CN108532611A - 一种基坑支护结构及施工方法 - Google Patents
一种基坑支护结构及施工方法 Download PDFInfo
- Publication number
- CN108532611A CN108532611A CN201810392036.7A CN201810392036A CN108532611A CN 108532611 A CN108532611 A CN 108532611A CN 201810392036 A CN201810392036 A CN 201810392036A CN 108532611 A CN108532611 A CN 108532611A
- Authority
- CN
- China
- Prior art keywords
- foundation pit
- dike
- jackstone
- sand
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/10—Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
- E02B3/106—Temporary dykes
- E02B3/108—Temporary dykes with a filling, e.g. filled by water or sand
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/18—Reclamation of land from water or marshes
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Revetment (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810392036.7A CN108532611A (zh) | 2018-04-27 | 2018-04-27 | 一种基坑支护结构及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810392036.7A CN108532611A (zh) | 2018-04-27 | 2018-04-27 | 一种基坑支护结构及施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108532611A true CN108532611A (zh) | 2018-09-14 |
Family
ID=63479527
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810392036.7A Pending CN108532611A (zh) | 2018-04-27 | 2018-04-27 | 一种基坑支护结构及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108532611A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111042051A (zh) * | 2019-12-30 | 2020-04-21 | 中建港航局集团有限公司 | 一种临时防汛体系施工工艺 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20080000510U (ko) * | 2008-03-24 | 2008-04-16 | 김광호 | 건설용 보강 마대 |
CN101298778A (zh) * | 2008-07-02 | 2008-11-05 | 中铁大桥局股份有限公司 | 一种复合型围堰及其施工方法 |
CN104499459A (zh) * | 2014-12-22 | 2015-04-08 | 中国水利水电第八工程局有限公司 | 一种土工管袋防波堤 |
CN105821885A (zh) * | 2015-01-05 | 2016-08-03 | 五冶集团上海有限公司 | 海积岛屿复杂地质中超长基坑的组合式支护和维护方法 |
CN206070494U (zh) * | 2016-08-25 | 2017-04-05 | 中交天津港航勘察设计研究院有限公司 | 一种适用于湖泊疏浚底泥堆场的围堰 |
CN107419731A (zh) * | 2017-08-04 | 2017-12-01 | 广州市市政工程设计研究总院 | 一种扶壁板式双排桩基坑支护结构及其施工方法 |
-
2018
- 2018-04-27 CN CN201810392036.7A patent/CN108532611A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20080000510U (ko) * | 2008-03-24 | 2008-04-16 | 김광호 | 건설용 보강 마대 |
CN101298778A (zh) * | 2008-07-02 | 2008-11-05 | 中铁大桥局股份有限公司 | 一种复合型围堰及其施工方法 |
CN104499459A (zh) * | 2014-12-22 | 2015-04-08 | 中国水利水电第八工程局有限公司 | 一种土工管袋防波堤 |
CN105821885A (zh) * | 2015-01-05 | 2016-08-03 | 五冶集团上海有限公司 | 海积岛屿复杂地质中超长基坑的组合式支护和维护方法 |
CN206070494U (zh) * | 2016-08-25 | 2017-04-05 | 中交天津港航勘察设计研究院有限公司 | 一种适用于湖泊疏浚底泥堆场的围堰 |
CN107419731A (zh) * | 2017-08-04 | 2017-12-01 | 广州市市政工程设计研究总院 | 一种扶壁板式双排桩基坑支护结构及其施工方法 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111042051A (zh) * | 2019-12-30 | 2020-04-21 | 中建港航局集团有限公司 | 一种临时防汛体系施工工艺 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108442382B (zh) | 横穿深基坑的压力管线原位保护及围护挡土结构及施工方法 | |
CN104404974B (zh) | 高承压水厚砂卵石地层深基坑注浆封底结构及其施工工艺 | |
CN105201001B (zh) | 一种岩溶地区大型溶洞的复合防渗结构及其施工方法 | |
CN207003499U (zh) | 一种地铁隧道上方基坑开挖的抗浮起装置 | |
CN108612117A (zh) | 一种海底大跨市政隧道挡水结构及施工方法 | |
CN113006144B (zh) | 一种透水构筑物隧道结构 | |
CN101319501B (zh) | 深基坑施工方法 | |
CN111622234B (zh) | 一种斜竖向组合钢管桩承托的卸荷式薄壁箱型挡墙及施工工艺 | |
CN105064373A (zh) | 河道陡坡基岩上的桥梁主墩承台基坑支护结构及其施工方法 | |
CN112854144A (zh) | 一种深厚淤泥层上土石坝的构筑结构及其施工方法 | |
CN108532611A (zh) | 一种基坑支护结构及施工方法 | |
CN107700514A (zh) | 一种关于软弱地基基础选择结构型式的处理方法 | |
CN204252148U (zh) | 高承压水厚砂卵石地层深基坑注浆封底结构 | |
CN207004520U (zh) | 一种地铁保护区竖井开挖的稳固结构 | |
CN110080234A (zh) | 一种在软土地基深基坑二次中心岛开挖的方法 | |
CN107447794B (zh) | 一种地铁保护区域内开挖基坑的抗浮起施工方法 | |
CN102425179A (zh) | 一种微型钢管灌注桩支撑加筋土渗沟结构 | |
CN204875807U (zh) | 河道陡坡基岩上的桥梁主墩承台基坑支护结构 | |
CN215715426U (zh) | 桥梁深基坑围堰结构 | |
CN212896447U (zh) | 一种人工挖孔灌注桩基础托换筏板基础的结构 | |
CN211773608U (zh) | 一种预制装配式矩形抗滑桩护壁 | |
CN204825916U (zh) | 一种强透水地层深基坑封底止水结构 | |
CN209025095U (zh) | 一种沉井结构 | |
CN113123358A (zh) | 一种采煤不均匀沉降作用下船池变形防治结构及施工方法 | |
CN206143717U (zh) | 残积土层不连续段坝体防渗结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 518000 22nd Floor, Botai Engineering Exploration Building, No. 8 South Science and Technology Eighth Road, Nanshan High-tech Park, Shenzhen City, Guangdong Province Applicant after: Academy of Iron Sciences (Shenzhen) Research and Design Institute Co., Ltd. Address before: 518000 22nd Floor, Botai Engineering Exploration Building, No. 8 South Science and Technology Eighth Road, Nanshan High-tech Park, Shenzhen City, Guangdong Province Applicant before: SHENZHEN RESEARCH AND DESIGN INSTITUTE OF CARS |
|
CB02 | Change of applicant information | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180914 |
|
RJ01 | Rejection of invention patent application after publication |