A kind of pre-stress floor installation auxiliary device Download PDF

Info

Publication number
CN108505751A
CN108505751A CN201810321351.0A CN201810321351A CN108505751A CN 108505751 A CN108505751 A CN 108505751A CN 201810321351 A CN201810321351 A CN 201810321351A CN 108505751 A CN108505751 A CN 108505751A
Authority
CN
China
Prior art keywords
fixed
floor
plate
bar shaped
bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810321351.0A
Other languages
Chinese (zh)
Inventor
周锡武
张润成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan University
Original Assignee
Foshan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan University filed Critical Foshan University
Priority to CN201810321351.0A priority Critical patent/CN108505751A/en
Publication of CN108505751A publication Critical patent/CN108505751A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements

Abstract

The invention discloses a kind of pre-stress floor installation auxiliary devices, are related to pre-stress floor technical field.Including L bracket, a clamping device is provided in L bracket, the opposite side on one surface of L bracket is respectively and fixedly provided with a gripping mechanism, and L bracket one side is connected with a positioning plate, L bracket includes starting stave and the second riser, and a fixed plate is fixed at one marginal surface of starting stave.The present invention is by the way that the head clamp of two auxiliary devices to be inserted into the notch on floor, turntable is rotated when one surface of the second riser contacts floor and drives clamping plate to move downward using screw body, floor is stuck between clamping plate and two head clamps, crane need to floor side to be mounted lean against two positioning plate sides and move downward accurately to fall floor side is being installed, solve the problems, such as that existing pre-stress floor needs excessive manpower auxiliary positioning and installation effect is bad.

Description

A kind of pre-stress floor installation auxiliary device
Technical field
The invention belongs to pre-stress floor technical fields, more particularly to a kind of pre-stress floor installation auxiliary device.
Background technology
Pre-stress floor refer in process of production to steel bar stress apply tension stress, to prevent plate here at work by It draws the concrete at position cracking, while also giving full play to the effect of tension reinforcement, saving steel.
Existing pre-stress floor is installed after during the installation process being lifted pre-stress floor using equipment such as cranes, However will appear the case where locating bias causes installation to tilt when positioning placement, it cannot be satisfied the use effect of user Fruit, and need worker to be oriented in both sides to install when positioning is installed, excessive wastes manpower object The effect of installation positioning is bad while power, to reduce the installation effectiveness of pre-stress floor.
Invention content
The purpose of the present invention is to provide a kind of pre-stress floor installation auxiliary device, by by two auxiliary devices Head clamp is inserted into the notch installed on floor, and turntable is rotated when one surface of the second riser contacts floor and utilizes lead screw machine Structure drives clamping plate to move downward, and floor is stuck between clamping plate and two head clamps, crane will need floor one to be mounted Side, which leans against two positioning plate sides and moves downward accurately to fall, is installing floor side, solves existing pre-stress floor Need excessive manpower auxiliary positioning and the bad problem of installation effect.
In order to solve the above technical problems, the present invention is achieved by the following technical solutions:
The present invention is a kind of pre-stress floor installation auxiliary device, including L bracket, is provided in the L bracket The opposite side of one clamping device, one surface of the L bracket is respectively and fixedly provided with a gripping mechanism, the L bracket one side activity It is connected with a positioning plate;
The L bracket includes starting stave and the second riser, and it is solid that one is fixed at one marginal surface of the starting stave Fixed board, one surface of the fixed plate are fixedly connected with one surface of the second riser;
The clamping device includes screw body, and the screw body bottom surface transmission has a clamping plate, the clamping plate position Between fixed plate and gripping mechanism;
The gripping mechanism includes a pair of of head clamp, and two one surfaces of the head clamp are respectively and fixedly provided with a pair of of thread bush, institute State thread bush internal whorl be connected with the matched threaded rod of thread bush, described threaded rod one end is fixed with adjusting block, described One surface inserting of adjusting block has a ball;
The starting stave one side offers several bar shaped conduits side by side, if one surface of the positioning plate is fixed with side by side The dry and matched bar shaped sliding block of bar shaped conduit.
Further, the screw body includes lead screw, and described lead screw one end is connect with one surface pivots of clamping plate, described The lead screw other end is fixed with a turntable, and one surface of the clamping plate is rectangular to be fixed with several guide rods, the guide rod one End is fixed with a limiting plate.
Further, a screw thread notch and several guiding slot ports, the screw thread notch and screw thread are provided in the fixed plate Bar screw-thread fit, the guide rod are slidably matched with guiding slot port.
Further, a reinforced column is fixed between the fixed plate and starting stave, the reinforced column is obliquely installed, institute State range of the angle at 30 ° -45 ° between reinforced column and fixed plate.
Further, the head clamp is a rectangular slab, and the rectangle plate top surface is a cambered surface.
Further, second bottom of the riser opposite side is respectively and fixedly provided with a universal wheel, and second riser is far from fixed A U-shaped handle is respectively and fixedly provided at one marginal surface of plate side and fixed plate, U-shaped handle outer surface is fixed with by bonding agent Rubber pad.
Further, the length of second riser is more than the length of starting stave, model of the difference in 150mm-200mm It encloses.
Further, the cross section of the bar shaped conduit and bar shaped sliding block is convex shape structure, bar shaped sliding block edge Bar shaped conduit slides, and the length of the bar shaped conduit is less than the height of the second riser, range of the difference in 150mm-200mm.
The invention has the advantages that:
1, the present invention has been installed by the way that head clamp to be inserted into notch on floor, and ball is in floor notch inner wall when insertion Bottom surface rotates, and when one surface of the second riser contacts floor, rotates turntable and drives clamping plate to move downward using screw body, Floor will be installed to be stuck between clamping plate and two head clamps, second auxiliary device is clipped in the same way and has been installed The other side of floor, crane need to floor side to be mounted lean against two positioning plate sides and move downward, according to the weight of floor Amount not will produce shaking, can accurately fall and install floor side, be convenient for user's Fast Installation floor, and avoided The use of manpower and materials is greatly saved on running fix floor in more manpower uses, and improves installation effect, avoids Floor installation tilts the problem of being not easy to adjustment, improves installation effectiveness.
2, the present invention is conveniently replaceable by bar shaped sliding block and being used cooperatively for bar shaped conduit since friction leads to determining for damage Position plate can utilize being used cooperatively to back out adjusting block and ball and more renewing for threaded rod and thread bush when ball damage Ball avoids unnecessary economic waste convenient for the maintenance aid that user replaces, and meets the use effect of user Fruit.
Certainly, it implements any of the products of the present invention and does not necessarily require achieving all the advantages described above at the same time.
Description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, will be described below to embodiment required Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for ability For the those of ordinary skill of domain, without creative efforts, it can also be obtained according to these attached drawings other attached Figure.
Fig. 1 is a kind of dimensional structure diagram of pre-stress floor installation auxiliary device of the present invention;
Fig. 2 is the dimensional structure diagram of L bracket;
Fig. 3 is the dimensional structure diagram of the L bracket other side;
Fig. 4 is the dimensional structure diagram of gripping mechanism;
Fig. 5 is the dimensional structure diagram of threaded rod and adjusting block;
Fig. 6 is the dimensional structure diagram of positioning plate;
Fig. 7 is the dimensional structure diagram of clamping device;
In attached drawing, parts list represented by the reference numerals are as follows:
1-L shape holders, 2- clamping devices, 3- gripping mechanisms, 4- positioning plates, 101- starting staves, the second risers of 102-, 103- fixed plates, 104- bar shaped conduits, 105- screw thread notches, 106- guiding slot ports, 107- reinforced columns, 108- universal wheels, 109-U Shape handle, 201- screw bodies, 202- clamping plates, 301- head clamps, 302- thread bush, 303- threaded rods, 304- adjusting blocks, 305- balls, 401- bar shaped sliding blocks, 2011- lead screws, 2012- turntables, 2013- guide rods, 2014- limiting plates.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained all other without creative efforts Embodiment shall fall within the protection scope of the present invention.
In the description of the present invention, it is to be understood that, term " trepanning ", "upper", "lower", " thickness ", "top", " in ", Indicating positions or the position relationship such as " length ", "inner", " surrounding ", are merely for convenience of description of the present invention and simplification of the description, without It is that the component of instruction or hint meaning or element must have a particular orientation, with specific azimuth configuration and operation, therefore not It can be interpreted as limitation of the present invention.
It please refers to Fig.1 shown in -7, the present invention is a kind of pre-stress floor installation auxiliary device, including L bracket 1, L-shaped A clamping device 2 is provided on holder 1, the opposite side on 1 one surface of L bracket is respectively and fixedly provided with a gripping mechanism 3, L bracket 1 one Side is connected with a positioning plate 4;
L bracket 1 includes starting stave 101 and the second riser 102, and one is fixed at 101 1 marginal surface of starting stave Fixed plate 103,103 1 surface of fixed plate are fixedly connected with 102 1 surface of the second riser;
Clamping device 2 includes screw body 201, and the transmission of 201 bottom surface of screw body has a clamping plate 202, clamping plate 202 Between fixed plate 103 and gripping mechanism 3;
Gripping mechanism 3 includes a pair of of head clamp 301, and two 301 1 surfaces of head clamp are respectively and fixedly provided with a pair of of thread bush 302, 302 internal whorl of thread bush be connected with 302 matched threaded rod 303 of thread bush, 303 one end of threaded rod is fixed with adjusting block 304,304 1 surface inserting of adjusting block has a ball 305;
101 one side of starting stave is opened up side by side there are four bar shaped conduit 104, and 4 one surface of positioning plate is fixed with four side by side A and 104 matched bar shaped sliding block 401 of bar shaped conduit.
Wherein, screw body 201 includes lead screw 2011, and 2011 one end of lead screw is connect with 202 1 surface pivots of clamping plate, silk 2011 other end of bar is fixed with a turntable 2012, and there are four guide rods 2013 for the rectangular fixation in 202 1 surface of clamping plate, are oriented to 2013 one end of bar is fixed with a limiting plate 2014, and guide rod 2013 plays the role of guiding.
Wherein, a screw thread notch 105 and four guiding slot ports 106, screw thread notch 105 and screw thread are provided in fixed plate 103 303 screw-thread fit of bar, guide rod 2013 are slidably matched with guiding slot port 106.
Wherein, a reinforced column 107 is fixed between fixed plate 103 and starting stave 101, reinforced column 107 is obliquely installed, adds Gu range of the angle at 30 ° -45 ° between column 107 and fixed plate 103, reinforced column 107, fixed plate 103 and starting stave 101 It is combined into a triangular structure, improves stability.
Wherein, head clamp 301 is a rectangular slab, and rectangle plate top surface is a cambered surface.
Wherein, 102 bottom opposite side of the second riser is respectively and fixedly provided with a universal wheel 108, and the second riser 102 is far from fixed plate A U-shaped handle 109 is respectively and fixedly provided at 103 1 marginal surface of 103 sides and fixed plate, 109 outer surface of U-shaped handle passes through bonding agent It is fixed with rubber pad, is moved convenient for user using U-shaped handle 109 and being used cooperatively for universal wheel 108.
Wherein, the length of the second riser 102 is more than the length of starting stave 101, range of the difference in 150mm-200mm.
Wherein, the cross section of bar shaped conduit 104 and bar shaped sliding block 401 is convex shape structure, and bar shaped sliding block 401 is along bar shaped Conduit 104 slides, and the length of bar shaped conduit 104 is less than the height of the second riser 102, and difference is in the range of 150mm-200mm, energy It is enough that positioning plate 4 is stuck on bar shaped conduit 104.
One of the present embodiment has particular application as:Two auxiliary devices are moved using universal wheel 108 and U-shaped handle 109 To two side positions for having installed floor, head clamp 301 is inserted into the notch installed on floor, ball 305 is in slot when insertion The rotation of mouth inner wall bottom surface rotates turntable 2012 when 102 1 surface of the second riser contacts floor, and screw body 201 is utilized to drive Clamping plate 202 moves downward, and will install floor and has been stuck between clamping plate 202 and two head clamps 301, and second auxiliary is filled Set to be clipped in the same way and the floor other side be installed, crane need to floor side to be mounted lean against two positioning plates 4 one Side, and slowly floor is driven to move downward, floor side is positioned against 4 slide downward of plate at this time, will not according to the weight of floor Shaking is generated, can accurately be fallen when floor slides into 4 most bottom surface of positioning plate and floor side is being installed.
In the description of this specification, the description of reference term " one embodiment ", " example ", " specific example " etc. means Particular features, structures, materials, or characteristics described in conjunction with this embodiment or example are contained at least one implementation of the present invention In example or example.In the present specification, schematic expression of the above terms may not refer to the same embodiment or example. Moreover, particular features, structures, materials, or characteristics described can be in any one or more of the embodiments or examples to close Suitable mode combines.
Present invention disclosed above preferred embodiment is only intended to help to illustrate the present invention.There is no detailed for preferred embodiment All details are described, are not limited the invention to the specific embodiments described.Obviously, according to the content of this specification, It can make many modifications and variations.These embodiments are chosen and specifically described to this specification, is in order to preferably explain the present invention Principle and practical application, to enable skilled artisan to be best understood by and utilize the present invention.The present invention is only It is limited by claims and its full scope and equivalent.

Claims (8)

1. a kind of pre-stress floor installation auxiliary device, it is characterised in that:Including L bracket (1), on the L bracket (1) It is provided with a clamping device (2), the opposite side on (1) one surface of the L bracket is respectively and fixedly provided with a gripping mechanism (3), the L-shaped Holder (1) one side is connected with a positioning plate (4);
The L bracket (1) includes starting stave (101) and the second riser (102), (101) one Surface Edge of the starting stave A fixed plate (103) is fixed at edge, (103) one surface of the fixed plate is fixedly connected with (102) one surface of the second riser;
The clamping device (2) includes screw body (201), and screw body (201) the bottom surface transmission has a clamping plate (202), the clamping plate (202) is located between fixed plate (103) and gripping mechanism (3);
The gripping mechanism (3) includes a pair of of head clamp (301), and two (301) one surfaces of the head clamp are respectively and fixedly provided with a pair Thread bush (302), thread bush (302) internal whorl are connected with and thread bush (302) matched threaded rod (303), institute It states threaded rod (303) one end and is fixed with adjusting block (304), (304) one surface inserting of the adjusting block has a ball (305);
Starting stave (101) one side offers several bar shaped conduits (104) side by side, and (4) one surface of the positioning plate is simultaneously Row is fixed with several and matched bar shaped sliding block (401) of bar shaped conduit (104).
2. a kind of pre-stress floor installation auxiliary device according to claim 1, which is characterized in that the screw body (201) include lead screw (2011), described lead screw (2011) one end is connect with (202) one surface pivots of clamping plate, the lead screw (2011) other end is fixed with a turntable (2012), and (202) one surface of the clamping plate is rectangular to be fixed with several guide rods (2013), described guide rod (2013) one end is fixed with a limiting plate (2014).
3. a kind of pre-stress floor installation auxiliary device according to claim 1, which is characterized in that the fixed plate (103) a screw thread notch (105) and several guiding slot ports (106), the screw thread notch (105) and threaded rod (303) are provided on Screw-thread fit, the guide rod (2013) are slidably matched with guiding slot port (106).
4. a kind of pre-stress floor installation auxiliary device according to claim 1, which is characterized in that the fixed plate (103) reinforced column (107) is fixed between starting stave (101), the reinforced column (107) is obliquely installed, the reinforcing Range of the angle at 30 ° -45 ° between column (107) and fixed plate (103).
5. a kind of pre-stress floor installation auxiliary device according to claim 1, which is characterized in that the head clamp (301) it is a rectangular slab, the rectangle plate top surface is a cambered surface.
6. a kind of pre-stress floor installation auxiliary device according to claim 1, which is characterized in that second riser (102) bottom opposite side is respectively and fixedly provided with a universal wheel (108), and second riser (102) is far from fixed plate (103) side and admittedly A U-shaped handle (109) is respectively and fixedly provided at (103) one marginal surface of fixed board, U-shaped handle (109) outer surface passes through bonding agent It is fixed with rubber pad.
7. a kind of pre-stress floor installation auxiliary device according to claim 1, which is characterized in that second riser (102) length is more than the length of starting stave (101), range of the difference in 150mm-200mm.
8. a kind of pre-stress floor installation auxiliary device according to claim 1, which is characterized in that the bar shaped conduit (104) and the cross section of bar shaped sliding block (401) is convex shape structure, and the bar shaped sliding block (401) is sliding along bar shaped conduit (104) Dynamic, the length of the bar shaped conduit (104) is less than the height of the second riser (102), range of the difference in 150mm-200mm.
CN201810321351.0A 2018-04-11 2018-04-11 A kind of pre-stress floor installation auxiliary device Pending CN108505751A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810321351.0A CN108505751A (en) 2018-04-11 2018-04-11 A kind of pre-stress floor installation auxiliary device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810321351.0A CN108505751A (en) 2018-04-11 2018-04-11 A kind of pre-stress floor installation auxiliary device

Publications (1)

Publication Number Publication Date
CN108505751A true CN108505751A (en) 2018-09-07

Family

ID=63381533

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810321351.0A Pending CN108505751A (en) 2018-04-11 2018-04-11 A kind of pre-stress floor installation auxiliary device

Country Status (1)

Country Link
CN (1) CN108505751A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002339569A (en) * 2001-05-14 2002-11-27 Misawa Homes Co Ltd Jig for suspending panel for building
JP2005168865A (en) * 2003-12-12 2005-06-30 Takumido:Kk Bracket positioning device for mounting decorated curtain rail
CN202081658U (en) * 2011-05-26 2011-12-21 余宜盛 Automatic flat-mounting device for wall building machine support
CN202755653U (en) * 2012-03-23 2013-02-27 浙江汉德邦建材有限公司 Fixing device for cast-in-place concrete floor
CN103982049A (en) * 2014-05-08 2014-08-13 河北联合大学 Wall body assembling straightening device for shear wall
CN204590656U (en) * 2015-03-16 2015-08-26 邯郸市曙光新型建材科技有限公司 Prefabricated superimposed sheet secured adjusted bar
CN106401199A (en) * 2016-06-22 2017-02-15 中国建筑局(集团)有限公司 Inclined strut fixing clamp, connection structure and construction method of connection structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002339569A (en) * 2001-05-14 2002-11-27 Misawa Homes Co Ltd Jig for suspending panel for building
JP2005168865A (en) * 2003-12-12 2005-06-30 Takumido:Kk Bracket positioning device for mounting decorated curtain rail
CN202081658U (en) * 2011-05-26 2011-12-21 余宜盛 Automatic flat-mounting device for wall building machine support
CN202755653U (en) * 2012-03-23 2013-02-27 浙江汉德邦建材有限公司 Fixing device for cast-in-place concrete floor
CN103982049A (en) * 2014-05-08 2014-08-13 河北联合大学 Wall body assembling straightening device for shear wall
CN204590656U (en) * 2015-03-16 2015-08-26 邯郸市曙光新型建材科技有限公司 Prefabricated superimposed sheet secured adjusted bar
CN106401199A (en) * 2016-06-22 2017-02-15 中国建筑局(集团)有限公司 Inclined strut fixing clamp, connection structure and construction method of connection structure

Similar Documents

Publication Publication Date Title
CN208555995U (en) A kind of crankshaft Vehicle Processing Workpiece tilting device
CN207495356U (en) The clamp mechanism that a kind of agitating device housing uses
CN108505751A (en) A kind of pre-stress floor installation auxiliary device
CN202292118U (en) Operating support of sawing machine
CN213923894U (en) Lifting device for control engineering is convenient for fix different objects
CN102528487A (en) Supporting device for quickly leveling stepped shaft
CN210476674U (en) Workbench clamp
CN211501871U (en) Water conservancy pipeline's supporting mechanism
CN208067667U (en) A kind of three-way pipeline jig
CN210002872U (en) adjustable formwork support mounting device
CN209602584U (en) A kind of fast pressure device of converter tapping sliding plate brick
CN208246245U (en) A kind of brill for processing flat-nose pliers attacks special plane
CN219951677U (en) Anti-seismic bridge support supporting structure
CN205713145U (en) A kind of reinforcing bar bending device
CN214553702U (en) Connecting mechanism for assembling experimental instrument
CN215721292U (en) Pipeline fixing device is used in energy-conserving transformation construction of air conditioner
CN218815002U (en) Wall surface flattening device
CN220549897U (en) Fastening anti-loosening type high tower filler steel wire rope clamp
CN215616273U (en) Reinforcing apparatus at steel pipe both ends
CN204585053U (en) A kind of cutter block clamping device
CN217860878U (en) Positioning device for angle steel processing
CN216711497U (en) Lifting device for construction engineering construction
CN218459276U (en) Stirring device is glued to structure
CN210164285U (en) Multipurpose steel pipe support
CN213483330U (en) Market survey report column

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180907