CN108494677A - The binding method and device of link - Google Patents

The binding method and device of link Download PDF

Info

Publication number
CN108494677A
CN108494677A CN201810253777.7A CN201810253777A CN108494677A CN 108494677 A CN108494677 A CN 108494677A CN 201810253777 A CN201810253777 A CN 201810253777A CN 108494677 A CN108494677 A CN 108494677A
Authority
CN
China
Prior art keywords
link
network equipment
logical links
communication sub
identifier information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810253777.7A
Other languages
Chinese (zh)
Other versions
CN108494677B (en
Inventor
侯志明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
New H3C Technologies Co Ltd
Original Assignee
New H3C Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by New H3C Technologies Co Ltd filed Critical New H3C Technologies Co Ltd
Priority to CN201810253777.7A priority Critical patent/CN108494677B/en
Publication of CN108494677A publication Critical patent/CN108494677A/en
Application granted granted Critical
Publication of CN108494677B publication Critical patent/CN108494677B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L45/00Routing or path finding of packets in data switching networks
    • H04L45/24Multipath
    • H04L45/245Link aggregation, e.g. trunking

Abstract

The present invention relates to a kind of binding method of link and devices, including:Obtain the current bundle status of the first link in the first network equipment, communication link of first link between the first network equipment and second network equipment;It has been bundled into multi-link protocol MP logical links when the current bundle status characterizes first link, and when receiving the first Link Control Protocol LCP messages of the carrying first identifier information that second network equipment is sent, using first link as the communication sub-link that can be used for sending datagram to second network equipment in the MP logical links;Wherein, second network equipment described in the first identifier information representation will be in first multilink bundling to the MP logical links.The binding method and device of the link provided according to embodiments of the present invention can avoid one-port equipment inconsistent for the MP bindings speed of the first link, the problem of causing data message to lose.

Description

The binding method and device of link
Technical field
The present invention relates to network technique field more particularly to the binding methods and device of a kind of link.
Background technology
Multi-link protocol (English:Multilink Protocol, referred to as:MP it is) by a plurality of point-to-point protocol (English: Point to Point Protocol, referred to as:PPP) multilink bundling is at a logical links.
During above-mentioned binding, the single advanced line link control protocol of ppp link (English:Link Control Protocol, referred to as:LCP negotiation) carries out the binding of ppp link after LCP negotiates successfully, by the ppp link bundle to On MP logical links.
But in MP network environments, since the processing capacity of the network equipment is different, the network equipment at ppp link both ends into The LCP of row ppp link negotiates spent time difference, and then the network equipment at ppp link both ends can be caused for ppp link MP binding speed it is inconsistent.Such as:The MP bindings of ppp link are completed in the network equipment 1, and the network equipment 2 not yet completes PPP The MP of link is bundled, if the network equipment 1 is sent out by the above-mentioned ppp link newly bundled in MP logical links to the network equipment 2 at this time The problem of sending data message, data message being caused to lose.
Invention content
In view of this, the present invention proposes a kind of binding method and device of link, to avoid one-port equipment for The MP bindings speed of ppp link is inconsistent, the problem of causing data message to lose..
In a first aspect, an embodiment of the present invention provides a kind of binding method of link, it is applied to first network equipment, institute The method of stating includes:
The current bundle status of the first link in the first network equipment is obtained, first link is first net Communication link between network equipment and second network equipment;
It has bundled into multi-link protocol MP logical links, and has connect when the current bundle status characterizes first link It, will be described when receiving the first Link Control Protocol LCP messages of the carrying first identifier information that second network equipment is sent First link is as the communication sub-link that can be used for sending datagram to second network equipment in the MP logical links;
Wherein, second network equipment described in the first identifier information representation is by first multilink bundling to the MP In logical links.
With reference to first aspect, in the first possible implementation, the method further includes:
It has bundled into the MP logical links when the current bundle status characterizes first link, and has not received When the first LCP messages, using first link as being not useable for setting to second network in the MP logical links The standby communication sub-link to send datagram.
With reference to first aspect, or with reference to first aspect the possible realization method of the first, in second of possible reality In existing mode, the method further includes:
The 2nd LCP messages are sent to second network equipment, the 2nd LCP messages include second identifier information, are used Determine the first network equipment by first link according to the second identifier information in making second network equipment In binding to the MP logical links.
With reference to first aspect, in the third possible realization method, the method further includes:
Judge whether first link is first communication sub-link in the MP logical links;
If first link is the first communication sub-link in the MP logical links, when the current binding shape When state characterization first link has been bundled into multi-link protocol MP logical links, by second described in the first chain road direction The network equipment sends the data message;
If first link is not the first communication sub-link in the MP logical links, when the current binding First link described in state representation has been bundled into multi-link protocol MP logical links, and receives second network equipment hair When the first Link Control Protocol LCP messages of the carrying first identifier information sent, using first link as the MP logics The communication sub-link that can be used for sending datagram to second network equipment in link.
The possible realization method of with reference to first aspect the first, in the 4th kind of possible realization method, the method Further include:
If the first LCP messages that second network equipment is sent are not received yet in preset time, by institute The first link is stated as the communication sub-link that can be used for sending datagram to second network equipment in the MP logical links.
In second aspect, an embodiment of the present invention provides a kind of bundling apparatuses of link, are applied to first network equipment, institute Stating device includes:
Acquisition module, the current bundle status for obtaining the first link in the first network equipment, first chain Communication link of the road between the first network equipment and second network equipment;
First processing module has been bundled for working as the current bundle status characterization first link to multi-link protocol In MP logical links, and receive the first Link Control Protocol of the carrying first identifier information that second network equipment is sent When LCP messages, using first link as can be used in the MP logical links to second network equipment transmission data The communication sub-link of message;
Wherein, second network equipment described in the first identifier information representation is by first multilink bundling to the MP In logical links.
In conjunction with second aspect, in the first possible implementation, described device further includes:
Second processing module has been bundled for working as the current bundle status characterization first link to the MP logics In link, and when not receiving the first LCP messages, using first link as being not useable in the MP logical links The communication sub-link to send datagram to second network equipment.
In conjunction with second aspect, or the first possible realization method of second aspect is combined, in second of possible reality In existing mode, described device further includes:
Sending module, for sending the 2nd LCP messages to second network equipment, the 2nd LCP messages include the Two identification informations, for making second network equipment determine that the first network equipment has been incited somebody to action according to the second identifier information In first multilink bundling to the MP logical links.
In conjunction with second aspect, in the third possible realization method, described device further includes:
Judgment module, for judging whether first link is first communication sub-link in the MP logical links;
Third processing module, if being the first communication sub-link in the MP logical links for first link, Then when the current bundle status, which characterizes first link, have been bundled into multi-link protocol MP logical links, by described Second network equipment described in first chain road direction sends the data message;
Fourth processing module, if being not the first communication subchain in the MP logical links for first link Road has then bundled into multi-link protocol MP logical links when the current bundle status characterizes first link, and has received When the first Link Control Protocol LCP messages of the carrying first identifier information sent to second network equipment, by described the One link is as the communication sub-link that can be used for sending datagram to second network equipment in the MP logical links.
In conjunction with the first possible realization method of second aspect, in the 4th kind of possible realization method, described device Further include:
5th processing module, if described for not receiving that second network equipment sends yet in preset time One LCP messages, then using first link as can be used for sending datagram to second network equipment in the MP logical links The communication sub-link of text.
According to another aspect of the present invention, a kind of bundling apparatus of link is provided, including:Processor;At storage Manage the memory of device executable instruction;Wherein, the processor is configured as executing the above method.
According to another aspect of the present invention, a kind of non-volatile computer readable storage medium storing program for executing is provided, is stored thereon with Computer program instructions, wherein the computer program instructions realize the above method when being executed by processor.
Therefore, by the binding method and device of application link provided in an embodiment of the present invention, first network equipment obtains The current bundle status of first link in first network equipment characterizes the first link in the current bundle status of the first link and has tied When being bind in MP logical links, and receiving the first LCP messages of carrying first identifier information of second network equipment transmission, really Fixed first link is the communication sub-link that can be used for sending datagram to second network equipment in MP logical links.Such one Come, binding of first link to MP logical links is completed in first network equipment in the first link, and second network equipment is complete At the first link to MP logical links binding when, first network equipment in MP logical links can be used as to be used for the second network The communication sub-link that equipment sends datagram avoids first network equipment and the first link is completed to the bundle of MP logical links It ties up, and when second network equipment not yet completes binding of first link to MP logical links, first network equipment uses MP logics First second network equipment of chain road direction of link sends datagram, caused by data message lose the problem of, can ensure number According to the stability of transmission.
According to below with reference to the accompanying drawings becoming to detailed description of illustrative embodiments, other feature of the invention and aspect It is clear.
Description of the drawings
Including in the description and the attached drawing of a part for constitution instruction and specification together illustrate the present invention's Exemplary embodiment, feature and aspect, and principle for explaining the present invention.
Fig. 1 shows the flow chart of the binding method of link according to an embodiment of the invention;
Fig. 2 shows the flow charts of the binding method of link according to an embodiment of the invention;
Fig. 3 shows the flow chart of the binding method of link according to an embodiment of the invention;
Fig. 4 shows the flow chart of the binding method of link according to an embodiment of the invention;
Fig. 5 shows the flow chart of the binding method of link according to an embodiment of the invention;
Fig. 6 shows the flow chart of the binding method of an illustrative link of the invention;
Fig. 7 shows the structural schematic diagram of the binding method of an illustrative link of the invention;
Fig. 8 shows the structure diagram of the bundling apparatus of link according to an embodiment of the invention;
Fig. 9 is a kind of hardware block diagram of the binding method of link shown according to an exemplary embodiment.
Specific implementation mode
Below with reference to attached drawing various exemplary embodiments, feature and the aspect that the present invention will be described in detail.It is identical in attached drawing Reference numeral indicate functionally the same or similar element.Although the various aspects of embodiment are shown in the accompanying drawings, remove It non-specifically points out, it is not necessary to attached drawing drawn to scale.
Dedicated word " exemplary " means " being used as example, embodiment or illustrative " herein.Here as " exemplary " Illustrated any embodiment should not necessarily be construed as preferred or advantageous over other embodiments.
In addition, in order to better illustrate the present invention, numerous details is given in specific implementation mode below. It will be appreciated by those skilled in the art that without certain details, the present invention can equally be implemented.In some instances, for Method, means, element and circuit well known to those skilled in the art are not described in detail, in order to highlight the purport of the present invention.
In the embodiment of the present invention, if first network equipment receives the carrying first identifier information of second network equipment transmission The first Link Control Protocol LCP messages when, then after by the first multilink bundling to MP logical links, using the first link as The communication sub-link that can be used for sending datagram to second network equipment in MP logical links;If not receiving the first LCP reports Text, then after by the first multilink bundling to MP logical links, using the first link as being not useable in MP logical links to The communication sub-link that two network equipments send datagram, with solve in the related technology first network equipment into MP logical links When bundling the first link, first network equipment completes binding of first link to MP logical links, and second network equipment is still When not completing binding of first link to MP logical links, first network equipment uses the first link conduct in MP logical links When communication sub-link sends datagram to second network equipment, the problem of causing data message to lose.
Fig. 1 shows the flow chart of the binding method of link according to an embodiment of the invention, and the binding method of the link can To be applied to first network equipment.As shown in Figure 1, the binding method of the link includes the following steps.
Step 101, the current bundle status for obtaining the first link in the first network equipment, first link is institute State the communication link between first network equipment and second network equipment.
First network equipment is executed the operation in the first multilink bundling to MP logical links, and obtains first network equipment In the first link current bundle status.The current bundle status of first link is to have bundled into MP logical links, Huo Zhe The current bundle status of one link is not bundle into MP logical links.
When the first link has been bundled into MP logical links in first network equipment, the first link in first network equipment Current bundle status characterize the first link and bundled to MP chains road;Alternatively, the first link is not yet in first network equipment When in binding to MP logical links, the current bundle status of the first link characterizes the first link and not yet bundlees in first network equipment To MP chains road.
Step 102 has been bundled when the current bundle status characterizes first link to multi-link protocol MP logic chains Lu Zhong, and receive the first Link Control Protocol LCP messages of the carrying first identifier information that second network equipment is sent When, first link is logical as can be used for sending datagram to second network equipment in the MP logical links Believe sublink.
Wherein, the first LCP messages are after second network equipment completes the first link to the binding of MP logical links, to first The LCP messages that the network equipment is sent.First LCP messages carry first identifier information, second net of first identifier information representation Network equipment will be in the first multilink bundling to MP logical links.For example, the first LCP messages include a MultiLink- ACK (response) field, the MultiLink-ACK fields are metric 88 for carrying first identifier information, corresponding numerical value.The After one network equipment receives the first LCP messages, it can be determined second network equipment by the first link according to first identifier information In binding to MP logical links.
The first link is characterized in the current bundle status of the first link to have bundled into MP logical links, and has received the Two network equipments send the first LCP messages when, first network equipment using the first link as can be used in MP logical links to The communication sub-link that second network equipment sends datagram.For example, it is available that the first link, which is arranged, in first network equipment State, first network equipment by MP logical links to second network equipment when being sent datagram, from available mode Communication sub-link in determine carrying data message communication sub-link.
In one example, after first network equipment receives the first LCP messages that second network equipment is sent, according to first First identifier information determines second network equipment by the first multilink bundling MP logical links in LCP messages, then the first net Network equipment determines that the opposite end binding of the first link is identified as the first binding mark, and the first binding mark characterization first network equipment is Receive the first LCP messages for the first link of second network equipment transmission.The first link is tied in first network equipment It is bind in MP logical links, i.e., the current bundle status of the first link characterizes the first link and bundled to MP in first network equipment When in logical links, first network equipment determines whether that having received the second network sets by the opposite end binding mark of the first link The first LCP messages that preparation is sent, when in the opposite end of the first link, binding is identified as the first binding mark, first network equipment determines The first LCP messages for having received the transmission of second network equipment, at this point, first network equipment is using the first link as MP logic chains The communication sub-link that can be used for sending datagram to second network equipment in road.
In another example, after first network equipment receives the first LCP messages that second network equipment is sent, the is obtained The current bundle status of first link in one network equipment has characterized the first link in the current bundle status of first network equipment When binding is in MP logical links, first network equipment is using the first link as can be used for setting to the second network in MP logical links The standby communication sub-link to send datagram.
Therefore, by the binding method of application link provided in an embodiment of the present invention, first network equipment obtains the first net The current bundle status of first link in network equipment characterizes the first link in the current bundle status of the first link and has bundled to MP In logical links, and receive second network equipment transmission carrying first identifier information the first LCP messages when, determine first Link is the communication sub-link that can be used for sending datagram to second network equipment in MP logical links.So, first Binding of first link to MP logical links is completed in first network equipment in link, and the first chain is completed in second network equipment Road to MP logical links binding when, can be used as MP logical links in first network equipment be used for second network equipment send The communication sub-link of data message avoids first network equipment and is completed binding of first link to MP logical links, and When two network equipments not yet complete binding of first link to MP logical links, first network equipment is using the of MP logical links One second network equipment of chain road direction sends datagram, caused by data message lose the problem of, can ensure data transmission Stability.
In another embodiment, it is patrolled if current bundle status the first link of characterization of first network equipment has been bundled to MP It collects in link, but not yet receives the first LCP messages of second network equipment transmission, is i.e. second network equipment is not yet by the first chain When road is bundled into MP logical links, the first link cannot function as sending datagram to second network equipment in MP logical links Communication sub-link.Below in conjunction with the flow chart of the binding method of link shown in Fig. 2, to the bundle of the link of the embodiment of the present invention The method of tying up is described in detail.
Specifically, the binding method of link shown in Fig. 2 includes the following steps.
Step 201, the current bundle status for obtaining the first link in the first network equipment, first link is institute State the communication link between first network equipment and second network equipment.
Step 202 has been bundled when the current bundle status characterizes first link to multi-link protocol MP logic chains Lu Zhong, and receive the first Link Control Protocol LCP messages of the carrying first identifier information that second network equipment is sent When, first link is logical as can be used for sending datagram to second network equipment in the MP logical links Believe sublink;
Wherein, second network equipment described in the first identifier information representation is by first multilink bundling to the MP In logical links.
It should be noted that step 201 and step 202 and step 101 in above method embodiment in the embodiment of the present invention Similar with step 102, details are not described herein for the embodiment of the present invention.
Step 203 has been bundled when the current bundle status characterizes first link into the MP logical links, and When not receiving the first LCP messages, using first link as being not useable in the MP logical links to described The communication sub-link that two network equipments send datagram.
First network equipment is not when receiving the first LCP messages of second network equipment transmission, it may be determined that the second net Network equipment is not yet by the first multilink bundling to MP logical links, even if the then current bundle status characterization of first network equipment the The first link has been bundled into MP logical links in one network equipment, and the first link not can be used as in MP logical links to second yet The communication sub-link that the network equipment sends datagram, until first network equipment receives the first of second network equipment transmission After LCP messages, using the first link as the communicator that can be used for sending datagram to second network equipment in MP logical links Link.
So, binding of first link to MP logical links, but is completed in first network equipment in the first link When two network equipments not yet complete binding of first link to MP logical links, it not can be used as first network in MP logical links and set It is ready for use on the communication sub-link to send datagram to second network equipment, first network equipment is avoided and the first link is completed To the binding of MP logical links, and when second network equipment not yet completes binding of first link to MP logical links, the first net Network equipment is sent datagram using first second network equipment of chain road direction of MP logical links, caused by data message lose Problem can ensure the stability of data transmission.
In another embodiment, second network equipment is by after in the first multilink bundling to MP logical links, to the first net During network equipment sends the first LCP messages, due to network failure etc., it may appear that the first LCP message droppings, the first net Network equipment can not receive the case where the first LCP messages of second network equipment transmission.In order to solve that the above situation is brought The problem of one link circuit resource wastes, first network equipment do not receive the first of peer network device transmission yet in preset time It, can be logical as can be used for sending datagram to second network equipment in MP logical links using the first link when LCP messages Believe sublink.Below in conjunction with the flow chart of the binding method of the link shown in Fig. 3, to the binding side of the link of the embodiment of the present invention Method is described in detail.
Specifically, the binding method of the link shown in Fig. 3 includes the following steps.
Step 301, the current bundle status for obtaining the first link in the first network equipment, first link is institute State the communication link between first network equipment and second network equipment.
Step 302 has been bundled when the current bundle status characterizes first link to multi-link protocol MP logic chains Lu Zhong, and receive the first Link Control Protocol LCP messages of the carrying first identifier information that second network equipment is sent When, first link is logical as can be used for sending datagram to second network equipment in the MP logical links Believe sublink;
Wherein, second network equipment described in the first identifier information representation is by first multilink bundling to the MP In logical links.
Step 303 has been bundled when the current bundle status characterizes first link into the MP logical links, and When not receiving the first LCP messages, using first link as being not useable in the MP logical links to described The communication sub-link that two network equipments send datagram.
It should be noted that above-mentioned steps 301 are to step 303 and step 201 in above method embodiment to step 203 phase Similar, details are not described herein for the embodiment of the present invention.
If step 304 does not receive the first LCP reports that second network equipment is sent yet in preset time Text, then using first link as the communication that can be used for sending datagram to second network equipment in the MP logical links Sublink.
Above-mentioned preset time is the time that those skilled in the art determine according to binding demand.For example, first network Equipment starts timing (alternatively, can be proceeded by first network equipment in the binding for completing the first link to MP logical links Start timing when the operation that will be bundled in the first chain road direction MP logical links), reach preset time in timing duration, does not receive yet The first LCP messages sent to second network equipment, then can give tacit consent to second network equipment and the first link is completed to MP logics The binding of link, using the first link as the communicator that can be used for sending datagram to second network equipment in MP logical links Link.
Illustratively, first network equipment is when completing binding of first link to MP logical links, open time delay pattern, Under the delay mode, using the first link as being not useable for sending datagram to second network equipment in MP logical links Communication sub-link;If first network equipment receives the first LCP messages of second network equipment transmission, delay mode is closed, Using the first link as the communication sub-link that can be used for sending datagram to second network equipment in MP logical links;Alternatively, When delay mode opening time reaches preset time period, delay mode is closed, using the first link as can be used in MP logical links In the communication sub-link to send datagram to second network equipment.
So, the second network can be caused to set to avoid the first LCP message droppings are caused due to network failure etc. It is standby that by the first multilink bundling to MP logical links, but first network equipment is not received by the first LCP messages, and by the One link is as the communication sub-link that can not be sent datagram to second network equipment in MP logical links, and caused first The problem of link circuit resource wastes.
In another embodiment, first network equipment is by after in the first multilink bundling to MP logical links, to the second net Network equipment send include second identifier information the 2nd LCP messages so that second network equipment passes through the in the 2nd LCP messages Two identification informations determine first network equipment by the first multilink bundling to MP logical links, so second network equipment will After in first multilink bundling to MP logical links, second network equipment can be using the first link as can be used in MP logical links The communication sub-link to send datagram to first network equipment.Below in conjunction with the flow of the binding method of the link shown in Fig. 4 Figure, is described in detail the binding method of the link of the embodiment of the present invention.
Specifically, the binding method of the link shown in Fig. 4 includes the following steps.
Step 401, the current bundle status for obtaining the first link in the first network equipment, first link is institute State the communication link between first network equipment and second network equipment.
Step 402 has been bundled when the current bundle status characterizes first link to multi-link protocol MP logic chains Lu Zhong, and receive the first Link Control Protocol LCP messages of the carrying first identifier information that second network equipment is sent When, first link is logical as can be used for sending datagram to second network equipment in the MP logical links Believe sublink;
Wherein, second network equipment described in the first identifier information representation is by first multilink bundling to the MP In logical links.
It should be noted that step 401 and step 402 and step 101 in above method embodiment in the embodiment of the present invention Similar with step 102, the embodiment of the present invention repeats no more this.
Step 403 sends the 2nd LCP messages to second network equipment, and the 2nd LCP messages include second identifier Information, for making second network equipment determine the first network equipment by described according to the second identifier information In one multilink bundling to the MP logical links.
For first network equipment after by the first multilink bundling to MP logical links, being sent to second network equipment has the 2nd LCP messages of two identification informations, second identifier information representation first network equipment is by the first multilink bundling to MP logics After in link.After second network equipment receives the 2nd LCP messages, the first network equipment has been determined according to second identifier information It will be in first multilink bundling to the MP logical links.
So, current bundle status the first link of characterization of the first link has been bundled to MP in second network equipment After in logical links, if second network equipment has received the 2nd LCP messages of first network equipment transmission, the second network is set For using the first link as the communication sub-link that can be used for sending datagram to first network equipment in MP logical links.
In another embodiment, if the first link is the first communication sub-link in MP logical links, in the first chain After road has been bundled into MP logical links, first network equipment is sent datagram by first second network equipment of chain road direction. Below in conjunction with the flow chart of the binding method of link shown in fig. 5, the embodiment of the present invention is described in detail.
Specifically, the binding method of link shown in fig. 5 includes the following steps.
Step 501, the current bundle status for obtaining the first link in the first network equipment, first link is institute State the communication link between first network equipment and second network equipment;
It should be noted that step 501 and step 502 and step 101 in above method embodiment in the embodiment of the present invention And step 102 is similar, details are not described herein for the embodiment of the present invention.
Step 502 judges whether first link is first communication sub-link in the MP logical links.
For example, first network equipment determines the number of communication sub-link in MP logical links, in MP logical links Communication sub-link number be 1 when, then first network equipment judges the first link for the first communicator in MP logical links Link;When the number of communication sub-link in MP logical links is not 1, the first link is judged not and is the head in MP logical links A communication sub-link.
If step 503, first link are the first communication sub-link in the MP logical links, when described the When one link has been bundled into the MP logical links, the number is sent by second network equipment described in the first chain road direction According to message.
In the first communication sub-link during the first link is MP logical links, if the current bundle status table of the first link When levying the first link and having bundled into MP logical sublinks, then first network equipment using MP logical links to second network equipment When sending datagram, using the first link as the communication sub-link to send datagram to second network equipment, that is, pass through Second network equipment described in one chain road direction sends the data message.
If step 504, first link are not the first communication sub-link in the MP logical links, when described Current bundle status characterizes first link and has bundled into multi-link protocol MP logical links, and receives second net When the first Link Control Protocol LCP messages of the carrying first identifier information that network equipment is sent, using first link as institute State the communication sub-link that can be used for sending datagram in MP logical links to second network equipment.
So, the first link be MP logical links in first communication sub-link when, the first multilink bundling extremely After in MP logical links, it can directly be sent datagram by first second network equipment of chain road direction, enable to the first net Network equipment can be sent datagram by MP logical links to second network equipment.
Fig. 6 shows the flow chart of the binding method of an illustrative link of the invention.
Illustratively, with reference to Fig. 6, the binding method of above-mentioned link includes the following steps.
Whether step 601, first network equipment judge the first link when by the first link bundling to MP logical links For the first communication sub-link of MP logical links, if so, executing step 602, no thening follow the steps 603.
Step 602 sends the data message by second network equipment described in the first chain road direction.
Step 603 is confirmed whether to receive the first LCP reports with first identifier information of second network equipment transmission Text, wherein the first link has been tied in MP logical links in second network equipment of first identifier information representation.
Step 604, received second network equipment transmission the first LCP messages when, using first link as institute The communication sub-link that can be used for sending datagram in MP logical links to second network equipment is stated, and executes step 606.
Step 605, do not received second network equipment transmission the first LCP messages when, using first link as It is not useable for the communication sub-link to send datagram to second network equipment in the MP logical links, and executes step 606。
Step 606 sends the 2nd LCP messages with second identifier information to second network equipment, wherein second identifier The first link has been tied in MP logical links in information representation first network equipment.
Fig. 7 shows the structure diagram of the bundling apparatus of link according to an embodiment of the invention, the bundling apparatus of the link It can be applied to first network equipment.As shown in fig. 7, the device may include:
Acquisition module 701, the current bundle status for obtaining the first link in the first network equipment, described first Communication link of the link between the first network equipment and second network equipment;
First processing module 702 has been bundled for working as the current bundle status characterization first link to multilink In agreement MP logical links, and receive the first link control for the carrying first identifier information that second network equipment is sent When agreement LCP messages, using first link as can be used in the MP logical links to second network equipment send The communication sub-link of data message;
Wherein, second network equipment described in the first identifier information representation is by first multilink bundling to the MP In logical links.
Therefore, by the bundling apparatus of application link provided in an embodiment of the present invention, first network equipment obtains the first net The current bundle status of first link in network equipment characterizes the first link in the current bundle status of the first link and has bundled to MP In logical links, and receive second network equipment transmission carrying first identifier information the first LCP messages when, determine first Link is the communication sub-link that can be used for sending datagram to second network equipment in MP logical links.So, first Binding of first link to MP logical links is completed in first network equipment in link, and the first chain is completed in second network equipment Road to MP logical links binding when, can be used as MP logical links in first network equipment be used for second network equipment send The communication sub-link of data message avoids first network equipment and is completed binding of first link to MP logical links, and When two network equipments not yet complete binding of first link to MP logical links, first network equipment is using the of MP logical links One second network equipment of chain road direction sends datagram, caused by data message lose the problem of, can ensure data transmission Stability.
Fig. 8 shows the structure diagram of the bundling apparatus of link according to an embodiment of the invention, wherein acquisition module 801, And first processing module 802 is similar with above-mentioned acquisition module 701 and first processing module 702, the embodiment of the present invention is herein not It repeats again.
In one possible implementation, with reference to Fig. 8, above-mentioned apparatus can also include:
Second processing module 803 has been bundled for working as the current bundle status characterization first link to the MP In logical links, and when not receiving the first LCP messages, using first link as can not in the MP logical links Communication sub-link for sending datagram to second network equipment.
In one possible implementation, with reference to Fig. 8, above-mentioned apparatus can also include:
Sending module 804, for sending the 2nd LCP messages to second network equipment, the 2nd LCP messages include Second identifier information, for making second network equipment determine the first network equipment according to the second identifier information It will be in first multilink bundling to the MP logical links.
In one possible implementation, with reference to Fig. 8, above-mentioned apparatus can also include:
Judgment module 805, for judging whether first link is first communication subchain in the MP logical links Road;
Third processing module 806, if being the first communication subchain in the MP logical links for first link Road passes through then when the current bundle status, which characterizes first link, have been bundled into multi-link protocol MP logical links Second network equipment described in the first chain road direction sends the data message;
Fourth processing module 807, if being not the first communicator in the MP logical links for first link Link has then been bundled into multi-link protocol MP logical links when the current bundle status characterizes first link, and has been connect It, will be described when receiving the first Link Control Protocol LCP messages of the carrying first identifier information that second network equipment is sent First link is as the communication sub-link that can be used for sending datagram to second network equipment in the MP logical links.
In one possible implementation, with reference to Fig. 8, above-mentioned apparatus can also include:
5th processing module 808, if the institute sent for not receiving second network equipment yet in preset time State the first LCP messages, then using first link as can be used in the MP logical links to second network equipment send number According to the communication sub-link of message.
Fig. 9 is a kind of hardware block diagram of the binding method of link shown according to an exemplary embodiment.In reality In, which can be realized by server.With reference to Fig. 9, the device 1300 may include processor 1301, be stored with machine can The machine readable storage medium 1302 executed instruction.Processor 1301 can be via system bus with machine readable storage medium 1302 1303 communications.Also, processor 1301 passes through corresponding with the binding logic of link in read machine readable storage medium storing program for executing 1302 Machine-executable instruction is to execute the binding method of link described above.
Machine readable storage medium 1302 referred to herein can be that any electronics, magnetism, optics or other physics are deposited Storage device can include or store information, such as executable instruction, data, etc..For example, machine readable storage medium can be: Random access memory (English:Radom Access Memory, referred to as:RAM), volatile memory, nonvolatile memory, Flash memory, memory driver (such as hard disk drive), solid state disk, any kind of storage dish (such as CD, dvd) or class As storage medium or combination thereof.Various embodiments of the present invention are described above, above description is exemplary , and non-exclusive, and it is also not necessarily limited to disclosed each embodiment.Without departing from illustrated each embodiment range and In the case of spirit, many modifications and changes will be apparent from for those skilled in the art.This The selection of term used herein, it is intended to best explain the principle, practical application or the skill to the technology in market of each embodiment Art is improved, or other those of ordinary skill of the art is enable to understand each embodiment disclosed herein.

Claims (10)

1. a kind of binding method of link, which is characterized in that it is applied to first network equipment, the method includes:
The current bundle status of the first link in the first network equipment is obtained, first link is that the first network is set The standby communication link between second network equipment;
It has bundled into multi-link protocol MP logical links, and has received when the current bundle status characterizes first link When the first Link Control Protocol LCP messages of the carrying first identifier information that second network equipment is sent, by described first Link is as the communication sub-link that can be used for sending datagram to second network equipment in the MP logical links;
Wherein, second network equipment described in the first identifier information representation is by first multilink bundling to the MP logics In link.
2. according to the method described in claim 1, it is characterized in that, the method further includes:
It has bundled into the MP logical links, and has not received described when the current bundle status characterizes first link When the first LCP messages, using first link as be not useable in the MP logical links to second network equipment send out Send the communication sub-link of data message.
3. method according to claim 1 or 2, which is characterized in that the method further includes:
The 2nd LCP messages are sent to second network equipment, the 2nd LCP messages include second identifier information, for making Second network equipment determines the first network equipment by first multilink bundling according to the second identifier information To in the MP logical links.
4. according to the method described in claim 1, it is characterized in that, the method further includes:
Judge whether first link is first communication sub-link in the MP logical links;
If first link is the first communication sub-link in the MP logical links, when the current bundle status table When levying first link and having bundled into multi-link protocol MP logical links, pass through the second network described in the first chain road direction Equipment sends the data message;
If first link is not the first communication sub-link in the MP logical links, when the current bundle status It characterizes first link to have bundled into multi-link protocol MP logical links, and receives what second network equipment was sent When carrying the first Link Control Protocol LCP messages of first identifier information, using first link as the MP logical links In the communication sub-link that can be used for sending datagram to second network equipment.
5. according to the method described in claim 2, it is characterized in that, the method further includes:
If not receiving the first LCP messages that second network equipment is sent yet in preset time, by described the One link is as the communication sub-link that can be used for sending datagram to second network equipment in the MP logical links.
6. a kind of bundling apparatus of link, which is characterized in that be applied to first network equipment, described device includes:
Acquisition module, the current bundle status for obtaining the first link in the first network equipment, first link are Communication link between the first network equipment and second network equipment;
First processing module characterizes first link and has bundled to multi-link protocol MP for working as the current bundle status and patrols It collects in link, and receives the first Link Control Protocol LCP of the carrying first identifier information that second network equipment is sent When message, using first link as can be used for sending datagram to second network equipment in the MP logical links Communication sub-link;
Wherein, second network equipment described in the first identifier information representation is by first multilink bundling to the MP logics In link.
7. device according to claim 6, which is characterized in that described device further includes:
Second processing module has been bundled for working as the current bundle status characterization first link to the MP logical links In, and when not receiving the first LCP messages, using first link as being not useable for institute in the MP logical links State the communication sub-link that second network equipment sends datagram.
8. the device described according to claim 6 or 7, which is characterized in that described device further includes:
Sending module, for sending the 2nd LCP messages to second network equipment, the 2nd LCP messages include the second mark Information is known, for making second network equipment determine that the first network equipment will be described according to the second identifier information In first multilink bundling to the MP logical links.
9. device according to claim 6, which is characterized in that described device further includes:
Judgment module, for judging whether first link is first communication sub-link in the MP logical links;
Third processing module, if being the first communication sub-link in the MP logical links for first link, when When the current bundle status characterization first link has been bundled into multi-link protocol MP logical links, pass through described first Second network equipment described in chain road direction sends the data message;
Fourth processing module, if being not the first communication sub-link in the MP logical links for first link, It has bundled into multi-link protocol MP logical links, and has received described when the current bundle status characterizes first link When the first Link Control Protocol LCP messages of the carrying first identifier information that second network equipment is sent, by first link As the communication sub-link that can be used for sending datagram to second network equipment in the MP logical links.
10. device according to claim 7, which is characterized in that described device further includes:
5th processing module, if sent for not receiving second network equipment yet in preset time described first LCP messages, then using first link as can be used for sending datagram to second network equipment in the MP logical links Communication sub-link.
CN201810253777.7A 2018-03-26 2018-03-26 Link binding method and device Active CN108494677B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810253777.7A CN108494677B (en) 2018-03-26 2018-03-26 Link binding method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810253777.7A CN108494677B (en) 2018-03-26 2018-03-26 Link binding method and device

Publications (2)

Publication Number Publication Date
CN108494677A true CN108494677A (en) 2018-09-04
CN108494677B CN108494677B (en) 2021-03-30

Family

ID=63337963

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810253777.7A Active CN108494677B (en) 2018-03-26 2018-03-26 Link binding method and device

Country Status (1)

Country Link
CN (1) CN108494677B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1523790A (en) * 2003-02-21 2004-08-25 华为技术有限公司 Link binding method of intelligent optical network
CN101610535A (en) * 2009-07-30 2009-12-23 杭州华三通信技术有限公司 Multilink direct continuous show scape guarantees the method, system and device of BFD conversation stability down
CN101834759A (en) * 2010-04-21 2010-09-15 中兴通讯股份有限公司 Detection method of binding link and distributed equipment
CN102394878A (en) * 2011-10-28 2012-03-28 杭州华三通信技术有限公司 Cross board point-to-point multilink protocol binding method and device thereof
CN102625478A (en) * 2012-03-28 2012-08-01 杭州华三通信技术有限公司 Wireless meshy Mesh link aggregation method and MPs
CN103024826A (en) * 2012-12-10 2013-04-03 华为技术有限公司 Method, device and system for bandwidth adjustment
CN103733600A (en) * 2013-06-28 2014-04-16 华为技术有限公司 Method, node and device for establishing link
EP3174261A1 (en) * 2014-08-22 2017-05-31 Huawei Technologies Co., Ltd. Multilink fusion method, server, client and system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1523790A (en) * 2003-02-21 2004-08-25 华为技术有限公司 Link binding method of intelligent optical network
CN101610535A (en) * 2009-07-30 2009-12-23 杭州华三通信技术有限公司 Multilink direct continuous show scape guarantees the method, system and device of BFD conversation stability down
CN101834759A (en) * 2010-04-21 2010-09-15 中兴通讯股份有限公司 Detection method of binding link and distributed equipment
CN102394878A (en) * 2011-10-28 2012-03-28 杭州华三通信技术有限公司 Cross board point-to-point multilink protocol binding method and device thereof
CN102625478A (en) * 2012-03-28 2012-08-01 杭州华三通信技术有限公司 Wireless meshy Mesh link aggregation method and MPs
CN103024826A (en) * 2012-12-10 2013-04-03 华为技术有限公司 Method, device and system for bandwidth adjustment
CN103733600A (en) * 2013-06-28 2014-04-16 华为技术有限公司 Method, node and device for establishing link
EP3174261A1 (en) * 2014-08-22 2017-05-31 Huawei Technologies Co., Ltd. Multilink fusion method, server, client and system

Also Published As

Publication number Publication date
CN108494677B (en) 2021-03-30

Similar Documents

Publication Publication Date Title
CN102200901B (en) Image transfer method, image transfer system, and projector
TWI330715B (en) Ultra low pin count interface for die testing
CN101478446B (en) Network appliance version loading method, apparatus and system
CN105577500B (en) The correlating method and device of VXLAN and tunnel
CN105721203B (en) Upgrade processing method and device
WO2017088494A1 (en) Link management method and apparatus
CN105187369B (en) A kind of data access method and device
CN109495434A (en) A kind of document transmission method and device
JP2013122631A (en) Program rewriting method, program rewriting device, and electronic control unit
CN104811431A (en) Data packet processing method and device based on parallel protocol stack instance
CN105471955B (en) Write method, client device and the distributed file system of distributed file system
CN107959702B (en) Routing method and device
CN108804329A (en) A kind of test system and method for data transfer integrity
CN108494677A (en) The binding method and device of link
CN105450679B (en) Carry out the method and system of data cloud storage
CN104618231A (en) Deep packet inspection method, device and system for cloud terminal Wi-fi system
CN107733785A (en) A kind of multiple terminals chat message synchronization removal method and device
CN104811432A (en) Data packet processing method and device based on parallel protocol stack instance
CN103441894A (en) Method and system for L2TP concurrent connection performance test
CN103957070B (en) The localization method of a kind of Frame and device
CN104065519A (en) Method for improving conversation interactive performance and automatic configuration server
CN105119968A (en) Picture transmission method and device
WO2017063589A1 (en) Data transmission method and apparatus
CN109936609A (en) Terminal chain type upgrade method, device and updating and management server
CN109388436A (en) Control method, device and the storage medium of starting procedure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant