CN108541022A - A kind of method and device for realizing Network Load Balance - Google Patents
A kind of method and device for realizing Network Load Balance Download PDFInfo
- Publication number
- CN108541022A CN108541022A CN201710119974.5A CN201710119974A CN108541022A CN 108541022 A CN108541022 A CN 108541022A CN 201710119974 A CN201710119974 A CN 201710119974A CN 108541022 A CN108541022 A CN 108541022A
- Authority
- CN
- China
- Prior art keywords
- cell
- load
- origin
- mlb
- functions
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W28/00—Network traffic management; Network resource management
- H04W28/02—Traffic management, e.g. flow control or congestion control
- H04W28/08—Load balancing or load distribution
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
The present invention provides a kind of method and device for realizing Network Load Balance, is related to field of communication technology, to improve the utilization rate of radio resource.The method of realization Network Load Balance of the present invention includes:Obtain the load of cell-of-origin;The load of the cell-of-origin and pre-determined threshold are compared, a judging result is obtained;If the judging result indicates that the load of the cell-of-origin is more than the pre-determined threshold, the network coverage mode of the cell-of-origin is obtained;If the network coverage mode indicates that the cell-of-origin is monolayer net overlay area, the load of the cell-of-origin is adjusted using same frequency mobility load balancing MLB functions;If the network coverage mode indicates that the cell-of-origin is Multilayer Network overlay area, using load balancing LB functions and mobility load balancing MLB functions, the load of cell-of-origin described in corrdinated adjustment.Present invention is mainly used in wireless technology.
Description
Technical field
The present invention relates to field of communication technology more particularly to a kind of method and devices for realizing Network Load Balance.
Background technology
In LTE (Long term evolution, long term evolution) network, user occupancy radio resource carries out signaling sum number
According to transmission.Radio resource is limited, becomes increasingly active with wireless traffic as LTE numbers of users increasingly increase, the load of network gradually adds
Weight.In the region that user concentrates, it may appear that the phenomenon that load imbalance:Serving cell load is excessively high, intra-cell users experience
It is not being met, and cell capacity and QoS (Quality of service, service quality) can be affected;And adjacent area
Load is relatively low or normal, and the user that can provide vacant resource to serving cell uses.Therefore, load balancing need to be used in time
Means, solving the problems, such as that load is excessively high leads to performance impairment, balances the load between cell, realizes wireless resource utility efficiency most
Bigization.
Currently, there are mainly three types of the means of load balancing for LTE network:(Carrier Aggregation, carrier wave are poly- by CA
Close), LB (load balance, load balancing) and MLB (Mobility Load Balancing, mobility load balancing).
Wherein, CA refers to:The terminal of carrier wave polymerization is supported to be carried out at the same time data transmit-receive on multiple member carriers.It can be not
With flexible dispatching is carried out on member carrier, load-balancing efficiency is promoted, improves utilization rate of air interface resource;LB refers to:From high load capacity
Serving cell in, select suitable user to migrate to underload adjacent area, realize intercell load balance;MLB refers to:Adjustment ginseng
Number so that user migrates from the serving cell of high load capacity to underload adjacent area, realizes intercell load balance.
The main application scenarios of these three technological means are different:CA is overlapping covered applied to multiband, and needs
Terminal is wanted to have the ability for supporting carrier wave polymerization;LB and MLB is to be resident situation by changing user, is balanced the load, the two
Technology is transparent for terminal.
For CA, LB and MLB, existing abundant technical research and application scheme.But existing net scene networking situation complexity,
Possibly maximum gain can not be obtained using single load balancing means.Therefore, under existing net scene, each technological means of synergistic application
The load for balancing carrier wave/minizone, reaches the maximized target of wireless resource utility efficiency.But still lack a kind of more means associations at present
With the implementation to come into force.
Invention content
In view of this, the present invention provides a kind of method and device for realizing Network Load Balance, to improve radio resource
Utilization rate.
In order to solve the above technical problems, the present invention provides a kind of method for realizing Network Load Balance, including:
Obtain the load of cell-of-origin;
The load of the cell-of-origin and pre-determined threshold are compared, a judging result is obtained;
If the judging result indicates that the load of the cell-of-origin is more than the pre-determined threshold, the cell-of-origin is obtained
Network coverage mode;
If the network coverage mode indicates that the cell-of-origin is monolayer net overlay area, same frequency mobility is utilized to load
Balanced MLB functions adjust the load of the cell-of-origin;
If the network coverage mode indicates that the cell-of-origin is Multilayer Network overlay area, load balancing LB functions are utilized
With mobility load balancing MLB functions, the load of cell-of-origin described in corrdinated adjustment.
Wherein, if the network coverage mode indicates that the cell-of-origin is Multilayer Network overlay area, load is utilized
The step of balanced LB functions and mobility load balancing MLB functions, the load of cell-of-origin described in corrdinated adjustment, including:
The load of the cell-of-origin is adjusted using load balancing LB functions;
The load of the cell-of-origin is obtained according to scheduled first time interval;
Since first sampling time, if the first sampling time obtain the cell-of-origin load be more than it is described pre-
Gating limits, then the time for being more than the pre-determined threshold to the load of the cell-of-origin carries out timing, obtains at the first time;
If the first time is more than the decline journey of the first preset value and the cell-of-origin load described in the continuous N sampling time
Degree all cannot be satisfied preset requirement, then alien frequencies mobility load balancing MLB functions is utilized to adjust the load of the cell-of-origin;
Wherein, M is natural number.
Wherein, described the step of adjusting the load of the cell-of-origin using alien frequencies mobility load balancing MLB functions it
Afterwards, the method further includes:
The load of the cell-of-origin is obtained according to scheduled second time interval;
Since first sampling time, if the second sampling time obtain the cell-of-origin load be more than it is described pre-
Gating limits, then the time for being more than the pre-determined threshold to the load of the cell-of-origin carries out timing, obtains for the second time;
If second time is more than the second preset value and can not choose suitable adjacent area, if second time
More than the second preset value and the decline degree of cell-of-origin load described in continuous N number of sampling time all cannot be satisfied preset requirement,
The load of the cell-of-origin is then adjusted using same frequency mobility load balancing MLB functions;
Wherein, N is natural number.
Wherein, the method further includes:
If the load in the cell-of-origin that second sampling time obtains is less than or equal to the pre-determined threshold, when full
When sufficient parameters back condition, the cell individual character of rollback alien frequencies MLB deviates CIO.
Wherein, it is described using adjust the load of the cell-of-origin with frequency mobility load balancing MLB functions the step of it
Afterwards, the method further includes:
When meeting parameters back condition, parameters back is carried out.
Wherein, the progress parameters back includes:
First retract same frequency MLB cell individual character offset CIO, then the alien frequencies MLB that retracts cell individual character deviate CIO.
Wherein, if the network coverage mode indicates that the cell-of-origin is monolayer net overlay area, described using with frequency
After the step of mobility load balancing MLB functions adjust the load of the cell-of-origin, the method further includes:
When meeting parameters back condition, retract with the cell individual character offset CIO of frequency MLB.
Second aspect, the present invention provide a kind of device for realizing Network Load Balance, including:
First acquisition module, the load for obtaining cell-of-origin;
Comparison module obtains a judging result for the load of the cell-of-origin and pre-determined threshold to be compared;
Second acquisition module, if indicating that the load of the cell-of-origin is more than the pre-determined threshold for the judging result,
Then obtain the network coverage mode of the cell-of-origin;
The first adjustment module, if indicating that the cell-of-origin is monolayer net overlay area for the network coverage mode,
The load of the cell-of-origin is adjusted using same frequency mobility load balancing MLB functions;
Second adjustment module, if indicating that the cell-of-origin is Multilayer Network overlay area for the network coverage mode,
Using load balancing LB functions and mobility load balancing MLB functions, the load of cell-of-origin described in corrdinated adjustment.
Wherein, first acquisition module is additionally operable to obtain the negative of the cell-of-origin according to scheduled first time interval
Lotus;The second adjustment module includes:
The first adjustment submodule, the load for adjusting the cell-of-origin using load balancing LB functions;
First timing submodule, for since first sampling time, if in the source that the first sampling time obtained
The load of cell is more than the pre-determined threshold, then the time for being more than the pre-determined threshold to the load of the cell-of-origin counts
When, it obtains at the first time;
Second adjustment submodule, if being more than the first preset value and in continuous N sampling time institute for the first time
The decline degree for stating cell-of-origin load all cannot be satisfied preset requirement, then utilizes alien frequencies mobility load balancing MLB functions to adjust
The load of the cell-of-origin;
Wherein, M is natural number.
Wherein, first acquisition module is additionally operable to obtain the negative of the cell-of-origin according to scheduled second time interval
Lotus;The second adjustment module further includes:
Second timing submodule, for since first sampling time, if in the source that the second sampling time obtained
The load of cell is more than the pre-determined threshold, then the time for being more than the pre-determined threshold to the load of the cell-of-origin counts
When, obtained for the second time;
Third adjusts submodule, if being more than the second preset value for second time and can not choose suitable neighbour
Area, if second time is more than the decline journey of the second preset value and the cell-of-origin load described in continuous N number of sampling time
Degree all cannot be satisfied preset requirement, then the load of the cell-of-origin is adjusted using same frequency mobility load balancing MLB functions;
Wherein, N is natural number.
Wherein, described device further includes:
First parameters back module, if the load in the cell-of-origin that the second sampling time obtained is less than or equal to
The pre-determined threshold, when meeting parameters back condition, the cell individual character of rollback alien frequencies MLB deviates CIO.
Wherein, described device further includes:
Second parameters back module, for when meeting parameters back condition, carrying out parameters back.
Wherein, the second parameters back module is specifically used for, and the cell individual character for the same frequency MLB that first retracts deviates CIO, then returns
Move back the cell individual character offset CIO of alien frequencies MLB.
Wherein, described device further includes:
Third parameters back module, the cell individual character for when meeting parameters back condition, retracting with frequency MLB deviate
CIO。
The above-mentioned technical proposal of the present invention has the beneficial effect that:
It in embodiments of the present invention, can be according to the network mode of cell-of-origin when the load of cell-of-origin is more than pre-determined threshold
The load that cell-of-origin is adjusted using MLB functions or using LB and MLB orthofunctions, to coordinate to utilize a variety of adjustment mode tune
The load of whole cell-of-origin more effectively balances the load between cell, to improve the utilization rate of radio resource.
Description of the drawings
Fig. 1 is the flow chart of the method for the realization Network Load Balance of the embodiment of the present invention one;
Fig. 2 is the flow chart of the method for the realization Network Load Balance of the embodiment of the present invention two;
Fig. 3 is the detailed process schematic diagram of step 205 in the embodiment of the present invention two;
Fig. 4 is the schematic diagram of the device of the realization Network Load Balance of the embodiment of the present invention three;
Fig. 5 is the structure chart of the device of the realization Network Load Balance of the embodiment of the present invention three.
Specific implementation mode
Below in conjunction with drawings and examples, the specific implementation mode of the present invention is described in further detail.Following reality
Example is applied for illustrating the present invention, but is not limited to the scope of the present invention.
The scene of wireless network is largely divided into 3 classes:The same covering scene of homogeneous frequency adjacent covering scene, alien frequencies, F-D layerings/macro
Micro- networking scene.When serving cell load is excessively high, it is as follows to analyze this 3 class high load scenarios:
One, homogeneous frequency adjacent covering scene
Under the scene if using LB, since switching user is located in the switching band of two neighboring communities, service is small
After user in area is switched to adjacent area, pingpang handoff is easy tod produce.It also contemplates for existing using anti-table tennis strategy alleviation pingpang handoff
As, but the strategy can influence the mobility of user.Therefore, in such a scenario, LB application effects are bad;Under the scene if
Using MLB, by adjusting handoff parameter, switching band is moved to high load capacity cell, user is promoted to be switched to underload cell, and
And since handoff parameter is to adjust in pairs, it also can effectively prevent switchback and ensure that the mobility of user;Scene master
If single layer network covers, CA can not be also applied.
Two, the same covering scene of alien frequencies
If being switched to neighboring community using LB selection users, because neighbor cell signal is strong, therefore can effectively prevent back
It cuts.LB significant effects, it can be achieved that minizone load balance.If using MLB, by adjusting handoff parameter, it can be achieved that cell
Between load balance.But since MLB can not achieve the accurate selection to user, effect is not so good as LB;Multiband, can with covering
Start CA functions, realizes the load balance of two carrier waves.
Three, F-D layerings/macro and micro networks scene
When D frequency range loads are excessively high, F-band cell load is low:If being switched to F using LB selection D frequency range intra-cell users
Frequency range cell, and since for F and D with covering, F-band cell signal is strong, can effectively prevent switchback at this time.LB significant effects, can be real
The load balance of existing minizone.If using MLB, by adjusting handoff parameter, part edge user is made to be switched to adjacent area, it can be real
The load balance of existing minizone.But since MLB can not achieve the accurate selection to user, effect is not so good as LB;Multiband covers
Lid can start CA, realize load balance.
When F-band cell load is excessively high, D frequency range cell loads are low:When considering using LB, it is necessary to reduce the switching door of LB
Limit, since F-band signal strength is due to D frequency range cells, is used though can select user at this time moves to underload D frequency range cells
Switchback of rattling easily occurs for family;If taking anti-table tennis strategy, and the mobility of user can be influenced.Therefore, under this scene, LB applications
It is ineffective.If using MLB, by adjusting handoff parameter, switching band D frequency range cells is moved, user is promoted to switch, and
It can effectively prevent switchback, significant effects of the MLB for balancing the load.Under this scene, since user focuses mostly in D frequency range cells
Edge, therefore, it is difficult to trigger the CA of D+F frequency ranges.
In conclusion three kinds of technologies respectively there are application scenarios, solve the problems, such as that serving cell load is excessively high under special scenes.It is right
For existing net, the high load capacity under all scenes cannot be solved the problems, such as by monotechnics and load is unbalanced.Therefore, this programme
A kind of application scheme that MLB and LB collaborations come into force is proposed, realizes the load balancing under all wireless network scenarios.
Embodiment one
As shown in Figure 1, the method for the realization Network Load Balance of the embodiment of the present invention one, including:
Step 101, the load for obtaining cell-of-origin.
It in embodiments of the present invention, can be according to the load of the acquisition cell-of-origin of certain cycle.
The load of the cell-of-origin and pre-determined threshold are compared by step 102, obtain a judging result.
Wherein, which can be arbitrarily arranged.
If step 103, the judging result indicate the cell-of-origin load be more than the pre-determined threshold, obtain described in
The network coverage mode of cell-of-origin.
In embodiments of the present invention, the network coverage mode of cell-of-origin includes Multilayer Network covering and monolayer net covering.Wherein
The network coverage mode can be obtained by modes such as user's measurements.
If step 104, the network coverage mode indicate that the cell-of-origin is monolayer net overlay area, using with frequency
MLB functions adjust the load of the cell-of-origin.
Specifically, here, selecting the neighboring community of suitable (such as signal quality is good, load is low) for cell-of-origin, adjustment is small
Handoff parameter between area pair carries out load migration.
If step 105, the network coverage mode indicate that the cell-of-origin is Multilayer Network overlay area, LB functions are utilized
With MLB functions, the load of cell-of-origin described in corrdinated adjustment.
It as seen from the above, in embodiments of the present invention, can be small according to source when the load of cell-of-origin is more than pre-determined threshold
The network mode in area is using MLB functions or using the load of LB and MLB orthofunctions adjustment cell-of-origin, to coordinate using more
The load of kind adjustment mode adjustment cell-of-origin, more effectively balances the load between cell, to improve the profit of radio resource
With rate.
Embodiment two
As shown in Fig. 2, the method for the realization Network Load Balance of the embodiment of the present invention two, including:
Step 201, the load for obtaining cell-of-origin.
It in embodiments of the present invention, can be according to the load of the acquisition cell-of-origin of certain cycle.
The load of the cell-of-origin and pre-determined threshold are compared by step 202, obtain a judging result.
Wherein, which can be arbitrarily arranged.
If step 203, the judging result indicate the cell-of-origin load be more than the pre-determined threshold, obtain described in
The network coverage mode of cell-of-origin.
In embodiments of the present invention, the network coverage mode of cell-of-origin includes Multilayer Network covering and monolayer net covering.Wherein
The network coverage mode can be obtained by modes such as user's measurements.
If step 204, the network coverage mode indicate that the cell-of-origin is monolayer net overlay area, using with frequency
MLB functions adjust the load of the cell-of-origin.
Specifically, here, selecting the neighboring community of suitable (such as signal quality is good, load is low) for cell-of-origin, adjustment is small
Handoff parameter between area pair carries out load migration.
After using the load for adjusting cell-of-origin with frequency MLB, the load of cell-of-origin can be obtained at predetermined intervals.
If the load in the cell-of-origin that some sampling time obtains is less than or equal to pre-determined threshold, return to step 201.If adopted at this
In certain time after the sample time, the load of the cell-of-origin of acquisition can then be recognized both less than or equal to the pre-determined threshold
To meet parameters back condition, then retract with the CIO (Cell individual offset, the offset of cell individual character) of frequency MLB.If
Load in the cell-of-origin that the sampling time obtains is more than pre-determined threshold and the state continue for the regular hour, then needs to enable and gather around
Plug mechanism adjusts the load of cell-of-origin.
If step 205, the network coverage mode indicate that the cell-of-origin is Multilayer Network overlay area, LB functions are utilized
With MLB functions, the load of cell-of-origin described in corrdinated adjustment.
Specifically, in this step, as shown in figure 3, comprising the following processes:
Step 301, the load that the cell-of-origin is adjusted using LB functions.
In this step, suitable user is selected to migrate to underload adjacent area from the user of cell-of-origin.
Step 302, the load that the cell-of-origin is obtained according to scheduled first time interval.
After having executed LB functions, here, the load of cell-of-origin can be still obtained according to certain period, to determine LB functions
Whether come into force.Wherein, which can be arbitrarily arranged.
Step 303 judges whether LB functions come into force.
Since first sampling time, if the first sampling time obtain the cell-of-origin load be more than it is described pre-
Gating limits, and thens follow the steps 304;If the load in the cell-of-origin that the first sampling time obtained is less than or equal to described default
Thresholding then illustrates that LB functions come into force, return to step 201.
Step 304, since first sampling time, if the first sampling time obtain the cell-of-origin load it is big
In the pre-determined threshold, then the time for being more than the pre-determined threshold to the load of the cell-of-origin carries out timing, when obtaining first
Between.
After having executed LB functions, judge to obtain since first sampling time when starting the load for obtaining cell-of-origin
Cell-of-origin load and pre-determined threshold relationship.If some first sampling time obtain cell-of-origin load be less than or
Equal to pre-determined threshold, then it represents that LB functions come into force.Otherwise, start timer and start timing, wherein the timer is for recording source
The based model for load duration of cell is higher than the time of pre-determined threshold.Assuming that in some sampling time after first sampling time, obtain
Cell-of-origin load be less than or equal to pre-determined threshold, then timer stop timing;Otherwise continue timing.
For the time value that timer obtains, it is referred to as at the first time.When first sampling time was any one sampling
Between.
If step 305, the first time are more than the first preset value and the cell-of-origin load described in the continuous N sampling time
Decline degree all cannot be satisfied preset requirement, then follow the steps 306.It is no to then follow the steps 301.
Wherein, M is natural number.First preset value can be arbitrarily arranged, which can also be arbitrarily arranged.For example,
What the preset requirement could be provided as cell-of-origin load decrease beyond 20% etc..
Step 306, the load that the cell-of-origin is adjusted using alien frequencies MLB functions.
Specifically, when adjusting the load of cell-of-origin using alien frequencies MLB, suitable neighboring community is selected, adjusts cell pair
Between handoff parameter, carry out load migration.
After having executed alien frequencies MLB functions, here, the load of cell-of-origin can be still obtained according to certain period, with determination
Whether alien frequencies MLB functions come into force.Detailed process is as follows:
Step 307, the load that the cell-of-origin is obtained according to scheduled second time interval.
Wherein, which can be arbitrarily arranged, can be identical as above-mentioned first time interval, also can be different.
Step 308 judges whether alien frequencies MLB functions come into force.
Since first sampling time, if the second sampling time obtain the cell-of-origin load be more than it is described pre-
Gating limits, and thens follow the steps 309;If the load in the cell-of-origin that the first sampling time obtained is less than or equal to described default
Thresholding then illustrates that alien frequencies MLB functions come into force, return to step 201.
Step 309, since first sampling time, if the second sampling time obtain the cell-of-origin load it is big
In the pre-determined threshold, then the time for being more than the pre-determined threshold to the load of the cell-of-origin carries out timing, when obtaining second
Between.
After having executed alien frequencies MLB functions, sentence since first sampling time when starting the load for obtaining cell-of-origin
The relationship of the load and pre-determined threshold of the disconnected cell-of-origin obtained.If the load in the cell-of-origin that some second sampling time obtains is small
In or equal to pre-determined threshold, then it represents that alien frequencies MLB functions come into force.Otherwise, start timer and start timing, wherein the timer
Based model for load duration for recording cell-of-origin is higher than the time of pre-determined threshold.Assuming that some sampling after second sampling time
The load of time, the cell-of-origin of acquisition are less than or equal to pre-determined threshold, then timer stops timing;Otherwise continue timing.
For the time value that timer obtains, it was referred to as the second time.When second sampling time was any one sampling
Between.
If the load in the cell-of-origin that second sampling time obtains is less than or equal to the pre-determined threshold, when full
When sufficient parameters back condition, the CIO of rollback alien frequencies MLB.
For example, the load in the cell-of-origin that the second sampling time obtained is less than or equal to the pre-determined threshold, at it
In certain time afterwards, the load of the cell-of-origin of acquisition is both less than or equal to the pre-determined threshold, then it is believed that meeting ginseng
Number fallback conditions, the CIO of rollback alien frequencies MLB.
If step 310, second time are more than the second preset value and can not choose suitable adjacent area, if described
Second time be more than the second preset value and the decline degree of cell-of-origin load described in continuous N number of sampling time all cannot be satisfied it is pre-
If it is required that thening follow the steps 311;Wherein, N is natural number.
Wherein, which can be arbitrarily arranged, which can also be arbitrarily arranged.For example, the preset requirement
Could be provided as cell-of-origin load decrease beyond 20% etc..Suitable adjacent area, such as can be that signal quality is good, load is low
Cell.
Step 311, the load that the cell-of-origin is adjusted using same frequency MLB functions.
Specifically, in this step, selecting suitable neighboring community, the handoff parameter between cell pair is adjusted, is loaded
Migration.
After performing same frequency MLB, the load of cell-of-origin can be still obtained at predetermined intervals.If in some sampling
The load for the cell-of-origin that time obtains is less than or equal to pre-determined threshold, then return to step 201.If after the sampling time
In certain time, the load of the cell-of-origin of acquisition then returns it is believed that meeting parameter both less than or equal to the pre-determined threshold
Move back condition, the CIO for the same frequency MLB that first retracts, then the alien frequencies MLB that retracts CIO.If the load in the cell-of-origin that the sampling time obtains
The regular hour is continue for more than pre-determined threshold and the state, then needs the load for enabling congestion mechanism adjustment cell-of-origin.
It as seen from the above, in embodiments of the present invention, can be small according to source when the load of cell-of-origin is more than pre-determined threshold
The network mode in area is using MLB functions or using the load of LB and MLB orthofunctions adjustment cell-of-origin, to coordinate using more
The load of kind adjustment mode adjustment cell-of-origin, more effectively balances the load between cell, to improve the profit of radio resource
With rate.
Embodiment three
As shown in figure 4, the device of the realization Network Load Balance of the embodiment of the present invention three, including:
First acquisition module 401, the load for obtaining cell-of-origin;Comparison module 402, for bearing the cell-of-origin
Lotus and pre-determined threshold are compared, and obtain a judging result;Second acquisition module 403, if indicating institute for the judging result
The load for stating cell-of-origin is more than the pre-determined threshold, then obtains the network coverage mode of the cell-of-origin;The first adjustment module
404, if indicating that the cell-of-origin is monolayer net overlay area for the network coverage mode, same frequency mobility is utilized to load
Balanced MLB functions adjust the load of the cell-of-origin;Second adjustment module 405, if indicating institute for the network coverage mode
It is Multilayer Network overlay area to state cell-of-origin, then utilizes load balancing LB functions and mobility load balancing MLB functions, corrdinated adjustment
The load of the cell-of-origin.
In practical applications, first acquisition module 401 is additionally operable to according to described in the acquisition of scheduled first time interval
The load of cell-of-origin;The second adjustment module 405 includes:The first adjustment submodule, for utilizing load balancing LB function tune
The load of the whole cell-of-origin;First timing submodule, for since first sampling time, if being obtained in the first sampling time
The cell-of-origin load be more than the pre-determined threshold, then to the load of the cell-of-origin be more than the pre-determined threshold when
Between carry out timing, obtain at the first time;Second adjustment submodule, if being more than the first preset value for the first time and connecting
The decline degree for continuing cell-of-origin load described in M sampling time all cannot be satisfied preset requirement, then utilizes alien frequencies mobility to load
Balanced MLB functions adjust the load of the cell-of-origin;Wherein, M is natural number.
In practical applications, first acquisition module 401 is additionally operable to according to described in the acquisition of scheduled second time interval
The load of cell-of-origin;The second adjustment module 405 includes:Second timing submodule, for since first sampling time,
If the load in the cell-of-origin that the second sampling time obtained is more than the pre-determined threshold, big to the load of the cell-of-origin
Timing is carried out in the time of the pre-determined threshold, obtained for the second time;Third adjusts submodule, if super for second time
It crosses the second preset value and suitable adjacent area can not be chosen, if second time is more than the second preset value and in continuous N
The decline degree of cell-of-origin load described in a sampling time all cannot be satisfied preset requirement, then utilizes with frequency mobility load balancing
MLB functions adjust the load of the cell-of-origin;Wherein, N is natural number.
As shown in figure 5, in order to further save resource, resource utilization is improved, described device further includes:
First parameters back module 406, if the load in the cell-of-origin that the second sampling time obtained be less than or
Equal to the pre-determined threshold, when meeting parameters back condition, the cell individual character of rollback alien frequencies MLB deviates CIO.
Again as shown in figure 5, in order to further save resource, resource utilization is improved, described device further includes:Second parameter
Rollback module 407, for when meeting parameters back condition, carrying out parameters back.In the case, second parameters back
Module is specifically used for, and the cell individual character for the same frequency MLB that first retracts deviates CIO, then the cell individual character for the alien frequencies MLB that retracts deviates CIO.
As shown in figure 5, described device further includes:Third parameters back module 408 meets parameters back condition for working as
When, it retracts with the cell individual character offset CIO of frequency MLB.
The operation principle of device of the present invention can refer to the description of preceding method embodiment.
It as seen from the above, in embodiments of the present invention, can be small according to source when the load of cell-of-origin is more than pre-determined threshold
The network mode in area is using MLB functions or using the load of LB and MLB orthofunctions adjustment cell-of-origin, to coordinate using more
The load of kind adjustment mode adjustment cell-of-origin, more effectively balances the load between cell, to improve the profit of radio resource
With rate.
In several embodiments provided herein, it should be understood that disclosed method and apparatus, it can be by other
Mode realize.For example, the apparatus embodiments described above are merely exemplary, for example, the division of the unit, only
For a kind of division of logic function, formula that in actual implementation, there may be another division manner, such as multiple units or component can combine
Or it is desirably integrated into another system, or some features can be ignored or not executed.Another point, shown or discussed phase
Coupling, direct-coupling or communication connection between mutually can be by some interfaces, the INDIRECT COUPLING or communication of device or unit
Connection can be electrical, machinery or other forms.
In addition, each functional unit in each embodiment of the present invention can be integrated in a processing unit, it can also
It is that the independent physics of each unit includes, it can also be during two or more units be integrated in one unit.Above-mentioned integrated list
The form that hardware had both may be used in member is realized, can also be realized in the form of hardware adds SFU software functional unit.
The above-mentioned integrated unit being realized in the form of SFU software functional unit can be stored in one and computer-readable deposit
In storage media.Above-mentioned SFU software functional unit is stored in a storage medium, including some instructions are used so that a computer
Equipment (can be personal computer, server or the network equipment etc.) executes receiving/transmission method described in each embodiment of the present invention
Part steps.And storage medium above-mentioned includes:USB flash disk, mobile hard disk, read-only memory (Read-Only Memory, abbreviation
ROM), random access memory (Random Access Memory, abbreviation RAM), magnetic disc or CD etc. are various to store
The medium of program code.
The above is the preferred embodiment of the present invention, it is noted that for those skilled in the art
For, without departing from the principles of the present invention, it can also make several improvements and retouch, these improvements and modifications
It should be regarded as protection scope of the present invention.
Claims (14)
1. a kind of method for realizing Network Load Balance, which is characterized in that including:
Obtain the load of cell-of-origin;
The load of the cell-of-origin and pre-determined threshold are compared, a judging result is obtained;
If the judging result indicates that the load of the cell-of-origin is more than the pre-determined threshold, the network of the cell-of-origin is obtained
Coverage mode;
If the network coverage mode indicates that the cell-of-origin is monolayer net overlay area, using with frequency mobility load balancing
MLB functions adjust the load of the cell-of-origin;
If the network coverage mode indicates that the cell-of-origin is Multilayer Network overlay area, load balancing LB functions and shifting are utilized
Dynamic property load balancing MLB functions, the load of cell-of-origin described in corrdinated adjustment.
2. if according to the method described in claim 1, it is characterized in that, the network coverage mode indicates the cell-of-origin
For Multilayer Network overlay area, then load balancing LB functions and mobility load balancing MLB functions are utilized, source is small described in corrdinated adjustment
The step of load in area, including:
The load of the cell-of-origin is adjusted using load balancing LB functions;
The load of the cell-of-origin is obtained according to scheduled first time interval;
Since first sampling time, if the load in the cell-of-origin that the first sampling time obtained is more than the pre- gating
Limit, the then time for being more than the pre-determined threshold to the load of the cell-of-origin carry out timing, obtain at the first time;
If the first time be more than the decline degree of the first preset value and the cell-of-origin load described in the continuous N sampling time all
Preset requirement is cannot be satisfied, then alien frequencies mobility load balancing MLB functions is utilized to adjust the load of the cell-of-origin;
Wherein, M is natural number.
3. according to the method described in claim 2, it is characterized in that, utilizing alien frequencies mobility load balancing MLB functions described
After the step of adjusting the load of the cell-of-origin, the method further includes:
The load of the cell-of-origin is obtained according to scheduled second time interval;
Since first sampling time, if the load in the cell-of-origin that the second sampling time obtained is more than the pre- gating
Limit, the then time for being more than the pre-determined threshold to the load of the cell-of-origin carry out timing, obtained for the second time;
If second time is more than the second preset value and can not choose suitable adjacent area, if second time be more than
The second preset value and decline degree of cell-of-origin load described in continuous N number of sampling time all cannot be satisfied preset requirement, then it is sharp
The load of the cell-of-origin is adjusted with same frequency mobility load balancing MLB functions;
Wherein, N is natural number.
4. according to the method described in claim 3, it is characterized in that, the method further includes:
If the load in the cell-of-origin that second sampling time obtains is less than or equal to the pre-determined threshold, join when meeting
When number fallback conditions, the cell individual character of rollback alien frequencies MLB deviates CIO.
5. according to the method described in claim 3, it is characterized in that, described using with frequency mobility load balancing MLB functions
After the step of adjusting the load of the cell-of-origin, the method further includes:
When meeting parameters back condition, parameters back is carried out.
6. according to the method described in claim 5, it is characterized in that, the progress parameters back includes:
First retract same frequency MLB cell individual character offset CIO, then the alien frequencies MLB that retracts cell individual character deviate CIO.
7. if according to the method described in claim 1, it is characterized in that, the network coverage mode indicates that the cell-of-origin is single
Layer net overlay area, it is described using adjust the load of the cell-of-origin with frequency mobility load balancing MLB functions the step of it
Afterwards, the method further includes:
When meeting parameters back condition, retract with the cell individual character offset CIO of frequency MLB.
8. a kind of device for realizing Network Load Balance, which is characterized in that including:
First acquisition module, the load for obtaining cell-of-origin;
Comparison module obtains a judging result for the load of the cell-of-origin and pre-determined threshold to be compared;
Second acquisition module obtains if indicating that the load of the cell-of-origin is more than the pre-determined threshold for the judging result
Take the network coverage mode of the cell-of-origin;
The first adjustment module utilizes if indicating that the cell-of-origin is monolayer net overlay area for the network coverage mode
The load of the cell-of-origin is adjusted with frequency mobility load balancing MLB functions;
Second adjustment module utilizes if indicating that the cell-of-origin is Multilayer Network overlay area for the network coverage mode
Load balancing LB functions and mobility load balancing MLB functions, the load of cell-of-origin described in corrdinated adjustment.
9. device according to claim 8, which is characterized in that first acquisition module is additionally operable to according to scheduled
The load of cell-of-origin described in one time interval acquiring;The second adjustment module includes:
The first adjustment submodule, the load for adjusting the cell-of-origin using load balancing LB functions;
First timing submodule, for since first sampling time, if in the cell-of-origin that the first sampling time obtained
Load be more than the pre-determined threshold, then to the load of the cell-of-origin be more than the pre-determined threshold time carry out timing, obtain
It obtains at the first time;
Second adjustment submodule, if being more than the first preset value and the source described in the continuous N sampling time for the first time
The decline degree of cell load all cannot be satisfied preset requirement, then utilizes described in the adjustment of alien frequencies mobility load balancing MLB functions
The load of cell-of-origin;
Wherein, M is natural number.
10. device according to claim 9, which is characterized in that first acquisition module is additionally operable to according to scheduled
Two time intervals obtain the load of the cell-of-origin;The second adjustment module further includes:
Second timing submodule, for since first sampling time, if in the cell-of-origin that the second sampling time obtained
Load be more than the pre-determined threshold, then to the load of the cell-of-origin be more than the pre-determined threshold time carry out timing, obtain
Obtained for the second time;
Third adjusts submodule, if it is more than the second preset value for second time and suitable adjacent area can not be chosen, or
If person second time be more than the second preset value and the cell-of-origin load described in continuous N number of sampling time decline degree all without
Method meets preset requirement, then the load of the cell-of-origin is adjusted using same frequency mobility load balancing MLB functions;
Wherein, N is natural number.
11. device according to claim 10, which is characterized in that described device further includes:
First parameters back module, if being less than or equal to for the load in the cell-of-origin that the second sampling time obtained described
Pre-determined threshold, when meeting parameters back condition, the cell individual character of rollback alien frequencies MLB deviates CIO.
12. device according to claim 10, which is characterized in that described device further includes:
Second parameters back module, for when meeting parameters back condition, carrying out parameters back.
13. device according to claim 12, which is characterized in that the second parameters back module is specifically used for, and first returns
The cell individual character offset CIO of same frequency MLB is moved back, then the cell individual character for the alien frequencies MLB that retracts deviates CIO.
14. device according to claim 8, which is characterized in that described device further includes:
Third parameters back module, the cell individual character for when meeting parameters back condition, retracting with frequency MLB deviate CIO.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710119974.5A CN108541022B (en) | 2017-03-02 | 2017-03-02 | Method and device for realizing network load balance |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710119974.5A CN108541022B (en) | 2017-03-02 | 2017-03-02 | Method and device for realizing network load balance |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108541022A true CN108541022A (en) | 2018-09-14 |
CN108541022B CN108541022B (en) | 2021-11-09 |
Family
ID=63489104
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710119974.5A Active CN108541022B (en) | 2017-03-02 | 2017-03-02 | Method and device for realizing network load balance |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108541022B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110392393A (en) * | 2019-06-19 | 2019-10-29 | 中国移动通信集团湖北有限公司 | For the business delamination process and device of VoLTE voice service and data service |
CN111182604A (en) * | 2019-12-27 | 2020-05-19 | 北京拓明科技有限公司 | Intelligent balancing method and system for LTE wireless network load |
CN113329444A (en) * | 2020-02-28 | 2021-08-31 | 中国移动通信集团福建有限公司 | High-load cell optimization method and device and electronic equipment |
CN113395712A (en) * | 2020-03-11 | 2021-09-14 | 中国移动通信集团设计院有限公司 | High-load cell optimization method and device |
WO2022184125A1 (en) * | 2021-03-05 | 2022-09-09 | 华为技术有限公司 | Loading balance method and apparatus, and readable storage medium |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102395157A (en) * | 2011-06-30 | 2012-03-28 | 西安电子科技大学 | Regional load balancing method in cellular mobile communication system |
CN102695209A (en) * | 2011-03-24 | 2012-09-26 | 中国科学院声学研究所 | Load balancing method for different coverage scenes and base station |
CN103987085A (en) * | 2013-02-07 | 2014-08-13 | 华为技术有限公司 | Inter-cell mobility load balance method and mobility load balance device |
CN105472660A (en) * | 2014-09-11 | 2016-04-06 | 中国移动通信集团公司 | Load balancing method and system and network equipment |
-
2017
- 2017-03-02 CN CN201710119974.5A patent/CN108541022B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102695209A (en) * | 2011-03-24 | 2012-09-26 | 中国科学院声学研究所 | Load balancing method for different coverage scenes and base station |
CN102395157A (en) * | 2011-06-30 | 2012-03-28 | 西安电子科技大学 | Regional load balancing method in cellular mobile communication system |
CN103987085A (en) * | 2013-02-07 | 2014-08-13 | 华为技术有限公司 | Inter-cell mobility load balance method and mobility load balance device |
CN105472660A (en) * | 2014-09-11 | 2016-04-06 | 中国移动通信集团公司 | Load balancing method and system and network equipment |
Non-Patent Citations (1)
Title |
---|
李丽: "基于 RE 的 LTE-A 异构多层网络移动负载均衡算法研究", 《湖南邮电职业技术学院学报》 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110392393A (en) * | 2019-06-19 | 2019-10-29 | 中国移动通信集团湖北有限公司 | For the business delamination process and device of VoLTE voice service and data service |
CN110392393B (en) * | 2019-06-19 | 2022-12-06 | 中国移动通信集团湖北有限公司 | Service layered processing method and device for VoLTE voice service and data service |
CN111182604A (en) * | 2019-12-27 | 2020-05-19 | 北京拓明科技有限公司 | Intelligent balancing method and system for LTE wireless network load |
CN113329444A (en) * | 2020-02-28 | 2021-08-31 | 中国移动通信集团福建有限公司 | High-load cell optimization method and device and electronic equipment |
CN113329444B (en) * | 2020-02-28 | 2022-07-01 | 中国移动通信集团福建有限公司 | High-load cell optimization method and device and electronic equipment |
CN113395712A (en) * | 2020-03-11 | 2021-09-14 | 中国移动通信集团设计院有限公司 | High-load cell optimization method and device |
CN113395712B (en) * | 2020-03-11 | 2023-04-07 | 中国移动通信集团设计院有限公司 | High-load cell optimization method and device |
WO2022184125A1 (en) * | 2021-03-05 | 2022-09-09 | 华为技术有限公司 | Loading balance method and apparatus, and readable storage medium |
Also Published As
Publication number | Publication date |
---|---|
CN108541022B (en) | 2021-11-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108541022A (en) | A kind of method and device for realizing Network Load Balance | |
CN105307258B (en) | It is a kind of adjust pilot reference signal transmission power method and base station | |
CN105991255B (en) | A kind of configuration method and device of carrier wave polymerization | |
CN109996332A (en) | Resident method and apparatus | |
CN105794247B (en) | For the method for resource-sharing, network node and storage medium | |
CN107172682A (en) | Super-intensive network radio resources distribution method based on dynamic clustering | |
CN103929781A (en) | Cross-layer interference coordination optimization method in super dense heterogeneous network | |
CN105612783A (en) | Cell reselection method, user equipment, and network device | |
CN110178408A (en) | Cell history in wireless communication system uses | |
CN103945418B (en) | A kind of auxiliary serving cell collocation method and equipment | |
CN105451241B (en) | Max-min fairness resource allocation methods in heterogeneous network based on interference coordination | |
CN107211332A (en) | A kind of cell selecting method and device | |
CN106900010B (en) | A kind of method and device carrying out load balancing based on RRC connection | |
CN101998514A (en) | Method and controller for balancing load among cells of multiband time division-synchronous code division multiple access (TD-SCDMA) system | |
CN103167557A (en) | Method for balancing load based on virtual cell breathing in long term evolution-advanced (LTE-A) system | |
CN103416089B (en) | Load balancing method and apparatus | |
CN104581826B (en) | A kind of dynamic load balancing method and system | |
CN105594243A (en) | Network optimization method and device, and base station | |
CN105898801A (en) | Load balance method and base station | |
CN104469849B (en) | A kind of dynamic traffic distribution method based on smart antenna in small base station network | |
CN106714246A (en) | Base station and cell switching method and device | |
CN105916178B (en) | A kind of method and device of load balancing | |
CN109756317A (en) | Interfere the method for determination and the network equipment | |
CN106162747B (en) | A kind of method and device of load balancing | |
EP2692081B1 (en) | Selection of a secondary component carrier based on interference information |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |