CN108527658B - A construction cement preparation machine - Google Patents

A construction cement preparation machine Download PDF

Info

Publication number
CN108527658B
CN108527658B CN201810227200.9A CN201810227200A CN108527658B CN 108527658 B CN108527658 B CN 108527658B CN 201810227200 A CN201810227200 A CN 201810227200A CN 108527658 B CN108527658 B CN 108527658B
Authority
CN
China
Prior art keywords
rod
frame body
cement
rotating
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810227200.9A
Other languages
Chinese (zh)
Other versions
CN108527658A (en
Inventor
李荣凤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaoshan Xinhe Industry and Trade Co.,Ltd.
Original Assignee
Ruian Yihe Architectural Decoration Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ruian Yihe Architectural Decoration Design Co Ltd filed Critical Ruian Yihe Architectural Decoration Design Co Ltd
Priority to CN201810227200.9A priority Critical patent/CN108527658B/en
Publication of CN108527658A publication Critical patent/CN108527658A/en
Application granted granted Critical
Publication of CN108527658B publication Critical patent/CN108527658B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C5/00Apparatus or methods for producing mixtures of cement with other substances, e.g. slurries, mortars, porous or fibrous compositions
    • B28C5/44Apparatus specially adapted for drive by muscle power
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C7/00Controlling the operation of apparatus for producing mixtures of clay or cement with other substances; Supplying or proportioning the ingredients for mixing clay or cement with other substances; Discharging the mixture
    • B28C7/04Supplying or proportioning the ingredients
    • B28C7/06Supplying the solid ingredients, e.g. by means of endless conveyors or jigging conveyors
    • B28C7/067Supplying the solid ingredients, e.g. by means of endless conveyors or jigging conveyors by means of stationary hoppers, chambers or bins from which the material is fed gravitationally, e.g. having agitating means therein
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C7/00Controlling the operation of apparatus for producing mixtures of clay or cement with other substances; Supplying or proportioning the ingredients for mixing clay or cement with other substances; Discharging the mixture
    • B28C7/04Supplying or proportioning the ingredients
    • B28C7/12Supplying or proportioning liquid ingredients
    • B28C7/126Supply means, e.g. nozzles

Landscapes

  • Chemical & Material Sciences (AREA)
  • Dispersion Chemistry (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Accessories For Mixers (AREA)

Abstract

The invention relates to a cement preparation machine, in particular to a cement preparation machine for buildings. The invention aims to solve the technical problem of cement caking, and provides a cement preparation machine for buildings, which can be used for completing the preparation of cement by discontinuously injecting water and can be convenient for workers to operate. The invention provides a cement preparation machine for buildings, which comprises an installation plate, an installation column, a discharge pipe, a valve, a frame body, a first bearing seat, a first rotating rod and the like; two erection columns are connected in the middle of the top of the installation plate, a frame body is connected between the top ends of the two erection columns, a discharge pipe is connected in the middle of the bottom of the frame body, and a valve is arranged on the discharge pipe. The cement mixer has the advantages that the cement caking problem can be solved, the cement can be prepared by injecting water discontinuously, and the operation of workers can be facilitated.

Description

一种建筑用水泥制备机A construction cement preparation machine

技术领域technical field

本发明涉及一种水泥制备机,尤其涉及一种建筑用水泥制备机。The invention relates to a cement preparation machine, in particular to a cement preparation machine for construction.

背景技术Background technique

水泥是粉状水硬性无机胶凝材料。加水搅拌后成浆体,能在空气中硬化或者在水中更好的硬化,并能把砂、石等材料牢固地胶结在一起。早期石灰与火山灰的混合物与现代的石灰火山灰水泥很相似,用它胶结碎石制成的混凝土,硬化后不但强度较高,而且还能抵抗淡水或含盐水的侵蚀。长期以来,它作为一种重要的胶凝材料,广泛应用于土木建筑、水利、国防等工程。Cement is a powdered hydraulic inorganic cementitious material. After adding water and stirring, it becomes a slurry, which can be hardened in air or better hardened in water, and can firmly bond materials such as sand and stone together. The mixture of early lime and pozzolan is very similar to the modern lime pozzolan cement. The concrete made of it cemented with crushed stone not only has high strength after hardening, but also can resist the erosion of fresh water or salt water. For a long time, as an important cementitious material, it has been widely used in civil engineering, water conservancy, national defense and other projects.

目前水泥制备主要是人们手动制备,水泥容易飘散大量灰尘影响人们身体健康,而现有的建筑用水泥制备机一般无法自动间断性的往未搅拌的水泥内注水。At present, cement preparation is mainly done manually by people. Cement is easily scattered with a large amount of dust and affects people's health. However, the existing cement preparation machines for construction generally cannot automatically and intermittently inject water into the unmixed cement.

因此亟需研发一种能够解决水泥结块问题,能够间断性注入水完成对水泥的制备和能够方便工作人员进行操作的建筑用水泥制备机,来克服现有技术中无法自动间断性的往未搅拌的水泥内注水的缺点。Therefore, it is urgent to develop a cement preparation machine for construction that can solve the problem of cement agglomeration, can inject water intermittently to complete the preparation of cement, and can facilitate the operation of the staff, so as to overcome the inability to automatically and intermittently in the prior art. Disadvantages of water injection in mixed cement.

发明内容SUMMARY OF THE INVENTION

(1)要解决的技术问题(1) Technical problems to be solved

本发明为了克服现有技术中无法自动间断性的往未搅拌的水泥内注水的缺点,本发明要解决的技术问题是提供一种能够解决水泥结块问题,能够间断性注入水完成对水泥的制备和能够方便工作人员进行操作的建筑用水泥制备机。In order to overcome the shortcoming of the prior art that water cannot be automatically and intermittently injected into the unstirred cement, the technical problem to be solved by the present invention is to provide a solution that can solve the problem of cement agglomeration, and can inject water intermittently to complete the treatment of cement. Construction cement preparation machine that can be prepared and can be easily operated by workers.

(2)技术方案(2) Technical solutions

为了解决上述技术问题,本发明提供了这样一种建筑用水泥制备机,包括有安装板、安装柱、出料管、阀门、框体、第一轴承座、第一转杆、密封圈、旋转杆、转轮、把手、固定杆、缸体、活塞、抽水管、单向阀、进水管和第一移动杆,安装板顶部中间连接有两个安装柱,两个安装柱顶端之间连接有一个框体,框体底部中间连接有出料管,出料管上设有阀门,框体外前壁设有第一轴承座,第一轴承座内转动式连接有第一转杆,第一转杆穿过框体外前壁,第一转杆上套有密封圈,密封圈安装在框体内前壁,第一转杆后部连接有转轮,转轮位于框体内,转轮外侧均匀连接有四个旋转杆,第一转杆前端连接有把手,安装板左壁顶部连接有固定杆,固定杆右端与框体左侧中部连接,固定杆左壁右侧上部连接有缸体,缸体内设有活塞,缸体底部右侧连接有抽水管,抽水管与缸体连通,缸体顶部右侧连接有进水管,进水管与缸体连通,进水管右壁穿过框体左壁上部,抽水管和进水管上均设有单向阀,活塞左侧中部连接有第一移动杆,第一移动杆穿过固定杆左壁上部。In order to solve the above technical problems, the present invention provides such a cement preparation machine for construction, which includes a mounting plate, a mounting column, a discharge pipe, a valve, a frame, a first bearing seat, a first rotating rod, a sealing ring, a rotary A rod, a runner, a handle, a fixed rod, a cylinder, a piston, a water pump, a one-way valve, a water inlet pipe and a first moving rod, two mounting posts are connected between the top of the mounting plate and two mounting posts are connected between the tops A frame body, a discharge pipe is connected in the middle of the bottom of the frame body, a valve is arranged on the discharge pipe, a first bearing seat is arranged on the outer front wall of the frame body, and a first rotating rod is rotatably connected in the first bearing seat. The rod passes through the outer front wall of the frame, the first rotating rod is covered with a sealing ring, the sealing ring is installed on the front wall of the frame, the rear part of the first rotating rod is connected with a runner, the runner is located in the frame, and the outer side of the runner is evenly connected with a runner. There are four rotating rods, the front end of the first rotating rod is connected with a handle, the top of the left wall of the mounting plate is connected with a fixing rod, the right end of the fixing rod is connected with the middle part of the left side of the frame body, the upper part of the right side of the left wall of the fixing rod is connected with a cylinder body, and the cylinder body is There is a piston, the bottom right side of the cylinder body is connected with a water pumping pipe, the water pumping pipe is connected with the cylinder body, the right side of the top of the cylinder body is connected with a water inlet pipe, the water inlet pipe is connected with the cylinder body, and the right wall of the water inlet pipe passes through the upper part of the left wall of the frame body, A one-way valve is arranged on both the water suction pipe and the water inlet pipe, the middle part of the left side of the piston is connected with a first moving rod, and the first moving rod passes through the upper part of the left wall of the fixed rod.

优选地,还包括有连接柱、挡板、第二轴承座、第二转杆、圆头杆和漏斗,框体左右两壁外侧上部均连接有连接柱,框体左右两壁顶部均开有通孔,两个通孔位于同一水平线,两个通孔内设有一个挡板,连接柱上设有漏斗,漏斗底部与挡板顶部接触,漏斗底部与框体顶部连通,漏斗左右两壁外侧中部均连接有第二轴承座,两个第二轴承座内转动式连接有第二转杆,第二转杆上均匀连接有六个圆头杆。Preferably, it also includes a connecting column, a baffle plate, a second bearing seat, a second rotating rod, a round head rod and a funnel, the upper part of the outer sides of the left and right walls of the frame body are connected with connecting columns, and the tops of the left and right walls of the frame body are opened with Through holes, two through holes are located on the same horizontal line, a baffle is arranged in the two through holes, a funnel is arranged on the connecting column, the bottom of the funnel is in contact with the top of the baffle, the bottom of the funnel is connected with the top of the frame, and the outer sides of the left and right walls of the funnel The middle parts are connected with second bearing seats, the two second bearing seats are rotatably connected with second rotating rods, and the second rotating rods are evenly connected with six round head rods.

优选地,还包括有杆子、伺服电机、螺杆和固定套,固定杆左壁右侧上部连接有杆子,固定杆左壁顶部连接有伺服电机,伺服电机的输出轴上连接有螺杆,螺杆右端与第二转杆左端连接,螺杆上套有固定套,固定套底部左侧与杆子顶端连接。Preferably, it also includes a rod, a servo motor, a screw rod and a fixing sleeve, a rod is connected to the upper right side of the left wall of the fixing rod, a servo motor is connected to the top of the left wall of the fixing rod, a screw rod is connected to the output shaft of the servo motor, and the right end of the screw rod is connected to the The left end of the second rotating rod is connected, the screw rod is covered with a fixing sleeve, and the left side of the bottom of the fixing sleeve is connected with the top end of the rod.

优选地,还包括有导轨、滑套、连杆、螺母、第二移动杆和L形杆,固定套顶部和底部均连接有导轨,两个导轨上均滑动式设有滑套,两个滑套内侧均连接有连杆,螺杆上滑动式连接有螺母,连杆均与螺母的上下两侧连接,螺杆与螺母配合,下侧的滑套底部连接有第二移动杆,第二移动杆穿过固定杆左壁上部,第二移动杆位于缸体的上方,第二移动杆左端连接有L形杆,L形杆右端与第一移动杆左侧中部连接。Preferably, it also includes a guide rail, a sliding sleeve, a connecting rod, a nut, a second moving rod and an L-shaped rod, the top and bottom of the fixed sleeve are connected with guide rails, and two guide rails are slidably provided with sliding sleeves. The inner side of the sleeve is connected with a connecting rod, a nut is slidably connected on the screw rod, the connecting rod is connected with the upper and lower sides of the nut, the screw rod is matched with the nut, the bottom of the sliding sleeve on the lower side is connected with a second moving rod, and the second moving rod passes through. Passing through the upper part of the left wall of the fixed rod, the second moving rod is located above the cylinder, the left end of the second moving rod is connected with an L-shaped rod, and the right end of the L-shaped rod is connected with the middle part of the left side of the first moving rod.

优选地,还包括有固定座、软垫和坐板,安装板右侧连接有固定座,固定座顶部连接有坐板,坐板上粘接有软垫。Preferably, it also includes a fixed seat, a soft pad and a seat plate, the right side of the installation plate is connected with the fixed seat, the top of the fixed seat is connected with the seat plate, and the seat plate is bonded with a soft cushion.

工作原理:当需要制备建筑用水泥时,工作人员首先将水泥倒入框体内,再将抽水管的末端放入到水池内,然后拉动第一移动杆向左运动,第一移动杆则会拉动活塞向左运动,此时水池内水则会通过抽水管抽入到缸体内,因为单向阀的作用,使得进入到缸体内的水不会通过抽水管倒流回水池中,接着再向右推动第一移动杆,第一移动杆带动活塞向右移动,此时缸体内的水受到挤压,于是缸体内的水顺着进水管进入框体内,等到框体内的水达到一定量时,工作人员停止拉动第一移动杆即可,接着工作人员转动把手,把手通过第一转杆带动转轮转动,从而使得转轮上的四个旋转杆发生转动,以此来搅拌框体内的水泥和水,当框体内的水泥和水搅拌好时,工作人员停止转动把手,然后再将收集水泥的装备放置在出料管的正下方,接着打开阀门,使框体内搅拌好的水泥顺着出料管进入收集装置内,等到水泥收集一定量后,工作人员关闭阀门即可,由此实现了对建筑用水泥的制备。Working principle: When it is necessary to prepare cement for construction, the staff first pours the cement into the frame, then puts the end of the suction pipe into the pool, and then pulls the first moving rod to the left, and the first moving rod will pull The piston moves to the left, and the water in the pool will be drawn into the cylinder through the water pipe. Push the first moving rod to the right, and the first moving rod drives the piston to move to the right. At this time, the water in the cylinder is squeezed, so the water in the cylinder enters the frame along the water inlet pipe, and waits until the water in the frame reaches a certain amount At this time, the staff stops pulling the first moving rod, and then the staff turns the handle, and the handle drives the runner to rotate through the first rotating rod, so that the four rotating rods on the rotating wheel rotate, so as to stir the inside of the frame. Cement and water, when the cement and water in the frame are well mixed, the staff stop turning the handle, and then place the equipment for collecting cement directly under the discharge pipe, and then open the valve to make the cement mixed in the frame follow the The discharge pipe enters the collection device, and after a certain amount of cement is collected, the staff can close the valve, thus realizing the preparation of cement for construction.

因为还包括有连接柱、挡板、第二轴承座、第二转杆、圆头杆和漏斗,框体左右两壁外侧上部均连接有连接柱,框体左右两壁顶部均开有通孔,两个通孔位于同一水平线,两个通孔内设有一个挡板,连接柱上设有漏斗,漏斗底部与挡板顶部接触,漏斗底部与框体顶部连通,漏斗左右两壁外侧中部均连接有第二轴承座,两个第二轴承座内转动式连接有第二转杆,第二转杆上均匀连接有六个圆头杆,所以为了防止水泥结块使框体内的旋转杆不方便搅拌水泥,工作人员可以先将水泥倒入漏斗内,接着转动第二转杆,同时第二转杆带动六个圆头杆发生转动,从而对漏斗内的水泥进行搅拌,由此避免了水泥结块对框体内水泥搅拌的不便,然后工作人员拉动挡板,使挡板与两个通孔脱离,这时漏斗内的水泥顺势进入框体内,当框体内水泥达到一定量时,工作人员再次使挡板穿过两个通孔,从而停止漏斗内的水泥继续进入框体内,由此避免了工作人员手动倒入水泥,水泥飘起大量灰尘影响工作人员身体健康的情况。Because it also includes a connecting column, a baffle plate, a second bearing seat, a second rotating rod, a round head rod and a funnel, the upper parts of the outer sides of the left and right walls of the frame are connected with connecting columns, and the tops of the left and right walls of the frame are provided with through holes. , the two through holes are located on the same horizontal line, there is a baffle in the two through holes, a funnel is arranged on the connecting column, the bottom of the funnel is in contact with the top of the baffle, the bottom of the funnel is connected with the top of the frame, and the outer middle of the left and right walls of the funnel are both A second bearing seat is connected, a second rotating rod is rotatably connected in the two second bearing seats, and six round-headed rods are evenly connected to the second rotating rod, so in order to prevent the cement from caking, the rotating rod in the frame will not be damaged. It is convenient to mix cement. The staff can first pour the cement into the funnel, and then turn the second rotary rod. At the same time, the second rotary rod drives the six round-headed rods to rotate, so as to stir the cement in the funnel, thereby avoiding the need for cement. The agglomeration is inconvenient for the cement mixing in the frame. Then the staff pulls the baffle to separate the baffle from the two through holes. At this time, the cement in the funnel enters the frame. When the cement in the frame reaches a certain amount, the staff again The baffle plate is passed through the two through holes to stop the cement in the funnel from continuing to enter the frame, thereby avoiding the situation that the staff manually pours the cement and the cement floats a lot of dust and affects the health of the staff.

因为还包括有杆子、伺服电机、螺杆和固定套,固定杆左壁右侧上部连接有杆子,固定杆左壁顶部连接有伺服电机,伺服电机的输出轴上连接有螺杆,螺杆右端与第二转杆左端连接,螺杆上套有固定套,固定套底部左侧与杆子顶端连接,所以当需要搅拌漏斗内的水泥时,工作人员可以启动伺服电机,控制伺服电机旋转,伺服电机通过螺杆带动第二转杆旋转,同时第二转杆带动六个圆头杆旋转,由此实现了自动搅拌漏斗内的水泥,并且方便了人们制备建筑用水泥。Because it also includes a rod, a servo motor, a screw rod and a fixed sleeve, a rod is connected to the upper right side of the left wall of the fixed rod, a servo motor is connected to the top of the left wall of the fixed rod, a screw rod is connected to the output shaft of the servo motor, and the right end of the screw rod is connected to the second The left end of the rotating rod is connected, and the screw is covered with a fixed sleeve. The left side of the bottom of the fixed sleeve is connected to the top of the rod. Therefore, when the cement in the hopper needs to be stirred, the staff can start the servo motor to control the rotation of the servo motor, and the servo motor drives the first through the screw. The second rotating rod rotates, and at the same time the second rotating rod drives the six round-headed rods to rotate, thereby realizing the automatic mixing of the cement in the hopper, and making it convenient for people to prepare cement for construction.

因为还包括有导轨、滑套、连杆、螺母、第二移动杆和L形杆,固定套顶部和底部均连接有导轨,两个导轨上均滑动式设有滑套,两个滑套内侧均连接有连杆,两个连杆之间连接有螺母,螺杆与螺母配合,下侧的滑套底部连接有第二移动杆,第二移动杆穿过固定杆左壁上部,第二移动杆位于缸体的上方,第二移动杆左端连接有L形杆,L形杆右端与第一移动杆左侧中部连接,所以工作人员首先打开进水管上的单向阀,然后启动伺服电机,控制伺服电机旋转,此时伺服电机通过螺杆带动螺母左右移动,螺母通过两个连杆带动两个滑套左右移动,当两个滑套向右移动时,下侧的滑套通过第二移动杆带动L形杆向右移动,并且L形杆通过第一移动杆带动活塞向右移动,这时缸体内的水受到挤压,于是缸体内的水顺着进水管进入框体内,当两个滑套向左移动时,下侧的滑套通过第二移动杆带动L形杆向左移动,并且L形杆通过第一移动杆带动活塞向左移动,这时缸体内的水不再受到挤压,缸体内的水也停止顺着进水管进入框体内,当两个滑套再次向右移动时,下侧的滑套再次通过第二移动杆带动L形杆向右移动,如此反复,由此达到了自动间断性的向框体内注入水的目的,如果不再需要向框体内注入水,关闭伺服电机和进水管上的单向阀即可。Because it also includes a guide rail, a sliding sleeve, a connecting rod, a nut, a second moving rod and an L-shaped rod, the top and bottom of the fixed sleeve are connected with guide rails, and sliding sleeves are provided on both guide rails. Both are connected with connecting rods, a nut is connected between the two connecting rods, the screw rod is matched with the nut, the bottom of the sliding sleeve on the lower side is connected with a second moving rod, the second moving rod passes through the upper part of the left wall of the fixed rod, and the second moving rod Located above the cylinder, the left end of the second moving rod is connected with an L-shaped rod, and the right end of the L-shaped rod is connected with the middle of the left side of the first moving rod, so the staff first open the one-way valve on the water inlet pipe, and then start the servo motor to control the The servo motor rotates. At this time, the servo motor drives the nut to move left and right through the screw. The nut drives the two sliding sleeves to move left and right through the two connecting rods. When the two sliding sleeves move to the right, the lower sliding sleeve is driven by the second moving rod. The L-shaped rod moves to the right, and the L-shaped rod drives the piston to move to the right through the first moving rod. At this time, the water in the cylinder is squeezed, so the water in the cylinder enters the frame along the water inlet pipe. When the two When the sliding sleeve moves to the left, the sliding sleeve on the lower side drives the L-shaped rod to move to the left through the second moving rod, and the L-shaped rod drives the piston to move to the left through the first moving rod. At this time, the water in the cylinder is no longer affected. Squeeze, the water in the cylinder also stops entering the frame along the water inlet pipe. When the two sliding sleeves move to the right again, the sliding sleeve on the lower side drives the L-shaped rod to move to the right again through the second moving rod, and so on. , thereby achieving the purpose of automatically and intermittently injecting water into the frame. If it is no longer necessary to inject water into the frame, just close the one-way valve on the servo motor and the water inlet pipe.

因为还包括有固定座、软垫和坐板,安装板右侧连接有固定座,固定座顶部连接有坐板,坐板上设有软垫,所以工作人员在搅拌框体内的水泥时,可以坐在坐板上,而坐板上放置的软垫可以使工作人员坐的更舒适。Because it also includes a fixed seat, a cushion and a seat plate, the right side of the installation plate is connected with a fixed seat, the top of the fixed seat is connected with a seat plate, and the seat plate is provided with a cushion, so the staff can mix cement in the frame. Sit on the seat plate, and the cushion placed on the seat plate can make the staff sit more comfortable.

(3)有益效果(3) Beneficial effects

本发明达到了能够解决水泥结块问题,能够间断性注入水完成对水泥的制备和能够方便工作人员进行操作的效果,通过设置了第一轴承座、第一转杆、密封圈、旋转杆、转轮和把手,实现了对框体内水泥的手动搅拌,通过设置了缸体、活塞、抽水管、单向阀、进水管和第一移动杆,实现了缸体内的水能够顺着进水管进入框体内,通过设置了挡板、第二轴承座、第二转杆和圆头杆,实现了对水泥结块问题的解决,通过设置了杆子、伺服电机、螺杆和固定套,实现了对漏斗内水泥的自动搅拌,通过设置了导轨、滑套、连杆、螺母、第二移动杆和L形杆,实现了自动间断性的往未搅拌的水泥内注水,通过设置了固定座、软垫和坐板,使工作人员可以坐着工作。The present invention can solve the problem of cement caking, can inject water intermittently to complete the preparation of cement and can facilitate the operation of the staff. The runner and handle realize manual mixing of the cement in the frame. By setting the cylinder, piston, water pump, one-way valve, water inlet pipe and first moving rod, the water in the cylinder can follow the water inlet pipe. Entering the frame, by setting the baffle plate, the second bearing seat, the second rotating rod and the round head rod, the problem of cement caking is solved. The automatic mixing of cement in the funnel realizes automatic and intermittent water injection into the unmixed cement by setting up guide rails, sliding sleeves, connecting rods, nuts, second moving rods and L-shaped rods. Pads and seating panels allow workers to sit and work.

附图说明Description of drawings

图1为本发明的第一种主视结构示意图。FIG. 1 is a schematic diagram of a first front view structure of the present invention.

图2为本发明的第二种主视结构示意图。FIG. 2 is a schematic diagram of a second front view structure of the present invention.

图3为本发明的第三种主视结构示意图。FIG. 3 is a schematic diagram of a third front view structure of the present invention.

图4为本发明的第四种主视结构示意图。FIG. 4 is a schematic diagram of a fourth front view structure of the present invention.

图5为本发明的第五种主视结构示意图。FIG. 5 is a schematic diagram of a fifth front view structure of the present invention.

附图中的标记为:1-安装板,2-安装柱,3-出料管,4-阀门,5-框体,6-第一轴承座,7-第一转杆,8-密封圈,9-旋转杆,10-转轮,11-把手,12-固定杆,13-缸体,14-活塞,15-抽水管,16-单向阀,17-进水管,18-第一移动杆,19-连接柱,20-通孔,21-挡板,22-第二轴承座,23-第二转杆,24-圆头杆,241-漏斗,25-杆子,26-伺服电机,27-螺杆,28-固定套,29-导轨,30-滑套,31-连杆,32-螺母,33-第二移动杆,34-L形杆,35-固定座,36-软垫,37-坐板。The marks in the drawings are: 1-installation plate, 2-installation column, 3-discharge pipe, 4-valve, 5-frame body, 6-first bearing seat, 7-first rotating rod, 8-sealing ring , 9-rotating rod, 10-runner, 11-handle, 12-fixed rod, 13-cylinder, 14-piston, 15-water pipe, 16-check valve, 17-water inlet pipe, 18-first move Rod, 19-Connecting Post, 20-Through Hole, 21-Baffle Plate, 22-Second Bearing Seat, 23-Second Rotary Rod, 24-Bound Rod, 241-Funnel, 25-Rod, 26-Servo Motor, 27-screw, 28-fixed sleeve, 29-guide rail, 30-sliding sleeve, 31-connecting rod, 32-nut, 33-second moving rod, 34-L-shaped rod, 35-fixed seat, 36-soft pad, 37 - Sit on the board.

具体实施方式Detailed ways

下面结合附图和实施例对本发明作进一步的说明。The present invention will be further described below with reference to the accompanying drawings and embodiments.

实施例1Example 1

一种建筑用水泥制备机,如图1-5所示,包括有安装板1、安装柱2、出料管3、阀门4、框体5、第一轴承座6、第一转杆7、密封圈8、旋转杆9、转轮10、把手11、固定杆12、缸体13、活塞14、抽水管15、单向阀16、进水管17和第一移动杆18,安装板1顶部中间连接有两个安装柱2,两个安装柱2顶端之间连接有一个框体5,框体5底部中间连接有出料管3,出料管3上设有阀门4,框体5外前壁设有第一轴承座6,第一轴承座6内转动式连接有第一转杆7,第一转杆7穿过框体5外前壁,第一转杆7上套有密封圈8,密封圈8安装在框体5内前壁,第一转杆7后部连接有转轮10,转轮10位于框体5内,转轮10外侧均匀连接有四个旋转杆9,第一转杆7前端连接有把手11,安装板1左壁顶部连接有固定杆12,固定杆12右端与框体5左侧中部连接,固定杆12左壁右侧上部连接有缸体13,缸体13内设有活塞14,缸体13底部右侧连接有抽水管15,抽水管15与缸体13连通,缸体13顶部右侧连接有进水管17,进水管17与缸体13连通,进水管17右壁穿过框体5左壁上部,抽水管15和进水管17上均设有单向阀16,活塞14左侧中部连接有第一移动杆18,第一移动杆18穿过固定杆12左壁上部。A cement preparation machine for construction, as shown in Figures 1-5, includes a mounting plate 1, a mounting column 2, a discharge pipe 3, a valve 4, a frame body 5, a first bearing seat 6, a first rotating rod 7, Sealing ring 8, rotating rod 9, runner 10, handle 11, fixed rod 12, cylinder 13, piston 14, suction pipe 15, one-way valve 16, water inlet pipe 17 and first moving rod 18, the middle of the top of the mounting plate 1 There are two installation columns 2 connected, a frame body 5 is connected between the tops of the two installation columns 2, a discharge pipe 3 is connected in the middle of the bottom of the frame body 5, and a valve 4 is arranged on the discharge pipe 3. The wall is provided with a first bearing seat 6, the first bearing seat 6 is rotatably connected with a first rotating rod 7, the first rotating rod 7 passes through the outer front wall of the frame body 5, and a sealing ring 8 is sleeved on the first rotating rod 7 , the sealing ring 8 is installed on the inner front wall of the frame body 5, the rear part of the first rotating rod 7 is connected with a rotating wheel 10, the rotating wheel 10 is located in the frame body 5, and the outer side of the rotating wheel 10 is evenly connected with four rotating rods 9. The front end of the rotating rod 7 is connected with a handle 11, the top of the left wall of the mounting plate 1 is connected with a fixing rod 12, the right end of the fixing rod 12 is connected with the middle part of the left side of the frame body 5, and the upper part of the right side of the left wall of the fixing rod 12 is connected with a cylinder block 13, the cylinder block 13 is provided with a piston 14, the bottom right side of the cylinder body 13 is connected with a water suction pipe 15, the water suction pipe 15 is communicated with the cylinder body 13, the top right side of the cylinder body 13 is connected with a water inlet pipe 17, and the water inlet pipe 17 is communicated with the cylinder body 13, The right wall of the water pipe 17 passes through the upper part of the left wall of the frame body 5, the water pumping pipe 15 and the water inlet pipe 17 are provided with a one-way valve 16, and the middle part of the left side of the piston 14 is connected with a first moving rod 18, and the first moving rod 18 passes through the fixed The upper part of the left wall of the rod 12.

实施例2Example 2

一种建筑用水泥制备机,如图1-5所示,包括有安装板1、安装柱2、出料管3、阀门4、框体5、第一轴承座6、第一转杆7、密封圈8、旋转杆9、转轮10、把手11、固定杆12、缸体13、活塞14、抽水管15、单向阀16、进水管17和第一移动杆18,安装板1顶部中间连接有两个安装柱2,两个安装柱2顶端之间连接有一个框体5,框体5底部中间连接有出料管3,出料管3上设有阀门4,框体5外前壁设有第一轴承座6,第一轴承座6内转动式连接有第一转杆7,第一转杆7穿过框体5外前壁,第一转杆7上套有密封圈8,密封圈8安装在框体5内前壁,第一转杆7后部连接有转轮10,转轮10位于框体5内,转轮10外侧均匀连接有四个旋转杆9,第一转杆7前端连接有把手11,安装板1左壁顶部连接有固定杆12,固定杆12右端与框体5左侧中部连接,固定杆12左壁右侧上部连接有缸体13,缸体13内设有活塞14,缸体13底部右侧连接有抽水管15,抽水管15与缸体13连通,缸体13顶部右侧连接有进水管17,进水管17与缸体13连通,进水管17右壁穿过框体5左壁上部,抽水管15和进水管17上均设有单向阀16,活塞14左侧中部连接有第一移动杆18,第一移动杆18穿过固定杆12左壁上部。A cement preparation machine for construction, as shown in Figures 1-5, includes a mounting plate 1, a mounting column 2, a discharge pipe 3, a valve 4, a frame body 5, a first bearing seat 6, a first rotating rod 7, Sealing ring 8, rotating rod 9, runner 10, handle 11, fixed rod 12, cylinder 13, piston 14, suction pipe 15, one-way valve 16, water inlet pipe 17 and first moving rod 18, the middle of the top of the mounting plate 1 There are two installation columns 2 connected, a frame body 5 is connected between the tops of the two installation columns 2, a discharge pipe 3 is connected in the middle of the bottom of the frame body 5, and a valve 4 is arranged on the discharge pipe 3. The wall is provided with a first bearing seat 6, the first bearing seat 6 is rotatably connected with a first rotating rod 7, the first rotating rod 7 passes through the outer front wall of the frame body 5, and a sealing ring 8 is sleeved on the first rotating rod 7 , the sealing ring 8 is installed on the inner front wall of the frame body 5, the rear part of the first rotating rod 7 is connected with a rotating wheel 10, the rotating wheel 10 is located in the frame body 5, and the outer side of the rotating wheel 10 is evenly connected with four rotating rods 9. The front end of the rotating rod 7 is connected with a handle 11, the top of the left wall of the mounting plate 1 is connected with a fixing rod 12, the right end of the fixing rod 12 is connected with the middle part of the left side of the frame body 5, and the upper part of the right side of the left wall of the fixing rod 12 is connected with a cylinder block 13, the cylinder block 13 is provided with a piston 14, the bottom right side of the cylinder body 13 is connected with a water suction pipe 15, the water suction pipe 15 is communicated with the cylinder body 13, the top right side of the cylinder body 13 is connected with a water inlet pipe 17, and the water inlet pipe 17 is communicated with the cylinder body 13, The right wall of the water pipe 17 passes through the upper part of the left wall of the frame body 5, the water pumping pipe 15 and the water inlet pipe 17 are provided with a one-way valve 16, and the middle part of the left side of the piston 14 is connected with a first moving rod 18, and the first moving rod 18 passes through the fixed The upper part of the left wall of the rod 12.

还包括有连接柱19、挡板21、第二轴承座22、第二转杆23、圆头杆24和漏斗241,框体5左右两壁外侧上部均连接有连接柱19,框体5左右两壁顶部均开有通孔20,两个通孔20位于同一水平线,两个通孔20内设有一个挡板21,连接柱19上设有漏斗241,漏斗241底部与挡板21顶部接触,漏斗241底部与框体5顶部连通,漏斗241左右两壁外侧中部均连接有第二轴承座22,两个第二轴承座22内转动式连接有第二转杆23,第二转杆23上均匀连接有六个圆头杆24。It also includes a connecting column 19, a baffle plate 21, a second bearing seat 22, a second rotating rod 23, a round head rod 24 and a funnel 241. The upper part of the outer sides of the left and right walls of the frame body 5 is connected with a connecting column 19. A through hole 20 is opened on the top of the two walls, the two through holes 20 are located on the same horizontal line, a baffle 21 is arranged in the two through holes 20, a funnel 241 is arranged on the connecting column 19, and the bottom of the funnel 241 is in contact with the top of the baffle 21. , the bottom of the funnel 241 is connected with the top of the frame body 5, the middle parts of the outer sides of the left and right walls of the funnel 241 are connected with a second bearing seat 22, and the two second bearing seats 22 are rotatably connected with a second rotating rod 23, and the second rotating rod 23 There are six round-headed rods 24 evenly connected thereon.

实施例3Example 3

一种建筑用水泥制备机,如图1-5所示,包括有安装板1、安装柱2、出料管3、阀门4、框体5、第一轴承座6、第一转杆7、密封圈8、旋转杆9、转轮10、把手11、固定杆12、缸体13、活塞14、抽水管15、单向阀16、进水管17和第一移动杆18,安装板1顶部中间连接有两个安装柱2,两个安装柱2顶端之间连接有一个框体5,框体5底部中间连接有出料管3,出料管3上设有阀门4,框体5外前壁设有第一轴承座6,第一轴承座6内转动式连接有第一转杆7,第一转杆7穿过框体5外前壁,第一转杆7上套有密封圈8,密封圈8安装在框体5内前壁,第一转杆7后部连接有转轮10,转轮10位于框体5内,转轮10外侧均匀连接有四个旋转杆9,第一转杆7前端连接有把手11,安装板1左壁顶部连接有固定杆12,固定杆12右端与框体5左侧中部连接,固定杆12左壁右侧上部连接有缸体13,缸体13内设有活塞14,缸体13底部右侧连接有抽水管15,抽水管15与缸体13连通,缸体13顶部右侧连接有进水管17,进水管17与缸体13连通,进水管17右壁穿过框体5左壁上部,抽水管15和进水管17上均设有单向阀16,活塞14左侧中部连接有第一移动杆18,第一移动杆18穿过固定杆12左壁上部。A cement preparation machine for construction, as shown in Figures 1-5, includes a mounting plate 1, a mounting column 2, a discharge pipe 3, a valve 4, a frame body 5, a first bearing seat 6, a first rotating rod 7, Sealing ring 8, rotating rod 9, runner 10, handle 11, fixed rod 12, cylinder 13, piston 14, suction pipe 15, one-way valve 16, water inlet pipe 17 and first moving rod 18, the middle of the top of the mounting plate 1 There are two installation columns 2 connected, a frame body 5 is connected between the tops of the two installation columns 2, a discharge pipe 3 is connected in the middle of the bottom of the frame body 5, and a valve 4 is arranged on the discharge pipe 3. The wall is provided with a first bearing seat 6, the first bearing seat 6 is rotatably connected with a first rotating rod 7, the first rotating rod 7 passes through the outer front wall of the frame body 5, and a sealing ring 8 is sleeved on the first rotating rod 7 , the sealing ring 8 is installed on the inner front wall of the frame body 5, the rear part of the first rotating rod 7 is connected with a rotating wheel 10, the rotating wheel 10 is located in the frame body 5, and the outer side of the rotating wheel 10 is evenly connected with four rotating rods 9. The front end of the rotating rod 7 is connected with a handle 11, the top of the left wall of the mounting plate 1 is connected with a fixing rod 12, the right end of the fixing rod 12 is connected with the middle part of the left side of the frame body 5, and the upper part of the right side of the left wall of the fixing rod 12 is connected with a cylinder block 13, the cylinder block 13 is provided with a piston 14, the bottom right side of the cylinder body 13 is connected with a water suction pipe 15, the water suction pipe 15 is communicated with the cylinder body 13, the top right side of the cylinder body 13 is connected with a water inlet pipe 17, and the water inlet pipe 17 is communicated with the cylinder body 13, The right wall of the water pipe 17 passes through the upper part of the left wall of the frame body 5, the water pumping pipe 15 and the water inlet pipe 17 are provided with a one-way valve 16, and the middle part of the left side of the piston 14 is connected with a first moving rod 18, and the first moving rod 18 passes through the fixed The upper part of the left wall of the rod 12.

还包括有连接柱19、挡板21、第二轴承座22、第二转杆23、圆头杆24和漏斗241,框体5左右两壁外侧上部均连接有连接柱19,框体5左右两壁顶部均开有通孔20,两个通孔20位于同一水平线,两个通孔20内设有一个挡板21,连接柱19上设有漏斗241,漏斗241底部与挡板21顶部接触,漏斗241底部与框体5顶部连通,漏斗241左右两壁外侧中部均连接有第二轴承座22,两个第二轴承座22内转动式连接有第二转杆23,第二转杆23上均匀连接有六个圆头杆24。It also includes a connecting column 19, a baffle plate 21, a second bearing seat 22, a second rotating rod 23, a round head rod 24 and a funnel 241. The upper part of the outer sides of the left and right walls of the frame body 5 is connected with a connecting column 19. A through hole 20 is opened on the top of the two walls, the two through holes 20 are located on the same horizontal line, a baffle 21 is arranged in the two through holes 20, a funnel 241 is arranged on the connecting column 19, and the bottom of the funnel 241 is in contact with the top of the baffle 21. , the bottom of the funnel 241 is connected with the top of the frame body 5, the middle parts of the outer sides of the left and right walls of the funnel 241 are connected with a second bearing seat 22, and the two second bearing seats 22 are rotatably connected with a second rotating rod 23, and the second rotating rod 23 There are six round-headed rods 24 evenly connected thereon.

还包括有杆子25、伺服电机26、螺杆27和固定套28,固定杆12左壁右侧上部连接有杆子25,固定杆12左壁顶部连接有伺服电机26,伺服电机26的输出轴上连接有螺杆27,螺杆27右端与第二转杆23左端连接,螺杆27上套有固定套28,固定套28底部左侧与杆子25顶端连接。It also includes a rod 25, a servo motor 26, a screw 27 and a fixing sleeve 28. A rod 25 is connected to the upper right side of the left wall of the fixing rod 12, a servo motor 26 is connected to the top of the left wall of the fixing rod 12, and the output shaft of the servo motor 26 is connected. There is a screw 27, the right end of the screw 27 is connected with the left end of the second rotating rod 23, the screw 27 is covered with a fixing sleeve 28, and the bottom left side of the fixing sleeve 28 is connected with the top end of the rod 25.

实施例4Example 4

一种建筑用水泥制备机,如图1-5所示,包括有安装板1、安装柱2、出料管3、阀门4、框体5、第一轴承座6、第一转杆7、密封圈8、旋转杆9、转轮10、把手11、固定杆12、缸体13、活塞14、抽水管15、单向阀16、进水管17和第一移动杆18,安装板1顶部中间连接有两个安装柱2,两个安装柱2顶端之间连接有一个框体5,框体5底部中间连接有出料管3,出料管3上设有阀门4,框体5外前壁设有第一轴承座6,第一轴承座6内转动式连接有第一转杆7,第一转杆7穿过框体5外前壁,第一转杆7上套有密封圈8,密封圈8安装在框体5内前壁,第一转杆7后部连接有转轮10,转轮10位于框体5内,转轮10外侧均匀连接有四个旋转杆9,第一转杆7前端连接有把手11,安装板1左壁顶部连接有固定杆12,固定杆12右端与框体5左侧中部连接,固定杆12左壁右侧上部连接有缸体13,缸体13内设有活塞14,缸体13底部右侧连接有抽水管15,抽水管15与缸体13连通,缸体13顶部右侧连接有进水管17,进水管17与缸体13连通,进水管17右壁穿过框体5左壁上部,抽水管15和进水管17上均设有单向阀16,活塞14左侧中部连接有第一移动杆18,第一移动杆18穿过固定杆12左壁上部。A cement preparation machine for construction, as shown in Figures 1-5, includes a mounting plate 1, a mounting column 2, a discharge pipe 3, a valve 4, a frame body 5, a first bearing seat 6, a first rotating rod 7, Sealing ring 8, rotating rod 9, runner 10, handle 11, fixed rod 12, cylinder 13, piston 14, suction pipe 15, one-way valve 16, water inlet pipe 17 and first moving rod 18, the middle of the top of the mounting plate 1 There are two installation columns 2 connected, a frame body 5 is connected between the tops of the two installation columns 2, a discharge pipe 3 is connected in the middle of the bottom of the frame body 5, and a valve 4 is arranged on the discharge pipe 3. The wall is provided with a first bearing seat 6, the first bearing seat 6 is rotatably connected with a first rotating rod 7, the first rotating rod 7 passes through the outer front wall of the frame body 5, and a sealing ring 8 is sleeved on the first rotating rod 7 , the sealing ring 8 is installed on the inner front wall of the frame body 5, the rear part of the first rotating rod 7 is connected with a rotating wheel 10, the rotating wheel 10 is located in the frame body 5, and the outer side of the rotating wheel 10 is evenly connected with four rotating rods 9. The front end of the rotating rod 7 is connected with a handle 11, the top of the left wall of the mounting plate 1 is connected with a fixing rod 12, the right end of the fixing rod 12 is connected with the middle part of the left side of the frame body 5, and the upper part of the right side of the left wall of the fixing rod 12 is connected with a cylinder block 13, the cylinder block 13 is provided with a piston 14, the bottom right side of the cylinder body 13 is connected with a water suction pipe 15, the water suction pipe 15 is communicated with the cylinder body 13, the top right side of the cylinder body 13 is connected with a water inlet pipe 17, and the water inlet pipe 17 is communicated with the cylinder body 13, The right wall of the water pipe 17 passes through the upper part of the left wall of the frame body 5, the water pumping pipe 15 and the water inlet pipe 17 are provided with a one-way valve 16, and the middle part of the left side of the piston 14 is connected with a first moving rod 18, and the first moving rod 18 passes through the fixed The upper part of the left wall of the rod 12.

还包括有连接柱19、挡板21、第二轴承座22、第二转杆23、圆头杆24和漏斗241,框体5左右两壁外侧上部均连接有连接柱19,框体5左右两壁顶部均开有通孔20,两个通孔20位于同一水平线,两个通孔20内设有一个挡板21,连接柱19上设有漏斗241,漏斗241底部与挡板21顶部接触,漏斗241底部与框体5顶部连通,漏斗241左右两壁外侧中部均连接有第二轴承座22,两个第二轴承座22内转动式连接有第二转杆23,第二转杆23上均匀连接有六个圆头杆24。It also includes a connecting column 19, a baffle plate 21, a second bearing seat 22, a second rotating rod 23, a round head rod 24 and a funnel 241. The upper part of the outer sides of the left and right walls of the frame body 5 is connected with a connecting column 19. A through hole 20 is opened on the top of the two walls, the two through holes 20 are located on the same horizontal line, a baffle 21 is arranged in the two through holes 20, a funnel 241 is arranged on the connecting column 19, and the bottom of the funnel 241 is in contact with the top of the baffle 21. , the bottom of the funnel 241 is connected with the top of the frame body 5, the middle parts of the outer sides of the left and right walls of the funnel 241 are connected with a second bearing seat 22, and the two second bearing seats 22 are rotatably connected with a second rotating rod 23, and the second rotating rod 23 There are six round-headed rods 24 evenly connected thereon.

还包括有杆子25、伺服电机26、螺杆27和固定套28,固定杆12左壁右侧上部连接有杆子25,固定杆12左壁顶部连接有伺服电机26,伺服电机26的输出轴上连接有螺杆27,螺杆27右端与第二转杆23左端连接,螺杆27上套有固定套28,固定套28底部左侧与杆子25顶端连接。It also includes a rod 25, a servo motor 26, a screw 27 and a fixing sleeve 28. A rod 25 is connected to the upper right side of the left wall of the fixing rod 12, a servo motor 26 is connected to the top of the left wall of the fixing rod 12, and the output shaft of the servo motor 26 is connected. There is a screw 27, the right end of the screw 27 is connected with the left end of the second rotating rod 23, the screw 27 is covered with a fixing sleeve 28, and the bottom left side of the fixing sleeve 28 is connected with the top end of the rod 25.

还包括有导轨29、滑套30、连杆31、螺母32、第二移动杆33和L形杆34,固定套28顶部和底部均连接有导轨29,两个导轨29上均滑动式设有滑套30,两个滑套30内侧均连接有连杆31,螺杆27上滑动式连接有螺母32,连杆31均与螺母32的上下两侧连接,螺杆27与螺母32配合,下侧的滑套30底部连接有第二移动杆33,第二移动杆33穿过固定杆12左壁上部,第二移动杆33位于缸体13的上方,第二移动杆33左端连接有L形杆34,L形杆34右端与第一移动杆18左侧中部连接。It also includes a guide rail 29, a sliding sleeve 30, a connecting rod 31, a nut 32, a second moving rod 33 and an L-shaped rod 34. The top and bottom of the fixed sleeve 28 are connected with the guide rail 29, and the two guide rails 29 are slidably provided with The sliding sleeve 30, the inner side of the two sliding sleeves 30 is connected with a connecting rod 31, the screw 27 is slidably connected with a nut 32, the connecting rod 31 is connected with the upper and lower sides of the nut 32, the screw 27 cooperates with the nut 32, and the lower A second moving rod 33 is connected to the bottom of the sliding sleeve 30, the second moving rod 33 passes through the upper part of the left wall of the fixed rod 12, the second moving rod 33 is located above the cylinder block 13, and the left end of the second moving rod 33 is connected with an L-shaped rod 34 , the right end of the L-shaped rod 34 is connected with the middle part of the left side of the first moving rod 18 .

还包括有固定座35、软垫36和坐板37,安装板1右侧连接有固定座35,固定座35顶部连接有坐板37,坐板37上粘接有软垫36。It also includes a fixed seat 35 , a soft pad 36 and a seat plate 37 . The right side of the mounting plate 1 is connected with a fixed seat 35 , the top of the fixed seat 35 is connected with a seat plate 37 , and the seat plate 37 is bonded with a soft pad 36 .

工作原理:当需要制备建筑用水泥时,工作人员首先将水泥倒入框体5内,再将抽水管15的末端放入到水池内,然后拉动第一移动杆18向左运动,第一移动杆18则会拉动活塞14向左运动,此时水池内水则会通过抽水管15抽入到缸体13内,因为单向阀16的作用,使得进入到缸体13内的水不会通过抽水管15倒流回水池中,接着再向右推动第一移动杆18,第一移动杆18带动活塞14向右移动,此时缸体13内的水受到挤压,于是缸体13内的水顺着进水管17进入框体5内,等到框体5内的水达到一定量时,工作人员停止拉动第一移动杆18即可,接着工作人员转动把手11,把手11通过第一转杆7带动转轮10转动,从而使得转轮10上的四个旋转杆9发生转动,以此来搅拌框体5内的水泥和水,当框体5内的水泥和水搅拌好时,工作人员停止转动把手11,然后再将收集水泥的装备放置在出料管3的正下方,接着打开阀门4,使框体5内搅拌好的水泥顺着出料管3进入收集装置内,等到水泥收集一定量后,工作人员关闭阀门4即可,由此实现了对建筑用水泥的制备。Working principle: When it is necessary to prepare cement for construction, the staff first pours the cement into the frame body 5, then puts the end of the suction pipe 15 into the pool, and then pulls the first moving rod 18 to the left to move the first The rod 18 will pull the piston 14 to move to the left. At this time, the water in the pool will be drawn into the cylinder 13 through the suction pipe 15. Because of the function of the one-way valve 16, the water entering the cylinder 13 will not pass through. The water suction pipe 15 flows back into the pool, and then pushes the first moving rod 18 to the right. The first moving rod 18 drives the piston 14 to move to the right. At this time, the water in the cylinder 13 is squeezed, so the water in the cylinder 13 is squeezed. Enter the frame body 5 along the water inlet pipe 17, and when the water in the frame body 5 reaches a certain amount, the staff stops pulling the first moving rod 18, and then the staff turns the handle 11, and the handle 11 passes through the first rotating rod 7. Drive the runner 10 to rotate, so that the four rotating rods 9 on the runner 10 rotate, so as to stir the cement and water in the frame body 5, when the cement and water in the frame body 5 are mixed well, the staff stops. Turn the handle 11, and then place the equipment for collecting cement directly under the discharge pipe 3, and then open the valve 4, so that the mixed cement in the frame 5 enters the collecting device along the discharge pipe 3, and wait until the cement collects for a certain amount of time. After the amount is measured, the staff can close the valve 4, thereby realizing the preparation of construction cement.

因为还包括有连接柱19、挡板21、第二轴承座22、第二转杆23、圆头杆24和漏斗241,框体5左右两壁外侧上部均连接有连接柱19,框体5左右两壁顶部均开有通孔20,两个通孔20位于同一水平线,两个通孔20内设有一个挡板21,连接柱19上设有漏斗241,漏斗241底部与挡板21顶部接触,漏斗241底部与框体5顶部连通,漏斗241左右两壁外侧中部均连接有第二轴承座22,两个第二轴承座22内转动式连接有第二转杆23,第二转杆23上均匀连接有六个圆头杆24,所以为了防止水泥结块使框体5内的旋转杆9不方便搅拌水泥,工作人员可以先将水泥倒入漏斗241内,接着转动第二转杆23,同时第二转杆23带动六个圆头杆24发生转动,从而对漏斗241内的水泥进行搅拌,由此避免了水泥结块对框体5内水泥搅拌的不便,然后工作人员拉动挡板21,使挡板21与两个通孔20脱离,这时漏斗241内的水泥顺势进入框体5内,当框体5内水泥达到一定量时,工作人员再次使挡板21穿过两个通孔20,从而停止漏斗241内的水泥继续进入框体5内,由此避免了工作人员手动倒入水泥,水泥飘起大量灰尘影响工作人员身体健康的情况。Because it also includes the connecting column 19, the baffle plate 21, the second bearing seat 22, the second rotating rod 23, the round head rod 24 and the funnel 241, the upper part of the outer sides of the left and right walls of the frame body 5 are connected with the connecting column 19, and the frame body 5 There are through holes 20 on the tops of the left and right walls, the two through holes 20 are located on the same horizontal line, a baffle 21 is arranged in the two through holes 20, a funnel 241 is arranged on the connecting column 19, the bottom of the funnel 241 and the top of the baffle 21 Contact, the bottom of the funnel 241 communicates with the top of the frame body 5, the middle parts of the outer sides of the left and right walls of the funnel 241 are connected with the second bearing seats 22, and the two second bearing seats 22 are rotatably connected with a second rotating rod 23, and the second rotating rod 23 is evenly connected with six round-headed rods 24, so in order to prevent the cement from caking and making the rotating rod 9 in the frame 5 inconvenient to mix cement, the staff can first pour the cement into the funnel 241, and then turn the second rotating rod. 23. At the same time, the second rotating rod 23 drives the six round-headed rods 24 to rotate, thereby stirring the cement in the funnel 241, thereby avoiding the inconvenience of cement agglomeration for mixing the cement in the frame 5, and then the staff pulls the block. plate 21, so that the baffle plate 21 is separated from the two through holes 20. At this time, the cement in the funnel 241 enters the frame body 5. When the cement in the frame body 5 reaches a certain amount, the staff makes the baffle plate 21 pass through the two holes again. There are through holes 20 to stop the cement in the funnel 241 from continuing to enter the frame 5, thereby avoiding the situation that the staff manually pours the cement, and the cement floats a lot of dust and affects the health of the staff.

因为还包括有杆子25、伺服电机26、螺杆27和固定套28,固定杆12左壁右侧上部连接有杆子25,固定杆12左壁顶部连接有伺服电机26,伺服电机26的输出轴上连接有螺杆27,螺杆27右端与第二转杆23左端连接,螺杆27上套有固定套28,固定套28底部左侧与杆子25顶端连接,所以当需要搅拌漏斗241内的水泥时,工作人员可以启动伺服电机26,控制伺服电机26旋转,伺服电机26通过螺杆27带动第二转杆23旋转,同时第二转杆23带动六个圆头杆24旋转,由此实现了自动搅拌漏斗241内的水泥,并且方便了人们制备建筑用水泥。Because it also includes a rod 25, a servo motor 26, a screw 27 and a fixing sleeve 28, a rod 25 is connected to the upper right side of the left wall of the fixing rod 12, and a servo motor 26 is connected to the top of the left wall of the fixing rod 12. The output shaft of the servo motor 26 A screw 27 is connected, the right end of the screw 27 is connected with the left end of the second rotating rod 23, a fixing sleeve 28 is sleeved on the screw 27, and the left side of the bottom of the fixing sleeve 28 is connected with the top of the rod 25, so when the cement in the hopper 241 needs to be stirred, work Personnel can start the servo motor 26 to control the rotation of the servo motor 26, the servo motor 26 drives the second rotating rod 23 to rotate through the screw 27, and at the same time the second rotating rod 23 drives the six round head rods 24 to rotate, thus realizing the automatic stirring funnel 241 It is convenient for people to prepare cement for construction.

因为还包括有导轨29、滑套30、连杆31、螺母32、第二移动杆33和L形杆34,固定套28顶部和底部均连接有导轨29,两个导轨29上均滑动式设有滑套30,两个滑套30内侧均连接有连杆31,两个连杆31之间连接有螺母32,螺杆27与螺母32配合,下侧的滑套30底部连接有第二移动杆33,第二移动杆33穿过固定杆12左壁上部,第二移动杆33位于缸体13的上方,第二移动杆33左端连接有L形杆34,L形杆34右端与第一移动杆18左侧中部连接,所以工作人员首先打开进水管17上的单向阀16,然后启动伺服电机26,控制伺服电机26旋转,此时伺服电机26通过螺杆27带动螺母32左右移动,螺母32通过两个连杆31带动两个滑套30左右移动,当两个滑套30向右移动时,下侧的滑套30通过第二移动杆33带动L形杆34向右移动,并且L形杆34通过第一移动杆18带动活塞14向右移动,这时缸体13内的水受到挤压,于是缸体13内的水顺着进水管17进入框体5内,当两个滑套30向左移动时,下侧的滑套30通过第二移动杆33带动L形杆34向左移动,并且L形杆34通过第一移动杆18带动活塞14向左移动,这时缸体13内的水不再受到挤压,缸体13内的水也停止顺着进水管17进入框体5内,当两个滑套30再次向右移动时,下侧的滑套30再次通过第二移动杆33带动L形杆34向右移动,如此反复,由此达到了自动间断性的向框体5内注入水的目的,如果不再需要向框体5内注入水,关闭伺服电机26和进水管17上的单向阀16即可。Because it also includes the guide rail 29, the sliding sleeve 30, the connecting rod 31, the nut 32, the second moving rod 33 and the L-shaped rod 34, the top and bottom of the fixed sleeve 28 are connected with the guide rail 29, and the two guide rails 29 are slidably arranged on both. There is a sliding sleeve 30, the inner side of the two sliding sleeves 30 is connected with a connecting rod 31, a nut 32 is connected between the two connecting rods 31, the screw 27 is matched with the nut 32, and the bottom of the sliding sleeve 30 on the lower side is connected with a second moving rod 33. The second moving rod 33 passes through the upper part of the left wall of the fixed rod 12, the second moving rod 33 is located above the cylinder 13, the left end of the second moving rod 33 is connected with an L-shaped rod 34, and the right end of the L-shaped rod 34 is connected to the first moving rod 34. The middle of the left side of the rod 18 is connected, so the staff first opens the one-way valve 16 on the water inlet pipe 17, and then starts the servo motor 26 to control the rotation of the servo motor 26. At this time, the servo motor 26 drives the nut 32 to move left and right through the screw 27, and the nut 32 The two sliding sleeves 30 are driven to move left and right by the two connecting rods 31. When the two sliding sleeves 30 move to the right, the lower sliding sleeve 30 drives the L-shaped rod 34 to move to the right through the second moving rod 33, and the L-shaped rod 34 moves to the right. The rod 34 drives the piston 14 to move to the right through the first moving rod 18. At this time, the water in the cylinder 13 is squeezed, so the water in the cylinder 13 enters the frame 5 along the water inlet pipe 17. When the 30 moves to the left, the lower sliding sleeve 30 drives the L-shaped rod 34 to move to the left through the second moving rod 33, and the L-shaped rod 34 drives the piston 14 to move to the left through the first moving rod 18. At this time, the cylinder block 13 The water inside is no longer squeezed, and the water in the cylinder 13 also stops entering the frame 5 along the water inlet pipe 17. When the two sliding sleeves 30 move to the right again, the lower sliding sleeve 30 passes through the second sliding sleeve 30 again. The moving rod 33 drives the L-shaped rod 34 to move to the right, and so on repeatedly, thus achieving the purpose of automatically and intermittently injecting water into the frame body 5. If it is no longer necessary to inject water into the frame body 5, turn off the servo motor 26 and The one-way valve 16 on the water inlet pipe 17 is sufficient.

因为还包括有固定座35、软垫36和坐板37,安装板1右侧连接有固定座35,固定座35顶部连接有坐板37,坐板37上设有软垫36,所以工作人员在搅拌框体5内的水泥时,可以坐在坐板37上,而坐板37上放置的软垫36可以使工作人员坐的更舒适。Because it also includes a fixed seat 35, a cushion 36 and a seat plate 37, the right side of the mounting plate 1 is connected with a fixed seat 35, the top of the fixed seat 35 is connected with a seat plate 37, and the seat plate 37 is provided with a cushion 36, so the staff When mixing the cement in the frame body 5, one can sit on the seat plate 37, and the soft pad 36 placed on the seat plate 37 can make the staff sit more comfortable.

以上所述实施例仅表达了本发明的优选实施方式,其描述较为具体和详细,但并不能因此而理解为对本发明专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干变形、改进及替代,这些都属于本发明的保护范围。因此,本发明专利的保护范围应以所附权利要求为准。The above-mentioned embodiments only represent the preferred embodiments of the present invention, and the descriptions thereof are specific and detailed, but should not be construed as limiting the scope of the present invention. It should be pointed out that for those of ordinary skill in the art, without departing from the concept of the present invention, several modifications, improvements and substitutions can be made, which all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention should be subject to the appended claims.

Claims (2)

1. A cement preparation machine for buildings is characterized by comprising a mounting plate (1), mounting columns (2), a discharging pipe (3), a valve (4), a frame body (5), a first bearing seat (6), a first rotating rod (7), a sealing ring (8), a rotating rod (9), a rotating wheel (10), a handle (11), a fixed rod (12), a cylinder body (13), a piston (14), a water pumping pipe (15), a one-way valve (16), a water inlet pipe (17) and a first moving rod (18), wherein the middle of the top of the mounting plate (1) is connected with the two mounting columns (2), the frame body (5) is connected between the top ends of the two mounting columns (2), the discharging pipe (3) is connected with the middle of the bottom of the frame body (5), the valve (4) is arranged on the discharging pipe (3), the first bearing seat (6) is arranged on the outer front wall of the frame body (5), the first rotating rod (7), the first rotating rod (7) penetrates through the outer front wall of the frame body (5), a sealing ring (8) is sleeved on the first rotating rod (7), the sealing ring (8) is installed on the inner front wall of the frame body (5), the rear part of the first rotating rod (7) is connected with a rotating wheel (10), the rotating wheel (10) is positioned in the frame body (5), four rotating rods (9) are uniformly connected to the outer side of the rotating wheel (10), the front end of the first rotating rod (7) is connected with a handle (11), the top of the left wall of the mounting plate (1) is connected with a fixing rod (12), the right end of the fixing rod (12) is connected with the middle part of the left side of the frame body (5), the upper part of the right side of the left wall of the fixing rod (12) is connected with a cylinder body (13), a piston (14) is arranged in the cylinder body (13), the right side of the bottom of the cylinder body (13) is connected with a, the right wall of the water inlet pipe (17) penetrates through the upper part of the left wall of the frame body (5), the water pumping pipe (15) and the water inlet pipe (17) are both provided with one-way valves (16), the middle part of the left side of the piston (14) is connected with a first movable rod (18), and the first movable rod (18) penetrates through the upper part of the left wall of the fixed rod (12); the funnel is characterized by further comprising a connecting column (19), a baffle (21), second bearing seats (22), second rotating rods (23), round-head rods (24) and a funnel (241), the upper parts of the outer sides of the left wall and the right wall of the frame body (5) are connected with the connecting column (19), through holes (20) are formed in the tops of the left wall and the right wall of the frame body (5), the two through holes (20) are located on the same horizontal line, one baffle (21) is arranged in each through hole (20), the funnel (241) is arranged on the connecting column (19), the bottom of the funnel (241) is in contact with the top of the baffle (21), the bottom of the funnel (241) is communicated with the top of the frame body (5), the middle parts of the outer sides of the left wall and the right wall of the funnel (241) are connected with the second bearing seats (22), the second rotating rods; the device is characterized by further comprising a rod (25), a servo motor (26), a screw rod (27) and a fixing sleeve (28), wherein the rod (25) is connected to the upper portion of the right side of the left wall of the fixing rod (12), the servo motor (26) is connected to the top of the left wall of the fixing rod (12), the screw rod (27) is connected to an output shaft of the servo motor (26), the right end of the screw rod (27) is connected with the left end of the second rotating rod (23), the fixing sleeve (28) is sleeved on the screw rod (27), and the left side of the bottom of the fixing sleeve (28) is connected with the top; also comprises a guide rail (29), a sliding sleeve (30) and a connecting rod (31), nut (32), second carriage release lever (33) and L shape pole (34), fixed cover (28) top and bottom all are connected with guide rail (29), all slidingtype on two guide rail (29) is equipped with sliding sleeve (30), two sliding sleeve (30) inboards all are connected with connecting rod (31), sliding connection has nut (32) on screw rod (27), connecting rod (31) all are connected with the upper and lower both sides of nut (32), screw rod (27) and nut (32) cooperation, sliding sleeve (30) bottom of downside is connected with second carriage release lever (33), second carriage release lever (33) pass dead lever (12) left side wall upper portion, second carriage release lever (33) are located the top of cylinder body (13), second carriage release lever (33) left end is connected with L shape pole (34), L shape pole (34) right-hand member is connected with first carriage release lever (18) left side middle part.
2. The cement preparation machine for buildings according to claim 1, further comprising a fixed seat (35), a soft cushion (36) and a seat plate (37), wherein the fixed seat (35) is connected to the right side of the mounting plate (1), the seat plate (37) is connected to the top of the fixed seat (35), and the soft cushion (36) is bonded to the seat plate (37).
CN201810227200.9A 2018-03-20 2018-03-20 A construction cement preparation machine Active CN108527658B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810227200.9A CN108527658B (en) 2018-03-20 2018-03-20 A construction cement preparation machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810227200.9A CN108527658B (en) 2018-03-20 2018-03-20 A construction cement preparation machine

Publications (2)

Publication Number Publication Date
CN108527658A CN108527658A (en) 2018-09-14
CN108527658B true CN108527658B (en) 2020-08-14

Family

ID=63484946

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810227200.9A Active CN108527658B (en) 2018-03-20 2018-03-20 A construction cement preparation machine

Country Status (1)

Country Link
CN (1) CN108527658B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113601724B (en) * 2021-08-15 2023-03-24 慈利鼎盛建材有限责任公司 Water supply installation of concrete mixing plant
CN113818670A (en) * 2021-09-14 2021-12-21 陆爱珍 Cement paving device for building

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2226104A (en) * 1938-11-28 1940-12-24 Chain Belt Co Water supply mechanism for concrete mixer drums
FR2891184B1 (en) * 2005-09-28 2011-12-23 Remi Ertzinger AUTONOMOUS WATER SUPPLY DEVICE FOR A SMALL CONCRETE BETTER WITH MEDIUM CAPABILITY.
CN104846827B (en) * 2015-05-14 2016-10-05 清华大学 Country rock reinforcement all-in-one
CN106313319A (en) * 2015-07-02 2017-01-11 周宝龙 Small cement mixing machine
CN106732048A (en) * 2017-02-28 2017-05-31 安徽金鼎新材料有限公司 A kind of adjustable powder modifying device of blanking
CN107081848A (en) * 2017-05-23 2017-08-22 中国十七冶集团有限公司 A kind of concrete mix device
CN206899492U (en) * 2017-06-03 2018-01-19 柳州市鹿寨恒业建材科技有限公司 A kind of build concrete mixing plant
CN107571393B (en) * 2017-09-28 2019-06-14 桐乡市钟大建材有限公司 A kind of concrete self-feeding agitating device

Also Published As

Publication number Publication date
CN108527658A (en) 2018-09-14

Similar Documents

Publication Publication Date Title
CN115338977A (en) Building construction cement stirring device and stirring method
CN107199634B (en) A kind of power plant construction concrete central mix plant
CN207058906U (en) A kind of build concrete quick agitator
CN211333945U (en) Concrete mixing device
CN108527658A (en) A kind of cement draft machine for building
CN205989430U (en) A kind of cement highly efficient agitating device for building
CN208451938U (en) A kind of concrete powdered additive feeding device
CN216968226U (en) Complete equipment for preparing fluid curable soil
CN206748731U (en) A kind of construction site concrete central mix plant
CN214973682U (en) Cement raw materials mixing stirring device for production
CN205936690U (en) Gas drainage under suction slip casting hole sealing device
CN214982040U (en) Cement mortar raw materials batching measurement mixing arrangement
CN211937126U (en) Cement reducing mechanism is used in highway construction
CN220198076U (en) Efficient concrete mixing equipment
CN217670144U (en) A stirring batching all-in-one for commercial concrete processing
CN220840851U (en) Quantitative proportioning device for concrete
CN109366730B (en) Efficient and environment-friendly concrete preparation equipment
CN215038788U (en) Novel concrete production is with reinforced device
CN220638396U (en) High-efficient agitating unit is used in concrete processing
CN206633210U (en) A kind of build concrete agitating device
CN217552735U (en) Building cement agitating unit
CN220741671U (en) A concrete material mixer
CN220241936U (en) Dust suppression device is put in to concrete mixing plant stirring host computer material
CN223147414U (en) A construction cement mixing device
CN205704681U (en) Civil construction material flows is mixed with processing means

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200723

Address after: Room 401, unit 2, building 3, Jinjia Huating, Xincheng street, Ruian City, Wenzhou City, Zhejiang Province 325200

Applicant after: Ruian Yihe architectural decoration design Co.,Ltd.

Address before: 210006 Nanjing District, Qinhuai, Nanjing, Jiangsu No. 120 Nanjing Tong Ya Construction Machinery Co., Ltd.

Applicant before: Li Rongfeng

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230525

Address after: Room 1-3, Enterprise Service Center, Middle Section of Jinlong Avenue, Wuyangba Street, Enshi City, Enshi Tujia and Miao Autonomous Prefecture, Hubei Province 445000

Patentee after: Enshi Anbesen Technology Service Co.,Ltd.

Address before: Room 401, Unit 2, Building 3, Jinjiahuating, Xincheng Street, Rui'an City, Wenzhou City, Zhejiang Province, 325200

Patentee before: Ruian Yihe architectural decoration design Co.,Ltd.

Effective date of registration: 20230525

Address after: 445000 No. 67 Gucheng Avenue, Zouma Town, Hefeng County, Enshi Tujia and Miao Autonomous Prefecture, Hubei Province

Patentee after: Hubei Jianling Building Materials Co.,Ltd.

Address before: Room 1-3, Enterprise Service Center, Middle Section of Jinlong Avenue, Wuyangba Street, Enshi City, Enshi Tujia and Miao Autonomous Prefecture, Hubei Province 445000

Patentee before: Enshi Anbesen Technology Service Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20251124

Address after: 411300 Hunan Province Xiangtan City Shaoshan City Yin Tian Town Nan Cun Village

Patentee after: Shaoshan Xinhe Industry and Trade Co.,Ltd.

Country or region after: China

Address before: 445000 No. 67 Gucheng Avenue, Zouma Town, Hefeng County, Enshi Tujia and Miao Autonomous Prefecture, Hubei Province

Patentee before: Hubei Jianling Building Materials Co.,Ltd.

Country or region before: China