CN108487027A - A kind of traffic route maintenance constructing device with impact drill - Google Patents
A kind of traffic route maintenance constructing device with impact drill Download PDFInfo
- Publication number
- CN108487027A CN108487027A CN201810217229.9A CN201810217229A CN108487027A CN 108487027 A CN108487027 A CN 108487027A CN 201810217229 A CN201810217229 A CN 201810217229A CN 108487027 A CN108487027 A CN 108487027A
- Authority
- CN
- China
- Prior art keywords
- chamber
- pedestal
- impact drill
- elevator
- heater box
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C23/00—Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
- E01C23/06—Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
- E01C23/09—Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges
- E01C23/096—Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges for forming, opening-out, cleaning, drying or heating and filling
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Machines (AREA)
Abstract
The invention discloses a kind of traffic route maintenance constructing device with impact drill, including pedestal, heater box, idler wheel, stirring motor and feed inlet;The blanking chamber that horizontal cylindrical structure is offered in separator, is coaxially installed with horizontal sealing column in blanking intracavitary;Multiple stock chests are uniformly provided on the side wall of sealing column;The lower end of elevator chamber is installed with horizontal pressing plate, and the heating device to inside heating is equipped in the elevator chamber;Impact drill straight down is installed on lifting seat, the output shaft of impact drill passes through pedestal, is fixed with drill bit on the end straight down.The present invention passes through the blanking chamber of setting and the sealing column coordinated with it so that asphalt stock is uniformly flowed out out of heater box, and the easily controllable amount of filling up reduces the waste of material;By being handled again in drill bit road pavement notch before material for repairing, keep notch smooth, filler is more uniform.
Description
Technical field
The present invention relates to a kind of Pavement Construction Equipment, specifically a kind of traffic route maintenance construction dress with impact drill
It sets.
Background technology
Currently, the demand with carrier is increasing, some truck men are during transport, it is often desired to
In primary transport, mostly with some transport articles, overloading wagon is as a result resulted in, the road in city is caused in traveling
Damage, during maintenance, what it is due to damage is fraction road surface to service worker, needs large-scale plant to repair, makes
With very inconvenient;Present road surface is largely bituminous paving, needs road pavement to be handled when being repaired, wherein to original
The material separation on road surface is one for the treatment of process, destroys notch and neighbouring bituminous paving by impact drill, makes notch
Neatly, it is convenient for repairing.
Invention content
The purpose of the present invention is to provide a kind of traffic route maintenance constructing device with impact drill, to solve the above-mentioned back of the body
The problem of being proposed in scape technology.
To achieve the above object, the present invention provides the following technical solutions:
A kind of traffic route maintenance constructing device with impact drill, including pedestal, heater box, idler wheel, stirring motor and charging
Mouthful;The idler wheel is mounted on the downside of pedestal, and heater box is fixedly mounted on pedestal, and stirring motor is fixed on the top of heater box
Portion is also communicated with the feed inlet with filter screen at the top of heater box;The output shaft of the stirring motor is extend into straight down
In heater box, it is fixedly connected with vertical agitating shaft in the output shaft lower end of stirring motor, is fixedly mounted on the side wall of agitating shaft
There are multiple paddles, the heating mantles for heated asphalt are installed on the madial wall of heater box, the middle part of the heater box is fixed
It is welded with separator of the upper surface center to lower recess, the blanking chamber of horizontal cylindrical structure is offered in separator, under
The upper end of material chamber offers the feed opening being connected to separator top, and horizontal sealing column is coaxially installed in blanking intracavitary;
Multiple stock chests are uniformly provided on the side wall of sealing column;It is communicated with drainage conduit in the bottom of the blanking chamber;The pedestal
On be equipped with elevator chamber vertically, vertical sliding block is fixed on the side wall of elevator chamber, offered on the corresponding pedestal of sliding block with it is sliding
The vertical sliding slot of block cooperation, sliding block slide in sliding slot;The first hydraulically extensible of installation is fixed by the bracket above elevator chamber
The lower end of mechanism, the first hydraulic telescopic machanism is fixedly connected with elevator chamber, and the lower end of elevator chamber is installed with horizontal pressing plate,
Pressing plate is located at the lower section of pedestal, and diameter is more than the diameter of elevator chamber, and the drainage conduit, which is communicated with, extend into going out in elevator chamber
The end outlet of expects pipe, discharge nozzle is located on pressing plate;Heating device to inside heating is installed in the elevator chamber;It is described
The second hydraulic telescopic machanism is also installed on the holder of pedestal, the lower end of the second hydraulic telescopic machanism is fixedly connected with lifting
Seat is installed with impact drill straight down on lifting seat, and the output shaft of impact drill passes through pedestal straight down, at its end
Drill bit is fixed on end, the outer sheath of the drill bit is equipped with air duct, is connected to wind turbine by pipeline in air duct.
Further:The heating mantles are made of outer cover and internal heating element.
Further:The distance between the sealing column and blanking cavity wall are less than 1mm, are fixed on the central shaft of sealing column
Connect driving device.
Further:The bottom of the stock chest is arcuate structure.
Further:The width of the stock chest is more than the width of feed opening.
Further:Valve for controlling blanking is installed on the discharge nozzle.
Further:The both ends of the lifting seat are respectively and fixedly provided with elevator, and vertical guide rod is equipped in elevator, is led
To bar and elevator clearance fit.
Compared with prior art, the beneficial effects of the invention are as follows:The present invention coordinates by the blanking chamber of setting and with it
Sealing column so that asphalt stock is uniformly flowed out out of heater box, uniform to notch material for repairing, the easily controllable amount of filling up,
Reduce the waste of material;By being handled again in drill bit road pavement notch before material for repairing, keep notch smooth, filler is more
Add uniformly, ensure repairing road surface is not easy collapse-deformation, and usage time is more long;Pitch after filling up is immediately exposed to press, and avoids
Pitch loads postcooling, mitigates difficulty of construction, pavement patching is made more easily to construct, convenient to use.
Description of the drawings
Fig. 1 is a kind of structural schematic diagram of the traffic route maintenance constructing device with impact drill.
Fig. 2 is a kind of structural schematic diagram of blanking intracavitary in traffic route maintenance constructing device with impact drill.
Fig. 3 is a kind of overlooking structure diagram of elevator chamber in traffic route maintenance constructing device with impact drill.
In figure:1- pedestals, 2- heater boxes, 3- idler wheels, 4- stirring motors, 5- feed inlets, 6- agitating shafts, 7- paddles, 8-
Separator, 9- blanking chambers, 10- sealing columns, 11- stock chests, 12- feed openings, 13- drainage conduits, 14- valves, 15- discharge nozzles, 16-
Heating mantles, the first hydraulic telescopic machanisms of 17-, 18- elevator chambers, 19- pressing plates, 20- heating devices, 21- wind turbines, 22- sliding slots, 23-
Sliding block, the second hydraulic telescopic machanisms of 24-, 25- lifting seats, 26- impact drills, 27- air ducts, 28- drill bits, 29- guide rods, 30- liters
Block drops.
Specific implementation mode
Please refer to figure, in the embodiment of the present invention, a kind of traffic route maintenance constructing device with impact drill, including pedestal
1, heater box 2, idler wheel 3, stirring motor 4 and feed inlet 5;The idler wheel 3 is mounted on the downside of pedestal 1, makes device conveniently moving,
Heater box 2 is fixedly mounted on pedestal 1, and stirring motor 4 is fixed on the top of heater box 2, is also communicated at the top of heater box 2
Feed inlet 5 with filter screen, for raw material to be encased in pedestal 1;The output shaft of the stirring motor 4 is extend into straight down
In heater box 2, it is fixedly connected with vertical agitating shaft 6 in the output shaft lower end of stirring motor 4, is fixed on the side wall of agitating shaft 6
Multiple paddles 7 are installed, internal asphalt stock is stirred by paddle 7, convenient for asphalt stock heating mixing, are added
Heating mantles 16 for heated asphalt are installed, heating mantles 16 are by outer cover and internal heating element structure on the madial wall of hot tank 2
At outer cover is Heat Conduction Material, internally provides heat.
The middle part of the heater box 2 is fixedly welded with separator 8 of the upper surface center to lower recess, and separator 8 makes stirring
Mixed asphalt stock is sent to center, is convenient for the conveying of asphalt stock, horizontal cylindrical structure is offered in separator 8
Blanking chamber 9, the upper end of blanking chamber 9 offers the feed opening 12 being connected to 8 top of separator, the interior coaxial peace in blanking chamber 9
Equipped with horizontal sealing column 10, the distance between sealing column 10 and 9 inner wall of blanking chamber are less than 1mm, on the central shaft of sealing column 10
It is fixedly connected with driving device, sealing column 10 is driven to rotate;It is uniformly provided with multiple stock chests 11 on the side wall of sealing column 10, stores up
The bottom of hopper 11 is arcuate structure, is flowed into and out convenient for material, and the width of stock chest 11 is more than the width of feed opening 12, makes
The raw material fallen in feed opening 12 is obtained to enter in stock chest 11;It is communicated with drainage conduit 13 in the bottom of the blanking chamber 9, makes original
Material discharge out of blanking chamber 9, makes raw material uniformly fall.
Elevator chamber 18 is equipped on the pedestal 1 vertically, vertical sliding block 23, sliding block are fixed on the side wall of elevator chamber 18
The vertical sliding slot 22 coordinated with sliding block 23 is offered on 23 corresponding pedestals 1, the sliding in sliding slot 22 of sliding block 23 makes elevator chamber
18 move in the vertical direction, its rotation, use is avoided more to stablize;The top of elevator chamber 18 is fixed by the bracket installation first
The lower end of hydraulic telescopic machanism 17, the first hydraulic telescopic machanism 17 is fixedly connected with elevator chamber 18, passes through the first hydraulically extensible machine
Structure 17 pushes elevator chamber 18 to move up and down, and the lower end of elevator chamber 18 is installed with horizontal pressing plate 19, and pressing plate 19 is located at pedestal 1
Lower section, the diameter of pressing plate 19 is more than the diameter of elevator chamber 18, increases it and press the area of asphalt material, the drainage conduit 13
It is communicated with the discharge nozzle 15 extending into elevator chamber 18, the end outlet of discharge nozzle 15 is located on pressing plate 19, and asphalt material is defeated
It sends out, road pavement material for repairing, the material of discharge nozzle 15 is plastic flexible pipe, and elevator chamber 18 can be followed to move up and down, gone out
Valve 14 for controlling blanking is installed in expects pipe 15;Heating device to inside heating is installed in the elevator chamber 18
20, the temperature in elevator chamber 18 is improved, high temperature improves the mobility of pitch.
The second hydraulic telescopic machanism 24 is also installed on the holder of the pedestal 1, the second hydraulic telescopic machanism 24
Lower end is fixedly connected with lifting seat 25, and the both ends of lifting seat 25 are respectively and fixedly provided with elevator 30, and it is vertical to be equipped in elevator 30
Guide rod 29, guide rod 29 and 30 clearance fit of elevator, enable elevator 30 to be slided on guide rod 29, make lifting seat 25
It moves in the vertical direction, avoids double swerve, move it and more stablize, be installed with straight down on lifting seat 25
Impact drill 26, the output shaft of impact drill 26 passes through pedestal 1, is fixed with drill bit 28 on the end, passes through impact straight down
Destruction of 26 realizations to notch road surface is bored, convenient for finishing, the outer sheath of the drill bit 28 is equipped with air duct 27, passes through pipe in air duct 27
Road is connected to wind turbine 21, is blown open the material after destruction by air, reduces resistance.
Needed on the road surface repaired in use, device is pushed to, mobile device will thereon drill bit 28 towards road surface notch,
Start impact drill 26, and adjust the height of drill bit 28 by the second hydraulic telescopic machanism 24, protrudes into notch, to lacking
It is hit in mouthful, the asphalt stock separation in notch, while coordinating the air of blowout, raw material is blown off, the raw material of disengaging is made
It is not contacted with drill bit 28, reduces the resistance of impact drill 26;After cleaning, mobile device makes the end direction of discharge nozzle 15 lack
Mouthful, opening valve 14 makes the asphalt material in heater box 2 enter in discharge nozzle 15, and the asphalt material in heater box 2 passes through close
The rotation of column 10 is sealed even into in discharge nozzle 15, making the asphalt material that discharge nozzle 15 flows out uniform, is filled out convenient for manual control
Doses after filler, makes pressing plate 19 be downwardly against on the pitch of indentation, there, by pitch pressure by the first hydraulic telescopic machanism 17 in time
In tangible notch, fast repairing asphalt pavement is realized.The present invention by the blanking chamber of setting and with the sealing column that it coordinates, make
It obtains asphalt stock uniformly to flow out out of heater box, uniform to notch material for repairing, the easily controllable amount of filling up reduces the wave of material
Take;By being handled again in drill bit road pavement notch before material for repairing, keep notch smooth, filler is more uniform, ensures
Repairing road surface is not easy collapse-deformation, and usage time is more long;Pitch after filling up is immediately exposed to press, cold after avoiding pitch from loading
But, mitigate difficulty of construction, pavement patching is made more easily to construct, it is convenient to use.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped
Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should
It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art
The other embodiment being appreciated that.
Claims (7)
1. a kind of traffic route maintenance constructing device with impact drill, including pedestal(1), heater box(2), idler wheel(3), stirring
Motor(4)And feed inlet(5);The idler wheel(3)Mounted on pedestal(1)Downside, heater box(2)It is fixedly mounted on pedestal(1)
On, stirring motor(4)It is fixed on heater box(2)Top, in heater box(2)Top be also communicated with the feed inlet with filter screen
(5);The stirring motor(4)Output shaft extend into heater box straight down(2)It is interior, in stirring motor(4)Output shaft under
End is fixedly connected with vertical agitating shaft(6), agitating shaft(6)Side wall on be installed with multiple paddles(7), heater box
(2)Madial wall on heating mantles for heated asphalt are installed(16), it is characterised in that:The heater box(2)Middle part it is solid
Surely it is welded with separator of the upper surface center to lower recess(8), in separator(8)It inside offers under horizontal cylindrical structure
Expect chamber(9), blanking chamber(9)Upper end offer and separator(8)The feed opening of top connection(12), in blanking chamber(9)It is interior
It is coaxially installed with horizontal sealing column(10);In sealing column(10)Side wall on be uniformly provided with multiple stock chests(11);Institute
State blanking chamber(9)Bottom be communicated with drainage conduit(13);
The pedestal(1)On be equipped with elevator chamber vertically(18), elevator chamber(18)Side wall on be fixed with vertical sliding block(23),
Sliding block(23)Corresponding pedestal(1)On offer and sliding block(23)The vertical sliding slot of cooperation(22), sliding block(23)In sliding slot
(22)Interior sliding;Elevator chamber(18)Top be fixed by the bracket installation the first hydraulic telescopic machanism(17), the first hydraulically extensible
Mechanism(17)Lower end and elevator chamber(18)It is fixedly connected, elevator chamber(18)Lower end be installed with horizontal pressing plate(19),
Pressing plate(19)Positioned at pedestal(1)Lower section, diameter be more than elevator chamber(18)Diameter, the drainage conduit(13)It is communicated with and stretches into
To elevator chamber(18)Interior discharge nozzle(15), discharge nozzle(15)End outlet be located at pressing plate(19)On;In the elevator chamber
(18)Heating device to inside heating is inside installed(20);
The pedestal(1)Holder on be also installed with the second hydraulic telescopic machanism(24), the second hydraulic telescopic machanism(24)
Lower end be fixedly connected with lifting seat(25), in lifting seat(25)On be installed with impact drill straight down(26), impact
It bores(26)Output shaft straight down pass through pedestal(1), it is fixed with drill bit on the end(28), the drill bit(28)Outside
It is arranged with air duct(27), air duct(27)It is interior to pass through pipeline and wind turbine(21)Connection.
2. a kind of traffic route maintenance constructing device with impact drill according to claim 1, it is characterised in that:It is described
Heating mantles(16)It is made of outer cover and internal heating element.
3. a kind of traffic route maintenance constructing device with impact drill according to claim 1, it is characterised in that:It is described
Sealing column(10)With blanking chamber(9)The distance between inner wall is less than 1mm, sealing column(10)Central shaft on be fixedly connected driving dress
It sets.
4. a kind of traffic route maintenance constructing device with impact drill according to claim 1, it is characterised in that:It is described
Stock chest(11)Bottom be arcuate structure.
5. a kind of traffic route maintenance constructing device with impact drill according to claim 1, it is characterised in that:It is described
Stock chest(11)Width be more than feed opening(12)Width.
6. a kind of traffic route maintenance constructing device with impact drill according to claim 1, it is characterised in that:It is described
Discharge nozzle(15)On valve for controlling blanking is installed(14).
7. a kind of traffic route maintenance constructing device with impact drill according to claim 1, it is characterised in that:It is described
Lifting seat(25)Both ends be respectively and fixedly provided with elevator(30), elevator(30)Inside it is equipped with vertical guide rod(29), guide rod
(29)With elevator(30)Clearance fit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810217229.9A CN108487027A (en) | 2018-03-16 | 2018-03-16 | A kind of traffic route maintenance constructing device with impact drill |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810217229.9A CN108487027A (en) | 2018-03-16 | 2018-03-16 | A kind of traffic route maintenance constructing device with impact drill |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108487027A true CN108487027A (en) | 2018-09-04 |
Family
ID=63339326
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810217229.9A Pending CN108487027A (en) | 2018-03-16 | 2018-03-16 | A kind of traffic route maintenance constructing device with impact drill |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108487027A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115262353A (en) * | 2022-07-18 | 2022-11-01 | 湖南映晟交通建设工程有限公司 | Construction equipment is used in maintenance of assistance-localization real-time formula traffic road |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205134164U (en) * | 2015-11-29 | 2016-04-06 | 吕善强 | Asphalt pavement maintenance vehicle |
CN106493868A (en) * | 2016-12-07 | 2017-03-15 | 无锡同心塑料制品有限公司 | Quantifying feed equipment is used in a kind of foamed plastics modification |
CN206034262U (en) * | 2016-08-25 | 2017-03-22 | 唐异茂 | Pavement construction machinery cutting machine |
-
2018
- 2018-03-16 CN CN201810217229.9A patent/CN108487027A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205134164U (en) * | 2015-11-29 | 2016-04-06 | 吕善强 | Asphalt pavement maintenance vehicle |
CN206034262U (en) * | 2016-08-25 | 2017-03-22 | 唐异茂 | Pavement construction machinery cutting machine |
CN106493868A (en) * | 2016-12-07 | 2017-03-15 | 无锡同心塑料制品有限公司 | Quantifying feed equipment is used in a kind of foamed plastics modification |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115262353A (en) * | 2022-07-18 | 2022-11-01 | 湖南映晟交通建设工程有限公司 | Construction equipment is used in maintenance of assistance-localization real-time formula traffic road |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108221619A (en) | A kind of constructing device of traffic route maintenance pretreatment | |
CN108411753A (en) | A kind of traffic route maintenance constructing device with cutting function | |
CN108396627A (en) | A kind of constructing device of traffic route maintenance preheating cleaning | |
CN206139263U (en) | Dry crushing machining device of cement material mixing | |
CN106166794A (en) | A kind of preform production line | |
CN205870869U (en) | Over -and -under type agitating unit for building | |
CN105546983B (en) | A kind of openable box-type alloy baking furnace system of furnace roof | |
CN108487027A (en) | A kind of traffic route maintenance constructing device with impact drill | |
CN206870103U (en) | Prefabricated component filling pipeline | |
CN108543495A (en) | A kind of new type resin pitch is blended device | |
CN107583549A (en) | A kind of efficient mixing arrangement of dregs of beans fish meal | |
CN106621943A (en) | Input-amount-controllable movable chemical raw material stirring and mixing device | |
CN107321253B (en) | Soil prosthetic devices's churn | |
CN206030207U (en) | Prefab production line | |
US9719214B1 (en) | Liquid asphalt heating and mixing system | |
CN105318681B (en) | Drier or pyrolysis apparatus | |
CN206186075U (en) | Prefab production line | |
CN108639472A (en) | A kind of automatic filling machine | |
CN109610284B (en) | Compaction device for road repair | |
CN105180610B (en) | Horizontal rotary dryer | |
CN105971285B (en) | A kind of concrete stirring pours device | |
CN108014865A (en) | A kind of packaged type has the coal reducing mechanism of dual crushing function | |
CN208949691U (en) | A kind of self-propelled border stone slip-form machine | |
CN206721616U (en) | A kind of good bituminous distributor of heat-insulating property | |
CN106368111B (en) | A kind of movable type warm-mixed asphalt maintenance of surface equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180904 |
|
RJ01 | Rejection of invention patent application after publication |