CN108492024B - Energy constraint system and method for satellite planning task - Google Patents
Energy constraint system and method for satellite planning task Download PDFInfo
- Publication number
- CN108492024B CN108492024B CN201810227808.1A CN201810227808A CN108492024B CN 108492024 B CN108492024 B CN 108492024B CN 201810227808 A CN201810227808 A CN 201810227808A CN 108492024 B CN108492024 B CN 108492024B
- Authority
- CN
- China
- Prior art keywords
- energy
- task
- satellite
- constraint
- planning
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 33
- 238000004364 calculation method Methods 0.000 claims abstract description 95
- 238000012937 correction Methods 0.000 claims description 28
- 238000012423 maintenance Methods 0.000 claims description 12
- 238000005265 energy consumption Methods 0.000 claims description 10
- 238000004904 shortening Methods 0.000 claims description 7
- 230000008859 change Effects 0.000 claims description 4
- 238000007599 discharging Methods 0.000 claims description 4
- 238000012217 deletion Methods 0.000 claims description 3
- 230000037430 deletion Effects 0.000 claims description 3
- 230000003993 interaction Effects 0.000 claims description 3
- 238000013519 translation Methods 0.000 claims description 2
- 238000004458 analytical method Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 4
- 238000004088 simulation Methods 0.000 description 4
- 230000008901 benefit Effects 0.000 description 2
- 238000005094 computer simulation Methods 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000003487 electrochemical reaction Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000014759 maintenance of location Effects 0.000 description 1
- 239000011159 matrix material Substances 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000001228 spectrum Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0637—Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
- G06Q10/06375—Prediction of business process outcome or impact based on a proposed change
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B64—AIRCRAFT; AVIATION; COSMONAUTICS
- B64G—COSMONAUTICS; VEHICLES OR EQUIPMENT THEREFOR
- B64G1/00—Cosmonautic vehicles
- B64G1/10—Artificial satellites; Systems of such satellites; Interplanetary vehicles
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Remote Sensing (AREA)
- Strategic Management (AREA)
- Educational Administration (AREA)
- Tourism & Hospitality (AREA)
- Quality & Reliability (AREA)
- Development Economics (AREA)
- Operations Research (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Theoretical Computer Science (AREA)
- Astronomy & Astrophysics (AREA)
- Game Theory and Decision Science (AREA)
- Aviation & Aerospace Engineering (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The application relates to an energy constraint system aiming at a satellite planning task, which carries out energy constraint check on the planning task in the whole satellite operation period. The system can accurately acquire the initial value of the energy source, adjust the task according to the task priority when the energy source constraint check is not passed, introduce real telemetering data to correct the energy source data to eliminate the calculation error, and accurately perform the energy source constraint check in the whole operation period of the satellite. The present application further provides a method of energy constraining a satellite using an energy constraint system for a satellite planning task as described herein.
Description
Technical Field
The application relates to the technical field of satellite task simulation, in particular to an energy constraint system and method for a satellite planning task, which are applied to earth observation satellites needing task planning and used for carrying out energy constraint check on the planning task in the whole satellite operation period.
Background
The earth observation satellite carries a satellite-borne sensor such as visible light, electronic reconnaissance and synthetic aperture radar, acquires information such as images and signals of ground targets, and transmits the information back to the ground station for analysis and use. Because the cost of the satellite is high, the satellite resources are precious, and in order to fully utilize the satellite-ground resources and exert the satellite efficiency to the maximum extent, the task planning of the satellite is necessary to maximize the utilization of the satellite resources. In the mission planning process, due to the limited satellite-ground resources, many constraints, such as satellite attitude constraint, load working capacity constraint, satellite energy constraint and the like, need to be considered in the mission planning. In the past, the attitude maneuvering capability and the satellite load working capability of the satellite limit the task execution quantity of a single track, the constraint of the energy source of the satellite on the task does not become the main limitation of the task realization capability of the satellite, and the energy source constraint is not considered when the task planning of the satellite is carried out or the energy source consumption during the load working period is simply considered. With the improvement of the satellite attitude mobility and the load performance, the working level of the satellite is greatly improved, but the energy consumption of the satellite is increased, and the expected use condition of the satellite energy is necessarily estimated, so that the condition that the satellite is insufficient in energy when executing a task is prevented, the satellite fault and the task cannot be completed smoothly.
At present, the research of Energy constraint aiming at satellites is less, and Trevor Bihl et al propose a Modeling method and an analysis Tool of a satellite Energy System (Bihl T, Heidenreich J, Allen D, et al SPECTRA: A Space Power System Modeling and Simulation Tool [ C ]// International Energy Conversion Engineering conference.2013). The inventor proposes a simulation analysis method of the energy of a near-earth satellite power supply system (the inventor, the Lin Baojun, the Lu Congren. the simulation analysis of the energy of the near-earth satellite power supply system [ J ]. computer simulation, 2005,22(8): 35-36). The method can realize energy consumption calculation of the satellite and is used for guiding the design of a satellite power supply system, but energy constraint inspection is not performed on a satellite planning task. The invention discloses a remote sensing satellite energy balance constraint analysis system and method (application number: 201610609295.1) which can carry out planning task energy constraint check aiming at attitude maneuver and is disclosed by Qiao Jie Shi et al in the Chinese invention patent application. Zhang Yong et al in the Chinese patent application "a short-term payload work planning method for improving the energy utilization efficiency of satellites" (application number: 2016108333288.X) discloses that energy constraints can be applied to the short-term payload in each orbital circle in which a satellite is operating.
However, the existing energy balance calculation method and energy constraint system can perform energy constraint calculation on a single planning task or a single-orbit planning task, but cannot perform accurate energy constraint check on multiple satellite planning tasks in the whole operation period of the satellite. Three problems are faced when the task energy constraint inspection is planned in the practical application of the systems: firstly, the initial energy value needs to be given manually when energy constraint calculation is carried out each time, the energy condition at the beginning of a task is often unknown when the task is planned, and particularly the initial energy value at the future time cannot be known when the future task is planned; secondly, due to the simplification of modeling and the change of satellite power consumption, the deviation of a calculation result and an actual result occurs, and error accumulation can be caused when correction is not carried out, so that the final calculation result is influenced; and thirdly, if the planned task cannot meet the energy constraint condition, only a result of failure is given, and a planning task adjustment suggestion is not provided, so that the task is not rapidly adjusted in the later period, and the whole task planning period is too long.
Therefore, there is a strong need in the art to develop an energy constraint system and method for satellite planning task, which performs energy constraint check on the planning task during the whole satellite operation period.
Disclosure of Invention
The present application aims to provide an energy constraint system for a satellite planning task, which performs an energy constraint check on the planning task in the whole satellite operation period, so as to solve the technical problems in the prior art. The method overcomes the defects that in the existing energy constraint calculation method, initial values are inaccurate due to discontinuous energy data, tasks cannot be adjusted quickly due to the fact that adjustment suggestions are not given when energy constraints do not pass, and calculation results are inaccurate due to the fact that calculation errors are not corrected. The system records the energy data of the whole operation period of the satellite by using the energy source database, can accurately obtain the initial value of the energy, performs task adjustment according to the task priority when the energy constraint check is not passed, introduces real telemetering data to correct the energy data to eliminate the calculation error, and can accurately perform the energy constraint check in the whole operation period of the satellite.
It is also an object of the present application to provide a method for energy-constraining a satellite using an energy-constraining system for a satellite planning task as described above.
In order to achieve the above object, the present application provides the following technical solutions.
In a first aspect, the present application provides an energy constraint system for a satellite planning task, the system including an energy source database, a mission period energy constraint calculation module, a task adjustment module, a non-mission period energy calculation module, and a telemetry correction module;
the energy source database is configured to record energy data of the whole operation cycle of the satellite, and the energy data comprises on-satellite time, a satellite working mode and a satellite energy value;
the task period energy constraint calculation module is configured to judge the working mode and the charging and discharging state of the satellite, calculate the energy consumption condition of the satellite in a period of time by combining the energy consumption of the satellite in different working modes, and judge whether a planning task meets the satellite energy constraint;
wherein the task adjustment module is configured to adjust the planned task when the task energy constraint cannot pass until the planned task meets the energy constraint;
the non-task period energy source calculation module is used for realizing the energy source calculation in the non-task period and injecting the calculated non-task period energy source data into an energy source database;
the telemetering correction module is configured to monitor energy telemetering data of the satellite, calculate an energy value of the satellite at a certain time point from the energy telemetering data, compare the energy value with energy data of the time point in the energy constraint system, correct energy data in the system into telemetering calculation data when the energy value and the energy data are inconsistent, and correct data after correction points in the system; and
the task period energy source constraint calculation module, the task adjustment module, the non-task period energy source calculation module and the telemetering correction module can perform data interaction with the energy source database.
In one embodiment of the first aspect, the energy constraint system for satellite planning tasks further comprises a database maintenance module configured to maintain data generated by any of the task period energy constraint calculation module, the task adjustment module, the non-task period energy calculation module, and the telemetry correction module.
In another implementation manner of the first aspect, the determining, by the mission period energy constraint calculation module, the working mode and the charge-discharge state of the satellite includes enabling the energy constraint system for the satellite planning mission to first obtain a planned mission time table and an orbit information table of satellite in-out earth shadow time, and determining the working mode and the charge-discharge state of the satellite by combining an attitude adjustment strategy of the satellite.
In another implementation manner of the first aspect, the task adjusting module adjusts the planning task by querying a task before the satellite planning task does not meet the energy constraint time point, deleting the task or shortening the task time from low to high according to the task priority until the adjusted task can meet the energy constraint, and outputting the energy constraint result and the task adjustment suggestion after the task adjustment and the energy constraint calculation are completed.
In another embodiment of the first aspect, the non-mission period energy calculation module performs the calculation only considering the satellite orbit information and the attitude adjustment strategy.
In another embodiment of the first aspect, the maintaining of the data by the data maintenance module includes one or more of the following operations: merging of coincident data, deletion of redundant data, or updating of energy data.
In a second aspect, the present application provides a method for energy constraining a satellite using an energy constraining system for a satellite planning task as described in the first aspect, the method comprising the steps of:
(1) in a task period, the energy constraint system aiming at the satellite planning task calls the energy constraint calculation module in the task period to judge that the satellite planning task meets energy constraint or the satellite planning task does not meet the energy constraint, if the planning task meets the energy constraint, the step (2) is implemented, and if the planning task does not meet the energy constraint, the step (3) is implemented;
(2) the task period energy constraint calculation module continues to calculate energy data of the next time point, and the step (1) is implemented again until the calculation is finished or the planning task of the satellite does not meet the energy constraint;
(3) the energy constraint system aiming at the satellite planning task calls the task adjustment module to enable the planning task to meet the energy constraint;
during the non-mission period, the energy constraint system aiming at the satellite planning mission calls the non-mission period energy calculation module to calculate the energy data of the satellite and injects the obtained energy data to the energy source database.
In an embodiment of the second aspect, the present application provides a method for energy constraining a satellite using the energy constraining system for satellite planning task according to the first aspect, the method comprising the following steps:
(1) in a task period, the energy constraint system aiming at the satellite planning task calls the energy constraint calculation module in the task period to judge that the satellite planning task meets energy constraint or the satellite planning task does not meet the energy constraint, if the planning task meets the energy constraint, the step (2) is implemented, and if the planning task does not meet the energy constraint, the step (3) is implemented;
(2) the task period energy constraint calculation module continues to calculate energy data of the next time point, and the step (1) is implemented again until the calculation is finished or the planning task of the satellite does not meet the energy constraint;
(3) the energy constraint system aiming at the satellite planning task calls the task adjustment module to enable the planning task to meet the energy constraint;
during the non-mission period, the energy constraint system aiming at the satellite planning mission calls the non-mission period energy computing module to compute the energy data of the satellite and injects the obtained energy data to the energy source database; and
at any time point when the energy constraint is carried out on the satellite, the energy constraint system aiming at the satellite planning task calls the database maintenance module to maintain the data generated by any one of the task period energy constraint calculation module, the task adjustment module, the non-task period energy calculation module and the telemetry correction module.
In another embodiment of the second aspect, the method further comprises invoking the telemetry correction module to correct the energy data in the energy database with the satellite telemetry data at any point in time when the energy constraint is performed on the satellite.
In another implementation manner of the second aspect, the task adjusting module adjusts the planning task by querying a task before the satellite planning task does not meet the energy constraint time point, deleting the task or shortening the task time from low to high according to the task priority until the adjusted task can meet the energy constraint, and outputting the energy constraint result and the task adjustment suggestion after the task adjustment and the energy constraint calculation are completed.
Compared with the prior art, the energy constraint system for the satellite planning task has the advantages that the energy data of the whole operation period of the satellite is recorded by the energy source database, the initial energy value can be accurately obtained, the task is adjusted according to the task priority when the energy constraint check is failed, real telemetering data is introduced to correct the energy data to eliminate the calculation error, and the energy constraint check can be accurately performed in the whole operation period of the satellite.
Drawings
Fig. 1 is a schematic diagram of an energy constraint system for a satellite planning task according to the present application.
Fig. 2 is a schematic diagram of task adjustment performed by the task adjustment module of the present application.
FIG. 3 is a flow chart of the calculation of the non-mission period energy calculation module of the present application.
FIG. 4 is a schematic diagram of telemetry calibration performed by the telemetry calibration module of the present application.
Detailed Description
The technical solution of the present application will be clearly and completely described below with reference to the accompanying drawings and the embodiments of the present application.
In a first aspect, the present application provides an energy constraint system for a satellite planning task, which is centered on an energy source database and comprises five modules, namely, task period energy constraint calculation, task adjustment, non-task period energy calculation, telemetry correction and database maintenance. The task period energy constraint calculation module is an existing energy constraint system, and the other four modules are the method provided by the application. The energy source database can calculate and accurately record the energy consumption condition of the whole operation period of the satellite through the five modules, and finally the purpose of performing energy constraint on the planning task is achieved.
The task period energy constraint calculation is similar to the existing energy constraint analysis method, the system firstly obtains a planned task time table and an orbit information table of satellite in-out ground shadow time, judges the working mode and the charging and discharging state of the satellite by combining the attitude adjustment strategy of the satellite, and can calculate the energy consumption condition of the satellite in a period of time by combining the energy consumption of the satellite in different working modes to judge whether the planned task meets the energy constraint of the satellite.
The task adjusting module is the method provided by the application. When the task energy constraint can not pass, the system utilizes the task adjusting module to adjust the planning task. The specific implementation method comprises the steps of inquiring the tasks before the energy constraint does not pass through the time point, deleting or shortening the task time from low to high according to the task priority until the adjusted tasks can meet the energy constraint. And after the task adjustment and the energy constraint calculation are finished, outputting an energy constraint result and a task adjustment suggestion.
The calculation of the energy in the non-mission period is the method provided by the application. The module realizes energy calculation in the non-task period, ensures the time continuity of energy data in the energy source database, and can accurately acquire the initial energy value from the energy source database when energy constraint is carried out in the task period. The calculation mode is similar to the task period energy calculation, but only the satellite orbit information and the attitude adjustment strategy are considered.
The telemetry correction module is the method proposed by the application. The system monitors the energy telemetering data of the satellite, calculates the energy value of the satellite at a certain time point from the energy telemetering data, compares the energy value with the energy data of the time point in the energy constraint system, corrects the energy data in the system into telemetering calculation data when the energy value and the energy data are inconsistent, and corrects the data after correction points in the system.
The database maintenance module is the method provided by the application. The module realizes maintenance of data generated by the four modules, including operations of merging of coincident data, deleting of redundant data, updating of energy data and the like.
Referring to fig. 1, fig. 1 is a system schematic of the present application. The system takes an energy source database as a center, and the task period energy constraint calculation, task adjustment, telemetering correction and non-task period energy calculation modules generate data interaction with the energy source database, and the data are managed by the energy source database maintenance module, and operations such as data retention, deletion, update, discarding and the like are implemented.
In the system, a mission period energy constraint calculation module is started and called by a mission planning system in a mission period. And when the call of the task planning system is received, the energy constraint system reads the start time and the end time of the task from the planning task table, and acquires the energy value of the initial time from the energy source database as the initial value for calculation. And then according to the input planning task table and the orbit information table, combining with a satellite attitude adjustment strategy, comprehensively obtaining the working mode of the satellite, judging the charging and discharging conditions of the satellite, and finally combining with the power consumption table under each working mode, calculating the energy change of the satellite until the calculation is finished.
Referring next to fig. 2, fig. 2 shows a task adjustment diagram in the present application, where the task adjustment module is invoked by the task period energy constraint calculation module when the task does not satisfy the energy constraint. At T5At that moment, the calculated energy value is lower than the energy threshold, and the model will calculate T6Time of day and obtaining energy value V of model at the time of day1With which it can be calculated to satisfy T6The energy value at the moment is greater than the energy threshold, requiring a shortened mission time. Due to T1When the energy value is full, the previous task is not adjusted any more, and the moduleType is only to T1-T6The task in between. As used herein, the term "full energy value" means that the satellite battery power source is fully charged. The model searches the task with the lowest priority one by one, if the task meets the energy constraint, the adjustment function is quitted, otherwise, the task with the priority or the task with the next lower priority is continuously adjusted. The adjustment includes shortening a task time or deleting a task. And after the task is adjusted, updating the originally changed energy data in the energy source database. And after the calculation is finished, outputting the code number of the adjustment task, and performing task adjustment by the task planning system. FIG. 2 shows adjusting T4-T6The post-mission energy value changes.
Fig. 3 shows a flow chart of the non-duty period energy calculation in the present application. And automatically calculating the timing of the model during the non-task period, and only considering the satellite orbit information and the attitude adjustment strategy. The model firstly obtains the latest time point from the energy source database as the calculation starting time, obtains the energy value of the time from the energy source database as the calculation initial value, reads the orbit information of the satellite after the time point from the orbit information table, calculates the energy by referring to the satellite attitude adjustment strategy, and injects the result into the energy source database.
FIG. 4 shows a telemetry calibration schematic of the present application. The system introduces satellite telemetry to correct energy values in the energy database. The satellite residual capacity is related to current, internal resistance and temperature, and the complicated electrochemical reaction in the battery causes the estimation method of the battery residual capacity to be complicated and the estimation result to be inaccurate, so that the energy residual capacity is difficult to estimate by using the satellite remote measurement.
However, the satellite square matrix current, the load current, and the charge/discharge current can be used to determine whether the satellite power source is fully charged. And in the model, acquiring the energy remote measurement of the satellite, and correcting the energy value of the corresponding time point in the energy source database to be full when the power supply is judged to be full. During correction, energy calculation does not need to be carried out on the energy after the time point of correction, and only corresponding linear translation is carried out according to the change of the energy value at the time point of correction until the next time point when the energy value is full. Model detection of T1If the energy source is full at the moment, the energy source database can be filled with energyT of1And correcting the energy value after the moment. T is1-T2During the charging state of the energy source, the energy source is full all the time, T2At any moment, the satellite energy increases H1Increasing H to the subsequent energy value1Until the energy source is full. At T4Energy value increase H at time2Due to the increase of H2<H1Then the subsequent energy value is increased by H2Until the energy source is full. T is6The energy before the correction is full at all times, and the subsequent energy does not need to be corrected.
The system establishes three data tables in the energy source database to maintain the energy source database: task period data tables, non-task period data tables, and energy data tables. And after the calculation is finished, if the task table indicates that the task is finally annotated, copying the calculated data to the energy data table, covering the data in the energy data table within the same time, correcting the subsequent data of the task, and otherwise, not copying the data. And during the non-task period calculation, the model inquires the energy data table and the non-task period data table, acquires the latest time as the calculation starting time to read the corresponding track information table for calculation, inquires the latest time of the energy data table and the corresponding energy value thereof after the calculation is finished, and copies the data later than the time point in the non-task period data table to the energy data table after correcting. The energy data table stores the on-satellite energy value and records the on-satellite energy consumption condition. And providing an initial value for calculating the energy constraint in the mission period, and receiving telemetry data correction.
In a second aspect, the present application provides a method for energy constraining a satellite using an energy constraining system for a satellite planning task as described in the first aspect, the method comprising the steps of:
(1) in a task period, the energy constraint system aiming at the satellite planning task calls the energy constraint calculation module in the task period to judge that the satellite planning task meets energy constraint or the satellite planning task does not meet the energy constraint, if the planning task meets the energy constraint, the step (2) is implemented, and if the planning task does not meet the energy constraint, the step (3) is implemented;
(2) the task period energy constraint calculation module continues to calculate energy data of the next time point, and the step (1) is implemented again until the calculation is finished or the planning task of the satellite does not meet the energy constraint;
(3) the energy constraint system aiming at the satellite planning task calls the task adjustment module to enable the planning task to meet the energy constraint;
during the non-mission period, the energy constraint system aiming at the satellite planning mission calls the non-mission period energy calculation module to calculate the energy data of the satellite and injects the obtained energy data to the energy source database.
In one embodiment, at any point in time when energy constraints are imposed on a satellite, the energy constraint system for a satellite planning task invokes the database maintenance module to maintain data generated by any of the mission period energy constraint calculation module, the mission adjustment module, the non-mission period energy calculation module, and the telemetry correction module.
In another embodiment, the method further comprises calling the telemetry correction module at any time point when the energy constraint is performed on the satellite, and correcting the energy data in the energy database by using the satellite telemetry data.
In another specific embodiment, the task adjusting module adjusts the planning task by querying a task before the time point when the satellite planning task does not satisfy the energy constraint, deleting the task or shortening the task time from low to high according to the task priority until the adjusted task can satisfy the energy constraint, and outputting the energy constraint result and the task adjustment suggestion after the task adjustment and the energy constraint calculation are completed.
The embodiments described above are intended to facilitate the understanding and appreciation of the application by those skilled in the art. It will be readily apparent to those skilled in the art that various modifications to these embodiments may be made, and the generic principles described herein may be applied to other embodiments without the use of the inventive faculty. Therefore, the present application is not limited to the embodiments herein, and those skilled in the art who have the benefit of this disclosure will appreciate that many modifications and variations are possible within the scope of the present application without departing from the scope and spirit of the present application.
Claims (10)
1. An energy constraint system aiming at a satellite planning task comprises an energy source database, a task period energy constraint calculation module, a task adjustment module, a non-task period energy calculation module and a telemetry correction module;
the energy source database is configured to record energy data of the whole operation cycle of the satellite, and the energy data comprises on-satellite time, a satellite working mode and a satellite energy value;
the task period energy constraint calculation module is configured to judge the working mode and the charging and discharging state of the satellite, calculate the energy consumption condition of the satellite in a period of time by combining the energy consumption of the satellite in different working modes, and judge whether a planning task meets the satellite energy constraint;
the task adjusting module is configured to adjust the planning task when the task energy constraint cannot meet the satellite energy constraint until the planning task meets the energy constraint;
the non-task period energy source calculation module is used for realizing the energy source calculation in the non-task period and injecting the calculated non-task period energy source data into an energy source database;
the telemetering correction module is configured to monitor energy telemetering data of the satellite, and when the power supply is judged to be full, the energy value of the corresponding time point in the energy source database is corrected to be full; during correction, energy calculation is not carried out on the energy after the time point of correction again, and only corresponding linear translation is carried out according to the change of the energy value at the time point of correction until the next time point when the energy value is full; and
the task period energy source constraint calculation module, the task adjustment module, the non-task period energy source calculation module and the telemetering correction module can perform data interaction with the energy source database.
2. An energy constraint system for a satellite planning task according to claim 1, further comprising a database maintenance module configured to maintain data generated by any of the task period energy constraint calculation module, task adjustment module, non-task period energy calculation module and telemetry correction module.
3. The energy constraint system for the satellite planning task according to claim 1 or claim 2, wherein the determining of the working mode and the charge-discharge state of the satellite by the task period energy constraint calculation module includes enabling the energy constraint system for the satellite planning task to first obtain a planned task schedule and an orbit information table of satellite in-out ground shadow time, and determining the working mode and the charge-discharge state of the satellite by combining an attitude adjustment strategy of the satellite.
4. The energy constraint system for the satellite planning task according to claim 1 or claim 2, wherein the task adjustment module adjusts the planning task by querying a task before a time point when the satellite planning task does not satisfy the energy constraint, deleting the task or shortening the task time from low to high according to the task priority until the adjusted task can satisfy the energy constraint, and outputting the energy constraint result and the task adjustment suggestion after the task adjustment and the energy constraint calculation are completed.
5. The energy constraint system for a satellite planning task according to claim 1 or claim 2, wherein the non-mission period energy calculation module performs calculations taking into account only satellite orbit information and attitude adjustment strategies.
6. The energy constraint system for a satellite planning task according to claim 2, wherein the maintenance of the data by the data maintenance module comprises one or more of the following operations: merging of coincident data, deletion of redundant data, or updating of energy data.
7. A method of energy constraining a satellite using the energy constraint system for a satellite planning task of claim 1, the method comprising the steps of:
(1) in a task period, the energy constraint system aiming at the satellite planning task calls the energy constraint calculation module in the task period to judge that the satellite planning task meets energy constraint or the satellite planning task does not meet the energy constraint, if the planning task meets the energy constraint, the step (2) is implemented, and if the planning task does not meet the energy constraint, the step (3) is implemented;
(2) the task period energy constraint calculation module continues to calculate energy data of the next time point, and the step (1) is implemented again until the calculation is finished or the planning task of the satellite does not meet the energy constraint;
(3) the energy constraint system aiming at the satellite planning task calls the task adjustment module to enable the planning task to meet the energy constraint;
during the non-mission period, the energy constraint system aiming at the satellite planning mission calls the non-mission period energy calculation module to calculate the energy data of the satellite and injects the obtained energy data to the energy source database.
8. A method of energy constraining a satellite using the energy constraint system for a satellite planning task of claim 2, the method comprising the steps of:
(1) in a task period, the energy constraint system aiming at the satellite planning task calls the energy constraint calculation module in the task period to judge that the satellite planning task meets energy constraint or the satellite planning task does not meet the energy constraint, if the planning task meets the energy constraint, the step (2) is implemented, and if the planning task does not meet the energy constraint, the step (3) is implemented;
(2) the task period energy constraint calculation module continues to calculate energy data of the next time point, and the step (1) is implemented again until the calculation is finished or the planning task of the satellite does not meet the energy constraint;
(3) the energy constraint system aiming at the satellite planning task calls the task adjustment module to enable the planning task to meet the energy constraint;
during the non-mission period, the energy constraint system aiming at the satellite planning mission calls the non-mission period energy computing module to compute the energy data of the satellite and injects the obtained energy data to the energy source database; and
at any time point when the energy constraint is carried out on the satellite, the energy constraint system aiming at the satellite planning task calls the database maintenance module to maintain the data generated by any one of the task period energy constraint calculation module, the task adjustment module, the non-task period energy calculation module and the telemetry correction module.
9. The method of energy restricting a satellite according to claim 7 or claim 8, further comprising invoking the telemetry correction module to correct the energy data in the energy database using the satellite telemetry data at any point in time when the energy restriction is performed on the satellite.
10. The method for energy constraint on the satellite according to claim 7 or claim 8, wherein the task adjustment module adjusts the planning task by querying the task before the time point when the satellite planning task does not satisfy the energy constraint, deleting the task or shortening the task time from low to high according to the task priority until the adjusted task can satisfy the energy constraint, and outputting the energy constraint result and the task adjustment suggestion after the task adjustment and the energy constraint calculation are completed.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810227808.1A CN108492024B (en) | 2018-03-20 | 2018-03-20 | Energy constraint system and method for satellite planning task |
CN202110273565.7A CN113033982B (en) | 2018-03-20 | 2018-03-20 | Method for performing energy constraint inspection on planning task of satellite |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810227808.1A CN108492024B (en) | 2018-03-20 | 2018-03-20 | Energy constraint system and method for satellite planning task |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110273565.7A Division CN113033982B (en) | 2018-03-20 | 2018-03-20 | Method for performing energy constraint inspection on planning task of satellite |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108492024A CN108492024A (en) | 2018-09-04 |
CN108492024B true CN108492024B (en) | 2021-03-16 |
Family
ID=63318499
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110273565.7A Active CN113033982B (en) | 2018-03-20 | 2018-03-20 | Method for performing energy constraint inspection on planning task of satellite |
CN201810227808.1A Active CN108492024B (en) | 2018-03-20 | 2018-03-20 | Energy constraint system and method for satellite planning task |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110273565.7A Active CN113033982B (en) | 2018-03-20 | 2018-03-20 | Method for performing energy constraint inspection on planning task of satellite |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN113033982B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109347537B (en) * | 2018-09-19 | 2020-10-20 | 上海微小卫星工程中心 | Data priority synchronous adjustment and data retrieval method for time division system constellation network |
CN109992838B (en) * | 2019-03-06 | 2023-02-21 | 中国科学院国家空间科学中心 | Imaging satellite energy constraint checking method based on dynamic energy balance period |
CN113837511B (en) * | 2020-06-23 | 2023-05-16 | 电力规划总院有限公司 | Energy planning method and device |
CN112287467B (en) * | 2020-12-24 | 2021-04-16 | 中国人民解放军国防科技大学 | Micro-nano satellite energy balance evaluation system and application method thereof |
CN114604443B (en) * | 2022-02-17 | 2023-06-06 | 中国电子科技集团公司第十研究所 | Multi-star measurement and control scheduling method and system under real and complex constraint conditions |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8498481B2 (en) * | 2010-05-07 | 2013-07-30 | Microsoft Corporation | Image segmentation using star-convexity constraints |
CN105068549A (en) * | 2015-08-18 | 2015-11-18 | 航天东方红卫星有限公司 | Method for autonomously and continuously planning satellite tasks |
CN106324631A (en) * | 2016-07-28 | 2017-01-11 | 北京空间飞行器总体设计部 | Remote sensing satellite energy balance constraint analysis system and method |
CN106972581A (en) * | 2017-04-28 | 2017-07-21 | 北京空间飞行器总体设计部 | It is a kind of to be applied to energy scheduling method on star of the remote sensing satellite based on energy state |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ES2377371B2 (en) * | 2010-07-23 | 2012-09-03 | Universidad De Sevilla | DEVICE, SYSTEM AND METHOD OF LOCATION AND ENERGY EFFICIENT FOLLOW-UP. |
US20120029812A1 (en) * | 2010-07-29 | 2012-02-02 | King Abdul Aziz City For Science And Technology | Method and system for automatically planning and scheduling a remote sensing satellite mission |
CN104090819B (en) * | 2014-07-22 | 2017-07-18 | 中国科学院空间科学与应用研究中心 | A kind of space astronomy satellite celestial sphere scan multiple target mission planning method |
-
2018
- 2018-03-20 CN CN202110273565.7A patent/CN113033982B/en active Active
- 2018-03-20 CN CN201810227808.1A patent/CN108492024B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8498481B2 (en) * | 2010-05-07 | 2013-07-30 | Microsoft Corporation | Image segmentation using star-convexity constraints |
CN105068549A (en) * | 2015-08-18 | 2015-11-18 | 航天东方红卫星有限公司 | Method for autonomously and continuously planning satellite tasks |
CN106324631A (en) * | 2016-07-28 | 2017-01-11 | 北京空间飞行器总体设计部 | Remote sensing satellite energy balance constraint analysis system and method |
CN106972581A (en) * | 2017-04-28 | 2017-07-21 | 北京空间飞行器总体设计部 | It is a kind of to be applied to energy scheduling method on star of the remote sensing satellite based on energy state |
Non-Patent Citations (1)
Title |
---|
基于重点任务优先规则的快速卫星任务规划方法;林元、何川东、郜斐、汤航;《电子技术与软件工程》;20131127;全文 * |
Also Published As
Publication number | Publication date |
---|---|
CN113033982B (en) | 2024-04-30 |
CN113033982A (en) | 2021-06-25 |
CN108492024A (en) | 2018-09-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108492024B (en) | Energy constraint system and method for satellite planning task | |
US20220342084A1 (en) | Navigation satellite time system and its autonomous recovery method | |
CN112345942B (en) | Battery system and BMS (battery management system) and full charge-discharge SOC (system on chip) calibration method thereof | |
CN110155377A (en) | The method and system of automatic management satellite ground TT&C system | |
US11796597B2 (en) | Method for estimating state of charge (SOC) of lithium-ion battery system based on artificial intelligence (AI) | |
KR20200010369A (en) | Battery level estimation device, battery level estimation method, and program | |
CN110487260B (en) | Intelligent star sensor for spacecraft attitude determination and attitude determination method thereof | |
Lenzen et al. | Onboard planning and scheduling autonomy within the scope of the firebird mission | |
GB2612359A (en) | Satellite operation and processing of satellite state data | |
CN117169749A (en) | Method for generating battery capacity prediction model, prediction method and device thereof | |
CN109992838B (en) | Imaging satellite energy constraint checking method based on dynamic energy balance period | |
CN114252077A (en) | Dual-GPS/SINS combined navigation method and system based on federal filter | |
US9915928B2 (en) | Availability prediction apparatus for electric power storage device | |
CN115099581A (en) | Dynamic task planning method and device for satellite, electronic equipment and medium | |
CN116184253A (en) | Satellite power supply test system, method and computer storage medium | |
CN110979737A (en) | Method and device for determining power-off time of carrier rocket and carrier rocket | |
CN111953401B (en) | Autonomous request type orbit service system for microsatellite | |
CN110018459B (en) | Method for designing analysis flow of satellite-borne SAR echo auxiliary data | |
CN114814595A (en) | SOC estimation method and device of vehicle battery, medium, controller and vehicle | |
JP7498247B2 (en) | Charging rate estimation method | |
Team et al. | Autonomous optical navigation (autonav) ds1 technology validation report | |
CN118584339B (en) | SOC calculation method of battery system, battery management system and battery system | |
CN113435634B (en) | Emergency task planning method based on greedy thought and shortest path method | |
Zhang et al. | Institute of Telecommunication and Navigation Satellites, China Academy of Space Technology, Beijing, China netoonhui@ 126. com | |
CN116881623A (en) | Track forecasting method based on low-track satellite-borne GNSS receiver |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |