CN108533277A - Major diameter slurry shield passes through shanty town settlement Control construction over long distances under the conditions of non-reinforced - Google Patents

Major diameter slurry shield passes through shanty town settlement Control construction over long distances under the conditions of non-reinforced Download PDF

Info

Publication number
CN108533277A
CN108533277A CN201810323276.1A CN201810323276A CN108533277A CN 108533277 A CN108533277 A CN 108533277A CN 201810323276 A CN201810323276 A CN 201810323276A CN 108533277 A CN108533277 A CN 108533277A
Authority
CN
China
Prior art keywords
shield
grouting
pressure
mud
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810323276.1A
Other languages
Chinese (zh)
Other versions
CN108533277B (en
Inventor
李世杰
王殿英
袁海峰
薛飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongqi Jiaojian Group Corp Ltd
Original Assignee
Zhongqi Jiaojian Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongqi Jiaojian Group Corp Ltd filed Critical Zhongqi Jiaojian Group Corp Ltd
Priority to CN201810323276.1A priority Critical patent/CN108533277B/en
Publication of CN108533277A publication Critical patent/CN108533277A/en
Application granted granted Critical
Publication of CN108533277B publication Critical patent/CN108533277B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/003Arrangement of measuring or indicating devices for use during driving of tunnels, e.g. for guiding machines
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0607Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield being provided with devices for lining the tunnel, e.g. shuttering
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0642Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield having means for additional processing at the front end
    • E21D9/0678Adding additives, e.g. chemical compositions, to the slurry or the cuttings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/08Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Environmental & Geological Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses it is a kind of it is non-reinforced under the conditions of major diameter slurry shield pass through shanty town settlement Control construction over long distances, include the following steps:(One)Preparation measures before shield crossing;(Two)Shield crossing shanty town Construction Control Measures;(Three)Settlement Control measure after shield crossing.The engineering method of the present invention does not carry out consolidation process to above ground structure.Constructing tunnel disturbance is slight, smaller by region ground settlement, is influenced on the intensive shanty town of relevant range earth's surface minimum.Day driving amount can reach 8 rings(16m), construction efficiency height.Realize shield pass through before, the monitoring of all the period of time by period and after passing through, it is ensured that the construction safety that shield passes through intensive shanty town.

Description

Major diameter slurry shield passes through shanty town settlement Control over long distances and applies under the conditions of non-reinforced Work engineering method
Technical field
The present invention relates to it is a kind of it is non-reinforced under the conditions of major diameter slurry shield pass through shanty town settlement Control construction over long distances Engineering method belongs to technical field of building construction.
Background technology
With the continuous propulsion of Chinese Urbanization construction process, traffic problems are increasingly notable caused by population increase, city Traffic pressure increases year by year, and more and more cities start to build Subway Network in China.To facilitate citizens' activities to the full extent, The big multipath dense population areas of city underground circuit or business aggregation ground, these regional architectures are intensive, flow of the people is big, for for Subway work disturbance requires high.Slurry shield construction technology is because its mechanization degree is high, noise is small, disturbance is small, safe and efficient The characteristics of, it is widely used in recent years in urban subway tunnel engineering construction, highly shortened the construction period of subway tunnel, The safety for improving subway engineering construction, promotes the development of subway engineering to a certain extent.
Invention content
The technical problem to be solved by the present invention is to:Major diameter slurry shield is worn over long distances under the conditions of offer one kind is non-reinforced More shanty town settlement Control construction
In order to solve the above technical problems, the technical solution adopted by the present invention is:
It is provided by the invention it is non-reinforced under the conditions of major diameter slurry shield pass through shanty town settlement Control construction work over long distances Method includes the following steps:
(1) preparation measures before shield crossing
1 building As-Is Assessment and control standard formulation
Before shield launching, commission has the third party of experience, corresponding qualification to existing buildings or structures along shanty town Security risk assessment is carried out, according to on-site investigation, inspection result, structural-load-carrying capacity and normal use requirement is taken into account, joins simultaneously Similar engineering is examined, the remaining resistance index of engineering structure is analyzed and calculated, to obtain As-Is Assessment Outcome Document, until Include architecture quality As-Is Assessment, structure residual resistance index assessment less (containing remaining non-deformability, Residual Loading Capacity etc.) And suggest treatment measures, building basic condition is investigated, is verified before construction, in conjunction with As-Is Assessment as a result, formulating safety Control standard.
2 shield driving test sections
Using the initial 75m of shield driving as test section, used by ground deformation monitoring data and shield-tunneling construction Parameter grasps the correlativity of shield machine boring parameter and ground settlement, continues to optimize adjustment.Every technology number when to promoting According to being acquired, counting, analyzing, strives for the operating characteristics for grasping Shield-type machinery equipment within a short period of time, determine shield driving Construction parameter setting range.
(2) shield crossing shanty town Construction Control Measures
The stage and form Corresponding Countermeasures that 1 analysis sedimentation is formed
Shield Tunneling certainly will cause the loosening and depression of surrounding soil, it intuitively shows as settling or swell.By it Influencing the construction of structures of tunnel neighbouring area will be deformed, settle or conjugate, so that make structures function by damaged or broken It is bad.Surface subsidence caused by shield driving by ground settlement changing rule can be divided into initial stage sedimentation, excavation face sedimentation (or protuberance), By when shield body at the top of sedimentation, the sedimentation of shield tail gap and long-term continue five stages such as sedimentation.
(1) initial stage sedimentation be in face of shield tunneling necromancer body pore water reduce, the soil body be squeezed it is compacted and formed sedimentation.
(2) excavation face sedimentation (or protuberance) refers to the part ground deformation immediately ahead of excavation face.Due to applying at working face Mud hydraulic pressure, it is possible to create the excessive protuberance of face pressure or pressure it is too small and generate sedimentation, pore water pressure increase, Total stress increase forms the protuberance on ground.
(3) by when shield body at the top of sedimentation be shield by when the surface subsidence that generates.This stage is divided into two parts: The sedimentation that mechanical function of the part between driving stratum and body generates, a part is between driving size and body diameter Sedimentation caused by taper gap.During entire shield driving, shield is by gross thrust, skin friction resistance and earth balance pressure The effect of three power of power.Since frictional resistance acts on, just generate shear stress in the soil layer of body periphery sliding surface, stratum because by The tensile stress sheared and generated causes soil to be moved at once to the gap after shield.Keep shield consistent with tunnel axis, In progradation, shield institute must compress a part of soil, relaxation another part soil through place.It keeps out the part of compression The deviation of shield, and the part of relaxation then brings surface subsidence.
Taper difference of the another part between cutterhead digging diameter and shield body shield tail, due to the digging diameter of shield machine Slightly larger than shield body diameter, and shield body diameter is slightly larger than shield tail diameter, and the digging diameter of this shield machine is up to 12.55 meters, and preceding shield body A diameter of 12.51 meters, a diameter of 12.49 meters of middle shield, a diameter of 12.47 meters of shield tail, therefore the sky between excavation face and shield tail The purpose of gap is about 4cm, this space does not carry out being taper space before grouting be- hind segment in section of jurisdiction abjection shield tail, this space be in order to It reduces the soil body extruding force and the frictional force of shield machine is arranged, but is likely to form top sedimentation in tunneling process One space.
(4) sedimentation of shield tail gap is happened at after shield tail passes through.Cause sedimentation the reason of be shield poop erection gap and Soil layer is disturbed around tunnel.The shield tail diameter 12.47m of the shield machine, 12.1 meters of section of jurisdiction outer diameter, gap is filled with 22.5cm. Will the support of shield body be lost suddenly when the soil body is detached from shield machine body fuselage, and be converted to section of jurisdiction support, but dashed forward herein Section of jurisdiction outside and the building gap of shield body will not fill closely knit at once during change, therefore produce periphery soil body relaxation, stress Release, as grouting at the tail of the shield machine cannot in time high quality follow-up, it will form the surface subsidence of larger area.
(5) continue depression for a long time
It refer to the sedimentation still carried over for a comparatively long period of time after shield passes through.It is bright that clay foundation continues sedimentation for a long time It is aobvious to be more than sandy subgrade.Therefore, this kind of plastic deformation for settling the Creep Characteristics for being attributed to foundation soil.The sedimentation cause in the stage It is that the nature of soil layer and tunnel surrounding soil are disturbed.Its lag time and the type of shield, geological conditions, construction matter The factors such as amount are related.
How to control the sedimentation of each stage in five stages and reach minimum, then the accumulative sedimentation of driving and follow-up phase Amount must be minimum, therefore formulates the effective technology measure of corresponding control settlement and protuberance, just can guarantee smoothly wearing for shanty town More.Injection that main technical measures are imitated from boring parameter, mud film quality, mud pressure control, gram mud, a synchronous grouting matter Amount control and the control of necessary secondary grouting and auxiliary monitoring measurement means are completed.
2 mud film qualities control
In order to reinforce the support capacity to the front soil body, ground grout is prevented, is pushed away using high specific gravity, highly viscous mud Into.Common Soft Soil Layer, sandy soil layer, mud balance are 1.1~1.2g/cm3, and viscosity is 17~20 seconds.It is built passing through shanty town Mud balance control is controlled in 1.2~1.25g/cm3, viscosity at 18~22 seconds when building object.Plugging material is properly added in mud, The percentage of water loss in the stratomere (layer of sand) is reduced, safeguards the stabilization of face.To ensure quality of mud fluid, in progradation, mud Water process personnel increase the test frequency of muddy water, adjust muddy water parameter in time, ensure being smoothed out for driving.
When shield, which needs to shut down in conventional thin silt, carries out warehouse entry upkeep operation with pressure, need to increase mud ratio Weight improves mud viscosity, and mud viscosity reaches the requirement that can meet warehouse entry with pressure in 35~40 seconds under normal conditions.Shield driving To water pressure higher section when, need in heavy viscous mud add pressurize short-term training material, it is ensured that mud film all has in the stipulated time Good performance of holding one's breath.
3 critical construction parameter finely regulatings
Tunneling process should require the parameters of reasonable set shield driving in conjunction with geological condition and surrounding enviroment protection.Pick Shield working order, boring parameter variation should be monitored and recorded in, into spoil disposal situation, and analysis feedback in time, adjustment driving Parameter controls shield attitude.The strict control in construction makes practical muddy water pressure be slightly larger than calculated value.By information-aided construction and When adjustment and corrected parameter, so that mud hydraulic pressure value is within zone of reasonableness.
(1) notch pressure controls
Notch pressure point calculates formula according to following water and soil:
Notch hydraulic pressure upper limit value:
POn=P1+P2+P3
w×h+K0×[(γ-γw)×h+γ×(H-h)]+20
In formula:POn- notch hydraulic pressure upper limit value (kPa);
P1- groundwater pressure (kPa);
P2- earth pressure at rest (kPa);
P3- become dynamic soil pressure, generally take 20kPa;
γwMolten heavy (the kN/m of-water3);
H-level of ground water edpth of tunnel below (calculates to tunnel center) (m);
Molten heavy (the kN/m of γ-soil3);
H-edpth of tunnel (calculates to tunnel center) (m);
K0- coefficient of static earth pressure.
Notch hydraulic pressure lower limiting value:
In formula:PUnder- notch hydraulic pressure lower limiting value (kPa);
P′2'-active earth pressure (kPa);
Ka- coefficient of active earth pressure;
cuThe cohesiveness (kPa) of-soil.
For this engineering when test section tunnels, notch pressure value adds the correction value of 0.2bar on the basis of calculated value, And according to the feedback of tunneling process surface subsidence monitoring data, optimization notch pressure value is corrected in time, it is ensured that shield crossing canopy The matching of notch pressure and stratum when family area building.
Notch water pressure fluctuations are too big simultaneously, can increase the disturbance of the front soil body, and the front soil body is caused to be lost in.Therefore it is constructing In should by notch water pressure fluctuations value control between -10kPa~10kPa, ensure soil stabilization.
(2) cutterhead rotating speed
It is promoted in Soft Soil Layer, cutterhead rotating speed should not be too large, and the rate of wear of cutter otherwise can be caused to accelerate, and high rotating speed holds Larger disturbance is easily caused to Soft Soil Layer, and the cutterhead rotating speed control of shanty town location is worn under shield in 0.8rpm~1.2rpm, is being pushed away When increasing into speed, in the case that cone penetration is more than 50, can suitably it increase speed, but be usually no more than 1.2rpm.
(3) driving speed controls
To ensure that shield can normally cut soil stabilization area, prevent mud line suction inlet from blocking, control promotes axis, protection Cutterhead, fltting speed is unsuitable too fast when originating, and so that shield is slowly steered a steady course, the driving speed before host fully enters stabilization zone Control can step up driving speed to 30mm/min in 3~5mm/min after shield machine is detached from stabilization zone.
Under the conditions of normal driving, driving speed should be set as 15~30mm/min;In shield machine special formation, driving speed Degree should control in 10~20mm/min, passing through slum-dweller Section Speed suitable control cannot be too fast, it is too fast influence synchronous grouting with Into speed, it is be easy to cause the cavity after the wall of section of jurisdiction, causes posterior settlement, therefore the matching of driving speed is to passing through shanty town to pass It is important.
(4) cutter head torque
Torque needed for cutterhead rotation, unit MN.m, cutter head torque should be controlled in 6~9MNm when passing through shanty town. Same geology cone penetration more large torque is bigger, if in parameter constants such as cone penetration, speed, when torque gradually significantly increases, To consider cutter whether serious wear, the abrasion of cutter can directly contribute torque and significantly increase, and need shutdown inspection cutter.
4 shield body taper space gram mud effect fillings
A gram mud effect is injected to outside shield body from the radial hole of shield machine, by the radial hole wheel streamer at 11 o'clock and 1 o'clock position Enter, fills the gap between digging diameter and shield body in time, injection rate is 120~130%, while controlling injection pressure and injection Amount, ground synchronous monitor the sedimentation on ground, adjust in time.
The effect filling of gram mud
(1) gram mud effect is with when dosage
Proportioning:Gram mud effect:Waterglass=20:1
Gram mud imitates every cubic metre of dosage:400 kilograms
Waterglass Baume ratio:Be40, proportion:1.38-1.39
Cutterhead digging diameter is 12550mm, and shield machine shield body outer diameter is 12470mm, is 2000mm per ring width, then per ring Theoretical gap is:2 × 3.14 × (12.55 × 12.55-12.47 × 12.47)/4=3.14m3
It is per the ring amount of being actually implanted into (setting injection rate as 120%):3.14 × 120% × 20=3.7m3
It is per ring gram mud effect actual amount:3.7 × 400=1480kg
It is per ring waterglass actual amount:3.7/20 × 1.38=255.3kg
5 back synchronous injections
(1) injecting paste material proportion design and Essential Performance Requirements
Using cement mortar as synchronous grouting material, slurry material should have high calculus rate, consolidating strength height, durability Well, the features such as preventing groundwater erosion, good water resistant dispersibility and the property noted, gelling time is determined according to formation condition, And match with driving speed, slip casting operation, it is determined by field test.It is usually no more than 6h (final set), it is strong to obtain early stage Degree, ensures good slip casting effect.Concretion body strength is not less than 0.2MPa for one day, is not less than 1.0MPa, shield crossing canopy within 28 days The locations Hu Qu synchronous grouting proportioning see the table below.
Table synchronous grouting material matches and performance indicator table (per side's materials)
(2) grouting pressure
To ensure to reach effective filling to circumferential gap, at the same can ensure that again tunnel segment structure not because slip casting is deformed and Damage, rule of thumb, grouting pressure are calculated according to slightly larger than notch pressure 0.5bar, are set as 0.3~0.5MPa.
(3) grouting amount
It is 17.41m that shield machine, which excavates the gap formed with section of jurisdiction outer diameter,3/ ring, according to similar engineering construction experience, shield It passes through shanty town location grouting amount volumetric efficiency and takes 130%~180%.Simultaneously, it is contemplated that earthing is shallower, and the floating shadow of shield It rings, shield machine top and bottom grouting amount should be by 2:1 control.When curved section tunnels, grouting amount should be slightly larger than on the outside of curved section Inside grouting amount.
Pay attention to:It passes through during risk assessment, continuous 2 ring synchronous grouting amount is higher than control range, and grouting pressure is less than When control range, driving should be suspended, analyze reason and formulate treatment measures.
(4) injection speed
Synchronous grouting speed should match with driving speed, complete to complete to note when ring in the time of a ring 2m drivings by shield Slurry amount determines its average injection speed.
(5) slip casting ending standard
Standard is controlled using grouting pressure and grouting amount Two indices, when grouting pressure reaches design pressure, grouting amount reaches Design grouting amount 80% or more when should terminate slip casting.
(6) grind slurries quality is examined
Amount of inspection:One hundred percent inspection is detected every ring mortar.
The method of inspection:Check raw material product certificate, quality inspection report, metering measure, test report and slip casting inspection Look into record.Slurry consistency is detected using consistometer, slurries presetting period and calculus rate are examined using graduated cylinder.
6 secondary groutings control
Shield crossing shanty town belongs to highly permeable thin silt, and shield driving speed is fast in the stratum, after slurries injection It is hardly formed independent firming body, secondary, multiple ftercompction slip casting need to be carried out in time to the section of jurisdiction for deviating from shield tail.
(1) technological process, as shown in Figure 1.
(2) injecting paste material, match ratio
Injecting paste material uses waterglass+cement mortar dual slurry, and grout coordinate ratio and its relevant parameter index are as shown in the table.
Table secondary grouting material and proportioning table (per side)
Injecting paste material Proportioning Remarks
Cement grout The ratio of mud=0.8:1 Cement uses P.O42.5 (bagged cement)
Waterglass 30Be It is adjusted according to setting time
Grout coordinate ratio:The cement mortar ratio of mud (weight ratio):0.8:1;Slurries are with waterglass volume ratio when injection:Cement Slurry:Waterglass=1:1, grout spreading range 0.7m.The slurries presetting period 1 divides 30 seconds;3 days compression strength 7.8MPa, resistance to compression in 7 days Intensity 11.2MPa, 28 days compression strength 13.3MPa.Slurries type and proportioning can be according to passing through actual formation and field test feelings Condition adjusts accordingly.
(3) mortar depositing construction
1. grouting sequence
Secondary grouting is preferably carried out in shield by about 10 ring positions, and same endless tube piece strictly presses ' two waists, two waists after first vault Method injection symmetrically '.
2. grouting pressure
Secondary grouting pressure is controlled in 0.8~1.0MPa.
3. trepanning point
Secondary grouting is carried out in such a way that spacer ring trepanning, every ring open three holes, trepanning depth is to punch synchronous grouting layer It is advisable, about 50cm.
4. grouting amount
1~1.5m of each hole injection cement grout3, and grouting amount is controlled according to practical grouting pressure.
5. slip casting ending standard
It is controlled, i.e., reached with grouting amount when grouting pressure reaches setting value using grouting pressure and grouting amount Two indices Design value 85% or more when, you can identification reach secondary grouting quality requirement.But if pressure is not up to setting value, and slip casting When amount reaches setting value, it should judge rationally to be controlled according to Analysis on monitoring data.
6. secondary, multiple reinforcement grouting process
Before slip casting first after hole for hoist loads onto slip casting inlet non return check valve, Kong Weihou 5cm protective layers are filled with electric hammer drill tying up, are opened Hole depth is advisable not less than 50cm, connects threeway and cement mortar pipe and waterglass pipe.When noting dual slurry, striaght cement slurries are first noted After 1min, opens waterglass valve and carry out mixed injection, whole Kong Shiying increases the concentration of waterglass.It is answered after a hole slip casting finishes Waiting 5~open to dredge the casting head after ten minutes and check injection effect, if water is very big, should re-inject, until having less Water when flowing out can whole hole, remove casting head and be capped and silently cover.If monitoring data reflection sedimentation is still unstable, multiple benefit can be taken Strong controlling measurement sedimentation.
Should there are gas vent, gas vent to be located in principle on pre-pouring grout hole during slip casting, and slip casting inlet non return check valve is installed, Ball valve is opened simultaneously, until occurring closing ball valve when grout, checks slip casting effect after ten minutes, is overflowed if any water, copes with the hole Carry out slip casting.
7 monitorings in real time, information system management
During shield crossing shanty town, reinforce the monitoring measurement in shanty town, to impacted surface buildings into The real-time settlement monitoring of row, differential settlement monitoring, surface buildings tilt monitoring and crack developing observation etc., arrange special messenger round the clock The situation observation of buildings or structures periphery is carried out within 24 hours, dynamic evaluation, while base are carried out to building safety according to monitoring data In assessment result to shield tunnelling parameters carry out finely regulating, finally by monitoring determine effect, to iterative cycles, verification, It is perfect, it is ensured that pass through safety.
It to ground settlement and passes through the weak fundamental construction in shanty town for research Big diameter slurry shield construction and builds object It influences, is set in advance as shield driving test section, the ground settlement progress in-situ monitoring that shield-tunneling construction is induced in test section, And record data are studied for further.Monitoring section spacing is 10m in test section, and 8- is laid according to periphery situation per section 10 measuring points, measuring point spacing 3-5m;Monitoring point arrangement principle is same as above in shanty town.
Project management department sets up special measurement and monitors 6 people groups, completes within daily 24 hours 6 continuous measurements, every 4 hours necessary Go out to monitor analysis results data with timely feedback guidance shield-tunneling construction.Uninterrupted measurement in 1 month, later stage are maintained after the completion of driving According to sedimentation change curve degree of stability, weekly monitoring measurement data analysis is determined, until settlement stability.
(3) settlement Control measure after shield crossing
Shield machine still needs to carry on monitoring measurement work after passing through within a certain period of time, it is contemplated that environmental protection and tunnel Stable requirement, such as after wall radar slip casting detection or find surface subsidence still have a greater change trend or Local Layer compared with It is soft, after-teeming slurry should be carried out again by injected hole more than section of jurisdiction middle part, supplement once grouting is not filled by part and slurries convergence Volume reducer, to reduce shield machine after the soil body posterior settlement, mitigate the waterproofing pressure in tunnel.Shield is pushed away simultaneously Exfoliated state caused by power is filled (between section of jurisdiction, injecting paste material, country rock), improves water-stagnating effect.Ftercompction sizing process is the same as two Secondary grouting process.Beneficial effects of the present invention:
(1) consolidation process is not carried out to above ground structure.
(2) constructing tunnel disturbance is slight, smaller by region ground settlement, is influenced on the intensive shanty town of relevant range earth's surface It is minimum.
(3) day driving amount can reach 8 rings (16m), and construction efficiency is high.
(4) realize shield pass through before, the monitoring of all the period of time by period and after passing through, it is ensured that shield passes through intensive canopy The construction safety in family area.
This engineering method be suitable for it is non-reinforced under the conditions of major diameter slurry shield over long distances pass through disturbance Sensitive Buildings construction.
No. 8 three bid sections of line civil construction part BT projects of Wuhan subway are constructed using major diameter slurry balance shield, from beginning Hair stands and passes through highly dense shanty town (overall length 754.618m) over long distances.By strictly controlling shield driving parameter, section of jurisdiction installation Standard, grouting parameter and the monitoring of real-time earth's surface, during slurry balance shield construction passes through shanty town, earth's surface is built (structure) It builds object and apparent displacement, sedimentation, cracking does not occur.Construction risk is reduced, the dispute with surrounding resident is reduced, is had good Good economic benefit and social benefit.
Description of the drawings
Fig. 1 is secondary grouting process flow chart.
Specific implementation mode
Embodiment 1
It is provided in this embodiment it is non-reinforced under the conditions of major diameter slurry shield pass through the construction of shanty town settlement Control over long distances Engineering method includes the following steps:
(1) preparation measures before shield crossing
1 building As-Is Assessment and control standard formulation
Before shield launching, commission has the third party of experience, corresponding qualification to existing buildings or structures along shanty town Security risk assessment is carried out, according to on-site investigation, inspection result, structural-load-carrying capacity and normal use requirement is taken into account, joins simultaneously Similar engineering is examined, the remaining resistance index of engineering structure is analyzed and calculated, to obtain As-Is Assessment Outcome Document, until Include architecture quality As-Is Assessment, structure residual resistance index assessment less (containing remaining non-deformability, Residual Loading Capacity etc.) And suggest treatment measures, building basic condition is investigated, is verified before construction, in conjunction with As-Is Assessment as a result, formulating safety Control standard.
2 shield driving test sections
Using the initial 75m of shield driving as test section, used by ground deformation monitoring data and shield-tunneling construction Parameter grasps the correlativity of shield machine boring parameter and ground settlement, continues to optimize adjustment.Every technology number when to promoting According to being acquired, counting, analyzing, strives for the operating characteristics for grasping Shield-type machinery equipment within a short period of time, determine shield driving Construction parameter setting range.
(2) shield crossing shanty town Construction Control Measures
The stage and form Corresponding Countermeasures that 1 analysis sedimentation is formed
Shield Tunneling certainly will cause the loosening and depression of surrounding soil, it intuitively shows as settling or swell.By it Influencing the construction of structures of tunnel neighbouring area will be deformed, settle or conjugate, so that make structures function by damaged or broken It is bad.Surface subsidence caused by shield driving by ground settlement changing rule can be divided into initial stage sedimentation, excavation face sedimentation (or protuberance), By when shield body at the top of sedimentation, the sedimentation of shield tail gap and long-term continue five stages such as sedimentation.
(1) initial stage sedimentation be in face of shield tunneling necromancer body pore water reduce, the soil body be squeezed it is compacted and formed sedimentation.
(2) excavation face sedimentation (or protuberance) refers to the part ground deformation immediately ahead of excavation face.Due to applying at working face Mud hydraulic pressure, it is possible to create the excessive protuberance of face pressure or pressure it is too small and generate sedimentation, pore water pressure increase, Total stress increase forms the protuberance on ground.
(3) by when shield body at the top of sedimentation be shield by when the surface subsidence that generates.This stage is divided into two parts: The sedimentation that mechanical function of the part between driving stratum and body generates, a part is between driving size and body diameter Sedimentation caused by taper gap.During entire shield driving, shield is by gross thrust, skin friction resistance and earth balance pressure The effect of three power of power.Since frictional resistance acts on, just generate shear stress in the soil layer of body periphery sliding surface, stratum because by The tensile stress sheared and generated causes soil to be moved at once to the gap after shield.Keep shield consistent with tunnel axis, In progradation, shield institute must compress a part of soil, relaxation another part soil through place.It keeps out the part of compression The deviation of shield, and the part of relaxation then brings surface subsidence.
Taper difference of the another part between cutterhead digging diameter and shield body shield tail, due to the digging diameter of shield machine Slightly larger than shield body diameter, and shield body diameter is slightly larger than shield tail diameter, and the digging diameter of this shield machine is up to 12.55 meters, and preceding shield body A diameter of 12.51 meters, a diameter of 12.49 meters of middle shield, a diameter of 12.47 meters of shield tail, therefore the sky between excavation face and shield tail The purpose of gap is about 4cm, this space does not carry out being taper space before grouting be- hind segment in section of jurisdiction abjection shield tail, this space be in order to It reduces the soil body extruding force and the frictional force of shield machine is arranged, but is likely to form top sedimentation in tunneling process One space.
(4) sedimentation of shield tail gap is happened at after shield tail passes through.Cause sedimentation the reason of be shield poop erection gap and Soil layer is disturbed around tunnel.The shield tail diameter 12.47m of the shield machine, 12.1 meters of section of jurisdiction outer diameter, gap is filled with 22.5cm. Will the support of shield body be lost suddenly when the soil body is detached from shield machine body fuselage, and be converted to section of jurisdiction support, but dashed forward herein Section of jurisdiction outside and the building gap of shield body will not fill closely knit at once during change, therefore produce periphery soil body relaxation, stress Release, as grouting at the tail of the shield machine cannot in time high quality follow-up, it will form the surface subsidence of larger area.
(5) continue depression for a long time
It refer to the sedimentation still carried over for a comparatively long period of time after shield passes through.It is bright that clay foundation continues sedimentation for a long time It is aobvious to be more than sandy subgrade.Therefore, this kind of plastic deformation for settling the Creep Characteristics for being attributed to foundation soil.The sedimentation cause in the stage It is that the nature of soil layer and tunnel surrounding soil are disturbed.Its lag time and the type of shield, geological conditions, construction matter The factors such as amount are related.
How to control the sedimentation of each stage in five stages and reach minimum, then the accumulative sedimentation of driving and follow-up phase Amount must be minimum, therefore formulates the effective technology measure of corresponding control settlement and protuberance, just can guarantee smoothly wearing for shanty town More.Injection that main technical measures are imitated from boring parameter, mud film quality, mud pressure control, gram mud, a synchronous grouting matter Amount control and the control of necessary secondary grouting and auxiliary monitoring measurement means are completed.
2 mud film qualities control
In order to reinforce the support capacity to the front soil body, ground grout is prevented, is pushed away using high specific gravity, highly viscous mud Into.Common Soft Soil Layer, sandy soil layer, mud balance are 1.1~1.2g/cm3, and viscosity is 17~20 seconds.It is built passing through shanty town Mud balance control is controlled in 1.2~1.25g/cm3, viscosity at 18~22 seconds when building object.Plugging material is properly added in mud, The percentage of water loss in the stratomere (layer of sand) is reduced, safeguards the stabilization of face.To ensure quality of mud fluid, in progradation, mud Water process personnel increase the test frequency of muddy water, adjust muddy water parameter in time, ensure being smoothed out for driving.
When shield, which needs to shut down in conventional thin silt, carries out warehouse entry upkeep operation with pressure, need to increase mud ratio Weight improves mud viscosity, and mud viscosity reaches the requirement that can meet warehouse entry with pressure in 35~40 seconds under normal conditions.Shield driving To water pressure higher section when, need in heavy viscous mud add pressurize short-term training material, it is ensured that mud film all has in the stipulated time Good performance of holding one's breath.
3 critical construction parameter finely regulatings
Tunneling process should require the parameters of reasonable set shield driving in conjunction with geological condition and surrounding enviroment protection.Pick Shield working order, boring parameter variation should be monitored and recorded in, into spoil disposal situation, and analysis feedback in time, adjustment driving Parameter controls shield attitude.The strict control in construction makes practical muddy water pressure be slightly larger than calculated value.By information-aided construction and When adjustment and corrected parameter, so that mud hydraulic pressure value is within zone of reasonableness.
(1) notch pressure controls
Notch pressure point calculates formula according to following water and soil:
Notch hydraulic pressure upper limit value:
POn=P1+P2+P3
w×h+K0×[(γ-γw)×h+γ×(H-h)]+20
In formula:POn- notch hydraulic pressure upper limit value (kPa);
P1- groundwater pressure (kPa);
P2- earth pressure at rest (kPa);
P3- become dynamic soil pressure, generally take 20kPa;
γwMolten heavy (the kN/m of-water3);
H-level of ground water edpth of tunnel below (calculates to tunnel center) (m);
Molten heavy (the kN/m of γ-soil3);
H-edpth of tunnel (calculates to tunnel center) (m);
K0- coefficient of static earth pressure.
Notch hydraulic pressure lower limiting value:
In formula:PUnder- notch hydraulic pressure lower limiting value (kPa);
P2'-active earth pressure (kPa);
Ka- coefficient of active earth pressure;
cuThe cohesiveness (kPa) of-soil.
For this engineering when test section tunnels, notch pressure value adds the correction value of 0.2bar on the basis of calculated value, And according to the feedback of tunneling process surface subsidence monitoring data, optimization notch pressure value is corrected in time, it is ensured that shield crossing canopy The matching of notch pressure and stratum when family area building.
Notch water pressure fluctuations are too big simultaneously, can increase the disturbance of the front soil body, and the front soil body is caused to be lost in.Therefore it is constructing In should by notch water pressure fluctuations value control between -10kPa~10kPa, ensure soil stabilization.
(2) cutterhead rotating speed
It is promoted in Soft Soil Layer, cutterhead rotating speed should not be too large, and the rate of wear of cutter otherwise can be caused to accelerate, and high rotating speed holds Larger disturbance is easily caused to Soft Soil Layer, and the cutterhead rotating speed control of shanty town location is worn under shield in 0.8rpm~1.2rpm, is being pushed away When increasing into speed, in the case that cone penetration is more than 50, can suitably it increase speed, but be usually no more than 1.2rpm.
(3) driving speed controls
To ensure that shield can normally cut soil stabilization area, prevent mud line suction inlet from blocking, control promotes axis, protection Cutterhead, fltting speed is unsuitable too fast when originating, and so that shield is slowly steered a steady course, the driving speed before host fully enters stabilization zone Control can step up driving speed to 30mm/min in 3~5mm/min after shield machine is detached from stabilization zone.
Under the conditions of normal driving, driving speed should be set as 15~30mm/min;In shield machine special formation, driving speed Degree should control in 10~20mm/min, passing through slum-dweller Section Speed suitable control cannot be too fast, it is too fast influence synchronous grouting with Into speed, it is be easy to cause the cavity after the wall of section of jurisdiction, causes posterior settlement, therefore the matching of driving speed is to passing through shanty town to pass It is important.
(4) cutter head torque
Torque needed for cutterhead rotation, unit MN.m, cutter head torque should be controlled in 6~9MNm when passing through shanty town. Same geology cone penetration more large torque is bigger, if in parameter constants such as cone penetration, speed, when torque gradually significantly increases, To consider cutter whether serious wear, the abrasion of cutter can directly contribute torque and significantly increase, and need shutdown inspection cutter.
4 shield body taper space gram mud effect fillings
A gram mud effect is injected to outside shield body from the radial hole of shield machine, by the radial hole wheel streamer at 11 o'clock and 1 o'clock position Enter, fills the gap between digging diameter and shield body in time, injection rate is 120~130%, while controlling injection pressure and injection Amount, ground synchronous monitor the sedimentation on ground, adjust in time.
The effect filling of gram mud
(1) gram mud effect is with when dosage
Proportioning:Gram mud effect:Waterglass=20:1
Gram mud imitates every cubic metre of dosage:400 kilograms
Waterglass Baume ratio:Be40, proportion:1.38-1.39
Cutterhead digging diameter is 12550mm, and shield machine shield body outer diameter is 12470mm, is 2000mm per ring width, then per ring Theoretical gap is:2 × 3.14 × (12.55 × 12.55-12.47 × 12.47)/4=3.14m3
It is per the ring amount of being actually implanted into (setting injection rate as 120%):3.14 × 120% × 20=3.7m3
It is per ring gram mud effect actual amount:3.7 × 400=1480kg
It is per ring waterglass actual amount:3.7/20 × 1.38=255.3kg
5 back synchronous injections
(1) injecting paste material proportion design and Essential Performance Requirements
Using cement mortar as synchronous grouting material, slurry material should have high calculus rate, consolidating strength height, durability Well, the features such as preventing groundwater erosion, good water resistant dispersibility and the property noted, gelling time is determined according to formation condition, And match with driving speed, slip casting operation, it is determined by field test.It is usually no more than 6h (final set), it is strong to obtain early stage Degree, ensures good slip casting effect.Concretion body strength is not less than 0.2MPa for one day, is not less than 1.0MPa, shield crossing canopy within 28 days The locations Hu Qu synchronous grouting proportioning see the table below.
Table synchronous grouting material matches and performance indicator table (per side's materials)
(2) grouting pressure
To ensure to reach effective filling to circumferential gap, at the same can ensure that again tunnel segment structure not because slip casting is deformed and Damage, rule of thumb, grouting pressure are calculated according to slightly larger than notch pressure 0.5bar, are set as 0.3~0.5MPa.
(3) grouting amount
It is 17.41m that shield machine, which excavates the gap formed with section of jurisdiction outer diameter,3/ ring, according to similar engineering construction experience, shield It passes through shanty town location grouting amount volumetric efficiency and takes 130%~180%.Simultaneously, it is contemplated that earthing is shallower, and the floating shadow of shield It rings, shield machine top and bottom grouting amount should be by 2:1 control.When curved section tunnels, grouting amount should be slightly larger than on the outside of curved section Inside grouting amount.
Pay attention to:It passes through during risk assessment, continuous 2 ring synchronous grouting amount is higher than control range, and grouting pressure is less than When control range, driving should be suspended, analyze reason and formulate treatment measures.
(4) injection speed
Synchronous grouting speed should match with driving speed, complete to complete to note when ring in the time of a ring 2m drivings by shield Slurry amount determines its average injection speed.
(5) slip casting ending standard
Standard is controlled using grouting pressure and grouting amount Two indices, when grouting pressure reaches design pressure, grouting amount reaches Design grouting amount 80% or more when should terminate slip casting.
(6) grind slurries quality is examined
Amount of inspection:One hundred percent inspection is detected every ring mortar.
The method of inspection:Check raw material product certificate, quality inspection report, metering measure, test report and slip casting inspection Look into record.Slurry consistency is detected using consistometer, slurries presetting period and calculus rate are examined using graduated cylinder.
6 secondary groutings control
Shield crossing shanty town belongs to highly permeable thin silt, and shield driving speed is fast in the stratum, after slurries injection It is hardly formed independent firming body, secondary, multiple ftercompction slip casting need to be carried out in time to the section of jurisdiction for deviating from shield tail.
(1) technological process, as shown in Figure 1.
(2) injecting paste material, match ratio
Injecting paste material uses waterglass+cement mortar dual slurry, and grout coordinate ratio and its relevant parameter index are as shown in the table.
Table secondary grouting material and proportioning table (per side)
Injecting paste material Proportioning Remarks
Cement grout The ratio of mud=0.8:1 Cement uses P.O42.5 (bagged cement)
Waterglass 30Be It is adjusted according to setting time
Grout coordinate ratio:The cement mortar ratio of mud (weight ratio):0.8:1;Slurries are with waterglass volume ratio when injection:Cement Slurry:Waterglass=1:1, grout spreading range 0.7m.The slurries presetting period 1 divides 30 seconds;3 days compression strength 7.8MPa, resistance to compression in 7 days Intensity 11.2MPa, 28 days compression strength 13.3MPa.Slurries type and proportioning can be according to passing through actual formation and field test feelings Condition adjusts accordingly.
(3) mortar depositing construction
1. grouting sequence
Secondary grouting is preferably carried out in shield by about 10 ring positions, and same endless tube piece strictly presses ' two waists, two waists after first vault Method injection symmetrically '.
2. grouting pressure
Secondary grouting pressure is controlled in 0.8~1.0MPa.
3. trepanning point
Secondary grouting is carried out in such a way that spacer ring trepanning, every ring open three holes, trepanning depth is to punch synchronous grouting layer It is advisable, about 50cm.
4. grouting amount
1~1.5m of each hole injection cement grout3, and grouting amount is controlled according to practical grouting pressure.
5. slip casting ending standard
It is controlled, i.e., reached with grouting amount when grouting pressure reaches setting value using grouting pressure and grouting amount Two indices Design value 85% or more when, you can identification reach secondary grouting quality requirement.But if pressure is not up to setting value, and slip casting When amount reaches setting value, it should judge rationally to be controlled according to Analysis on monitoring data.
6. secondary, multiple reinforcement grouting process
Before slip casting first after hole for hoist loads onto slip casting inlet non return check valve, Kong Weihou 5cm protective layers are filled with electric hammer drill tying up, are opened Hole depth is advisable not less than 50cm, connects threeway and cement mortar pipe and waterglass pipe.When noting dual slurry, striaght cement slurries are first noted After 1min, opens waterglass valve and carry out mixed injection, whole Kong Shiying increases the concentration of waterglass.It is answered after a hole slip casting finishes Waiting 5~open to dredge the casting head after ten minutes and check injection effect, if water is very big, should re-inject, until having less Water when flowing out can whole hole, remove casting head and be capped and silently cover.If monitoring data reflection sedimentation is still unstable, multiple benefit can be taken Strong controlling measurement sedimentation.
Should there are gas vent, gas vent to be located in principle on pre-pouring grout hole during slip casting, and slip casting inlet non return check valve is installed, Ball valve is opened simultaneously, until occurring closing ball valve when grout, checks slip casting effect after ten minutes, is overflowed if any water, copes with the hole Carry out slip casting.
7 monitorings in real time, information system management
During shield crossing shanty town, reinforce the monitoring measurement in shanty town, to impacted surface buildings into The real-time settlement monitoring of row, differential settlement monitoring, surface buildings tilt monitoring and crack developing observation etc., arrange special messenger round the clock The situation observation of buildings or structures periphery is carried out within 24 hours, dynamic evaluation, while base are carried out to building safety according to monitoring data In assessment result to shield tunnelling parameters carry out finely regulating, finally by monitoring determine effect, to iterative cycles, verification, It is perfect, it is ensured that pass through safety.
It to ground settlement and passes through the weak fundamental construction in shanty town for research Big diameter slurry shield construction and builds object It influences, is set in advance as shield driving test section, the ground settlement progress in-situ monitoring that shield-tunneling construction is induced in test section, And record data are studied for further.Monitoring section spacing is 10m in test section, and 8- is laid according to periphery situation per section 10 measuring points, measuring point spacing 3-5m;Monitoring point arrangement principle is same as above in shanty town.
Project management department sets up special measurement and monitors 6 people groups, completes within daily 24 hours 6 continuous measurements, every 4 hours necessary Go out to monitor analysis results data with timely feedback guidance shield-tunneling construction.Uninterrupted measurement in 1 month, later stage are maintained after the completion of driving According to sedimentation change curve degree of stability, weekly monitoring measurement data analysis is determined, until settlement stability.
(3) settlement Control measure after shield crossing
Shield machine still needs to carry on monitoring measurement work after passing through within a certain period of time, it is contemplated that environmental protection and tunnel Stable requirement, such as after wall radar slip casting detection or find surface subsidence still have a greater change trend or Local Layer compared with It is soft, after-teeming slurry should be carried out again by injected hole more than section of jurisdiction middle part, supplement once grouting is not filled by part and slurries convergence Volume reducer, to reduce shield machine after the soil body posterior settlement, mitigate the waterproofing pressure in tunnel.Shield is pushed away simultaneously Exfoliated state caused by power is filled (between section of jurisdiction, injecting paste material, country rock), improves water-stagnating effect.Ftercompction sizing process is the same as two Secondary grouting process.2 case history of embodiment
No. 8 three bid sections of line civil construction part BT projects of Wuhan subway, mainly include one section of a station, i.e., Xu family's canopy station and Get over river shield section in Huangpu way station~Xu family's canopy station.Shield section using diameter 12.51m combined type slurry balance shield machine into Row construction, originated from Xu family's canopy station, pass through highly dense shanty town (overall length 754.618m) over long distances, under wear the Changjiang river reach Hankow Huang Pu way station receives, section overall length 3185.545m.
Highly dense shanty town is worn down at shield loom Xu family's canopy station after being originated with the curve of R=700m, profile grade by Flat slope becomes 27 ‰ descending, and driving stratum is tunneling boring thin silt.The shanty town is originally removed before driving, but It removes and has no resolution because of various reasons.The shanty town overwhelming majority is the pervious brick-and-concrete buildings nineties, this part architectural appearance is ancient Old outmoded, majority is there are the scene that wall crazing, wall skin fall off, and there are severe compromises.Shield crossing shanty town construction with " height viscous excellent slurry, steady propulsion, quick-assembling, is forbidden shutting down, once pass through precise controlling " is principle, with surface settlement control For core, with buildings or structures safety along ensuring for target.
Before construction, investigation is carried out to all existing buildings or structures, has been verified, and Important building along the line has been clapped According to, measure convenient for staying card.And it is provided with the observations such as numerous sedimentations, cracking, inclination, displacement and level of ground water in surface buildings Point is monitored in real time in the later stage.The monitoring of complex environment earth's surface is that construction in later period safety has played significant role with settlement Control.
This engineering is supervised using the initial 75m of shield as driving test section according to test section boring parameter and ground settlement It surveys situation and contacting between boring parameter and ground settlement is determined, so that it is determined that control ground settlement under the premise of reasonably Boring parameter ensures that construction safety successfully carries out.
In shield-tunneling construction, the stringent shield driving parameter that controls installs standard with section of jurisdiction.The soil body is disturbed to reduce simultaneously It is dynamic, correction is reduced, by plan-position control within design axis ± 30mm;In view of earthing is shallower, and the upper drift shadow of shield It rings, when passing through structure building, actually high process control is designing axis -30mm or so to shield.Driving speed is controlled in 15mm/min Left and right prevents from generating greater impact to the front soil body because driving speed is too fast.
Synchronous grouting material in shield-tunneling construction uses cement mortar, the advantage is that high with calculus rate, Seed harvest is strong Degree is high, durability is good and resistance to groundwater erosion is good.It is determined by field test.It is usually no more than 6h (final set), to obtain Early strength ensures good slip casting effect.Concretion body strength is not less than 0.2MPa for one day, is not less than 1.0MPa within 28 days.Slip casting Pressure is set as 0.3~0.5MPa, and grouting amount volumetric efficiency takes 130%~180%, and injection speed is matched with driving speed, when Terminate slip casting when grouting pressure reaches design pressure, grouting amount reaches 80% or more of design grouting amount, is examined in time after slip casting Slip casting effect, this project secondary grouting are emergent and spare slip casting, since the Forming Quality of once grouting is high, do not carry out secondary injection Slurry.
By strictly controlling the measures such as shield driving parameter, section of jurisdiction installation standard, synchronous grouting and the monitoring of real-time earth's surface, The line of Wuhan subway 8 cross-river tunnels pass through over long distances slum-dweller section earth's surface buildings or structures do not occur apparent displacement, sedimentation, Cracking, does not receive the complaint of resident's an example, and construction smoothly completes.

Claims (1)

1. major diameter slurry shield passes through shanty town settlement Control construction over long distances under the conditions of non-reinforced, which is characterized in that Include the following steps:
(One)Preparation measures before shield crossing
1 building As-Is Assessment and control standard formulation
Before shield launching, commission has the third party of experience, corresponding qualification to be built to existing along shanty town(Structure)Build object progress Security risk assessment according to on-site investigation, inspection result, takes into account structural-load-carrying capacity and normal use requirement, to engineering structure Remaining resistance index analyzed and calculated, to obtain As-Is Assessment Outcome Document, commented including at least architecture quality present situation Estimate, structure residual resistance index assessment and suggest treatment measures, construction before building basic condition is investigated, is verified, knot As-Is Assessment is closed as a result, formulating safety control standed;
2 shield driving test sections
Using the initial 75m of shield driving as test section, according to parameter used by ground deformation monitoring data and shield-tunneling construction, The correlativity for grasping shield machine boring parameter and ground settlement, is optimized and revised;Every technical data when to promoting is adopted Collection, statistics, analysis, strive for the operating characteristics for grasping Shield-type machinery equipment within a short period of time, determine the construction ginseng of shield driving Number setting range;
(Two)Shield crossing shanty town Construction Control Measures
The stage and form Corresponding Countermeasures that 1 analysis sedimentation is formed
2 mud film qualities control
In order to reinforce the support capacity to the front soil body, ground grout is prevented, is promoted using high specific gravity, highly viscous mud;It is general Logical Soft Soil Layer, sandy soil layer, mud balance are 1.1~1.2g/cm3, and viscosity is 17~20 seconds;When passing through shanty town building Mud balance control is controlled in 1.2~1.25g/cm3, viscosity at 18~22 seconds;It is properly added plugging material in mud, reduces The stratomere(Layer of sand)Percentage of water loss, safeguard the stabilization of face;To ensure quality of mud fluid, in progradation, Slurry treatment Personnel increase the test frequency of muddy water, adjust muddy water parameter in time, ensure being smoothed out for driving;
When shield, which needs to shut down in conventional thin silt, carries out warehouse entry upkeep operation with pressure, needs to increase mud balance, carry High mud viscosity, under normal conditions mud viscosity reach the requirement that can meet warehouse entry with pressure in 35 ~ 40 seconds;Shield driving is to hydraulic pressure Power higher section when, need in heavy viscous mud add pressurize short-term training material, it is ensured that mud film all has good in the stipulated time It holds one's breath performance;
3 critical construction parameter finely regulatings
Tunneling process should require the parameters of reasonable set shield driving in conjunction with geological condition and surrounding enviroment protection;In driving It should monitor and record shield working order, boring parameter variation, into spoil disposal situation, and analysis feedback in time, adjust boring parameter, Control shield attitude;The strict control in construction makes practical muddy water pressure be slightly larger than calculated value;It is adjusted in time by information-aided construction And corrected parameter, so that mud hydraulic pressure value is within zone of reasonableness;
(1)Notch pressure controls
Notch pressure point calculates formula according to following water and soil:
Notch hydraulic pressure upper limit value:
In formula:- notch hydraulic pressure upper limit value (kPa);
- groundwater pressure (kPa);
- earth pressure at rest (kPa);
- become dynamic soil pressure, generally take 20 kPa;
Molten heavy (the kN/m of-water3);
- level of ground water edpth of tunnel below(It calculates to tunnel center)(m);
Molten heavy (the kN/m of-soil3);
- edpth of tunnel(It calculates to tunnel center)(m);
- coefficient of static earth pressure;
Notch hydraulic pressure lower limiting value:
In formula:- notch hydraulic pressure lower limiting value (kPa);
- active earth pressure (kPa);
- coefficient of active earth pressure;
The cohesiveness (kPa) of-soil;
When test section tunnels, notch pressure value adds the correction value of 0.2bar on the basis of calculated value, and according to driving The feedback of process surface subsidence monitoring data corrects optimization notch pressure value, it is ensured that shield crossing shanty town building in time When notch pressure and stratum matching;
Notch water pressure fluctuations are too big simultaneously, can increase the disturbance of the front soil body, and the front soil body is caused to be lost in;Therefore it is answered in construction By the control of notch water pressure fluctuations value between -10kPa~10kPa, ensure soil stabilization;
(2)Cutterhead rotating speed
It is promoted in Soft Soil Layer, cutterhead rotating speed should not be too large, and the rate of wear of cutter otherwise can be caused to accelerate, easy pair of high rotating speed Soft Soil Layer causes larger disturbance, and the cutterhead rotating speed control of shanty town location is worn under shield in 0.8rpm~1.2rpm, is promoting speed When degree increases, in the case that cone penetration is more than 50, it is possible to increase rotating speed, but it is no more than 1.2rpm;
(3)Driving speed controls
To ensure that shield can normally cut soil stabilization area, prevent mud line suction inlet from blocking, control promotes axis, protection knife Disk, fltting speed is unsuitable too fast when originating, and so that shield is slowly steered a steady course, the driving speed control before host fully enters stabilization zone System can step up driving speed to 30mm/min in 3~5mm/min after shield machine is detached from stabilization zone;
Under the conditions of normal driving, driving speed should be set as 15~30mm/min;In shield machine special formation, driving speed is answered In 10~20mm/min, passing through slum-dweller Section Speed suitable control cannot be too fast for control, the too fast follow-up speed for influencing synchronous grouting Degree, be easy to cause the cavity after the wall of section of jurisdiction, causes posterior settlement, therefore the matching of driving speed is to passing through shanty town to closing weight It wants;
(4)Cutter head torque
Torque needed for cutterhead rotation, unit MN.m, cutter head torque should be controlled in 6~9MNm when passing through shanty town;Same Geology cone penetration more large torque is bigger, if in parameter constants such as cone penetration, speed, when torque gradually significantly increases, to examine Consider cutter whether serious wear, the abrasion of cutter can directly contribute torque and significantly increase, and need shutdown inspection cutter;
4 shield body taper space gram mud effect fillings
A gram mud effect is injected to outside shield body from the radial hole of shield machine, is injected in turn by the radial hole of 11 o'clock and 1 o'clock position, and When filling digging diameter and shield body between gap, injection rate is 120 ~ 130%, while controlling injection pressure and injection rate, ground The sedimentation on Simultaneous Monitoring ground adjusts in time;
The effect filling of gram mud
(1)Gram mud effect is with when dosage
Proportioning:Gram mud effect:Waterglass=20:1
Gram mud imitates every cubic metre of dosage:400 kilograms
Waterglass Baume ratio:Be40, proportion:1.38-1.39
Cutterhead digging diameter is 12550mm, and shield machine shield body outer diameter is 12470mm, is 2000mm per ring width, then theoretical per ring Gap is:2×3.14×(12.55×12.55-12.47×12.47)/4=3.14m³
Per the ring amount of being actually implanted into(Injection rate is set as 120%)For:3.14 ×120% × 20=3.7m³
It is per ring gram mud effect actual amount:3.7 ×400=1480kg
It is per ring waterglass actual amount:3.7/20 ×1.38=255.3kg
5 back synchronous injections
(1)Injecting paste material proportion design and Essential Performance Requirements
Using cement mortar as synchronous grouting material, slurry material should have high calculus rate, consolidating strength height, durability good, anti- Only groundwater erosion, good water resistant dispersibility and the features such as the property noted, gelling time is determined according to formation condition, and with pick Match into speed, slip casting operation, is determined by field test;No more than 6h(Final set), to obtain early strength, ensure good Slip casting effect;Concretion body strength one day is not less than 0.2MPa, is not less than within 28 days 1.0MPa, shield crossing shanty town ground segment sync Slip casting proportioning see the table below;
Table synchronous grouting material matches and performance indicator table (per side's materials)
(2)Grouting pressure
To ensure to reach effective filling to circumferential gap, while it can ensure that tunnel segment structure not because slip casting is deformed and is damaged again Bad, rule of thumb, grouting pressure is calculated according to slightly larger than notch pressure 0.5bar, is set as 0.3~0.5MPa;
(3)Grouting amount
It is 17.41m that shield machine, which excavates the gap formed with section of jurisdiction outer diameter,3/ ring, according to similar engineering construction experience, shield crossing canopy The locations Hu Qu grouting amount volumetric efficiency takes 130%~180%;Simultaneously, it is contemplated that earthing is shallower, and the floating of shield influences, shield Machine top and bottom grouting amount should be by 2:1 control;When curved section tunnels, grouting amount should be slightly larger than inside slip casting on the outside of curved section Amount;
Pay attention to:It passes through during risk assessment, continuous 2 ring synchronous grouting amount is higher than control range, and grouting pressure is less than control When range, driving should be suspended, analyze reason and formulate treatment measures;
(4)Injection speed
Synchronous grouting speed should match with driving speed, complete to complete to work as ring grouting amount in the time of a ring 2m drivings by shield To determine its average injection speed;
(5)Slip casting ending standard
Standard is controlled using grouting pressure and grouting amount Two indices, when grouting pressure reaches design pressure, grouting amount reaches design Grouting amount 80% or more when should terminate slip casting;
(6)Grind slurries quality is examined
Amount of inspection:One hundred percent inspection is detected every ring mortar;
The method of inspection:Check raw material product certificate, quality inspection report, metering measure, test report and slip casting inspection note Record;Slurry consistency is detected using consistometer, slurries presetting period and calculus rate are examined using graduated cylinder;
6 secondary groutings control
Shield crossing shanty town belongs to highly permeable thin silt, and shield driving speed is fast in the stratum, is difficult after slurries injection Independent firming body is formed, secondary, multiple ftercompction slip casting need to be carried out in time to the section of jurisdiction for deviating from shield tail;
(1)Technological process
(2)Injecting paste material, match ratio
Injecting paste material uses waterglass+cement mortar dual slurry, and grout coordinate ratio and its relevant parameter index are as shown in the table;
Table secondary grouting material and proportioning table (per side)
Injecting paste material Proportioning Remarks Cement grout The ratio of mud=0.8:1 Cement uses P.O42.5(Bagged cement) Waterglass 30Be It is adjusted according to setting time
Grout coordinate ratio:The cement mortar ratio of mud (weight ratio):0.8:1;Slurries are with waterglass volume ratio when injection:Cement mortar:Water Glass=1:1, grout spreading range 0.7m;The slurries presetting period 1 divides 30 seconds;3 days compression strength 7.8MPa, 7 days compression strength 11.2MPa, 28 days compression strength 13.3MPa;Slurries type and proportioning can according to pass through actual formation and field test situation into The corresponding adjustment of row;
(3)Mortar depositing construction
1. grouting sequence
Secondary grouting is preferably carried out in shield by about 10 ring positions, and same endless tube piece strictly presses ' two waists, two waists pair after first vault Claim ' method injection;
2. grouting pressure
Secondary grouting pressure is controlled in 0.8~1.0MPa;
3. trepanning point
Secondary grouting is carried out in such a way that spacer ring trepanning, every ring open three holes, trepanning depth is advisable with punching synchronous grouting layer, About 50cm;
4. grouting amount
1~1.5m of each hole injection cement grout3, and grouting amount is controlled according to practical grouting pressure;
5. slip casting ending standard
It is controlled using grouting pressure and grouting amount Two indices, i.e., when grouting pressure reaches setting value and grouting amount reaches design Value 85% or more when, you can identification reach secondary grouting quality requirement;But if pressure is not up to setting value, and grouting amount reaches When to setting value, it should judge rationally to be controlled according to Analysis on monitoring data;
6. secondary, multiple reinforcement grouting process
Before slip casting first after hole for hoist loads onto slip casting inlet non return check valve, Kong Weihou 5cm protective layers are filled with electric hammer drill tying up, trepanning is deep Degree is advisable not less than 50cm, connects threeway and cement mortar pipe and waterglass pipe;When noting dual slurry, striaght cement slurries 1min is first noted Afterwards, it opens waterglass valve and carries out mixed injection, whole Kong Shiying increases the concentration of waterglass;It should be waited for after a hole slip casting finishes 5~open to dredge the casting head after ten minutes and check injection effect, if water is very big, it should re-inject, until there is less flow When going out can whole hole, remove casting head and be capped and silently cover;If monitoring data reflection sedimentation is still unstable, multiple reinforcement can be taken to arrange Apply control settlement;
Should there are gas vent, gas vent to be located in principle on pre-pouring grout hole during slip casting, and slip casting inlet non return check valve is installed, simultaneously Ball valve is opened, until occurring closing ball valve when grout, checks slip casting effect after ten minutes, overflows, which should be carried out if any water Slip casting;
7 monitorings in real time, information system management
During shield crossing shanty town, reinforce the monitoring measurement in shanty town, impacted surface buildings is carried out real When settlement monitoring, differential settlement monitoring, surface buildings tilt monitoring and crack developing observation etc., arrange special messenger 24 small round the clock Shi Jinhang is built(Structure)The situation observation of object periphery is built, dynamic evaluation is carried out to building safety according to monitoring data, while being based on commenting Estimate result and finely regulating is carried out to shield tunnelling parameters, effect is determined finally by monitoring, to iterative cycles, verification, perfect, Ensure to pass through safety;
To ground settlement and the influence that the weak fundamental construction in shanty town builds object is passed through for the construction of research Big diameter slurry shield, It is set in advance as shield driving test section, the ground settlement progress in-situ monitoring that shield-tunneling construction is induced in test section, and will Data are recorded for further studying;Monitoring section spacing is 10m in test section, and 8-10 are laid according to periphery situation per section Measuring point, measuring point spacing 3-5m;Monitoring point arrangement principle is same as above in shanty town;
It sets up special measurement and monitors 6 people groups, complete within daily 24 hours 6 continuous measurements, monitoring analysis must be gone out within every 4 hours Performance data is with timely feedback guidance shield-tunneling construction;Uninterrupted measurement in 1 month, later stage is maintained to be become according to sedimentation after the completion of driving Change curve degree of stability, weekly monitoring measurement data analysis is determined, until settlement stability;
(Three)Settlement Control measure after shield crossing
Shield machine still needs to carry on monitoring measurement work after passing through, it is contemplated that the requirement of environmental protection and tunnel stabilization, such as wall Radar slip casting detects or finds that surface subsidence still has a greater change trend or Local Layer is softer afterwards, should pass through in the middle part of section of jurisdiction Above injected hole carries out after-teeming slurry again, and supplement once grouting is not filled by part and slurries restrain volume reducer, to The posterior settlement of the soil body, mitigates the waterproofing pressure in tunnel after reduction shield machine;Simultaneously to exfoliated state caused by shield thrust It is filled, improves water-stagnating effect;Ftercompction sizing process is the same as secondary grouting technique.
CN201810323276.1A 2018-04-12 2018-04-12 Sedimentation control construction method for long-distance penetration of large-diameter slurry shield through shed area under non-reinforced condition Active CN108533277B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810323276.1A CN108533277B (en) 2018-04-12 2018-04-12 Sedimentation control construction method for long-distance penetration of large-diameter slurry shield through shed area under non-reinforced condition

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810323276.1A CN108533277B (en) 2018-04-12 2018-04-12 Sedimentation control construction method for long-distance penetration of large-diameter slurry shield through shed area under non-reinforced condition

Publications (2)

Publication Number Publication Date
CN108533277A true CN108533277A (en) 2018-09-14
CN108533277B CN108533277B (en) 2020-07-24

Family

ID=63480895

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810323276.1A Active CN108533277B (en) 2018-04-12 2018-04-12 Sedimentation control construction method for long-distance penetration of large-diameter slurry shield through shed area under non-reinforced condition

Country Status (1)

Country Link
CN (1) CN108533277B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108678758A (en) * 2018-04-28 2018-10-19 青岛新华友建工集团股份有限公司 Major diameter slurry shield passes through shanty town settlement Control construction over long distances under the conditions of non-reinforced
CN109736842A (en) * 2019-01-10 2019-05-10 中铁隧道集团二处有限公司 The construction method in foundation-free residential house area is passed through in a kind of slurry shield reduction disturbance
CN110359921A (en) * 2019-08-13 2019-10-22 中铁十一局集团城市轨道工程有限公司 Wear the construction method of building in a kind of shield short distance side
CN110939451A (en) * 2019-12-24 2020-03-31 中铁隧道集团三处有限公司 Construction method for preventing shield construction from penetrating through building to prevent settlement
CN111411971A (en) * 2020-03-25 2020-07-14 中铁三局集团有限公司 Settlement control construction method for water-rich silt stratum shield underpass building group
CN112576265A (en) * 2020-11-30 2021-03-30 中建八局轨道交通建设有限公司 Sedimentation control method for old villages penetrated by shield
CN113503177A (en) * 2021-08-25 2021-10-15 中铁十七局集团有限公司 In-hole treatment method for liquefiable stratum shield tunnel
CN114753851A (en) * 2022-05-09 2022-07-15 西南交通大学 Settlement control method and system for close-range penetration of shield through sensitive building group

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1932244A (en) * 2006-09-28 2007-03-21 上海隧道工程股份有限公司 Construction method for double-circular shield near-distance passing through building or structure
CN101126318A (en) * 2007-09-28 2008-02-20 中铁二局股份有限公司 Shield construction method for three-line parallel under-passing trunk railway tunnel
CN101131090A (en) * 2007-10-09 2008-02-27 中铁二局股份有限公司 Construction method for shallow soil-covered river bed under shield tunnel
CN101761237A (en) * 2009-12-24 2010-06-30 上海隧道工程股份有限公司 Method for constructing isolation pile for shield tunnel to go through deformation control of buildings and structures at short distance
CN102720508A (en) * 2012-04-28 2012-10-10 中铁二局股份有限公司 Shield construction method for continuously under-passing dense buildings in silty-soil and silty-sand formation
CN103527209A (en) * 2013-10-22 2014-01-22 北京交通大学 Micro disturbance tunneling method used for shield machine to tunnel under building on rich water weak formation

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1932244A (en) * 2006-09-28 2007-03-21 上海隧道工程股份有限公司 Construction method for double-circular shield near-distance passing through building or structure
CN101126318A (en) * 2007-09-28 2008-02-20 中铁二局股份有限公司 Shield construction method for three-line parallel under-passing trunk railway tunnel
CN101131090A (en) * 2007-10-09 2008-02-27 中铁二局股份有限公司 Construction method for shallow soil-covered river bed under shield tunnel
CN101761237A (en) * 2009-12-24 2010-06-30 上海隧道工程股份有限公司 Method for constructing isolation pile for shield tunnel to go through deformation control of buildings and structures at short distance
CN102720508A (en) * 2012-04-28 2012-10-10 中铁二局股份有限公司 Shield construction method for continuously under-passing dense buildings in silty-soil and silty-sand formation
CN103527209A (en) * 2013-10-22 2014-01-22 北京交通大学 Micro disturbance tunneling method used for shield machine to tunnel under building on rich water weak formation

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108678758A (en) * 2018-04-28 2018-10-19 青岛新华友建工集团股份有限公司 Major diameter slurry shield passes through shanty town settlement Control construction over long distances under the conditions of non-reinforced
CN109736842A (en) * 2019-01-10 2019-05-10 中铁隧道集团二处有限公司 The construction method in foundation-free residential house area is passed through in a kind of slurry shield reduction disturbance
CN110359921A (en) * 2019-08-13 2019-10-22 中铁十一局集团城市轨道工程有限公司 Wear the construction method of building in a kind of shield short distance side
CN110359921B (en) * 2019-08-13 2024-05-07 中铁十一局集团城市轨道工程有限公司 Construction method for shield close-range side-penetrating building
CN110939451A (en) * 2019-12-24 2020-03-31 中铁隧道集团三处有限公司 Construction method for preventing shield construction from penetrating through building to prevent settlement
CN111411971A (en) * 2020-03-25 2020-07-14 中铁三局集团有限公司 Settlement control construction method for water-rich silt stratum shield underpass building group
CN111411971B (en) * 2020-03-25 2021-12-14 中铁三局集团有限公司 Settlement control construction method for water-rich silt stratum shield underpass building group
CN112576265A (en) * 2020-11-30 2021-03-30 中建八局轨道交通建设有限公司 Sedimentation control method for old villages penetrated by shield
CN113503177A (en) * 2021-08-25 2021-10-15 中铁十七局集团有限公司 In-hole treatment method for liquefiable stratum shield tunnel
CN114753851A (en) * 2022-05-09 2022-07-15 西南交通大学 Settlement control method and system for close-range penetration of shield through sensitive building group

Also Published As

Publication number Publication date
CN108533277B (en) 2020-07-24

Similar Documents

Publication Publication Date Title
CN108678758A (en) Major diameter slurry shield passes through shanty town settlement Control construction over long distances under the conditions of non-reinforced
CN108533277A (en) Major diameter slurry shield passes through shanty town settlement Control construction over long distances under the conditions of non-reinforced
CN108240234B (en) A kind of Along Railway underlies coal mine gob Grouting method
CN105804761B (en) Construction method suitable for liquefied sand stratum shield near-distance passing through building
CN110924967B (en) Fine control construction method for shield proximity sensitive building in water-rich sandy gravel stratum
CN104265307B (en) Non-uniform-hardness stratum earth pressure balance shield tunnel underpassing railway existing line construction method
CN100580221C (en) Construction method for shallow soil-covered river bed under shield tunnel
CN107842374B (en) The novel inert slurry of shield and combination grouting process for upper soft lower hard water rich strata
CN109779639A (en) Suitable for wearing the anti-floating control method in existing major diameter tunnel in arenaceous stratum shield
CN102926759A (en) Long-distance tunneling construction method for big-diameter slurry shield underwater shallow earthing
CN109681236A (en) Big cross section water-rich sand layer shield driving synchronous grouting method
CN103276649B (en) Side is had to limit layering many thickness Stone Filled Embankment construction method
WO2021098444A1 (en) Technique for controlling tunneling parameters of shielded tunneling machine for rocky region at shielded tunneling launch point
CN111594190A (en) Method for controlling shield tunneling parameters when shield passes through different risk sources
Song et al. Treatment design of geological defects in dam foundation of Jinping I hydropower station
CN107448204A (en) Closely wear construction method of deep foundation ditch down in sandy gravel accumulation horizon shallow burial hidden digging tunnel
CN108222954B (en) Construction method for shield to penetrate through sandstone material backfill area
CN206917657U (en) A kind of shallow buried covered excavation benching tunnelling method constructing structure
CN111156008A (en) Shield construction and monitoring method for dangerous source river electric power tunnel
CN110130317A (en) Goaf Treatment Methods are lied prostrate on a kind of freeway tunnel
Chen et al. The Key Technology of Large-Diameter Shield Tunneling Through the Embankment
Chen et al. Construction technology of shield tunnel crossing the middle channel section of yangtze river
Liu et al. Analysis on influence of metro shield on ground subsidence
Zhang Study on Ground Deformation during Shield Tunnel Construction
Kai-jun Research on Construction Technology of Tunnel Face Slump in Soft Rock Tunnel of China-Laos Railway

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant