CN108505515A - 一种水泥砂浆复合桩的施工方法 - Google Patents
一种水泥砂浆复合桩的施工方法 Download PDFInfo
- Publication number
- CN108505515A CN108505515A CN201810338681.0A CN201810338681A CN108505515A CN 108505515 A CN108505515 A CN 108505515A CN 201810338681 A CN201810338681 A CN 201810338681A CN 108505515 A CN108505515 A CN 108505515A
- Authority
- CN
- China
- Prior art keywords
- pile
- cement mortar
- pilot hole
- construction method
- prefabricated pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/50—Piles comprising both precast concrete portions and concrete portions cast in situ
-
- C—CHEMISTRY; METALLURGY
- C04—CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
- C04B—LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
- C04B28/00—Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0018—Cement used as binder
- E02D2300/0021—Mortar
Abstract
本发明属于土木工程领域,具体公开了一种水泥砂浆复合桩的施工方法,包括一下步骤:(1)在桩位处,钻机取土形成引孔,钻机下钻至引孔底标高处;(2)泵送水泥砂浆混合料至引孔底标高处,同时提升钻机;(3)在引孔内吊装植入预制桩,并压入至预制桩设计深度。制得的复合桩中预制桩设计深度深于引孔底标高3倍预制桩直径。该施工方法简单、施工工期短且制得的复合桩桩身强度高。
Description
技术领域
本发明属于土木工程领域,涉及一种复合桩的施工方法,具体涉及一种水泥砂浆复合桩的施工方法。
背景技术
随着我国社会经济建设的发展,城市化进程的加快,城市用地日益紧张,城市不断向空中和地下索要发展空间。于是,建筑物的上部结构越建越高,因此它对下部基础的要求也越来越高。桩基础作为一种深基础形式发挥着越来越重要的作用。预制桩,是我国建筑领域中常用的桩型之一,主要有混凝土方桩、预应力混凝土管桩、钢桩等,其中预应力混凝土管桩应用最为广泛,其优势在于能承受较大的荷载,能够避免现浇混凝土桩基的缩径、断桩等问题,但是在施工过程中,直接打桩,当遇有砂层、碎石层等土层较硬的地质情况,预制桩的穿透能力低,施工工效慢,特别是在沉桩过程中对预制桩的桩头和桩底会产生巨大的应力集中,不可避免的出现桩身强度受损,易出现桩头劈裂、酥裂等现象,在建筑物长期施压的情况下将严重影响建筑结构安全。
发明内容
本发明的目的在于提供一种施工简单、施工工期短且桩身强度高的水泥砂浆复合桩的施工方法。
为实现上述目的,本发明采用以下技术方案:一种水泥砂浆复合桩的施工方法,包括以下步骤:
(1)在桩位处,钻机取土形成引孔,钻机下钻至引孔底标高处;
(2)泵送水泥砂浆混合料至引孔底标高处,同时提升钻机;
(3)在引孔内吊装植入预制桩,并压入至预制桩设计深度。
进一步地,预制桩设计深度比引孔底标高深3倍预制桩截面外接圆直径。
优选地,预制桩选自H型钢、PHC桩、PC桩、PRC桩、SC桩、PS桩、PHS桩。
其中,PHC桩:Prestressed High-strength Concrete的缩写,表示预应力高强混凝土桩,混凝土的强度等级不低于C80;
PC桩:PC是Prestressed Concrete的缩写,表示预应力混凝土桩,混凝土强度等级一般介于C60~C80;
PRC桩:研发的混合配筋制预应力混凝土管桩,即PRC桩。它同普通预应力混凝土管桩一样,亦是由混凝土、钢筋骨架及端头板组成,不同处在于钢筋骨架中除了有预应力钢筋外,还加入一定数量的非预应力钢筋,形成一种新型的混合配筋的骨架,配筋率高,为普通管桩的1.5~2倍。按非预应力钢筋和预应力钢筋的直径数量分有多种类别、型号,可以根据实际工程需要,选择相匹配的混合配筋预应力混凝土管桩;
SC桩:预制高强混凝土管桩,为钢管与混凝土合成桩。钢管一般由钢板卷曲并焊接成型,在钢管内浇筑混凝土,经离心法成桩,截面为环形。混凝土强度一般不低于C80;
PS桩:预应力混凝土空心方桩,截面为方形,中间孔洞为圆形,混凝土强度一般为C60;
PHS桩:预应力高强混凝土空心方桩,截面为方形,中间孔洞为圆形,混凝土强度一般为C80。
所述内插预制桩采用预制混凝土桩时,可由一种或多种形式的管桩进行组合使用。桩身范围内有软土层时,在软土层范围内可采用PRC管桩提高抗弯承载力,其余部位采用PHC管桩。在特殊设计要求下预制桩可由等尺寸的多种管桩或方桩进行组合。
优选地,步骤(2)中,1m3水泥砂浆混合料由以下重量份的原料混合而成:水泥200~300kg,砂1200~1300kg,粉煤灰100kg,水250~300kg,余量为添加剂;所述水泥砂浆混合料强度不低于15MPa。
优选地,所述添加剂为保水剂和/或减水剂与缓凝剂的混合物,添加剂的质量为水泥质量的1%~3%。
进一步地,水泥砂浆混合料泵送量为引孔内插入预制桩后剩余的空腔体积的1.1~1.2倍。内插管桩时,灌浆体积为钻孔体积的50%-60%,内插H型钢时,灌浆体积为钻孔体积的95%左右。
进一步地,步骤(4)中,采用震动、锤击或静压方法将预制桩压至设计深度。若周边环境复杂,不允许噪音或震动时,采用静压方法;若环境条件允许,采用震动或锤击方法。
本发明的有益效果为:
(1)本申请先形成引孔、泵送水泥砂浆混合料然后植入预制桩身,该方法施工简单且施工工期短;
(2)在预先成孔的情况下,预制桩植入简单,甚至仅通过重锤的重量就可以将预制桩压入地基中,操作简单、节约成本;预制桩底标高(设计深度)深于引孔底标高,预制桩压入或锤击施工时对桩底土层有挤密作用,可有效发挥桩端土层承载力,形成强度较好的复合桩;
(3)与传统的混凝土材料相比,本申请的泵送材料为水泥砂浆混合料,其具有的可泵送性、保水性以及延迟凝固的特性,为插入预制桩提供条件;
(4)本申请提供的方法可应用于多项桩基工程中,在相同地质条件下,复合桩端承载力相比同直径钻孔灌注桩提高1倍左右。
附图说明
图1为本发明的施工流程示意图;
图2为复合桩结构示意图;
图3为内插环形桩截面图。
具体实施方式
下面结合实施例和图1-3对本发明进行详细说明,
实施例1
郑州某项目桩基工程,采用水泥砂浆复合桩基础,具体施工步骤如下:
(1)先开挖基坑,开挖至桩顶标高处进行桩基施工。在桩位处,钻机取土形成引孔,引孔直径800mm,孔深15m,钻机下钻至引孔底标高处;
(2)泵送水泥砂浆混合料2,其中1m3水泥砂浆混合料2中包括水泥200kg,水泥为32.5的普通硅酸盐水泥,砂1200kg,粉煤灰100kg,水270kg,减水剂与缓凝剂混合物(添加剂)6kg(添加剂的质量为水泥质量的3%,减水剂与缓凝剂的质量比为1:1),水泥砂浆混合料2强度不低于15MPa,单桩泵送量6.2m3,泵送同时提升钻机;
(3)在引孔内吊装植入预制桩1,预制桩1采用PHC-800-110-AB管桩,预制桩1长18m,为两根管桩拼接而成,单桩抗压承载力特征值3400kN,通过静压法压入至预制桩1设计深度。
经静载试验检测,复合桩抗压承载力满足设计要求。
实施例2
郑州某地下隧道基坑工程基坑深度10.5m,采用排桩钢支撑支护,支护桩采用水泥砂浆复合桩,具体施工步骤如下:
(1)在自然地面施工支护桩,桩顶在自然地面下0.5m。在桩位处,钻机取土形成引孔,引孔直径600mm,孔深13m,钻机下钻至引孔底标高处;
(2)泵送水泥砂浆混合料2,其中1m3水泥砂浆混合料2中水泥250kg,水泥为32.5的普通硅酸盐水泥,砂1200kg,粉煤灰100kg,水250kg,减水剂与缓凝剂混合物(添加剂)6kg(添加剂的质量为水泥质量的2.4%,减水剂与缓凝剂的质量比为1:1),水泥砂浆混合料强度不低于15MPa,单桩泵送量3.2m3,泵送同时提升钻机;
(3)在引孔内吊装植入预制桩1,预制桩1采用PRC-Ⅰ600C110管桩,预制桩1长15m,通过震动法击至预制桩1设计深度。
本基坑监测结果表明,基坑各项变形指标均在规范要求的范围以内,本发明桩型满足设计要求。
Claims (8)
1.一种水泥砂浆复合桩的施工方法,其特征在于,包括以下步骤:
(1)在桩位处,钻机取土形成引孔,钻机下钻至引孔底标高处;
(2)泵送水泥砂浆混合料至引孔底标高处,同时提升钻机;
(3)在引孔内吊装植入预制桩,并压入至预制桩设计深度。
2.根据权利要求1所述的水泥砂浆复合桩的施工方法,其特征在于,所述引孔的直径等于或小于预制桩截面外接圆直径。
3.根据权利要求2所述的水泥砂浆复合桩的施工方法,其特征在于,预制桩设计深度比引孔底标高深3倍预制桩截面外接圆直径。
4.根据权利要求3所述的水泥砂浆复合桩的施工方法,其特征在于,所述预制桩选自H型钢、PHC桩、PC桩、PRC桩、SC桩、PS桩、PHS桩。
5.根据权利要求4所述的水泥砂浆复合桩的施工方法,其特征在于:步骤(2)中,1m3水泥砂浆混合料由以下重量份的原料混合而成:水泥200~300kg,砂1200~1300kg,粉煤灰100kg,水250~300kg,余量为添加剂;所述水泥砂浆混合料强度不低于15MPa。
6.根据权利要求5所述的水泥砂浆复合桩的施工方法,其特征在于,所述添加剂为保水剂和/或减水剂与缓凝剂的混合物。
7.根据权利要求6所述的水泥砂浆复合桩的施工方法,其特征在于,水泥砂浆混合料泵送量为引孔内插入预制桩后剩余的空腔体积的1.1~1.2倍。
8.根据权利要求1所述的水泥砂浆复合桩的施工方法,其特征在于,步骤(4)中,采用震动、锤击或静压方法将预制桩压至设计深度。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810338681.0A CN108505515A (zh) | 2018-04-16 | 2018-04-16 | 一种水泥砂浆复合桩的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810338681.0A CN108505515A (zh) | 2018-04-16 | 2018-04-16 | 一种水泥砂浆复合桩的施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108505515A true CN108505515A (zh) | 2018-09-07 |
Family
ID=63381905
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810338681.0A Pending CN108505515A (zh) | 2018-04-16 | 2018-04-16 | 一种水泥砂浆复合桩的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108505515A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111172971A (zh) * | 2020-02-27 | 2020-05-19 | 周同和 | 一种管内灌浆挤扩根固桩的施工方法 |
CN113774906A (zh) * | 2021-07-29 | 2021-12-10 | 安徽省交通规划设计研究总院股份有限公司 | 一种扩引孔灌注充盈砂浆植入复合截面空心桩施工工艺 |
CN114482013A (zh) * | 2022-02-14 | 2022-05-13 | 安徽省交通规划设计研究总院股份有限公司 | 一种扩引孔预制桩悬浮式可嵌岩复合桩结构及其施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS56100922A (en) * | 1980-01-14 | 1981-08-13 | Toshima Kensetsu Kk | Construction of shaft |
CN1718937A (zh) * | 2005-07-22 | 2006-01-11 | 苏州市能工基础工程有限责任公司 | 非取土引孔预应力管桩或预制方桩沉桩工艺 |
CN102767178A (zh) * | 2012-07-18 | 2012-11-07 | 上海建工二建集团有限公司 | 立柱桩及其施工方法 |
CN104404947A (zh) * | 2014-11-20 | 2015-03-11 | 张红 | 一种复合桩的施工方法 |
CN105421445A (zh) * | 2015-11-01 | 2016-03-23 | 天津建城基业集团有限公司 | 非预应力离心高强混凝土桩植桩施工方法 |
-
2018
- 2018-04-16 CN CN201810338681.0A patent/CN108505515A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS56100922A (en) * | 1980-01-14 | 1981-08-13 | Toshima Kensetsu Kk | Construction of shaft |
CN1718937A (zh) * | 2005-07-22 | 2006-01-11 | 苏州市能工基础工程有限责任公司 | 非取土引孔预应力管桩或预制方桩沉桩工艺 |
CN102767178A (zh) * | 2012-07-18 | 2012-11-07 | 上海建工二建集团有限公司 | 立柱桩及其施工方法 |
CN104404947A (zh) * | 2014-11-20 | 2015-03-11 | 张红 | 一种复合桩的施工方法 |
CN105421445A (zh) * | 2015-11-01 | 2016-03-23 | 天津建城基业集团有限公司 | 非预应力离心高强混凝土桩植桩施工方法 |
Non-Patent Citations (3)
Title |
---|
建筑工程手册编委会编: "《建筑工程手册 第三册 建筑工程施工卷》", 30 November 1993, 地震出版社 * |
沈旦申等: "《粉煤灰优质混凝土》", 30 November 1992, 上海科学技术出版社 * |
竹涛主编: "《矿山固体废物处理与处置工程》", 30 June 2016, 冶金工业出版社 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111172971A (zh) * | 2020-02-27 | 2020-05-19 | 周同和 | 一种管内灌浆挤扩根固桩的施工方法 |
CN113774906A (zh) * | 2021-07-29 | 2021-12-10 | 安徽省交通规划设计研究总院股份有限公司 | 一种扩引孔灌注充盈砂浆植入复合截面空心桩施工工艺 |
CN114482013A (zh) * | 2022-02-14 | 2022-05-13 | 安徽省交通规划设计研究总院股份有限公司 | 一种扩引孔预制桩悬浮式可嵌岩复合桩结构及其施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20140314497A1 (en) | Polymer grouting method for constructing gravel pile | |
CN202466594U (zh) | 水平旋喷土锚和灌注桩复合基坑支护结构 | |
CN103015413B (zh) | 内植刚性体嵌入硬持力层复合桩的施工方法 | |
CN101225661A (zh) | 桩加锚基坑支护工法 | |
CN108505515A (zh) | 一种水泥砂浆复合桩的施工方法 | |
CN107012861B (zh) | 一种散体材料芯膨胀混凝土桩及其施工方法 | |
CN108560542A (zh) | 一种废旧轮胎包覆建渣的双向增强体及其施工方法 | |
CN103603379A (zh) | 抗浮水泥土桩和抗浮锚杆相结合的抗浮体系及其施工工艺 | |
CN104988914A (zh) | 一种水域环境下的钻孔灌注桩断桩处理方法 | |
CN104863613B (zh) | 岩质地层暗挖地下结构高边墙锚拉初支结构及施工方法 | |
CN106149745A (zh) | 一种桁架式钢管注浆桩基础及其施工方法 | |
CN203613568U (zh) | 抗浮水泥土桩和抗浮锚杆相结合的抗浮体系 | |
CN103161164A (zh) | 一种旋压凿岩植入桩底后注浆的嵌岩预应力管桩 | |
CN205917713U (zh) | 一种桁架式钢管注浆桩基础 | |
CN202672161U (zh) | 一种带有土钉的水泥土搅拌筒板联桩护坡结构 | |
CN203334288U (zh) | 一种新型竖向基坑围护结构 | |
CN105714832A (zh) | 一种深基坑大尺寸预制围护结构及施工方法 | |
CN111396061B (zh) | 一种盾构施工方法及其施工作业面 | |
CN102433882A (zh) | 一种混凝土桩墙与旋喷锚桩组合形成基坑支护的施工方法及锚筋结构件 | |
CN103790190B (zh) | 预制空心打入桩基补救加固方法 | |
CN111172971A (zh) | 一种管内灌浆挤扩根固桩的施工方法 | |
CN113106969A (zh) | 一种劲性载体桩及施工工艺 | |
Zhang et al. | Shield cutting pile-group implementation effects on the superstructure | |
CN104878762A (zh) | 一种适用于倾斜坚硬岩石地段钻孔桩施工方法 | |
CN218204422U (zh) | 一种prc管桩与预应力锚索组合的基坑支护结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180907 |