CN108462087A - A kind of 110KV substations building arrangement - Google Patents
A kind of 110KV substations building arrangement Download PDFInfo
- Publication number
- CN108462087A CN108462087A CN201810468688.4A CN201810468688A CN108462087A CN 108462087 A CN108462087 A CN 108462087A CN 201810468688 A CN201810468688 A CN 201810468688A CN 108462087 A CN108462087 A CN 108462087A
- Authority
- CN
- China
- Prior art keywords
- layer
- transformer
- building
- substations
- accommodating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02B—BOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
- H02B7/00—Enclosed substations, e.g. compact substations
- H02B7/06—Distribution substations, e.g. for urban network
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H5/00—Buildings or groups of buildings for industrial or agricultural purposes
- E04H5/02—Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories
- E04H5/04—Transformer houses; Substations or switchgear houses
Abstract
The present invention relates to High-Voltage Technology fields, disclose 110KV substations building arrangement.The 110KV substations building arrangement of the present invention includes transformer substation body and attached building, and the attached building is set to above the transformer substation body, and the transformer substation body includes the subterranean layer set gradually, first layer, the second layer and third layer;The subterranean layer is equipped with cable interlayer;The first layer is equipped with main transformer, 10KV SVG equipment, 10KV switchgears and ground connection and becomes;The second layer is equipped with 110KV GIS devices, 10KV SVG equipment;The third layer is equipped with relay and main transformer fan.The 110KV substations building arrangement of the present invention can be embedded in the lower section projection in building, not independent land occupation resource, and large amount of land resources are saved for city.
Description
Technical field
The present invention relates to High-Voltage Technology fields, more particularly, to a kind of 110KV substations building arrangement.
Background technology
Land resource is a restraining factors very outstanding, especially key city in urban development, and the density of population is big,
The land resource being capable of supply that is extremely limited.
Existing 110KV substations are all the cloth in a manner of an independent building building using independent addressing, independent occupation of land
It sets, it is clear that existing 110KV substations arrangement can occupy a large amount of land resource, aggravate the burden in city.
Invention content
For overcome the deficiencies in the prior art, the present invention provides a kind of Embedded 110KV substations building arrangement,
Substation is combined with building, can effectively save land resource.
The technical solution adopted by the present invention to solve the technical problems is:A kind of 110KV substations building arrangement knot is provided
Structure, including transformer substation body, the transformer substation body include the subterranean layer set gradually, first layer, the second layer and third layer;
The subterranean layer is equipped with cable interlayer;The first layer is equipped with main transformer, 10KV SVG equipment, 10KV switchgears and ground connection
Become;The second layer is equipped with 110KV GIS devices, 10KV SVG equipment;The third layer is equipped with relay and main transformer fan.
As a further improvement of the above technical scheme, the subterranean layer is located at -3m layers, and the first layer is located at 0m layers,
The second layer is located at 5m layers, and the third layer is located at 11m layers.
As a further improvement of the above technical scheme, the first layer, the second layer, the third layer it is adjacent
Both sides be equipped with installation outlet, the first layer, the second layer, the third layer other both sides be equipped with fire wall.
As a further improvement of the above technical scheme, the main transformer is SF6Gas transformer.
As a further improvement of the above technical scheme, the first layer is provided with the master for accommodating the main transformer
Become room, the rooms SVG for accommodating the 10KV SVG equipment, the switchgear house for accommodating the 10KV switchgears, for accommodating
The ground connection that the ground connection becomes becomes room;The second layer is provided with the rooms GIS for accommodating the 110KV GIS devices and is used for
Accommodate the rooms SVG of the 10KV SVG equipment;The third layer be provided with relay bungalow for accommodating the relay and
Fan house for accommodating the main transformer fan.
As a further improvement of the above technical scheme, the transformer chamber, the rooms SVG, switchgear house, ground connection become room, the rooms GIS,
Sound-absorbing material is installed in the metope of relay bungalow and fan house.
As a further improvement of the above technical scheme, the transformer chamber has the transformer chamber and the substation
The supporting base of ontology isolation.
As a further improvement of the above technical scheme, it is additionally provided with beam under the transformer chamber.
The beneficial effects of the invention are as follows:
The 110KV substations building arrangement of the present invention, including transformer substation body, attached building, the attached building
Be set to above the transformer substation body, the transformer substation body include the subterranean layer set gradually, first layer, the second layer and
Third layer;The subterranean layer is equipped with cable interlayer;The first layer is equipped with main transformer, 10KV SVG equipment, 10KV switchgears
And ground connection becomes;The second layer is equipped with 110KV GIS devices, 10KV SVG equipment;The third layer be equipped with relay and
Main transformer fan.The 110KV substations building arrangement of the present invention arranges electrical equipment, entire power transformation using hierachical structure
Standing can be embedded at the lower section projection in building building, and not independent land occupation resource can save a large amount of land resource.
Description of the drawings
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is the cross-section diagram of the 110KV embedded transformer station arrangements of the present invention;
Fig. 2 is the plane arrangement structure figure of first layer;
Fig. 3 is the plane arrangement structure figure of the second layer;
Fig. 4 is the plane arrangement structure figure of third layer.
Specific implementation mode
The technique effect of the design of the present invention, concrete structure and generation is carried out below with reference to embodiment and attached drawing clear
Chu, complete description, to be completely understood by the purpose of the present invention, scheme and effect.It should be noted that the case where not conflicting
Under, the features in the embodiments and the embodiments of the present application can be combined with each other.
It should be noted that unless otherwise specified, when a certain feature is referred to as " fixing ", " connection " is in another feature,
It can directly fix, be connected in another feature, can also fix, be connected in another feature indirectly.In addition, this
The descriptions such as the up, down, left, right, before and after used in invention be only relative in attached drawing each component part of the present invention it is mutual
For position relationship.
In addition, unless otherwise defined, the technology of all of technologies and scientific terms used here by the article and the art
The normally understood meaning of personnel is identical.Term used in the description is intended merely to description specific embodiment herein, without
It is to limit the present invention.Term " and or " used herein includes the arbitrary of one or more relevant Listed Items
Combination.
Please refer to Fig. 1,110KV substations building arrangement of the invention includes transformer substation body 1, attached building, attached
Belong to building and be set to the top of transformer substation body 1, attached building is conventional residential building or commercial building, transformer substation body 1 with it is attached
Belong to building and build completion together by conventional building means, therefore the structural schematic diagram in attached building, substation are not shown in Fig. 1
Ontology 1, which is set gradually, is respectively arranged with subterranean layer 10, first layer 11, the second layer 12, third layer 13, subterranean layer 10, first layer 11,
The second layer 12, third layer 13 are respectively intended to the electrical equipment of arrangement substation, and whole transformer station can be embedded under affiliated building
Side, as the part in building, to the not independent land occupation resource of substation itself.
In the present embodiment, subterranean layer 10 is arranged at the positions -3m, and first layer 11 is arranged at 0m layers of position, the second layer 12
It is arranged at 5m layers of position, third layer 13 is arranged at the positions 11m.
Incorporated by reference to Fig. 1 to Fig. 4, in the present embodiment, subterranean layer 10 arranges cable interlayer;First layer 11 arranges main transformer
20,10KV SVG equipment 21,10KV switchgears 22, ground connection become the change of 23,10KV occupancy and neutral point device;The second layer 12 is arranged
110KV GIS devices 24,10KV SVG equipment 21;Third layer 13 arranges relay and main transformer fan 26.
Preferably, the second layer 12 there also is provided auxiliary equipment department 27, and auxiliary equipment department 27 includes battery room 270, gas cylinder
Between between 271, tool between 272, data 274 between 273, standby redundancy.
Consider the problems of that large scale equipment transports, in the present embodiment, the setting of main transformer 20 in first layer 11 with convenience in transport,
And installation outlet 110 is set in the adjacent both sides of first layer 11, to facilitate the transport of electrical equipment to install and subsequent
Safeguard, fire wall 111 be set in the other both sides of first layer 11, first layer 11 by fire wall 111 and the building that is embedded into every
From.
It is the problem of to meet substation's fire-fighting, first layer 11, the second layer 12, all in third layer 13 in the present embodiment
Electrical equipment is all made of non-oil ultra high vacuum system design, and main transformer 20 selects SF6Gas transformer, in addition, fire wall 111 is designed as fire resisting
The limit is not less than 3 hours, and all fire-fighting equipments use gas in fire prevention of the setting of installation outlet 110 not less than 1m wide cornices, stand
Body fire-fighting equipment.
In order to meet noise problem, in order to avoid noise pollution is brought to substation surface and surrounding enviroment, by main noise
Source arranges that, specifically, in the present embodiment, the Main Noise Sources in substation include main transformer 20,10KV using independent room
SVG equipment 21,10KV switchgears 22, ground connection become 23,110KV GIS devices 24, relay and main transformer fan 26, for this purpose,
First layer 11 be provided with the transformer chamber 200 for accommodating main transformer 20, the rooms SVG 210 for accommodating 10KV SVG equipment 21,
Ground connection change room 230 for accommodating the switchgear house 220 of 10KV switchgears 22, becoming 23 for accommodating ground connection, the second layer 12 are provided with
The rooms SVG 210 for accommodating 10KV SVG equipment 21, the rooms GIS 240 for accommodating 110KV GIS devices 24, third layer 13 are set
It is equipped with the relay bungalow 250 for accommodating relay and the fan house 260 for accommodating main transformer fan 26.Preferably, above-mentioned
The independent room for noise insulation source, indoor wall is equipped with sound-absorbing material, to increase the acoustic absorptivity of metope, reduce
Room noise, in addition, above-mentioned independent room is also equipped with soundproof door, noise reduction shutter, noise elimination ventilation opening etc., for further subtracting
Small noise.
In the present embodiment, the arrangement of substation also contemplates vibration source vibration and is produced to the affiliated building above substation
Raw influence, in the present embodiment, vibration source includes main transformer 20, for this purpose, considering main transformer 20 and corresponding transformer chamber
200 be arranged in first layer 11, underground be separately provided be useful for bearing transformer chamber 200 supporting base, make transformer chamber 200 with
Transformer substation body has mutually independent supporting base, in this way, the vibration of main transformer 20 will not cause the vibration of substation.
Preferably, it is also equipped with beam in the lower section of transformer chamber 200, further decreases the vibration of main transformer 20 to becoming
The influence in power station.
The 110KV substations building arrangement of the present invention has the following advantages that:
It carries out, applies simultaneously, approval process is examined by government together, legal conjunction 1. the construction of substation is synchronous with building
Rule avoid the obstruction of resident nearby in substation's process of construction.
2. transformer substation body 1 is arranged below attached building, attached building is residential building or commercial building, to attached building
It lives or commercialization does not impact, and transformer substation body 1 itself does not occupy extra land resource additionally.
3. 110KV substations using the present invention building arrangement, transformer substation body 1 can enter downtown area,
Easily for downtown area, nearby trade company, resident family provide required electric energy.
4. transformer substation body 1 can be built electricity consumption concentration zones nearby, powers nearby, greatly reduces the demand of cable,
Meanwhile line loss is also significantly reduced, improve power consumption efficiency.
It is illustrating for progress to be implemented to the preferable of the present invention, but the invention is not limited to the implementation above
Example, those skilled in the art can also make various equivalent variations or be replaced under the premise of without prejudice to spirit of that invention
It changes, these equivalent deformations or replacement are all contained in the application claim limited range.
Claims (8)
1. a kind of 110KV substations building arrangement, which is characterized in that described attached including transformer substation body and attached building
Belong to building to be set to above the transformer substation body, the transformer substation body includes the subterranean layer, first layer, the second layer set gradually
And third layer;
The subterranean layer is equipped with cable interlayer;
The first layer is equipped with main transformer, 10KV SVG equipment, 10KV switchgears and ground connection and becomes;
The second layer is equipped with 110KV GIS devices, 10KV SVG equipment;
The third layer is equipped with relay and main transformer fan.
2. 110KV substations according to claim 1 building arrangement, which is characterized in that the subterranean layer is located at -3m
Layer, the first layer are located at 0m layers, and the second layer is located at 5m layers, and the third layer is located at 11m layers.
3. 110KV substations according to claim 1 or 2 building arrangement, which is characterized in that the first layer, institute
State the second layer, the adjacent both sides of the third layer are equipped with installation outlet, the first layer, the second layer, the third layer
Other both sides be equipped with fire wall.
4. 110KV substations according to claim 1 or 2 building arrangement, which is characterized in that the main transformer is
SF6Gas transformer.
5. 110KV substations according to claim 1 or 2 building arrangement, which is characterized in that the first layer setting
It is useful for the transformer chamber for the accommodating the main transformer, rooms SVG for accommodating the 10KV SVG equipment, described for accommodating
The switchgear house of 10KV switchgears becomes room for accommodating the ground connection that the ground connection becomes;The second layer is provided with described for accommodating
The rooms GIS of 110KV GIS devices and rooms SVG for accommodating the 10KV SVG equipment;The third layer, which is provided with, to be used for
Accommodate the relay bungalow of the relay and the fan house for accommodating the main transformer fan.
6. 110KV substations according to claim 5 building arrangement, which is characterized in that the transformer chamber, the rooms SVG,
Switchgear house, ground connection become room, the rooms GIS, relay bungalow and fan house metope in sound-absorbing material is installed.
7. 110KV substations according to claim 5 building arrangement, which is characterized in that the transformer chamber has
The supporting base that the transformer chamber is isolated with the transformer substation body.
8. 110KV substations according to claim 7 building arrangement, which is characterized in that also set under the transformer chamber
It is equipped with beam.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810468688.4A CN108462087A (en) | 2018-05-16 | 2018-05-16 | A kind of 110KV substations building arrangement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810468688.4A CN108462087A (en) | 2018-05-16 | 2018-05-16 | A kind of 110KV substations building arrangement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108462087A true CN108462087A (en) | 2018-08-28 |
Family
ID=63215284
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810468688.4A Pending CN108462087A (en) | 2018-05-16 | 2018-05-16 | A kind of 110KV substations building arrangement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108462087A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109888654A (en) * | 2019-02-28 | 2019-06-14 | 广东南海电力设计院工程有限公司 | A kind of novel transformer substation layout |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013051782A (en) * | 2011-08-30 | 2013-03-14 | Nissin Electric Co Ltd | Switch gear |
WO2013051002A2 (en) * | 2011-10-03 | 2013-04-11 | Crompton Greaves Limited | An environmentally harmonised modular substation |
CN203260930U (en) * | 2013-05-17 | 2013-10-30 | 深圳供电规划设计院有限公司 | Novel transformer substation structure arrangement |
CN103887725A (en) * | 2012-12-20 | 2014-06-25 | 河南省电力勘测设计院 | All indoor transformer station |
CN204885957U (en) * | 2015-06-25 | 2015-12-16 | 中机国能电力工程有限公司 | GIS staggered floor is arranged and indoor 220kV transformer substation of cable business turn over line |
CN205724786U (en) * | 2016-04-22 | 2016-11-23 | 深圳供电规划设计院有限公司 | A kind of double loop cable terminal station |
CN107492825A (en) * | 2017-09-19 | 2017-12-19 | 深圳供电规划设计院有限公司 | A kind of full indoor substation of 500KV and complex building |
CN206834591U (en) * | 2017-05-17 | 2018-01-02 | 内蒙古电力(集团)有限责任公司内蒙古电力经济技术研究院分公司 | A kind of complete indoor 110kV transformer stations arrangement |
-
2018
- 2018-05-16 CN CN201810468688.4A patent/CN108462087A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013051782A (en) * | 2011-08-30 | 2013-03-14 | Nissin Electric Co Ltd | Switch gear |
WO2013051002A2 (en) * | 2011-10-03 | 2013-04-11 | Crompton Greaves Limited | An environmentally harmonised modular substation |
CN103887725A (en) * | 2012-12-20 | 2014-06-25 | 河南省电力勘测设计院 | All indoor transformer station |
CN203260930U (en) * | 2013-05-17 | 2013-10-30 | 深圳供电规划设计院有限公司 | Novel transformer substation structure arrangement |
CN204885957U (en) * | 2015-06-25 | 2015-12-16 | 中机国能电力工程有限公司 | GIS staggered floor is arranged and indoor 220kV transformer substation of cable business turn over line |
CN205724786U (en) * | 2016-04-22 | 2016-11-23 | 深圳供电规划设计院有限公司 | A kind of double loop cable terminal station |
CN206834591U (en) * | 2017-05-17 | 2018-01-02 | 内蒙古电力(集团)有限责任公司内蒙古电力经济技术研究院分公司 | A kind of complete indoor 110kV transformer stations arrangement |
CN107492825A (en) * | 2017-09-19 | 2017-12-19 | 深圳供电规划设计院有限公司 | A kind of full indoor substation of 500KV and complex building |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109888654A (en) * | 2019-02-28 | 2019-06-14 | 广东南海电力设计院工程有限公司 | A kind of novel transformer substation layout |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204927913U (en) | Transformer substation | |
CN104917086A (en) | Outdoor prefabricated transformer substation | |
CN103887725A (en) | All indoor transformer station | |
CN108462087A (en) | A kind of 110KV substations building arrangement | |
CN102361241A (en) | Box type transformer station | |
Peng | Application of prefabricated building in emergency rescue project construction Taking—Wuhan Huoshenshan Hospital Project as an example | |
CN107994497A (en) | A kind of distributed generation resource is quickly accessed with one or two unit equipment prefabricated cabins | |
CN102561748B (en) | Multifunctional large plant structure for plume satellite test | |
CN113708281A (en) | Environment-friendly nonmetal modularization prefabricated cabin formula intelligent substation | |
CN105356345A (en) | Combined intelligent box-type transformer station | |
CN210224761U (en) | 220kV all-indoor transformer substation compactly arranged | |
CN204179529U (en) | A kind of intelligent medium landscape type ring main unit | |
CN204156379U (en) | A kind of Combined intelligent box-type transformer substation | |
CN203326445U (en) | Frame type intelligent transformer station | |
CN202142797U (en) | High-voltage compact substation | |
CN213071939U (en) | Compact energy-saving assembled box-type substation | |
CN200997494Y (en) | Indoor double-layer assembled converting station | |
Zhang et al. | Prediction and analysis of 220kV substation based on geometric acoustic simulation | |
Song et al. | Cross-Section design of ultra-long underwater high-voltage cable tunnel by “double diamond model” | |
CN205265332U (en) | Container formula energy supply system | |
CN108565757A (en) | A kind of energy-efficient oval box-type substation complete set of equipments | |
CN102931606B (en) | High-voltage compact substation | |
CN217934769U (en) | Compact three-main-transformer large-scale offshore booster station | |
CN220822398U (en) | Reactive compensation arrangement structure of 110kV full indoor transformer substation | |
CN201413727Y (en) | 0.6/1kv crosslinked polyethylene insulated power cable and below |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |