CN108537500A - A kind of method and apparatus of schedule transfer - Google Patents

A kind of method and apparatus of schedule transfer Download PDF

Info

Publication number
CN108537500A
CN108537500A CN201810225748.XA CN201810225748A CN108537500A CN 108537500 A CN108537500 A CN 108537500A CN 201810225748 A CN201810225748 A CN 201810225748A CN 108537500 A CN108537500 A CN 108537500A
Authority
CN
China
Prior art keywords
user
date
schedule
schedule information
transferred
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810225748.XA
Other languages
Chinese (zh)
Inventor
李晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201810225748.XA priority Critical patent/CN108537500A/en
Publication of CN108537500A publication Critical patent/CN108537500A/en
Priority to PCT/CN2018/110364 priority patent/WO2019179081A1/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/109Time management, e.g. calendars, reminders, meetings or time accounting

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of methods and apparatus of schedule transfer, to solve in the prior art when carrying out schedule transfer, schedule occur and obscure, leak and build or build more, the problem of more trouble is brought to user.The embodiment of the present invention is according to the first schedule transfer instruction, it may be determined that goes out in user's designated date at least one schedule information shifted;According to the second schedule transfer instruction, it may be determined that go out user and need the date being transferred to;Finally at least one schedule information shifted in determining user's designated date was transferred in the determining date.Since the present invention can be transferred in the determining date schedule batch some or all of in the scheduled date, can not only quickly solve the problems, such as user by certain day whole schedules or part schedule shift, simultaneously during carrying out schedule transfer, be not in that schedule is obscured, leaks the problem of building or building more, keep user's enhanced convenience when carrying out schedule transfer quick.

Description

A kind of method and apparatus of schedule transfer
Technical field
The present invention relates to Developing Technology of Applied Software field, more particularly to a kind of method and apparatus of schedule transfer.
Background technology
With the development of electronic product, applied software development is more and more rapider, and application software makes people’s lives become to get over It is more convenient to come, and life is made increasingly to have planning.
By taking calendar as an example, all includes calendar in the electronic products such as existing mobile phone, computer, electronic watch, people is allowed to exist Corresponding schedule in the date can also be determined while knowing the date, because many calendar class applications all add schedule thing now Part function, and something is being done to meeting automatically prompting user after the defined time, keep user more convenient when in use.
Currently, the user that daily schedule is always managed using day is more and more, the date that user can be different in calendar Interior adding schedule.But occur because of the case where emergency situations can not carry out the schedule of today, user's determination at this time will be because of prominent The schedule that hair-like condition can not carry out was transferred in other dates.
In the prior art when being shifted to schedule, the schedule that can only shift determining needs is in other dates It is created one by one, and the schedule in original date (OD) is deleted one by one, while during carrying out schedule transfer, be easy Schedule is obscured, is leaked and is built or build more, to user with more trouble.
To sum up, existing when carrying out schedule transfer, can only by the schedule shifted one by one in new day It is interim to re-establish, and the schedule for needing to shift in original schedule is deleted, it is easy obscure schedule, leak and build or build more, to use The more trouble of family band.
Invention content
The present invention provides a kind of method and apparatus of schedule transfer, and day is being carried out to solve existing calendar in the prior art During journey shifts, there is schedule and obscure, leak and build or build more, the problem of more trouble is brought to user.
In a first aspect, the embodiment of the present invention provides a kind of method of schedule transfer, this method includes:
According to the first schedule transfer instruction, at least one schedule letter shifted in user's designated date is determined Breath;
According to the second schedule transfer instruction, determine that user needs the date being transferred to;
It will determine that at least one schedule information shifted in user's designated date is transferred to the determining date In.
The above method, according to the first schedule transfer instruction, it may be determined that go out in user's designated date and shift At least one schedule information;According to the second schedule transfer instruction, it may be determined that go out user and need the date being transferred to;Finally will At least one schedule information shifted in determining user's designated date was transferred in the determining date.Due to this Schedule batch some or all of in the scheduled date can be transferred in the determining date, can not only quickly be solved in invention Certainly user because emergency case need by certain day whole schedules or part schedule shift the problem of, while carry out schedule Be not in that schedule is obscured, leaks the problem of building or building more during transfer, keep user more square when carrying out schedule transfer Just quick.
In one possible implementation, after determining that user needs the date being transferred to, determining user is specified Before at least one schedule information shifted in date was transferred in the determining date, user's designated date is determined The middle at least one schedule information shifted needs the schedule information in the date being transferred to not conflict with user is determined.
The above method, in the feelings for determining that the schedule shifted does not conflict with the schedule information in the date determined Under condition, after user determines the schedule shifted being transferred in the determining date, day that institute's some need is shifted Journey information was transferred in the determining date, be no longer at a fixed date in establishment one by one need the schedule that shifts, use Family enhanced convenience when carrying out schedule transfer is quick, and is not in reconstruction, leaks the phenomenon that building, obscuring.
In one possible implementation, however, it is determined that the schedule letter shifted in user's designated date It ceases and needs the schedule information in the date being transferred to conflict with the determining user, and determine that user continues to shift, then it will be described At least one schedule information shifted in user's designated date was transferred in the determining date, and to the day of conflict Journey marks;Or the schedule information for occurring not conflict in user's designated date was transferred in the determining date, and it is right The schedule information of conflict redefines user and needs date for being transferred to, judges to clash in user's designated date Whether schedule information conflicts with the schedule information redefined in the date that user's needs are transferred to.
The above method when carrying out the schedule information shifted progress batch transfer, conflicts determining determining to exist After schedule, decide whether to continue to shift by user, according to the determination information of user, not clash to determining all schedules or Schedule shifted, redefine for the schedule of conflict and continue after the date to determine whether to shift according to the decision of user, no It is to establish schedule in the new date one by one again, saves the time of user, keeps user's enhanced convenience when schedule shifts fast It is prompt.
In a kind of possible mode, however, it is determined that the schedule information that is shifted in user's designated date with The determining user needs the schedule information conflict in the date being transferred to, and determines that user does not continue to shift, then redefines User needs date for being transferred to, judge at least one schedule information shifted in user's designated date with It redefines user and needs whether the schedule information in the date being transferred to conflicts;Or stop transfer schedule information.
The above method determines in the date of transfer there is conflict schedule when being shifted, then is according to the decision of user determination It is no to continue to shift, after receiving the instruction for not continuing transfer, it is determined whether reselect the date being transferred to, however, it is determined that The date being transferred to is reselected, then after redefining the date, judges the schedule to be shifted and the date redefined In schedule whether conflict, receive do not reselect transfer the date instruction after, indicate user not in the schedule to transfer It is shifted, will stop shifting schedule information at this time, user, which can clearly plan, when shifting schedule is transferred to Event in date and time bring conveniently to user.
In a kind of possible mode, the voice messaging of user is obtained;It is identified from the voice messaging described first day Journey transfer instruction and/or the second schedule transfer instruction.
The above method can also determine the first schedule transfer instruction and/or the second schedule transfer instruction by voice messaging, Keep the transfer enhanced convenience of schedule quick.
Second aspect, the embodiment of the present invention provide a kind of equipment of schedule transfer, which includes:At least one processing is single First and at least one storage unit, wherein the storage unit has program stored therein code, when said program code is by the processing When unit executes so that the processing unit executes following process:
According to the first schedule transfer instruction, at least one schedule letter shifted in user's designated date is determined Breath;
According to the second schedule transfer instruction, determine that user needs the date being transferred to;
It will determine that at least one schedule information shifted in user's designated date is transferred to the determining date In.
The third aspect, the equipment that the embodiment of the present invention provides another schedule transfer, the equipment include:
First determining module, for according to the first schedule transfer instruction, determining and turning in user's designated date At least one schedule information moved;
Second determining module, for according to the second schedule transfer instruction, determining that user needs the date being transferred to;
Shift module, for that will determine at least one schedule information shifted in user's designated date transfer Into the determining date.
Fourth aspect, the application also provide a kind of computer readable storage medium, in the computer readable storage medium Including program code, when run on a computer so that computer executes the method described in above-mentioned various aspects.
5th aspect, the application also provides a kind of computer program product including instruction, when it runs on computers When so that computer executes the method described in above-mentioned various aspects.
In addition, technique effect caused by any realization method can be found in first aspect in second aspect to the 5th aspect Technique effect caused by middle difference realization method, details are not described herein again.
These aspects or other aspects of the application can more straightforward in the following description.
Description of the drawings
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment Attached drawing is briefly introduced, it should be apparent that, drawings in the following description are only some embodiments of the invention, for this For the those of ordinary skill in field, without having to pay creative labor, it can also be obtained according to these attached drawings His attached drawing.
Fig. 1 is a kind of method flow diagram of schedule transfer provided in an embodiment of the present invention;
Fig. 2 is a kind of holistic approach flow chart of schedule transfer provided in an embodiment of the present invention;
Fig. 3 is the holistic approach flow chart of another schedule transfer provided in an embodiment of the present invention;
Fig. 4 is a kind of equipment structure chart of schedule transfer provided in an embodiment of the present invention;
Fig. 5 is the equipment structure chart of another schedule transfer provided in an embodiment of the present invention.
Specific implementation mode
The framework and business scenario of the embodiment of the present application description are to more clearly illustrate the embodiment of the present application Technical solution does not constitute the restriction for technical solution provided by the embodiments of the present application, those of ordinary skill in the art it is found that With the appearance of new business scene, technical solution provided by the embodiments of the present application is equally applicable for similar technical problem.
All include the calendar class application that calendar events function can be added in current many electronic products, in rising for schedule Time beginning can remind user to be carved with what needs to go to complete, and makes user will not be since it is desired that the thing done is more and forgets at this time Note processing.But user can because emergency case can not do certain things, just need at this time user will because of emergency case without The thing that method executes is shifted.
To make the objectives, technical solutions, and advantages of the present invention clearer, below in conjunction with attached drawing to the present invention make into It is described in detail to one step, it is clear that described embodiment is only a part of embodiment of the invention, instead of all the embodiments. Based on the embodiments of the present invention, obtained by those of ordinary skill in the art without making creative efforts all Other embodiments belong to the range that the present invention protects.
As shown in Figure 1, for a kind of method flow diagram of schedule transfer provided by the present application, specifically comprise the following steps:
Step 100, according to the first schedule transfer instruction, at least one shifted in user's designated date is determined A schedule information;
Step 101, according to the second schedule transfer instruction, determine that user needs the date being transferred to;
Step 102, it will determine that at least one schedule information shifted in user's designated date is transferred to really In the fixed date.
In embodiments of the present invention, according to the first schedule transfer instruction, it may be determined that go out in user's designated date and need At least one schedule information shifted;According to the second schedule transfer instruction, it may be determined that go out user and need the day being transferred to Phase;At least one schedule information shifted in determining user's designated date is finally transferred to the determining date In.It, can not only due to can be transferred in the determining date to schedule batch some or all of in the scheduled date in the present invention It is enough quickly solve the problems, such as user because emergency case need by certain day whole schedules or part schedule shift, simultaneously Be not in that schedule is obscured, leaks the problem of building or building more during carrying out schedule transfer, user is made to carry out schedule transfer When enhanced convenience it is quick.
Specifically, when determining the first schedule transfer instruction and/or the second schedule transfer instruction, acquisition can be passed through The information that user chooses manually determines, or is determined according to the voice messaging of user, is introduced below for above-mentioned scene.
Scene one:The information chosen manually according to the user of acquisition determines the first schedule transfer instruction and the transfer of the second schedule Instruction.
Specifically, when determining that certain day cannot execute certain things because of emergency case, user, which determines, to be needed to carry out schedule Transfer, into schedule editing mode, the schedule information shifted is chosen according to user and determines the first transfer instruction manually, And determine at least one schedule information shifted;Shifted in determining user's designated date to After a few schedule information, determine whether user will shift the determining schedule information, however, it is determined that transfer then continues Date true second transfer instruction chosen according to user, and determine that user needs the date being transferred to, judging whether will be described After determining that at least one schedule information shifted in user's designated date was transferred in the date of the determination, root It is judged that result the schedule information that shifts of needs is shifted.
In force, when carrying out the transfer of the schedule, when determining that user needs the date being transferred to, determination is transferred to Date can be emergency case before date, or the date after emergency case.It that is can be by determination It needs the schedule shifted, is transferred in the date before emergency case occurs, i.e., the schedule that will can not be executed by emergency case In advance;Can also by need the schedule that shifts be transferred to emergency case after date in, i.e., will can not be held because of emergency case After capable schedule is moved;Whether the schedule on the day of emergency case can specifically be shifted to an earlier date, the time for depending primarily on emergency case is no The schedule information in current date can not then be shifted to an earlier date if current time for current time.
Assuming that current time is 7 days 14 March in 2018:00, the time for receiving emergency case generation is March 7 in 2018 Day 16:00—20:00, user, which chooses, at this time occupies 7 days 16 March in 2018:00—20:The schedule of 00 period, determination will account for With 7 days 16 March in 2018:00—20:The schedule of 00 period is shifted, can only will be determining at this time when being shifted After schedule information moves.
If current time is 7 days 14 March in 2018:00, the time for receiving emergency case generation is on March 10th, 2018 16:00—20:00, user, which chooses, at this time occupies 10 days 16 March in 2018:00—20:The schedule of 00 period, determining will occupy 10 days 16 March in 2018:00—20:The schedule of 00 period is shifted, can be by determining day at this time when being shifted Journey information shifts to an earlier date, after can also moving determining schedule information.
Specifically, when being shifted to schedule information, the schedule information shifted can will be needed individually shift and turn Moving the date can be identical or different, whole schedule informations in the schedule information shifted can also will be needed to be transferred to together The identical date can also will need the part schedule information in the schedule information shifted to carry out being transferred to identical day together Phase.
Based on the above, setting on March 10th, 2018 schedule information as illustrated in chart 1;
10 days 8 March in 2018:00~10:00 Company's meeting
10 days 14 March in 2018:30~15:20 Parents' meeting
10 days 15 March in 2018:30~16:50 See client
10 days 17 March in 2018:00~18:00 Video conference
10 days 18 March in 2018:10~19:00 Yoga class
10 days 19 March in 2018:30~20:30 Family dinner party
Table 1
As known from Table 1, all schedules on March 10th, 2018, due to receiving 10 days 16 March in 2018:00—20: 00 there are accident, determines and is occupying 16:00—20:The schedule of 00 period has 15:30~16:See client when 50,17:00 ~18:Video conference when 00,18:10~19:Yoga class when 00,19:30~20:Family dinner party when 30;Needing at this time will be above-mentioned Four kinds of schedule informations are shifted, can be by 15 when being shifted:30~16:See client when 50,17:00~18:It is regarded when 00 Frequency meeting, 18:10~19:Yoga class when 00,19:30~20:Family dinner party is transferred on March 9th, 2018 one by one when 30;Also may be used With by 15:30~16:See client when 50,17:00~18:Video conference when 00,18:10~19:Yoga class when 00,19:30~ 20:Family dinner party is transferred on March 9th, 2018 together when 30;Or by 15:30~16:See client when 50,17:00~18:00 When video conference be transferred on March 8th, 2018, by 18:10~19:Yoga class when 00,19:30~20:Family dinner party one when 30 It rises and is transferred on March 9th, 2018.Whether the schedule shifted will be needed to be transferred in the identical date when being shifted, is one It plays transfer still to shift one by one, mainly be determined by user itself.
It should be noted that the schedule having occurred and that is shown as not editable state, if all needing to shift and to turn It moves on on the same day, then can be selected entirely, click " full choosing " button of display interface.
Optionally, after determining that user needs the date being transferred to, turn determining in user's designated date Before at least one schedule information moved was transferred in the determining date, judge to turn in user's designated date Whether at least one schedule information moved conflicts with the schedule information in the date of the determination.
Specifically, after determining the date that user is transferred to, it would be desirable to carry out transfer schedule information and the determining user Schedule information in the date being transferred to is done to detection, if in the date that the schedule information of transfer is transferred to the determining user Schedule information initial time it is identical, it is determined that for the schedule information of transfer with determine the schedule in date for being transferred to of user There is conflict in information;If the time of schedule information of the initial time of the schedule information of transfer in the date of the determination simultaneously The initial time of schedule information in section or in the date of the determination is within the period of the schedule information of transfer, it is determined that Schedule information in the date being transferred to determining user for the schedule information of transfer, which exists, to conflict.
For example, by 15 in 10 days March in 2018:30~16:See client when 50,17:00~18:Video conference when 00, 18:10~19:Yoga class when 00,19:30~20:Family dinner party is transferred on March 11st, 2018, as shown in table 2,2018 when 30 The schedule information of setting on March 11, in.
11 days 10 March in 2018:00~12:00 Beauty parlor
11 days 14 March in 2018:00~15:00 Yoga class
11 days 15 March in 2018:30~18:00 About friend
Table 2
As seen from the table, all schedule informations on March 11st, 2018, detect 15:30~18:00 friend Shi Yueliao with 15:30~16:See that the initial time of client is identical when 50,17:00~18:The initial time of video conference is 15 when 00:30~ 18:In the calendar events section of 00 friend Shi Yueliao, therefore 15:30~18:00 friend Shi Yueliao and 15:30~16:Visitor is seen when 50 Family and 17:00~18:Video conference conflict when 00.
Optionally, however, it is determined that the schedule information shifted in user's designated date and the determining user It needs the schedule information conflict in the date being transferred to, and determines that user continues to shift, then it will be in user's designated date At least one schedule information shifted was transferred in the determining date, and was marked to the schedule of conflict;Or by institute It states the schedule information for occurring not conflict in user's designated date to be transferred in the determining date, and to the schedule information weight of conflict It is new to determine that user needs the date being transferred to, judge the schedule information clashed in user's designated date with again really Determine user and needs whether the schedule information in the date being transferred to conflicts.
Specifically, after the schedule information for determining transfer conflicts with the schedule information in the date determined, provides one and carry Show elastic window, the determining transfer schedule information is continued to shift for judging whether, window, which is shown, " there are calendar events Conflict, if determining transfer schedule information was transferred in the determining date " indicates conflict day after determination continues transfer Journey information can be carried out at the same time without influence, and the transfer schedule information of the determination was transferred in the determining date, and is being shifted The schedule information of conflict is marked afterwards.
For example, being determined 15 in 10 days March in 2018 according to the above:30~16:See client when 50,17:00~ 18:Video conference when 00,18:10~19:Yoga class when 00,19:30~20:Family dinner party is transferred to March 11 in 2018 when 30 Day, on March 11st, 1, updated schedule setting was as shown in table 3.
Table 3
At this point, for the schedule 15 of conflict:30~18:00 friend Shi Yueliao and 15:30~16:Client and 17 are seen when 50: 00~18:Video conference marks when 00.
Wherein, it when the schedule information to the conflict marks, can be marked using color symbol, color is identical Be expressed as conflict schedule.
It in embodiments of the present invention,, can also be directly by user after determination continues transfer when carrying out schedule transfer The schedule information that schedule information in designated date does not clash with the schedule information determined in the date is transferred to determining In date, continue to determine whether to shift for the schedule information of conflict;After determining transfer, the schedule of conflict is shifted, and The schedule of conflict is marked after transfer;Needs are redefined after determination does not continue transfer for the schedule information of conflict to be transferred to Date, and continue to judge whether the schedule information of the conflict conflicts with the schedule in the date redefined, rushed determining After dashing forward or not conflicting, it is determined whether continue to shift.
Specifically, after the schedule information for determining transfer conflicts with the schedule information in the date determined, entry/exit conflicts are shown Schedule information, and provide an elastic window of prompt, determining schedule information continued to shift for judging whether, Determine transfer after, the schedule information not conflicted is shifted, but for conflict schedule information prompt window show " whether By determine conflict schedule information be transferred in the determining date ", determine continue transfer after, indicate conflict schedule information without shadow It rings, can be carried out at the same time, determining conflict schedule information was transferred in the determining date, and after the transfer to the schedule of conflict Information marks;If after judging whether to continue transfer to determining conflict schedule information, determining not to the schedule that conflicts After information continues transfer, the date being transferred to will be redefined for the schedule information of conflict, and carries out detecting whether to conflict, but It is to be transferred directly in the determining date for the determining schedule information not conflicted.
For example, the schedule information of conflict was not transfer in the determining date by determination, according to the above, determining will 15 in 10 days March in 2018:30~16:See client when 50,17:00~18:Video conference when 00,18:10~19:Fine jade when 00 Gal class, 19:30~20:Family dinner party is transferred on March 11st, 2018 when 30, on March 11st, 1 updated schedule Setting is as shown in table 4.
11 days 10 March in 2018:00~12:00 Beauty parlor
11 days 14 March in 2018:00~15:00 Yoga class
11 days 15 March in 2018:30~18:00 About friend
11 days 18 March in 2018:10~19:00 Yoga class
11 days 19 March in 2018:30~20:30 Family dinner party
Table 4
At this point, for the schedule 15 of conflict:30~16:Client and 17 are seen when 50:00~18:Video conference is again true when 00 Surely the date being transferred to.
In force, when carrying out the schedule information shifted progress batch transfer, conflict determining determining to exist After schedule, decide whether to continue to shift by user, according to the determination information of user, not clash to determining all schedules or Schedule shifted, redefine for the schedule of conflict and continue after the date to determine whether to shift according to the decision of user, no It is to establish schedule in the new date one by one again, saves the time of user, keeps user's enhanced convenience when schedule shifts fast It is prompt.
In embodiments of the present invention, the schedule information shifted and the schedule information under the date determined are being determined When in the presence of conflict, the schedule information not conflicted can also be transferred directly in the date that parent determines, for the schedule of conflict Information is determined whether to continue to shift by user.
Optionally, however, it is determined that the schedule information shifted in user's designated date and the determining user The schedule information conflict in the date being transferred to is needed, and determines that user does not continue to shift, then redefines user and needs to shift The date arrived judges at least one schedule information shifted in user's designated date and redefines user Need whether the schedule information in the date being transferred to conflicts;Or stop transfer schedule information.
Specifically, what the schedule information shifted in determining user's designated date was transferred to the determination After schedule information conflict in date, judges whether to continue to shift, after determination does not continue transfer, provide prompt window, prompt Whether user redefines the date being transferred to the schedule information shifted, needs to reselect the date in determination Afterwards, on the date selected according to user, at least one schedule shifted in user's designated date is rejudged Information needs whether the schedule information in the date being transferred to conflicts with the user redefined;Or determination need not again really Surely after the date being transferred to, stop transfer schedule information.
In force, there is conflict schedule in the date for determining transfer when being shifted, be then according to the decision of user determination It is no to continue to shift, after receiving the instruction for not continuing transfer, it is determined whether reselect the date being transferred to, however, it is determined that The date being transferred to is reselected, then after redefining the date, judges the schedule to be shifted and the date redefined In schedule whether conflict, receive do not reselect transfer the date instruction after, indicate user not in the schedule to transfer It is shifted, will stop shifting schedule information at this time, user, which can clearly plan, when shifting schedule is transferred to Event in date and time bring conveniently to user.
In embodiments of the present invention, after determining the date that user is transferred to, it would be desirable to carry out transfer schedule information and institute State the schedule information in the date that determining user is transferred to do to detection, however, it is determined that the date being transferred to be whole day event, then Whole day event does not conflict with all schedules.
For example, by 15 in 10 days March in 2018:30~16:See client when 50,17:00~18:Video conference when 00, 18:10~19:Yoga class when 00,19:30~20:Family dinner party is transferred on March 11st, 2018, on March 11st, 2018 when 30 Schedule information be expressed as " birthday that today is Zhang San ", at this time determine on March 11st, 2018 be whole day event, with aforementioned four There is no conflict schedule informations for schedule information.
Optionally, after the determining user needs the date being transferred to, will be needed in determining user's designated date into Row transfer at least one schedule information be transferred in the determining date before, determine needed in user's designated date into The schedule information of row transfer needs the schedule information in the date being transferred to not conflict with the determining user.
Specifically, determining that the schedule information that shifts of needs and the schedule information in the date determined do not conflict schedule letter After breath, a prompt window is shown to user, for determining whether user continues to shift, this window shows " whether determine The schedule shifted is transferred in the determining date ", after determining that user continues transfer, it will determine that user refers to At least one schedule information shifted in the fixed date was transferred in the determining date.
In force, in the feelings for determining that the schedule shifted does not conflict with the schedule information in the date determined Under condition, after user determines the schedule shifted being transferred in the determining date, day that institute's some need is shifted Journey information was transferred in the determining date, be no longer at a fixed date in establishment one by one need the schedule that shifts, use Family enhanced convenience when carrying out schedule transfer is quick, and is not in reconstruction, leaks the phenomenon that building, obscuring.
As shown in Fig. 2, for it is provided by the present application it is a kind of carry out schedule transfer holistic approach flow chart, specifically include as Lower step:
Step 200, there is accident, need to shift schedule;
Step 201, into schedule editing mode, selection needs at least one schedule information shifted;
Step 202, at least one schedule information for needing to shift is determined;
Step 203, determine that user needs the date being transferred to;
Step 204, detection needs at least one schedule information shifted to be needed in the date being transferred to user is determined Whether schedule information conflicts, no to then follow the steps 207 if conflict, thens follow the steps 205;
Step 205, judge whether to continue that at least one schedule information for needing to shift was transferred in the determining date, if Continue, then follow the steps 206, otherwise, executes step 203;
Step 206, it would be desirable to which at least one schedule information of transfer was transferred in the determining date, and to the schedule of conflict Information marks;
Step 207, it is confirmed whether at least one schedule information for needing to shift being transferred in the determining date, if confirming Transfer, thens follow the steps 208, no to then follow the steps 209;
Step 208, it would be desirable to which at least one schedule information of transfer was transferred in the determining date;
Step 209, terminate.
Scene two:Determine that the first schedule transfer instruction and the transfer of the second schedule refer to according to the voice messaging of the user of acquisition It enables.
Optionally, the voice messaging of user is obtained;Identified from the voice messaging the first schedule transfer instruction and/ Or the second schedule transfer instruction.
Specifically, when determining that certain day cannot execute certain things because of emergency case, user, which determines, to be needed to carry out schedule Transfer, into voice input interface, the first schedule transfer instruction and/or the second schedule are identified according to the voice messaging got Transfer instruction, and day instruction is turned according to the first schedule and determines need in user's designated date respectively with the second schedule transfer instruction At least one schedule information shifted and user need the date being transferred to;Judge whether to refer to the determining user At least one schedule information shifted in the fixed date was transferred in the date of the determination, after determining transfer, It will determine that at least one schedule information shifted in user's designated date was transferred in the determining date.
Wherein, the first schedule transfer instruction or the second schedule transfer instruction can be determined according to a voice messaging, or First schedule transfer instruction and the second schedule transfer instruction.
Believed at this time according to voice for example, the voice messaging got is " shifting the schedule on March 10th, 2018 " Breath determines the first schedule transfer instruction;
When the voice messaging got be " determining schedule is transferred on March 11st, 2018 ", believed at this time according to voice Breath determines the second schedule transfer instruction;
When the voice messaging got is " schedule on March 10th, 2018 is transferred on March 11st, 2018 ", at this time root The first schedule transfer instruction and the second schedule transfer instruction are determined according to voice messaging.
In force, if voice messaging is " schedule on March 10th, 2018 is transferred on March 11st, 2018 ", expression will Whole schedules on March 10th, 2018 were transferred in 11 days March in 2018.
Wherein, mainly according to the keyword in voice messaging come first day when determining when carrying out voice messaging identification Journey transfer instruction or the second schedule transfer instruction had still not only included the first schedule transfer instruction but also had been shifted comprising the second schedule Instruction.
It is in force, if identical as the date in the second transfer instruction according to the first transfer instruction of voice messaging determination, Such as " schedule on March 10th, 2018 is transferred on March 10th, 2018 ", then prompt window is popped up, for prompting user's root It is identical as the date of determination being transferred to of the second schedule transfer instruction according to the scheduled date that the first schedule transfer instruction determines, It can not will determine that at least one schedule information shifted in user's designated date was transferred in the determining date, also Voice messaging please be re-enter, voice input interface is returned, redefines the defeated information of voice.
In embodiments of the present invention, the schedule information of needs transfer, such as " March 10 in 2018 can also be explicitly indicated that out Day 17:00~18:Video conference when 00 is transferred on March 11st, 2018 " but if it is to determining schedule information progress Batch shifts, such as " 10 days 15 March in 2018:30~16:50 see client, 17:00~18:00 video conference, 18:10 ~19:00 Yoga class and 19:30~20:30 family dinner party moves on on March 11st, 2018 ", then it is crucial in identification process Word is more, and the time needed is longer, is unfavorable for using.
As shown in figure 3, for the flow chart of another holistic approach for carrying out schedule transfer provided by the present application, specifically include Following steps:
Step 300, there is accident, need to shift schedule;
Step 301, enter voice input interface depending on the user's operation;
Step 302, determine that the scheduled date needs at least one schedule information shifted according to the voice messaging of input;
Step 303, determine that user needs the date being transferred to according to the voice messaging of input;
Step 304, detection needs at least one schedule information shifted to be needed in the date being transferred to user is determined No conflict when schedule information, it is no to then follow the steps 307 if conflict, thens follow the steps 305;
Step 305, judge whether to continue that at least one schedule information for needing to shift was transferred in the determining date, if Continue, then follow the steps 306, otherwise, executes step 309;
Step 306, at least one schedule information for needing to shift will be transferred in the determining date, and to the day of conflict Journey information marks;
Step 307, it is confirmed whether at least one schedule information for needing to shift being transferred in the determining date, if confirming Transfer, thens follow the steps 308, no to then follow the steps 309;
Step 308, it would be desirable to which at least one schedule information of transfer was transferred in the determining date;
Step 309, terminate.
In force, the first schedule transfer instruction and/or the second schedule transfer instruction are determined by voice messaging, makes schedule To turn day enhanced convenience quick.
In embodiments of the present invention, the first schedule transfer instruction can also be determined by obtaining the information that user chooses manually Or second transfer instruction, determine that the first schedule transfer instruction or the second date transfer instruction are mutually tied with according to the voice messaging of user The method of conjunction carries out the transfer of schedule information, i.e., by obtain user choose manually information determine the first schedule transfer instruction with Determine that the second schedule transfer instruction is combined the transfer of progress schedule information according to the voice messaging of acquisition, or by according to acquisition Voice messaging determine that the first schedule transfer instruction chooses information and determine the second schedule transfer instruction manually with by obtaining user It is combined the transfer for carrying out schedule information.Specifically mainly determined by user using the transfer that above-mentioned mode carries out schedule information It is fixed.
In embodiments of the present invention, the schedule information shifted for needs, after shifting successfully, in the original date then It is automatically left out, such as by 15 in 10 days March in 2018:30~16:See client when 50,17:00~18:Video council when 00 View, 18:10~19:Yoga class when 00,19:30~20:Family dinner party is transferred to when 30 shift successfully on March 11st, 2018 after, 10 days 15 March in 2018:30~20:30 schedule information will no longer be 15:30~16:See client when 50,17:00~18: Video conference when 00,18:10~19:Yoga class when 00,19:30~20:Family dinner party when 30.
In some possible embodiments, the various aspects of schedule transfer provided in an embodiment of the present invention can also be realized For a kind of form of program product comprising program code, when program code is run on a computing device, program code is used Described in this specification schedule is turned according to various illustrative embodiments of the invention in making computer equipment execute Step in the method for shifting.
The arbitrary combination of one or more readable mediums may be used in program product.Readable medium can be that readable signal is situated between Matter or readable storage medium storing program for executing.Readable storage medium storing program for executing for example may be-but not limited to-electricity, magnetic, optical, electromagnetic, infrared The system of line or semiconductor, device or device, or the arbitrary above combination.The more specific example of readable storage medium storing program for executing is (non- Exhaustive list) include:Electrical connection, portable disc, hard disk, random access memory (RAM) with one or more conducting wires, Read-only memory (ROM), erasable programmable read only memory (EPROM or flash memory), optical fiber, the read-only storage of portable compact disc Device (CD-ROM), light storage device, magnetic memory device or above-mentioned any appropriate combination.
The program product for data forwarding control according to the embodiment of the present invention, may be used Portable, compact Disk read-only memory (CD-ROM) and include program code, and can be run on server apparatus.However, the program of the present invention Product is without being limited thereto, in this document, readable storage medium storing program for executing can be any include or storage program tangible medium, the program It can be transmitted by information, device either device use or in connection.
Readable signal medium may include in a base band or as the data-signal that a carrier wave part is propagated, wherein carrying Readable program code.Diversified forms may be used in the data-signal of this propagation, including --- but being not limited to --- electromagnetism letter Number, optical signal or above-mentioned any appropriate combination.Readable signal medium can also be other than readable storage medium storing program for executing it is any can Medium is read, which can send, propagate either transmission for being used by periodic network moving system, device or device Or program in connection.
The program code for including on readable medium can transmit with any suitable medium, including --- but being not limited to --- Wirelessly, wired, optical cable, RF etc. or above-mentioned any appropriate combination.
It can be write with any combination of one or more programming languages for executing the program that operates of the present invention Code, programming language include object oriented program language-Java, C++ etc., further include conventional process Formula programming language-such as " C " language or similar programming language.Program code can be calculated fully in user It executes in equipment, partly execute on a user device, being executed, partly in user calculating equipment as an independent software package Upper part executes or is executed in remote computing device or server completely on a remote computing.It is being related to remotely counting In the situation for calculating equipment, remote computing device can pass through the network of any kind --- including LAN (LAN) or wide area network (WAN)-it is connected to user calculating equipment, or, it may be connected to external computing device.
The embodiment of the present invention also provides a kind of computing device readable storage medium storing program for executing for the method for schedule transfer, that is, after powering off Content is not lost.Software program, including program code are stored in the storage medium, when program code is run on the computing device When, the software program can be realized when being read and executed by one or more processors the embodiment of the present invention it is any of the above it is a kind of into Scheme when row schedule shifts.
Based on same inventive concept, a kind of equipment of schedule transfer is additionally provided in the embodiment of the present invention, due to the equipment Corresponding is the corresponding equipment of method of schedule of embodiment of the present invention transfer, and the principle and this method that the equipment solves the problems, such as It is similar, therefore the implementation of the equipment may refer to the implementation of method, overlaps will not be repeated.
As shown in figure 4, for a kind of equipment of schedule transfer provided by the present application, which includes:At least one processing is single Member 400 and at least one storage unit 401, wherein the storage unit 401 has program stored therein code, works as said program code When being executed by the processing unit 400 so that the processing unit 400 executes following process:
According to the first schedule transfer instruction, at least one schedule letter shifted in user's designated date is determined Breath;
According to the second schedule transfer instruction, determine that user needs the date being transferred to;
It will determine that at least one schedule information shifted in user's designated date is transferred to the determining date In.
Optionally, the processing unit 400 is additionally operable to:
Determine that the schedule information shifted in user's designated date needs to shift with the determining user To date in schedule information do not conflict.
Optionally, the processing unit 400 is additionally operable to:
If it is determined that the schedule information shifted in user's designated date needs to turn with the determining user Schedule information conflict in the date moved on to, and determine user continue to shift, then will be needed in user's designated date into At least one schedule information of row transfer was transferred in the determining date, and was marked to the schedule of conflict;Or by the user The schedule information for occurring not conflict in designated date was transferred in the determining date, and was redefined to the schedule information of conflict User needs the date being transferred to, and judges the schedule information clashed in user's designated date and redefines user Need whether the schedule information in the date being transferred to conflicts.
Optionally, the processing unit 400 is additionally operable to:
If it is determined that the schedule information shifted in user's designated date needs to turn with the determining user Schedule information conflict in the date moved on to, and determine that user does not continue to shift, then it redefines user and needs the day being transferred to Phase judges at least one schedule information shifted in user's designated date and redefines user's needs turn Whether the schedule information in the date moved on to conflicts;Or stop transfer schedule information.
Optionally, the processing unit 400 is additionally operable to:
Obtain the voice messaging of user;
The first schedule transfer instruction and/or the second schedule transfer instruction are identified from the voice messaging.
As shown in figure 5, for the equipment of another schedule transfer provided by the present application, which includes:
First determining module 500, for according to the first schedule transfer instruction, determining and needing to carry out in user's designated date At least one schedule information of transfer;
Second determining module 501, for according to the second schedule transfer instruction, determining that user needs the date being transferred to;
Shift module 502, for that will determine at least one schedule information shifted in user's designated date It is transferred in the determining date.
Optionally, second determining module 501 is additionally operable to:
Determine that the schedule information shifted in user's designated date needs to shift with the determining user To date in schedule information do not conflict.
Optionally, second determining module 502 is additionally operable to:
If it is determined that the schedule information shifted in user's designated date needs to turn with the determining user Schedule information conflict in the date moved on to, and determine user continue to shift, then will be needed in user's designated date into At least one schedule information of row transfer was transferred in the determining date, and was marked to the schedule of conflict;Or by the user The schedule information for occurring not conflict in designated date was transferred in the determining date, and was redefined to the schedule information of conflict User needs the date being transferred to, and judges the schedule information clashed in user's designated date and redefines user Need whether the schedule information in the date being transferred to conflicts.
Optionally, second determining module 502 is additionally operable to:
If it is determined that the schedule information shifted in user's designated date needs to turn with the determining user Schedule information conflict in the date moved on to, and determine that user does not continue to shift, then it redefines user and needs the day being transferred to Phase judges at least one schedule information shifted in user's designated date and redefines user's needs turn Whether the schedule information in the date moved on to conflicts;Or stop transfer schedule information.
Optionally, which further includes:Sound identification module 503 is used to obtain the voice messaging of user;From the voice The first schedule transfer instruction and/or the second schedule transfer instruction are identified in information.
Above by reference to showing according to the method, apparatus (system) of the embodiment of the present application and/or the frame of computer program product Figure and/or flow chart describe the application.It should be understood that can realize that block diagram and or flow chart is shown by computer program instructions The combination of one block of figure and the block of block diagram and or flow chart diagram.These computer program instructions can be supplied to logical With computer, the processor of special purpose computer and/or other programmable data processing units, to generate machine so that via meter The instruction that calculation machine processor and/or other programmable data processing units execute creates for realizing block diagram and or flow chart block In specified function action method.
Correspondingly, the application can also be implemented with hardware and/or software (including firmware, resident software, microcode etc.).More Further, the application can take computer usable or the shape of computer program product on computer readable storage medium Formula has the computer realized in the medium usable or computer readable program code, to be made by instruction execution system It is used with or in conjunction with instruction execution system.In the present context, computer can be used or computer-readable medium can be with It is arbitrary medium, can includes, store, communicating, transmitting or transmitting program, is made by instruction execution system, device or equipment With, or instruction execution system, device or equipment is combined to use.
Obviously, various changes and modifications can be made to the invention without departing from essence of the invention by those skilled in the art God and range.In this way, if these modifications and changes of the present invention belongs to the range of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to include these modifications and variations.

Claims (11)

1. a kind of method of schedule transfer, which is characterized in that this method includes:
According to the first schedule transfer instruction, at least one schedule information shifted in user's designated date is determined;
According to the second schedule transfer instruction, determine that user needs the date being transferred to;
It will determine that at least one schedule information shifted in user's designated date was transferred in the determining date.
2. the method as described in claim 1, which is characterized in that after the determining user needs the date being transferred to, will determine User's designated date in before at least one schedule information for being shifted is transferred in the determining date, also wrap It includes:
Determine what the schedule information shifted in user's designated date was transferred to determining user's needs Schedule information in date does not conflict.
3. method as claimed in claim 2, which is characterized in that this method further includes:
If it is determined that the schedule information shifted in user's designated date needs to be transferred to the determining user Date in schedule information conflict, and determine user continue to shift, then will turn in user's designated date At least one schedule information moved was transferred in the determining date, and was marked to the schedule of conflict;Or the user is specified Date in the schedule information that occurs not conflict be transferred in the determining date, and user is redefined to the schedule information of conflict The date being transferred to is needed, judge the schedule information clashed in user's designated date and redefines user's needs Whether the schedule information in the date being transferred to conflicts.
4. method as claimed in claim 2, which is characterized in that this method further includes:
If it is determined that the schedule information shifted in user's designated date needs to be transferred to the determining user Date in schedule information conflict, and determine that user does not continue to shift, then redefine user and need date for being transferred to, sentence At least one schedule information shifted in disconnected user's designated date needs to be transferred to user is redefined Date in schedule information whether conflict;Or stop transfer schedule information.
5. the method as described in Claims 1 to 4 is any, which is characterized in that this method further includes:
Obtain the voice messaging of user;
The first schedule transfer instruction and/or the second schedule transfer instruction are identified from the voice messaging.
6. a kind of equipment of schedule transfer, which is characterized in that the equipment includes:At least one processing unit and at least one storage Unit, wherein the storage unit has program stored therein code, when said program code is executed by the processing unit so that The processing unit executes following process:
According to the first schedule transfer instruction, at least one schedule information shifted in user's designated date is determined;
According to the second schedule transfer instruction, determine that user needs the date being transferred to;
It will determine that at least one schedule information shifted in user's designated date was transferred in the determining date.
7. equipment as claimed in claim 6, which is characterized in that the processing unit is additionally operable to:
Determine what the schedule information shifted in user's designated date was transferred to determining user's needs Schedule information in date does not conflict.
8. equipment as claimed in claim 7, which is characterized in that the processing unit is additionally operable to:
If it is determined that the schedule information shifted in user's designated date needs to be transferred to the determining user Date in schedule information conflict, and determine user continue to shift, then will turn in user's designated date At least one schedule information moved was transferred in the determining date, and was marked to the schedule of conflict;Or the user is specified Date in the schedule information that occurs not conflict be transferred in the determining date, and user is redefined to the schedule information of conflict The date being transferred to is needed, judge the schedule information clashed in user's designated date and redefines user's needs Whether the schedule information in the date being transferred to conflicts.
9. equipment as claimed in claim 7, which is characterized in that the processing unit is additionally operable to:
If it is determined that the schedule information shifted in user's designated date needs to be transferred to the determining user Date in schedule information conflict, and determine that user does not continue to shift, then redefine user and need date for being transferred to, sentence At least one schedule information shifted in disconnected user's designated date needs to be transferred to user is redefined Date in schedule information whether conflict;Or stop transfer schedule information.
10. the equipment as described in claim 6~9 is any, which is characterized in that the processing unit is additionally operable to:
Obtain the voice messaging of user;
The first schedule transfer instruction and/or the second schedule transfer instruction are identified from the voice messaging.
11. a kind of equipment of schedule transfer, which is characterized in that the equipment includes:
First determining module is determined and is shifted in user's designated date for according to the first schedule transfer instruction At least one schedule information;
Second determining module, for according to the second schedule transfer instruction, determining that user needs the date being transferred to;
Shift module, for will determine that at least one schedule information shifted in user's designated date is transferred to really In the fixed date.
CN201810225748.XA 2018-03-19 2018-03-19 A kind of method and apparatus of schedule transfer Pending CN108537500A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201810225748.XA CN108537500A (en) 2018-03-19 2018-03-19 A kind of method and apparatus of schedule transfer
PCT/CN2018/110364 WO2019179081A1 (en) 2018-03-19 2018-10-16 Schedule transfer method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810225748.XA CN108537500A (en) 2018-03-19 2018-03-19 A kind of method and apparatus of schedule transfer

Publications (1)

Publication Number Publication Date
CN108537500A true CN108537500A (en) 2018-09-14

Family

ID=63484006

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810225748.XA Pending CN108537500A (en) 2018-03-19 2018-03-19 A kind of method and apparatus of schedule transfer

Country Status (2)

Country Link
CN (1) CN108537500A (en)
WO (1) WO2019179081A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019179081A1 (en) * 2018-03-19 2019-09-26 格力电器(武汉)有限公司 Schedule transfer method and device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020152105A1 (en) * 2001-04-16 2002-10-17 International Business Machines Corporation Apparatus, system and method for active scheduling of time based event-driven long running processes
JP2009187212A (en) * 2008-02-05 2009-08-20 Brother Ind Ltd Schedule coordination apparatus and schedule coordination program
CN103870942A (en) * 2014-04-04 2014-06-18 深圳市医诺智能科技发展有限公司 Medical treatment schedule managing method and system
CN105354702A (en) * 2015-11-23 2016-02-24 魅族科技(中国)有限公司 Conflict detection method and device for schedules
CN105678511A (en) * 2015-12-31 2016-06-15 联想(北京)有限公司 Schedule information processing method and device and electronic device
CN106469365A (en) * 2016-09-22 2017-03-01 北京小米移动软件有限公司 Agenda managing method and device

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6629698B2 (en) * 2016-08-22 2020-01-15 ファナック株式会社 Cell control system
CN106873988A (en) * 2017-01-17 2017-06-20 北京奇虎科技有限公司 A kind of alarm clock automatic adjusting method, device and mobile terminal
CN108537500A (en) * 2018-03-19 2018-09-14 珠海格力电器股份有限公司 A kind of method and apparatus of schedule transfer

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020152105A1 (en) * 2001-04-16 2002-10-17 International Business Machines Corporation Apparatus, system and method for active scheduling of time based event-driven long running processes
JP2009187212A (en) * 2008-02-05 2009-08-20 Brother Ind Ltd Schedule coordination apparatus and schedule coordination program
CN103870942A (en) * 2014-04-04 2014-06-18 深圳市医诺智能科技发展有限公司 Medical treatment schedule managing method and system
CN105354702A (en) * 2015-11-23 2016-02-24 魅族科技(中国)有限公司 Conflict detection method and device for schedules
CN105678511A (en) * 2015-12-31 2016-06-15 联想(北京)有限公司 Schedule information processing method and device and electronic device
CN106469365A (en) * 2016-09-22 2017-03-01 北京小米移动软件有限公司 Agenda managing method and device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019179081A1 (en) * 2018-03-19 2019-09-26 格力电器(武汉)有限公司 Schedule transfer method and device

Also Published As

Publication number Publication date
WO2019179081A1 (en) 2019-09-26

Similar Documents

Publication Publication Date Title
US11449220B2 (en) Electronic device including touch sensitive display and method for managing the display
KR102157289B1 (en) Method for processing data and an electronic device thereof
CN109725975B (en) Method and device for prompting read state of message and electronic equipment
US20180253209A1 (en) Electronic device for processing user input and method for processing user input
KR102635945B1 (en) Method for managing a schedule and electronic apparatus therefor
EP3182245B1 (en) Method and apparatus for providing user interface of electronic device
CN108432260B (en) Electronic device and image control method thereof
CN105824772B (en) Method and apparatus for managing data using multiple processors
KR102481687B1 (en) Job information processing method and electronic device supporting the same
EP3082028B1 (en) Apparatus and method for providing information via portion of display
EP2889741B1 (en) Screen display method and electronic device supporting same
EP3396517B1 (en) Electronic device and method for switching and aligning applications thereof
CN106055300B (en) Method for controlling sound output and electronic device thereof
KR20160126354A (en) Electronic apparatus and method for displaying message
US10884578B2 (en) Electronic device and method for controlling user interface of electronic device
EP3115912A2 (en) Method for displaying web content and electronic device supporting the same
KR102521214B1 (en) Method for displaying user interface and electronic device supporting the same
US20160065648A1 (en) Electronic device and method of executing function thereof
CN106339148A (en) Apparatus and method for providing memo function
EP3001656A1 (en) Method and apparatus for providing function by using schedule information in electronic device
KR102323797B1 (en) Electronic device and method for sharing information of the same
KR102665642B1 (en) Method for managing schedule and electronic device supporting the same
CN108537500A (en) A kind of method and apparatus of schedule transfer
CN108540644B (en) Method and electronic device for setting an alarm
US20160182498A1 (en) Separated use mobile devices

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180914