CN108532982A - A method of replacing grid node - Google Patents

A method of replacing grid node Download PDF

Info

Publication number
CN108532982A
CN108532982A CN201810437666.1A CN201810437666A CN108532982A CN 108532982 A CN108532982 A CN 108532982A CN 201810437666 A CN201810437666 A CN 201810437666A CN 108532982 A CN108532982 A CN 108532982A
Authority
CN
China
Prior art keywords
rod piece
steel
steel pipe
bolt
anchor ear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810437666.1A
Other languages
Chinese (zh)
Inventor
卢春亭
郭士干
左秀宏
王星
王建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Construction Quality Supervision Station
China Construction Seventh Engineering Bureau Installation Engineering Co Ltd
Original Assignee
Henan Construction Quality Supervision Station
China Construction Seventh Engineering Bureau Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Construction Quality Supervision Station, China Construction Seventh Engineering Bureau Installation Engineering Co Ltd filed Critical Henan Construction Quality Supervision Station
Priority to CN201810437666.1A priority Critical patent/CN108532982A/en
Publication of CN108532982A publication Critical patent/CN108532982A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention discloses a kind of method for replacing grid node, solves the technical issues of difficulty of construction when grid node is replaced in the prior art is big, big, installation progress and construction quality can not ensure to structure security implication.The present invention includes the following steps:Gap between pacch bolt ball and rod piece sleeve, the installation site for measuring steel pipe anchor ear, the rod piece of polishing bolt sphere both sides, brushing steel steel binder on the rod piece after polishing, install on steel steel stick side steel pipe anchor ear, contraposition installation other side steel pipe anchor ear, install between the steel pipe anchor ear of both sides it is high-strength to drawing anchor bolt, tightening to drawing anchor bolt stress, replacing bolt sphere between rod piece, completion acceptance.It is constructed using the present invention, it will be apparent that shorten the construction period, saved construction cost, while construction safety being made to be guaranteed.

Description

A method of replacing grid node
Technical field
The present invention relates to Construction of The Grids technical fields, particularly relate to a kind of method for replacing grid node.
Background technology
The light roof of large span, using grid structure, steel using amount can greatly reduce, and save cost, and the Beauty It sees, is gradually received by owner and design side.But since rack span is big, the rod piece of grid structure is all prefabrication type component, By amount of deflection and installation cumulative errors etc. are various influences in installation process, it is a lot of to be bound to cause rack installation quality problem.Greatly Multilist is present:Gap between rod piece sleeve and bolt sphere is more than that code requirement, sleeve are directly welded by cutting during the installation process It is connected to the first-class problems of bolt sphere.Eample Analysis is carried out with regard to this installation question below.
Xi'an arenas is oval curved surface grid structure, 152 meters of length, 148 meters of width.Grid node is bolt ball-joint Point and part welded spherical node.There are gap, sleeves to cut between the radial rod piece sleeve of discovery and bolt sphere after installation is completed, The problems such as without sleeve, influences the security presence of grid structure.Since radial rod piece is the main stressed member of Elements of Space Grid Truss, rod piece For pull rod or compression bar.Since rack has installed, to rack dismounting reinstall it is costly, and the duration cannot expire Foot requires.Such as radial rod piece is replaced, it is big that there are difficulty of construction, constructs complicated, big to structure security implication and is not easy to protect Demonstrate,prove installation progress and construction quality.
Invention content
For the deficiency in above-mentioned background technology, the present invention proposes a kind of method for replacing grid node, solves existing Difficulty of construction is big when grid node is replaced in technology, to structure security implication, big, construction speed and construction quality can not ensure Technical problem.
The technical proposal of the invention is realized in this way:A method of grid node is replaced, is included the following steps:
Step 1:Gap between pacch bolt ball and rod piece sleeve;
Step 2:Measure the installation site of steel pipe anchor ear;
Step 3:The rod piece of bolt sphere of polishing both sides;
Step 4:Brushing steel steel binder on rod piece after polishing;
Step 5:Side steel pipe anchor ear is installed on steel steel stick;
Step 6:Contraposition installation other side steel pipe anchor ear;
Step 7:It is installed between the steel pipe anchor ear of both sides high-strength to drawing anchor bolt;
Step 8:It tightens to drawing anchor bolt stress;
Step 9:Replace the bolt sphere between rod piece;
Step 10:Completion acceptance.
When the step 1 carries out gap repairing, filled up first using electric welding, voltage, the electric current of welding, which will meet construction, to be wanted It asks, grinding process is carried out to welding residue at gap after squeegeeing, residue and smooth is not stayed in guarantee.
It is measured using the tape measure examined when the step 2 measures, carrying out scene with the use of square puts Sample ensures error within 1mm, and slate pencil underlining on rod piece is used after determining the installation site of steel pipe anchor ear.
When the step 3 carries out rod piece polishing, uses sander to carry out processing of rust removing first, rod piece is polished Then metallic luster uses wheel polisher to carry out roughness processing to rod piece, rod piece is made to obtain larger roughness, line of polishing Lu Yingyu steel Impact directions are vertical, are stained with acetone by the rod piece wiped clean after polishing using staple thereafter.
When the step 4 brushing steel steel binder, brushing will uniformly, and thickness is maintained in 0.5mm-1mm.
When the step 5 and step 6 installation steel pipe anchor ear, close inspection installation effect, with hand hammer along stickup after stickup Face gently taps steel pipe anchor ear, indicates to have pasted if without empty sound closely knit, otherwise should peel steel pipe anchor ear, carry out glue, weight It is new to paste.
When tightened in the step 8 to drawing anchor bolt, using torque wrench to drawing anchor bolt to fasten, ensureing to drawing anchor The screw rod of bolt is 2-3 exposed, checks whether bolt loosens using hammering method after fastening.
This law is simple in structure, easily fabricated, easy to use, of low cost, can not only stablize and realize that rod member for grid stress passes It passs, and can accelerate construction progress, is highly practical, safety guarantee is provided for rack reinforcing.Rod member for grid design is thought of as axle center Stressed member, i.e. rod member for grid stress are pressure or pulling force, present invention can ensure that grid structure is safe, former rod member for grid Stress is avoided bolt sphere and is transferred on the rod piece of other side, and the consolidation process to rod member for grid has been reliably achieved, can be convenient Ground carries out grid node and repairs replacement, solves in the prior art, and grid node replacement difficulty of construction is big, and construction quality is not Reliable problem.
Specific implementation mode
The technical scheme in the embodiments of the invention will be clearly and completely described below, it is clear that described implementation Example is only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, this field is common The every other embodiment that technical staff is obtained under the premise of not making the creative labor belongs to the model that the present invention protects It encloses.
A method of grid node is replaced, is included the following steps:
Step 1:Gap between pacch bolt ball and rod piece sleeve, is filled up using electric welding first, and voltage, the electric current of welding are wanted Meet construction requirement, grinding process is carried out to welding residue at gap after squeegeeing, residue and smooth is not stayed in guarantee.
Step 2:The installation site for measuring steel pipe anchor ear, is measured using the tape measure examined, and is used cooperatively square Field lofting is carried out, ensures error within 1mm, determines and is crossed on rod piece mark with slate pencil after the installation site of steel pipe anchor ear Note.
Step 3:The rod piece of bolt sphere of polishing both sides, uses sander to carry out processing of rust removing, rod piece is polished first Go out metallic luster, then wheel polisher is used to carry out roughness processing to rod piece, rod piece is made to obtain larger roughness, polishes Lines should be vertical with steel Impact direction, is stained with acetone by the rod piece wiped clean after polishing using staple thereafter.
Step 4:Brushing steel steel binder on rod piece after polishing, brushing will uniformly, and thickness is maintained at 0.5mm- In 1mm.
Step 5:Side steel pipe anchor ear, close inspection installation effect, with hand hammer along viscous after stickup are installed on steel steel stick Veneer gently taps steel pipe anchor ear, indicates to have pasted if without empty sound closely knit, otherwise should peel steel pipe anchor ear, carry out glue, It re-pastes.In addition, steel steel binder must have a work certificate, the quality testing report of product description and product, into Entering will be to product through row retrial behind scene;The stringent construction method strict construction for pressing product description during use.
Step 6:Contraposition installation other side steel pipe anchor ear, close inspection installation effect are light along adhesive surface with hand hammer after stickup Tapping steel pipe anchor ear, indicates to have pasted closely knit if without empty sound, otherwise should peel steel pipe anchor ear, carry out glue, glue again Patch.
Step 7:It is installed between the steel pipe anchor ear of both sides high-strength to drawing anchor bolt.
Step 8:It tightens to drawing anchor bolt stress, using torque wrench to drawing anchor bolt to fasten, ensureing to drawing anchor bolt Screw rod is 2-3 exposed, checks whether bolt loosens using hammering method after fastening.
Step 9:Replace the bolt sphere between rod piece.
Step 10:Completion acceptance.
In addition, being reconnoitred to the rod piece ambient enviroment to need reinforcement, remove barriers object, is provided conveniently for construction;It is inciting somebody to action It replaces and is laid with safety net below the rack of node, reinforcing area installs preventing dropped material funnel, prevents falling object from high altitude.Construction personnel It wears " Triratna ", carrying out safe practice to construction personnel before every day shift tells somebody what one's real intentions are, and forms record of telling somebody what one's real intentions are, signature filing;Scene peace The full-time safety manager of row, safety management is carried out to construction overall process;Forbid violation operation in construction, give directions against regulations;Scene The construction equipment used must be within the defined effect phase, and ensures that performance is stablized.
The not detailed place of the present invention is the common knowledge of this field.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention With within principle, any modification, equivalent replacement, improvement and so on should all be included in the protection scope of the present invention god.

Claims (7)

1. a kind of method for replacing grid node, it is characterised in that include the following steps:
Step 1:Gap between pacch bolt ball and rod piece sleeve;
Step 2:Measure the installation site of steel pipe anchor ear;
Step 3:The rod piece of bolt sphere of polishing both sides;
Step 4:Brushing steel steel binder on rod piece after polishing;
Step 5:Side steel pipe anchor ear is installed on steel steel stick;
Step 6:Contraposition installation other side steel pipe anchor ear;
Step 7:It is installed between the steel pipe anchor ear of both sides high-strength to drawing anchor bolt;
Step 8:It tightens to drawing anchor bolt stress;
Step 9:Replace the bolt sphere between rod piece;
Step 10:Completion acceptance.
2. the method according to claim 1 for replacing grid node, it is characterised in that:The step 1 carries out gap repairing When, it is filled up first using electric welding, voltage, the electric current of welding will meet construction requirement, be remained after squeegeeing to being welded at gap Object carries out grinding process, and residue and smooth is not stayed in guarantee.
3. the method according to claim 1 for replacing grid node, it is characterised in that:The step 2 makes when measuring It is measured with the tape measure examined, field lofting is carried out with the use of square, ensure that error within 1mm, determines steel pipe Slate pencil underlining on rod piece is used after the installation site of anchor ear.
4. the method according to claim 1 for replacing grid node, it is characterised in that:The step 3 carries out rod piece polishing When, it uses sander to carry out processing of rust removing first, rod piece is polished into metallic luster, then use wheel polisher to bar Part carries out roughness processing, so that rod piece is obtained larger roughness, polishing lines should be vertical with steel Impact direction, uses thereafter Staple is stained with acetone by the rod piece wiped clean after polishing.
5. the method according to claim 1 for replacing grid node, it is characterised in that:The step 4 brushing steel steel bonds When agent, brushing will uniformly, and thickness is maintained in 0.5mm-1mm.
6. the method according to claim 1 for replacing grid node, it is characterised in that:The step 5 and step 6 installation When steel pipe anchor ear, close inspection installation effect gently taps steel pipe anchor ear along adhesive surface after stickup with hand hammer, if without empty sound Expression has been pasted closely knit, otherwise should be peeled steel pipe anchor ear, be carried out glue, re-paste.
7. the method according to claim 1 for replacing grid node, it is characterised in that:It is tightened in the step 8 to drawing anchor When bolt, using torque wrench to drawing anchor bolt to fasten, guarantee is 2-3 exposed to the screw rod for drawing anchor bolt, and hammer is used after fastening Striking checks whether bolt loosens.
CN201810437666.1A 2018-05-09 2018-05-09 A method of replacing grid node Pending CN108532982A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810437666.1A CN108532982A (en) 2018-05-09 2018-05-09 A method of replacing grid node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810437666.1A CN108532982A (en) 2018-05-09 2018-05-09 A method of replacing grid node

Publications (1)

Publication Number Publication Date
CN108532982A true CN108532982A (en) 2018-09-14

Family

ID=63476700

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810437666.1A Pending CN108532982A (en) 2018-05-09 2018-05-09 A method of replacing grid node

Country Status (1)

Country Link
CN (1) CN108532982A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110468960A (en) * 2019-08-12 2019-11-19 兰州理工大学 A kind of support construction and construction method of adjustable rack displacement of joint
CN113529979A (en) * 2021-07-30 2021-10-22 中建七局安装工程有限公司 Exempt from welded rack node reinforced structure
CN114541802A (en) * 2022-03-08 2022-05-27 中国矿业大学 Device and method for replacing pulled rod piece
CN115929068A (en) * 2022-12-02 2023-04-07 中铁二局集团有限公司 Device for repairing bolt ball joint by using carbon fiber and repairing method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1570333A (en) * 2004-04-26 2005-01-26 武汉大学 Process for reinforcing electricity transmission and transformation steel pipe frames
CN201507122U (en) * 2009-06-09 2010-06-16 宋明志 Grid structure bar replacing apparatus
CN105735667A (en) * 2016-04-13 2016-07-06 陕西建工机械施工集团有限公司 Assembled replacement tool for steel net frame rod piece
CN206376574U (en) * 2016-12-06 2017-08-04 北京建筑大学 A kind of grid structure bar replacing apparatus of adjustable in length
CN107366440A (en) * 2017-08-25 2017-11-21 中冶建筑研究总院有限公司 A kind of reinforcing device and method of bolt-ball net frame pull bar and node

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1570333A (en) * 2004-04-26 2005-01-26 武汉大学 Process for reinforcing electricity transmission and transformation steel pipe frames
CN201507122U (en) * 2009-06-09 2010-06-16 宋明志 Grid structure bar replacing apparatus
CN105735667A (en) * 2016-04-13 2016-07-06 陕西建工机械施工集团有限公司 Assembled replacement tool for steel net frame rod piece
CN206376574U (en) * 2016-12-06 2017-08-04 北京建筑大学 A kind of grid structure bar replacing apparatus of adjustable in length
CN107366440A (en) * 2017-08-25 2017-11-21 中冶建筑研究总院有限公司 A kind of reinforcing device and method of bolt-ball net frame pull bar and node

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
梁峰: "大连电视塔结构检测与构件修复及置换设计研究", 《建筑结构》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110468960A (en) * 2019-08-12 2019-11-19 兰州理工大学 A kind of support construction and construction method of adjustable rack displacement of joint
CN110468960B (en) * 2019-08-12 2020-12-22 甘肃一安建设科技集团有限公司 Supporting structure capable of adjusting node displacement of net rack and construction method
CN113529979A (en) * 2021-07-30 2021-10-22 中建七局安装工程有限公司 Exempt from welded rack node reinforced structure
CN114541802A (en) * 2022-03-08 2022-05-27 中国矿业大学 Device and method for replacing pulled rod piece
CN115929068A (en) * 2022-12-02 2023-04-07 中铁二局集团有限公司 Device for repairing bolt ball joint by using carbon fiber and repairing method thereof
CN115929068B (en) * 2022-12-02 2023-09-05 中铁二局集团有限公司 Device for repairing bolt ball node by carbon fiber and repairing method thereof

Similar Documents

Publication Publication Date Title
CN108532982A (en) A method of replacing grid node
EP0844334B1 (en) Method for reinforcing an asphalt applied concrete structure
Schober et al. FRP reinforcement of timber structures
CN107246158A (en) The construction technology of carbon fiber cloth strengthening technology
Campilho et al. Experimental and numerical evaluation of composite repairs on wood beams damaged by cross-graining
CN102704698A (en) Fully prestressed and compositely integrally reinforced concrete structure
CN105625197A (en) Concrete beam bending reinforcing method based on steel plate-prestressed carbon fiber plate
Haghani et al. A new design model for adhesive joints used to bond FRP laminates to steel beams: Part B: Experimental verification
CN102425311A (en) Concrete structure reinforcing method based on near surface mounted prestressed FRP (Fiber Reinforced Polymer)
Salinas et al. Interface layer tack coat optimization
CN106638332A (en) Concrete bridge reinforcing design method based on force rib stress test result
Mertz et al. The rehabilitation of steel bridge girders using advanced composite materials
Dawood Fundamental behavior of steel-concrete composite beams strengthened with high modulus carbon fiber reinforced polymer (CFRP) materials
CN109444030A (en) FRP plate material/sheet material the corrosion testing apparatus and method of self-correction prestressing force angle
CN109184248A (en) Reinforcement means is cut to reinforced beam using CFRP grid-PCM reinforcing layer
JP5265152B2 (en) Monitoring method of fatigue crack growth in CFRP plate
CN105421813B (en) The external prestress strengthening method of concrete truss
CN108103966A (en) A kind of steel box-girder ruggedized construction and its reinforcement means
CN207347843U (en) A kind of gapless rail insulation safety device
CN106639354B (en) The method of steel plate and prestressed carbon cloth reinforced beams of concrete shear-carrying capacity
CN108589537A (en) The single formula external pre-stress bundle construction of reeving of filled-type epoxy coating strand
KR20110100890A (en) Method of reinforcing the concrete pole
CN206972271U (en) A kind of steel arch-shelf connecting plate protection device
KR20120011218A (en) Repairing crevis sheet of paved road and repairing method using it
CN100395409C (en) Method for reconditioning road surface by using asphalt rubber

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180914