CN108462087A - A kind of 110KV substations building arrangement - Google Patents

A kind of 110KV substations building arrangement Download PDF

Info

Publication number
CN108462087A
CN108462087A CN201810468688.4A CN201810468688A CN108462087A CN 108462087 A CN108462087 A CN 108462087A CN 201810468688 A CN201810468688 A CN 201810468688A CN 108462087 A CN108462087 A CN 108462087A
Authority
CN
China
Prior art keywords
layer
transformer
building
substations
accommodating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810468688.4A
Other languages
Chinese (zh)
Inventor
陈卫东
黄有为
刘忠文
倪虹妹
王晓欢
蓝翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN POWER SUPPLY PLANNING DESIGN INSTITUTE Co Ltd
Original Assignee
SHENZHEN POWER SUPPLY PLANNING DESIGN INSTITUTE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN POWER SUPPLY PLANNING DESIGN INSTITUTE Co Ltd filed Critical SHENZHEN POWER SUPPLY PLANNING DESIGN INSTITUTE Co Ltd
Priority to CN201810468688.4A priority Critical patent/CN108462087A/en
Publication of CN108462087A publication Critical patent/CN108462087A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B7/00Enclosed substations, e.g. compact substations
    • H02B7/06Distribution substations, e.g. for urban network
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H5/00Buildings or groups of buildings for industrial or agricultural purposes
    • E04H5/02Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories
    • E04H5/04Transformer houses; Substations or switchgear houses

Abstract

The present invention relates to High-Voltage Technology fields, disclose 110KV substations building arrangement.The 110KV substations building arrangement of the present invention includes transformer substation body and attached building, and the attached building is set to above the transformer substation body, and the transformer substation body includes the subterranean layer set gradually, first layer, the second layer and third layer;The subterranean layer is equipped with cable interlayer;The first layer is equipped with main transformer, 10KV SVG equipment, 10KV switchgears and ground connection and becomes;The second layer is equipped with 110KV GIS devices, 10KV SVG equipment;The third layer is equipped with relay and main transformer fan.The 110KV substations building arrangement of the present invention can be embedded in the lower section projection in building, not independent land occupation resource, and large amount of land resources are saved for city.

Description

A kind of 110KV substations building arrangement
Technical field
The present invention relates to High-Voltage Technology fields, more particularly, to a kind of 110KV substations building arrangement.
Background technology
Land resource is a restraining factors very outstanding, especially key city in urban development, and the density of population is big, The land resource being capable of supply that is extremely limited.
Existing 110KV substations are all the cloth in a manner of an independent building building using independent addressing, independent occupation of land It sets, it is clear that existing 110KV substations arrangement can occupy a large amount of land resource, aggravate the burden in city.
Invention content
For overcome the deficiencies in the prior art, the present invention provides a kind of Embedded 110KV substations building arrangement, Substation is combined with building, can effectively save land resource.
The technical solution adopted by the present invention to solve the technical problems is:A kind of 110KV substations building arrangement knot is provided Structure, including transformer substation body, the transformer substation body include the subterranean layer set gradually, first layer, the second layer and third layer; The subterranean layer is equipped with cable interlayer;The first layer is equipped with main transformer, 10KV SVG equipment, 10KV switchgears and ground connection Become;The second layer is equipped with 110KV GIS devices, 10KV SVG equipment;The third layer is equipped with relay and main transformer fan.
As a further improvement of the above technical scheme, the subterranean layer is located at -3m layers, and the first layer is located at 0m layers, The second layer is located at 5m layers, and the third layer is located at 11m layers.
As a further improvement of the above technical scheme, the first layer, the second layer, the third layer it is adjacent Both sides be equipped with installation outlet, the first layer, the second layer, the third layer other both sides be equipped with fire wall.
As a further improvement of the above technical scheme, the main transformer is SF6Gas transformer.
As a further improvement of the above technical scheme, the first layer is provided with the master for accommodating the main transformer Become room, the rooms SVG for accommodating the 10KV SVG equipment, the switchgear house for accommodating the 10KV switchgears, for accommodating The ground connection that the ground connection becomes becomes room;The second layer is provided with the rooms GIS for accommodating the 110KV GIS devices and is used for Accommodate the rooms SVG of the 10KV SVG equipment;The third layer be provided with relay bungalow for accommodating the relay and Fan house for accommodating the main transformer fan.
As a further improvement of the above technical scheme, the transformer chamber, the rooms SVG, switchgear house, ground connection become room, the rooms GIS, Sound-absorbing material is installed in the metope of relay bungalow and fan house.
As a further improvement of the above technical scheme, the transformer chamber has the transformer chamber and the substation The supporting base of ontology isolation.
As a further improvement of the above technical scheme, it is additionally provided with beam under the transformer chamber.
The beneficial effects of the invention are as follows:
The 110KV substations building arrangement of the present invention, including transformer substation body, attached building, the attached building Be set to above the transformer substation body, the transformer substation body include the subterranean layer set gradually, first layer, the second layer and Third layer;The subterranean layer is equipped with cable interlayer;The first layer is equipped with main transformer, 10KV SVG equipment, 10KV switchgears And ground connection becomes;The second layer is equipped with 110KV GIS devices, 10KV SVG equipment;The third layer be equipped with relay and Main transformer fan.The 110KV substations building arrangement of the present invention arranges electrical equipment, entire power transformation using hierachical structure Standing can be embedded at the lower section projection in building building, and not independent land occupation resource can save a large amount of land resource.
Description of the drawings
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is the cross-section diagram of the 110KV embedded transformer station arrangements of the present invention;
Fig. 2 is the plane arrangement structure figure of first layer;
Fig. 3 is the plane arrangement structure figure of the second layer;
Fig. 4 is the plane arrangement structure figure of third layer.
Specific implementation mode
The technique effect of the design of the present invention, concrete structure and generation is carried out below with reference to embodiment and attached drawing clear Chu, complete description, to be completely understood by the purpose of the present invention, scheme and effect.It should be noted that the case where not conflicting Under, the features in the embodiments and the embodiments of the present application can be combined with each other.
It should be noted that unless otherwise specified, when a certain feature is referred to as " fixing ", " connection " is in another feature, It can directly fix, be connected in another feature, can also fix, be connected in another feature indirectly.In addition, this The descriptions such as the up, down, left, right, before and after used in invention be only relative in attached drawing each component part of the present invention it is mutual For position relationship.
In addition, unless otherwise defined, the technology of all of technologies and scientific terms used here by the article and the art The normally understood meaning of personnel is identical.Term used in the description is intended merely to description specific embodiment herein, without It is to limit the present invention.Term " and or " used herein includes the arbitrary of one or more relevant Listed Items Combination.
Please refer to Fig. 1,110KV substations building arrangement of the invention includes transformer substation body 1, attached building, attached Belong to building and be set to the top of transformer substation body 1, attached building is conventional residential building or commercial building, transformer substation body 1 with it is attached Belong to building and build completion together by conventional building means, therefore the structural schematic diagram in attached building, substation are not shown in Fig. 1 Ontology 1, which is set gradually, is respectively arranged with subterranean layer 10, first layer 11, the second layer 12, third layer 13, subterranean layer 10, first layer 11, The second layer 12, third layer 13 are respectively intended to the electrical equipment of arrangement substation, and whole transformer station can be embedded under affiliated building Side, as the part in building, to the not independent land occupation resource of substation itself.
In the present embodiment, subterranean layer 10 is arranged at the positions -3m, and first layer 11 is arranged at 0m layers of position, the second layer 12 It is arranged at 5m layers of position, third layer 13 is arranged at the positions 11m.
Incorporated by reference to Fig. 1 to Fig. 4, in the present embodiment, subterranean layer 10 arranges cable interlayer;First layer 11 arranges main transformer 20,10KV SVG equipment 21,10KV switchgears 22, ground connection become the change of 23,10KV occupancy and neutral point device;The second layer 12 is arranged 110KV GIS devices 24,10KV SVG equipment 21;Third layer 13 arranges relay and main transformer fan 26.
Preferably, the second layer 12 there also is provided auxiliary equipment department 27, and auxiliary equipment department 27 includes battery room 270, gas cylinder Between between 271, tool between 272, data 274 between 273, standby redundancy.
Consider the problems of that large scale equipment transports, in the present embodiment, the setting of main transformer 20 in first layer 11 with convenience in transport, And installation outlet 110 is set in the adjacent both sides of first layer 11, to facilitate the transport of electrical equipment to install and subsequent Safeguard, fire wall 111 be set in the other both sides of first layer 11, first layer 11 by fire wall 111 and the building that is embedded into every From.
It is the problem of to meet substation's fire-fighting, first layer 11, the second layer 12, all in third layer 13 in the present embodiment Electrical equipment is all made of non-oil ultra high vacuum system design, and main transformer 20 selects SF6Gas transformer, in addition, fire wall 111 is designed as fire resisting The limit is not less than 3 hours, and all fire-fighting equipments use gas in fire prevention of the setting of installation outlet 110 not less than 1m wide cornices, stand Body fire-fighting equipment.
In order to meet noise problem, in order to avoid noise pollution is brought to substation surface and surrounding enviroment, by main noise Source arranges that, specifically, in the present embodiment, the Main Noise Sources in substation include main transformer 20,10KV using independent room SVG equipment 21,10KV switchgears 22, ground connection become 23,110KV GIS devices 24, relay and main transformer fan 26, for this purpose, First layer 11 be provided with the transformer chamber 200 for accommodating main transformer 20, the rooms SVG 210 for accommodating 10KV SVG equipment 21, Ground connection change room 230 for accommodating the switchgear house 220 of 10KV switchgears 22, becoming 23 for accommodating ground connection, the second layer 12 are provided with The rooms SVG 210 for accommodating 10KV SVG equipment 21, the rooms GIS 240 for accommodating 110KV GIS devices 24, third layer 13 are set It is equipped with the relay bungalow 250 for accommodating relay and the fan house 260 for accommodating main transformer fan 26.Preferably, above-mentioned The independent room for noise insulation source, indoor wall is equipped with sound-absorbing material, to increase the acoustic absorptivity of metope, reduce Room noise, in addition, above-mentioned independent room is also equipped with soundproof door, noise reduction shutter, noise elimination ventilation opening etc., for further subtracting Small noise.
In the present embodiment, the arrangement of substation also contemplates vibration source vibration and is produced to the affiliated building above substation Raw influence, in the present embodiment, vibration source includes main transformer 20, for this purpose, considering main transformer 20 and corresponding transformer chamber 200 be arranged in first layer 11, underground be separately provided be useful for bearing transformer chamber 200 supporting base, make transformer chamber 200 with Transformer substation body has mutually independent supporting base, in this way, the vibration of main transformer 20 will not cause the vibration of substation.
Preferably, it is also equipped with beam in the lower section of transformer chamber 200, further decreases the vibration of main transformer 20 to becoming The influence in power station.
The 110KV substations building arrangement of the present invention has the following advantages that:
It carries out, applies simultaneously, approval process is examined by government together, legal conjunction 1. the construction of substation is synchronous with building Rule avoid the obstruction of resident nearby in substation's process of construction.
2. transformer substation body 1 is arranged below attached building, attached building is residential building or commercial building, to attached building It lives or commercialization does not impact, and transformer substation body 1 itself does not occupy extra land resource additionally.
3. 110KV substations using the present invention building arrangement, transformer substation body 1 can enter downtown area, Easily for downtown area, nearby trade company, resident family provide required electric energy.
4. transformer substation body 1 can be built electricity consumption concentration zones nearby, powers nearby, greatly reduces the demand of cable, Meanwhile line loss is also significantly reduced, improve power consumption efficiency.
It is illustrating for progress to be implemented to the preferable of the present invention, but the invention is not limited to the implementation above Example, those skilled in the art can also make various equivalent variations or be replaced under the premise of without prejudice to spirit of that invention It changes, these equivalent deformations or replacement are all contained in the application claim limited range.

Claims (8)

1. a kind of 110KV substations building arrangement, which is characterized in that described attached including transformer substation body and attached building Belong to building to be set to above the transformer substation body, the transformer substation body includes the subterranean layer, first layer, the second layer set gradually And third layer;
The subterranean layer is equipped with cable interlayer;
The first layer is equipped with main transformer, 10KV SVG equipment, 10KV switchgears and ground connection and becomes;
The second layer is equipped with 110KV GIS devices, 10KV SVG equipment;
The third layer is equipped with relay and main transformer fan.
2. 110KV substations according to claim 1 building arrangement, which is characterized in that the subterranean layer is located at -3m Layer, the first layer are located at 0m layers, and the second layer is located at 5m layers, and the third layer is located at 11m layers.
3. 110KV substations according to claim 1 or 2 building arrangement, which is characterized in that the first layer, institute State the second layer, the adjacent both sides of the third layer are equipped with installation outlet, the first layer, the second layer, the third layer Other both sides be equipped with fire wall.
4. 110KV substations according to claim 1 or 2 building arrangement, which is characterized in that the main transformer is SF6Gas transformer.
5. 110KV substations according to claim 1 or 2 building arrangement, which is characterized in that the first layer setting It is useful for the transformer chamber for the accommodating the main transformer, rooms SVG for accommodating the 10KV SVG equipment, described for accommodating The switchgear house of 10KV switchgears becomes room for accommodating the ground connection that the ground connection becomes;The second layer is provided with described for accommodating The rooms GIS of 110KV GIS devices and rooms SVG for accommodating the 10KV SVG equipment;The third layer, which is provided with, to be used for Accommodate the relay bungalow of the relay and the fan house for accommodating the main transformer fan.
6. 110KV substations according to claim 5 building arrangement, which is characterized in that the transformer chamber, the rooms SVG, Switchgear house, ground connection become room, the rooms GIS, relay bungalow and fan house metope in sound-absorbing material is installed.
7. 110KV substations according to claim 5 building arrangement, which is characterized in that the transformer chamber has The supporting base that the transformer chamber is isolated with the transformer substation body.
8. 110KV substations according to claim 7 building arrangement, which is characterized in that also set under the transformer chamber It is equipped with beam.
CN201810468688.4A 2018-05-16 2018-05-16 A kind of 110KV substations building arrangement Pending CN108462087A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810468688.4A CN108462087A (en) 2018-05-16 2018-05-16 A kind of 110KV substations building arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810468688.4A CN108462087A (en) 2018-05-16 2018-05-16 A kind of 110KV substations building arrangement

Publications (1)

Publication Number Publication Date
CN108462087A true CN108462087A (en) 2018-08-28

Family

ID=63215284

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810468688.4A Pending CN108462087A (en) 2018-05-16 2018-05-16 A kind of 110KV substations building arrangement

Country Status (1)

Country Link
CN (1) CN108462087A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109888654A (en) * 2019-02-28 2019-06-14 广东南海电力设计院工程有限公司 A kind of novel transformer substation layout

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013051782A (en) * 2011-08-30 2013-03-14 Nissin Electric Co Ltd Switch gear
WO2013051002A2 (en) * 2011-10-03 2013-04-11 Crompton Greaves Limited An environmentally harmonised modular substation
CN203260930U (en) * 2013-05-17 2013-10-30 深圳供电规划设计院有限公司 Novel transformer substation structure arrangement
CN103887725A (en) * 2012-12-20 2014-06-25 河南省电力勘测设计院 All indoor transformer station
CN204885957U (en) * 2015-06-25 2015-12-16 中机国能电力工程有限公司 GIS staggered floor is arranged and indoor 220kV transformer substation of cable business turn over line
CN205724786U (en) * 2016-04-22 2016-11-23 深圳供电规划设计院有限公司 A kind of double loop cable terminal station
CN107492825A (en) * 2017-09-19 2017-12-19 深圳供电规划设计院有限公司 A kind of full indoor substation of 500KV and complex building
CN206834591U (en) * 2017-05-17 2018-01-02 内蒙古电力(集团)有限责任公司内蒙古电力经济技术研究院分公司 A kind of complete indoor 110kV transformer stations arrangement

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013051782A (en) * 2011-08-30 2013-03-14 Nissin Electric Co Ltd Switch gear
WO2013051002A2 (en) * 2011-10-03 2013-04-11 Crompton Greaves Limited An environmentally harmonised modular substation
CN103887725A (en) * 2012-12-20 2014-06-25 河南省电力勘测设计院 All indoor transformer station
CN203260930U (en) * 2013-05-17 2013-10-30 深圳供电规划设计院有限公司 Novel transformer substation structure arrangement
CN204885957U (en) * 2015-06-25 2015-12-16 中机国能电力工程有限公司 GIS staggered floor is arranged and indoor 220kV transformer substation of cable business turn over line
CN205724786U (en) * 2016-04-22 2016-11-23 深圳供电规划设计院有限公司 A kind of double loop cable terminal station
CN206834591U (en) * 2017-05-17 2018-01-02 内蒙古电力(集团)有限责任公司内蒙古电力经济技术研究院分公司 A kind of complete indoor 110kV transformer stations arrangement
CN107492825A (en) * 2017-09-19 2017-12-19 深圳供电规划设计院有限公司 A kind of full indoor substation of 500KV and complex building

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109888654A (en) * 2019-02-28 2019-06-14 广东南海电力设计院工程有限公司 A kind of novel transformer substation layout

Similar Documents

Publication Publication Date Title
CN204927913U (en) Transformer substation
CN104917086A (en) Outdoor prefabricated transformer substation
CN103887725A (en) All indoor transformer station
CN108462087A (en) A kind of 110KV substations building arrangement
CN102361241A (en) Box type transformer station
Peng Application of prefabricated building in emergency rescue project construction Taking—Wuhan Huoshenshan Hospital Project as an example
CN107994497A (en) A kind of distributed generation resource is quickly accessed with one or two unit equipment prefabricated cabins
CN102561748B (en) Multifunctional large plant structure for plume satellite test
CN113708281A (en) Environment-friendly nonmetal modularization prefabricated cabin formula intelligent substation
CN105356345A (en) Combined intelligent box-type transformer station
CN210224761U (en) 220kV all-indoor transformer substation compactly arranged
CN204179529U (en) A kind of intelligent medium landscape type ring main unit
CN204156379U (en) A kind of Combined intelligent box-type transformer substation
CN203326445U (en) Frame type intelligent transformer station
CN202142797U (en) High-voltage compact substation
CN213071939U (en) Compact energy-saving assembled box-type substation
CN200997494Y (en) Indoor double-layer assembled converting station
Zhang et al. Prediction and analysis of 220kV substation based on geometric acoustic simulation
Song et al. Cross-Section design of ultra-long underwater high-voltage cable tunnel by “double diamond model”
CN205265332U (en) Container formula energy supply system
CN108565757A (en) A kind of energy-efficient oval box-type substation complete set of equipments
CN102931606B (en) High-voltage compact substation
CN217934769U (en) Compact three-main-transformer large-scale offshore booster station
CN220822398U (en) Reactive compensation arrangement structure of 110kV full indoor transformer substation
CN201413727Y (en) 0.6/1kv crosslinked polyethylene insulated power cable and below

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination