CN108500148A - A kind of chain buckle structure and its mechanical-pneumatic assembling die and processing method - Google Patents

A kind of chain buckle structure and its mechanical-pneumatic assembling die and processing method Download PDF

Info

Publication number
CN108500148A
CN108500148A CN201710107711.2A CN201710107711A CN108500148A CN 108500148 A CN108500148 A CN 108500148A CN 201710107711 A CN201710107711 A CN 201710107711A CN 108500148 A CN108500148 A CN 108500148A
Authority
CN
China
Prior art keywords
recessed portion
die
link plate
chain
buckle structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710107711.2A
Other languages
Chinese (zh)
Inventor
宋阳
全宏鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Green Jewelry Manufacturing Co Ltd
Original Assignee
Shenzhen Green Jewelry Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Green Jewelry Manufacturing Co Ltd filed Critical Shenzhen Green Jewelry Manufacturing Co Ltd
Priority to CN201710107711.2A priority Critical patent/CN108500148A/en
Publication of CN108500148A publication Critical patent/CN108500148A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D37/00Tools as parts of machines covered by this subclass
    • B21D37/10Die sets; Pillar guides
    • B21D37/12Particular guiding equipment, e.g. pliers; Special arrangements for interconnection or cooperation of dies
    • AHUMAN NECESSITIES
    • A44HABERDASHERY; JEWELLERY
    • A44CPERSONAL ADORNMENTS, e.g. JEWELLERY; COINS
    • A44C27/00Making jewellery or other personal adornments
    • A44C27/001Materials for manufacturing jewellery
    • A44C27/002Metallic materials
    • AHUMAN NECESSITIES
    • A44HABERDASHERY; JEWELLERY
    • A44CPERSONAL ADORNMENTS, e.g. JEWELLERY; COINS
    • A44C5/00Bracelets; Wrist-watch straps; Fastenings for bracelets or wrist-watch straps
    • A44C5/18Fasteners for straps, chains or the like
    • A44C5/20Fasteners for straps, chains or the like for open straps, chains or the like
    • A44C5/2071Fasteners for straps, chains or the like for open straps, chains or the like with the two ends of the strap or chain overlapping each other and fastened by an action perpendicularly to the main plane of these two ends
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D28/00Shaping by press-cutting; Perforating
    • B21D28/24Perforating, i.e. punching holes
    • B21D28/34Perforating tools; Die holders
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D45/00Ejecting or stripping-off devices arranged in machines or tools dealt with in this subclass
    • B21D45/003Ejecting or stripping-off devices arranged in machines or tools dealt with in this subclass in punching machines or punching tools
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Buckles (AREA)

Abstract

The present invention relates to a kind of chain buckle structure and its mechanical-pneumatic assembling die and processing method, a kind of chain buckle structure, including:Ontology;The ontology includes:Left link plate and right link plate, and the connection part for coupling left link plate and right link plate;The inner end that the left link plate, right link plate are bordering on connection part is respectively equipped with left connecting hole, right connecting hole;The outer end that the left link plate, right link plate are distal to connection part is respectively equipped with left recessed portion, right recessed portion;For the ontology after connection part doubling, the left connecting hole, right connecting hole form lower chain button hole, the left recessed portion, right recessed portion both sides gap form cochain button hole.Left link plate and right link plate can be once-forming by press machine, and easy to assembly, and mold can recycle, and reduce production cost, improve production efficiency.

Description

A kind of chain buckle structure and its mechanical-pneumatic assembling die and processing method
Technical field
The present invention relates to jewellery and mold and method more particularly to chain buckle structure and its mechanical-pneumatic assembling die and processing Method.
Background technology
The chains such as traditional necklace, bangle jewellery are shaped using lost wax casting, and the chain that a secondary wax-pattern can shape buckles Structure limited amount, and manufacturing process process is complicated, time-consuming, chains jewellery size, the weight such as necklace, bangle of lost wax casting manufacture Differ, and there is phenomena such as higher husky hole, crackle, cost, low production efficiency.
Invention content
Place in order to overcome the above-mentioned deficiencies of the prior art, the object of the present invention is to provide a kind of chain buckle structure and its machineries Pneumatic assembling die and processing method.
The technical scheme is that:
A kind of chain buckle structure, including:Ontology;The ontology includes:Left link plate and right link plate, and for coupling a left side The connection part of link plate and right link plate;The inner end that the left link plate, right link plate are bordering on connection part is respectively equipped with left connection Hole, right connecting hole;The outer end that the left link plate, right link plate are distal to connection part is respectively equipped with left recessed portion, right recessed portion;Institute Ontology is stated after connection part doubling, the left connecting hole, right connecting hole form lower chain button hole, the left recessed portion, right recessed portion The gap of both sides forms cochain button hole.
Its further technical solution is:The left link plate is equipped with left inside recessed between connection part and left recessed portion Portion;The right link plate is equipped with the right inner fovea part between connection part and right recessed portion;The left inside recess portion is equipped with described Left connecting hole;The right inner fovea part be equipped with the right connecting hole;The ontology is after connection part doubling, the left inside recess portion Be fixedly connected with the edge of right inner fovea part, the left recessed portion is fixedly connected with the tail portion of right recessed portion so that left inside recess portion with Abdominal cavity is formed between right inner fovea part, left recessed portion and right recessed portion;The left connecting hole, abdominal cavity, right connecting hole form lower cuff link Hole;The left recessed portion and the gap portion of right recessed portion both sides form cochain button hole with abdominal cavity.
Its further technical solution is:Two edges of the left recessed portion and the adjacent surface of right recessed portion are indent The end of shape, the two is fixedly connected, and forms the cochain button hole.
A kind of mechanical-pneumatic assembling die is used to manufacture the sheet structure of above-mentioned ontology, the mechanical-pneumatic combination die Tool includes upper die holder, lower die holder;The upper die holder is equipped with forming terrace die, punch upper die successively;The lower die holder successively be equipped at Shape matrix cavity, punching lower mode cavity;The forming terrace die is matched with female die for forming chamber, to shape left link plate and right connection sheet Profile;The punch upper die is matched with punching lower mode cavity, to shape the left connecting hole and right connecting hole.
Its further technical solution is:The lower die holder includes fixed die holder and active mould seat;The fixed die holder is set There is the female die for forming chamber, the installation cavity being located on rear side of female die for forming chamber, and interior and top is equipped with punching positioned at installation cavity The punching protrusion of punch-pin;The active mould seat is slidably connected in the installation cavity of fixed die holder, active mould seat and fixed die holder it Between be equipped with elastic component, active mould seat is equipped with the punching lower mode cavity positioned at top, and for the mounting hole across punching protrusion;Institute It states punch upper die and is equipped with the upper die hole for being used for punching protrusion.
Its further technical solution is:The lower die holder further includes the guide plate for being fixed on fixed die holder upper end;It is described to lead It is equipped with feeding channel between plate and fixed die holder;The guide plate be equipped with for across forming terrace die, punch upper die it is several Pilot hole.
Its further technical solution is:The punch upper die is equipped with blows material channel positioned at upper mold bore end;The machinery Pneumatic assembling die further includes blowing waste material device;The lower die holder is equipped with the inlet channel being connected to punching lower mode cavity, Yi Jiwei In inlet channel offside tapping channel;When blowing material channel with being docked between inlet channel, tapping channel of the upper die holder, it is described Waste material device is blown to blow to inlet channel.
Its further technical solution is:The lower die holder is provided with positioned at side and blows waste material device air blowing for controlling Travel switch;The upper die holder is fixed with an elastic top-pressure part for controlling travel switch on/off.
Its further technical solution is:A kind of processing method of chain buckle structure, uses above-mentioned mechanical-pneumatic combination die The processing method of tool, the chain buckle structure is method one or method two;
The method one includes the following steps:
A. sheet blank is manufactured;
B. mechanical-pneumatic assembling die is used to shape several ontologies;
C. for ontology along connection part doubling, the left connecting hole, right connecting hole form lower chain button hole, the left recessed portion, the right side The gap of recessed portion both sides forms cochain button hole;
D. the edge of welded chain buckle structure left inside recess portion and right inner fovea part;
E. connect latter chain buckle structure to previous chain buckle structure lower chain button hole;
F. the tail portion of the left recessed portion and right recessed portion of latter chain buckle structure is welded;
G. step E, F is repeated, to form cuff link chain structure;
H. the chain buckle structure on serial chain bitch chain head and tail portion, to form cuff link string;
I. the tail portion of the left recessed portion and right recessed portion of welding front-end chain buckle structure;
The method two includes the following steps:
A. sheet blank is manufactured;
B. mechanical-pneumatic assembling die is used to shape several ontologies;
C. for ontology along connection part doubling, the left connecting hole, right connecting hole form lower chain button hole, the left recessed portion, the right side The gap of recessed portion both sides forms cochain button hole;
D. connect latter chain buckle structure to previous chain buckle structure lower chain button hole;
E. the edge of all chain buckle structure left inside recess portions and right inner fovea part is welded;
F. the tail portion of all chain buckle structure left recessed portions and right recessed portion is welded..
The present invention having the technical effect that compared with prior art:A kind of point of chain buckle structure, left link plate and right link plate Not She You left connecting hole, right connecting hole and left recessed portion, right recessed portion, left link plate and right link plate are along connection part bending Afterwards, left connecting hole, right connecting hole form lower chain button hole, left recessed portion, right recessed portion both sides gap form cochain button hole, pass through Lower chain button hole, cochain button hole realize the other chain buckle structures of rear and front end series connection, to form chain or String structure.Left link Piece and right link plate can be shaped by press machine, reduced production cost, improved production efficiency.
Further, left link plate and right link plate form hollow abdominal cavity between the two after connection part bending, less Material can make the larger chain buckle structure of volume, can meet the purchasing demand of client.
A kind of mechanical-pneumatic assembling die, uses upper die holder, lower die holder to match, to shape left link plate profile, a left side Connecting hole, process is simple, production efficiency is high, and mold can recycle, and production cost is low, also, change punch-pin, matrix cavity The shape or lines on surface, it is possible to produce the body construction of different shapes, the controlled shape of left link plate and right link plate Property is strong.
A kind of processing method of chain buckle structure, the left link plate of said combination mold manufacturing and right link plate are first fabricated to Then chain buckle structure is sequentially connected in series and is welded by chain buckle structure, to form chain or String structure.
The invention will be further described in the following with reference to the drawings and specific embodiments.
Description of the drawings
Fig. 1 is a kind of vertical view of chain buckle structure unfolded state of the present invention;
Fig. 2 is the three-dimensional view after a kind of welding of chain buckle structure of the present invention;
Fig. 3 is a kind of three-dimensional view of chain bitch chain of the present invention;
Fig. 4 is a kind of three-dimensional view of mechanical-pneumatic assembling die;
Fig. 5 is a kind of decomposition view of mechanical-pneumatic assembling die;
Fig. 6 is the vertical view of lower die holder;
Fig. 7 is the sectional view of lower die holder;
Fig. 8 is the three-dimensional view of upper die holder;
Fig. 9 is the upward view of upper die holder;
Figure 10 is the flow chart of a kind of method one in processing method of chain buckle structure;
Figure 11 is the flow chart of a kind of method two in processing method of chain buckle structure.
Reference numeral
10 chain buckle structure, 1 left link plate
11 left inside recess portion, 111 left connecting hole
12 left recessed portion, 2 right link plate
21 right inner fovea part, 211 right connecting hole
22 right recessed portion, 3 connection part
41 times 42 cochain button holes of chain button hole
43 abdominal cavity, 44 male part
20 5 upper die holders of pneumatic combination
51 forming terrace die, 52 punch upper die
Die hole 522 blows material channel on 521
53 blank punch-pin 54 cut punch-pin
6 lower die holders 61 fix die holder
611 upper fixed seat, 612 lower fixed seat
613 female die for forming chamber 613A punching lower mode cavities
614 installation cavity, 615 piercing punch
616 punchings, 617 blank matrix cavities of protrusion
Blow tank after blow tank 618A before 617A
618 cut 619 inlet channel of matrix cavity
62 active mould seat of 619A tapping channels
63 travel switch, 64 guide plate
Blow waste material device in 65 feeding channels 7
8 elastic components
Specific implementation mode
It is further to technical scheme of the present invention with reference to schematic diagram in order to more fully understand the technology contents of the present invention It introduces and illustrates, but not limited to this.
A kind of chain buckle structure can be applied to the chain buckle structure of bangle, necklace, chain string, pendant.Chain buckle structure includes:This Body.Ontology includes:What left link plate and right link plate were constituted, and the connection part for coupling left link plate and right link plate. The inner end that left link plate, right link plate are bordering on connection part is respectively equipped with left connecting hole, right connecting hole, left link plate, right link plate The outer end for being distal to connection part is respectively equipped with left recessed portion, right recessed portion.Ontology is after connection part doubling, left connecting hole, right connection Hole forms lower chain button hole, left recessed portion, right recessed portion both sides gap form cochain button hole.
As shown in Figure 1, Figure 2, Figure 3 shows, a kind of chain buckle structure 10, including:Ontology.Ontology includes:Left link plate 1 and right link Piece 2, and the connection part 3 for coupling left link plate 1 and right link plate 2.Left link plate 1, right link plate 2 are bordering on connection part 3 Inner end be respectively equipped with left connecting hole 111, right connecting hole 211, left link plate 1, right link plate 2 are distal to the outer end point of connection part 3 It She You not left recessed portion 12, right recessed portion 22.Ontology is after 3 doubling of connection part, under left connecting hole 111, right connecting hole 211 are formed Chain button hole 41, left recessed portion 12,22 both sides of right recessed portion gap form cochain button hole 42.
Left link plate 1 is equipped with the left inside recess portion 11 between connection part 3 and left recessed portion 12, and right link plate 2 is equipped with position Right inner fovea part 21 between connection part 3 and right recessed portion 22.Left inside recess portion 11 be equipped with left connecting hole 111, right inner fovea part 21 with Equipped with right connecting hole 211.After 3 doubling of connection part, left inside recess portion 11 is fixedly connected ontology with the edge of right inner fovea part 21, left recessed Concave portion 12 is fixedly connected with the tail portion of right recessed portion 22 so that left inside recess portion 11 and right inner fovea part 21, left recessed portion 12 and the right side are recessed Abdominal cavity 43 is formed between concave portion 22.Left connecting hole 111, abdominal cavity 43, right connecting hole 211 form lower chain button hole 41, left recessed portion 12 With the gap portion of 22 both sides of right recessed portion cochain button hole 42 is formed with abdominal cavity 43.Preferably, left inside recess portion 11 and right inner fovea part The tail portion at 21 edge, left recessed portion 12 and right recessed portion 22, which uses, to be welded and fixed.
Two edges of left recessed portion 12 and the adjacent surface of right recessed portion 22 are concave shaped, and connection is fixed in the end of the two It connects, forms cochain button hole 42.Latter chain buckle structure 10 pass through previous chain buckle structure 10 lower chain button hole 41 mounting be unified into chain or Person's string-like.
Welding can form the chain buckle structure being closed after 2 bending of left link plate 1 and right link plate, and manufacturing process is simpler It is single, and it is hollow structure that it is internal, and it is larger can to make volume for less materials such as the necklaces, bangle, pendant of noble metal Contour structures, the purchasing demand of client can be met.
The surface of left link plate 1 and right link plate 2 is additionally provided with male part 44, in other embodiments, left link plate 1 and the right side The surface of link plate 2 is equipped with decorative pattern lines, thus it is possible to vary lines designs a variety of link plates of different moneys.
As shown in Figure 4, Figure 5, a kind of mechanical-pneumatic assembling die 20, is used to manufacture the sheet structure of above-mentioned ontology.Machine The pneumatic assembling die 20 of tool includes upper die holder 5, lower die holder 6.Upper die holder 5 successively be equipped with forming terrace die 51, punch upper die 52 (in conjunction with Fig. 8), lower die holder 6 is equipped with female die for forming chamber 613, punching lower mode cavity 613A successively.Forming terrace die 51 and 613 phase of female die for forming chamber Cooperation, to shape the profile of the profile of left link plate and right connection sheet, punch upper die 52 is matched with punching lower mode cavity 613A, with Shape left connecting hole and right connecting hole.In the present embodiment, forming process is divided into the progress of two steps, and therefore, forming terrace die is by two It is grouped as, female die for forming chamber also consists of two parts, and in other embodiments, can select one according to the specific requirement of forming Secondary or multiple forming.
Lower die holder 6 includes fixed die holder 61 and active mould seat 62.Fixed die holder 61 includes upper fixed seat 611 and lower solid Reservation 612.Fixed die holder 61 is equipped with female die for forming chamber 613, is located at the installation cavity 614 of 613 rear side of female die for forming chamber, and is located at In installation cavity 614 and top is equipped with the punching protrusion 616 of piercing punch 615, wherein punching protrusion 616 is fixed on lower fixed seat 612。
Lower die holder 6 is provided with positioned at side and for controlling the travel switch for blowing waste material device air blowing, and upper die holder 5 is fixed with The one elastic top-pressure part for controlling 63 on/off of travel switch, elastic top-pressure part are moved downward simultaneously with upper die holder 5, elastic top When casting die clamping stroke switch 63, blows waste material device and blow.
Preferably, upper die holder 5 is additionally provided with the blank punch-pin 53 positioned at 51 front side of forming terrace die, is located at 51 rear side of forming terrace die Cut punch-pin 54 (in conjunction with Fig. 8).Lower die holder 6 is additionally provided with the blank matrix cavity 617 positioned at 613 front side of female die for forming chamber, and Preceding blow tank 617A positioned at the lower section of blank matrix cavity 617 cuts matrix cavity 618 positioned at 613 rear side of female die for forming chamber, and Positioned at the rear blow tank 618A for cutting 618 lower section of matrix cavity.The sheet noumenon of completion is cut from rear blow tank 618A blankings, blank The flaky material of completion is from preceding blow tank 617A blankings.In other embodiments, blank punch-pin, blank matrix cavity, preceding blow tank With cut punch-pin, cut matrix cavity, rear blow tank is also not arranged in assembling die;It is recessed that can also blank punch-pin, blank be only set Die cavity, preceding blow tank cut punch-pin, cut matrix cavity, rear blow tank.Lower die holder 6 further includes being fixed on 61 upper end of fixed die holder Guide plate 64, feeding channel 65 is equipped between guide plate 64 and fixed die holder 61.It is equidistant gradually by feed mechanism when punching press Sheet stock is transferred in feeding channel 65 into formula.Guide plate 64 is equipped with for convex across forming terrace die 51, punch upper die 52, blank Mould 53, the pilot hole for cutting punch-pin 54.
The guide post and guide groove for guiding are additionally provided between upper die holder 5 and lower die holder 6.
As shown in fig. 6, punch upper die 52 is equipped with blows material channel 522 (in conjunction with Fig. 8), machinery positioned at 521 end of upper die hole Pneumatic assembling die 20 further includes blowing waste material device 7, and lower die holder 6 is equipped with the inlet channel 619 being connected to punching lower mode cavity 613A, And it is located at 619 offside tapping channel 619A of inlet channel.The material channel 522 of blowing of upper die holder 5 leads to inlet channel 619, discharging It when road 619A is docked, blows waste material device 7 and blows to inlet channel 619, to which punching protrusion 616 is punched into upper die hole 521 Waste material is blown out from material channel 522 is blown.Wherein, travel switch 63 blows waste material device 7 to the air blowing of inlet channel 619 for controlling.
As shown in fig. 7, active mould seat 62 is slidably connected in the installation cavity 614 of fixed die holder 61, active mould seat 62 with it is solid Elastic component 8 is equipped between cover half seat 61.Active mould seat 62 is equipped with the punching lower mode cavity 613A positioned at top, and for across punching The mounting hole 621 of hole protrusion 616.Specifically, elastic component 8 is spring, when 52 downward punching of punch upper die, active mould seat 62 exists It is moved down under the shock of film in punching, so that punching protrusion 616 coordinates with upper fenestra.
As shown in Figure 8,9, forming terrace die 51 includes left punch-pin 511 and right punch-pin 512.Punch upper die 52 include upper left mould and Upper right mould, female die for forming chamber 613 include left cavity plate and right cavity plate.Punching lower mode cavity 613A includes lower-left mould and bottom right mould, and a left side is convex Mould 511 is matched with left cavity plate, upper left mould with lower-left mould, to shape left link plate, right punch-pin 512 and right cavity plate, upper right mould with Bottom right mould matches, to shape right link plate.
Preferably, punch upper die 52 is equipped with the upper die hole 521 for punching protrusion 616, and punching protrusion 616 is fixed on lower solid Reservation 612.In other embodiments, punch upper die is equipped with punching protrusion, and upper die hole is arranged on upper fixed seat.
Left link plate and right link plate can be shaped by a punching press, also, forming period is slow, therefore, production Efficiency is very high.
In other embodiments, the upper and lower position of punch upper die and punching lower mode cavity can be inverted.
In other embodiments, left link plate and right link plate are segmented into and process twice, and therefore, forming terrace die can be set There are left punch-pin or right punch-pin, punch upper die to be equipped with upper left mould or upper right mould.
A kind of processing method of chain buckle structure, uses above-mentioned mechanical-pneumatic assembling die, the processing side of chain buckle structure Method is method one or method two;
As shown in Figure 10, method one includes the following steps:
A. sheet blank is manufactured;
B. mechanical-pneumatic assembling die is used to shape several ontologies;
C. for ontology along connection part doubling, the left connecting hole, right connecting hole form lower chain button hole, the left recessed portion, the right side The gap of recessed portion both sides forms cochain button hole;
D. the edge of welded chain buckle structure left inside recess portion and right inner fovea part;
E. connect latter chain buckle structure to previous chain buckle structure lower chain button hole;
F. the tail portion of the left recessed portion and right recessed portion of latter chain buckle structure is welded;
G. step E, F is repeated, to form cuff link chain structure;
H. the chain buckle structure on serial chain bitch chain head and tail portion, to form cuff link string;
I. the tail portion of the left recessed portion and right recessed portion of welding front-end chain buckle structure;
As shown in figure 11, method two includes the following steps:
A. sheet blank is manufactured;
B. mechanical-pneumatic assembling die is used to shape several ontologies;
C. for ontology along connection part doubling, the left connecting hole, right connecting hole form lower chain button hole, the left recessed portion, the right side The gap of recessed portion both sides forms cochain button hole;
D. connect latter chain buckle structure to previous chain buckle structure lower chain button hole;
E. the edge of all chain buckle structure left inside recess portions and right inner fovea part is welded;
F. the tail portion of all chain buckle structure left recessed portions and right recessed portion is welded.
It in the specific implementation, can be according to specific needs, by cuff link structures in series at chain or string-like.
It is above-mentioned only with embodiment come the technology contents that further illustrate the present invention, in order to which reader is easier to understand, but not It represents embodiments of the present invention and is only limitted to this, any technology done according to the present invention extends or recreation, by the present invention's Protection, protection scope of the present invention are subject to claims.

Claims (10)

1. a kind of chain buckle structure, which is characterized in that including:Ontology;The ontology includes:Left link plate and right link plate, and Connection part for coupling left link plate and right link plate;The left link plate, right link plate are bordering on the inner end difference of connection part Equipped with left connecting hole, right connecting hole;The left link plate, right link plate be distal to connection part outer end be respectively equipped with left recessed portion, Right recessed portion;For the ontology after connection part doubling, the left connecting hole, right connecting hole form lower chain button hole, the left recess The gap formation cochain button hole in portion, right recessed portion both sides.
2. chain buckle structure according to claim 1, which is characterized in that the left link plate is equipped with recessed positioned at connection part and a left side Left inside recess portion between concave portion;The right link plate is equipped with the right inner fovea part between connection part and right recessed portion;The left side Inner fovea part is equipped with the left connecting hole;The right inner fovea part be equipped with the right connecting hole;The ontology is along connection part pair After folding, the left inside recess portion is fixedly connected with the edge of right inner fovea part, and the tail portion of the left recessed portion and right recessed portion, which is fixed, to be connected It connects so that form abdominal cavity between left inside recess portion and right inner fovea part, left recessed portion and right recessed portion;The left connecting hole, abdominal cavity, the right side Connecting hole forms lower chain button hole;The left recessed portion and the gap portion of right recessed portion both sides form cochain button hole with abdominal cavity.
3. chain buckle structure according to claim 2, which is characterized in that the left recessed portion and the adjacent surface of right recessed portion Two edges are concave shaped, and the end of the two is fixedly connected, and form the cochain button hole.
4. a kind of mechanical-pneumatic assembling die is used to manufacture the sheet structure of the ontology as described in claim any one of 1-3, It is characterized in that, the mechanical-pneumatic assembling die includes upper die holder, lower die holder;The upper die holder is equipped with forming terrace die, punching successively Hole upper mold;The lower die holder is equipped with female die for forming chamber, punching lower mode cavity successively;The forming terrace die matches with female die for forming chamber It closes, to shape the profile of left link plate and right connection sheet;The punch upper die is matched with punching lower mode cavity, described with forming Left connecting hole and right connecting hole.
5. mechanical-pneumatic assembling die according to claim 4, which is characterized in that the lower die holder includes fixed die holder, And active mould seat;The fixed die holder is equipped with the female die for forming chamber, the installation cavity being located on rear side of female die for forming chamber, and In installation cavity and top is equipped with the punching protrusion of piercing punch;The active mould seat is slidably connected to the installation of fixed die holder Intracavitary, is equipped with elastic component between active mould seat and fixed die holder, active mould seat is equipped with the punching lower mode cavity positioned at top, Yi Jiyong In the mounting hole across punching protrusion;The punch upper die is equipped with the upper die hole for punching protrusion.
6. mechanical-pneumatic assembling die according to claim 5, which is characterized in that the lower die holder further includes being fixed on The guide plate of cover half seat upper end;It is equipped with feeding channel between the guide plate and fixed die holder;The guide plate is equipped with for wearing Cross several pilot holes of forming terrace die, punch upper die.
7. mechanical-pneumatic assembling die according to claim 5, which is characterized in that the punch upper die, which is equipped with, is located at upper mold Bore end blows material channel;The mechanical-pneumatic assembling die further includes blowing waste material device;The lower die holder be equipped with under punching The inlet channel of die cavity connection, and it is located at inlet channel offside tapping channel;The material channel of blowing of the upper die holder leads to air inlet When being docked between road, tapping channel, the waste material device that blows blows to inlet channel.
8. mechanical-pneumatic assembling die according to claim 7, which is characterized in that the lower die holder is provided with positioned at side And for controlling the travel switch for blowing waste material device air blowing;The upper die holder is fixed with one for controlling travel switch on/off Elastic top-pressure part.
9. mechanical-pneumatic assembling die according to claim 4, which is characterized in that the upper die holder is additionally provided with positioned at forming Blank punch-pin on front side of punch-pin;The lower die holder is additionally provided with the blank matrix cavity on front side of female die for forming chamber, and positioned at cutting Expect the preceding blow tank below matrix cavity;
And/or
The upper die holder is additionally provided with cuts punch-pin on rear side of forming terrace die;The lower die holder is additionally provided with positioned at female die for forming chamber Rear side cuts matrix cavity, and positioned at the rear blow tank cut below matrix cavity.
10. a kind of processing method of chain buckle structure, uses mechanical-pneumatic assembling die as claimed in claim 4, feature It is, the processing method of the chain buckle structure is method one or method two;
The method one includes the following steps:
A. sheet blank is manufactured;
B. mechanical-pneumatic assembling die is used to shape several ontologies;
C. for ontology along connection part doubling, the left connecting hole, right connecting hole form lower chain button hole, the left recessed portion, right recess The gap of portion both sides forms cochain button hole;
D. the edge of welded chain buckle structure left inside recess portion and right inner fovea part;
E. connect latter chain buckle structure to previous chain buckle structure lower chain button hole;
F. the tail portion of the left recessed portion and right recessed portion of latter chain buckle structure is welded;
G. step E, F is repeated, to form cuff link chain structure;
H. the chain buckle structure on serial chain bitch chain head and tail portion, to form cuff link string;
I. the tail portion of the left recessed portion and right recessed portion of welding front-end chain buckle structure;
The method two includes the following steps:
A. sheet blank is manufactured;
B. mechanical-pneumatic assembling die is used to shape several ontologies;
C. for ontology along connection part doubling, the left connecting hole, right connecting hole form lower chain button hole, the left recessed portion, right recess The gap of portion both sides forms cochain button hole;
D. connect latter chain buckle structure to previous chain buckle structure lower chain button hole;E. all left inside recess portions of chain buckle structure and the right side are welded The edge of inner fovea part;F. the tail portion of all chain buckle structure left recessed portions and right recessed portion is welded.
CN201710107711.2A 2017-02-27 2017-02-27 A kind of chain buckle structure and its mechanical-pneumatic assembling die and processing method Pending CN108500148A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710107711.2A CN108500148A (en) 2017-02-27 2017-02-27 A kind of chain buckle structure and its mechanical-pneumatic assembling die and processing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710107711.2A CN108500148A (en) 2017-02-27 2017-02-27 A kind of chain buckle structure and its mechanical-pneumatic assembling die and processing method

Publications (1)

Publication Number Publication Date
CN108500148A true CN108500148A (en) 2018-09-07

Family

ID=63373150

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710107711.2A Pending CN108500148A (en) 2017-02-27 2017-02-27 A kind of chain buckle structure and its mechanical-pneumatic assembling die and processing method

Country Status (1)

Country Link
CN (1) CN108500148A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109731996A (en) * 2019-01-31 2019-05-10 深圳市金玲珑珠宝首饰有限公司 A kind of full-automatic split-mounting type necklace mold

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100622442B1 (en) * 2006-03-02 2006-09-12 이영우 Hanger manufacturing method and hanger manufacture system
WO2008067692A1 (en) * 2006-12-06 2008-06-12 Hoi Ling Cheng A manufacture method of a milan chain graphical sheet
US20080314189A1 (en) * 2006-02-07 2008-12-25 Christian Lutz Deformable element, of a steering wheel spindle in the form of a corrugated tube
CN201172086Y (en) * 2007-04-11 2008-12-31 天津市津荣天和机电有限公司 Novel fine stamping die
JP4922466B1 (en) * 2011-08-25 2012-04-25 株式会社杢目金屋 Ring manufacturing method, apparatus and ring
CN103350140A (en) * 2013-08-01 2013-10-16 厦门锐腾电子科技有限公司 Upper punching structure for continuous deep drawing or molding die
CN203356394U (en) * 2013-07-03 2013-12-25 吉林博仁科技股份有限公司 Automobile engine pipeline support die
CN104525731A (en) * 2014-12-17 2015-04-22 吉林博仁科技股份有限公司 Novel Audi B9 front support, left support and right support continuous forming die
CN104668338A (en) * 2013-11-28 2015-06-03 梁万利 High-precision bending mold for side face punching
CN205253895U (en) * 2015-12-03 2016-05-25 苏州东风精冲工程有限公司 Little scrap (bridge) blanking shaping essence towards continuous mould of bending
CN205866197U (en) * 2016-05-31 2017-01-11 老凤祥东莞珠宝首饰有限公司 Watch -type hand lace with three -dimensional stereoeffect
CN206535941U (en) * 2017-02-27 2017-10-03 深圳市翠绿首饰制造有限公司 A kind of chain buckle structure and its mechanical-pneumatic assembling die

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080314189A1 (en) * 2006-02-07 2008-12-25 Christian Lutz Deformable element, of a steering wheel spindle in the form of a corrugated tube
KR100622442B1 (en) * 2006-03-02 2006-09-12 이영우 Hanger manufacturing method and hanger manufacture system
WO2008067692A1 (en) * 2006-12-06 2008-06-12 Hoi Ling Cheng A manufacture method of a milan chain graphical sheet
CN201172086Y (en) * 2007-04-11 2008-12-31 天津市津荣天和机电有限公司 Novel fine stamping die
JP4922466B1 (en) * 2011-08-25 2012-04-25 株式会社杢目金屋 Ring manufacturing method, apparatus and ring
CN203356394U (en) * 2013-07-03 2013-12-25 吉林博仁科技股份有限公司 Automobile engine pipeline support die
CN103350140A (en) * 2013-08-01 2013-10-16 厦门锐腾电子科技有限公司 Upper punching structure for continuous deep drawing or molding die
CN104668338A (en) * 2013-11-28 2015-06-03 梁万利 High-precision bending mold for side face punching
CN104525731A (en) * 2014-12-17 2015-04-22 吉林博仁科技股份有限公司 Novel Audi B9 front support, left support and right support continuous forming die
CN205253895U (en) * 2015-12-03 2016-05-25 苏州东风精冲工程有限公司 Little scrap (bridge) blanking shaping essence towards continuous mould of bending
CN205866197U (en) * 2016-05-31 2017-01-11 老凤祥东莞珠宝首饰有限公司 Watch -type hand lace with three -dimensional stereoeffect
CN206535941U (en) * 2017-02-27 2017-10-03 深圳市翠绿首饰制造有限公司 A kind of chain buckle structure and its mechanical-pneumatic assembling die

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109731996A (en) * 2019-01-31 2019-05-10 深圳市金玲珑珠宝首饰有限公司 A kind of full-automatic split-mounting type necklace mold
CN109731996B (en) * 2019-01-31 2024-04-16 深圳市金玲珑珠宝首饰有限公司 Full-automatic assembled combined necklace die

Similar Documents

Publication Publication Date Title
CN103894515B (en) The production technology of automobile axle wire harness bracket and molding, punching-cut-out mould
CN104971997B (en) Make the progressive die and its method of automotive seat hinge
CN205253895U (en) Little scrap (bridge) blanking shaping essence towards continuous mould of bending
CN202212463U (en) Cutting and punching die
CN104190815A (en) Forming die and method for fireproof hood
CN206373230U (en) A kind of mobile fingerprint decoration diel
CN202516925U (en) Cutting and punching die
CN108500148A (en) A kind of chain buckle structure and its mechanical-pneumatic assembling die and processing method
CN206535941U (en) A kind of chain buckle structure and its mechanical-pneumatic assembling die
CN105436318B (en) A kind of progressive die for being used to process automotive starter shell
CN105598330B (en) The plastic forming method of eccentric hexagonal pivot pin
CN102935456A (en) Sealing cover inner-outer flanging forming die
CN204996989U (en) Spur gear blank precision forging forming die
CN105499398B (en) A kind of progressive die for production safety type lighter wind cap
CN218080214U (en) Parking gear blocking forging extrusion device
CN109367114A (en) A kind of new-energy automobile transformer part processing unit (plant)
CN106140940A (en) A kind of slab precise piecing die and hole-punching method thereof
KR102303484B1 (en) The cutout groove molding/metal patterns of the anchor rivet and anchor rivet manufacturing method using the same
CN203764782U (en) Bulging and punching progressive die for countersinking of plate springs with countersinks
CN208099241U (en) Ultra-thin hollow out chain integrally forming machine
CN110814168A (en) Precise die for manufacturing housing of DIP-6838 quartz crystal oscillator
CN208178229U (en) Automobile gusset tablet continuous stamping die
US604376A (en) Metal-working tool
CN205386598U (en) A modulus of continuity for producing high strength lighter wind cap
CN205519167U (en) Die -cut mould of car longitudinal wall inner panel part

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination