CN108487455A - Modularization steel frame - Google Patents
Modularization steel frame Download PDFInfo
- Publication number
- CN108487455A CN108487455A CN201810628984.6A CN201810628984A CN108487455A CN 108487455 A CN108487455 A CN 108487455A CN 201810628984 A CN201810628984 A CN 201810628984A CN 108487455 A CN108487455 A CN 108487455A
- Authority
- CN
- China
- Prior art keywords
- column
- frame
- bolt
- layer
- modular unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/19—Three-dimensional framework structures
- E04B1/1903—Connecting nodes specially adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/04—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
- E04C3/06—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal with substantially solid, i.e. unapertured, web
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/30—Columns; Pillars; Struts
- E04C3/32—Columns; Pillars; Struts of metal
Abstract
The present invention proposes a kind of modularization steel frame, belongs to technical field of structural engineering, can give full play to twin columns twin beams combined effect.The frame includes multi-layer phase with modular unit layer, and every layer of modular unit layer includes multiple modular units, and each modular unit is the box frame being formed by connecting by frame column and Vierendeel girder;Further include connection component, connection component includes that inner sleeve, column connection bolt connect bolt with beam;In same modular unit layer, four, middle part frame column is bolted into combination center pillar by column connection, and two frame columns of lateral surface are bolted into combination side column by column connection, and corner frame column is corner post;In adjacent two layers modular unit layer, between neighbouring two combination center pillars, two combination side columns and two corner posts, respectively it is connected by inner sleeve;In adjacent two layers modular unit layer, four, middle part Vierendeel girder is bolted into combination central sill by beam connection, and the two frame girders of lateral surface are bolted into combination side bar by beam connection.
Description
Technical field
The invention belongs to technical field of structural engineering more particularly to a kind of modularization steel frames.
Background technology
Modularization steel-frame structure has the characteristics that high capacity, size selection are flexible, has vast potential for future development.No
It is same as common steel-frame structure, modularization steel frame is usually connected and composed by multiple modular units, and each modular unit is
The box frame being formed by connecting by frame column and Vierendeel girder;In modularization steel frame, multiple modular units in multiple rows of, multiple row,
Multilayer arranges, wherein the opposite sides face of each two adjacent modular units is bonded to each other.After connection, in modularization steel frame
Column position is four frame columns being immediately adjacent to each other of four, the upper layer frame column being immediately adjacent to each other and lower layer, totally eight frame columns;Side
Column position is two frame columns being immediately adjacent to each other of two, the upper layer frame column being immediately adjacent to each other and lower layer, totally four frame columns;Angle
Column position is piece frame column of one, upper layer frame column and lower layer.The central sill position of modularization steel frame is four and is immediately adjacent to each other
Vierendeel girder, side bar position are two Vierendeel girders being immediately adjacent to each other.Thus, form " eight columns, 16 beam " inside modularization steel frame
Connecting node, modularization steel frame side formed " four columns, eight beam " connecting node, formed in modularization steel frame side
The connecting node of " four beam of twin columns ".
How modular unit safely and reliably connected by connector by modularization steel frame, it has also become be badly in need of research
Problem.Currently, the connecting node form between modular unit mainly has corner fittings connecting node, cover plate bolt connecting node, answers in advance
Power connecting node, that beam beam connecting node connects plate node etc. with inner sleeve is several.Wherein, corner fittings connecting node, cover plate bolt connect
It is similar with three kinds of types of attachment of prestressing force connecting node to connect node, when connection, vertically by column open interior installation bolt or adopts
The mode for applying pretightning force with elongated prestressed strand connects, and horizontal direction is connected by connecting plate, but such connection shape
The vertical bonding strength of formula is weaker, causes the anti-side rigidity of modularization steel frame weaker.In beam beam connecting node, the beam of modular unit
It is attached using bolt between beam, and nothing is directly connected between modular unit column and column, connecting node intensity and rigidity are inclined
It is weak.Inner sleeve connects in plate node, is vertically welded to connect the frame column of upper and lower modular unit by inner sleeve, and horizontal direction is logical
It crosses connecting plate to be welded to connect inner sleeve, using being welded to connect the bonding strength and rigidity that ensure that node, but increase existing
The workload of field welding, site welding difficulty of construction are larger, it is difficult to ensure welding quality.In short, using above-mentioned existing node shape
The existing module steel frame of formula connection can envoy's dot due to lacking effective connection between column and column or between Liang Yuliang
There are prodigious gaps between formula center pillar and column or between Liang Yuliang, cannot the column of adjacent modular units and beam effectively be connected shape
At coupled column and combination beam, it is difficult to give full play to the combined effect of modularization steel-frame structure twin columns twin beams, when structure stress, is easy
Because the frame beam column section of node premature failure or individual module unit is surrendered too early, and structure is caused integrally to be destroyed.
Thus, a kind of simple structure and modularization steel frame easy for construction how are provided, to give full play to modularization steel
The twin columns twin beams combined effect of frame structure is a current technical problem for being badly in need of solving.
Invention content
The present invention is directed to the deficiency of above-mentioned existing module steel frame, proposes a kind of modularization steel frame, adjacent mould
The frame column and Vierendeel girder of module unit form coupled column and combination beam, can common stress to give full play to modularization steel frame knot
The twin columns twin beams combined effect of structure, each connecting node have higher bearing capacity and stiffness, meanwhile, the modularization steel framework is rack-mounted
It is convenient with efficient and construction.
In order to achieve the above object, the technical solution adopted by the present invention is:
Modularization steel frame, including the multi-layer phase that stacked on top arranges is the same as modular unit layer, every layer of modular unit layer
Include the multiple modular units arranged in multiple rows of multiple row, each modular unit is by four frame columns and eight Vierendeel girders
The box frame being formed by connecting;The modularization steel frame further includes the connection group for connecting the two neighboring modular unit
Part, the connection component include inner sleeve, column connection bolt connect bolt with beam;In the same modular unit layer, in being located at
The frame column that four of portion are immediately adjacent to each other is bolted into a combination center pillar by column connection, is located at lateral surface
Two side by side the adjacent frame column by the column connection be bolted into one combination side column, be located at corner the frame
Trestle is corner post;In modular unit layer described in adjacent two layers, between neighbouring two combination center pillars, neighbouring
Between two combination side columns and between neighbouring two corner posts, it is connected by the inner sleeve;It is described
The upper end of inner sleeve is inserted into and is fixed in the lower end of the frame column on upper layer, under lower end is inserted into and is fixed in and is located at
In the upper end of the associated frame members column of layer;In modular unit layer described in adjacent two layers, positioned at four of middle part be immediately adjacent to each other described in
Vierendeel girder is bolted into a combination central sill by beam connection, positioned at two frames being immediately adjacent to each other of lateral surface
Beam is bolted into a combination side bar by beam connection.
As a preferred embodiment, column connection bolt include for through adjacent two frame columns to elongating spiral shell
Bolt, and for through frame column to drawing lag bolt.
As a preferred embodiment, in the combination center pillar, the every two adjacent frame columns pass through described pair of elongation bolt
It is connected to drawing, described pair is elongated bolt simultaneously through the inner sleeve being inserted into the frame column.
As a preferred embodiment, in the combination side column, it is described right that two frame columns pass through along its direction that is arranged side by side
Bolt is elongated to connect to drawing, the every frame column is being equipped with described pair of drawing lag bolt perpendicular to the direction that is arranged side by side,
The described pair of inner sleeve for elongating bolt and being inserted into the frame column to drawing lag bolt to run through.
As a preferred embodiment, described pair of drawing lag bolt is equipped between the side wall facing each other of the corner post, it is described
To drawing lag bolt through the inner sleeve being inserted into the frame column.
As a preferred embodiment, in the combination central sill, four Vierendeel girders are C-shaped channel girder steel, including the first web,
It is vertically connected at the first top flange of first web upper end, is vertically connected at the first bottom wing of first web lower end
Edge;First web of the adjacent Vierendeel girder of same layer two mutually fits, and connects bolt by the beam and be fixedly connected;Upper layer
First top flange of the first lower flange Vierendeel girder adjacent with lower layer of the Vierendeel girder mutually fits, and is connected by the beam
Connecting bolt is fixedly connected.
As a preferred embodiment, in the combination side bar, two Vierendeel girders are H profile steel beam, including the second web, are hung down
Direct-connected the second top flange for being connected to second web upper end, is vertically connected at the second lower flange of second web lower end;
Second top flange of the second lower flange Vierendeel girder adjacent with lower layer of Vierendeel girder described in upper layer mutually fits, and by described
Beam connection bolt is fixedly connected.
As a preferred embodiment, the modular unit further includes top stiffener and bottom stiffener, the top stiffener
It is welded in four Vierendeel girders in top between every two adjacent Vierendeel girders, the bottom stiffener is welded in bottom four
In Vierendeel girder described in root between every two adjacent Vierendeel girders.
As a preferred embodiment, the top stiffener and bottom stiffener are corner cut triangular steel plate.
Compared with prior art, the advantages of the present invention are:
1, in modularization steel frame provided by the invention, between adjacent modular units, the frame column being immediately adjacent to each other is by setting
The column connection bolt shape set at combination center pillar or combination side column, can ensure it is seamless between the frame column of adjacent modular units,
The combination center pillar or the combination common stress of side column of formation, give full play to the combined effect of modularization steel frame two-column system;In turn,
Between the combination center pillar of adjacent layer, between combination side column and between the frame column in corner, pass through the inner sleeve phase of setting
Even, it can ensure effective connection of upper layer and lower layer modular unit layer, moreover, the inner sleeve of setting can also reduce frame column nodes domains
Deformation, improve the rotational stiffness of node;In addition, the Vierendeel girder being immediately adjacent to each other connects bolt shape in combination by the beam of setting
Beam or combination side bar can ensure also seamless, the combination central sill of formation or combination side between the Vierendeel girder of adjacent modular units
The common stress of beam gives full play to the combined effect of modularization steel frame twin beams system;
2, in modularization steel frame provided by the invention, the connection of two neighboring modular unit is complete by connection component
At scene is welded to connect without any, easy for installation, effectively reduces the construction time, efficiency of assembling is high, is conveniently replaceable and dismantles.
Description of the drawings
Fig. 1 is the structural schematic diagram of modularization steel frame provided in an embodiment of the present invention;
Fig. 2 is the structural schematic diagram of modular unit provided in an embodiment of the present invention;
Fig. 3 is the structural schematic diagram of inner sleeve provided in an embodiment of the present invention;
Fig. 4 is the schematic diagram that column provided in an embodiment of the present invention connects bolt;
Fig. 5 is the structural schematic diagram of the middle column connected node of modularization steel frame provided in an embodiment of the present invention;
Fig. 6 is the structural schematic diagram of the middle column connected node after modular unit layer removes at the middle and upper levels by Fig. 5;
Fig. 7 is the connection sectional view of combination center pillar provided in an embodiment of the present invention and the inner sleeve being inserted;
Fig. 8 is the structural schematic diagram of the side column connecting node of modularization steel frame provided in an embodiment of the present invention;
Fig. 9 is the structural schematic diagram of the side column connecting node after modular unit layer removes at the middle and upper levels by Fig. 8;
Figure 10 is the connection sectional view of combination side column provided in an embodiment of the present invention and the inner sleeve being inserted;
Figure 11 is the structural schematic diagram of the corner post connecting node of modularization steel frame provided in an embodiment of the present invention;
Figure 12 is the structural schematic diagram of the corner post connecting node after modular unit layer removes at the middle and upper levels by Figure 11;
Figure 13 is the connection sectional view of corner post provided in an embodiment of the present invention and the inner sleeve being inserted;
Figure 14 is the connection sectional view of combination central sill provided in an embodiment of the present invention;
Figure 15 is the connection sectional view of combination side bar provided in an embodiment of the present invention;
In above each figure:1, modular unit;11, frame column;12, Vierendeel girder;121, C-shaped channel girder steel;1211, the first upper limb
Edge;1212, the first web;1213, the first lower flange;122, H profile steel beam;1221, the second top flange;1222, the second web;
1223, the second lower flange;13, top stiffener;14, bottom stiffener;2, center pillar is combined;3, side column is combined;4, corner post;5, group
Close central sill;6, side bar is combined;7, inner sleeve;71, bolt hole;8, column connects bolt;81, to elongating bolt;82, to drawing short spiral shell
Bolt;9, beam connects bolt.
Specific implementation mode
In the following, the present invention is specifically described by illustrative embodiment.It should be appreciated, however, that not into one
In the case of step narration, element, structure and features in an embodiment can also be advantageously incorporated into other embodiment
In.
In the description of the present invention, it should be noted that the orientation or position of the instructions such as term "inner", "outside", "upper", "lower"
Set relationship be based on attached position relationship shown in FIG. 1, be merely for convenience of description of the present invention and simplification of the description, rather than indicate or
It implies that signified device or element must have a particular orientation, with specific azimuth configuration and operation, therefore should not be understood as
Limitation of the present invention.In addition, term " first ", " second " are used for description purposes only, it is not understood to indicate or imply phase
To importance.
As shown in Fig. 1-Figure 15, the present invention relates to a kind of modularization steel frame, including the multi-layer phase of stacked on top arrangement are same
Modular unit layer, every layer of modular unit layer include in multiple modular units 1 of multiple rows of multiple row arrangement, and each modular unit 1 is
The box frame being formed by connecting by four frame columns 11 and eight Vierendeel girders 12;Modularization steel frame further includes adjacent for connecting
The connection component of two modular units 1, connection component include inner sleeve 7, column connection bolt 8 bolt 9 is connected with beam;Same module
In elementary layer, four in the middle part of the modular unit layer frame columns 11 being immediately adjacent to each other connect bolt 8 by column and connect into one
Combine center pillar 2, positioned at two of modular unit layer lateral surface side by side adjacent frame column 11 bolt 8 connected by column connect into one
Root combines side column 3, and the frame column 11 for being located at modular unit layer corner is corner post 4;It is neighbouring in adjacent two layers modular unit layer
Two combination center pillars 2 between, neighbouring two combination side columns 3 between and neighbouring two corner posts 4 between,
It is connected by inner sleeve 7;The upper end of inner sleeve 7 is inserted into and is fixed in the lower end of the frame column 11 on upper layer, lower end
It is inserted into and is fixed in the upper end of the associated frame members column 11 of lower layer;In adjacent two layers modular unit layer, it is located at the four of middle part
The Vierendeel girder 12 that root is immediately adjacent to each other connects bolt 9 by beam and connects into a combination central sill 5, and be located at lateral surface two are mutually tight
Adjacent Vierendeel girder 12 connects bolt 9 by beam and connects into a combination side bar 6.
In above-mentioned modularization steel frame, between adjacent modular units 1, the frame column 11 being immediately adjacent to each other is connected by the column of setting
Connecting bolt 8 forms combination center pillar 2 or combination side column 3, can ensure seamless, shape between the frame column 11 of adjacent modular units 1
At combination center pillar 2 or combination 3 common stress of side column, give full play to the combined effect of modularization steel frame two-column system;Meanwhile
Between the combination center pillar 2 of adjacent layer, between combination side column 3 and between the frame column 11 in corner, pass through the inner sleeve of setting
7 are connected, and can ensure effective connection of upper layer and lower layer modular unit layer, moreover, the inner sleeve 7 of setting can also reduce frame column 11
The deformation of nodes domains improves the rotational stiffness of node;In addition, the Vierendeel girder 12 being immediately adjacent to each other connects bolt 9 by the beam of setting
Combination central sill 5 or combination side bar 6 are formed, can ensure also seamless, the group of formation between the Vierendeel girder 12 of adjacent modular units 1
Central sill 5 or combination 6 common stress of side bar are closed, the combined effect of modularization steel frame twin beams system is given full play to.Moreover, the module
Change in steel frame, the connection of two neighboring modular unit 1 is completed by connection component, and scene is welded to connect without any, is installed
It is convenient, the construction time is effectively reduced, efficiency of assembling is high, is conveniently replaceable and dismantles.
In one embodiment, as shown in Figure 1, Fig. 1 shows a modularization steel being made of eight modular units 1
Frame, including two layers of modular unit layer, every layer of modular unit layer include four modular units 1 in two rows of two column arrays arrangements.
It should be noted that as shown in Fig. 2, identical as the conventional modules unit of existing module steel frame, used in the present embodiment
It is the box frame of the four-prism shape on side that modular unit 1, which is also with frame column 11 and Vierendeel girder 12,.In arrangement modular unit 1
When, as shown in Figure 1, modular unit 1 is in lateral, longitudinal and vertical equal alignment.In this way after alignment, as shown in fig. 7,
Four frame columns 11 of combination center pillar 2 are constituted in two row arrangement of two rows;As shown in figure 14, four frames of combination central sill 5 are constituted
Beam 12 is also in two row arrangement of two rows.
For the specific connection of combination center pillar 2, combination side column 3 and corner post 4, detailed description are as follows:
As shown in figure 4, column connection bolt 8 include for through adjacent two frame columns 11 to elongate bolt 81, and
For through frame column 11 to drawing lag bolt 82.
As shown in Figure 5-Figure 7, it combines in center pillar 2, every two adjacent frame columns 11 pass through to elongating bolt 81 to the company of drawing
It connects, to elongating bolt 81 simultaneously through the inner sleeve 7 being inserted into frame column 11, realize combination the affixed of center pillar 2 and inner sleeve 7.
It should be noted that in the present embodiment, every two adjacent frame columns 11 are connected to elongating bolt 81 to drawing by two, with
Ensure bonding strength.
As Figure 8-Figure 10, it combines in side column 3, two frame columns 11 pass through along its direction that is arranged side by side to elongating bolt
81 pairs are drawn connection, and every frame column 11 is equipped with perpendicular to the direction that is arranged side by side to drawing lag bolt 82, to elongating 81 He of bolt
The inner sleeve 7 being inserted into frame column 11 to drawing lag bolt 82 to run through realize combination the affixed of side column 3 and inner sleeve 7.It needs
Bright, in the present embodiment, two frame columns 11 are connected to elongating bolt 81 to drawing by two, and every frame column 11 is worn
To draw lag bolt 82 also be two, can ensure bonding strength.
As shown in figures 11-13, it is equipped between the side wall facing each other of corner post 4 to drawing lag bolt 82, it is short to drawing
For bolt 82 through the inner sleeve 7 being inserted into frame column 11, realization corner post 4 is affixed with inner sleeve 7.It should be noted that at this
In embodiment, it is two to drawing lag bolt 82 to be worn between each two opposing sidewalls, to ensure bonding strength.
As shown in Fig. 7, Figure 10 and Figure 13, the outer wall clearance fit of the inner wall of frame column 11 and the inner sleeve 7 being inserted,
To meet the installation requirement between inner sleeve 7 and frame column 11.As a preferred embodiment, the length of inner sleeve 7 is at least Vierendeel girder
Twice of 12 height, to ensure the coupling stiffness of inner sleeve 7 and frame column 11.
In above-mentioned connection, it should be noted that in the present embodiment, 7 equal clod wash rectangle side of frame column 11 and inner sleeve
Steel pipe.In addition, as shown in figure 3, the top and bottom of inner sleeve 7 are correspondingly provided with bolt hole 71 respectively, in order to pass through to elongating
Bolt 81 or to draw lag bolt 82.
For the specific connection of combination central sill 5 and combination side bar 6, detailed description are as follows:
As shown in figure 14, it combining in central sill 5, four Vierendeel girders 12 are C-shaped channel girder steel 121, including the first web 1212,
It is vertically connected at the first top flange 1211 of 1212 upper end of the first web, is vertically connected under the first of 1212 lower end of the first web
The edge of a wing 1213;Set a roof beam in place 12 the first web 1212 of two adjacent frames of same layer mutually fits, and passes through beam and connect bolt 9 and fix and connect
It connects;Set a roof beam in place 12 the first top flange 1211 of first lower flange 1213 of upper layer Vierendeel girder 12 and lower layer adjacent frame mutually fits, and
Bolt 9 is connected by beam to be fixedly connected.
As shown in figure 15, it combines in side bar 6, two frame girders 12 are H profile steel beam 122, including the second web 1222, are hung down
Direct-connected the second top flange 1221 for being connected to 1222 upper end of the second web, is vertically connected at the second bottom wing of 1222 lower end of the second web
Edge 1223;Set a roof beam in place 12 the second top flange 1221 of second lower flange 1223 of upper layer Vierendeel girder 12 and lower layer adjacent frame is mutually affixed
It closes, and bolt 9 is connected by beam and is fixedly connected.It should be noted that compared to C-shaped channel girder steel, the combination that is made of H profile steel beam
Side bar 6 is capable of the torsional rigidity of reinforced frame outermost anti-side rigidity and frame entirety.The H profile steel used in combination side bar 6
The height of beam 122 with combine the highly consistent of the C-shaped channel girder steel 121 used in central sill 5.
In addition, as shown in Fig. 2, modular unit 1 further includes top stiffener 13 and bottom stiffener 14, top stiffener 13
It is welded in every two adjacent frames in four Vierendeel girders 12 in top to set a roof beam in place between 12, bottom stiffener 14 is welded in the frame of bottom four
Every two adjacent frames are set a roof beam in place between 12 in beam 12.In the present embodiment, top stiffener 13 and bottom stiffener 14 are corner cut
Triangular steel plate.The top stiffener 13 and bottom stiffener 14 being arranged in the present embodiment can play the role of beam-ends and expand the wing,
Forming reinforced node, whens joints, makes beam-ends plastic hinge, and beam-ends weld seam is avoided to destroy, be allowed to meet " strong node, it is weak
The requirement of component ".
The connection method of above-mentioned modularization steel frame, includes the following steps:
(1) frame column 11 and the welding of Vierendeel girder 12 are obtained into modular unit 1 in the factory.As a preferred embodiment, welding mould
Further include the steps that welding top stiffener 13 and bottom stiffener 14 when module unit 1.It should be noted that being used in welding
Full penetration butt weld is welded.
(2) multiple modular units 1 are arranged in one layer of modular unit layer, by every four phases in the middle part of this layer of modular unit layer
Mutual adjacent frame column 11 connects bolt 8 by column and connects into a combination center pillar 2, in connection, by the lower end of inner sleeve 7
It is inserted into the upper end for each frame column 11 for forming the combination center pillar 2, and makes inner sleeve 7 to combine center pillar 2 affixed with this;By the layer
The adjacent frame column 11 side by side of every two of modular unit layer lateral surface connects bolt 8 by column and connects into a combination side column
3, in connection, the lower end of inner sleeve 7 is inserted into the upper end for each frame column 11 for forming the combination side column 3, and make inner sleeve
To combine side column 3 affixed with this for cylinder 7;The lower end of inner sleeve 7 is inserted into the every corner post 4 in this layer of modular unit layer corner, and led to
Crossing column connection bolt 8 keeps inner sleeve 7 and the corner post 4 affixed.
(3) in one layer of modular unit layer of the top of this layer of modular unit layer rearrangement, arrangement, make each modular unit 1
In the lower end of each frame column 11 be sleeved on outside the upper end of mounted inner sleeve 7, connect upper layer according to the method in step (2)
Each combination center pillar 2 in modular unit layer and combination side column 3, and complete the group of each inner sleeve 7 and upper layer module elementary layer
Close being respectively and fixedly connected with for center pillar 2, combination side column 3 and corner post 4.
(4) by every four Vierendeel girders 12 being immediately adjacent to each other in the middle part of two layers of modular unit layer, spiral shell is connected by beam
Bolt 9 connects into a combination central sill 5, will connect bolt 9 by beam positioned at every two Vierendeel girders 12 being immediately adjacent to each other of lateral surface
Connect into a combination side bar 6.
(5) inner sleeve 7 is installed in the upper end of each frame column 11 of upper layer module elementary layer according to the method for step (2),
Step (3) and (4) is repeated, until the number of plies of modular unit layer reaches requirement, completes the installation of entire modularization steel frame.
Claims (9)
1. modularization steel frame, including the multi-layer phase that stacked on top arranges is the same as modular unit layer, every layer of modular unit layer packet
Multiple modular units (1) in the arrangement of multiple rows of multiple row are included, each modular unit (1) is by four frame columns (11) and eight
The box frame that root Vierendeel girder (12) is formed by connecting;It is characterized in that:
The modularization steel frame further includes the connection component for connecting the two neighboring modular unit (1), the connection
Component include inner sleeve (7), column connection bolt (8) bolt (9) is connected with beam;In the same modular unit layer, it is located at middle part
Four frame columns (11) being immediately adjacent to each other by the column connect bolt (8) connect into one combination center pillar (2), be located at
The adjacent frame column (11) connects into a combination side column to two of lateral surface by column connection bolt (8) side by side
(3), the frame column (11) for being located at corner is corner post (4);In modular unit layer described in adjacent two layers, neighbouring two
Between the combination center pillar (2), between neighbouring two combination side columns (3) and described in neighbouring two
Between corner post (4), it is connected by the inner sleeve (7);The upper end of the inner sleeve (7) is inserted into and is fixed in positioned at upper layer
In the lower end of the frame column (11), lower end is inserted into and is fixed in the upper end of the associated frame members column (11) of lower layer;Phase
In adjacent two layers of modular unit layer, four Vierendeel girders (12) being immediately adjacent to each other positioned at middle part connect spiral shell by the beam
Bolt (9) connects into a combination central sill (5), and two Vierendeel girders (12) being immediately adjacent to each other positioned at lateral surface pass through the beam
Connection bolt (9) connects into a combination side bar (6).
2. modularization steel frame according to claim 1, it is characterised in that:The column connection bolt (8) includes for passing through
Wear adjacent two frame columns (11) to elongating bolt (81), and for through frame column (11) to drawing
Lag bolt (82).
3. modularization steel frame according to claim 2, it is characterised in that:In the combination center pillar (2), every two adjacent
The frame column (11) by described pair elongate bolt (81) to draw connect, described pair elongate bolt (81) and meanwhile through be inserted into
The inner sleeve (7) in the frame column (11).
4. modularization steel frame according to claim 2, it is characterised in that:In the combination side column (3), two frames
Trestle (11) elongates bolt (81) by described pair along its direction that is arranged side by side and is connected to drawing, and the every frame column (11) is being hung down
Directly described pair being equipped in the direction that is arranged side by side and drawing lag bolt (82), described pair is elongated bolt (81) and to drawing lag bolt
(82) run through the inner sleeve (7) being inserted into the frame column (11).
5. modularization steel frame according to claim 2, it is characterised in that:The side wall facing each other of the corner post (4)
Between be equipped with described pair and draw lag bolt (82), described pair is drawn lag bolt (82) through the institute being inserted into the frame column (11)
State inner sleeve (7).
6. modularization steel frame according to claim 1, it is characterised in that:In the combination central sill (5), four frames
Set a roof beam in place (12) be C-shaped channel girder steel (121), including the first web (1212), be vertically connected on first web (1212)
First top flange (1211) at end, is vertically connected at the first lower flange (1213) of the first web (1212) lower end;Same layer
The first web (1212) of two adjacent Vierendeel girders (12) mutually fits, and connects the fixed company of bolt (9) by the beam
It connects;First top flange of the first lower flange (1213) Vierendeel girder (12) adjacent with lower layer of Vierendeel girder described in upper layer (12)
(1211) it mutually fits, and bolt (9) is connected by the beam and is fixedly connected.
7. modularization steel frame according to claim 1, it is characterised in that:In the combination side bar (6), two frames
Set a roof beam in place (12) be H profile steel beam (122), including the second web (1222), be vertically connected at the second web (1222) upper end
The second top flange (1221), be vertically connected at the second lower flange (1223) of the second web (1222) lower end;Upper layer institute
The second top flange (1221) for stating the second lower flange (1223) Vierendeel girder (12) adjacent with lower layer of Vierendeel girder (12) is mutual
Fitting, and bolt (9) is connected by the beam and is fixedly connected.
8. modularization steel frame according to claim 1, it is characterised in that:The modular unit (1) further includes that top adds
Strong plate (13) and bottom stiffener (14), the top stiffener (13) are welded in every two in four Vierendeel girders (12) in top
Between the adjacent Vierendeel girder (12) of root, the bottom stiffener (14) is welded in every two in the Vierendeel girder (12) of bottom four
Between the adjacent Vierendeel girder (12) of root.
9. modularization steel frame according to claim 8, it is characterised in that:The top stiffener (13) and bottom are reinforced
Plate (14) is corner cut triangular steel plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810628984.6A CN108487455A (en) | 2018-06-19 | 2018-06-19 | Modularization steel frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810628984.6A CN108487455A (en) | 2018-06-19 | 2018-06-19 | Modularization steel frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108487455A true CN108487455A (en) | 2018-09-04 |
Family
ID=63342996
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810628984.6A Pending CN108487455A (en) | 2018-06-19 | 2018-06-19 | Modularization steel frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108487455A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110258797A (en) * | 2019-06-27 | 2019-09-20 | 西安建筑科技大学 | Connecting node between a kind of steel construction cassette module |
CN110284732A (en) * | 2019-06-13 | 2019-09-27 | 中国矿业大学 | A kind of modular containers building connecting node |
CN110847360A (en) * | 2019-11-29 | 2020-02-28 | 扬州大学 | Novel directly expand anti-shear steel frame node of wing section |
CN112282066A (en) * | 2020-10-19 | 2021-01-29 | 重庆大学 | Full-modular building structure system |
CN112376692A (en) * | 2020-11-04 | 2021-02-19 | 重庆大学 | Splicing node and splicing method between box type modular steel structure building boxes |
CN113062457A (en) * | 2021-04-16 | 2021-07-02 | 青岛理工大学 | Modular steel frame hoop outer sleeve connecting device |
CN114263378A (en) * | 2021-12-24 | 2022-04-01 | 深圳供电局有限公司 | Semi-underground transformer substation with combined structure |
CN114562039A (en) * | 2022-04-06 | 2022-05-31 | 中建八局第四建设有限公司 | Modular steel frame inner sleeve split bolt connecting node and connecting method thereof |
CN114622657A (en) * | 2022-04-24 | 2022-06-14 | 石家庄铁道大学 | Steel-wood combined connecting system based on sleeve connection |
CN114922295A (en) * | 2022-05-18 | 2022-08-19 | 东南大学 | Modular steel structure middle bolt connection node and construction method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200407077Y1 (en) * | 2005-11-09 | 2006-01-23 | 금강공업 주식회사 | join structure between crossbeams |
KR101044792B1 (en) * | 2010-12-29 | 2011-06-27 | 주식회사 포스코에이앤씨건축사사무소 | Modular unit for easy transportation and modular structure using the same |
CN202627216U (en) * | 2012-06-29 | 2012-12-26 | 中国建筑股份有限公司 | Connection node of square steel tube, grouted inner sleeve and through bolts |
KR20160027595A (en) * | 2014-09-01 | 2016-03-10 | 현대건설주식회사 | Frame modular construction |
CN106522363A (en) * | 2016-12-05 | 2017-03-22 | 青岛理工大学 | Modular steel frame connection device and connection method thereof |
CN108118786A (en) * | 2017-12-26 | 2018-06-05 | 北京建筑大学 | A kind of inner sleeve cartridge type column connected node based on civil engineering |
CN208430625U (en) * | 2018-06-19 | 2019-01-25 | 青岛理工大学 | Modularization steel frame |
-
2018
- 2018-06-19 CN CN201810628984.6A patent/CN108487455A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR200407077Y1 (en) * | 2005-11-09 | 2006-01-23 | 금강공업 주식회사 | join structure between crossbeams |
KR101044792B1 (en) * | 2010-12-29 | 2011-06-27 | 주식회사 포스코에이앤씨건축사사무소 | Modular unit for easy transportation and modular structure using the same |
CN202627216U (en) * | 2012-06-29 | 2012-12-26 | 中国建筑股份有限公司 | Connection node of square steel tube, grouted inner sleeve and through bolts |
KR20160027595A (en) * | 2014-09-01 | 2016-03-10 | 현대건설주식회사 | Frame modular construction |
CN106522363A (en) * | 2016-12-05 | 2017-03-22 | 青岛理工大学 | Modular steel frame connection device and connection method thereof |
CN108118786A (en) * | 2017-12-26 | 2018-06-05 | 北京建筑大学 | A kind of inner sleeve cartridge type column connected node based on civil engineering |
CN208430625U (en) * | 2018-06-19 | 2019-01-25 | 青岛理工大学 | Modularization steel frame |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110284732B (en) * | 2019-06-13 | 2024-02-27 | 中国矿业大学 | Modularized container building connection node |
CN110284732A (en) * | 2019-06-13 | 2019-09-27 | 中国矿业大学 | A kind of modular containers building connecting node |
CN110258797A (en) * | 2019-06-27 | 2019-09-20 | 西安建筑科技大学 | Connecting node between a kind of steel construction cassette module |
CN110847360A (en) * | 2019-11-29 | 2020-02-28 | 扬州大学 | Novel directly expand anti-shear steel frame node of wing section |
CN112282066A (en) * | 2020-10-19 | 2021-01-29 | 重庆大学 | Full-modular building structure system |
CN112376692A (en) * | 2020-11-04 | 2021-02-19 | 重庆大学 | Splicing node and splicing method between box type modular steel structure building boxes |
CN113062457A (en) * | 2021-04-16 | 2021-07-02 | 青岛理工大学 | Modular steel frame hoop outer sleeve connecting device |
CN114263378A (en) * | 2021-12-24 | 2022-04-01 | 深圳供电局有限公司 | Semi-underground transformer substation with combined structure |
CN114562039A (en) * | 2022-04-06 | 2022-05-31 | 中建八局第四建设有限公司 | Modular steel frame inner sleeve split bolt connecting node and connecting method thereof |
CN114622657A (en) * | 2022-04-24 | 2022-06-14 | 石家庄铁道大学 | Steel-wood combined connecting system based on sleeve connection |
CN114622657B (en) * | 2022-04-24 | 2023-12-05 | 石家庄铁道大学 | Steel-wood combined connection system based on sleeve connection |
CN114922295A (en) * | 2022-05-18 | 2022-08-19 | 东南大学 | Modular steel structure middle bolt connection node and construction method |
CN114922295B (en) * | 2022-05-18 | 2024-03-26 | 东南大学 | Middle bolt connection node of modularized steel structure and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108487455A (en) | Modularization steel frame | |
CN109555230A (en) | Structural framing assembly node is partially filled with recovery function | |
CN106049671A (en) | Fabricated steel frame and steel plate shear wall structure replaceable after earthquake | |
CN103967133B (en) | Rectangular steel-tube concrete column and H profile steel beam bolted and welded connection node | |
CN105569184A (en) | One-way bolt connection node between rectangular steel pipe concrete column and H-type girders | |
CN109057023A (en) | One kind is for rigidly connected node structure of beam column of steel structure and preparation method thereof, Housing Structure System | |
CN208430625U (en) | Modularization steel frame | |
CN108468384A (en) | Assembled self- recoverage energy-dissipating type frame core wall structure system | |
CN110258797A (en) | Connecting node between a kind of steel construction cassette module | |
CN107447861A (en) | A kind of assembling type steel structure square tube post beam column node connection device with diagonal brace | |
CN105780989A (en) | Double beam floor structure | |
CN103174222A (en) | Steel casting modularization panel point for connection of steel pipe column and H-shaped beam | |
CN106869326B (en) | The frame system and construction method that hollow steel tube concrete integral node is constituted | |
CN111997196B (en) | Combined steel module structure system and construction method thereof | |
CN203412112U (en) | Easily repaired beam column node of band open strip-type energy dissipation element | |
CN108505621A (en) | Inner sleeve cartridge type steel frame beam column attachment device | |
CN211621953U (en) | Prefabricated beam column connected node structure | |
CN208650328U (en) | Connecting node between a kind of assembling steel plate-Combined concrete wall wall | |
CN210713199U (en) | Hinged joint device of H-shaped steel beam and steel column | |
CN110158808A (en) | A kind of assembled steel tube bank vertical node type of attachment of concrete | |
CN207092260U (en) | A kind of tenon riveting steel structure modularization house | |
CN106869320A (en) | Framework and its construction method that coupled column combination beam is constituted | |
CN207582277U (en) | A kind of combination steel suspension bridge | |
CN214423784U (en) | H-shaped steel beam and steel frame light roof panel connected node | |
CN214328469U (en) | Modular assembly type honeycomb bridge structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |