CN108505812A - A kind of communication pole of integrated multi-operator easy to repair - Google Patents

A kind of communication pole of integrated multi-operator easy to repair Download PDF

Info

Publication number
CN108505812A
CN108505812A CN201810344300.XA CN201810344300A CN108505812A CN 108505812 A CN108505812 A CN 108505812A CN 201810344300 A CN201810344300 A CN 201810344300A CN 108505812 A CN108505812 A CN 108505812A
Authority
CN
China
Prior art keywords
lifting unit
main rod
rod body
communication pole
integrated multi
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810344300.XA
Other languages
Chinese (zh)
Inventor
赵鹏
肖雄
郎宏科
杨冕
李刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Energy Investment Refco Group Ltd
Original Assignee
Sichuan Energy Investment Refco Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Energy Investment Refco Group Ltd filed Critical Sichuan Energy Investment Refco Group Ltd
Priority to CN201810344300.XA priority Critical patent/CN108505812A/en
Publication of CN108505812A publication Critical patent/CN108505812A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/18Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures movable or with movable sections, e.g. rotatable or telescopic

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The present invention relates to communication pole field, especially a kind of communication pole of integrated multi-operator easy to repair comprising:Main rod body;Lifting unit, the lifting unit are installed in the main rod body, and can be lifted along main rod body;The lifting unit quantity is three or more and can individually be lifted, it is mounted on RRU on single lifting unit, and the antenna connected with RRU, the goal of the invention of the present invention be to provide a kind of reduction feeder line bending or deposition path it is longer caused by the low influence of transmittability, antenna can still use during declining when safeguarding antenna, reduce the loss at feeder line and antenna docking, multiple operator's antennas and mutually interference-free can be set simultaneously, the communication pole for the integrated multi-operator easy to repair for playing good protection when later maintenance is also convenient for and safeguards in the case of multiple operator's antennas to the equipment of non-present operator is set simultaneously.

Description

A kind of communication pole of integrated multi-operator easy to repair
Technical field
The present invention relates to communication pole field, especially a kind of communication pole of integrated multi-operator easy to repair.
Background technology
A kind of communication pole, rod-like structure being installed in city, has communication function.
In communication pole, having the antenna for emitting signal, antenna is connect by feeder line with RRU (Remote Radio Unit), The strength and stiffness design requirement of feeder line is very high, while the requirement of curvature is also higher, and curvature is excessive, the transmittability of feeder line It can have a greatly reduced quality, so at present in the organization plan of communication pole, there are two types of the project plan comparison of use is universal:
1, antenna is fixed at the top of communication pole, and RRU is located at the bottom of communication pole, is disposed with along communication club shaft linear Feeder line, feeder line both ends are connected to RRU and antenna;
2, antenna is liftably installed on communication club shaft, and RRU is located at the bottom of communication pole, along communication club shaft arrangement There are linear feeder line, feeder line both ends to be connected to RRU and antenna;
The shortcomings that both existing communication poles are respectively present at present:
1, antenna is fixed at the top of communication pole, and later maintenance is pretty troublesome, and feeder line is longer, also affects feeder line to a certain extent Transmittability;
2, antenna convenient later maintenance, but since the feeder line that front is talked about cannot be bent excessive problem, so this When the kind scheme later stage is to antenna maintenance, feeder line and antenna is needed to dismantle, then declines antenna and (decline process and maintenance process antenna The function of transmitting signal can be lost), efficiency is low and will also result in irreversible loss to the junction of feeder line and antenna, influences to pass Movement Capabilities, meanwhile and above-mentioned 1 scheme in there is also the longer defects of feeder line, also affect the transmission of feeder line to a certain extent Ability.
Secondly, there is the communication pole that multiple operator's antennas can be set at present, be integrated at the top of communication pole, be mounted on In identical carrier, first, being easy to interfere with each other, second is that later maintenance is very inconvenient, maintenance personnel needs to climb up communication pole dimension It protects, the equipment for being also easy to touch other non-present operators in maintenance process causes to accidentally injure.
Invention content
In view of the problems of the existing technology, goal of the invention of the invention is to provide a kind of reduction feeder line bending or arrangement The low influence of transmittability caused by path is longer, antenna can still use during declining, reduce feedback when safeguarding antenna Multiple operator's antennas and mutually interference-free while multiple operations are arranged can be arranged in loss at line and antenna docking simultaneously Being convenient for for good protection is played to the equipment of non-present operator when later maintenance is also convenient for and safeguards in the case of quotient's antenna The communication pole of the integrated multi-operator of repair.
To achieve the goals above, the technical solution adopted by the present invention is:
A kind of communication pole of integrated multi-operator easy to repair comprising:
Main rod body;
Lifting unit, the lifting unit are installed in the main rod body, and can be lifted along main rod body;
The lifting unit quantity is three or more and can individually be lifted, and RRU is mounted on single lifting unit, And the antenna connected with RRU.
By the way that RRU settings in lifting unit, can be shortened the distance of feeder line significantly, feeder line is reduced because length brings transmission The decaying of ability, meanwhile, antenna is arranged on lifting unit, later maintenance is more convenient, it is often more important that, this scheme, the later stage When safeguarding, it can directly decline lifting unit, since RRU is mounted in antenna on lifting unit and is connected each other by feeder line, Lifting unit does not just have to dismounting when declining, and will not be bent and transmittability is caused to decay, not to the junction of feeder line and antenna yet Can cause irreversible loss, maintenance efficiency is high, it is often more important that, the lifting unit quantity be three or more and can individually into Row lifts, and is mounted on RRU on single lifting unit, can at least be arranged three or more and be set with lifting unit corresponding number operator It is standby, the adjustment of each lifting unit relative position can be effectively carried out by the independent lifting of lifting unit, prevent different operators Antenna interferes with each other, and secondly, later maintenance is very convenient, and maintenance personnel only needs to decline the liter of the corresponding Provider Equipment of installation Safeguarded that the equipment that other non-present operators will not be touched in maintenance process causes to accidentally injure in drop portion.
As the preferred embodiment of the present invention, the lifting unit is configured as:It not will produce when being lifted between different lifting units Interference also enables the maintenance specific aim in later stage more strongly lift corresponding Provider Equipment while protecting lifting unit.
As the preferred embodiment of the present invention, the main rod body is interior, main rod body is equipped with BBU (base band outside and/or on lifting unit Processing unit), the BBU is connected with RRU, is connected by optical fiber between BBU and RRU, when BBU is arranged on lifting unit, then Optical fiber also state stable as feeder line, (is mostly bottom, convenient for safeguarding, while mitigating liter when BBU is arranged in main rod body The heavy burden in drop portion), the optical fiber can then reserve a segment length, then optical fiber is adaptively bent when lifting unit lifts, and optical fiber is not As feeder line cannot be bent.
As the preferred embodiment of the present invention, transmission device and DCDU (power distribution unit) are installed in the main rod body, And connected with the BBU and RRU, then multiselect convenient for safeguarding, while mitigating lifting in main rod body bottom for installation in main rod body The heavy burden in portion.
Transmission device and DCDU be installed as the preferred embodiment of the present invention, on the lifting unit, and and the BBU with And RRU connections, gather degree higher, concentrated in together convenient for equipment, facilitate later maintenance, while also saving the sky of main rod body Between, it can accomplish thinner.
As the preferred embodiment of the present invention, Switching Power Supply is installed outside the main rod body bottom and/or main rod body, it is described to open Powered-down source is connected with DCDU, and personnel easy to operation carry out operation in the bottom of main rod body, meanwhile, it is integrated into main rod body, leads to Believe that the globality of bar is stronger, more saves space and beauty.
As the preferred embodiment of the present invention, it is provided with light source on the main rod body and/or lifting unit, communication in this scheme Bar can then have the function of street lamp, since street lamp is more evenly distributed rule in city incity, and be municipal power supply, so it is made For communication pole, the covering power of signal can be made to greatly enhance, the state used is also more stable, also no longer needs individually to carry out single The body of rod of communication function is installed.
As the preferred embodiment of the present invention, promising lifting unit is installed between the main rod body and lifting unit, lifting drive is provided Pulley mechanism, and the pulley mechanism is by individual power source drive, it is simple in structure, it is convenient for the repair and replacement in later stage, cost It is low.
As the preferred embodiment of the present invention, the pulley mechanism includes:
Pulley blocks, the pulley blocks connection main rod body and lifting unit, the pulley blocks connect the power source;
Holding section, the clamping portion are the two parts being mutually matched, and are respectively arranged at the top of main rod body and each lift In portion, when lifting unit rises to preset height by pulley blocks driving, is acted on and being limited by holding section, lifting unit is made to be declined by limitation, Keep the lifting process of lifting unit more excellent, when equipment in maintenance lifting portion, the maintenance efficiency higher of maintenance personnel, learning cost is more It is low.
As the preferred embodiment of the present invention, the holding section is configured to:Lifting unit is after the limit, and pulley blocks are again Task driven lifting unit rises, and when rising to another preset height, holding section releases limit, and lifting unit can be driven by pulley blocks Decline along main rod body, keep the lifting process of lifting unit more excellent, when equipment in maintenance lifting portion, the maintenance efficiency of maintenance personnel is more Height, learning cost are lower.
The beneficial effects of the invention are as follows:
By the way that RRU settings in lifting unit, can be shortened the distance of feeder line significantly, feeder line is reduced because length brings transmission The decaying of ability, meanwhile, antenna is arranged on lifting unit, later maintenance is more convenient, it is often more important that, this scheme, the later stage When safeguarding, it can directly decline lifting unit, since RRU is mounted in antenna on lifting unit and is connected each other by feeder line, Lifting unit does not just have to dismounting when declining, and will not be bent and transmittability is caused to decay, not to the junction of feeder line and antenna yet Can cause irreversible loss, maintenance efficiency is high, it is often more important that, the lifting unit quantity be three or more and can individually into Row lifts, and is mounted on RRU on single lifting unit, can at least be arranged three or more and be set with lifting unit corresponding number operator It is standby, the adjustment of each lifting unit relative position can be effectively carried out by the independent lifting of lifting unit, prevent different operators Antenna interferes with each other, and secondly, later maintenance is very convenient, and maintenance personnel only needs to decline the liter of the corresponding Provider Equipment of installation Safeguarded that the equipment that other non-present operators will not be touched in maintenance process causes to accidentally injure in drop portion.
Description of the drawings
Fig. 1 is the structural schematic diagram of the present invention;
Fig. 2 is the position view of inventive antenna support pallet;
Fig. 3 is the position view of pulley blocks of the present invention;
Fig. 4 is the position view of hoist engine of the present invention;
Fig. 5 is present invention lifting schematic diagram;
It is marked in figure:1, motor A 2, motor B 3, motor C 4, Support bracket 5, antenna mounting pallet A 6, antenna-feeder system A 7, antenna mounting pallet B 8, antenna-feeder system B 9, antenna mounting pallet C 10, antenna-feeder system C 11, hook box A 12, hook Box B 13, it hook box C 14, steel wire rope connecting plate A 15, steel wire rope connecting plate B 16, pulley blocks B 17, pulley blocks C 18, slides Wheel group A 19, clothes-hook 20, Support bracket extension element 21, main rod body 22, cabinet 23, hoist engine A 24, hoist engine B 25, volume Raise machine C.
Specific implementation mode
With reference to embodiment and specific implementation mode, the present invention is described in further detail.But this should not be understood It is only limitted to embodiment below for the range of the above-mentioned theme of the present invention, the technology that all invention contents based on the present invention are realized is equal Belong to the scope of the present invention.
Embodiment 1
Such as Fig. 1-5, a kind of communication pole of integrated multi-operator easy to repair comprising:
Main rod body 21;
Lifting unit, the lifting unit are installed in the main rod body 21, and can be lifted along main rod body 21;
The lifting unit quantity is three or more and can individually be lifted (to be three in the present embodiment, and the liter Drop portion is configured as:Interference is not will produce when being lifted between different lifting units, and mobile, unicom can be installed respectively and telecommunications three is transported greatly The equipment for seeking quotient), RRU is mounted on single lifting unit, and the antenna connected with RRU, be equipped on the lifting unit BBU, the BBU are connected with RRU, transmission device and DCDU are equipped on the lifting unit, and connect with the BBU and RRU It connects, 21 bottom of the main rod body is equipped with Switching Power Supply, and (21 bottom of main rod body is provided with cabinet 22, and the Switching Power Supply setting exists In cabinet 22), the Switching Power Supply is connected with DCDU.
Specifically, in the present embodiment, light source (for illuminating lamp holder) is provided on the lifting unit, communication pole has street lamp Function installs the pulley mechanism that promising lifting unit provides lifting drive, and the turbine between the main rod body 21 and lifting unit Structure is by individual power source drive.
The pulley mechanism includes:
Pulley blocks, the pulley blocks connection main rod body 21 and lifting unit, the pulley blocks connect power source (this implementation It is motor in example, such as Fig. 4, motor includes three in the present embodiment, is motor A1, motor B2 and motor C3, is mounted on mobile jib The inside of body 21 and it is located at lower section, corresponds to the driving force that three lifting units provide lifting, it is equal on motor A1, motor B2 and motor C3 It is provided with gear A, the rotation of motor direct-drive gear A, motor top position is horizontally arranged with transmission shaft, also is located at main rod body In 21, transmission outer shaft sleeve is equipped with hoist engine and gear B, gear A and gear B cooperation, and the final driving hoist engine of gear A rotation turns It is dynamic), in the present embodiment, also correspondence is divided into three to hoist engine, is hoist engine A23, hoist engine B24 and hoist engine C25, corresponds to respectively Motor A1, motor B2 and motor C3, the pulley blocks (it is pulley blocks A18, pulley blocks B16 and pulley blocks C17 in the present embodiment, Three lifting units are corresponded to respectively) include fixed pulley group and fixed pulley holder, the fixed pulley holder is mounted on 21 top of main rod body, Quantity is three, and (fixed pulley holder shape such as Fig. 3 is trident, and the outer diameter of different pulley blocks is different, and such as Fig. 2 is descending Ground is matched with following antenna mounting pallet A5, antenna mounting pallet B7 and antenna mounting pallet C9), the fixed pulley group is three Group is symmetrically installed on the fixed pulley holder, and main steel rope is equipped with to winding on the hoist engine, and one end of main steel rope connects It is connected to the steel wire rope connecting plate inside main rod body 21 and (is divided into steel wire rope connecting plate A14, steel wire rope connecting plate B15 and steel wire Restrict connecting plate C), the symmetrical two fixed pulley groups of connection in the side opposite with main steel rope, fixed pulley group on steel wire rope connecting plate In steel wire rope be secondary steel cable, secondary steel cable one end is connected on steel wire rope connecting plate, and the other end connects after fixed pulley holder In on lifting unit;
Holding section, the clamping portion are the two parts (holding section includes hook box and clothes-hook 19) being mutually matched, 21 top of main rod body and lifting unit are respectively arranged at (specifically, clothes-hook 19 is arranged on the antenna mounting pallet being described below, originally Hook box is divided into hook box A11, hook box B12 and hook box C13 in embodiment, is correspondingly arranged at different antenna mountings respectively Clothes-hook 19 on pallet matches, and hook box A11, hook box B12 and hook box C13 are equally spaced from the bottom up in mobile jib 21 top of body, and the length of the expenditure main rod body 21 of hook box A11 is more than hook box B12, the expenditure main rod body 21 of hook box B12 Length be more than hook box C13), lifting unit by pulley blocks driving rise to preset height when, by holding section act on limit, make liter Drop portion is declined by limitation, and the holding section is configured to:Lifting unit is after the limit, pulley blocks task driven lifting unit again Rise, when rising to another preset height, holding section releases limit, and lifting unit can be by under pulley blocks drives edge main rod body 21 Drop, hook box be arranged main rod body 21 above, clothes-hook 19 setting on antenna mounting pallet, match on antenna mounting pallet there are three Clothes-hook 19 (or quantity more than three), clothes-hook 19 is based on cylinder or cylinder-like structure, as shown in Figure 5:In antenna branch In support plate uphill process, clothes-hook 19 ramps, when clothes-hook 19 encounters the lower inclined plane of hook box, because by leading straight up Gravitation, clothes-hook 19 will be moved along inclined-plane to the positions b from the positions a, when exceeding the height of the position positions c, because of torsion reason, will be returned It receives to above the positions c, antenna mounting pallet will be stuck in hook box, make lifting unit is whole to be declined by limitation, at this time communication pole Long-term service stage can be entered;When needing to put down on pallet, mostly maintenance phase, continuing to drag main steel rope makes pallet rise, When clothes-hook 19 encounters hook box ramp, similarly, clothes-hook 19 will from the positions d to the positions e, then to the positions f move, and then be detached from Hook box can adjust direction of motor rotation at this time, and antenna mounting pallet is made to decline.
In the present embodiment, lifting unit includes antenna mounting pallet, and the RRU, feeder line, antenna, BBU, DCDU and transmission are set For being mounted on the antenna mounting pallet, (RRU, feeder line, antenna, BBU, DCDU and transmission device are denoted as antenna feeder in figure System is the disk-like structure of circular ring shape in the present embodiment there are three antenna mounting pallets, matches outside main rod body 21, is Antenna mounting pallet A5, antenna mounting pallet B7 and antenna mounting pallet C9, are correspondingly arranged antenna-feeder system A6, antenna feeder respectively thereon The outer diameter of system B8 and antenna-feeder system C10, antenna mounting pallet A5 are less than the internal diameter of antenna mounting pallet B7, antenna mounting pallet The outer diameter of B7 be less than antenna mounting pallet C9 internal diameter), be circular disk-like structure and with 21 circular arc external surface phase of main rod body Matching, adjacent antenna is equiangularly arranged two-by-two centered on the center of circle of antenna mounting pallet, and 21 lower part of main rod body is provided with outward The Support bracket extension element 20 of expenditure, has Telescopic, and 20 lower section of Support bracket extension element is provided with the branch for reinforcing Bracketing frame 4, when communication pole normal use, Support bracket 4 can be taken in main rod body 21, beautiful and prevent from causing to hinder to pedestrian Gear, when needing to safeguard communication pole, Support bracket extension element 20 stretches out, and the antenna mounting pallet of decline transfers to support It completes to place on bracket extension element 20, then can be safeguarded, prevent antenna mounting pallet from not supporting only in pulley blocks Lower easy shaking is pulled, difficulty is caused to maintenance.
The present embodiment also discloses the application method of the communication pole of the integrated multi-operator easy to repair comprising Step:
A, it controls the lifting unit and drops to 21 bottom of main rod body along the main rod body 21;
B, the equipment on lifting unit is safeguarded;
C, the position to the antenna is calibrated, the angle of antenna is calibrated, control the lifting unit along institute It states main rod body 21 and rises to predetermined altitude.
Embodiment 2
The present embodiment and embodiment 1 difference lies in, be equipped in the cabinet 22 in the main rod body 21 transmission device and DCDU, and connected with the BBU and RRU, antenna, feeder line and RRU are installed on antenna mounting pallet.

Claims (10)

1. a kind of communication pole of integrated multi-operator easy to repair comprising:
Main rod body;
Lifting unit, the lifting unit are installed in the main rod body, and can be lifted along main rod body;
It is characterized in that,
The lifting unit quantity is three or more and can individually be lifted, and RRU is mounted on single lifting unit, and The antenna connected with RRU.
2. a kind of communication pole of integrated multi-operator easy to repair according to claim 1, which is characterized in that the liter Drop portion is configured as:Interference is not will produce when being lifted between different lifting units.
3. a kind of communication pole of integrated multi-operator easy to repair according to claim 1, which is characterized in that the master The body of rod is interior, main rod body is equipped with BBU outside and/or on lifting unit, and the BBU is connected with RRU.
4. a kind of communication pole of integrated multi-operator easy to repair according to claim 3, which is characterized in that the master Transmission device and DCDU are installed in the body of rod, and connected with the BBU and RRU.
5. a kind of communication pole of integrated multi-operator easy to repair according to claim 3, which is characterized in that the liter Transmission device and DCDU are installed in drop portion, and connected with the BBU and RRU.
6. a kind of communication pole of integrated multi-operator easy to repair according to claim 4 or 5, which is characterized in that institute It states and Switching Power Supply is installed outside main rod body bottom and/or main rod body, the Switching Power Supply is connected with DCDU.
7. a kind of communication pole of integrated multi-operator easy to repair according to claim 6, which is characterized in that the master It is provided with light source on the body of rod and/or lifting unit.
8. a kind of communication pole of integrated multi-operator easy to repair according to claim 7, which is characterized in that the master The pulley mechanism that promising lifting unit provides lifting drive is installed, and the pulley mechanism is by individual power between the body of rod and lifting unit Source drives.
9. a kind of communication pole of integrated multi-operator easy to repair according to claim 8, which is characterized in that the cunning Taking turns mechanism includes:
Pulley blocks, the pulley blocks connection main rod body and lifting unit, the pulley blocks connect the power source;
Holding section, the clamping portion are the two parts being mutually matched, and are respectively arranged at the top of main rod body and on each lifting unit, It when lifting unit rises to preset height by pulley blocks driving, is acted on and being limited by holding section, lifting unit is made to be declined by limitation.
10. a kind of communication pole of integrated multi-operator easy to repair according to claim 9, which is characterized in that described Holding section is configured to:Lifting unit is after the limit, and task driven lifting unit rises pulley blocks again, rises to another default When height, holding section releases limit, and lifting unit can be declined by pulley blocks drives edge main rod body.
CN201810344300.XA 2018-04-17 2018-04-17 A kind of communication pole of integrated multi-operator easy to repair Pending CN108505812A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810344300.XA CN108505812A (en) 2018-04-17 2018-04-17 A kind of communication pole of integrated multi-operator easy to repair

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810344300.XA CN108505812A (en) 2018-04-17 2018-04-17 A kind of communication pole of integrated multi-operator easy to repair

Publications (1)

Publication Number Publication Date
CN108505812A true CN108505812A (en) 2018-09-07

Family

ID=63382473

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810344300.XA Pending CN108505812A (en) 2018-04-17 2018-04-17 A kind of communication pole of integrated multi-operator easy to repair

Country Status (1)

Country Link
CN (1) CN108505812A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109659665A (en) * 2018-12-21 2019-04-19 何汉聪 Lift communication antenna support rod
CN109714749A (en) * 2019-03-05 2019-05-03 南京其善信息技术有限公司 A kind of 5G movable emergency base station

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102820893A (en) * 2012-07-24 2012-12-12 大唐移动通信设备有限公司 Integrated modularized system including RRU (remote radio unit) and antenna, and mobile communication base station
KR101276704B1 (en) * 2012-12-06 2013-06-19 김윤용 Structure of the antenna
US8830131B1 (en) * 2010-02-17 2014-09-09 Rockwell Collins, Inc. Dual polarization antenna with high port isolation
CN205039236U (en) * 2015-10-13 2016-02-17 中国铁塔股份有限公司盐城市分公司 Light pole communication base station
US20160056524A1 (en) * 2014-08-19 2016-02-25 Raytheon Company Antenna Lifting Apparatus and Related Techniques
CN107548170A (en) * 2017-08-01 2018-01-05 陈永福 A kind of ground communication base station of easy access

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8830131B1 (en) * 2010-02-17 2014-09-09 Rockwell Collins, Inc. Dual polarization antenna with high port isolation
CN102820893A (en) * 2012-07-24 2012-12-12 大唐移动通信设备有限公司 Integrated modularized system including RRU (remote radio unit) and antenna, and mobile communication base station
KR101276704B1 (en) * 2012-12-06 2013-06-19 김윤용 Structure of the antenna
US20160056524A1 (en) * 2014-08-19 2016-02-25 Raytheon Company Antenna Lifting Apparatus and Related Techniques
CN205039236U (en) * 2015-10-13 2016-02-17 中国铁塔股份有限公司盐城市分公司 Light pole communication base station
CN107548170A (en) * 2017-08-01 2018-01-05 陈永福 A kind of ground communication base station of easy access

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109659665A (en) * 2018-12-21 2019-04-19 何汉聪 Lift communication antenna support rod
CN109714749A (en) * 2019-03-05 2019-05-03 南京其善信息技术有限公司 A kind of 5G movable emergency base station

Similar Documents

Publication Publication Date Title
CN208267524U (en) A kind of communication pole of integrated multi-operator easy to repair
CN108505812A (en) A kind of communication pole of integrated multi-operator easy to repair
CN108461890A (en) A kind of communication pole and its method of adjustment of conveniently adjusting angle
CN208088947U (en) A kind of liftable communication pole
CN209399252U (en) A kind of High-Pole Lamp with function of preventing wire rope twisting
KR101267471B1 (en) Lotus lamp of Horizontality maintain type Elevating apparatus
CN205487568U (en) Cable strand machine for charging cable
CN105864699A (en) Lift type high-pole lamp provided with semiautomatic hitching device
CN209461847U (en) A kind of low-tension distribution box that classification fixation can be carried out to harness of easy access
CN203612779U (en) Elevator device with driving component having functions of signal transmission and traction driving
CN215446259U (en) Lamp lifting device
CN215557869U (en) Cable conductor is pay-off for strand machine
CN208014894U (en) A kind of communication pole of conveniently adjusting angle
CN219606808U (en) Lifting type high-pole lamp
CN108695771A (en) Transmission line of electricity OPGW optical cable preformed armor rods install Special-purpose lifting tool
CN113387279A (en) Circular rail crane and assembling method thereof
CN112944286B (en) Illumination high pole
CN209038742U (en) A kind of " 8+0 " optical cable automatic coil winding machine
CN220011676U (en) Cable winding and unwinding device for communication engineering
CN204859595U (en) Induction coil group of electric melting furnace
CN212374627U (en) Cable take-up and pay-off device
CN219766413U (en) Paying-off machine suitable for basket type and spool type simultaneously
CN216918355U (en) A a gallows structure assembly for electromechanical device installation
CN220017235U (en) Rotary lifting multi-eye light beam ball lamp
CN209146918U (en) A kind of height-adjustable office lamp

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination