CN108518838A - A kind of chassis structure and the mobile air-conditioner with the structure - Google Patents

A kind of chassis structure and the mobile air-conditioner with the structure Download PDF

Info

Publication number
CN108518838A
CN108518838A CN201810405093.4A CN201810405093A CN108518838A CN 108518838 A CN108518838 A CN 108518838A CN 201810405093 A CN201810405093 A CN 201810405093A CN 108518838 A CN108518838 A CN 108518838A
Authority
CN
China
Prior art keywords
water
area
level
convergence
liquid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810405093.4A
Other languages
Chinese (zh)
Other versions
CN108518838B (en
Inventor
叶鲁伟
冷晓刚
成日雄
陈明侠
王长刚
耿德国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Aux Air Conditioning Co Ltd
Original Assignee
Aux Air Conditioning Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Aux Air Conditioning Co Ltd filed Critical Aux Air Conditioning Co Ltd
Priority to CN201810405093.4A priority Critical patent/CN108518838B/en
Publication of CN108518838A publication Critical patent/CN108518838A/en
Application granted granted Critical
Publication of CN108518838B publication Critical patent/CN108518838B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/20Casings or covers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/22Means for preventing condensation or evacuating condensate
    • F24F13/222Means for preventing condensation or evacuating condensate for evacuating condensate

Abstract

The present invention provides a kind of chassis structure, including:Suction zones, sink area, area of fetching water, water level control area further include:Water retaining ribs, for the suction zones to be isolated with the sink area;Convergence portion fetches water positioned at described between area and the sink area, and close to the convergence mouth in the area of fetching water;The bottom in the water level control area is provided with water storage flume, and an at least liquid-level switch is provided with above the water storage flume;The water of the sink area is preferentially fetched water described in flow direction area, next flows to the suction zones, finally flow to the water level control area.Chassis structure of the present invention can reasonably plan the water on chassis, effectively dispatch condensed water and preferentially flow to area of fetching water from sink area, next flows to water level control area, finally flows to suction zones.

Description

A kind of chassis structure and the mobile air-conditioner with the structure
Technical field
The present invention relates to air-conditioning technical fields, more particularly to a kind of chassis structure.
Background technology
There is mobile air conditioner chassis, chassis can be divided into four regions according to its water channel, respectively:Water level control area is inhaled Pool, sink area and area of fetching water.Wherein sink area is connected to suction zones, area of fetching water, and sink area is used to cache the water on chassis, The water in area of fetching water can get to condenser fin evaporation by wheel of fetching water, and the water in suction zones passes through pumped.Actually make With in the process, the water in sink area should preferentially flow into area of fetching water, the normal work for the wheel that ensures to fetch water first, and the prior art Middle suction zones are directly connected to sink area, and the water in sink is easy to flow directly into suction zones, cause to flow into the flow fetched water in area Amount is insufficient, and water that can not be on reasonable distribution chassis can not effectively play area of fetching water to cause unnecessary action waste Function, meanwhile, it in hypervolia on chassis, needs reasonably to plan flow, avoids causing to shut down.
Invention content
In view of this, the present invention is directed to propose a kind of chassis structure is mentioned cold with the flow direction of water on chassis of making rational planning for The service efficiency of condensate.
In order to achieve the above objectives, the technical proposal of the invention is realized in this way:
A kind of chassis structure, including:Suction zones, sink area, area of fetching water, water level control area further include:
Water retaining ribs, for the suction zones to be isolated with the sink area;
Convergence portion fetches water positioned at described between area and the sink area, and close to the convergence mouth in the area of fetching water;Institute It states and is provided with supporting rib in sink area;
The bottom in the water level control area is provided with water storage flume, and an at least liquid-level switch is provided with above the water storage flume;
The water of the sink area is preferentially fetched water described in flow direction area, next flows to the suction zones, finally flow to the water level Control zone.
Further, the convergence portion is the high concave structure of intermediate low surrounding;The concave structure in the convergence portion is by more A convergence face is composed, and all convergence faces intersect at convergent point.
Further, a connection channel is additionally provided between the suction zones and the sink area, the water retaining ribs are parallel In the cross section of the interface channel and it is set to interface channel axial direction any position.
Further, the convergence face is by being the convergence face one being obliquely installed, convergence face two, convergence face three and convergence Face four is combined and spliced to be formed, and the angle that the number of degrees are 174 degree of -178 degree is presented between adjacent Mosaic face.
Further, the inclined direction in the convergence face one and the convergence face three with the sink area to the convergence Portion tilts from high to low.
Further, the liquid-level switch, including:The upper of the first water storage flume is fixed in first order liquid-level switch, suspension Side, is monitored for the water level to first water storage flume;The second water storage flume is fixed in second level liquid-level switch, suspension Top is monitored for the water level to second water storage flume;When the first water storage flume water water level rise, it is described When the float of first order liquid-level switch rises arrival level-one alert locations, level-one alarm signal is triggered;When second water storage flume When the water level of water rises, the float of two level liquid-level switch floating reaches secondary alarm position, triggering secondary alarm letter Number.
Further, first water storage flume is different from the depth of the second water storage flume.
Further, the bottom setting of the suction zones is fluted, and the groove is equipped with the filtering being connected with water pump Component.
Further, it is provided with water bloking piece between the convergence portion and the area of fetching water, the convergence portion is beaten with described Pool separates, and the water bloking piece offers convergence mouth, and the convergence mouth is mutually staggered with the convergent point position, to avoid Ponding flows directly into the area of fetching water from the convergent point.
Compared with the existing technology, chassis structure of the present invention has the advantage that:
(1) suction zones are isolated using water retaining ribs with sink area, sink area is allow to store certain product Water, when condenser working, the ponding of sink area can preferentially converge to area of fetching water, and by fetching water, ponding is got to condensation by wheel On the fin of device.On the other hand, using the design of water retaining ribs, ponding can be effectively prevent to flow backward to suction zones, to cause to beat When water wheels work, the hydropenic phenomenon of condensation in area of fetching water generates the unnecessary stand-by period;The setting in the convergence portion, It fetches water described in ponding entrance before area, ponding is preferentially introduced into the convergence portion;The water retaining ribs are matched with the convergence portion It closes, guiding function can be played to the water on chassis, it is preferential to flow to area of fetching water;(2) the convergence face one and the convergence face three Inclined direction tilted from high to low to the convergence portion with the sink area, and then by the water at the sink area, preferentially draw It is directed at the convergence portion, and then makes the water on chassis preferentially to flowing at the area of fetching water;(3) secondary alarm pattern is taken, it can When effectively avoiding ponding product full, the problem of air-conditioning also fails to shut down in time, air-conditioning can also be avoided to be run to from powerful The security risk brought when shutting down suddenly.Two-stage water level switch controlling alarm increases mobile control degree of intelligence, enhances Safety;
It (5), can be to the water on chassis by structures such as the water retaining ribs, convergence portion, water storage flume, the grooves that are arranged on chassis It is reasonably planned, effectively dispatches condensed water and preferentially flow to area of fetching water from sink area, next flows to water level control area, finally Suction zones are flowed to, and in hypervolia, carry out classifying alarm, extend usage time, reduces downtime.
Another object of the present invention is to propose that a kind of mobile air-conditioner, the mobile air-conditioner include described above Chassis structure.
Possessed advantage is identical compared with the existing technology with the chassis structure for the air conditioner, and details are not described herein.
Description of the drawings
The attached drawing for constituting the part of the present invention is used to provide further understanding of the present invention, and of the invention is schematic Embodiment and its explanation are not constituted improper limitations of the present invention for explaining the present invention.In the accompanying drawings:
Fig. 1 is the overall schematic of chassis structure of the present invention;
Fig. 2 is the partial schematic diagram one of chassis structure of the present invention;
Fig. 3 is multiple water retaining ribs structural schematic diagrams;
Fig. 4 is plug division structural schematic diagram;
Fig. 5 is water retaining ribs structural schematic diagram;
Fig. 6 is the partial schematic diagram two of chassis structure of the present invention;
Fig. 7 is the schematic diagram in convergence portion of the present invention;
Fig. 8 fetches water for the present invention and takes turns schematic view of the mounting position;
Fig. 9 is the structural schematic diagram one of slot of the invention of fetching water;
Figure 10 is the structural schematic diagram two of slot of the invention of fetching water;
Figure 11 is the structural schematic diagram of wheel of the invention of fetching water;
Figure 12 a are the vertical view state one of wheel of the invention of fetching water;
Figure 12 b are the vertical view state two of wheel of the invention of fetching water;
Figure 13 is the overall schematic of the clamp device of liquid-level switch of the present invention;
Figure 14 is the schematic diagram of screw pole of the present invention;
Figure 15 is liquid-level switch of the present invention and the support bracket fastened connection diagram of liquid-level switch;
Figure 16 is the overall schematic of liquid-level switch of the present invention;
Figure 17 is water level control area of the present invention schematic diagram;
Figure 18 is multi-stage level switch schematic diagram one of the present invention;
Figure 19 is multi-stage level switch schematic diagram two of the present invention;
Figure 20 is the schematic diagram of float in the present invention;
Figure 21 is the structural schematic diagram of discharge structure of the present invention;
Figure 22 is chassis structure groove location schematic diagram of the present invention;
Figure 23 is filter assemblies schematic diagram of the present invention;
Figure 24 is enlarged drawing at the A of Figure 22;
Figure 25 is water draining beak structural schematic diagram of the present invention;
Figure 26 is present invention draining mouth structure scheme of installation;
Figure 27 is the schematic diagram of water draining beak notch of the present invention;
Figure 28 is the notched water draining beak scheme of installation of the present invention;
Figure 29 is the structural schematic diagram of the external Notched specimen of the present invention;
Figure 30 is the schematic diagram of supporting rib of the present invention.
Reference sign:
The suction zones 321-, the sink areas 322-, 330- fetch water area, 313- water level controls area, 323- grooves, and 3925- connections are logical Road, 3926- water retaining ribs, the first water retaining ribs of 325-, the second water retaining ribs of 326-, 327- third water retaining ribs, 328- fourth gear water muscle, 329- fifth gear water muscle, the plug divisions 320-, 39261- notches;331- convergence mouths, 332- convergences portion, 333- convergent points, 334- enter The mouth of a river, 335- water bloking pieces, 336- converge face one, and 337- converges face two, and 338- converges face three, and 339- converges face four, 3310- gears Water-bound, the sink areas 322-;315- fetches water wheel, and 316- fetches water slot, and 317- fetches water motor, 318- groove bodies, 319- step structures, The first catch of 3110-, the second catch of 3111-, 3112- the first slot sections, 3113- the second slot sections;3911- screw poles, 3912- liquid Bit switch fixing bracket, 3913- liquid-level switches, 39111- huge pillars, 39112- pillars, 39113- threaded holes, 39121- connections Foot, 39122- through-holes, the sides 39123-, 39124- extend outwardly structure, 39131- connecting rods, and 3921- first order liquid levels are opened It closes, the second level 3922- liquid-level switch, 3943- liquid-level switches holder one, 3944- liquid-level switches holder two, 3945- screw poles One, 3946- screw pole two, the first water storage flumes of 3947-, the second water storage flumes of 3948-, 3925- interface channels, 3926- water retaining ribs, 39261- notches, 3930- multi-stage level switchs, 3931- floating balls, 3932- level-one floats, 3933- two level floats, 3934- three-levels Float, 3935- snap rings, 3936- guide rods, 3937- guide rails, 3938- connecting rods, 3939- multi-stage level switch fixing brackets, Mono- rings of 39311-, 39312- guide grooves, bis- rings of 39313-;361- filter assemblies, 362- water pumps, 363- drain mouth structure, 364- the A connecting pipe, the second connecting pipes of 365-, 366- filters, 367- fixation kits, 368- connection ring sets, 3671- covers, 3672- fixed arms, 3673- hollow pipelines, 3610- mounting brackets, 3611- water covers, 3613- fixed plates, 3614- discharge outlet connect Head, 3615- fixing grooves, 3616- location holes, the positioning regions 3617-, 341- water draining beak ontologies, the external water outlets of 342-, outside 346- Connect Notched specimen, 347- diversion columns, 633- supporting ribs.
Specific implementation mode
It should be noted that in the absence of conflict, the feature in embodiment and embodiment in the present invention can phase Mutually combination.
The present invention will be described in detail below with reference to the accompanying drawings and embodiments.
Embodiment one
The present invention provides a kind of mobile air-conditioner, and mobile air-conditioner includes a chassis structure, in conjunction with shown in Fig. 1 to Fig. 5, Chassis structure includes:Suction zones 321, water level control area 313, sink area 322 and area 330 of fetching water;Chassis structure further includes:
A connection channel 3625 is set between suction zones 321 and sink area 322, is used for suction zones 321 and sink area 322 connection;
An at least water retaining ribs 3926, the cross section for being parallel to interface channel are set to the axial arbitrary position of interface channel 3925 It sets, for suction zones 321 to be isolated with sink area 322.
Suction zones 321 are isolated with sink area 322 using water retaining ribs 3926, sink area 322 is allow to store centainly Ponding, when condenser working, the ponding of sink area 322 can preferentially converge to area of fetching water, and by fetching water, wheel beats ponding Onto the fin of condenser, it is possibility to have effect prevents ponding from flowing backward to suction zones 321, to when fetching water wheel work, avoid beating The hydropenic phenomenon of condensation in pool 321 occurs, and brings the unnecessary stand-by period.
Preferably, the bottom setting fluted 323 of suction zones 321.The advantages of this arrangement are as follows suction zones 321 are arranged Fluted 323, when ponding is excessive, groove 323 can be with a part of ponding of valid cache.
Preferably, water retaining ribs 3926 include two kinds of arrangement forms, first, water retaining ribs 3926 and interface channel 3925 are one A entirety, water retaining ribs 3926 do not need separately fabricated, reduce manufacturing procedure, avoid the separately fabricated institute of water retaining ribs 3926 The additional cost waste brought.Second, water retaining ribs 3926 are to be arranged on absolute construction, with the interface channel 3925 At least one plug division 320 coordinates, by the way that the water retaining ribs 3926 to be inserted into different plug divisions 320, to change suction zones 321 with the area size of sink area 322, adjust reservoir storage.
Embodiment two
Mobile air-conditioner as described above, the present embodiment is different from place and is, in conjunction with shown in Fig. 6, Fig. 7, chassis Structure further includes:Convergence portion 332 is used to connect sink area 322 and area 330 of fetching water, is located at fetch water area 330 and sink Between area 322, and close to the convergence mouth 331 in area 330 of fetching water;
Convergence portion 332 is the high concave structure of intermediate low surrounding, the advantages of this arrangement are as follows, enter in ponding and fetches water Before area 330, ponding is preferentially introduced into convergence portion 332, ponding is made to cache a part in convergence portion 332;Meanwhile alleviating ponding Into the speed in area 330 of fetching water, the load for wheel of fetching water is reduced.
Preferably, the concave structure in convergence portion 332 is composed of multiple convergence faces, convergence face includes:Convergence face one 336, face 2 337, convergence face 3 338 and convergence face 4 339 are converged, four convergence faces are combined and spliced in the counterclockwise direction to be formed, Convergence face is to be obliquely installed, and certain angle is rendered as between adjacent convergence face, and all convergence faces intersect at convergent point 333.The advantages of this arrangement are as follows making ponding before entering area 330 of fetching water, a part of product can be cached in convergence portion 332 Water;Meanwhile the speed that ponding flows into area 330 of fetching water can be slowed down.Further, the degree of the angle between adjacent convergence face Number is 174 degree of -178 degree.The advantages of this arrangement are as follows the angle between preventing adjacent convergence face is too big, make entirely to converge Face is rendered as plane, cannot effectively cache ponding;On the other hand, prevent the angle between adjacent convergence portion 332 too small, Cause entire convergence portion 332 too deep, caching ponding is too many, prevents ponding from timely entering area 330 of fetching water.
Preferably, convergence face 1 and converge face 3 338 inclined direction with sink area 322 to convergence portion 332 by height To low dip, and then by the water at sink area 322, vector preferably makes water on chassis preferentially to beating to convergence portion 332 It is flowed at pool 330.
Preferably, convergence face is plane, all convergence faces intersect at convergent point 333.The advantages of this arrangement are as follows side Just the machine-shaping in face is converged.
Preferably, convergence face is arcwall face, all convergence faces intersect at convergent point 333, and convergence portion 332 is flowed into ponding Generate preferably buffering.In turn, the concave structure in convergence portion 332 is rendered as round bottom pot shape structure, and ponding is made to enter area of fetching water Before 330, a part of ponding can be cached in convergence portion 332;Meanwhile the speed that ponding flows into area 330 of fetching water can be slowed down. In addition, the design of round bottom also avoids the generation for the phenomenon that sediment accumulation is difficult to clean on one point.
Preferably, water bloking piece 335 is provided between convergence portion 332 and area 330 of fetching water, by convergence portion 332 and area of fetching water 330 separate, and water bloking piece 335 offers convergence mouth 331, and convergence mouth 331 is mutually staggered with 333 position of convergent point, to avoid accumulating Water flows directly into area 330 of fetching water from convergent point 333, plays the role of preferable ponding caching.
Preferably, being provided with water-retaining structure 3310 between convergence portion 332 and sink area 322, water-retaining structure is offered into water Mouth 334, water inlet 334 is mutually staggered with 333 position of convergent point, and water inlet 334 and 331 position of convergence mouth mutually stagger, from And ponding is made to first pass through convergent point 333, convergence mouth 331 then is flowed into from convergent point 333, ponding is made to be delayed in convergent point 333 Punching avoids ponding from flowing directly into convergence mouth 331.
Preferably, being provided with water-retaining structure 3310 around convergence portion 332, water-retaining structure 3310 is by sink area 322 and converges Portion 332 separates, and water-retaining structure 3310 offers multiple water inlets 334, and water inlet 334 is set to the opposite remittance of 332 water level of convergence portion 333 higher position of accumulation, water inlet 334 are staggered with convergent point 333, and water inlet 334 and convergence mouth 331 are staggered.In this way Setting is advantageous in that, ponding is made smoothly to enter convergence portion 332 from sink area 322.
Embodiment three
Mobile air-conditioner as described above, the present embodiment are different from place and are that mobile air-conditioner further includes a dozen Water-bound is used to write condensed water to condenser fin freely and easily, and in conjunction with shown in Fig. 8 to Figure 10, water fetching structure includes:A dozen Sink 316, is used for accumulating condensed water;At least a dozen water wheels 315, at least part of be placed in are fetched water in slot 316, and will The interior condensed water gathered of slot 316 of fetching water is write freely and easily;A dozen hydroelectric machines 317, wheel 315 is connect with fetching water, and drives wheel of fetching water 315 rotations;Fetch water 316 bottom surface of slot be groove body 318, groove body 318 along fetch water wheel 315 radial direction from both ends to intermediate recess, Groove structure low between formation both sides senior middle school in turn;The structure type of groove body 318 can make the condensed water of inflow groove body 318 It is gathered in the bottom of groove body 318, is conducive to the ponding dead angle for eliminating slot 316 of fetching water, avoids the idle waste of partial condensation water, The wheel 315 that enables to fetch water as far as possible gets to the condensed water assembled in groove body 318 on the fin of condenser, and raising is fetched water wheel 315 working efficiency;
Preferably, the groove structure of groove body 318 is the arcuate structure mutually agreed with 315 shapes of wheel of fetching water.
Groove body 318 includes the first slot section 3112 and the second slot section 3113;First slot section 3112 is the smooth ramp tilted down Face so that condensed water, which can flow into rapidly, fetches water slot;Second slot section 3113 is the arc mutually agreed with 315 shapes of wheel of fetching water Curved surface, the bottom end of the first slot section 3112 and one end of the second slot section 3113 are smoothly connected, and the lowermost end of the first slot section 3112 is higher than The lowermost end of second slot section 3113, the bottom of 3113 curved surface of the second slot section are in the lowest order of opposite groove body 318;
Preferably, the circumferential shape of the second slot section and the circumferential shape for wheel 315 of fetching water are adapted, wheel 315 of fetching water is mounted on Above the bottom surface of second slot section so that fetching water for wheel 315 of fetching water is more efficient;
Preferably, the one end of the second slot section 3113 far from the first slot section 3112 is concordant or higher than the second slot section 3113 The other end, with the rotation for wheel 315 of fetching water, condensate liquid can flow directly into the second slot section 3113 of groove body 318, and assemble In bottom end;
Two kinds of slot sections match so that while condensed water can preferably flow into groove body 318, eliminate groove body 318 It fetches water dead angle so that the structural behaviour for slot 316 of fetching water is more preferable.
Slot 316 of fetching water further includes a step structure 319, and the top of step structure 319 is additionally provided with a buffering table top, table top To fetching water, 316 side of slot slightly extends, and is connected with groove body 318, is gathered in groove body 318 convenient for condensed water;
Preferably, buffer table face includes first side and second side, first side is located at buffering table top with second side Opposite both sides, first side are inclined outwardly with second side, and second side is connected with groove body 318.
The recess both sides of groove body 318 are additionally provided with the first catch 3110 and the second catch 3111, the first catch 3110 and second Catch 3111 is higher than slot 316 of fetching water, and the first catch 3110 and the second catch 3111 can limit the circulation path of condensed water;
Preferably, the top of the first catch 3110 and the second catch 3111 is equipped with one or more notches, it is convenient for condensed water It is gathered in fetching water slot 316.
First catch and the second catch are relative to being all Yi Shuitai below the another side of groove body 318, and water platform is the bottom of relative to The vertical height of disk is higher than groove body, and the notch depth and water platform table top flush of the first catch and the second catch are convenient for liquid flow Enter in groove body.
The installation site for corresponding to wheel 315 of fetching water of second catch 3111 is equipped with groove, and groove bottom end is to lower recess Cambered surface, groove are used to accommodate the connecting shaft of motor 317 of fetching water, connect axis connection and fetch water wheel 315;
Preferably, the circumferential shape of the shape of groove and the connecting shaft for motor 317 of fetching water is adapted.
Water fetching structure, which is set to, fetches water in area 330, and area 330 of fetching water is between suction zones 321 and water level control area 313, Area 330 of fetching water is engaged with sink area 313;
322 top of sink area is equipped with condenser, and condenser includes at least two fins, and wheel 315 of fetching water, which is mounted on, to be corresponded to Between two fins, wheel 315 of fetching water gets to the condensed water gathered in groove body 318 on two fins, can accelerate condensed water Evaporation, while make structural arrangement it is even closer, saved space.
Preferably, in the present embodiment, 315 quantity of wheel of fetching water are one.
Example IV
Mobile air-conditioner as described above, the present embodiment is different from place and is, in conjunction with shown in Figure 11, Figure 12 a, Wheel 315 of fetching water is fetched water wheel 3151 including first, and second fetches water wheel 3152, and third is fetched water wheel 3153;
First wheel 3152, the third wheel 3153 of fetching water of fetching water of wheel 3151 and second of fetching water may be contained within fetching water 316 top of slot.
Motor 317 of fetching water 3152 is connect via a first rotating shaft 3174 with the first wheel of fetching water of wheel 3151 and second of fetching water, the One shaft 3174 drives the first wheel of fetching water of wheel 3151 and second of fetching water 3152 coaxially to rotate in same direction;
First rotating shaft 3174 is connect via gear set with the second shaft 3175;Second shaft 3175 drives third to fetch water wheel 3153 rotations.Second shaft 3175 via gear set transmission, and then it is opposite with 3174 rotation direction of first rotating shaft;Then, A dozen water wheels 3151 are identical with the second 3152 rotation directions of wheel of fetching water, and third wheel 3153 of fetching water fetches water with first and takes turns 3151 or the Two fetch water wheel 3152 rotation direction it is opposite.
Preferably, the second shaft 3175 is coaxially disposed with first rotating shaft 3174.
Preferably, gear set includes the first cone tooth 3171, and the second cone tooth 3172, triconodont 3173;First cone tooth 3171 It connect and rotates in same direction with first rotating shaft 3174;Second cone tooth 3172 connect and rotates in same direction with the second shaft 3175;Third is bored Tooth 3173 is bored tooth 3172 with the first cone tooth 3171 and second simultaneously and is engaged, to make the first cone tooth 3171 and second bore tooth 3172 Rotation direction it is opposite.
Third wheel 3153 of fetching water 3152 rotates in the opposite direction with the first wheel of fetching water of wheel 3151 or second of fetching water, being capable of general Condensed water is write freely and easily in the opposite direction, increases the contact area of condenser and condensed water, improves volatilization efficiency.
As another realization method of the present embodiment, in conjunction with shown in Figure 12 b, wheel 315 of fetching water is fetched water wheel including first 3151, second fetches water wheel 3152;And second shaft 3175 and 3174 non-coaxial setting of first rotating shaft;First cone tooth 3171 and the Plug tap tooth 3172 is intermeshed, to make the first wheel of fetching water of wheel 3151 and second of fetching water 3152 rotate in the opposite direction;
Preferably, the first cone tooth 3171 is an integral structure with first rotating shaft 3174;Second cone tooth 3172 and the second shaft 3175 are an integral structure;
Unlike those described above, the first cone tooth 3171 is split structure with first rotating shaft 3174;Second cone tooth 3172 and the Two shafts 3175 are split structure.
Embodiment five
Mobile air-conditioner as described above, the present embodiment is different from place and is, in conjunction with shown in Figure 13 to 20, moves Dynamic air conditioner further includes an at least liquid level prior-warning device, is monitored for the ponding to chassis water level control area, liquid level early warning Device includes:
Water storage flume, including the first water storage flume 3947 and the second water storage flume 3948 generate in the process for collecting operation of air conditioner Ponding;
Liquid-level switch, including:First order liquid-level switch 3921, suspension are fixed on the top of the first water storage flume 3947, are used for The water level of first water storage flume 3947 is monitored;The second water storage flume 3948 is fixed in second level liquid-level switch 3922, suspension Top is monitored for the water level to the second water storage flume 3948;
The height that first order liquid-level switch 3921 and second level liquid-level switch 3922 trigger water level when alarming is different, thus Ensure after the triggering alarm of first order liquid-level switch 3921, guarantee has sufficient time to that air-conditioning is made to respond, and sends out in time Adjustment order.It is different with the opportunity of the triggering alarm of second level liquid-level switch 3922 by first order liquid-level switch 3921, to realize Control to mobile air conditioner operating.When the water level rising of 3947 water of the first water storage flume, the float of first order liquid-level switch 3921 When the arrival level-one alert locations that float, level-one alarm signal is triggered, breeze fan rotating speed is slack-off, and condenser temperature increases, water removal Efficiency enhances;When the water level of 3948 water of the second water storage flume continues to rise, float floats to secondary alarm position, triggers again Alarm signal, mobile air conditioner are shut down.
Preferably, first order liquid-level switch 3921 is connected by connecting rod one with liquid-level switch fixing bracket 1, First order liquid-level switch 3921 is set to hang the top for being fixed on the first water storage flume 3947, second level liquid-level switch 3922 passes through company Extension bar two is connected with liquid-level switch fixing bracket 2 3944, and the suspension of second level liquid-level switch 3922 is made to be fixed on the second water The top of slot 3948 facilitates installation and detachable maintaining, keeps away to efficiently avoid being directly connected to for liquid-level switch and chassis Exempt from unnecessary trouble.
Preferably, level-one alert locations are different from the height of secondary alarm position.The advantages of this arrangement are as follows ensureing Level-one is alarmed has certain time interval between secondary alarm, after making the triggering alarm of air-conditioning first order liquid-level switch 3921, has Time enough is ordered to respond and send out in time adjustment, also avoids level-one alarm and the appearance of secondary alarm simultaneously.
Preferably, the lower surface of the float of first order liquid-level switch 3921 will be less than the top edge of the first water storage flume 3947. Ensure that first order liquid-level switch 3921 before water accumulates full first water storage flume 3947, can be responded effectively;Preferably, The lower surface of the float of second level liquid-level switch 3922 will be less than 3948 top edge of the second water storage flume.Ensure that second level liquid level is opened 3922 are closed before water accumulates full second water storage flume 3948, can effectively be responded.
Preferably, the depth of the first water storage flume 3947 is different from the depth of the second water storage flume 3948.The benefit being arranged in this way It is, on the one hand, can preferably save space;On the other hand, it is contemplated that the structure setting on chassis makes the first water storage flume 3947 can store ponding more as possible before level-one alarm.
Preferably, the height of first order liquid-level switch 3921 and second level liquid-level switch 3922 relative to water level control area It is different.Ensure to have between the 3921 triggering alarm of first order liquid-level switch and the triggering alarm of second level liquid-level switch 3922 certain Time interval allows air-conditioning to be unlikely to be performed simultaneously two alarm signals and lose Protection significance.
Preferably, the slot bottom of the first water storage flume 3947 and the second water storage flume 3948 is provided with discharge outlet, what is be arranged in this way is good It is in the critical moment, ponding can be discharged in time, avoid potential security risk, on the other hand, facilitate the row of ponding Go out and after-sales service.
Preferably, the form of liquid-level switch can be float type level switch or tongue tube liquid-level switch.
Liquid-level switch further includes a clamp device, for realizing the fastening between liquid-level switch 3913 and air-conditioner base plate, tightly Be fixedly mounted with set including:
Liquid-level switch fixing bracket 3912, is rendered as " L " shape, and the end face 39124 of liquid-level switch fixing bracket 3912 opens up There are at least one through-hole, liquid-level switch 3913 to be connected with end face 39124, the side 39123 of liquid-level switch fixing bracket 3912 Lower edge be provided with connecting pin 39121, connecting pin 39121 is the thin-walled boss structure that bottom opens up set access slot;Screw pole 3911, it is set on the chassis of air-conditioning, screw pole 3911 is step structure, including pillar 39112 and huge pillar 39111;
The set access slot of connecting pin 39121 is socketed in outside pillar 39112, is formed dismountable socket connection, is realized to liquid The limit of bit switch fixing bracket 3912.Liquid-level switch 3913 and the chassis of air-conditioning are linked together, avoids and opens liquid level The generation for the inconsistent phenomenon that pass 3913 is likely to occur when other non-chassis structures are connect with air-conditioning, in addition, solid by liquid-level switch Fixed rack 3912 is directly connected to chassis, and when dismounting need to only dismantle liquid-level switch fixing bracket 3912, facilitate installation With demolition and maintenance, while also avoiding frequently dismantling the destruction that brings liquid-level switch 3913 of liquid-level switch 3913.
Preferably, the inner section of the set access slot of connecting pin 39121 is identical as the cross sectional shape of pillar 39112, and pillar 39112 are inserted into set access slot can be free slidable in the axial direction.Ensure that set access slot is socketed on the stability after pillar 39112 Meanwhile being easily installed the convenience with dismounting.
Preferably, the center of 3911 upper surface of screw pole offers threaded hole 39113;39121 upper surface of connecting pin is arranged There are through-hole 39122, through-hole 39122 to run through 39121 sets of access slots of connecting pin;The set access slot of connecting pin 39121 is socketed in pillar Outside 39112, threaded hole that through-hole 39122 and 3911 upper surface of screw pole of the setting of 39121 upper surface of connecting pin open up 39113 position consistencies realize that device to hole position is concentric, avoid misplacing when installation;Through-hole 39122 is passed through by a screw simultaneously It is fixed with threaded hole 39113, and then liquid-level switch fixing bracket 3912 and screw pole 3911 is fixed, further The movement of liquid-level switch 3913 in above-below direction is limited, while being also convenient for later maintenance.
Preferably, the sectional area of pillar 39112 is smaller than the sectional area of huge pillar 39111.After pillar is inserted into set access slot, set The outer wall of access slot outer wall and pillar flushes, and ensure that the aesthetic feeling of appearance.
Preferably, the upper surface of huge pillar 39111 can abut the bottom surface of connecting pin 39121, conveniently it is installed to Position, while ensureing the positional precision of liquid-level switch 3913.
Preferably, extend outwardly knot of the liquid-level switch 3913 by connecting rod 39131 and liquid-level switch fixing bracket 3912 Structure 39124 is connected, and the fixation to liquid-level switch 3913 is realized by the fastening of liquid-level switch fixing bracket 3912, to Being directly connected to for liquid-level switch 3913 and air-conditioner base plate is efficiently avoided, facilitates installation and detachable maintaining, avoids unnecessary Trouble.
Preferably, 3911 structure type of screw pole includes the following two kinds:First, screw pole 3911 is individually designed knot Structure is separated with air-conditioner base plate, is socketed by screw fastening means or snap or with the mounting post being arranged on the chassis of air-conditioning Mode realize the connection of screw pole 3911 and air-conditioner base plate.The advantages of this arrangement are as follows can be beaten on chassis multiple Hole, mounting screw column, avoids the waste of cost caused by designing multiple screw poles on chassis in place, It can also increase whole aesthetics simultaneously.Second, screw pole 3911 is designed with air-conditioner base plate for integral type, screw is avoided Unnecessary process caused by the independent processing of column 3911, to generate larger waste.
Further, liquid-level switch fixing bracket 3912 is provided with a knob, by knob to the height of liquid-level switch 3913 Degree is adjusted, and then improves service precision, facilitates and carries out pre-sales debugging and after-sales service.
Preferably, screw pole is provided with around water storage flume, by the support bracket fastened connection of screw pole and liquid-level switch come real Now to the support bracket fastened connection of liquid-level switch, the fixation to liquid-level switch is realized indirectly.Wherein, by screw pole 1 with Connecting to realize to the fixation of liquid-level switch fixing bracket 1 for liquid-level switch fixing bracket 1, passes through screw pole 2 3946 realize the fixation to liquid-level switch fixing bracket 2 3944 with the connection of liquid-level switch fixing bracket 2 3944.
Preferably, level-one alert locations are less than the top edge of water storage flume, mobile air conditioner can be made timely to receive signal, Keep breeze fan rotating speed slack-off, condenser temperature increases, and prevents air-conditioning from continuing the possibility for causing ponding to overflow that runs well. Ensure that first order liquid-level switch 3921 before water storage flume accumulates full water, can be responded effectively.
First order liquid-level switch 3921 is connect by liquid-level switch fixing bracket with air-conditioning bottom plate, solid by liquid-level switch The fixation of fixed rack realizes the fixation and dismounting of level-one liquid-level switch liquid-level switch 3921 with dismounting, prevents first order liquid level The damage that the dismounting of switch 3921 frequently results in;Second level liquid-level switch 3922 passes through liquid-level switch fixing bracket and air-conditioning bottom Plate connects, and the fixation of two level liquid-level switch liquid-level switch 3922 is realized with dismounting by the support bracket fastened fixation of liquid-level switch With dismounting, the damage for preventing the dismounting of second level liquid-level switch 3922 from frequently resulting in.
Preferably, the form of first order liquid-level switch 3921 and second level liquid-level switch 3922 can be floating ball type liquid level Switch or tongue tube liquid-level switch.
Preferably, water storage flume is provided with discharge outlet in slot bottom, so that water can be discharged in time for Emergency time.Deposit Water area is provided with discharge outlet in slot bottom, and effectively ponding can be discharged.
Liquid-level switch can also be multi-stage level switch, and multi-stage level switch 3930 hangs the top for being fixed on water storage flume, It is monitored for the water level to water storage flume, such as schemes, multi-stage level switch includes:
Guide rod 3936, is rendered as circular cone rod structure, and circular cone rod structure sectional area gradually subtracts along water level ascent direction It is small, generate guiding role for the restriction of the position to floating ball 3931 and float, and to the movement of floating ball 3931 and float.
Floating ball 3931, is rendered as cyclic structure, is surrounded on guide rod 3936, is set to the sectional area of guide rod 3936 most Big side, when water level rises, floating ball 3931 along guide rod 3936 upwards float, when the water level descends, floating ball 3931 along Guide rod 3936 declines, until dropping back into initial position;
Float, quantity are one or more, are rendered as cyclic structure, are surrounded on guide rod 3936, along water level rising side To level-one float 3932, two level float 3933, three-level float 3934 is named as successively, float puts in order by natural number upwards It is set in turn in 3931 top of floating ball, when water level floats, float floats along guide rod 3936, when the water level descends, float Decline along guide rod 3936, until dropping back into initial position;
When the water level of water storage flume constantly rises, and floating ball 3931 touches level-one float 3932, multi-stage level switch 3930 touches Hair alarm, breeze fan rotating speed is slack-off, and condenser temperature increases, water rem oval enhancing;When water level continues to rise, floating ball 3931 drive level-one floats 3932 continue to float, and when touching two level float 3933, breeze fan rotating speed is further slack-off, cold Condenser temperature increases, and water rem oval further enhances;When water level continues to rise, floating ball 3931 drives 3932 He of level-one float Two level float 3933 continues to float, and when touching three-level float 3934, liquid-level switch alarm, mobile air conditioner is shut down.It is arranged in this way It is advantageous in that, takes the pattern of multiple protective, enhance the monitoring to the water level of water storage flume, meanwhile, air-conditioning is carried out multiple Regulation and control, strengthen the protection to mobile air conditioner.
Preferably, the inner ring of float includes a ring 39311 and two rings 39313, the area of two rings 39313 is more than a ring 39311 area.The advantages of this arrangement are as follows since guide rod 3936 gradually subtracts along the direction sectional area that water level rises Small, after float disengaging position starts floating, float no longer by the constraint of guide rod 3936, reduces when float floats and is held The external resistance of load.
Preferably, be provided with guide rail 3937 on guide rod 3936, so as to preferably to floating ball 3931 and small float Movement generates guiding role, prevents all floats from rotating or overturning during the motion.
Preferably, guide groove 39312 is provided with around the inner ring of float, the equivalent width of width and guide rail 3937, and stay There is the gap that float is moved along guide rail 3937.The advantages of this arrangement are as follows reaching matching relationship with guide rail 3937, fully Using the guiding role of guide rail 3937,
Preferably, the inner ring of single float along water level ascent direction, different location sectional area it is different, with respective institute The area of section for locating 3936 position of guide rod is identical.The advantages of this arrangement are as follows each float is in fixed position, it can It with the position where accurately induction level, prevents all floats from connecting together, generates unnecessary shake-up, to multistage liquid The alarm of bit switch 3930 is misled.
Preferably, there are gaps between floating ball 3931 and float and adjacent float, the contact of adjacent float is avoided Interference to alarm signal.The advantages of this arrangement are as follows being made by the size of float according to the speed that actual water level rises The distance between adjacent buoys are certain certain value, are connected in and to alarm that there are certain response times next time.
Preferably, guide rod 3936 is provided with snap ring 3935, snap ring 3935 is set to above all floats, to float into Row limit, prevents float from skidding off.
Preferably, the smaller side of the sectional area of guide rod 3936 is provided with connecting rod 3938, by connecting rod 3938 with it is more Grade liquid-level switch fixing bracket 3939 connects, to realize the connection of multi-stage level switch and chassis.It is straight to avoid multi-stage level switch The connection between chassis or air-conditioning side plate is connect, can be destroyed caused by multi-stage level switch to avoid frequent dismounting in this way, Directly dismantle liquid-level switch fixing bracket, you can realize the dismounting of multi-stage level switch.
Preferably, the inner ring of different floats is all different along water level ascent direction, in the sectional area of different location, but with Respectively the area of section of residing 3936 position of guide rod is identical, ensures that float is surrounded on the different location of guide rod 3936.
Preferably, guide rail 3937 is at least 1, a plurality of guide rail 3937 can better ensure that stabilization when float floats Property.Around guide rod 3936, symmetrical structure can ensure when float floats about guiding 3937 array distribution of all guide rails The symmetry of bar 3936 further increases the stability in float uphill process.
Float can have a multistage, respectively one, two, three ... N grades of float, N is the sum of all floats, N grades of floats to On put in order by natural number and be set in turn in the top of floating ball 3931, all floats float and decline each along guide rod 3936, When liquid level constantly rises, floating ball 3931 is moved upwards along guide rod 3936, is touched N grades of floats successively and is driven all shake-up The float crossed moves upwardly together, and triggers corresponding N grades of alarm signal, when triggering N-1 grades of signals, breeze fan rotating speed Slack-off, condenser temperature increases, and water rem oval enhancing, when triggering N grades of signals, multi-stage level switch 3930 is alarmed, mobile Air-conditioning is shut down.The advantages of this arrangement are as follows according to the depth of different air-conditioning water storage flumes, to adjust the number of float, more It accurately realizes the monitoring to water storage flume water level, enhances the protection to air-conditioning.
Embodiment six
Mobile air-conditioner as described above, the present embodiment are different from place and are that mobile air-conditioner further includes a row Water-bound, in conjunction with shown in Figure 21 and Figure 29, discharge structure include filter assemblies 361, water pump 362, draining mouth structure 363 and First connecting pipe 364 and the second connecting pipe 365;
Filter assemblies 361 are mounted on chassis in the groove 323 that is arranged, groove 323 from chassis plane to lower recess and At filter assemblies 361 are set in groove 323, contribute to the liquid for blotting chassis accumulation;Filter assemblies 361 connect by first Thread a pipe and 364 be connected with the water inlet of water pump 362, the water outlet of water pump 362 by the second connecting pipe 365 be located at bottom The draining mouth structure 363 of plate edge is connected;
Under gravity, the condensed water gathered in chassis flows into the groove 323 of low level, makees in 362 suction of water pump Under, condensed water filters out the impurity in liquid by the strainer of filter assemblies 361, flows into water pump 362, then flows through second Connecting pipe 365, and the filtered liquid of filter assemblies is passed through by the discharge of draining mouth structure 363;
What water pump 362 transmitted is filtered condensate liquid, prevents the impurity being mingled in liquid from entering in water pump 362 and damages The normal use of evil water pump 362 is conducive to the working performance for improving air conditioner, reduces failure rate, while can will be less than draining The condensed water of mouth structure 363 is discharged to outside air conditioner, increases air-conditioning internal metal parts service life.
Filter assemblies 361 include a filter 366, and a fixation kit 367 and one connects ring set 368, filter assemblies 361 Fixation kit 367 include cover 3671 for enclosed filters 366, and be used to support the fixed arm of filter assemblies 3672;
Preferably, cover 3671 is an integral structure with fixed arm 3672.
There is a hollow pipeline 3673 among fixation kit 367, is used for the circulation of liquid;Hollow pipeline extends to outside, structure At a conducting orifice, conducting orifice is additionally operable to be connected with first connecting pipe 364 so that filter assemblies 361 are connected to water pump 362;
Filter 366 is engaged with fixation kit 367 by connecting ring set 368, using detachable connection method; Filter 366 can be to snap connection, be threadedly coupled with the connection type of fixation kit 367, convenient for being removed when later maintenance Filter clears up the impurity of aggregation;
Preferably, fixed arm 3672 includes centered on hollow pipeline 3673, it is symmetrically solid to both sides horizontal-extending first Fixed arm and the second fixed arm;
Preferably, being additionally provided with sealing structure in connection ring set 368, sealing structure can play the performance of sealing, make Filter 366 and fixation kit 367 connect even closer, prevent the condensate liquid filtered from leaking outside and unfiltered liquid Into in pipeline.
Fixed arm 3672 is fixed by the fixed structure that chassis is arranged, and fixed structure is located at 3672 length direction of fixed arm On both sides;The fixed structure of side is the first fixing piece 3693 on chassis, and the other side is the second fixing piece.
First fixing piece 3693 is a three-dimensional platform, and shape can be cuboid, bucking ladder or round platform, the first fixing piece 3693 wall surfaces towards 366 side of filter are equipped with a hollow out mouth, and hollow out mouth is used to accommodate the first fixation of fixed arm 3672 Arm;
Preferably, being additionally provided at least one arrived piece inside hollow out mouth, it is used to abut the first fixed arm, prevents first Fixed arm play along its length in hollow out mouth;
Preferably, the first fixing piece 3693 extends a groove body from top down, groove body is penetrated through with hollow out mouth, and slot is arranged Body clearly can observe whether the first fixed arm is installed in place during the installation process.
Preferably, the shape of hollow out mouth and the shape of the first fixed arm are adapted, and then reduce by the first fixed arm in hollow out Play in mouthful.
Second fixing piece consists of two parts, and a part is supporter 3692, and supporter 3692 is equipped with and fixed arm 3372 The adaptable openings of shape, openings can be open-topped groove, can also be the hollow out on 3692 wall surface of supporter The outside in channel, supporter 3692 is equipped with a card column 3691, and card column 3691 is elastic component, and the top of card column 3691 is equipped with a card Part;
The first fixed arm and the second fixed arm of fixed arm 3672 are each passed through the hollow out mouth and supporter of three-dimensional platform 3696 3692 openings, by the vertical direction of both the groove body bottom surface of three-dimensional platform 3696 and the openings bottom surface of supporter 3692 Support and card column 3691 fastener and groove body hollow out mouth top surface limit, fixed arm 3672 is fixed on to certain height Degree;
The arrived piece of three-dimensional platform 3693 and the wall surface of card column 3691 pass through three-dimensional platform respectively against the both ends of fixed arm 3672 Fixed arm 3672, is fixed on certain horizontal position by the restriction in the horizontal direction of 3696 3691 wall surface of arrived piece and card column;
Preferably, an inclined surface is provided on fastener, when installing filter assemblies 361, first by the of fixed arm 3672 One fixed arm is inserted into the hollow out mouth of three-dimensional platform 3696, and then presses down on the second fixed arm of fixed arm 3672, card column 3691 It is bent under the effect of elasticity to the direction far from filter assemblies 361, the second fixed arm will slide into along the inclined surface of fastener and support In the openings of body 3692, after being installed in place, card column 3691 is sprung back, and realizes the clamping to filter assemblies 361;In disassembly process, Card column 3691 is moved, can easily be taken out filter assemblies 361.
Fixed arm 3672 is fixed on certain position by fixed structure by the interaction force between all parts, and being can Separate structure, good fixing effect are easy for installation and removal.
Preferably, having screw hole in the two-arm of fixed arm 3672, fixed arm 3672 can be threadedly coupled by screw hole Mode fix.
Connection type between first connecting pipe 364 and filter assemblies 361 and the water inlet of water pump 362 is detachable Formula connects;Connection type between second connecting pipe 365 and the water outlet and draining mouth structure 363 of water pump 362 is detachable Formula connects;Above-mentioned detachable connection, such as can be connected by spiral, the elasticity of hose can also be utilized to realize socket, Pipeline is regularly cleared up when facilitating later maintenance, the impurity effect system gathered in pipeline after preventing prolonged liquid from flowing The work of system.
Embodiment seven
Mobile air-conditioner as described above, the present embodiment are different from place and are,
It includes mounting bracket 3610, water draining beak ontology 341 and the water cover 3611 for sealing, water draining beak to drain mouth structure 363 Ontology 341 is hollow structure, and water draining beak ontology 341 includes external water outlet 342, fixed plate 3613 and discharge outlet connector 3614, Second connecting pipe 365 is connect with discharge outlet connector 3614, and water cover 3611 is connect with external water outlet 342;
Preferably, the axis perpendicular of the plane of fixed plate 3613 and external water outlet 342, fixed water draining beak ontology 341;Discharge outlet connector 3614 is axial perpendicular with external water outlet 342, and discharge outlet connector 3614 and external water outlet 342 Intersection, internal run-through, joint face part uses arc-shaped structure, to seamlessly transit, the circulation of liquid, discharge outlet is convenient for connect First 3614 section radius is less than the section radius of external water outlet 342;The axis of the axis of discharge outlet connector and external water outlet Line is angled;
Preferably, water cover 3611 and the connection type of water draining beak ontology 341 are detachable connection, such as can be logical Threaded connection is crossed, when drainage system is not in the working condition under heating mode, water cover 3611 is connected with water draining beak ontology 341 It connects, prevents dust and other impurities from entering the operation of damage machine in machine, drainage system is in the working condition under heating mode When, remove water cover 3611 so that condensed water can be flowed out by draining mouth structure 363;
Preferably, draining mouth structure 363 is installed in the top of 361 top level of filter assemblies, 362 bottom end of water pump The discharge of liquid is convenient in the lower section of horizontal plane.
The fixed plate 3613 of water draining beak ontology 341 is equipped with a fixing groove 3615, and corresponding mounting bracket 3610 is equipped with one Mounting hole, at least a connection structure are fixedly connected through fixing groove 3615 with mounting hole;And be fixed fixed plate 3613, At least one location hole 3616 is additionally provided in fixed plate 3613, corresponding bottom case position is equipped at least one positioning region 3617; Positioning region 3617 passes through location hole 3616, water draining beak ontology 341 is stuck in certain height, preferably, mounting hole and fixing groove It can be connected through a screw thread, water draining beak ontology 341 is fixed;
Preferably, after discharge outlet connector 3614 is fixed on bottom case, compared to horizontal plane, 342 inner wall of external water outlet is downward It tilts, is convenient for the discharge of water.
Discharge outlet connector 3614, the water inlet of hollow pipeline 3673 and water pump 362, water outlet outer surface be wave Shape structure is conducive to improve the leakproofness of each interface and hose, while increasing friction force, prevents air-conditioning using wavy shaped configuration During device use, hose surprisingly falls off.
Water draining beak ontology 341 is both ends open and the hollow structure that both sides penetrate through;
342 water outlet bottom of external water outlet is equipped with a notch, and notch is recessed inwardly by water outlet bottom, is used for Water surface tension is destroyed, due to water surface tension so that the condensed water of accumulation blocks external water outlet 342, can not be successfully discharge, notch The condensed water gathered in ground end disk can be made efficiently to be discharged, residual is less, and the shape of notch can be semicircle, oval, and three Angular, polygon is trapezoidal.
It further includes an external Notched specimen 346 to drain mouth structure 363, and 346 1 side end face of external Notched specimen is provided with a socket Portion, socket part can be socketed on outside water draining beak, to which external Notched specimen 346 to be connect with external water outlet 342;It is external to lack A notch is provided on mouth part 346, notch far from one side end face of socket part by being recessed inwardly;
The connection type of socket part and external water outlet 342 is detachable so that the adaptability of external water outlet 342 More preferably, different external Notched specimens or different components can be socketed so that application is wider.
A diversion column 347 is additionally provided on external Notched specimen 346, diversion column 347 is triangular structure, in external notch After part 346 is socketed on external water outlet 342,347 first side of diversion column is bonded with 342 end face of external water outlet, diversion column 347 Second is sloped downwardly, and extends to the position of notch;Diversion column 347 can lead to the water of 342 end of external water outlet scarce To drip at mouthful.
On 342 outer wall of external water outlet, it is additionally provided with helicitic texture, it can be close by screw thread with water cover, it can also be used to connect Conduit pipe, helicitic texture is simple, and connection and sealing effect is good.
Under use state, the inner wall of external water outlet 342 is tilted down compared to horizontal plane, under the action of inclined-plane, liquid Body is easier to flow downward.
Embodiment eight
Mobile air-conditioner as described above, the present embodiment is different from place and is, in conjunction with shown in Figure 30, sink area At least one supporting rib 633 is provided in 322, supporting rib 633 is platy structure, is connected to the bottom of sink area 322;Support Muscle is used to support the condenser in portion placed thereon, while feed trough area 322 reserves the space of accommodating water, and supporting rib can Blocking hot wind is blown over from sink area 322, to make what hot wind more concentrated to blow on condenser, is reduced wind-force and is lost in.
There are gaps between adjacent supports muscle 633, form the drainage channel of intercommunication;Avoid the condensed water in sink area 322 Generate slough;The quantity of supporting rib 633 is depending on the size in 322 space of sink area.
Embodiment nine
Mobile air-conditioner as described above, the present embodiment are different from place and are, water retaining ribs 3926 are multiple water blocking The combination of muscle, including:First water retaining ribs 325, the second water retaining ribs 326, third water retaining ribs 327, fourth gear water muscle 328 and the 5th The height of water retaining ribs 329, water retaining ribs 3926 is sequentially increased along the flow of sink area 322 to the direction of suction zones 321, adjacent There are certain gap between water retaining ribs 3926, the bottom of the interface channel 3925 between adjacent water retaining ribs 3926 is provided with Discharge outlet, and the height of water retaining ribs 3926 is not higher than the top edge of interface channel 3925.The advantages of this arrangement are as follows On the one hand, the speed that ponding flows into suction zones 321 from sink area 322 can be slowed down, ponding is made to be not enough to overflow, on the other hand, It can be according to the suitable water retaining ribs of power selection height for wheel of fetching water.
Preferably, the top of water retaining ribs 3926 offers multiple notches 39261, reduce the tension of water when ponding covers, product Water is covered along notch 39261, the generation for the phenomenon that preventing the ponding covered simultaneously excessive and ponding is caused to overflow.Further , 39261 array distribution of notch is in the top of water retaining ribs 3926, undulate distribution.The advantages of this arrangement are as follows increasing Channel when ponding covers prevents notch 39261 very few, causes ponding that cannot timely overflow, the notch of array distribution, Ponding equilibrium can be made to cover water retaining ribs 3926, it is also possible to increase the aesthetics of structure.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention With within principle, any modification, equivalent replacement, improvement and so on should all be included in the protection scope of the present invention god.

Claims (10)

1. a kind of chassis structure, including:Suction zones (321), sink area (322), area of fetching water (330), water level control area (313), It is characterized in that, further including:
Water retaining ribs (3926), for the suction zones (321) to be isolated with the sink area (322);
Convergence portion (332) fetches water positioned at described between area (330) and the sink area (322), and close to the area of fetching water (330) convergence mouth (331);It is provided with supporting rib (633) in the sink area (322);
The bottom of the water level control area (313) is provided with water storage flume (3923), be provided with above the water storage flume (3923) to A few liquid-level switch;
The water of the sink area (322) is preferentially fetched water described in flow direction area (330), next flows to the suction zones (321), finally flows To the water level control area (313).
2. chassis structure according to claim 1, which is characterized in that the convergence portion (332) is high recessed of intermediate low surrounding Shape structure;The concave structure of the convergence portion (332) is composed of multiple convergence faces, and all convergence faces intersect at convergence Point (333).
3. chassis structure according to claim 1, which is characterized in that the suction zones (321) and the sink area (322) it Between be additionally provided with a connection channel (3925), the water retaining ribs (3926) are parallel to the cross section of the interface channel (3925) simultaneously It is set to the axial any position of the interface channel (3925).
4. chassis structure according to claim 1, which is characterized in that the convergence face is by being the convergence face one being obliquely installed (336), face two (337), convergence face three (338) are converged and converges that face four (339) are combined and spliced forms, between adjacent Mosaic face The angle that the number of degrees are 174 degree of -178 degree is presented.
5. chassis structure according to claim 4, which is characterized in that the convergence face one (336) and the convergence face three (338) inclined direction is tilted with the sink area (322) to the convergence portion (332) from high to low.
6. chassis structure according to claim 3, which is characterized in that the liquid-level switch, including:First order liquid-level switch (3921), the top of the first water storage flume (3947) is fixed in suspension, is carried out for the water level to first water storage flume (3947) Monitoring;The top of the second water storage flume (3948) is fixed in second level liquid-level switch (3922), suspension, for second water The water level of slot (3948) is monitored;When the water level of the first water storage flume (3947) water rises, the first order liquid level is opened When closing the float rising arrival level-one alert locations of (3921), level-one alarm signal is triggered;When second water storage flume (3948) When the water level of water rises, the float of the two level liquid-level switch (3942) floating reaches secondary alarm position, two level report is triggered Alert signal.
7. chassis structure according to claim 6, which is characterized in that first water storage flume (3947) and second water The depth of slot (3948) is different.
8. chassis structure according to claim 2, which is characterized in that the bottom setting of the suction zones (321) is fluted (323), the filter assemblies (361) being connected with water pump (362) are installed at the groove (323).
9. chassis structure according to claim 1, which is characterized in that the convergence portion (332) and the area of fetching water (330) it Between be provided with water bloking piece (335), the convergence portion (332) and the area of fetching water (330) are separated, the water bloking piece (335) is opened Equipped with convergence mouth (331), the convergence mouth (331) mutually staggers with the convergent point (333) position, to avoid ponding from institute It states convergent point (333) and flows directly into the area (330) of fetching water.
10. a kind of mobile air conditioner, which is characterized in that the mobile air conditioner includes the chassis structure of any of the above-described claim.
CN201810405093.4A 2018-04-28 2018-04-28 Chassis structure and mobile air conditioner with same Active CN108518838B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810405093.4A CN108518838B (en) 2018-04-28 2018-04-28 Chassis structure and mobile air conditioner with same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810405093.4A CN108518838B (en) 2018-04-28 2018-04-28 Chassis structure and mobile air conditioner with same

Publications (2)

Publication Number Publication Date
CN108518838A true CN108518838A (en) 2018-09-11
CN108518838B CN108518838B (en) 2024-02-02

Family

ID=63429743

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810405093.4A Active CN108518838B (en) 2018-04-28 2018-04-28 Chassis structure and mobile air conditioner with same

Country Status (1)

Country Link
CN (1) CN108518838B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109974275A (en) * 2019-04-30 2019-07-05 宁波奥克斯电气股份有限公司 A kind of air conditioner chassis structure and air conditioner
WO2020098678A1 (en) * 2018-11-13 2020-05-22 宁波奥克斯电气股份有限公司 Draining device and air conditioner
WO2020221251A1 (en) * 2019-04-30 2020-11-05 宁波奥克斯电气股份有限公司 Air conditioner bottom-tray structure and air conditioner
CN112484271A (en) * 2020-11-17 2021-03-12 珠海格力电器股份有限公司 Courtyard machine air conditioner control method and device and courtyard machine air conditioner

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004198068A (en) * 2002-12-20 2004-07-15 Fujitsu General Ltd Integral air-conditioner
CN201259299Y (en) * 2008-07-18 2009-06-17 广东志高空调有限公司 Self-vaporizing sprinkler for mobile air conditioner condensate water
CN104764095A (en) * 2015-03-27 2015-07-08 广东美的制冷设备有限公司 Integrated air conditioner and condensed water processing method for integrated air conditioner
CN106052075A (en) * 2016-05-30 2016-10-26 广东美的制冷设备有限公司 Air conditioner
CN106482234A (en) * 2016-10-31 2017-03-08 佛山市顺德区美的电子科技有限公司 The chassis assembly of mobile air-conditioner and the mobile air-conditioner with it
CN208154659U (en) * 2018-04-28 2018-11-27 奥克斯空调股份有限公司 A kind of chassis structure and the mobile air-conditioner with the structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004198068A (en) * 2002-12-20 2004-07-15 Fujitsu General Ltd Integral air-conditioner
CN201259299Y (en) * 2008-07-18 2009-06-17 广东志高空调有限公司 Self-vaporizing sprinkler for mobile air conditioner condensate water
CN104764095A (en) * 2015-03-27 2015-07-08 广东美的制冷设备有限公司 Integrated air conditioner and condensed water processing method for integrated air conditioner
CN106052075A (en) * 2016-05-30 2016-10-26 广东美的制冷设备有限公司 Air conditioner
CN106482234A (en) * 2016-10-31 2017-03-08 佛山市顺德区美的电子科技有限公司 The chassis assembly of mobile air-conditioner and the mobile air-conditioner with it
CN208154659U (en) * 2018-04-28 2018-11-27 奥克斯空调股份有限公司 A kind of chassis structure and the mobile air-conditioner with the structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020098678A1 (en) * 2018-11-13 2020-05-22 宁波奥克斯电气股份有限公司 Draining device and air conditioner
CN109974275A (en) * 2019-04-30 2019-07-05 宁波奥克斯电气股份有限公司 A kind of air conditioner chassis structure and air conditioner
WO2020221251A1 (en) * 2019-04-30 2020-11-05 宁波奥克斯电气股份有限公司 Air conditioner bottom-tray structure and air conditioner
CN112484271A (en) * 2020-11-17 2021-03-12 珠海格力电器股份有限公司 Courtyard machine air conditioner control method and device and courtyard machine air conditioner

Also Published As

Publication number Publication date
CN108518838B (en) 2024-02-02

Similar Documents

Publication Publication Date Title
CN108518838A (en) A kind of chassis structure and the mobile air-conditioner with the structure
CN108870551A (en) A kind of mobile air-conditioner
CN108344063A (en) A kind of mobile air-conditioner
CN108870552A (en) A kind of mobile air-conditioner
CN208419111U (en) A kind of liquid level prior-warning device and the mobile air-conditioner with the device
CN2844803Y (en) Ice machine
CN208154659U (en) A kind of chassis structure and the mobile air-conditioner with the structure
CN208398338U (en) A kind of multi-stage level switch and the mobile air-conditioner with the liquid-level switch
CN208398241U (en) A kind of mobile air-conditioner
CN208418995U (en) A kind of mobile air-conditioner
CN208266469U (en) A kind of washing tube and the washing machine with the washing tube
CN208154782U (en) A kind of water fetching structure and the chassis with the structure
CN208154779U (en) A kind of wheel construction and mobile air-conditioner with the structure of fetching water
CN208418994U (en) A kind of mobile air-conditioner
CN106196330A (en) Air purifier
CN106705402A (en) Split wall hanging internal unit condensed water draining structure
CN208998307U (en) One kind is fetched water area's guide structure and mobile air conditioner
CN208154780U (en) A kind of draining mouth structure and the mobile air-conditioner with the structure
CN208365788U (en) A kind of chassis structure and the mobile air-conditioner with the structure
CN208620446U (en) A kind of mobile air-conditioner
CN208620561U (en) A kind of discharge structure and the mobile air-conditioner with the structure
CN208566909U (en) A kind of area's guide structure and air conditioner with the structure of fetching water
CN208154772U (en) A kind of chassis structure and the mobile air-conditioner with the structure
CN109237630A (en) A kind of mobile air-conditioner
WO2001089664A1 (en) Air cleaner

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant