CN108508770A - A kind of energy source optimization system and method for rail traffic station - Google Patents

A kind of energy source optimization system and method for rail traffic station Download PDF

Info

Publication number
CN108508770A
CN108508770A CN201810350324.6A CN201810350324A CN108508770A CN 108508770 A CN108508770 A CN 108508770A CN 201810350324 A CN201810350324 A CN 201810350324A CN 108508770 A CN108508770 A CN 108508770A
Authority
CN
China
Prior art keywords
rail traffic
traffic station
station
electricity consumption
electrical equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810350324.6A
Other languages
Chinese (zh)
Other versions
CN108508770B (en
Inventor
曾博
吴颖锋
陈琼
谭卫军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU NIKEY ELECTRIC TECHNOLOGY Co Ltd
Original Assignee
GUANGZHOU NIKEY ELECTRIC TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU NIKEY ELECTRIC TECHNOLOGY Co Ltd filed Critical GUANGZHOU NIKEY ELECTRIC TECHNOLOGY Co Ltd
Priority to CN201810350324.6A priority Critical patent/CN108508770B/en
Publication of CN108508770A publication Critical patent/CN108508770A/en
Application granted granted Critical
Publication of CN108508770B publication Critical patent/CN108508770B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers

Abstract

A kind of energy source optimization system and method for rail traffic station, the energy source optimization system for realizing the electric energy optimizing at least one rail traffic station, including:Collecting device is acquired the electricity consumption data of rail traffic station, and it is uploaded to station end server, the electricity consumption data got is sent to the section Power Controller for managing the rail traffic station by end server of standing, so that section Power Controller realizes the electric energy optimizing to its managed rail traffic station.Implement the embodiment of the present invention, can realize the energy source optimization in rail traffic, improves energy utilization rate.

Description

A kind of energy source optimization system and method for rail traffic station
Technical field
The present invention relates to technical field of rail traffic, and in particular to a kind of energy source optimization system of rail traffic station and side Method.
Background technology
To alleviate traffic pressure, facilitate resident trip, each metropolitan rail traffic in China rapidly develops, and this rapid hair The rail traffic of exhibition is using huge energy expenditure as cost, for example, train and rail traffic station in rail traffic The electric quantity consumption of electrical equipment (headlamp, elevator, air-conditioning, rays safety detection apparatus etc.).Under the advocating of China's energy-saving and emission-reduction slogan, such as The energy in what optimization rail traffic, improving energy utilization rate becomes a urgent problem needed to be solved.
Invention content
The embodiment of the present invention discloses a kind of energy source optimization system and method for rail traffic station, can realize and hand over track Energy source optimization in logical improves energy utilization rate.
First aspect of the embodiment of the present invention discloses a kind of energy source optimization system of rail traffic station, the energy source optimization system System is for realizing the electric energy optimizing at least one rail traffic station, which is characterized in that the energy source optimization system includes:Peace The section controlling electric energy of collecting device, stand end server and each section electric energy of management loaded on each rail traffic station Device, each section include at least one rail traffic station, wherein:
The collecting device is carried out for the electrical equipment to each rail traffic station or the electricity consumption data with electrical circuit Acquisition, and the electricity consumption data is sent to station end server;
Station end server, for obtaining the electricity consumption data from the collecting device and store, and by the use Electric data are sent to the section Power Controller;
The section Power Controller, each track is handed at least one rail traffic station for being managed according to it The electricity consumption data at station of being open to traffic optimizes the electric energy of at least one rail traffic station.
As an alternative embodiment, in first aspect of the embodiment of the present invention, the collecting device is used for every The electrical equipment of one rail traffic station is acquired with the electricity consumption data of electrical circuit, and the electricity consumption data is sent to institute State station end server mode be specially:
The collecting device, for electrical equipment connected to it in each rail traffic station or with electrical circuit Electricity consumption data is acquired, and target frequency bands are randomly choosed from unauthorized frequency range, and will be described by the target frequency bands Electricity consumption data is sent to station end server.
As an alternative embodiment, in first aspect of the embodiment of the present invention, the electricity consumption data includes at least The electricity consumption electric energy of the regenerative braking electric energy of braking train and electrical equipment, the section at least one rail traffic station The electricity consumption of each rail traffic station at least one rail traffic station that Power Controller is used to be managed according to it The mode that data optimize the electric energy of at least one rail traffic station is specially:
The section Power Controller, each track is handed at least one rail traffic station for being managed according to it Be open to traffic station the electricity consumption data to the train regenerative braking electric energy and electrical equipment at least one rail traffic station Electricity consumption electric energy optimize.
As an alternative embodiment, in first aspect of the embodiment of the present invention, the section Power Controller is used In at least one rail traffic station managed according to it the electricity consumption data of each rail traffic station to it is described extremely Lacking the mode that the train regenerative braking electric energy in a rail traffic station optimizes is specially:
The section Power Controller, each track is handed at least one rail traffic station for being managed according to it The electricity consumption data at station of being open to traffic counts train regenerative braking electric energy at least one rail traffic station, and searches Traction consuming electric power at least one rail traffic station in addition to braking train when other train operations, and will be described Traction consuming electric power at least one rail traffic station in addition to braking train when other train operations, which is superimposed, always to be drawn Consuming electric power, and train regenerative braking electric energy at least one rail traffic station are more than total traction consuming electric power When electric energy more than needed is distributed to other trains at least one rail traffic station in addition to braking train, wherein institute It is train regenerative braking electric energy and the total traction consuming electric power at least one rail traffic station to state electric energy more than needed Difference.
As an alternative embodiment, in first aspect of the embodiment of the present invention, the section Power Controller is used Have in the mode that electric energy more than needed is distributed to other trains at least one rail traffic station in addition to braking train Body is:
The section Power Controller is handed over for electric energy more than needed to be distributed at least one track according to preset rules The other trains being open to traffic in station in addition to braking train, to improve other trains in addition to braking train in a certain fixation The coasting duration of the speed of service and extension other trains in addition to braking train in period, and removed described in record The coasting duration of other trains except braking train;Wherein, the preset rules are used to indicate described in addition to braking train Other trains in each train to the accounting of the electric energy more than needed.
As an alternative embodiment, in first aspect of the embodiment of the present invention, in the section Power Controller It is stored with the facility information of each electrical equipment at least one rail traffic station, the facility information at least wraps The Station XXX and the device numbering in affiliated rail traffic station for including the affiliated rail traffic station of electrical equipment, the section The electricity consumption of each rail traffic station at least one rail traffic station that Power Controller is used to be managed according to it The mode that data optimize the electricity consumption electric energy of the electrical equipment at least one rail traffic station is specially:
The section Power Controller, each track is handed at least one rail traffic station for being managed according to it The electricity consumption data at station of being open to traffic is identified in electrical equipment at least one rail traffic station and is used with the presence or absence of abnormal The practical electricity consumption of electric equipment, the abnormal electrical equipment at least one rail traffic station is more than its preset electricity consumption; And according to the practical electricity consumption of the abnormal electrical equipment at least one rail traffic station from pre-stored a variety of Pre- examine determines that the target of the abnormal electrical equipment at least one rail traffic station is examined scheme and exported in advance in scheme So that user checks.
As an alternative embodiment, in first aspect of the embodiment of the present invention, the energy source optimization system is also wrapped It includes:
Center management server, at least one track managed for obtaining at least one section Power Controller The facility information and target of abnormal electrical equipment in traffic station examine scheme in advance, and obtain at least one rail traffic The coasting duration of other trains in station in addition to braking train.
As an alternative embodiment, in first aspect of the embodiment of the present invention, the center management server, also For recording abnormal electrical equipment at least one rail traffic station that each section Power Controller is managed Target examine the rate of adopting of scheme in advance, and receive the institute input by user managed for each section Power Controller State at least one rail traffic station the diagnosis scheme of abnormal electrical equipment, and by each section Power Controller institute The diagnosis scheme of abnormal electrical equipment is sent to corresponding section electric energy control at least one rail traffic station of management Device processed.
As an alternative embodiment, in first aspect of the embodiment of the present invention, the section Power Controller, also Diagnosis for receiving abnormal electrical equipment at least one rail traffic station that the center management server is sent Scheme, and according to the diagnosis scheme of abnormal electrical equipment at least one rail traffic station received to it is described extremely The scheme of examining is updated optimization to the target of abnormal electrical equipment in advance in a few rail traffic station.
Second aspect of the embodiment of the present invention discloses a kind of energy source optimization method of rail traffic station, and it is real to be applied to the present invention In the energy source optimization system for applying the rail traffic station disclosed in a first aspect, the energy source optimization system is for realizing right The electric energy optimizing of at least one rail traffic station, the method includes:
Electrical equipment of the collecting device to each rail traffic station or the electricity consumption data with electrical circuit are acquired, and will The electricity consumption data is sent to station end server;
The station end server obtains the electricity consumption data from the collecting device and stores, and by the electricity consumption data It is sent to section Power Controller;
Each rail vehicle at least one rail traffic station that the section Power Controller is managed according to it The electricity consumption data stood optimizes the electric energy of at least one rail traffic station.
Compared with prior art, the embodiment of the present invention has the advantages that:
In the embodiment of the present invention, collecting device is acquired the electricity consumption data of rail traffic station, and is uploaded to station end The electricity consumption data got is sent to the section Power Controller for managing the rail traffic station by server, end server of standing, So that section Power Controller realizes the electric energy optimizing to its managed rail traffic station.As it can be seen that excellent by implementing the energy Change system, user (such as administrative staff) can utilize section Power Controller to realize at least one rail traffic managed it The energy source optimization at station, this fining, intelligent and synthesization energy source optimization can effectively improve energy utilization rate.
Description of the drawings
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to needed in the embodiment Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for ability For the those of ordinary skill of domain, without creative efforts, it can also be obtained according to these attached drawings other attached Figure.
Fig. 1 is a kind of network architecture diagram of the energy source optimization system of rail traffic station disclosed by the embodiments of the present invention;
Fig. 2 is a kind of system schematic of the energy source optimization system of rail traffic station disclosed by the embodiments of the present invention;
Fig. 3 is the system schematic of the energy source optimization system of another rail traffic station disclosed by the embodiments of the present invention;
Fig. 4 is a kind of flow diagram of the energy source optimization method of rail traffic station disclosed by the embodiments of the present invention.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiment is only a part of the embodiment of the present invention, instead of all the embodiments.Based on this Embodiment in invention, every other reality obtained by those of ordinary skill in the art without making creative efforts Example is applied, shall fall within the protection scope of the present invention.
It should be noted that the term " comprising " and " having " in the embodiment of the present invention and attached drawing and their any changes Shape, it is intended that cover and non-exclusive include.Such as contain the process of series of steps or unit, method, system, product or Equipment is not limited to the step of having listed or unit, but further includes the steps that optionally not listing or unit or optional Ground further includes for the intrinsic other steps of these processes, method, product or equipment or unit.
The embodiment of the present invention discloses a kind of energy source optimization system and method for rail traffic station, can realize rail traffic In energy source optimization, improve energy utilization rate.It is described in detail separately below.
Embodiment one
Referring to Fig. 1, Fig. 1 is a kind of network of the energy source optimization system of rail traffic station disclosed by the embodiments of the present invention Organization Chart.It should be noted that the energy source optimization system is for realizing the energy source optimization at least one rail traffic station, figure 1 is only introduced with rail traffic station 1 and rail traffic station 2 for example:Rail traffic station 1 and rail traffic station 2 In collecting device connect respectively with corresponding station end server network by ad hoc network mode, 1 He of rail traffic station The station end server of rail traffic station 2 is connect with section Power Controller respectively, and section Power Controller is for managing track The electric energy of traffic station 1 and rail traffic station 2, the section Power Controller access in the dry net of rail traffic.It needs to illustrate It is to be connected using ad hoc network mode in each rail traffic station, can ensures high efficiency, real-time and the safety of data acquisition Property.
Referring to Fig. 2, Fig. 2 is a kind of system of the energy source optimization system of rail traffic station disclosed by the embodiments of the present invention Schematic diagram.The schematic diagram of the electric energy management system includes the collecting device 10 for being installed on each rail traffic station, end of standing services The section Power Controller 30 of device 20 and each section electric energy of management.Wherein, equipment involved by the energy source optimization system Concrete function is described as follows:
Collecting device 10, for each rail traffic station electrical equipment or adopted with the electricity consumption data of electrical circuit Collection, and collected electricity consumption data is sent to station end server 20.
It should be noted that collecting device 10 may include mainly the power information acquisition of various models in the embodiment of the present invention Equipment, it is relatively common such as NEMU-IP-E power information collecting device, NEMU-IP-1001+ power information collecting device, NEMU-M- 4001 power information collecting devices and NEMU-S-4001 power information collecting devices etc..Wherein, the work of most power information collecting devices It is 85~265VAC/DC to make voltage, and humidity is %5RH~%100RH, and temperature is -10 DEG C~70 DEG C, and power consumption is less than or equal to 5W, and ICP/IP protocol, multi-function watt-hour meter communication protocol and Modbus communications protocol can be followed, it is seen that most power information Requirement of the collecting device for mounting condition is not especially high, can be installed in the rail traffic station of a variety of environment, in addition, Some power information collecting devices it is small, light-weight, can effectively improve the space availability ratio in rail traffic station.
As an alternative embodiment, in embodiments of the present invention, collecting device 10 is used for each rail traffic The electrical equipment at station is acquired with the electricity consumption data of electrical circuit, and collected electricity consumption data is sent to the service of station end The mode of device 20 is specifically as follows:Collecting device 10, for electrical equipment connected to it in each rail traffic station or The electricity consumption data of person's electrical circuit is acquired, and target frequency bands are randomly choosed from unauthorized frequency range, and passes through the target Electricity consumption data is sent to station end server 20 by frequency range.
It stands end server 20, for obtaining electricity consumption data from collecting device 10 and store, and electricity consumption data is sent to Section Power Controller 30.
Section Power Controller 30, each rail traffic at least one rail traffic station for being managed according to it The electricity consumption data at station optimizes the electric energy of at least one rail traffic station.
It should be noted that any rail vehicle that station end server 20 can be managed by section Power Controller 30 The station end server stood, the embodiment of the present invention do not limit.
In embodiments of the present invention, in above-mentioned at least one rail traffic station each rail traffic station electricity consumption data At least may include the regenerative braking electric energy of braking train at least one rail traffic station and the electricity consumption electric energy of electrical equipment, So, each rail traffic station at least one rail traffic station that section Power Controller 30 is used to be managed according to it Electricity consumption data mode that the electric energy of at least one rail traffic station is optimized be specifically as follows:Section Power Controller 30, the electricity consumption data of each rail traffic station is at least one at least one rail traffic station for being managed according to it The electricity consumption electric energy of train regenerative braking electric energy and electrical equipment in a rail traffic station optimizes.
In view of the constituent for referring to electricity consumption data in the above embodiment, then collecting device 10 can be default with first Frequency acquisition is acquired the regenerative braking electric energy of braking train at least one rail traffic station, and default with second Frequency acquisition is acquired the electricity consumption electric energy of electrical equipment at least one rail traffic station.Wherein, the first default acquisition Frequency can need self-defining or setting by user according to frequency acquisition, further, it is also possible to which the transmission of collecting device 10 is arranged The period of electricity consumption data and condition, with triggering collection equipment 10 in the set period or while reaching set condition is complete At transmission, for example, the first default frequency acquisition of collecting device 10 is 1ms, i.e., primary every 1ms acquisitions, the second default acquisition Frequency is 0.5ms, i.e., primary every 0.5ms acquisitions, and electricity consumption data is sent to station end server 20 by completion in 3s.It is optional , it may include active and passive that electricity consumption data is sent to station end server 20 by collecting device 10, or actively and passively mixing etc. Sending method, the embodiment of the present invention do not limit, and electricity consumption data is sent to station end by collecting device 10 using active sending method The mode of server 20 can be:When collecting device 10 detects that current time meets sending cycle or sends condition, will use Electric data are sent to station end server 20.Electricity consumption data is sent to station end server 20 by collecting device 10 using passive mode Mode can be:When collecting device 10 detects that current time meets sending cycle or sends condition, detect whether to receive Enabled instruction is sent, when detection receives above-mentioned transmission enabled instruction, then electricity consumption data is sent to station end server 20, In, above-mentioned transmission enabled instruction can directly be triggered on collecting device 10 by user, can also be sent out by response station end server 20 The request triggering sent, the embodiment of the present invention do not limit.
It is further alternative, at least one rail traffic station that section Power Controller 30 is used to be managed according to it The electricity consumption data of each rail traffic station optimizes the train regenerative braking electric energy at least one rail traffic station Mode be specifically as follows:Section Power Controller 30, it is every at least one rail traffic station for being managed according to it The electricity consumption data of one rail traffic station counts the train regenerative braking electric energy at least one rail traffic station, and searches Traction consuming electric power at least one rail traffic station in addition to braking train when other train operations, and will be at least one Traction consuming electric power in rail traffic station in addition to braking train when other train operations is superimposed to obtain total traction consuming electric power, with And the train regenerative braking electric energy at least one rail traffic station distributes electric energy more than needed more than when always drawing consuming electric power To other trains at least one rail traffic station in addition to braking train, wherein electric energy more than needed is at least one track The difference of train regenerative braking electric energy and total traction consuming electric power in traffic station.
Wherein, section Power Controller 30 is used to distribute to electric energy more than needed at least one rail traffic station except braking The mode of other trains except train is specifically as follows:Section Power Controller 30 is used for electric energy more than needed according to default rule Other trains in addition to braking train at least one rail traffic station are then distributed to, to improve in addition to braking train The coasting duration of the speed of service and extension other trains except braking train in addition to of other trains in a certain fixed time period, And record the coasting duration of other trains in addition to braking train;Wherein, which is used to indicate except braking train Except other trains in each train to the accounting of the electric energy more than needed.
It should be noted that in embodiments of the present invention, in order to ensure that section Power Controller 30 is managed at least one The electric energy fair relatively more than needed that a rail traffic station is assigned to, above-mentioned preset rules can be, its in addition to braking train Each train in its train is identical to the accounting of the electric energy more than needed, is handed over for example, section Power Controller 30 manages 6 tracks Be open to traffic station, there is the train braking of 2 rail traffic stations in this 6 rail traffic stations, cause to generate enough one it is non-brake The electric energy more than needed of train coasting 20 minutes, section Power Controller 30 are more than needed by enough one non-brake train coasting 20 minutes Electric energy is averagely allocated to the non-brake train of remaining 4 rail traffic station, so that remaining 4 rail traffic station is non-brake Train can possess 5 minutes coasting durations respectively.Above-mentioned preset rules can also be a certain fixed time period inner section electric energy The coasting duration that each rail traffic station is possessed at least one rail traffic station that controller 30 is managed is identical, should A certain fixed time period can be two hours, one day, one month, a season or 1 year etc., and the embodiment of the present invention is not done It limits.
In embodiments of the present invention, above-mentioned at least one rail traffic station can be stored in section Power Controller 30 The facility information of each interior electrical equipment, the facility information at least may include the affiliated rail traffic station of electrical equipment Station XXX and the device numbering in affiliated rail traffic station, then, above-mentioned section Power Controller 30 is used for according to it The electricity consumption data of each rail traffic station is to above-mentioned at least one rail at least one rail traffic station managed The mode that the electricity consumption electric energy of electrical equipment in road traffic station optimizes is specifically as follows:Section Power Controller 30 is used The electricity consumption data identification of each rail traffic station is above-mentioned at least at least one rail traffic station managed according to it With the presence or absence of abnormal electrical equipment in electrical equipment in one rail traffic station, in above-mentioned at least one rail traffic station Abnormal electrical equipment practical electricity consumption be more than its preset electricity consumption;And according in above-mentioned at least one rail traffic station The practical electricity consumption of abnormal electrical equipment determine that above-mentioned at least one track is handed in scheme from pre-stored a variety of pre- examine The target for the abnormal electrical equipment in station that is open to traffic is examined scheme and is exported so that user checks in advance.
Incorporated by reference to Fig. 2, advanced optimize to obtain energy source optimization system as shown in Figure 3 on the basis of Fig. 2, the energy is excellent Change system can also include:
Center management server 40, for obtain at least one section Power Controller 30 managed it is above-mentioned at least one The facility information and target of abnormal electrical equipment in rail traffic station examine scheme in advance, and obtain at least one rail traffic The coasting duration of other trains in station in addition to braking train.
It is done on the net it should be noted that center management server 40 can access rail traffic station, it in this way can be square Just the energy of all rail traffic stations to accessing the Rail traffic network is managed and optimizes.
In embodiments of the present invention, center management server 40 can be also used for recording each section Power Controller 30 The target of abnormal electrical equipment examines the rate of adopting of scheme in advance in the above-mentioned at least one rail traffic station managed, and receives Abnormal electricity consumption in the above-mentioned at least one rail traffic station input by user managed for each section Power Controller 30 It is different in the diagnosis scheme of equipment, and above-mentioned at least one rail traffic station that each section Power Controller 30 is managed The diagnosis scheme of common electric equipment is sent to corresponding section Power Controller 30.
Section Power Controller 30 is additionally operable to receive above-mentioned at least one rail traffic that center management server 40 is sent The diagnosis scheme of abnormal electrical equipment in station, and used extremely according in the above-mentioned at least one rail traffic station received The diagnosis scheme of electric equipment is examined scheme to the target of abnormal electrical equipment in above-mentioned at least one rail traffic station and is carried out more in advance New optimization.
In embodiments of the present invention, section Power Controller 30 is used for according to the above-mentioned at least one rail traffic received The diagnosis scheme of abnormal electrical equipment is pre- to the target of abnormal electrical equipment in above-mentioned at least one rail traffic station in station The mode that the scheme of examining is updated optimization can be specially:Section Power Controller 30, for judge to receive it is above-mentioned at least In one rail traffic station the diagnosis scheme of abnormal electrical equipment whether with it is abnormal in above-mentioned at least one rail traffic station It is identical that the target of electrical equipment examines scheme in advance;And the diagnosis when abnormal electrical equipment in above-mentioned at least one rail traffic station The target of abnormal electrical equipment is when the scheme of examining differs in advance in scheme and above-mentioned at least one rail traffic station, using it is above-mentioned extremely The diagnosis scheme of abnormal electrical equipment is replaced abnormal in above-mentioned at least one rail traffic station in a few rail traffic station The target of electrical equipment examines scheme in advance.
As an alternative embodiment, in embodiments of the present invention, which can also include:
It stands end client, for accessing station end server 20, according to the electricity consumption data got to station 20 institute of end server The operating status of electrical equipment of rail traffic station analyzed, to realize to the real-time of electrical equipment operating status Monitoring and abnormity early warning.Wherein, end client of standing can be based on client/server (Client/Server, C/S) framework , it not only can ensure the safety of data, can also be relatively easy to realize multilayer certification, station end visitor can also be improved The response speed at family end.
Centre management client is inquired each section Power Controller 30 and is managed for accessing center management server 40 What the target of abnormal electrical equipment examined scheme in advance in above-mentioned at least one rail traffic station of reason adopts rate and user's input The above-mentioned at least one rail traffic station managed for each section Power Controller 30 in abnormal electrical equipment examine Disconnected scheme.In embodiments of the present invention, centre management client can be based on browser/server (Browser/Server, B/S) framework, centre management client may not need installation specific program, has stronger interactivity, can also reduce upgrading Cost needed for centre management client 40 and workload.
By implementing above system, user can manage it by the realization of section Power Controller 30 at least one The electric energy optimizing of rail traffic station can also pass through operation of the end client to electrical equipment in any rail traffic station of standing Situation is monitored in real time, can also pass through central server 40 or each section controlling electric energy of centre management client query The target of abnormal electrical equipment examines the rate of adopting of scheme in advance in above-mentioned at least one rail traffic station that device 30 is managed, and Abnormal electricity consumption in the above-mentioned at least one rail traffic station input by user managed for each section Power Controller 30 The diagnosis scheme of equipment.This fining, intelligent and synthesization energy source optimization system can effectively improve energy utilization rate.
Embodiment two
Referring to Fig. 4, Fig. 4 is a kind of flow of the energy source optimization method of rail traffic station disclosed by the embodiments of the present invention Schematic diagram.The energy source optimization method can be applied in the energy source optimization system described in embodiment one, for the energy source optimization side Connection type in method between involved each equipment is referred to the description of embodiment one, and details are not described herein.The track The energy source optimization method of traffic station may include:
401, electrical equipment of the collecting device to each rail traffic station or the electricity consumption data with electrical circuit are acquired, And the electricity consumption data is sent to station end server.
As an alternative embodiment, in embodiments of the present invention, collecting device is to each rail traffic station Electrical equipment is acquired with the electricity consumption data of electrical circuit, and collected electricity consumption data is sent to station end server can be with Including:Collecting device is carried out to electrical equipment connected to it in each rail traffic station or with the electricity consumption data of electrical circuit Acquisition, and target frequency bands are randomly choosed from unauthorized frequency range, and electricity consumption data is sent to station end by the target frequency bands Server.
402, end server of standing obtains electricity consumption data from above-mentioned collecting device and stores, and the electricity consumption data that will be got It is sent to section Power Controller.
403, each rail vehicle at least one rail traffic station that section Power Controller is managed according to it The electricity consumption data stood optimizes the electric energy of at least one rail traffic station.
It should be noted that any rail traffic station that station end server can be managed by section Power Controller It stands end server, the embodiment of the present invention does not limit.
In embodiments of the present invention, in above-mentioned at least one rail traffic station each rail traffic station electricity consumption data The electricity consumption electric energy of regenerative braking electric energy and electrical equipment including at least braking train at least one rail traffic station, that , the electricity consumption number of each rail traffic station at least one rail traffic station that section Power Controller is managed according to it It is optimized according to the electric energy at least one rail traffic station and may include:Section Power Controller according to its managed to The electricity consumption data of each rail traffic station is to the train at least one rail traffic station in a few rail traffic station Regenerative braking electric energy and the electricity consumption electric energy of electrical equipment optimize.
It should be noted that in view of the constituent of above-mentioned electricity consumption data, related collecting device acquires the detailed of electricity consumption data Thin description please refers to embodiment one, and the embodiment of the present invention repeats no more.
It is further alternative, each rail at least one rail traffic station that section Power Controller is managed according to it The electricity consumption data of road traffic station is optimized and can be wrapped to the train regenerative braking electric energy at least one rail traffic station It includes:The electricity consumption number of each rail traffic station at least one rail traffic station that section Power Controller is managed according to it Train regenerative braking electric energy at least one rail traffic station according to statistics, and search at least one rail traffic station Traction consuming electric power in addition to braking train when other train operations, and braking row will be removed at least one rail traffic station Traction consuming electric power except vehicle when other train operations is superimposed to obtain total traction consuming electric power, and at least one rail vehicle Electric energy more than needed is distributed at least one rail traffic station when train regenerative braking electric energy in standing is more than total traction consuming electric power Interior other trains in addition to braking train, wherein electric energy more than needed is the train regeneration system at least one rail traffic station The difference of electrokinetic energy and total traction consuming electric power.
Wherein, section Power Controller by electric energy more than needed distribute at least one rail traffic station except braking train it Outer other trains may include:Electric energy more than needed is distributed at least one track according to preset rules and handed over by section Power Controller The other trains being open to traffic in station in addition to braking train, to improve other trains in addition to braking train in a certain set time The coasting duration of other trains of the speed of service and extension in addition to braking train in section, and record is in addition to braking train Other trains coasting duration;Wherein, which is used to indicate each in other trains in addition to braking train Accounting of the train to the electric energy more than needed.Wherein, embodiment one, the embodiment of the present invention are please referred to for the introduction of the preset rules It repeats no more.
In embodiments of the present invention, it can be stored in section Power Controller in above-mentioned at least one rail traffic station Each electrical equipment facility information, which at least may include the vehicle of the affiliated rail traffic station of electrical equipment Stand number and the device numbering in affiliated rail traffic station, then, what above-mentioned section Power Controller was managed according to it The electricity consumption data of each rail traffic station is to above-mentioned at least one rail vehicle at least one rail traffic station The electricity consumption electric energy of electrical equipment in standing, which optimizes, may include:Section Power Controller is managed at least one according to it The electricity consumption data of each rail traffic station identifies the electricity consumption in above-mentioned at least one rail traffic station in rail traffic station It whether there is abnormal electrical equipment, the practical electricity consumption of the abnormal electrical equipment in above-mentioned at least one rail traffic station in equipment Amount is more than its preset electricity consumption;And the practical electricity consumption according to the abnormal electrical equipment in above-mentioned at least one rail traffic station Amount determines the abnormal electrical equipment in above-mentioned at least one rail traffic station from pre-stored a variety of pre- examine in scheme Target is examined scheme and is exported so that user checks in advance.
Optionally, which can also include:
Center management server obtains above-mentioned at least one rail traffic that at least one section Power Controller is managed The facility information and target of abnormal electrical equipment in station examine scheme in advance, and obtain and removed at least one rail traffic station The coasting duration of other trains except braking train.
In embodiments of the present invention, center management server can also record each section Power Controller managed it is upper The target for stating abnormal electrical equipment at least one rail traffic station examines the rate of adopting of scheme in advance, and receives input by user The diagnosis side of abnormal electrical equipment in the above-mentioned at least one rail traffic station managed for each section Power Controller Case, and abnormal electrical equipment in above-mentioned at least one rail traffic station that each section Power Controller is managed is examined Disconnected scheme is sent to corresponding section Power Controller.
Section Power Controller can also receive above-mentioned at least one rail traffic station of center management server transmission The diagnosis scheme of middle exception electrical equipment, and set according to abnormal electricity consumption in the above-mentioned at least one rail traffic station received Standby diagnosis scheme to the target of abnormal electrical equipment in above-mentioned at least one rail traffic station in advance the scheme of examining be updated it is excellent Change.
It should be noted that section Power Controller is to abnormal electrical equipment in above-mentioned at least one rail traffic station The scheme of examining is updated the specific implementation mode of optimization to target in advance, please refers to the description in embodiment one, the embodiment of the present invention is not It repeats again.
As an alternative embodiment, in embodiments of the present invention, which can also include:
End client of standing accesses station end server, is handed over the track where the end server of station according to the electricity consumption data got The operating status of electrical equipment at station of being open to traffic is analyzed, to realize real-time monitoring to electrical equipment operating status and extremely Early warning.
Centre management client accesses center management server, inquire that each section Power Controller managed it is above-mentioned extremely In a few rail traffic station target of abnormal electrical equipment examine in advance scheme adopt rate and it is input by user for each The diagnosis scheme of abnormal electrical equipment in above-mentioned at least one rail traffic station that section Power Controller is managed.
By the implementation above method, the electric energy optimizing at least one rail traffic station may be implemented, it can also be to appointing The operating condition of electrical equipment in one rail traffic station is monitored in real time, can also inquire each section Power Controller What the target of abnormal electrical equipment examined scheme in advance in the above-mentioned at least one rail traffic station managed adopts rate and user Abnormal electrical equipment in the above-mentioned at least one rail traffic station of input managed for each section Power Controller Diagnosis scheme.This fining, intelligent and synthesization energy source optimization method can effectively improve energy utilization rate.
One of ordinary skill in the art will appreciate that all or part of step in the various methods of above-described embodiment is can It is completed with instructing relevant hardware by program, which can be stored in a computer readable storage medium, storage Medium include read-only memory (Read-Only Memory, ROM), random access memory (Random Access Memory, RAM), programmable read only memory (Programmable Read-only Memory, PROM), erasable programmable is read-only deposits Reservoir (Erasable Programmable Read Only Memory, EPROM), disposable programmable read-only memory (One- Time Programmable Read-Only Memory, OTPROM), the electronics formula of erasing can make carbon copies read-only memory (Electrically-Erasable Programmable Read-Only Memory, EEPROM), CD-ROM (Compact Disc Read-Only Memory, CD-ROM) or other disk storages, magnetic disk storage, magnetic tape storage or can Any other computer-readable medium for carrying or storing data.
A kind of energy source optimization system and method for rail traffic station disclosed by the embodiments of the present invention has been carried out in detail above Thin to introduce, principle and implementation of the present invention are described for specific case used herein, and above-mentioned specific case The size of middle step number is not meant to the inevitable priority of execution sequence, and the execution sequence of each process should be with its function and inherence Logic determines that the implementation process of the embodiments of the invention shall not be constituted with any limitation.The above-mentioned list illustrated as separating component Member may or may not be physically separated, and can select according to the actual needs some or all of wherein unit and come It achieves the purpose of the solution of this embodiment.
Character "/" herein, it is a kind of relationship of "or" to typically represent forward-backward correlation object.In reality provided by the present invention It applies in example, it should be appreciated that " B corresponding with A " indicates that B is associated with A, and B can be determined according to A.It is also to be understood that determining B according to A It is not meant to determine B only according to A, can also determine B according to A and/or other information.Technical scheme of the present invention is substantially The part that contributes to existing technology or the technical solution is all or part of in other words, can be with the shape of software product Formula embodies, which is stored in a memory, including several requests are used so that a computer Equipment (can be personal computer, server or network equipment etc., can be specifically the processor in computer equipment) is held Some or all of each embodiment above method of row present invention step.
The explanation of above example is only intended to facilitate the understanding of the method and its core concept of the invention;Meanwhile for this The those skilled in the art in field, according to the thought of the present invention, there will be changes in the specific implementation manner and application range, In conclusion the content of the present specification should not be construed as limiting the invention.

Claims (10)

1. a kind of energy source optimization system of rail traffic station, the energy source optimization system is handed over for realizing at least one track Be open to traffic the electric energy optimizing at station, which is characterized in that the energy source optimization system includes:It is installed on the acquisition of each rail traffic station The section Power Controller of equipment, stand end server and each section electric energy of management, each section includes at least one Rail traffic station, wherein:
The collecting device, for each rail traffic station electrical equipment or adopted with the electricity consumption data of electrical circuit Collection, and the electricity consumption data is sent to station end server;
Station end server, for obtaining the electricity consumption data from the collecting device and store, and by the electricity consumption number According to being sent to the section Power Controller;
The section Power Controller, each rail vehicle at least one rail traffic station for being managed according to it The electricity consumption data stood optimizes the electric energy of at least one rail traffic station.
2. energy source optimization system according to claim 1, which is characterized in that the collecting device is used to hand over each track Be open to traffic station electrical equipment or be acquired with the electricity consumption data of electrical circuit, and the electricity consumption data is sent to the station end and is taken Business device mode be specially:
The collecting device, for electrical equipment connected to it in each rail traffic station or with the electricity consumption of electrical circuit Data are acquired, and target frequency bands are randomly choosed from unauthorized frequency range, and by the target frequency bands by the electricity consumption Data are sent to station end server.
3. energy source optimization system according to claim 1 or 2, which is characterized in that the electricity consumption data includes at least described The electricity consumption electric energy of the regenerative braking electric energy of braking train and electrical equipment at least one rail traffic station, the section electric energy The electricity consumption data of each rail traffic station at least one rail traffic station that controller is used to be managed according to it The mode optimized to the electric energy of at least one rail traffic station is specially:
The section Power Controller, each rail vehicle at least one rail traffic station for being managed according to it Use of the electricity consumption data stood to train regenerative braking electric energy and electrical equipment at least one rail traffic station Electric energy optimizes.
4. energy source optimization system according to claim 3, which is characterized in that the section Power Controller is used for according to it The electricity consumption data of each rail traffic station is at least one rail at least one rail traffic station managed The mode that train regenerative braking electric energy in road traffic station optimizes is specially:
The section Power Controller, each rail vehicle at least one rail traffic station for being managed according to it The electricity consumption data stood counts the train regenerative braking electric energy at least one rail traffic station, and described in lookup Traction consuming electric power at least one rail traffic station in addition to braking train when other train operations, and by described at least Traction consuming electric power in one rail traffic station in addition to braking train when other train operations is superimposed to obtain total traction power consumption Can, and general when train regenerative braking electric energy at least one rail traffic station is more than total traction consuming electric power Electric energy more than needed distributes to other trains in addition to braking train at least one rail traffic station, wherein the richness Remaining electric energy is the difference of the train regenerative braking electric energy and total traction consuming electric power at least one rail traffic station.
5. energy source optimization system according to claim 4, which is characterized in that the section Power Controller will be for that will have more than needed The mode that electric energy distributes to other trains in addition to braking train at least one rail traffic station is specially:
The section Power Controller, for electric energy more than needed to be distributed at least one rail vehicle according to preset rules Other trains in standing in addition to braking train, to improve other trains in addition to braking train in a certain set time The coasting duration of the speed of service and extension other trains in addition to braking train in section, and described remove of record are braked The coasting duration of other trains except train;Wherein, the preset rules are used to indicate its in addition to braking train The accounting of each train in its train to the electric energy more than needed.
6. energy source optimization system according to claim 5, is characterized in that, it is stored in the section Power Controller described The facility information of each electrical equipment at least one rail traffic station, the facility information include at least electrical equipment The Station XXX of affiliated rail traffic station and the device numbering in affiliated rail traffic station, the section Power Controller The electricity consumption data of each rail traffic station is to described at least one rail traffic station for being managed according to it The mode that the electricity consumption electric energy of electrical equipment at least one rail traffic station optimizes is specially:
The section Power Controller, each rail vehicle at least one rail traffic station for being managed according to it The electricity consumption data stood is identified in the electrical equipment at least one rail traffic station and is set with the presence or absence of abnormal electricity consumption Standby, the practical electricity consumption of the abnormal electrical equipment at least one rail traffic station is more than its preset electricity consumption;And It a variety of pre- is examined from pre-stored according to the practical electricity consumption of the abnormal electrical equipment at least one rail traffic station Determined in scheme the target of the abnormal electrical equipment at least one rail traffic station examine in advance scheme and export for User checks.
7. energy source optimization system according to claim 6, which is characterized in that the energy source optimization system further includes:
Center management server, at least one rail traffic managed for obtaining at least one section Power Controller The facility information and target of abnormal electrical equipment in station examine scheme in advance, and obtain at least one rail traffic station In other trains in addition to braking train coasting duration.
8. energy source optimization system according to claim 7, which is characterized in that the center management server is additionally operable to remember Record the target of abnormal electrical equipment at least one rail traffic station that each section Power Controller is managed The pre- rate of adopting for examining scheme, and receive it is input by user for each section Power Controller managed it is described at least The diagnosis scheme of abnormal electrical equipment in one rail traffic station, and each section Power Controller is managed The diagnosis scheme of abnormal electrical equipment is sent to corresponding section Power Controller at least one rail traffic station.
9. energy source optimization system according to claim 8, which is characterized in that the section Power Controller is additionally operable to connect The diagnosis scheme for receiving abnormal electrical equipment at least one rail traffic station that the center management server is sent, with And according to the diagnosis scheme of abnormal electrical equipment at least one rail traffic station received to described at least one The scheme of examining is updated optimization to the target of abnormal electrical equipment in advance in rail traffic station.
10. a kind of energy source optimization method of rail traffic station, which is characterized in that be applied to described in any one of claim 1 to 9 Rail traffic station energy source optimization system in, the energy source optimization system is for realizing at least one rail traffic station Electric energy optimizing, the method includes:
Electrical equipment of the collecting device to each rail traffic station or the electricity consumption data with electrical circuit are acquired, and will be described Electricity consumption data is sent to station end server;
The station end server obtains the electricity consumption data from the collecting device and stores, and the electricity consumption data is sent Give section Power Controller;
Each rail traffic station at least one rail traffic station that the section Power Controller is managed according to it The electricity consumption data optimizes the electric energy of at least one rail traffic station.
CN201810350324.6A 2018-04-18 2018-04-18 Energy optimization system and method for rail transit station Active CN108508770B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810350324.6A CN108508770B (en) 2018-04-18 2018-04-18 Energy optimization system and method for rail transit station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810350324.6A CN108508770B (en) 2018-04-18 2018-04-18 Energy optimization system and method for rail transit station

Publications (2)

Publication Number Publication Date
CN108508770A true CN108508770A (en) 2018-09-07
CN108508770B CN108508770B (en) 2020-04-10

Family

ID=63382422

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810350324.6A Active CN108508770B (en) 2018-04-18 2018-04-18 Energy optimization system and method for rail transit station

Country Status (1)

Country Link
CN (1) CN108508770B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103915900A (en) * 2014-04-18 2014-07-09 上海电科智能系统股份有限公司 Rail transit power monitoring direct current load monitoring method
CN103913630A (en) * 2014-04-18 2014-07-09 上海电科智能系统股份有限公司 Centralized electric energy measuring and energy consumption analyzing system for rail transit
CN104242454A (en) * 2014-09-24 2014-12-24 刘瑞 Power monitoring system of rail transit power supply system
CN104238531A (en) * 2014-10-17 2014-12-24 成都四为电子信息股份有限公司 Railway station energy management system and energy-saving control method
CN104260759A (en) * 2014-10-08 2015-01-07 北京交通大学 Method and system for optimizing energy conservation of urban rail transit
WO2017021095A1 (en) * 2015-07-31 2017-02-09 Siemens Aktiengesellschaft Method for optimizing the travel plot for rail vehicles
CN107239874A (en) * 2017-04-26 2017-10-10 广西电网有限责任公司电力科学研究院 A kind of quality of power supply and energy-saving analysis system towards track traffic

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103915900A (en) * 2014-04-18 2014-07-09 上海电科智能系统股份有限公司 Rail transit power monitoring direct current load monitoring method
CN103913630A (en) * 2014-04-18 2014-07-09 上海电科智能系统股份有限公司 Centralized electric energy measuring and energy consumption analyzing system for rail transit
CN104242454A (en) * 2014-09-24 2014-12-24 刘瑞 Power monitoring system of rail transit power supply system
CN104260759A (en) * 2014-10-08 2015-01-07 北京交通大学 Method and system for optimizing energy conservation of urban rail transit
CN104238531A (en) * 2014-10-17 2014-12-24 成都四为电子信息股份有限公司 Railway station energy management system and energy-saving control method
WO2017021095A1 (en) * 2015-07-31 2017-02-09 Siemens Aktiengesellschaft Method for optimizing the travel plot for rail vehicles
CN107239874A (en) * 2017-04-26 2017-10-10 广西电网有限责任公司电力科学研究院 A kind of quality of power supply and energy-saving analysis system towards track traffic

Also Published As

Publication number Publication date
CN108508770B (en) 2020-04-10

Similar Documents

Publication Publication Date Title
CN103312836B (en) A kind of large-scale local network ip address management method
RU2446610C2 (en) Stream-oriented setup for working in amr/ami-service networks
CN104394366B (en) The method and system of distributed video streaming media transcoding access control
DE112012004330T5 (en) Monitor and control multiple units
CN103888443B (en) The method and multi-protocol analysis system of a kind of multi-protocol analysis
CN105812480B (en) A kind of intelligence bulk grain transportation vehicle long-distance management device and its management method
CN105812190B (en) A kind of network address controller method of FT server blade system
CN106304396A (en) The method of access point discovery wireless controller, system and relevant apparatus
DE102013203101A1 (en) Extend the attributes of a credential request
EP3195552A1 (en) Device and method for administering a network
DE102006062244B4 (en) Method for reading out data from the memory of a cooking appliance and cooking appliance for carrying out such a method
CN102017546B (en) Discontinuous access management method using waiting ticket for resource allocation control, waiting ticket management method, and resource allocation control method
CN108921954A (en) Internet of Things banister management method, banister control panel, cloud platform and storage medium
CN104618522B (en) The method and Ethernet access equipment that IP address of terminal automatically updates
CN107770010A (en) A kind of home intranet method and home networking system based on OpenFlow
CN101741925A (en) Method for allocating access addresses and access equipment
EP1909433A4 (en) A method and system for realizing the access management of the network devices
CN108508770A (en) A kind of energy source optimization system and method for rail traffic station
CN107295101A (en) Air cleaning centralized control system
CN106034162B (en) Maintaining method, system and the device of aircraft airborne equipment
CN109003432A (en) Information copy reading method based on power-line carrier communication system
CN108389387A (en) A kind of shared public bicycles intelligent dispatching method and system
CN108429641A (en) A kind of network device management method and device
WO2018224277A1 (en) Data protection configuration for electronic devices in a network
CN108010381A (en) A kind of method on the parking stall of opening and shares at times based on ground lock

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: An energy optimization system and method for rail transit station

Effective date of registration: 20210112

Granted publication date: 20200410

Pledgee: Daxin sub branch of Bank of Guangzhou Co.,Ltd.

Pledgor: GUANGZHOU NIKEY ELECTRIC TECHNOLOGY Co.,Ltd.

Registration number: Y2021440000008

PE01 Entry into force of the registration of the contract for pledge of patent right
PP01 Preservation of patent right

Effective date of registration: 20240123

Granted publication date: 20200410

PP01 Preservation of patent right