CN108488993A - Monitoring system and method for air-conditioning experiment - Google Patents

Monitoring system and method for air-conditioning experiment Download PDF

Info

Publication number
CN108488993A
CN108488993A CN201810446648.XA CN201810446648A CN108488993A CN 108488993 A CN108488993 A CN 108488993A CN 201810446648 A CN201810446648 A CN 201810446648A CN 108488993 A CN108488993 A CN 108488993A
Authority
CN
China
Prior art keywords
air
unit
conditioning
monitoring
conditioning unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810446648.XA
Other languages
Chinese (zh)
Other versions
CN108488993B (en
Inventor
赵凌峰
李越峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Changhong Air Conditioner Co Ltd
Original Assignee
Sichuan Changhong Air Conditioner Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Changhong Air Conditioner Co Ltd filed Critical Sichuan Changhong Air Conditioner Co Ltd
Priority to CN201810446648.XA priority Critical patent/CN108488993B/en
Publication of CN108488993A publication Critical patent/CN108488993A/en
Application granted granted Critical
Publication of CN108488993B publication Critical patent/CN108488993B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • F24F11/41Defrosting; Preventing freezing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • F24F11/65Electronic processing for selecting an operating mode

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Physics & Mathematics (AREA)
  • Fuzzy Systems (AREA)
  • Mathematical Physics (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

The present invention relates to the experimental techniques of running state of air conditioner.At present in air conditioner researches and develops experimentation, it can not achieve in current air conditioning labor monitoring system and tested experiment air conditioner virtual condition be monitored, caused by experimenter frequently disengaging laboratory influences experiment condition and monitoring data and cannot directly instruct the experimental implementation of experimenter and follow-up R&D process during the experiment.Based on the above issues, the present invention proposes a kind of monitoring system and method for air-conditioning experiment, and drip irrigation device is:After related operating parameter is sent to monitoring unit by air-conditioning unit, judge the operating status of air-conditioning unit, and control camera unit and video and/or photograph taking are carried out to the virtual condition of air-conditioning unit, monitoring unit judges whether the corresponding experimental state of air-conditioning unit complies with standard according to the operating status for the air-conditioning unit judged with virtual condition comparison.

Description

Monitoring system and method for air-conditioning experiment
Technical field
The present invention relates to the monitoring technologies of air-conditioning parameter, more particularly to the practical shape of air-conditioner controller in air-conditioning experiment The technology that state is monitored and analyzes.
Background technology
At present in air conditioner R&D process, current air conditioning labor is typically only capable to acquire each outer of tested experiment air-conditioning Portion's parameter, and the operating parameter inside tested experiment air-conditioning can not be directly acquired, it is even more impossible to the practical shapes to tested experiment air-conditioning State is monitored.In general, the state that tested experiment air-conditioning is current, such as the frosting situation of outdoor unit, the condensation situation of indoor unit All it is some problems directly related with air-conditioning quality, and based on current laboratory environment, experimenter generally requires to enter Laboratory is observed the virtual conditions such as frosting, condensation, and first, the disengaging laboratory of experimenter can be to air conditioning labor Operating mode have an impact, to influence experimental result;Secondly, experimenter is typically only capable to empty according to detected tested experiment The external parameter of tune tests whether air-conditioning enters the operational process such as frosting, condensation to judge to be tested, it is most likely that in real process Enter laboratory observation when generation, observation or tested is either just entered when real process is over Experiment air-conditioning finishes defrosting state in the case where the situation that defrosts is unsatisfactory, this is for wishing through air-conditioning experiment come accurate The true work for monitoring air conditioner actual motion state and carrying out parameter improvement brings great inconvenience.
In the patent application application No. is 201711117388.3, a kind of convertible frequency air-conditioner integrated monitoring control system is disclosed System, it is proposed that by the monitoring object of operating parameter by the monitoring system and monitoring strategies that are converted to outside air-conditioning inside air-conditioning. Since detection data is converted to from by the outside of experiment air-conditioning by the inside of experiment air conditioner, detected operation can be made to join Number is more accurate, and the judgement basis of experimenter is more accurate, but does not solve experimenter fundamentally and need to enter experiment Room observation air-conditioning state brings above-mentioned influence and inconvenience.
In practical operation, though laboratory carries video monitoring, but due under normal conditions, video monitoring and laboratory Monitoring device is to work independently, and can not realize data interconnection, can not realize and judge experimenter and monitor experimental state The guidance of work.So existing experimental monitoring system and video monitoring equipment can not solve it is above-mentioned air conditioner experiment in Problem encountered.
Invention content
The object of the present invention is to provide a kind of monitoring system and method for air-conditioning experiment, solution is ground in air conditioner at present It sends out in experimentation, can not achieve in current air conditioning labor monitoring system and tested experiment air conditioner virtual condition is supervised Control, caused by experimenter during the experiment frequently disengaging laboratory influence experiment condition and monitoring data cannot be straight Connect the technical issues of instructing the experimental implementation of experimenter and follow-up R&D process.
The present invention solves its technical problem, the technical solution adopted is that:The monitoring system of air-conditioning experiment, including air-conditioning list Member, which is characterized in that further include monitoring unit and camera unit, the air-conditioning unit and camera unit are and monitoring unit Connection;
The air-conditioning unit by the related operating parameter inside air-conditioning unit for being sent to monitoring unit in real time;
Monitoring data is sent to monitoring by the camera unit for being monitored to the virtual condition of air-conditioning unit Unit, the monitoring include the shooting of video and/or photo;The monitoring unit for obtaining and analyzing related operation ginseng in real time Number, judges the operating status of air-conditioning unit, and control reality of the camera unit to the air-conditioning unit under related operating parameter State carries out the shooting of video and/or photo, and the video taken and/or photo are transferred to monitoring unit, monitoring unit The virtual condition comparison of the air-conditioning unit obtained according to the operating status for the air-conditioning unit judged and monitoring judges air-conditioning unit Whether corresponding experimental state complies with standard;Monitoring unit is additionally operable to whether monitoring air-conditioning unit enters the operation shape judged State;Specifically, monitoring unit is used to obtain and analyze in real time the related operating parameter of air-conditioning unit, to the operation shape of air-conditioning unit State is judged, and is controlled camera unit and executed supervisory control action to air-conditioning unit;Monitoring unit can also be by comparing air-conditioning The related operating parameter and air-conditioning state monitoring data of unit, judge the operation that air-conditioning unit is entered under related operating parameter Whether state is consistent with air-conditioning actual motion state, for example, having shown air-conditioning unit according to the related operating parameter of air-conditioning unit Tested air-conditioning unit not frosting at this time is shown through entering defrosting state, but according to the monitoring situation of camera unit, to It need not defrost, pass through the comparison of air-conditioning unit correlation operating parameter and camera unit monitoring data in this case Realize that the parameter entered needed for defrosting state to air-conditioning unit optimizes, furthermore it is also possible to air-conditioning unit in corresponding environment With the operating status under relevant parameter whether rationally, whether comply with standard, for example, defrosting state run time it is whether reasonable Deng to realize the intelligent guidance to experimenter's observation experiment state, such as to unreasonable or non-compliant experimental state It is prompted, so that experimenter carries out observational study emphatically and parameter optimization, experiment money is provided for later research and development improvement Material;Monitoring unit can also be judged by the related operating parameter and air-conditioning unit condition monitoring data of comparison air-conditioning unit The actual motion state that is entered of air-conditioning unit controller whether be consistent with the theoretical operating status under air conditioner operation parameters, example Such as, it is shown according to the related operating parameter of air-conditioning unit in the pendulum leaf position of air-conditioning unit and the monitoring situation of camera unit Pendulum leaf position is not inconsistent.
Specifically, camera unit is arranged in the position that can at least take the various virtual conditions of air-conditioning unit.
Further, the use environment of the monitoring unit expands to the practical service environment of air-conditioning unit.
Specifically, the air-conditioning unit includes the interface of the related operating parameter of output, is joined correlation operation by the interface Number is sent to monitoring unit.
Still further, after the monitoring unit obtains and analyzes related operating parameter in real time, it is automatically or manually controlled and sentences Break and the operating status of air-conditioning unit and camera unit is automatically or manually controlled to the air-conditioning unit under related operating parameter Virtual condition carries out the shooting of video and/or photo, and the virtual condition of the air-conditioning unit includes the defrosting of air-conditioning unit and coagulates Dewiness state further includes other states of air-conditioning unit.
Specifically, the monitoring unit includes storage analytic unit, and the storage unit is for storing air-conditioning unit transmission The video and/or photo of the related operating parameter and the virtual condition of the air-conditioning unit taken under related operating parameter come, when When related personnel needs to check, the related operating parameter that air-conditioning unit is read by storage unit is shot under related operating parameter The video and/or photo of the virtual condition of the air-conditioning unit arrived.
Still further, when monitoring unit control camera unit is to the practical shape of the air-conditioning unit under related operating parameter When the shooting of state progress video and/or photo, shooting instruction is sent to camera unit by USB interface.
Specifically, the monitoring unit sends shooting instruction to camera unit at intervals of set time, records air-conditioning unit Virtual condition.
Further, monitoring unit obtains and analyzes air-conditioning unit correlation operating parameter in real time, to the fortune of air-conditioning unit The virtual condition for the air-conditioning unit that row state is judged, and recorded with the camera unit under in the same time is compared, such as It is not consistent, then sends out hint instructions.
Specifically, monitoring unit is judged by the analysis to air-conditioning unit operating parameter at the outer wind turbine of air-conditioning unit In operating status, and in the same time under air-conditioning unit virtual condition China and foreign countries' wind turbine for being recorded of camera unit and not running, then Monitoring unit sends out hint instructions.
Still further, monitoring unit obtains and analyze the operating parameter of air-conditioning unit in real time, when judging air-conditioning unit When into Defrost operation state, then defrosting virtual condition of the camera unit to the air-conditioning unit surfaces externally and internally under in the same time is controlled The shooting for carrying out video and/or photo then controls camera unit knot when judging that air-conditioning unit exits Defrost operation state Shooting of the beam to the video and/or photo of the defrosting virtual condition of the air-conditioning unit surfaces externally and internally under in the same time, and will take Video and/or photo be transferred to monitoring unit and be stored in storage analytic unit together, monitoring unit is according to the air-conditioning judged The defrosting of the Defrost operation state and Defrost operation parameter of unit and the air-conditioning unit surfaces externally and internally monitored down in the same time is practical The comparison of state judges whether the Defrost operation parameter of air-conditioning unit is reasonable, such as, if it eliminates, whether defrost too early, thus Carry out the adjustment of Defrost operation parameter.
Still further, monitoring unit can transfer Defrost operation parameter and sky stored by the defrosting experiment of different type of machines The defrosting virtual condition video and/or photo for adjusting unit compare and analyze.
For the monitoring method of air-conditioning experiment, it is applied to the monitoring system for air-conditioning experiment, which is characterized in that Include the following steps:
Camera unit is installed to suitable position by step 1, enable normally the virtual condition to air-conditioning unit into The shooting of row video and/or photo;
Step 2, connection air-conditioning unit and monitoring unit, connect camera unit and monitoring unit;
Step 3, air-conditioning unit booting run well;
Related operating parameter is sent to monitoring unit by step 4, air-conditioning unit;
After step 5, monitoring unit get the related operating parameter of air-conditioning unit, it is automatically or manually controlled and judges air-conditioning list The operating status of member;
Reality of the camera unit to the air-conditioning unit under related operating parameter is automatically or manually controlled in step 6, monitoring unit Border state carries out the shooting of video and/or photo, and the video taken and/or photo are transferred to monitoring unit and stored And analysis;
Step 7, monitoring unit are according to the operating status for the air-conditioning unit judged, the sky with camera unit monitoring gained It adjusts unit virtual condition to compare, judges whether the operating status of current air-conditioning unit meets to descend in the same time needed for air-conditioning unit Operating status provides indicator, while storing related operating parameter that air-conditioning unit is sent and taking down in the same time The video and/or photo of the virtual condition of air-conditioning unit.
The invention has the advantages that by the above-mentioned monitoring system and method for air-conditioning experiment, monitoring unit is utilized It obtains the related operating parameter of air-conditioning unit and judges the operating status of air-conditioning unit, to control camera unit to air-conditioning The virtual condition of unit is taken pictures and/or is imaged, and the operating status of air-conditioning unit is compared with virtual condition, judges sky It adjusts whether the operating status of unit is consistent with required operating status, and then the related operating parameter of air-conditioning unit is adjusted to most It is good, while monitoring unit stores the related operating parameter that air-conditioning unit is sent and the air-conditioning list taken under related operating parameter The video and/or photo of the virtual condition of member, and the content operating parameter related to air-conditioning that camera unit is shot is related Connection, and then the correspondence of the virtual condition of air-conditioning unit and corresponding operating parameter within the scope of setting time is monitored, it helps real It tests personnel subsequently to be checked, analyzed and compared, to judge whether the control program of the related operating parameter of air-conditioning setting closes Reason, monitoring unit can transfer the operating parameter stored by different type of machines and the virtual condition of air-conditioning unit under relevant parameter Video and/or photo compare and analyze, and experimenter is helped to analyze the difference between different type of machines.
Description of the drawings
Fig. 1 is the structure diagram of the monitoring system of air-conditioning of the present invention experiment.
Specific implementation mode
With reference to embodiment and attached drawing, detailed description of the present invention technical solution.
The monitoring system of air-conditioning experiment of the present invention, is made of air-conditioning unit, monitoring unit and camera unit, ties Structure block diagram is referring to Fig. 1, wherein air-conditioning unit and camera unit are connect with monitoring unit;The air-conditioning unit is for real-time Related operating parameter inside air-conditioning unit is sent to monitoring unit;
Monitoring data is sent to monitoring by the camera unit for being monitored to the virtual condition of air-conditioning unit Unit, the monitoring include the shooting of video and/or photo;
Monitoring data is sent to monitoring by the camera unit for being monitored to the virtual condition of air-conditioning unit Unit, the monitoring include the shooting of video and/or photo;The monitoring unit for obtaining and analyzing related operation ginseng in real time Number, judges the operating status of air-conditioning unit, and control reality of the camera unit to the air-conditioning unit under related operating parameter State carries out the shooting of video and/or photo, and the video taken and/or photo are transferred to monitoring unit, monitoring unit The virtual condition comparison of the air-conditioning unit obtained according to the operating status for the air-conditioning unit judged and monitoring judges air-conditioning unit Whether corresponding experimental state complies with standard;Monitoring unit is additionally operable to whether monitoring air-conditioning unit enters the operation shape judged State;Specifically, monitoring unit is used to obtain and analyze in real time the related operating parameter of air-conditioning unit, to the operation shape of air-conditioning unit State is judged, and is controlled camera unit and executed supervisory control action to air-conditioning unit;Monitoring unit can also be by comparing air-conditioning The related operating parameter and air-conditioning state monitoring data of unit, judge the operation that air-conditioning unit is entered under related operating parameter Whether state is consistent with air-conditioning actual motion state, for example, having shown air-conditioning unit according to the related operating parameter of air-conditioning unit Tested air-conditioning unit not frosting at this time is shown through entering defrosting state, but according to the monitoring situation of camera unit, to It need not defrost, pass through the comparison of air-conditioning unit correlation operating parameter and camera unit monitoring data in this case Realize that the parameter entered needed for defrosting state to air-conditioning unit optimizes, furthermore it is also possible to air-conditioning unit in corresponding environment With the operating status under relevant parameter whether rationally, whether comply with standard, for example, defrosting state run time it is whether reasonable Deng to realize the intelligent guidance to experimenter's observation experiment state, such as to unreasonable or non-compliant experimental state It is prompted, so that experimenter carries out observational study emphatically and parameter optimization, experiment money is provided for later research and development improvement Material;Monitoring unit can also be judged by the related operating parameter and air-conditioning unit condition monitoring data of comparison air-conditioning unit The actual motion state that is entered of air-conditioning unit controller whether be consistent with the theoretical operating status under air conditioner operation parameters, example Such as, it is shown according to the related operating parameter of air-conditioning unit in the pendulum leaf position of air-conditioning unit and the monitoring situation of camera unit Pendulum leaf position is not inconsistent.
For the monitoring method of air-conditioning experiment, it is applied to the monitoring system for air-conditioning experiment, by following steps Composition:
Camera unit is installed to suitable position by step 1, enable normally the virtual condition to air-conditioning unit into The shooting of row video and/or photo;
Step 2, connection air-conditioning unit and monitoring unit, connect camera unit and monitoring unit;
Step 3, air-conditioning unit booting run well;
Related operating parameter is sent to monitoring unit by step 4, air-conditioning unit;
After step 5, monitoring unit get the related operating parameter of air-conditioning unit, it is automatically or manually controlled and judges air-conditioning list The operating status of member;
Reality of the camera unit to the air-conditioning unit under related operating parameter is automatically or manually controlled in step 6, monitoring unit Border state carries out the shooting of video and/or photo, and the video taken and/or photo are transferred to monitoring unit and stored And analysis;
Step 7, monitoring unit are according to the operating status for the air-conditioning unit judged, the sky with camera unit monitoring gained It adjusts unit virtual condition to compare, judges whether the operating status of current air-conditioning unit meets to descend in the same time needed for air-conditioning unit Operating status provides indicator, while storing related operating parameter that air-conditioning unit is sent and taking down in the same time The video and/or photo of the virtual condition of air-conditioning unit.
Here, monitoring unit is used to obtain and analyze in real time the related operating parameter of air-conditioning unit, to the fortune of air-conditioning unit Row state is judged, and controls supervisory control action of the camera unit to air-conditioning unit;Monitoring unit can also be empty by comparing The related operating parameter and air-conditioning state monitoring data for adjusting unit, judge air-conditioning unit required entrance under related operating parameter Operating status whether be consistent with air-conditioning actual motion state.
Embodiment
The embodiment of the present invention is illustrated by taking the Defrost operation parameter of air-conditioning as an example.
The monitoring system of the air-conditioning experiment of this example, including air-conditioning unit, monitoring unit and camera unit, wherein air-conditioning Unit and camera unit are connect with monitoring unit;Air-conditioning unit is used in real time by the related operating parameter inside air-conditioning unit It is sent to monitoring unit;Monitoring data is sent to by camera unit for being monitored to the virtual condition of air-conditioning unit Monitoring unit, monitoring include the shooting of video and/or photo;Monitoring unit is used to obtain and analyze related operating parameter in real time, Judge the operating status of air-conditioning unit, and controls virtual condition of the camera unit to the air-conditioning unit under related operating parameter Carry out the shooting of video and/or photo, and the video taken and/or photo be transferred to monitoring unit, monitoring unit according to The virtual condition comparison for the air-conditioning unit that the operating status for the air-conditioning unit judged is obtained with monitoring judges that air-conditioning unit is corresponding Experimental state whether comply with standard;Monitoring unit is additionally operable to whether monitoring air-conditioning unit enters the operating status judged.
Specifically, monitoring unit is used to obtain and analyze in real time the related operating parameter of air-conditioning unit, to air-conditioning unit Operating status is judged, and controls supervisory control action of the camera unit to air-conditioning unit;Monitoring unit can also pass through comparison The related operating parameter and air-conditioning state monitoring data of air-conditioning unit, required for judging air-conditioning unit under residing ambient condition Whether the operating status of entrance is consistent with air-conditioning actual motion state, for example, the related operating parameter according to air-conditioning unit is shown Air-conditioning unit comes into defrosting state, but shows tested air-conditioning unit at this time not according to the monitoring situation of camera unit Frosting passes through air-conditioning unit correlation operating parameter and camera unit monitoring data in this case without defrosting Comparison can realize that the parameter entered needed for defrosting state to air-conditioning unit optimizes, furthermore it is also possible to air-conditioning unit Operating status under corresponding environment and parameter whether rationally, whether comply with standard, for example, the run time of defrosting state whether Rationally etc., to realize the intelligent guidance to experimenter's observation experiment state, such as to unreasonable or non-compliant experiment State is prompted, so that experimenter carries out observational study emphatically and parameter optimization, examination is provided for later research and development improvement Certification of registered capital material;Monitoring unit can also be judged by the related operating parameter and air-conditioning state monitoring data of comparison air-conditioning unit The required entrance under related operating parameter of air-conditioning unit controller operating status whether with air-conditioning actual motion state phase Symbol, for example, showing the monitoring feelings of pendulum the leaf position and camera unit of air-conditioning unit according to the related operating parameter of air-conditioning unit Pendulum leaf position in condition is not inconsistent.
In above system, air-conditioning unit can be the air-conditioning unit with the interface including the related operating parameter of output, should Interface is preferably RS485 interfaces, Defrost operation parameter can be sent to monitoring unit by the interface;Camera unit can be with For USB camera, monitoring unit can be the PC machine that program is controlled with air conditioning monitoring program and camera, and USB camera is set It sets in the position that can at least take the ambient condition residing for air-conditioning unit;Monitoring unit obtains and analyzes related operation in real time After parameter, it can select that the operating status for judging air-conditioning unit is automatically or manually controlled, and can be automatically or manually controlled and take the photograph As head unit carries out the virtual condition of the air-conditioning unit under Defrost operation parameter the shooting of video and/or photo, wherein automatic Or manually control monitoring unit and go to judge the operating status of air-conditioning unit, and camera unit is automatically or manually controlled to defrosting The virtual condition of air-conditioning unit under operating parameter carries out the shooting of video and/or photo, is all that relevant experimenter can It independently selects, so that experiment is carried out more smooth, also provided conveniently for experiment;Monitoring unit may include storage analytic unit, The air-conditioning unit that storage unit is used to store the Defrost operation parameter that air-conditioning unit transmission comes and is taken under Defrost operation parameter Virtual condition video and/or photo, when related personnel needs to check, pass through storage unit read air-conditioning unit defrosting The video and/or photo of the virtual condition of the air-conditioning unit taken under operating parameter and Defrost operation parameter;Work as monitoring unit When controlling shooting of the camera unit to air-conditioning unit progress video and/or photo under Defrost operation parameter, pass through USB interface USB camera sending action is instructed.
In practical application, monitoring unit obtains and analyzes the operating parameter of air-conditioning unit in real time, when judging air-conditioning unit When into Defrost operation state, then defrosting virtual condition of the camera unit to the air-conditioning unit surfaces externally and internally under in the same time is controlled The shooting for carrying out video and/or photo then controls camera unit knot when judging that air-conditioning unit exits Defrost operation state Shooting of the beam to the video and/or photo of the defrosting virtual condition of the air-conditioning unit surfaces externally and internally under in the same time, and will take Video and/or photo be transferred to monitoring unit and be stored in storage analytic unit together, monitoring unit is according to the air-conditioning judged The defrosting of the Defrost operation state and Defrost operation parameter of unit and the air-conditioning unit surfaces externally and internally monitored down in the same time is practical The comparison of state judges whether the Defrost operation parameter of air-conditioning unit is reasonable, such as, if it eliminates, whether defrost too early, thus Carry out the adjustment of Defrost operation parameter.
For the monitoring method of air-conditioning experiment, it is applied to, for the monitoring system of air-conditioning experiment, include the following steps:
Camera unit is installed to suitable position by step 1, enable normally the virtual condition to air-conditioning unit into The shooting of row video and/or photo;
Step 2, connection air-conditioning unit and monitoring unit, connect camera unit and monitoring unit;
Step 3, air-conditioning unit booting run well;
Related operating parameter is sent to monitoring unit by step 4, air-conditioning unit;
After step 5, monitoring unit get the related operating parameter of air-conditioning unit, it is automatically or manually controlled and judges air-conditioning list The operating status of member;
Reality of the camera unit to the air-conditioning unit under related operating parameter is automatically or manually controlled in step 6, monitoring unit Border state carries out the shooting of video and/or photo, and the video taken and/or photo are transferred to monitoring unit and stored And analysis;
Step 7, monitoring unit are according to the operating status for the air-conditioning unit judged, the sky with camera unit monitoring gained It adjusts unit virtual condition to compare, judges whether the operating status of current air-conditioning unit meets to descend in the same time needed for air-conditioning unit Operating status provides indicator, while storing related operating parameter that air-conditioning unit is sent and taking down in the same time The video and/or photo of the virtual condition of air-conditioning unit.
In the above method, related personnel can also check the real-time of USB camera at any time in the case where not entering laboratory Video, judgment experiment state manually control the shooting that USB camera carries out video and/or photo by PC machine.
In actual experiment, other operating parameters other than Defrost operation parameter are applicable in the application, and the application is no longer described in detail.

Claims (9)

1. for the monitoring system of air-conditioning experiment, including air-conditioning unit, which is characterized in that further include monitoring unit and camera list Member, the air-conditioning unit and camera unit are connect with monitoring unit;
The air-conditioning unit by the related operating parameter inside air-conditioning unit for being sent to monitoring unit in real time;
The camera unit is sent to monitoring list for being monitored to the virtual condition of air-conditioning unit, and by monitoring data Member, the monitoring include the shooting of video and/or photo;
The monitoring unit judges the operating status of air-conditioning unit, and control for obtaining and analyzing related operating parameter in real time Camera unit processed carries out the virtual condition of the air-conditioning unit under related operating parameter the shooting of video and/or photo, and will The video and/or photo taken is transferred to monitoring unit, monitoring unit according to the operating status of the air-conditioning unit judged with The virtual condition comparison for monitoring obtained air-conditioning unit judges whether the corresponding experimental state of air-conditioning unit complies with standard;
Monitoring unit is additionally operable to whether monitoring air-conditioning unit enters the operating status judged.
2. the monitoring system according to claim 1 for air-conditioning experiment, which is characterized in that the camera unit setting In the position that can at least take the various virtual conditions of air-conditioning unit.
3. the monitoring system according to claim 1 for air-conditioning experiment, which is characterized in that the monitoring unit includes depositing Analytic unit is stored up, the storage unit is used to store the related operating parameter that air-conditioning unit transmission comes and is clapped under related operating parameter The video and/or photo of the virtual condition for the air-conditioning unit taken the photograph are read when related personnel needs to check by storage unit The video and/or photograph of the related operating parameter of air-conditioning unit and the virtual condition of the air-conditioning unit taken under related operating parameter Piece.
4. the monitoring system according to claim 3 for air-conditioning experiment, which is characterized in that monitoring unit obtains simultaneously in real time The operating parameter of analysis air-conditioning unit then controls camera unit pair when judging that air-conditioning unit enters Defrost operation state The defrosting virtual condition of air-conditioning unit surfaces externally and internally under in the same time carries out the shooting of video and/or photo, when judging air-conditioning When unit exits Defrost operation state, then controls camera unit and terminate defrosting to the air-conditioning unit surfaces externally and internally under in the same time The shooting of the video and/or photo of virtual condition, and the video taken and/or photo are transferred to monitoring unit and stored together In storage analytic unit, monitoring unit is according to the Defrost operation state and Defrost operation parameter of the air-conditioning unit judged and simultaneously The comparison for inscribing the defrosting virtual condition of the air-conditioning unit surfaces externally and internally monitored judges that the Defrost operation parameter of air-conditioning unit is It is no reasonable.
5. the monitoring system according to claim 1 for air-conditioning experiment, which is characterized in that the monitoring unit is every rule It fixes time and sends shooting instruction to camera unit, record the virtual condition of air-conditioning unit.
6. the monitoring system according to claim 1 for air-conditioning experiment, which is characterized in that the reality of the air-conditioning unit State includes practical frosting or the condensation state of air-conditioning unit surfaces externally and internally, further includes the actual motion of air-conditioning unit all parts State.
7. the monitoring system according to claim 1 for air-conditioning experiment, which is characterized in that the use of the monitoring unit Practical service environment of the Environment Extension to air-conditioning unit.
8. the monitoring system for air-conditioning experiment according to claim 1-7 any one, which is characterized in that the air-conditioning Unit and monitoring unit are realized between monitoring unit and camera unit by data transmission interface or wireless data transfer module Data transmission.
9. for the monitoring method of air-conditioning experiment, it is applied to the monitoring system according to any one of claims 8 for air-conditioning experiment, it is special Sign is, includes the following steps:
Camera unit is installed to suitable position by step 1, is enabled the virtual condition normally to air-conditioning unit and is regarded The shooting of frequency and/or photo;
Step 2, connection air-conditioning unit and monitoring unit, connect camera unit and monitoring unit;
Step 3, air-conditioning unit booting run well;
Related operating parameter is sent to monitoring unit by step 4, air-conditioning unit;
After step 5, monitoring unit get the related operating parameter of air-conditioning unit, it is automatically or manually controlled and judges air-conditioning unit Operating status;
Practical shape of the camera unit to the air-conditioning unit under related operating parameter is automatically or manually controlled in step 6, monitoring unit State carries out the shooting of video and/or photo, and the video taken and/or photo are transferred to monitoring unit and is stored and is divided Analysis;
Step 7, monitoring unit are according to the operating status for the air-conditioning unit judged, the air-conditioning list with camera unit monitoring gained First virtual condition compares, and judges whether the operating status of current air-conditioning unit meets the operation descended in the same time needed for air-conditioning unit State provides indicator, while storing the related operating parameter that air-conditioning unit is sent and the air-conditioning taken down in the same time The video and/or photo of the virtual condition of unit.
CN201810446648.XA 2018-05-11 2018-05-11 Monitoring system and method for air conditioner experiment Active CN108488993B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810446648.XA CN108488993B (en) 2018-05-11 2018-05-11 Monitoring system and method for air conditioner experiment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810446648.XA CN108488993B (en) 2018-05-11 2018-05-11 Monitoring system and method for air conditioner experiment

Publications (2)

Publication Number Publication Date
CN108488993A true CN108488993A (en) 2018-09-04
CN108488993B CN108488993B (en) 2020-08-25

Family

ID=63352839

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810446648.XA Active CN108488993B (en) 2018-05-11 2018-05-11 Monitoring system and method for air conditioner experiment

Country Status (1)

Country Link
CN (1) CN108488993B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012247169A (en) * 2011-05-31 2012-12-13 Fujitsu General Ltd Air conditioner
CN204880386U (en) * 2015-08-17 2015-12-16 济南赛文特仪器设备有限公司 Laboratory atmospheric control and monitored control system
CN106382718A (en) * 2016-08-30 2017-02-08 广州穗剑实验室科技有限公司 Ventilation and air-conditioning control system based on real-time video analysis
CN206755489U (en) * 2016-12-09 2017-12-15 宋显峰 Air monitoring system
CN107975910A (en) * 2017-12-21 2018-05-01 重庆金鑫科技产业发展有限公司 A kind of monitoring system of central air-conditioning
CN207302300U (en) * 2017-08-21 2018-05-01 四川本未科技有限公司 A kind of Laboratory Monitoring System

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012247169A (en) * 2011-05-31 2012-12-13 Fujitsu General Ltd Air conditioner
CN204880386U (en) * 2015-08-17 2015-12-16 济南赛文特仪器设备有限公司 Laboratory atmospheric control and monitored control system
CN106382718A (en) * 2016-08-30 2017-02-08 广州穗剑实验室科技有限公司 Ventilation and air-conditioning control system based on real-time video analysis
CN206755489U (en) * 2016-12-09 2017-12-15 宋显峰 Air monitoring system
CN207302300U (en) * 2017-08-21 2018-05-01 四川本未科技有限公司 A kind of Laboratory Monitoring System
CN107975910A (en) * 2017-12-21 2018-05-01 重庆金鑫科技产业发展有限公司 A kind of monitoring system of central air-conditioning

Also Published As

Publication number Publication date
CN108488993B (en) 2020-08-25

Similar Documents

Publication Publication Date Title
US9187188B2 (en) Assembly inspection system and method
CN106443387B (en) A kind of method, apparatus and system controlling crusing robot Partial Discharge Detection
CN109205430B (en) Safety inspection device, system and method for elevator
CN113091667B (en) Inspection robot and inspection method
CN109073252B (en) Air conditioner visualization system
KR102179598B1 (en) Apparatus and method for learning facilities using video file
CN109484934B (en) Tracking of maintenance trajectories for elevator systems
CN111064935B (en) Intelligent construction site personnel posture detection method and system
CN109491408A (en) A kind of unmanned plane can be used for doors structure detection
CN109729167A (en) A kind of outstation and its data uploading method
CN113762183A (en) Intelligent checking and analyzing system for existing building safety and operation method
CN111141529B (en) Automatic test method for automobile instrument signals
CN111680402A (en) Shield door fault visualization method, system, device and storage medium
CN112113968A (en) Detection system, visual detection device and detection method
CN108444056A (en) Central air-conditioning monitoring system and its monitoring method
CN108488993A (en) Monitoring system and method for air-conditioning experiment
CN116542502B (en) Building construction period optimization system and method based on convolutional neural network
CN109579226A (en) The service ability detection method and system of air-conditioning
CN110800315B (en) Device maintenance support system and device maintenance support apparatus
CN113065540A (en) Power transmission line element failure identification method and system based on machine patrol image
CN108397864A (en) Automatically cleaning control method for air conditioner
CN107063729A (en) A kind of vehicle air conditioner temperature Linear testing method and system based on host computer
CN106839339B (en) A kind of detection method and device of the real-time air output of air conditioner, air conditioner
Mitra et al. A UAV Payload for Real-time Inspection of Highway Ancillary Structures
CN113910229B (en) Load parameter identification method, identification device, readable storage medium and robot

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant