CN108526379A - A kind of flange forging equipment - Google Patents

A kind of flange forging equipment Download PDF

Info

Publication number
CN108526379A
CN108526379A CN201810286613.4A CN201810286613A CN108526379A CN 108526379 A CN108526379 A CN 108526379A CN 201810286613 A CN201810286613 A CN 201810286613A CN 108526379 A CN108526379 A CN 108526379A
Authority
CN
China
Prior art keywords
furnace body
stove
regenerative
connecting pipe
furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810286613.4A
Other languages
Chinese (zh)
Other versions
CN108526379B (en
Inventor
叶成松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Haisheng Jinhuan Machinery Co Ltd
Original Assignee
Zhejiang Haisheng Jinhuan Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Haisheng Jinhuan Machinery Co Ltd filed Critical Zhejiang Haisheng Jinhuan Machinery Co Ltd
Priority to CN201810286613.4A priority Critical patent/CN108526379B/en
Publication of CN108526379A publication Critical patent/CN108526379A/en
Application granted granted Critical
Publication of CN108526379B publication Critical patent/CN108526379B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J17/00Forge furnaces

Landscapes

  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Forging (AREA)

Abstract

The invention discloses a kind of flange forging equipment, including pedestal, shaft main body and regenerative furnace, lower furnace body is installed above the pedestal, and it is provided with lower stove hermatic door below the outer surface of lower furnace body, first connecting pipe is installed on the outside of the lower furnace body, product heat cal rod is mounted at left and right sides of the shaft main body, and shaft main body is located at the outside of lower furnace body and upper furnace body, additional thermosphere is provided on the outside of the regenerative furnace, and regenerative furnace is located at the logical only outer side of valve.The flange forging equipment is using steel ingot, square steel or round steel as raw material, it is cut into corresponding weight and the laggard stove heat of size by sawing machine, coarse-blank processed, after thick embryo melts down heating, rolling ring of coming out of the stove, utilize the mold mating with shape of product, thick embryo rolling ring is directly gone out into the shape close to finished product, saves material, reduces material weight, the finishing time is saved, machining dramatically saves process time according to shape processing.

Description

A kind of flange forging equipment
Technical field
The present invention relates to flange production technical field, specially a kind of flange forging equipment.
Background technology
Flange is called flange flange disk or flange, and flange is the part being connected with each other between axis and axis, between pipe end Connection, also have with the flange imported and exported in equipment, for the connection between two equipment, such as speed reducer flange, two panels method Gasket is added between blue disk, is then fastened with bolt, and the flange thicknesses of different pressures is different, and the bolt that they are used is not yet Together.
However the modern times, for the production and processing of flange, the main means of production does not depend on high temperature refinery still entirely, After the completion of flange thick embryo manufacture, but can cause subsequently to need to carry out due to the difference of flange size complicated semifinishing with And finishing so that processing is relatively difficult, and material deterioration inside is big, and long processing time, difficulty of processing is big, for this purpose, it is proposed that a kind of Material is saved, material weight is reduced and the flange forging equipment of finishing time can be saved.
Invention content
It is mentioned above in the background art to solve the purpose of the present invention is to provide a kind of flange forging equipment Modern times, the main means of production did not depended on high temperature refinery still entirely, in the thick embryo system of flange for the production and processing of flange It after the completion of making, and can cause subsequently to need to carry out complicated semifinishing and finishing due to the difference of flange size, make It must process relatively difficult, material deterioration inside is big, long processing time, the big problem of difficulty of processing.
To achieve the above object, the present invention provides the following technical solutions:A kind of flange forging equipment, including base Seat, shaft main body and regenerative furnace are equipped with lower furnace body above the pedestal, and are provided with lower stove below the outer surface of lower furnace body Hermatic door is equipped with the first connecting pipe on the outside of the lower furnace body, and the centre of the first connecting pipe is fixed with the second connection Pipeline, is equipped with support plate above the lower furnace body, and support plate is internally provided with connection stove bucket, the support plate it is upper Side is equipped with upper furnace body, and is provided with stove hermatic door above the outer surface of upper furnace body, and the left and right sides of the shaft main body is equal Product heat cal rod is installed, and shaft main body is located at the outside of lower furnace body and upper furnace body, the outer side of the product heat cal rod is equipped with logical Only valve is provided with additional thermosphere on the outside of the regenerative furnace, and regenerative furnace is located at the logical only outer side of valve, the additional thermosphere Outside be fixed with the warm cylinder of shield, the inner wall of the regenerative furnace is provided with interior heating layer, and the inside of regenerative furnace is fixed with partition board, institute It states and bell is installed above regenerative furnace.
Preferably, the steel ingot, square steel or round steel raw material are added separately to by lower stove hermatic door and upper stove hermatic door In lower furnace body and upper furnace body, and the horizontal center line between lower furnace body and upper furnace body about support plate is symmetrical.
Preferably, the lower furnace body and upper furnace body have been placed equidistant with 3 along the horizontal direction of support plate, and lower furnace body and It is corresponded and is connected to by the first connecting pipe between upper furnace body.
Preferably, between first connecting pipe and the second connecting pipe be vertical connection, and the second connecting pipe with It is to be fixedly connected between product heat cal rod.
Preferably, the outside wall surface of the medial surface of the additional thermosphere and regenerative furnace, interior heating layer lateral surface and regenerative furnace Internal face between fit closely, and the central axes of regenerative furnace, the central axes of additional thermosphere and interior heating layer central axes weight It closes.
Preferably, the partition board is arranged along the vertical direction parallel equidistant of regenerative furnace, and thickness is equal between partition board.
Compared with prior art, the beneficial effects of the invention are as follows:The flange forging equipment is with steel ingot, square steel or circle Steel is raw material, and corresponding weight and the laggard stove heat of size are cut by sawing machine, coarse-blank processed, after thick embryo melts down heating, Thick embryo rolling ring is directly gone out the shape close to finished product by rolling ring of coming out of the stove using the mold mating with shape of product, saves material, drop Low material weight saves the finishing time, and machining dramatically saves process time according to shape processing, steel ingot, square steel or Round steel raw material are added in lower furnace body and upper furnace body, and lower furnace body and upper furnace body are numbered, and same original is added in same stove Material, and the heat (batch) number of remarks raw material, weight, producer and quantity, material are entered in lower furnace body and upper furnace body and are carried out respectively Heating, takes out after being heated to forging temperature, manufactures thick embryo after punching, reaming, the first connecting pipe for balance thermal current and Hot barometric pressure makes to make full use of heat there are heat interaction transmittance process between lower furnace body and upper furnace body, improve heating effect Rate is put into after the manufacture of thick embryo in regenerative furnace, is separated by partition board and is placed so that suffered by thick embryo to melt down temperature more uniform, Thick embryo melts down heating, and is heated to rolling ring of coming out of the stove after rolling ring temperature, and rolling ring can be according to the mating corresponding mold of shape of product, directly Connecing the blank that rolling ring goes out close to finished form can go out respectively thus without being uniformly ground into a ring according to product drawing Type saves process time, while also saving material, and product heat cal rod is used to recycle generated heat in regenerative furnace, To being utilized in regenerative furnace because carrying out heat caused by reheating to thick embryo, hot-fluid sends second to by product heat cal rod Connecting pipe sends the first connecting pipe to by the second connecting pipe, is that lower furnace body and upper furnace body carry out heat supply, lower furnace body and upper Heat in furnace body can also be passed in regenerative furnace, improve heat utilization ratio, and additional thermosphere is played with interior heating layer and assisted back The effect of hot stove heating, makes regenerative furnace internal temperature rapid increase, and ensures the shape that a continuous heating is in inside regenerative furnace State.
Description of the drawings
Fig. 1 is production equipment structural schematic diagram of the present invention.
In figure:1, pedestal, 2, lower furnace body, 3, lower stove hermatic door, the 4, first connecting pipe, the 5, second connecting pipe, 6, branch Fagging, 7, connection stove bucket, 8, upper furnace body, 9, upper stove hermatic door, 10, shaft main body, 11, product heat cal rod, 12, logical only valve, 13, backheat Stove, 14, additional thermosphere, 15, the warm cylinder of shield, 16, interior heating layer, 17, partition board, 18, bell.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Referring to Fig. 1, the present invention provides a kind of technical solution:A kind of flange forging equipment, including pedestal 1, stove The top of body main body 10 and regenerative furnace 13, pedestal 1 is equipped with lower furnace body 2, and it is close to be provided with lower stove below the outer surface of lower furnace body 2 Closure door 3, the outside of lower furnace body 2 is equipped with the first connecting pipe 4, and the centre of the first connecting pipe 4 is fixed with the second connecting tube The top in road 5, lower furnace body 2 is equipped with support plate 6, and being internally provided with for support plate 6 is connected to stove bucket 7, the top peace of support plate 6 Equipped with upper furnace body 8, and it is provided with stove hermatic door 9 above the outer surface of upper furnace body 8, steel ingot, square steel or round steel raw material pass through Lower stove hermatic door 3 and upper stove hermatic door 9 are added separately in lower furnace body 2 and upper furnace body 8, and are closed between lower furnace body 2 and upper furnace body 8 Symmetrical in the horizontal center line of support plate 6, steel ingot, square steel or round steel raw material are added in lower furnace body 2 and upper furnace body 8, under Furnace body 2 and upper furnace body 8 are numbered, in same stove plus same raw material, and the heat (batch) number of remarks raw material, weight, producer with And quantity, lower furnace body 2 and upper furnace body 8 have been placed equidistant with 3, and lower furnace body 2 and upper furnace body 8 along the horizontal direction of support plate 6 Between corresponded and be connected to by the first connecting pipe 4, material enters in lower furnace body 2 and upper furnace body 8 and is respectively heated, add It is taken out after heat to forging temperature, thick embryo is manufactured after punching, reaming, the left and right sides of shaft main body 10 is mounted on product heat cal rod 11, and shaft main body 10 is located at the outside of lower furnace body 2 and upper furnace body 8, is between the first connecting pipe 4 and the second connecting pipe 5 Vertical connection, and to be fixedly connected between the second connecting pipe 5 and product heat cal rod 11, the first connecting pipe 4 is for balancing thermal current And hot barometric pressure, make to make full use of heat there are heat interaction transmittance process between lower furnace body 2 and upper furnace body 8, improve and add The thermal efficiency, product heat cal rod 11 is for recycling generated heat in regenerative furnace 13, to being carried out because of to thick embryo in regenerative furnace 13 Heat caused by reheating is utilized, and hot-fluid sends the second connecting pipe 5 to by product heat cal rod 11, by the second connecting tube Road 5 sends the first connecting pipe 4 to, is lower furnace body 2 and the progress heat supply of upper furnace body 8, the heat in lower furnace body 2 and upper furnace body 8 It can be passed in regenerative furnace 13, improve heat utilization ratio, the outer side of product heat cal rod 11 is equipped with logical only valve 12, regenerative furnace 13 Outside be provided with additional thermosphere 14, and regenerative furnace 13 is located at the logical only outer side of valve 12, and the outside of additional thermosphere 14 is fixed There is the warm cylinder 15 of shield, the inner wall of regenerative furnace 13 is provided with interior heating layer 16, and the inside of regenerative furnace 13 is fixed with partition board 17, external heat It is close between the medial surface and the outside wall surface of regenerative furnace 13 of layer 14, the lateral surface and the internal face of regenerative furnace 13 of interior heating layer 16 Fitting, and the central axes of the central axes of regenerative furnace 13, the central axes of additional thermosphere 14 and interior heating layer 16 overlap, thick embryo, which melts down, to be added Heat, and it is heated to rolling ring of coming out of the stove after rolling ring temperature, rolling ring can go out connect according to the mating corresponding mold of shape of product, direct rolling ring The blank of nearly finished form does not have to thus uniformly be ground into a ring, various types can be gone out according to product drawing, are saved Process time, while material is also saved, additional thermosphere 14 plays the role of that regenerative furnace 13 is assisted to heat with interior heating layer 16, makes 13 internal temperature rapid increase of regenerative furnace, and ensure that the inside of regenerative furnace 13 is in the state of a continuous heating, partition board 17 is along returning The vertical direction parallel equidistant of hot stove 13 is arranged, and thickness is equal between partition board 17, after thick embryo manufacture, is put into regenerative furnace 13 In, separated by partition board 17 and placed so that temperature is more uniform for melting down suffered by thick embryo, and the top of regenerative furnace 13 is equipped with bell 18。
It is former as flange basis using steel ingot, square steel or round steel in a kind of flange forging equipment that the present invention introduces Material needs that these raw material are cut into corresponding weight and size by sawing machine first, under opening before being heated Stove hermatic door 3 and upper stove hermatic door 9, material are respectively put into lower furnace body 2 or upper furnace body 8, to each lower furnace body 2 and upper furnace body 8 into line label, and when production needs to carry out remarks to raw material heat (batch) number, weight, producer and quantity, and material enters 2 He of lower furnace body It is respectively heated in upper furnace body 8, is taken out after being heated to forging temperature, thick embryo is manufactured after punching, reaming, in heating process In, each lower furnace body 2 and upper furnace body 8, which separate, heats material, passes through the first connecting pipe 4 between lower furnace body 2 and upper furnace body 8 It completes hot-fluid to transmit, can mutually balance respective internal heating air pressure and thermal current, heat is recycled, open stove The thick embryo manufactured is put into regenerative furnace 13 and melts down heating by lid 18, and thick embryo disperses to place on partition board 17, thermally equivalent, Thick embryo is heated to rolling ring of coming out of the stove after rolling ring temperature, according to shape of product, selection and the mating mold of product, direct rolling ring when rolling ring Go out the blank close to finished form, need not uniformly be ground into a ring and carry out complicated machining again, it can be according to product figure Paper goes out various types, saves material, reduces material weight, saves the finishing time, and carrying out machine to shaped blank part adds Work can save process time according to shape processing, and for thick embryo when carrying out melting down heating, additional thermosphere 14 and interior heating layer 16 are right Temperature in regenerative furnace 13 is kept, and makes the internal temperature rapid increase of regenerative furnace 13, logical only valve 12 is opened, from shaft master The hot-fluid generated in body 10 can be transitioned by the second connecting pipe 5 and product heat cal rod 11 in regenerative furnace 13, be filled to heat Divide and utilize, the backheat hot-fluid in regenerative furnace 13 can also be transmitted in each lower furnace body 2 and upper furnace body 8 by product heat cal rod 11 to be participated in The heating of material.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of variations, modification, replace And modification, the scope of the present invention are limited by appended claims with equivalent.

Claims (6)

1. a kind of flange forging equipment, including pedestal (1), shaft main body (10) and regenerative furnace (13), it is characterised in that: Lower furnace body (2) is installed above the pedestal (1), and lower stove hermatic door (3) is provided with below the outer surface of lower furnace body (2), First connecting pipe (4) is installed, and the centre of the first connecting pipe (4) is fixed with the second company on the outside of the lower furnace body (2) Take over road (5), be equipped with support plate (6) above the lower furnace body (2), and support plate (6) is internally provided with connection stove bucket (7), upper furnace body (8) is installed above the support plate (6), and is provided with stove sealing above the outer surface of upper furnace body (8) Door (9) is mounted on product heat cal rod (11) at left and right sides of the shaft main body (10), and shaft main body (10) is located at lower furnace body (2) and the outside of upper furnace body (8), the outer side of the product heat cal rod (11) are equipped with logical only valve (12), the regenerative furnace (13) Outside be provided with additional thermosphere (14), and regenerative furnace (13) is located at the logical only outer side of valve (12), the additional thermosphere (14) the warm cylinder (15) of shield is fixed on the outside of, the inner wall of the regenerative furnace (13) is provided with interior heating layer (16), and regenerative furnace (13) inside is fixed with partition board (17), and bell (18) is equipped with above the regenerative furnace (13).
2. a kind of flange forging equipment according to claim 1, it is characterised in that:The steel ingot, square steel or circle Steel raw material is added separately to by lower stove hermatic door (3) and upper stove hermatic door (9) in lower furnace body (2) and upper furnace body (8), and under Horizontal center line between furnace body (2) and upper furnace body (8) about support plate (6) is symmetrical.
3. a kind of flange forging equipment according to claim 1, it is characterised in that:The lower furnace body (2) and upper Furnace body (8) has been placed equidistant with 3 along the horizontal direction of support plate (6), and passes through between lower furnace body (2) and upper furnace body (8) One connecting pipe (4) corresponds connection.
4. a kind of flange forging equipment according to claim 1, it is characterised in that:First connecting pipe (4) it is vertical connection between the second connecting pipe (5), and is fixed company between the second connecting pipe (5) and product heat cal rod (11) It connects.
5. a kind of flange forging equipment according to claim 1, it is characterised in that:The additional thermosphere (14) The outside wall surface of medial surface and regenerative furnace (13), interior heating layer (16) lateral surface and the internal face of regenerative furnace (13) between it is close Fitting, and the central axes of the central axes of regenerative furnace (13), the central axes of additional thermosphere (14) and interior heating layer (16) overlap.
6. a kind of flange forging equipment according to claim 1, it is characterised in that:The partition board (17) is along backheat The vertical direction parallel equidistant of stove (13) is arranged, and thickness is equal between partition board (17).
CN201810286613.4A 2018-03-30 2018-03-30 A kind of flange forging equipment Active CN108526379B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810286613.4A CN108526379B (en) 2018-03-30 2018-03-30 A kind of flange forging equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810286613.4A CN108526379B (en) 2018-03-30 2018-03-30 A kind of flange forging equipment

Publications (2)

Publication Number Publication Date
CN108526379A true CN108526379A (en) 2018-09-14
CN108526379B CN108526379B (en) 2019-11-08

Family

ID=63482909

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810286613.4A Active CN108526379B (en) 2018-03-30 2018-03-30 A kind of flange forging equipment

Country Status (1)

Country Link
CN (1) CN108526379B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63130710A (en) * 1986-11-19 1988-06-02 Daido Steel Co Ltd Steel heating furnace
CN201704379U (en) * 2010-05-05 2011-01-12 洛阳市科本机械设备有限公司 Communication type forged heating and after-forged heat-treatment furnace
CN203679162U (en) * 2013-12-26 2014-07-02 江油市长祥特殊钢制造有限公司 Waste heat recycle device of forge heating furnace
CN204052778U (en) * 2014-06-23 2014-12-31 上虞市通特锻造有限公司 Energy-saving forging furnace
CN204430153U (en) * 2015-02-11 2015-07-01 杭州伟达铸锻有限公司 Forge furnace
CN106513558A (en) * 2015-09-11 2017-03-22 湖北中冶窑炉有限公司 Front-back door opening multi-chamber forging furnace adopting blast furnace gas as fuel
CN107363212A (en) * 2017-08-03 2017-11-21 四川瑞丰锻造有限公司 The forge furnace that a kind of waste heat recycles

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63130710A (en) * 1986-11-19 1988-06-02 Daido Steel Co Ltd Steel heating furnace
CN201704379U (en) * 2010-05-05 2011-01-12 洛阳市科本机械设备有限公司 Communication type forged heating and after-forged heat-treatment furnace
CN203679162U (en) * 2013-12-26 2014-07-02 江油市长祥特殊钢制造有限公司 Waste heat recycle device of forge heating furnace
CN204052778U (en) * 2014-06-23 2014-12-31 上虞市通特锻造有限公司 Energy-saving forging furnace
CN204430153U (en) * 2015-02-11 2015-07-01 杭州伟达铸锻有限公司 Forge furnace
CN106513558A (en) * 2015-09-11 2017-03-22 湖北中冶窑炉有限公司 Front-back door opening multi-chamber forging furnace adopting blast furnace gas as fuel
CN107363212A (en) * 2017-08-03 2017-11-21 四川瑞丰锻造有限公司 The forge furnace that a kind of waste heat recycles

Also Published As

Publication number Publication date
CN108526379B (en) 2019-11-08

Similar Documents

Publication Publication Date Title
CN104648696B (en) Space metal propellant tank and manufacture method thereof
CN102688998B (en) Method for producing double-clutch valve
CN102151820B (en) Metallurgical ladle device with vacuum shell
CN102019353A (en) Precision casting molding method for complex thin-walled member
CN108580830A (en) A kind of method of processing flange
CN105970033A (en) Die casting method of dry aluminium alloy double-clutch valve body
CN103667765B (en) A kind of continuous producing apparatus of foam aluminium alloy
CN104999034B (en) Casting method of large allowance-free pressure expander precise casting piece
CN108526379B (en) A kind of flange forging equipment
CN100496812C (en) Seepage apparatus for manufacturing foam metal by seepage casting method
CN109402425A (en) A kind of superaudio induction heating light-alloy vacuum melting pouring furnace
CN103962436B (en) A kind of superplastic forming device
CN203018704U (en) Device for manufacturing large-scale hollow steel ingots through single-sleeve forced cooling
CN105087968A (en) Optimized production method for producing aluminum alloy casting through vacuum melting and casting
CN208437627U (en) A kind of hot investment casting ultra-large type composite form dewaxing device
CN203448396U (en) Offline heating device used on CSP (compact strip production) online milling roll
CN102601114A (en) Production method for 100-200 mm thick steel plates meeting ultrasonic flaw detection level I
CN108127101B (en) A kind of large thin-wall aluminium alloy castings plaster casting method
CN206310714U (en) A kind of machine oil heating case
CN208407039U (en) Iron ore Molten drop test combined type graphite crucible
CN111947456B (en) Continuous casting vacuum induction smelting furnace
CN107377728A (en) Spinning molybdenum crucible fast demoulding core rod device
CN102705557A (en) Dual-clutch valve body
CN105865209A (en) Water cooling cantilever roller way for steel billet heating furnace
CN204194732U (en) A kind of sand mould box produced for coke oven lining board of coke bucket car

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Equipment for flange forging production

Effective date of registration: 20231007

Granted publication date: 20191108

Pledgee: Industrial Commercial Bank of China Ltd. Suichang branch

Pledgor: ZHEJIANG HAISHENG JINHUAN MACHINE CO.,LTD.

Registration number: Y2023330002222

PE01 Entry into force of the registration of the contract for pledge of patent right