CN108487018A - Asphalt road surface by microwave heating restorative procedure based on surface layer preheating - Google Patents

Asphalt road surface by microwave heating restorative procedure based on surface layer preheating Download PDF

Info

Publication number
CN108487018A
CN108487018A CN201810265413.0A CN201810265413A CN108487018A CN 108487018 A CN108487018 A CN 108487018A CN 201810265413 A CN201810265413 A CN 201810265413A CN 108487018 A CN108487018 A CN 108487018A
Authority
CN
China
Prior art keywords
road surface
heating
microwave
asphalt
surface layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810265413.0A
Other languages
Chinese (zh)
Inventor
苏涛
刘曌旋
姜震华
徐乙超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xidian University
Original Assignee
Xidian University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xidian University filed Critical Xidian University
Priority to CN201810265413.0A priority Critical patent/CN108487018A/en
Publication of CN108487018A publication Critical patent/CN108487018A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • E01C23/065Recycling in place or on the road, i.e. hot or cold reprocessing of paving in situ or on the traffic surface, with or without adding virgin material or lifting of salvaged material; Repairs or resurfacing involving at least partial reprocessing of the existing paving
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/02Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for preparing the materials
    • E01C19/10Apparatus or plants for premixing or precoating aggregate or fillers with non-hydraulic binders, e.g. with bitumen, with resins, i.e. producing mixtures or coating aggregates otherwise than by penetrating or surface dressing; Apparatus for premixing non-hydraulic mixtures prior to placing or for reconditioning salvaged non-hydraulic compositions
    • E01C19/1004Reconditioning or reprocessing bituminous mixtures, e.g. salvaged paving, fresh patching mixtures grown unserviceable; Recycling salvaged bituminous mixtures; Apparatus for the in-plant recycling thereof

Abstract

The invention discloses a kind of asphalt road surface by microwave heating restorative procedure based on surface layer preheating, mainly solves the problems, such as that the prior art efficiency of heating surface is low, the heating process time is grown.Its implementation is:The asphalt concrete pavement heated will be needed to be divided into surface layer road surface and second layer road surface according to thickness first;Then, using hot wind or infrared or microwave mode, first time heating is carried out to surface layer road surface, heating temperature at 100 DEG C 130 DEG C, then by microwave heating to second layer road-surface heating to 130 DEG C or more;Finally, two layers of road surface is subjected to milling rake pine processing, while sprays regenerative agent, mixes new asphalt material, flattened on the circuit face that paves again again after being sufficiently mixed, complete road surface and repair.The present invention improves the efficiency of heating surface, shortens heating time, reduces rehabilitation cost, and green non-pollution, can be used for highway reparation and maintenance.

Description

Asphalt road surface by microwave heating restorative procedure based on surface layer preheating
Technical field
This method belongs to microwave technical field, more particularly to a kind of road-surface heating method, can be used for highway reparation with The fields such as maintenance.
Background technology
With the economic fast development with science and technology, the high-grade expressway construction cause in China also achieves considerable hair Exhibition, by the development and construction of more than ten years, Chinese Higher grade highway has occupied the first in the world on total kilometrage.High-grade height Fast highway is usually using asphalt concrete material as level, and bituminous paving is natural environment is bad, transition load and frequently load When, normal work damage is will produce, to form concave-convex pit slot, various horizontal and vertical cracks, lopsided deformation, spider web Type cracking, gathers around phenomena such as packet, cleavage block at spill track.When these diseases occurs in road surface, such as handled not in time, it will The overall structure of bituminous paving can be caused to be destroyed, if the state of affairs of leaving continues to develop, the degree of disease area and damage can be into one Step becomes larger, and finally will cause road surface that can not be continuing with, and seriously affects the people's lives and property safety.Nowadays, the highway in China Infrastructure is by based on construction, being changed into construction and laying equal stress on maintenance.Wherein, proposition and the practical problems of new method are conserved, are dropped Low-maintenance technology and equipment cost problem improve the concern that the problems such as conserving efficiency and quality has been obtained for more and more people.
Currently, the research for bituminous paving heating technique both at home and abroad, mainly uses following several method:
1. open firing
Open firing is directly heated to bituminous paving by open fire, so that bituminous paving is softened, and then repaired Road surface or the method for recycling pitch.This method is although simple to operation, but inefficiency, seriously polluted, not easy to control, and Different degrees of damage can be generated to pitch.
2. infrared heating
Infrared heating is the method for the infrared heating bituminous paving generated in material surface burning using fuel.Due to red Outside line is only 2-3 inches to the penetration power of bituminous concrete, therefore can in a relatively short period of time be softened asphalt material, then is passed through It crosses the processes such as scarifying, levelling, compacting and repairing can be completed.The advantages of this method be it is simple and quick, it is environmentally protective.But the disadvantage is that: Controllability is not high, and equipment is heavy, not easy to operate.
3. microwave heating
Microwave heating relative to open fire and it is infrared for, be a kind of completely new mode of heating.Microwave heating is based primarily upon electricity The principle of magnetic wave near-field thermal radiation is powered by magnetron and generates electromagnetic wave, coupled inside cavity, will finally by antenna On electromagenetic wave radiation to bituminous paving, using the penetrability of microwave, heating and softening processing is carried out to bituminous paving.Relative to open fire And the mode of infrared heating, microwave heating mainly have the following advantages:Green pollution-free, heating uniformity is good, is convenient for Control, the efficiency of heating surface increase.But only with the single heating mode of asphalt road surface by microwave heating, still there is heating The process consuming time is longer, the relatively low problem of the efficiency of heating surface.
In conclusion during road-surface heating is repaired, not only to consider whether method is simple and convenient, and whether is heating Uniformly, whether harmless to environment, it is also contemplated that whether used method can shorten heating time, if can improve and add The factors such as the thermal efficiency.Therefore, there is the asphalt road surface by microwave heating restorative procedure based on surface layer preheating important engineering practice to anticipate Justice.
Invention content
The purpose of the present invention is heating the deficiency of restorative procedure for existing bituminous paving, provide a kind of based on surface layer preheating Asphalt road surface by microwave heating restorative procedure, with effectively reduce heating time, improve the efficiency of heating surface.
In order to achieve the above object, the technical solution adopted by the present invention is:
First, construction road surface is sampled on the spot and carries out Marshall experiment, judge the degree of aging of bituminous paving;When construction, Electromagnetic shielding facility is placed around the road surface to be repaired, it would be desirable to which the asphalt concrete pavement of heating is divided into two layers, i.e., from upper Surface layer road surface (1) and second layer road surface (2) are followed successively by under and;
Then, using hot wind or infrared or microwave mode, the first time heating of asphalt concrete pavement is carried out, i.e., by surface layer Road surface (1) is heated to 100 DEG C -130 DEG C, and its temperature is kept to be not less than 100 DEG C, then carries out second of asphalt concrete pavement Heating, i.e., penetrate into second layer road surface (2) to 130 DEG C or more by microwave heating, and it is in doughy state to make bituminous paving;
Finally, two layers of road surface is subjected to milling rake pine processing, keeps pavement temperature to be not less than 130 DEG C, while spraying regeneration Agent mixes new asphalt material, and the road surface of heating and regenerative agent and new asphalt material are sufficiently mixed, and forms new mixture It paves and is flattened on the face of circuit again again, complete road surface and repair.
Further, the asphalt material weight sampled on the spot is not less than 200g, and it is small that the time that sample is stood before testing is no less than 4 When, according to the experimental result that Marshall is tested, it can determine that the degree of aging of bituminous paving is short ageing or long-term ageing.
Further, described the asphalt concrete pavement that heats to be needed to be divided into two layers, be 2-3 inches by thickness pitch Road surface divides surface layer road surface (1), the bituminous paving that thickness under the road surface of surface layer is 7-10 inches is divided second layer road surface (2), i.e., First time heating operation carries out on the surface that thickness is 2-3 inches, and second of heating operation is on the surface that thickness is 7-10 inches It carries out.
Further, regenerative agent includes furfural oil, lubricating oil, machine oil, corn oil, and the content of sprinkling is heated asphalt material The 6%-10% of proportion;The weight of the new pitch mixed is the 16%-35% of heated asphalt material.
Further, new mixture is paved again when being flattened on the face of circuit, 2 is successively carried out using 1 road roller Secondary road surface at the uniform velocity flattens work, and rolling speed is no more than 5km/h, and pavement temperature when flattening for the first time is not less than 130 DEG C, the Pavement temperature when secondary pressing is not less than 70 DEG C.
Compared with prior art, the present invention having the advantages that:
1. the present invention makes surface layer road surface after with initial temperature as a result of surface layer pre-add thermal technology, then using micro- Wave heating second layer road surface, not only reduces heating time, and improve the efficiency of heating surface.
2 present invention are to be carried out under conditions of carrying out electromagnetic shielding, thus microwave heating is to asphalt road due to heating process Greenbelt around face is almost harmless, will not generate environmentally harmful by-product, so entire heating process green ring It protects pollution-free.
3. working procedure of the present invention is simple, corollary equipment is easy to get, and has not only saved human resources, but also reduce and repair Multiple cost.
4. the present invention is mixed during reparation using the waste material and new pitch material and regenerative agent on old road surface It mixes, whole process does not waste raw material, improves economic and social benefit.
Description of the drawings
Fig. 1 is that asphalt concrete pavement structure is layered schematic diagram.
Fig. 2 is the implementation flow chart of the present invention.
Specific implementation mode
Below in conjunction with the accompanying drawings and case is embodied, the present invention is furture elucidated, it should be understood that these examples are merely to illustrate It the present invention rather than limits the scope of the invention, after having read the present invention, those skilled in the art are to of the invention each The modification of kind equivalent form falls within the application range as defined in the appended claims.
With reference to Fig. 2, specific implementation of the invention provides following three kinds of embodiments:
Embodiment 1 repairs road surface with hot wind with the mode of heating that microwave is combined.
Step 1, road surface is layered
Construction road surface is sampled on the spot, sample carries out Marshall experiment after placing 4 hours, judges the aging journey of bituminous paving Degree;When construction, the setting electromagnetic shielding facility around the road surface to be repaired, it would be desirable to which the asphalt concrete pavement of heating is divided into two Layer, i.e., be followed successively by surface layer road surface and second layer road surface from top to bottom.As shown in Figure 1, the bituminous paving that thickness is 2 inches is divided The bituminous paving that thickness under the road surface of surface layer is 9.5 inches is divided second layer road surface 2, the pitch in two layers of road surface by surface layer road surface 1 Gather materials is 3.
Step 2, road surface leveled heating
Using Hot-blast Heating mode, first time heating is carried out to asphalt concrete pavement, i.e., is added using 1 heated air circulation type Heat engine, the temperature that setting heater heats are 100 DEG C, and with hot air circulation heating machine, back and forth traveling heats on road surface, by surface layer Road-surface heating continues to use microwave heating to rated temperature, and under conditions of keeping the temperature on surface layer road surface to be not less than 100 DEG C Mode carries out second to asphalt concrete pavement and heats, that is, 1 microwave heating working machine, setting heater is used to heat Temperature is 130 DEG C, and with microwave heating machine, back and forth traveling heats on road surface, by microwave spoke by second layer road-surface heating to 130 ℃.Hot air circulation microwave heating machine and microwave heating machine this 2 heaters in tandem, are divided into 1.2 meters, and every heater Speed be 5m/min.
Step 3, it stirs, pave and pavement compaction
Milling rake pine processing is carried out to two layers of road surface after heating, and pavement temperature is kept to be not less than 130 DEG C, according to Marshall The result of experiment judges the degree of aging of bituminous paving, if result is short ageing, the new pitch material weight mixed is road By the 18% of heating Bituminous concrete surface material, the lubrication oil content of sprinkling is road surface by the 7% of heating Bituminous concrete surface material proportion in face;If As a result it is long-term ageing, the new pitch material weight mixed is road surface by the 33% of heating Bituminous concrete surface material, the lubricating oil of sprinkling Content is road surface by the 9% of heating Bituminous concrete surface material proportion;
The road surface of heating and regenerative agent and new asphalt material are sufficiently mixed, new mixture is formed and paves back again again It is flattened on road surface;
When pressing, 2 road surfaces are successively carried out using 1 road roller and at the uniform velocity flatten work, rolling speed is no more than 5km/h, And pavement temperature when pressing for the first time is not less than 130 DEG C, pavement temperature when flattening for the second time is not less than 70 DEG C, i.e. completion pair The repair on road surface;
When pavement temperature is less than 50 DEG C, you can reopen traffic.
Embodiment 2 repairs road surface with the infrared mode of heating being combined with microwave.
Step 1, road surface layering
Construction road surface is sampled on the spot, sample carries out Marshall experiment after placing 4 hours, judges the aging journey of bituminous paving Degree;When construction, the setting electromagnetic shielding facility around the road surface to be repaired, it would be desirable to which the asphalt concrete pavement of heating is divided into two Layer, i.e., be followed successively by surface layer road surface and second layer road surface from top to bottom.As shown in Figure 1, the bituminous paving that thickness is 2.5 inches is drawn Divide surface layer road surface 1, the bituminous paving that thickness under the road surface of surface layer is 9 inches is divided into second layer road surface 2, the pitch in two layers of road surface Gather materials is 3.
Step 2, road surface leveled heating
Using 1 infrared-type heater, the temperature that setting heater heats is 120 DEG C, is existed with infrared-type heater Surface layer road-surface heating to rated temperature is carried out first time heating by back and forth traveling heating on road surface to asphalt concrete pavement, and Under conditions of keeping the temperature on surface layer road surface to be not less than 100 DEG C, continue to use microwave heating, to asphalt concrete pavement It carries out second to heat, that is, uses 1 microwave heating working machine, the temperature that setting heater heats is 140 °C, uses microwave heating Machine back and forth traveling heating on road surface, by microwave radiation by second layer road-surface heating to rated temperature.Infrared-type heater In tandem with microwave heating machine this 2 heaters, it is divided into 1 meter, and the speed of every heater is 4m/min.
Step 3 stirs, paves and pavement compaction
The specific implementation of this step is identical as the step 3 of embodiment 1.
Embodiment 3 repairs road surface with the mode of heating that 2 microwave operational machines are combined.
Step A, road surface layering
Construction road surface is sampled on the spot, sample carries out Marshall experiment after placing 4 hours, judges the aging journey of bituminous paving Degree;When construction, the setting electromagnetic shielding facility around the road surface to be repaired, it would be desirable to which the asphalt concrete pavement of heating is divided into two Layer, i.e., be followed successively by surface layer road surface and second layer road surface from top to bottom.As shown in Figure 1, the bituminous paving that thickness is 3 inches is divided The bituminous paving that thickness under the road surface of surface layer is 8.5 inches is divided second layer road surface 2, the pitch in two layers of road surface by surface layer road surface 1 Gather materials is 3.
Step B, road surface leveled heating
Using microwave heating, first time heating is carried out to asphalt concrete pavement, that is, uses 1 microwave heating to work Machine, the temperature that setting heater heats are 130 DEG C, and with microwave heating working machine, back and forth traveling heats on road surface, by surface layer road Face is heated to rated temperature, and under conditions of keeping the temperature on surface layer road surface to be not less than 100 DEG C, continues to use microwave heating side Formula carries out second to asphalt concrete pavement and heats, i.e., 1 microwave heating working machine, setting heater is in addition used to heat Temperature be 135 DEG C, with microwave heating machine on road surface back and forth traveling heat, by microwave radiation by second layer road-surface heating extremely 130℃.2 microwave heating machines in tandem, are divided into 0.8 meter, and the speed of every heater is 3m/min.
Step C stirs, paves and pavement compaction
The specific implementation of this step is identical as the step 3 of embodiment 1.
Above description is only several specific examples of the present invention, does not constitute any limitation of the invention, it is clear that for It, all may be without departing substantially from the principle of the invention, structure after having understood the principle of the invention and content for one of skill in the art In the case of, various modifications in form and details and change are carried out, such as spray regenerative agent, can not only the present invention be used to use Lubricating oil, furfural oil, machine oil, corn oil can also be used, but these modifications and variations based on inventive concept still exist Within the claims of the present invention.

Claims (10)

1. the asphalt road surface by microwave heating restorative procedure based on surface layer preheating, it is characterised in that:
First, progress Marshall experiment sample on the spot to construction road surface, judge the degree of aging of bituminous paving, when construction, Electromagnetic shielding facility is placed around the road surface of reparation, it would be desirable to which the asphalt concrete pavement of heating is divided into two layers, i.e., from top to bottom It is followed successively by surface layer road surface (1) and second layer road surface (2);
Then, using hot wind or infrared or microwave mode, the first time heating of asphalt concrete pavement is carried out, i.e., by surface layer road surface (1) 100 DEG C -130 DEG C are heated to, and its temperature is kept to be not less than 100 DEG C, then carries out adding for the second time for asphalt concrete pavement Heat penetrates into second layer road surface (2) to 130 DEG C or more by microwave heating, it is in doughy state to make bituminous paving;
Finally, two layers of road surface is subjected to milling rake pine processing, keeps pavement temperature to be not less than 130 DEG C, while spraying regenerative agent, mixing New asphalt material is mixed, the road surface of heating and regenerative agent and new asphalt material are sufficiently mixed, new mixture is formed and weighs again It is flattened on the new circuit face that paves, completes road surface and repair.
2. according to the method described in claim 1, it is characterized in that, the asphalt material weight sampled on the spot is not less than 200g, in fact The time that sample is stood before testing is no less than 4 hours, according to the experimental result that Marshall is tested, can determine that the aging journey of bituminous paving Degree is short ageing or long-term ageing.
3. according to the method described in claim 1, it is characterized in that, the asphalt concrete pavement that heats will be needed to be divided into two layers, It is that the bituminous paving for being 2-3 inches by thickness divides surface layer road surface (1), the asphalt road for being 7-10 inches by thickness under the road surface of surface layer Face divides second layer road surface (2), i.e., first time heating operation carries out on the surface that thickness is 2-3 inches, second of heating operation It is carried out on the surface that thickness is 7-10 inches.
4. it is with 1 heat according to the method described in claim 1, it is characterized in that, using hot wind to surface layer road surface (1) heating Wind circulating heater carries out, that is, it is 100 DEG C -130 DEG C that heater heating temperature, which is arranged, is back and forth travelled on road surface with heater Heating.
5. it is to use 1 according to the method described in claim 1, it is characterized in that, using infrared to surface layer road surface (1) heating Infrared-type heater carries out, and the temperature that setting heater heats is 100 DEG C -130 DEG C, is back and forth travelled on road surface with heater Heating.
6. according to the method described in claim 1, it is characterized in that, using microwave to surface layer road surface (1) heat, be with 1 it is micro- Wave heating working machine carries out, and setting working machine heating temperature is 100 DEG C -130 DEG C, and with working machine, back and forth traveling adds on road surface Heat.
7. it is to use 1 according to the method described in claim 1, it is characterized in that, using microwave to second layer road surface (2) heating Platform microwave heating working machine carry out, be arranged working machine temperature be 130 DEG C -150 DEG C, by this microwave heating working machine be placed in It is divided between the working machine on previous heated surface layer road surface at 0.8-1.2 meters of position, and the speed of every heater is 2-5m/ Min makes the back and forth traveling heating on road surface simultaneously of two working machines.
8. according to the method described in claim 1, it is characterized in that, the weight of the new pitch mixed is heated asphalt material 16%-35%.
9. according to the method described in claim 1, it is characterized in that, regenerative agent includes furfural oil, lubricating oil, machine oil, corn oil, Its content sprayed is the 6%-10% of heated asphalt material proportion.
10. according to the method described in claim 1, being pressed on the face of circuit it is characterized in that, new mixture is paved again Usually, 2 road surfaces are successively carried out using 1 road roller and at the uniform velocity flatten work, and rolling speed is no more than 5km/h, and presses for the first time Pavement temperature usually is not less than 130 DEG C, and pavement temperature when flattening for the second time is not less than 70 DEG C.
CN201810265413.0A 2018-03-28 2018-03-28 Asphalt road surface by microwave heating restorative procedure based on surface layer preheating Pending CN108487018A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810265413.0A CN108487018A (en) 2018-03-28 2018-03-28 Asphalt road surface by microwave heating restorative procedure based on surface layer preheating

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810265413.0A CN108487018A (en) 2018-03-28 2018-03-28 Asphalt road surface by microwave heating restorative procedure based on surface layer preheating

Publications (1)

Publication Number Publication Date
CN108487018A true CN108487018A (en) 2018-09-04

Family

ID=63316592

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810265413.0A Pending CN108487018A (en) 2018-03-28 2018-03-28 Asphalt road surface by microwave heating restorative procedure based on surface layer preheating

Country Status (1)

Country Link
CN (1) CN108487018A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109881569A (en) * 2018-12-14 2019-06-14 香港英达生态科技投资有限公司 A kind of asphalt pavement pit repairing method
CN113515153A (en) * 2021-07-23 2021-10-19 山东交通学院 Control method for heating power and running speed in-place heat regeneration construction
CN114922035A (en) * 2022-04-22 2022-08-19 浙江工业大学 Construction method for repairing pits of asphalt pavement by microwave heating and rapid regeneration of old materials

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101058970A (en) * 2007-04-13 2007-10-24 乔子君 Microwave heating device for asphalt pavement and repairing machine thereof
CN105002808A (en) * 2015-07-21 2015-10-28 吉林省嘉鹏集团有限公司 Bituminous pavement hot in-place recycling device achieving layered heating and spiking-up and movable mixing
CN105926413A (en) * 2016-06-03 2016-09-07 河北扶波机械制造有限公司 Hotin-place recycling engine for pavement
CN106680113A (en) * 2017-01-17 2017-05-17 武汉理工大学 Method for evaluating pavement aging situation by adopting interlayer shear test
CN107366211A (en) * 2017-09-06 2017-11-21 东南大学 A kind of bituminous concrete in-situ heat regeneration is layered heating in reciprocating mode technique

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101058970A (en) * 2007-04-13 2007-10-24 乔子君 Microwave heating device for asphalt pavement and repairing machine thereof
CN105002808A (en) * 2015-07-21 2015-10-28 吉林省嘉鹏集团有限公司 Bituminous pavement hot in-place recycling device achieving layered heating and spiking-up and movable mixing
CN105926413A (en) * 2016-06-03 2016-09-07 河北扶波机械制造有限公司 Hotin-place recycling engine for pavement
CN106680113A (en) * 2017-01-17 2017-05-17 武汉理工大学 Method for evaluating pavement aging situation by adopting interlayer shear test
CN107366211A (en) * 2017-09-06 2017-11-21 东南大学 A kind of bituminous concrete in-situ heat regeneration is layered heating in reciprocating mode technique

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109881569A (en) * 2018-12-14 2019-06-14 香港英达生态科技投资有限公司 A kind of asphalt pavement pit repairing method
CN113515153A (en) * 2021-07-23 2021-10-19 山东交通学院 Control method for heating power and running speed in-place heat regeneration construction
CN114922035A (en) * 2022-04-22 2022-08-19 浙江工业大学 Construction method for repairing pits of asphalt pavement by microwave heating and rapid regeneration of old materials

Similar Documents

Publication Publication Date Title
CN108487018A (en) Asphalt road surface by microwave heating restorative procedure based on surface layer preheating
CN104762863B (en) Bituminous mixture used for thin layer overlay of cement concrete pavement and preparation and construction methods of bituminous mixture
CN106145777B (en) Warm-mixed recycled asphalt mixture and preparation method thereof
CN104278598B (en) A kind of self-compaction bituminous concrete water-protected enclosure layer and construction method thereof
CN103590296A (en) In-situ heat regeneration remixing and paving technology of asphalt pavement
ES2712963T3 (en) Mobile microwave processing unit for the recycling of pavement and the production of asphalt pavement
CN107366211A (en) A kind of bituminous concrete in-situ heat regeneration is layered heating in reciprocating mode technique
CN108867231A (en) A kind of antiskid type asphalt pavement construction technique
CN110453562A (en) The method for improving the self-healing of cold-mix asphalt mixture based on carbon nano-fiber
CN109912258A (en) A kind of asphalt material for repairing and its preparation method and application for repairing asphalt pavement pit
CN109653052A (en) A kind of warm mix type pitch local hot reproduction construction method
CN108301279A (en) A kind of thermosets modified asphalt concrete pavement construction method
CN108485523A (en) Bituminous paving microwave is rapidly heated accelerating agent and preparation method thereof and application method
CN213625024U (en) Cold regeneration road surface structure of emulsified asphalt
CN107419635A (en) A kind of composite pavement sealing method
CN113668316B (en) Construction method of asphalt highway
CN109881569A (en) A kind of asphalt pavement pit repairing method
CN201180251Y (en) Sheet pavement heating apparatus for thermal regeneration vehicle for heating sheet pavement on site
CN104276786B (en) A kind of method that premixing bitumastic prepares self-compaction bituminous concrete
CN207130588U (en) A kind of complete unit of microwave in-situ heat regeneration
CN114182595B (en) Construction method of long-life asphalt road
CN109437676A (en) SBR high-modulus composite modified asphalt mixture and preparation method thereof and pavement structure
WO2019091035A1 (en) Sampling method for simulated asphalt pavement of hot in-place recycling working conditions
CN204780556U (en) Multi -functional bituminous paving hot repair assisting vehicle
CN202492789U (en) Cloak-type microwave heating and repairing hood for bituminous pavement

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180904

WD01 Invention patent application deemed withdrawn after publication