CN108534292A - The vertical parallel fresh air system of teaching building - Google Patents

The vertical parallel fresh air system of teaching building Download PDF

Info

Publication number
CN108534292A
CN108534292A CN201810449364.6A CN201810449364A CN108534292A CN 108534292 A CN108534292 A CN 108534292A CN 201810449364 A CN201810449364 A CN 201810449364A CN 108534292 A CN108534292 A CN 108534292A
Authority
CN
China
Prior art keywords
air
separate room
fresh air
supply pipeline
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810449364.6A
Other languages
Chinese (zh)
Inventor
张树信
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taian Lantian Purifying Technology Co Ltd
Original Assignee
Taian Lantian Purifying Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taian Lantian Purifying Technology Co Ltd filed Critical Taian Lantian Purifying Technology Co Ltd
Priority to CN201810449364.6A priority Critical patent/CN108534292A/en
Publication of CN108534292A publication Critical patent/CN108534292A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F7/00Ventilation
    • F24F7/04Ventilation with ducting systems, e.g. by double walls; with natural circulation
    • F24F7/06Ventilation with ducting systems, e.g. by double walls; with natural circulation with forced air circulation, e.g. by fan positioning of a ventilator in or against a conduit
    • F24F7/08Ventilation with ducting systems, e.g. by double walls; with natural circulation with forced air circulation, e.g. by fan positioning of a ventilator in or against a conduit with separate ducts for supplied and exhausted air with provisions for reversal of the input and output systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/70Control systems characterised by their outputs; Constructional details thereof
    • F24F11/72Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure
    • F24F11/74Control systems characterised by their outputs; Constructional details thereof for controlling the supply of treated air, e.g. its pressure for controlling air flow rate or air velocity
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/02Ducting arrangements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/24Means for preventing or suppressing noise
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/28Arrangement or mounting of filters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F3/00Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems
    • F24F3/12Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems characterised by the treatment of the air otherwise than by heating and cooling
    • F24F3/16Air-conditioning systems in which conditioned primary air is supplied from one or more central stations to distributing units in the rooms or spaces where it may receive secondary treatment; Apparatus specially designed for such systems characterised by the treatment of the air otherwise than by heating and cooling by purification, e.g. by filtering; by sterilisation; by ozonisation
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F8/00Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying
    • F24F8/60Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying by adding oxygen

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Ventilation (AREA)
  • Building Environments (AREA)

Abstract

The present invention provides a kind of vertical parallel fresh air system of teaching building, it includes, new wind turbine, the air supply pipeline being vertically set in same ordered series of numbers separate room, the air return pipeline parallel with air supply pipeline, three constitute parallel vertical fresh air system, will not destroy the overall appearance layout of teaching building, interior occupies little space, noiseless, a new wind devices complete the fresh air conveying in multiple rooms of same ordered series of numbers, and installation is safeguarded simple, energy saving, noise is low.

Description

The vertical parallel fresh air system of teaching building
Technical field
The present invention relates to air cleaning facility technical fields, are specifically a kind of teaching building vertically parallel fresh air system System.
Background technology
A set of independent air processing system that fresh air system is made of supply air system and exhaust system, according to closed Fresh air is sent in indoor side with special equipment to interior, then from the other side from special equipment to outdoor discharge, can be formed indoors " new The principle of wind flow field ", to meet the needs of indoor fresh air ventilating.Fresh air system is divided into duct type fresh air system and without pipeline Two kinds of fresh air system, duct type fresh air system is made of new wind turbine and pipe fitting, passes through air outside new wind turbine cleaning processing chamber Interior is imported, room air is discharged by pipeline;Without pipeline fresh air system(Cabinet-type air conditioner crosses wall hanging machine)By Fresh air handling units at equally Interior is entered by new wind turbine clean room outer space conductance, duct type fresh air system is done since quantities is more suitable for greatly industrial or large area Public area uses, and is then more suitable for independent room without pipeline fresh air system and uses, for current fresh air system structure, exist with Under several defects:
1. occupied space is big, new fan body needs to install indoors, pipe-line layout or furred ceiling or is placed in underground, as furred ceiling is new Wind turbine needs to be mounted at the top of classroom or corridor, and pipeline is complicated, and is exposed to top, and not only constructional difficulties, also there is space Certain requirement;
2. new wind turbine or air cleaner installation are indoors, noise, such as cabinet-type air conditioner or wall hanging machine certainly will be will produce, single air port or The logical outdoor in double air ports, to meet fresh air volume, power must assure that noise is unavoidable, and high classroom, place are required for mute The places such as house, hospital are not suitable for the such equipment of installation.
The especially big separate room environment of the indoor density of population such as teaching building, dormitory building almost needs every separate room to be arranged one newly Wind turbine does not only take up certain space, and noise can not avoid, influences environmental demand to meet air purification demand, and Exterior wall per building building is not necessarily suitable for drilling operation(New fan vent installation needs), such as glass curtain wall, cladding Dali Stone exterior wall needs and the extraneous wall etc. contacted but be not suitable for placing machine.
Invention content
In order to solve the above technical problems, the present invention provides a kind of vertical parallel fresh air system of teaching building, one New Fan Equipment meets more floor separate room air purification demands of entire perpendicular row, and indoor no or low noise is laid out construction is simple, accounts for Small with space, External Wall does not punch, and saves energy consumption, is particularly suitable for the teaching building, dormitory building, hospital of low noise environment demand.
For achieving the above object, the technical solution used in the present invention is:
A kind of vertical parallel fresh air system of teaching building, it includes new wind turbine, air supply pipeline, and the new wind turbine is arranged in building Top on layer ensures that new wind turbine is arranged outside the separate room for needing to be improved air quality, is arranged in roof, construction maintenance side Just, noise does not interfere with lower layer, and air outlet is arranged in new wind turbine, and air outlet is connected to air supply pipeline, the air supply pipeline edge Wall is vertically arranged between single perpendicular list, and air supply pipeline is provided with separate room air outlet and is connected to separate room, and above-mentioned separate room refers to same The room that needs on ordered series of numbers are blown, can be individual room, can also be inner room.
The teaching building further includes air return pipeline with vertical parallel fresh air system, and air return pipeline is parallel with air supply pipeline, single Between be provided with separate room return air inlet and be connected to air return pipeline, air supply pipeline it is vertical with air return pipeline composition it is parallel walk wind system.
Further, the air supply pipeline is VERTICAL TUBE.
Further, the air supply pipeline caliber from top to bottom, successively decreases successively as needed, and floor is relatively low, is such as less than Four layers, air-supply decays and small can directly select straight tube, the higher air supply pipeline using caliber reduction structure of floor.
Further, air supply pipeline, air return pipeline are arranged at the interior angle of separate room, and through-hole is provided between upper and lower separate room, use To pass through air supply pipeline or air return pipeline.
Further, the air supply pipeline in every layer of separate room or air return pipeline are provided with one or more separate room air outlets.
Further, separate room air outlet is arranged with separate room return air inlet in adjacent chamber's interior angle, or relatively indoor angle, wind direction road Diameter include diagonally leak out, diversified forms, preferred as shown below, separate room air outlet and the setting of separate room return air inlet such as Qian shape leaks out At two interior angles of same avris wall, the coverage mode that Qian shape leaks out is realized:
To be further ensured that air-supply noise reduction, silencing means is set at new wind turbine air outlet, silencing means is dropped using existing pipeline It makes an uproar equipment, such as dissipative muffler, reactive muffler, impedance composite muffler.
Further, air-valve is arranged in the described separate room air outlet, by the opening and closing degree realization separate room air output of air-valve can Control.
Further, to meet separate room air quality, filtration, purification layer, noise reduction layer are additionally provided at the air outlet of separate room, such as The filter devices such as filter cotton.
The new wind turbine is the prior art, and a kind of gas processing device is defeated by wind turbine after being handled outdoor wind Enter ajutage, outdoor wind can pass through the measures such as heating, purification, oxygen-rich treated and be sent into air supply pipeline.
The new wind turbine is provided with air quantity adjusting control device, and adjustable control is carried out to air output,
Fresh air air stream drives power realizes that power requirement is selected according to number of floor levels by air blower in new wind turbine, such as four layers of teaching building, Ensured by being located at the air-valve of branching pipe road, the lowermost Stall is identical with four buildings air outputs of the top.
The present invention the course of work be:Processed new air stream is sent into the multilayer of same column by new wind turbine by air supply pipeline Separate room, completes the introducing of fresh air, and dirty air can be discharged by two ways:1. the ventilations such as door, window, ventilation opening fill It sets and is in communication with the outside;2. preferred, the strong separate room of closure is concentrated by air return pipeline and is drawn, air supply pipeline and air return pipeline structure At vertical induced draught system in parallel, all separate rooms stronger separate room of especially seal in same column can obtain fresh air simultaneously Introducing, drawn by air return pipeline.
The present invention program's has the beneficial effect that:
1. aeration device is arranged at the top of floor, easy to maintain, ensure indoor no or low noise circumstance;
2. only needing simple furred ceiling stringing in Room, without installing the new wind turbine of cabinet type or wall type, space, construction is simple are saved;
3. a new wind turbine, which to more floor separate rooms on same vertical line concentrate, changes wind, energy saving.
4. walking air pipe line is located at indoor corner, up and down mode, separate room wall need not punching, will not destroy wall and Outdoor wall surface is laid out and appearance.
Description of the drawings
Fig. 1 is 1 structural schematic diagram of the embodiment of the present invention;
Fig. 2 is 2 structural schematic diagram of the embodiment of the present invention;
Fig. 3 is that interior leaks out coverage mode schematic diagram.
Specific implementation mode
A kind of vertical parallel fresh air system of the teaching building as shown in Fig. 1 of embodiment 1., it includes new wind turbine, air-supply Pipeline, the new wind turbine are arranged on floor top, ensure that new wind turbine is arranged in the separate room for needing to be improved air quality The attic in roof or upper end is arranged in outside, and construction maintenance is convenient, and noise does not interfere with lower layer, and new wind turbine is provided with air-supply Mouthful, air outlet is connected to air supply pipeline, and air supply pipeline wall between single perpendicular list is vertically arranged, and air supply pipeline is provided with Separate room air outlet is connected to separate room.
Air supply pipeline can be arranged in teaching building back side exterior wall, and back side punching installation separate room air-supply is carried out to every classroom Mouthful, it is preferably located on the interior angle of classroom back side wall, passes through connection type up and down.
Processed new air stream is sent into the multilayer separate room of same column by new wind turbine by air supply pipeline, completes fresh air It introduces, dirty air can be discharged by two ways:1. the ventilation devices such as door, window, ventilation opening are in communication with the outside;2. it is preferred that , the strong separate room of closure is concentrated by air return pipeline and is drawn, and air supply pipeline constitutes vertical induced draught system in parallel with air return pipeline, All separate rooms stronger separate room of especially seal in same column, can obtain the introducing of fresh air, pass through air return pipeline simultaneously It draws.
A kind of vertical parallel fresh air system of the teaching building as shown in Fig. 2 of embodiment 2., it includes new wind turbine, send Air pipe line, the new wind turbine are arranged on floor top, ensure that new wind turbine is arranged in the list for needing to be improved air quality Between it is external, the attic in roof or upper end is set, and new wind turbine is provided with air outlet, and air outlet is connected to air supply pipeline, described Air supply pipeline wall between single perpendicular list is vertically arranged, and air supply pipeline is provided with separate room air outlet and is connected to separate room, further includes back Air pipe line, air return pipeline is parallel with air supply pipeline, and separate room is provided with separate room return air inlet and is connected to air return pipeline, air supply pipeline with return Air pipe line constitute it is vertical it is parallel walk wind system.
Further, the air supply pipeline is VERTICAL TUBE.
Further, the air supply pipeline caliber from top to bottom, successively decreases successively, can successively decrease by height distance, It is excessively high that this kind of structure design allows for floor, and air-supply will appear decaying, and the air-supply effect of lower end is improved by necking mode.
Further, air supply pipeline, air return pipeline are arranged at the interior angle of separate room, and through-hole is provided between upper and lower separate room, use To pass through air supply pipeline or air return pipeline.
Further, the air supply pipeline in every layer of separate room or air return pipeline are provided with one or more separate room air outlets.
Further, adjacent chamber's interior angle that separate room air outlet is arranged with separate room return air inlet in separate room, or it is relatively indoor Angle, wind direction Path form is a variety of, including diagonally leaks out, the diversified forms such as Qian shape leaks out, preferred as shown in figure 3, separate room is blown Mouth is arranged with separate room return air inlet at two interior angles of same avris wall, realizes the coverage mode that Qian shape leaks out:
To be further ensured that air-supply noise reduction, silencing means is set at new wind turbine air outlet, silencing means is dropped using existing pipeline It makes an uproar equipment, such as dissipative muffler, reactive muffler, impedance composite muffler.
Further, air-valve is arranged in the described separate room air outlet, by the opening and closing degree realization separate room air output of air-valve can Control.
Further, to meet separate room air quality, filtration, purification layer, noise reduction layer are additionally provided at the air outlet of separate room, such as The filter devices such as filter cotton.
The new wind turbine is prior art device, and a kind of gas processing device passes through wind after being handled outdoor wind Machine inputs ajutage, and outdoor wind can pass through the measures such as heating, purification, oxygen-rich treated and be sent into air supply pipeline.It is general 12 meters long Vertical ventilation pipeline, four floor height can be met, it is 5000-6000 cubes m/h of wind turbine to need nominal air delivery, generally For the power of fan of this rank at 1.1 kilowatts or so, return air air quantity should be more smaller than air-supply air quantity, generally with 0.8 dry watt Wind turbine.
The new wind turbine is provided with air quantity adjusting control device loaded in classroom, and adjustable control is carried out to air output,
Fresh air air stream drives power realizes that power requirement is selected according to number of floor levels by air blower in new wind turbine, such as four layers of teaching building, Ensured by being located at the air-valve of branching pipe road, the lowermost Stall is identical with four buildings air outputs of the top.
Teaching building vertical parallel fresh air system, application and inpatient department of the embodiment 3. with embodiment 2.
Embodiment 4. with embodiment 2 the vertical parallel fresh air system of teaching building, using with intensive dormitory building.
Described above is only the preferred embodiment of invention, it is noted that the those of ordinary skill of technical field is come It says, without departing from the principle of the present invention, several improvement can also be made, these are improved before not making the creative labor It puts and also should be regarded as protection scope of the present invention.

Claims (10)

1. a kind of vertical parallel fresh air system of teaching building, it is characterized in that:It includes fresh air purifier, air supply pipeline, described Fresh air purifier be arranged on floor top, ensure that new wind turbine is arranged outside the separate room for needing to be improved air quality, New wind turbine is provided with air outlet, and air outlet is connected to air supply pipeline, and air supply pipeline wall between single perpendicular list is vertically set It sets, air supply pipeline is provided with separate room air outlet and is connected to separate room, and above-mentioned separate room refers to the room that the needs on same ordered series of numbers are blown Between.
2. the vertical parallel fresh air system of teaching building according to claim 1, it is characterized in that:
Further include air return pipeline, air return pipeline is parallel with air supply pipeline, and separate room is provided with separate room return air inlet and is connected to air return pipeline, Air supply pipeline it is vertical with air return pipeline composition it is parallel walk wind system.
3. the vertical parallel fresh air system of teaching building according to claim 1 or 2, it is characterized in that:The ajutage Road is VERTICAL TUBE.
4. the vertical parallel fresh air system of teaching building according to claim 3, it is characterized in that:The air supply pipeline pipe Diameter from top to bottom, successively decreases successively.
5. the vertical parallel fresh air system of teaching building according to claim 1 or 2, it is characterized in that:Air supply pipeline, return air Pipeline is arranged at the interior angle of separate room, through-hole is provided between upper and lower separate room, to pass through air supply pipeline or air return pipeline.
6. the vertical parallel fresh air system of teaching building according to claim 1 or 2, it is characterized in that:In every layer of separate room Air supply pipeline or air return pipeline are provided with one or more separate room air outlets.
7. the vertical parallel fresh air system of teaching building according to claim 1 or 2, it is characterized in that:Separate room air outlet with Separate room return air inlet is arranged in adjacent chamber's interior angle, or relatively indoor angle.
8. the vertical parallel fresh air system of teaching building according to claim 1, it is characterized in that:At new wind turbine air outlet Silencing means is set.
9. the vertical parallel fresh air system of teaching building according to claim 1, it is characterized in that:The separate room air outlet Air-valve is set, the controllable of separate room air output is realized by the opening and closing degree of air-valve.
10. the vertical parallel fresh air system of teaching building according to claim 1 or 2, it is characterized in that:The fresh air system is answered For hospital ward building or dormitory building.
CN201810449364.6A 2018-05-11 2018-05-11 The vertical parallel fresh air system of teaching building Withdrawn CN108534292A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810449364.6A CN108534292A (en) 2018-05-11 2018-05-11 The vertical parallel fresh air system of teaching building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810449364.6A CN108534292A (en) 2018-05-11 2018-05-11 The vertical parallel fresh air system of teaching building

Publications (1)

Publication Number Publication Date
CN108534292A true CN108534292A (en) 2018-09-14

Family

ID=63476918

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810449364.6A Withdrawn CN108534292A (en) 2018-05-11 2018-05-11 The vertical parallel fresh air system of teaching building

Country Status (1)

Country Link
CN (1) CN108534292A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114413378A (en) * 2021-12-31 2022-04-29 安徽悦达环保科技有限公司 Multi-level exhaust equipment of underground garage

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2508126Y (en) * 2000-09-11 2002-08-28 中国船舶工业总公司第七研究院第七○三研究所 Ring grid power dust remover
CN2789664Y (en) * 2005-04-14 2006-06-21 Tcl集团股份有限公司 Air conditioner coupling pipe capable of freely bending
CN102442761A (en) * 2010-10-12 2012-05-09 陈莉 Method for producing ultra-thin glass
CN102865623A (en) * 2012-09-28 2013-01-09 季涛 Centralized heating public building heat supply energy-saving control method
CN103383121A (en) * 2012-05-03 2013-11-06 南京市建筑设计研究院有限责任公司 District air-conditioner distributed secondary pump system
CN104028020A (en) * 2014-05-18 2014-09-10 浙江军马神铝业有限公司 Secondary filtering device for process oil of aluminum foil rolling mill
CN204042279U (en) * 2014-07-17 2014-12-24 河南同济恒爱暖通消防有限公司 The effective tee union of a kind of air feed
CN205579853U (en) * 2016-04-22 2016-09-14 苏州艾尔新净化科技有限公司 New trend clean system is used in classroom
CN106765581A (en) * 2017-01-10 2017-05-31 张树信 A kind of tandem VMC between classroom
CN206361827U (en) * 2016-12-29 2017-07-28 黑龙江大学 A kind of solar energy Classroom air purifier
CN206361854U (en) * 2016-12-29 2017-07-28 黑龙江大学 A kind of energy-saving classroom air purifier
CN206361852U (en) * 2016-12-29 2017-07-28 黑龙江大学 A kind of Classroom air purifier
CN206459260U (en) * 2017-01-10 2017-09-01 张树信 A kind of tandem VMC being used between classroom
CN206500001U (en) * 2017-01-17 2017-09-19 浙江大学 A kind of medium-and-large-sized air cleaning system of solid-state fan Coupling Adsorption purification
CN107965859A (en) * 2017-10-13 2018-04-27 浙江理工大学 A kind of two-way divides equally fresh air induction dry coil pipe air-conditioning device
CN208458189U (en) * 2018-05-11 2019-02-01 泰安市蓝天净化科技有限公司 The vertical parallel fresh air system of teaching building

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2508126Y (en) * 2000-09-11 2002-08-28 中国船舶工业总公司第七研究院第七○三研究所 Ring grid power dust remover
CN2789664Y (en) * 2005-04-14 2006-06-21 Tcl集团股份有限公司 Air conditioner coupling pipe capable of freely bending
CN102442761A (en) * 2010-10-12 2012-05-09 陈莉 Method for producing ultra-thin glass
CN103383121A (en) * 2012-05-03 2013-11-06 南京市建筑设计研究院有限责任公司 District air-conditioner distributed secondary pump system
CN102865623A (en) * 2012-09-28 2013-01-09 季涛 Centralized heating public building heat supply energy-saving control method
CN104028020A (en) * 2014-05-18 2014-09-10 浙江军马神铝业有限公司 Secondary filtering device for process oil of aluminum foil rolling mill
CN204042279U (en) * 2014-07-17 2014-12-24 河南同济恒爱暖通消防有限公司 The effective tee union of a kind of air feed
CN205579853U (en) * 2016-04-22 2016-09-14 苏州艾尔新净化科技有限公司 New trend clean system is used in classroom
CN206361852U (en) * 2016-12-29 2017-07-28 黑龙江大学 A kind of Classroom air purifier
CN206361827U (en) * 2016-12-29 2017-07-28 黑龙江大学 A kind of solar energy Classroom air purifier
CN206361854U (en) * 2016-12-29 2017-07-28 黑龙江大学 A kind of energy-saving classroom air purifier
CN106765581A (en) * 2017-01-10 2017-05-31 张树信 A kind of tandem VMC between classroom
CN206459260U (en) * 2017-01-10 2017-09-01 张树信 A kind of tandem VMC being used between classroom
CN206500001U (en) * 2017-01-17 2017-09-19 浙江大学 A kind of medium-and-large-sized air cleaning system of solid-state fan Coupling Adsorption purification
CN107965859A (en) * 2017-10-13 2018-04-27 浙江理工大学 A kind of two-way divides equally fresh air induction dry coil pipe air-conditioning device
CN208458189U (en) * 2018-05-11 2019-02-01 泰安市蓝天净化科技有限公司 The vertical parallel fresh air system of teaching building

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
冷超群,李长城,曲梦露主编: "《建筑节能设计》" *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114413378A (en) * 2021-12-31 2022-04-29 安徽悦达环保科技有限公司 Multi-level exhaust equipment of underground garage

Similar Documents

Publication Publication Date Title
CN206191842U (en) Air supply arrangement of application skirting line air supply and new trend conveying system thereof
CN207214278U (en) Top set changes in temperature one air-conditioning
CN206786983U (en) One kind oxygen VMC
CN209726431U (en) Indoor micro-positive pressure fresh air system
CN108344093A (en) A kind of engineering industry energy-saving ventilation system
CN206145892U (en) Indoor air purification equipment
CN208458189U (en) The vertical parallel fresh air system of teaching building
CN108534292A (en) The vertical parallel fresh air system of teaching building
CN205717732U (en) A kind of fresh air dehumidifying system
CN202254094U (en) Wall-mounted ventilation structure
CN208536257U (en) A kind of house ornamentation fresh air pipeline system
CN105299857B (en) Fresh air cleaning efficiency multiplier and system
CN103604188B (en) Domestic indoor/outdoor air circulation system
CN201748560U (en) Split type air convection machine
CN204460609U (en) Window central authorities VMC
KR102129080B1 (en) Eco-Friendly Cleaning Ventilation System of Indoor Air
CN207797316U (en) Intelligent gas stream guidance system
CN108644958B (en) Air purifying wall unit and air purifying wall system
CN102705948A (en) Natural ventilation system of high-rise building
CN208293721U (en) A kind of noise reduction multi-functional sewer pipe
CN207555872U (en) A kind of energy saving ventilation system of green building
CN206347691U (en) Based on the prefabricated fresh air replacement device of building industrialization
CN206786975U (en) A kind of wall-mounted new blower fan
CN205957362U (en) New trend system of central authorities with ion purification performance
CN1987232A (en) Outdoor circulation ventilation device for building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20180914

WW01 Invention patent application withdrawn after publication