CN108506735A - A kind of coking waste gas recovery governing system - Google Patents

A kind of coking waste gas recovery governing system Download PDF

Info

Publication number
CN108506735A
CN108506735A CN201810581061.XA CN201810581061A CN108506735A CN 108506735 A CN108506735 A CN 108506735A CN 201810581061 A CN201810581061 A CN 201810581061A CN 108506735 A CN108506735 A CN 108506735A
Authority
CN
China
Prior art keywords
pressure
valve
waste gas
storage tank
gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810581061.XA
Other languages
Chinese (zh)
Other versions
CN108506735B (en
Inventor
方文新
陈泉明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI MEISHAN INDUSTRY CIVIL ENGINEERING DESIGN RESEARCH INSTITUTE Co Ltd
Original Assignee
SHANGHAI MEISHAN INDUSTRY CIVIL ENGINEERING DESIGN RESEARCH INSTITUTE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI MEISHAN INDUSTRY CIVIL ENGINEERING DESIGN RESEARCH INSTITUTE Co Ltd filed Critical SHANGHAI MEISHAN INDUSTRY CIVIL ENGINEERING DESIGN RESEARCH INSTITUTE Co Ltd
Priority to CN201810581061.XA priority Critical patent/CN108506735B/en
Publication of CN108506735A publication Critical patent/CN108506735A/en
Application granted granted Critical
Publication of CN108506735B publication Critical patent/CN108506735B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D3/00Arrangements for supervising or controlling working operations
    • F17D3/01Arrangements for supervising or controlling working operations for controlling, signalling, or supervising the conveyance of a product
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D1/00Pipe-line systems
    • F17D1/02Pipe-line systems for gases or vapours
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17DPIPE-LINE SYSTEMS; PIPE-LINES
    • F17D3/00Arrangements for supervising or controlling working operations
    • F17D3/14Arrangements for supervising or controlling working operations for eliminating water

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Processing Of Solid Wastes (AREA)
  • Treating Waste Gases (AREA)
  • Sampling And Sample Adjustment (AREA)

Abstract

The present invention relates to a kind of coking waste gas recovery governing systems, including several storage tanks and gas sampling pipeline, and waste gas exhaust pipe is connected between the storage tank and gas sampling pipeline.The coking waste gas recovery governing system further includes nitrogen stabilization pressure device, groove top safety device, and exhaust gas pressure regulating device, groove top pressure monitoring device and manifold oxygen contents are monitored on-line and quick cutting device.The present invention realizes the hermetic reclaim of exhaust gas in the storage tank of coking region;By being accurately controlled to each storage tank, energy consumption is significantly reduced;Solve exhaust gas in slot existing for existing collection system mutually to go here and there, lack the problems such as necessary on-line monitoring facility, it is ensured that storage tank, waste gas collecting system safety, so that exhaust gas in the storage tank of coking region has been obtained safe and effective improvement.

Description

A kind of coking waste gas recovery governing system
Technical field
The present invention relates to a kind of coking waste gas recovery governing systems, belong to coking waste gas recovery Treatment process field.
Background technology
The coal gas dispatch of coking region is largely used to the storage tank of storage material with being equipped in purification process.Object in these storage tanks Material has stronger volatility at the storage temperature, has a certain amount of exhaust gas effusion.These exhaust gas have it is inflammable, explosive, have It is malicious, irritant, be corrosive, complicated component the features such as, more serious pollution, Er Qieyan can be not only caused to atmospheric environment Ghost image rings the physical and mental health of worker.
In the prior art, coking zone off gas mostly directly puts idle discharge by storage tank floss hole.Even if exhaust gas is arranged Collection processing system implementing is also only that simply the Waste gas outlet of each storage tank is connected, and is carried out in exhaust gas supervisor end simple Pressure control after be introduced directly into coal gas system.The problem of gas sampling processing system is primarily present has:1, due to each storage tank The series connection of all kinds of storage tanks is simply carried out gas sampling and easily caused respectively by the difference of interior storage material variety, characteristic and storage temperature Exhaust gas is mutually gone here and there in storage tank, or even causes the major industrial accidents such as fire, explosion;2, no oxygen content of waste gas on-line monitoring is set It applies, oxygen content of waste gas can not be measured in real time, exhaust gas can in the presence of what is exploded when oxygen content reaches a certain level in exhaust gas Can, and coal gas dispatch system oxygen content can be adversely affected, or even coal gas dispatch system electric fishing chaser is caused, influence coal The normal production of gas refining system;3, control pressurer system is too simple coarse, not enough precisely, and is arranged without storage tank pressure detecting It applies, be easy to cause storage tank and inhale flat or be split up.
Invention content
Technical problem to be solved by the present invention lies in a kind of coking waste gas recovery governing system is provided, can combine all kinds of Coking exhaust gas is safely and effectively introduced coal gas negative pressure system by the operating condition of storage tank.
To solve the above-mentioned problems, the technical solution adopted by the present invention is as follows:
A kind of coking waste gas recovery governing system, including several storage tanks and gas sampling pipeline, the storage tank and exhaust gas are received Waste gas exhaust pipe is connected between collection pipeline, the coking waste gas recovery governing system further includes nitrogen stabilization pressure device, groove top peace Full device, exhaust gas pressure regulating device, groove top pressure monitoring device and manifold oxygen contents on-line monitoring and quick cutting device,
The nitrogen stabilization pressure device includes the nitrogen inlet duct being connected between nitrogen supervisor and storage tank, the nitrogen air inlet First shut-off valve, the first regulating valve, site pressure table and first pressure remote transmitter, first regulating valve are installed on pipe It is mutually chain with first pressure remote transmitter,
The groove top safety device includes the deadweight safety valve and breather valve being mounted at the top of storage tank, the breather valve and storage It is connected by pipeline between slot,
The exhaust gas pressure regulating device include be mounted on the waste gas exhaust pipe on the second regulating valve and butterfly valve, it is described One end of waste gas exhaust pipe is connected on pipeline, and the other end is connected with gas sampling pipeline,
The groove top pressure monitoring device includes second pressure remote transmitter, the second pressure remote transmitter and Two regulating valves are mutually chain,
The manifold oxygen contents on-line monitoring and quick cutting device include the oxygen content being mounted on gas sampling pipeline On-line computing model, third regulating valve, third pressure remote transmitter, gate valve and desorption tube, the third regulating valve and third Pressure remote transmitter is mutually chain, and fast cut valve is equipped on the desorption tube, and gate valve is mounted on desorption tube and coal gas negative pressure system Between.
Further, it further includes steamtraced piping, and the steamtraced piping is divided into three tunnels, the first via and breather valve One end is connected, and the other end of breather valve is connected with condensate drain, and steam enters condensate liquid after breather valve and is discharged Guan Zhong;Waste gas exhaust pipe setting is close on second tunnel of steamtraced piping, and the setting of gas sampling pipeline is close on third road, described cold The tail end of drip pipe and the tail end on the second tunnel, third road are separately installed with steam trap.
Further, it further includes hot ammonium hydroxide delivery pipe, and number is connected between the hot ammonium hydroxide delivery pipe and gas sampling pipeline The water inlet pipe of root is equipped with third shut-off valve on the water inlet pipe.
Further, the quantity of the breather valve is two.
The function and principle of each device are as follows in the present invention:
Nitrogen stabilization pressure device:When being less than setting value when pressure declines in storage tank, the first regulating valve is opened, and nitrogen is by nitrogen Supervisor injects nitrogen into slot through nitrogen inlet duct, and storage tank is made to be in slight positive pressure state, avoids entering air in storage tank or be inhaled The generation of flat equal damages.
Groove top safety device:When system jam, air is filled into storage tank or breathes out exhaust gas outward, it is ensured that storage tank Interior pressure is in safe range always, prevents the influence to production system.
Groove top pressure monitoring device:For being monitored in real time to groove top pressure;
Exhaust gas pressure regulating device:Control is adjusted to storage tank exhaust gas discharge pressure, the of exhaust gas pressure regulating device Two regulating valves and the second pressure remote transmitter of groove top pressure monitoring device are mutually chain, when pressure is higher than setting pressure in slot When, the second regulating valve is gradually opened is discharged gas by waste gas exhaust pipe to gas sampling pipeline.When pressure is less than setting in slot The second regulating valve is in full-shut position when pressure, can mutually be gone here and there to avoid exhaust gas in each storage tank.
Manifold oxygen contents are monitored on-line and quick cutting device:Oxygen content on-line computing model is in real time to the oxygen content in exhaust gas It is monitored, when oxygen content exceeds setting value, the second shut-off valve quickly cuts off the exhaust gas that exhaust gas is delivered to coal gas refining system Pipeline, the fast cut valve on desorption tube are opened, and exhaust gas changes to be discharged by desorption tube.
Steamtraced piping and hot ammonium hydroxide delivery pipe:It can prevent the impurity such as naphthalene, tar from condensing.If there is condensate liquid generation, The condensate drain and steam trap that can be arranged by system drain into specified underground tank.
Compared with prior art, the beneficial effects of the present invention are:
1, the hermetic reclaim for realizing exhaust gas in the storage tank of coking region, so that exhaust gas has been obtained safety has Effect is administered.
2, the automatic collection for realizing coking region storage tank exhaust gas is administered, and manpower and materials are reduced.
3, each storage tank is accurately controlled, to make the storage tank most of the time not generate " breathing ", can be effectively subtracted The magnitude of recruitment of few nitrogen, is greatly reduced energy consumption.
4, it solves exhaust gas in slot existing for existing collection system mutually to go here and there, lack the problems such as necessary on-line monitoring facility, Ensure the safety of storage tank, waste gas collecting system, at the same also eliminate oxygen content coal gas refining system is normally produced it is unfavorable It influences.
5, the occurrence of impurity such as naphthalene, tar in coking exhaust gas can be effectively prevent easily to crystallize, reduce line clogging, drop The workload of low maintenance repair and maintenance.
Description of the drawings
Fig. 1 is the flow sheet of one embodiment of the present invention.
Fig. 2 is the enlarged drawing of box part A in Fig. 1.
Fig. 3 is the enlarged drawing of box part B in Fig. 1.
Fig. 4 is the enlarged drawing of manifold oxygen contents on-line monitoring and quick cutting device 6 in the present invention.
Specific implementation mode
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.According to following explanation, originally The purpose, technical scheme and advantage of invention will be apparent from.It should be noted that described embodiment is the preferred of the present invention Embodiment, instead of all the embodiments.
In conjunction with shown in Fig. 1, a kind of coking waste gas recovery governing system, including several storage tanks 1 and gas sampling pipeline 4a, nitrogen Gas stable-pressure device 2, groove top safety device 3, exhaust gas pressure regulating device 4, groove top pressure monitoring device 5 and manifold oxygen contents are online Monitoring and quick cutting device 6, waste gas exhaust pipe 4b is connected between the storage tank 1 and gas sampling pipeline 4a.
In conjunction with Fig. 2 and Fig. 3, the nitrogen stabilization pressure device 2 include be connected to nitrogen supervisor 2a and storage tank between nitrogen into First shut-off valve 2c, the first regulating valve 2d, the pressures of site pressure table 2e and first are installed on tracheae 2b, the nitrogen inlet duct 2b Power remote transmitter 2f, the first regulating valve 2d and first pressure remote transmitter 2f phases are chain.
The groove top safety device 3 includes the deadweight safety valve 3a and breather valve 3b being mounted at the top of storage tank, the breathing It is connected by pipeline 3c between valve and storage tank.
The exhaust gas pressure regulating device 4 includes the second regulating valve 4c and butterfly valve being mounted on the waste gas exhaust pipe 4b One end of 4d, the waste gas exhaust pipe 4b are connected on pipeline 3c, and the other end is connected with gas sampling pipeline 4a.
The groove top pressure monitoring device 5 includes second pressure remote transmitter 5a, the second pressure remote transmitter 5a and the second regulating valve 4c phases are chain.
In conjunction with shown in Fig. 4, the manifold oxygen contents on-line monitoring and quick cutting device 6 include being mounted on gas sampling pipe Oxygen content on-line computing model 6a, third regulating valve 6b, third pressure remote transmitter 6c, gate valve 6d on road 4a and desorption tube 13, the third regulating valve 6b and third pressure remote transmitter 6c phases are chain, and fast cut valve 14 is equipped on the desorption tube 13, The gate valve 6d is mounted between desorption tube 13 and coal gas negative pressure system 7.In coal gas negative pressure system, 7a is coal gas primary cooler, 7b is direct-cooled tower, and 7c is gas-fog separator, and 7d is turnover panel, and 7e is gas-blowing engine.
Combined with Figure 1 and Figure 2, the invention also includes steamtraced piping 8, the steamtraced piping 8 divides for two-way, and first Road 8a is connected with one end of breather valve 3b, and the other end of breather valve 3b is connected with condensate drain 11, and steam is by exhaling Enter in condensate drain 11 after inhaling valve, the second road 8b of steamtraced piping 8 is close to waste gas exhaust pipe 4b settings, third road 8c is close to the tail end difference of the 4a settings of gas sampling pipeline, the tail end of the condensate drain and the second road 8b, third road 8c Steam trap 12 is installed.
The invention also includes hot ammonium hydroxide delivery pipe 9, number is connected between the hot ammonium hydroxide delivery pipe 9 and gas sampling pipeline 4a The water inlet pipe 10 of root is equipped with third shut-off valve 9a on the water inlet pipe 10.
The function and principle of each device are as follows in the present invention:
Nitrogen stabilization pressure device:When being less than setting value when pressure declines in storage tank, the first regulating valve is opened, and nitrogen is by nitrogen Supervisor injects nitrogen into slot through nitrogen inlet duct, and storage tank is made to be in slight positive pressure state, avoids entering air in storage tank or be inhaled The generation of flat equal damages.
Groove top safety device:When system jam, air is filled into storage tank or breathes out exhaust gas outward, it is ensured that storage tank Interior pressure is in safe range always, prevents the influence to production system.
Groove top pressure monitoring device:For being monitored in real time to groove top pressure;
Exhaust gas pressure regulating device:Control is adjusted to storage tank exhaust gas discharge pressure, the of exhaust gas pressure regulating device Two regulating valves and the second pressure remote transmitter of groove top pressure monitoring device are mutually chain, when pressure is higher than setting pressure in slot When, the second regulating valve is gradually opened is discharged gas by waste gas exhaust pipe to gas sampling pipeline.When pressure is less than setting in slot The second regulating valve is in full-shut position when pressure, can mutually be gone here and there to avoid exhaust gas in each storage tank.
Manifold oxygen contents are monitored on-line and quick cutting device:Oxygen content on-line computing model is in real time to the oxygen content in exhaust gas It is monitored, when oxygen content exceeds setting value, the second shut-off valve quickly cuts off the exhaust gas that exhaust gas is delivered to coal gas refining system Pipeline, the fast cut valve on desorption tube are opened, and exhaust gas changes to be discharged by desorption tube.
Steamtraced piping and hot ammonium hydroxide delivery pipe:It can prevent the impurity such as naphthalene, tar from condensing.If there is condensate liquid generation, The condensate drain and steam trap that can be arranged by system drain into specified underground tank.
The above is only the description explanation of the preferred embodiment of the present invention, and not limiting the scope of the present invention, shows So, any technical person familiar with the field is based on above-described embodiment, can readily occur in replacement or variation to obtain other implementations Example, these are covered by the protection scope of the present invention.

Claims (4)

1. a kind of coking waste gas recovery governing system, including several storage tanks (1) and gas sampling pipeline (4a), the storage tank (1) Waste gas exhaust pipe (4b) is connected between gas sampling pipeline (4a), it is characterised in that:
The coking waste gas recovery governing system further includes nitrogen stabilization pressure device (2), groove top safety device (3), exhaust gas pressure tune Regulating device (4), groove top pressure monitoring device (5) and manifold oxygen contents on-line monitoring and quick cutting device (6),
The nitrogen stabilization pressure device (2) includes the nitrogen inlet duct (2b) for being connected to nitrogen supervisor (2a) between storage tank, described First shut-off valve (2c), the first regulating valve (2d), site pressure table (2e) and first pressure are installed on nitrogen inlet duct (2b) Remote transmitter (2f), first regulating valve (2d) and first pressure remote transmitter (2f) are mutually chain,
The groove top safety device (3) includes the deadweight safety valve (3a) and breather valve (3b) being mounted at the top of storage tank, described to exhale It inhales and is connected by pipeline (3c) between valve and storage tank,
The exhaust gas pressure regulating device (4) includes the second regulating valve (4c) being mounted on the waste gas exhaust pipe (4b) and butterfly One end of valve (4d), the waste gas exhaust pipe (4b) is connected on pipeline (3c), and the other end is connected with gas sampling pipeline (4a) It connects,
The groove top pressure monitoring device (5) includes second pressure remote transmitter (5a), the second pressure remote transmitter (5a) and the second regulating valve (4c) are mutually chain,
The manifold oxygen contents on-line monitoring and quick cutting device (6) include that the oxygen being mounted on gas sampling pipeline (4a) contains Measure on-line computing model (6a), third regulating valve (6b), third pressure remote transmitter (6c), gate valve (6d) and desorption tube (13), the third regulating valve (6b) and third pressure remote transmitter (6c) are mutually chain, are equipped on the desorption tube (13) Fast cut valve (14), the gate valve (6d) are mounted between desorption tube (13) and coal gas negative pressure system (7).
2. coking waste gas recovery governing system according to claim 1, it is characterised in that:
It further includes steamtraced piping (8), and the steamtraced piping (8) is divided into three tunnels, the first via (8a) and breather valve The one end of (3b) is connected, and the other end of breather valve (3b) is connected with condensate drain (11), and steam is after breather valve Into in condensate drain (11), waste gas exhaust pipe (4b) setting, third are close in the second tunnel (8b) of steamtraced piping (8) It is close to gas sampling pipeline (4a) setting, the tail end of the condensate drain and the second tunnel (8b), third road (8c) in road (8c) Tail end be separately installed with steam trap (12).
3. coking waste gas recovery governing system according to claim 1, it is characterised in that:
It further includes hot ammonium hydroxide delivery pipe (9), is connected between the hot ammonium hydroxide delivery pipe (9) and gas sampling pipeline (4a) several Water inlet pipe (10), third shut-off valve (9a) is installed on the water inlet pipe (10).
4. coking waste gas recovery governing system according to claim 1, it is characterised in that:
The quantity of the breather valve (3b) is two.
CN201810581061.XA 2018-06-07 2018-06-07 Coking waste gas recovery and treatment system Active CN108506735B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810581061.XA CN108506735B (en) 2018-06-07 2018-06-07 Coking waste gas recovery and treatment system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810581061.XA CN108506735B (en) 2018-06-07 2018-06-07 Coking waste gas recovery and treatment system

Publications (2)

Publication Number Publication Date
CN108506735A true CN108506735A (en) 2018-09-07
CN108506735B CN108506735B (en) 2023-06-27

Family

ID=63402787

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810581061.XA Active CN108506735B (en) 2018-06-07 2018-06-07 Coking waste gas recovery and treatment system

Country Status (1)

Country Link
CN (1) CN108506735B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109316893A (en) * 2018-12-03 2019-02-12 河北格源环保科技有限公司 A kind of cold bulging volatilization gas zero-emission negative pressure recovery system
CN109847546A (en) * 2019-02-15 2019-06-07 邢台恒禄科技有限公司 A kind of environmental protection zero-emission tail gas treatment process
CN111120858A (en) * 2019-11-25 2020-05-08 宣化钢铁集团有限责任公司 Exhaust gas recovery control system and control method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104003419A (en) * 2014-06-16 2014-08-27 武汉钢铁(集团)公司 Device and method for recycling waste ammonia gas in arsenic coking process
CN104359005A (en) * 2014-11-10 2015-02-18 河南中鸿集团煤化有限公司 Automatic recycling device for discharged gas
CN204563939U (en) * 2015-04-14 2015-08-19 天津华能能源设备有限公司 Coke oven flue gas denitration desulfurization and UTILIZATION OF VESIDUAL HEAT IN integration system
KR101591190B1 (en) * 2014-07-30 2016-02-04 두산엔진주식회사 Exhaust gas purification device
CN207076326U (en) * 2017-12-28 2018-03-09 中机国能炼化工程有限公司 A kind of VOCs gas devices for recycling fixed roof tank discharge
CN207085625U (en) * 2017-06-14 2018-03-13 唐山钢铁集团有限责任公司 A kind of coking device for recovering tail gas of achievable zero-emission

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104003419A (en) * 2014-06-16 2014-08-27 武汉钢铁(集团)公司 Device and method for recycling waste ammonia gas in arsenic coking process
KR101591190B1 (en) * 2014-07-30 2016-02-04 두산엔진주식회사 Exhaust gas purification device
CN104359005A (en) * 2014-11-10 2015-02-18 河南中鸿集团煤化有限公司 Automatic recycling device for discharged gas
CN204563939U (en) * 2015-04-14 2015-08-19 天津华能能源设备有限公司 Coke oven flue gas denitration desulfurization and UTILIZATION OF VESIDUAL HEAT IN integration system
CN207085625U (en) * 2017-06-14 2018-03-13 唐山钢铁集团有限责任公司 A kind of coking device for recovering tail gas of achievable zero-emission
CN207076326U (en) * 2017-12-28 2018-03-09 中机国能炼化工程有限公司 A kind of VOCs gas devices for recycling fixed roof tank discharge

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109316893A (en) * 2018-12-03 2019-02-12 河北格源环保科技有限公司 A kind of cold bulging volatilization gas zero-emission negative pressure recovery system
CN109316893B (en) * 2018-12-03 2023-11-24 河北格源环保科技有限公司 Cold drum volatile gas zero release negative pressure recovery system
CN109847546A (en) * 2019-02-15 2019-06-07 邢台恒禄科技有限公司 A kind of environmental protection zero-emission tail gas treatment process
CN109847546B (en) * 2019-02-15 2021-07-27 邢台恒禄科技有限公司 Environment-friendly zero-emission tail gas treatment process
CN111120858A (en) * 2019-11-25 2020-05-08 宣化钢铁集团有限责任公司 Exhaust gas recovery control system and control method thereof

Also Published As

Publication number Publication date
CN108506735B (en) 2023-06-27

Similar Documents

Publication Publication Date Title
CN108506735A (en) A kind of coking waste gas recovery governing system
CN103691290B (en) A kind of cement furnace SNCR flue gas denitrification system improving denitration security
CN110160065B (en) Method for system for safely collecting and discharging low-pressure gas from storage tank VOCs
CN108792336B (en) Autonomous respiration zero-emission system of nitrogen sealed storage tank and treatment method
CN108328144B (en) Oil gas recovery system of storage tank and nitrogen sealing process
CN208311960U (en) A kind of coking waste gas recovery governing system
CN208382184U (en) A kind of VOCs waste-gas burning system
CN205235693U (en) Organic waste gas recycling processed system
CN110143379B (en) Safety device of low-pressure gas system for discharging VOCs (volatile organic compounds) from storage tank
CN111174221B (en) Multi-region escaping gas treatment system
CN213983002U (en) VOCs self-adaptation intelligence conveyor
CN109308082B (en) Safety control method for VOCs in released gas in low-temperature plasma treatment sewage collection, storage and treatment links
CN104848033A (en) Alkane storage tank protection method
CN215215763U (en) Recovery processing device of coke oven gas clean system tail gas
CN110203573B (en) Method for collecting volatile organic compounds of oil product storage tank
CN104960809A (en) Oil product storage tank protection method
CN105737517A (en) Method and device for purifying oil storage tank discharge gas
CN104843379A (en) Method for preventing gas-phase blasting of organic alcohol storage tanks and reducing volatile matter discharge
CN104760957B (en) The gas recovery system of silicon carbide smelting technique
CN203663694U (en) Cement kiln SNCR flue gas denitration system for improving denitration security
CN212417524U (en) Epoxypropane acidizing tail gas safety processing system
CN207071291U (en) A kind of automatic control system of waste gas tower exhaust-gas treatment
CN104828420A (en) Organic aldehyde storage tank protecting method
CN220852173U (en) Aniline VOCs tail gas treatment device
CN101457274B (en) Explosion suppression system and method applied to steel converter gas recovery

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant