(108)It is sequentially connected, the tank body(101)It is internally provided with and stores liquid frame(105), the tank body (101)With storage liquid frame(105)It is integrated, the storage liquid frame(105)Right end is equipped with liquid delivery tube(106), institute The storage liquid frame stated(105)And liquid delivery tube(106)It is connected, the storage liquid frame(105)It is internally provided with rabbling mechanism (104), the transmission mechanism(103)And rabbling mechanism(104)It is meshed, the liquid delivery tube(106)It is interior to be equipped with list To valve(107)And liquid valve(109), the check valve(107)And liquid valve(109)And liquid delivery tube(106)Using Clearance fit.
2. high-voltage line erection construction according to claim 1 steelframe antirust paint painting device, it is characterised in that:Described Driving mechanism(102)Including pipe sleeve(1021), shaft(1022), axle sleeve(1023), drive bevel gear(1024), the pipe sleeve (1021)It is interior to be equipped with shaft(1022), the pipe sleeve(1021)And shaft(1022)It is connected, the shaft(1022)It is left End is equipped with drive bevel gear(1024), the shaft(1022)And drive bevel gear(1024)Welding, the shaft (1022)Surface is equipped with axle sleeve(1023), the shaft(1022)And axle sleeve(1023)It matches, the active conical tooth Wheel(1024)And transmission mechanism(103)It is sequentially connected, the drive bevel gear(1024)And drying mechanism(1010)It is meshed.
3. high-voltage line erection construction according to claim 1 or 2 steelframe antirust paint painting device, it is characterised in that:Institute The transmission mechanism stated(103)Including worm screw(1031), the first belt pulley(1032), driven wheel of differential(1033), the first belt (1034), the first Double-skin belt wheel(1035), the second belt(1036), the second Double-skin belt wheel(1037), third belt (1038), the second belt pulley(1039), cam(10310), the worm screw(1031)It is equipped with the first belt pulley(1032), institute The worm screw stated(1031)With the first belt pulley(1032)It is connected, the worm screw(1031)Right end is equipped with driven wheel of differential (1033), the worm screw(1031)And driven wheel of differential(1033)Welding, first belt pulley(1032)It is set on right side There is the first Double-skin belt wheel(1035), first belt pulley(1032)With the first Double-skin belt wheel(1035)Pass through the first skin Band(1034)It is sequentially connected, the first Double-skin belt wheel(1035)Top is equipped with the second Double-skin belt wheel(1037), described The first Double-skin belt wheel(1035)With the second Double-skin belt wheel(1037)Pass through the second belt(1036)It is connected, described Two Double-skin belt wheels(1037)Left is equipped with the second belt pulley(1039), the second Double-skin belt wheel(1037)With the second skin Belt wheel(1039)Pass through third belt(1038)It matches, second belt pulley(1039)It is equipped with cam(10310), institute The second belt pulley stated(1039)And cam(10310)It is fixedly connected, the cam(10310)With propulsive liquid mechanism(108)It is sliding Dynamic cooperation, the worm screw(1031)And rabbling mechanism(104)It is meshed.
4. high-voltage line erection construction according to claim 1 or 3 steelframe antirust paint painting device, it is characterised in that:Institute The rabbling mechanism stated(104)Including first gear(1041), third belt pulley(1042), fixed pulley(1043), the 4th belt (1044), the 4th belt pulley(1045), agitating shaft(1046), the first gear(1041)Centre position is equipped with third skin Belt wheel(1042), the first gear(1041)With third belt pulley(1042)Mechanical connection, the third belt pulley (1042)Left side is equipped with the 4th belt pulley(1045), the third belt pulley(1042)With the 4th belt pulley(1045)Pass through 4th belt(1044)It is sequentially connected, the 4th belt(1044)It is equipped with fixed pulley(1043), the 4th belt (1044)And fixed pulley(1043)It is slidably matched, the 4th belt pulley(1045)Top is equipped with agitating shaft(1046), institute The 4th belt pulley stated(1045)And agitating shaft(1046)It is fixedly connected.
5. high-voltage line erection construction according to claim 1 or 3 steelframe antirust paint painting device, it is characterised in that:Institute The propulsive liquid mechanism stated(108)Including sliding bar(1081), locating shaft(1082), briquetting(1083), pressing plate(1084), spring (1085), injection rod(1086), the sliding bar(1081)Left end is equipped with briquetting(1083), the sliding bar(1081) And briquetting(1083)It matches, the briquetting(1083)Centre position is equipped with locating shaft(1082), the briquetting (1083)And locating shaft(1082)It is gap-matched, the briquetting(1083)One end is equipped with pressing plate(1084), described Briquetting(1083)And pressing plate(1084)Flexible connection, the pressing plate(1084)It is equipped with injection rod(1086), the pressing plate (1084)And injection rod(1086)It is fixedly connected, the injection rod(1086)It is equipped with spring(1085), the injection rod (1086)And spring(1085)It is connected.
6. high-voltage line erection construction according to claim 1 or 2 steelframe antirust paint painting device, it is characterised in that:Institute The drying mechanism stated(1010)Including second gear(10101), rotary shaft(10102), drying frame(10103), flabellum (10104), the rotary shaft(10102)It is vertically installed at second gear(10101)On top, the rotary shaft (10102)One end is set to drying frame(10103)Inside, the rotary shaft(10102)With drying frame(10103)It is connected, institute The rotary shaft stated(10102)One end is equipped with flabellum(10104), the rotary shaft(10102)And flabellum(10104)Using It is full of cooperation.
7. high-voltage line erection construction according to claim 2 steelframe antirust paint painting device, it is characterised in that:Described Axle sleeve(1023)It further include operating lever(10231), the axle sleeve(1023)It is equipped with operating lever(10231), the axle sleeve (1023)And operating lever(10231)It is fixedly connected.
8. high-voltage line erection construction according to claim 3 steelframe antirust paint painting device, it is characterised in that:Described Worm screw(1031)And first gear(1041)It is meshed, the cam(10310)And sliding bar(1081)It is slidably matched.
CN201810382842.6A 2018-04-26 2018-04-26 Steel frame antirust paint brushing device for high-voltage line erection construction Active CN108543639B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810382842.6A CN108543639B (en) 2018-04-26 2018-04-26 Steel frame antirust paint brushing device for high-voltage line erection construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810382842.6A CN108543639B (en) 2018-04-26 2018-04-26 Steel frame antirust paint brushing device for high-voltage line erection construction

Publications (2)

Publication Number Publication Date
CN108543639A true CN108543639A (en) 2018-09-18
CN108543639B CN108543639B (en) 2020-12-11

Family

ID=63512691

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810382842.6A Active CN108543639B (en) 2018-04-26 2018-04-26 Steel frame antirust paint brushing device for high-voltage line erection construction

Country Status (1)

Country Link
CN (1) CN108543639B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206483509U (en) * 2016-12-22 2017-09-12 武汉东湖学院 A kind of water-coal-slurry prepares the broken and stirring integratedization equipment to be formed
CN107377256A (en) * 2017-08-30 2017-11-24 朱正直 A kind of uniform spraying device of mobile model processing cutting fluid
CN107442346A (en) * 2017-09-04 2017-12-08 甘世昌 A kind of high-voltage line erection construction steelframe antirust paint painting device
CN206881974U (en) * 2017-07-05 2018-01-16 肖亚男 A kind of construction site thimerosal high efficient sprinkling device
CN107734443A (en) * 2017-11-20 2018-02-23 湖州宏跃电子器件厂 A kind of stereo set surface lacquer air-dry apparatus

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206483509U (en) * 2016-12-22 2017-09-12 武汉东湖学院 A kind of water-coal-slurry prepares the broken and stirring integratedization equipment to be formed
CN206881974U (en) * 2017-07-05 2018-01-16 肖亚男 A kind of construction site thimerosal high efficient sprinkling device
CN107377256A (en) * 2017-08-30 2017-11-24 朱正直 A kind of uniform spraying device of mobile model processing cutting fluid
CN107442346A (en) * 2017-09-04 2017-12-08 甘世昌 A kind of high-voltage line erection construction steelframe antirust paint painting device
CN107734443A (en) * 2017-11-20 2018-02-23 湖州宏跃电子器件厂 A kind of stereo set surface lacquer air-dry apparatus

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈秀宁,顾大强: "《机械设计 第2版》", 31 July 2017, 杭州:浙江大学出版社 *

Also Published As

Publication number Publication date
CN108543639B (en) 2020-12-11

Similar Documents

Publication Publication Date Title
CN206474355U (en) A kind of fancy goods spray-painting plant
CN107442346B (en) A kind of high-voltage line erection construction steelframe antirust paint painting device
CN208009848U (en) A kind of indoor wall painting device
CN207171754U (en) A kind of Portable steel pipe derusting device
CN108355868A (en) A kind of water pipeline outer wall mopping device
CN206238170U (en) Small agricultural chemical sprayer
CN108080195A (en) A kind of novel steel tube surfaces externally and internally spray-painting plant
CN108636676A (en) A kind of metal circular tube antirust waxy film rust-proof oil spraying equipment
CN208789976U (en) A kind of packaging facilities that rotation can be clamped to packing case
CN108543639A (en) High-voltage line erection construction steelframe antirust paint painting device
CN207321886U (en) A kind of efficient fertilizer apparatus of agricultural production
CN206538056U (en) A kind of arrangement type cable hank
CN107496571A (en) Efficient swing shiny-leaved yellowhorn green-keeping machine
CN108371064A (en) A kind of energy saving water jet of agricultural high-effiency
CN205985042U (en) Solar cell panel's frame adds mucilage binding and puts
CN204591186U (en) A kind of injection head gooseneck controlled by hydraulic jack
CN207014985U (en) A kind of tobacco business paper ink-jet VOC absorption plants
CN207840711U (en) Clamping device and its electric beveling machine for pipes for electric beveling machine for pipes
CN206599972U (en) A kind of ground trowelling machine
CN209124261U (en) A kind of glue spreader
CN208032960U (en) A kind of steel pipe coating roller of use for laboratory
CN106888586A (en) A kind of collapsible environmentally friendly mini-tiller of wheel
CN209283927U (en) A kind of energy energy conservation and environmental protection irrigation rig
CN208054641U (en) A kind of electric power cable first-aid repair construction take-up
CN207437710U (en) Reel sprinkling irrigation machine slides shift transmission

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Qian Zhijun

Inventor after: Feng Lian

Inventor after: Wang Tao

Inventor after: Yang Li

Inventor after: Yan Lihong

Inventor after: Chen Fenglin

Inventor after: Yang Bin

Inventor before: Yang Li

Inventor before: Yan Lihong

Inventor before: Chen Fenglin

Inventor before: Yang Bin

GR01 Patent grant
GR01 Patent grant
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20201127

Address after: Zhejiang province Shaoxing City Ring Road 312400 Shengzhou Yan Lake Street No. 18

Applicant after: STATE GRID ZHEJIANG SHENGZHOU POWER SUPPLY Co.,Ltd.

Applicant after: STATE GRID ZHEJIANG ELECTRIC POWER CO., LTD. SHAOXING POWER SUPPLY Co.

Applicant after: SHENGZHOU CITY GUANGYU INDUSTRY Co.,Ltd.

Address before: 300450 Binhai New Area, Tianjin, No. 3102, 2 Gates, 10 Building, Binshang Garden, Jingshan South Road

Applicant before: Yang Li

Applicant before: Yan Lihong

Applicant before: Chen Fenglin