CN108458470A - Mounting device and air-conditioning system - Google Patents
Mounting device and air-conditioning system Download PDFInfo
- Publication number
- CN108458470A CN108458470A CN201810381421.1A CN201810381421A CN108458470A CN 108458470 A CN108458470 A CN 108458470A CN 201810381421 A CN201810381421 A CN 201810381421A CN 108458470 A CN108458470 A CN 108458470A
- Authority
- CN
- China
- Prior art keywords
- mounting
- wall hanging
- hanging board
- mounting device
- air conditioner
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000004378 air conditioning Methods 0.000 title claims abstract description 15
- 238000009434 installation Methods 0.000 claims abstract description 32
- 230000000712 assembly Effects 0.000 claims description 3
- 238000000429 assembly Methods 0.000 claims description 3
- 230000002265 prevention Effects 0.000 description 11
- 230000033001 locomotion Effects 0.000 description 8
- 238000010586 diagram Methods 0.000 description 7
- 230000000694 effects Effects 0.000 description 4
- 230000009471 action Effects 0.000 description 3
- 230000008859 change Effects 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 241000894006 Bacteria Species 0.000 description 2
- 239000000428 dust Substances 0.000 description 2
- 239000000725 suspension Substances 0.000 description 2
- 238000004140 cleaning Methods 0.000 description 1
- 239000006185 dispersion Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000003032 molecular docking Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F13/00—Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
- F24F13/32—Supports for air-conditioning, air-humidification or ventilation units
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Air Filters, Heat-Exchange Apparatuses, And Housings Of Air-Conditioning Units (AREA)
Abstract
The present invention provides a kind of mounting device and air-conditioning systems.Wherein, mounting device includes:Mounting bracket is fixed at position to be installed;Wall hanging board, for being connect with air conditioner;Traction component, wall hanging board are connect by traction component with mounting bracket position-adjustable.The present invention solves the problems, such as that air conditioner installation in the prior art is inconvenient.
Description
Technical field
The present invention relates to household electrical appliance mounting technique fields, in particular to a kind of mounting device and air-conditioning system.
Background technology
The installation of air conditioner at present needs installation personnel aloft operation, it is necessary first to punch, pacify at punching on the wall
Expansion bolt is installed, then air conditioner is mounted at expansion bolt again.Above operation is all to need installation personnel aloft
Operation, which increase the difficulty of installation, there is a degree of harm for safety of the high-rise working to installation personnel.
It follows that there is installation inconvenience in air conditioner in the prior art.
Invention content
The main purpose of the present invention is to provide a kind of mounting device and air-conditioning systems, to solve air-conditioning in the prior art
The inconvenient problem of device installation.
To achieve the goals above, according to an aspect of the invention, there is provided a kind of mounting device for air conditioner,
Including:Mounting bracket is fixed at position to be installed;Wall hanging board, for being connect with air conditioner;Traction component, wall hanging board is by leading
Draw component to connect with mounting bracket position-adjustable.
Further, traction component includes:The both ends of hitch structure, hitch structure connect with mounting bracket and wall hanging board respectively
It connects;Dynamic structure, dynamic structure are drivingly connected with hitch structure to adjust the position relationship of wall hanging board and mounting bracket.
Further, the driving end of dynamic structure by the back side of mounting bracket it is protruding after connect with hitch structure.
Further, hitch structure is draught line.
Further, traction component is multiple and is intervally installed.
Further, mounting device further includes the guide assembly being arranged on mounting bracket, and wall hanging board can be along guide assembly
Sliding.
Further, guide assembly includes multiple guide rail sections, and the connection that slides over each other between multiple guide rail sections, at least one
Guide rail section is fixed on mounting bracket, and at least another guide rail section is connect with wall hanging board.
Further, guide rail section is clamped with wall hanging board and/or is connect by fastener.
Further, at least one guide rail section has clamping portion, and along the extending direction of guide rail section, which, which also has, connects
Boss is connect for fixation fastener.
Further, clamping portion is buckling groove or blocked hole.
Further, multiple guide rail sections are nested with one another setting.
Further, there is at least part of mounting bracket mounting groove, at least part of guide assembly to be placed in installation
In slot.
Further, mounting bracket includes:First mounting plate, the first mounting plate have sliding slot hole;Second mounting plate, second
Mounting plate is parallel with the first mounting plate and interval is arranged, and to form accommodating space between, wall hanging board is located at the first installation
The side far from the second mounting plate of plate;Connecting plate, the first mounting plate are connect by connecting plate with the second mounting plate, guide assembly
At least part be located in accommodating space and by being connect with wall hanging board after being stretched out in sliding slot hole.
Further, connecting plate is multiple and interval setting, two neighboring connecting plate and the first mounting plate, the second mounting plate
Mounting groove is surrounded, at least part of guide assembly is placed in mounting groove.
Further, sliding slot hole is multiple, and multiple sliding slot holes edges are spaced perpendicular to the direction that wall hanging board moves
Setting;Guide assembly is multiple, and there are one guide assemblies for correspondence at each sliding slot hole.
Further, mounting device further includes protection structure, and wall hanging board can be connect by protection structure with mounting bracket, with
Keep wall hanging board fixed relative to mounting bracket when traction component does not work.
According to another aspect of the present invention, a kind of air-conditioning system is provided, including:Mounting device, mounting device are above-mentioned
Mounting device;The wall hanging board of air conditioner, air conditioner and mounting device connects.
Further, air conditioner is clamped with wall hanging board.
Further, it is arranged fluted on air conditioner, wall hanging board has the hook that coordinates with groove.
It applies the technical scheme of the present invention, mounting device includes mounting bracket, wall hanging board and traction component, and mounting bracket is fixed on
At position to be installed;Wall hanging board with air conditioner for connecting;Wall hanging board by traction component and mounting bracket position-adjustable connects
It connects.It, can be to the phase between wall hanging board and mounting bracket due to being provided with traction component, thus under the draw of traction component
Position is adjusted, to meet different use demands.Wherein, mounting bracket can be fixed on the wall, in the work of traction component
Under, the up and down motion of wall hanging board may be implemented.Therefore, operation height when installation can be reduced, the installation of air conditioner is improved
Efficiency preferably ensures the personal safety of installation personnel.
Description of the drawings
The accompanying drawings which form a part of this application are used to provide further understanding of the present invention, and of the invention shows
Meaning property embodiment and its explanation are not constituted improper limitations of the present invention for explaining the present invention.In the accompanying drawings:
Fig. 1 shows the structural schematic diagram of the air-conditioning system of the alternative embodiment of the present invention;
Fig. 2 shows the front views of air-conditioning system in Fig. 1;
Fig. 3 shows the structural schematic diagram that air conditioner is installed in place in Fig. 1;
Fig. 4 shows the front view that air conditioner is installed in place in Fig. 3;
Fig. 5 shows the structural schematic diagram of mounting device in Fig. 3;
Fig. 6 shows the assembling schematic diagram of mounting device in Fig. 1;
Fig. 7 shows the assembling schematic diagram of mounting device in Fig. 5;
Fig. 8 shows the structural schematic diagram of wall hanging board in Fig. 7;And
Fig. 9 shows the structural schematic diagram of another angle of wall hanging board in Fig. 7.
Wherein, above-mentioned attached drawing includes the following drawings label:
100, mounting bracket;110, the first mounting plate;111, slot hole is slid;120, the second mounting plate;130, connecting plate;200、
Wall hanging board;210, wall hanging board ontology;211, main part;212, adjutage;220, disconnecting prevention structure;230, interconnecting piece;240, it hangs
Structure;250, mounting part;260, mounting hole;300, traction component;310, hitch structure;320, dynamic structure;321, end is driven;
400, guide assembly;410, guide rail section;411, clamping portion;412, boss is connected;500, air conditioner.
Specific implementation mode
It should be noted that in the absence of conflict, the features in the embodiments and the embodiments of the present application can phase
Mutually combination.The present invention will be described in detail below with reference to the accompanying drawings and embodiments.
It should be pointed out that unless otherwise specified, all technical and scientific terms used in this application have and the application
The normally understood identical meanings of person of an ordinary skill in the technical field.
In the present invention, in the absence of explanation to the contrary, the noun of locality used such as " upper and lower, top, bottom " is typically needle
For direction shown in the drawings, or for component itself is on vertical, vertical or gravity direction;Equally
Ground for ease of understanding and describes, and " inside and outside " refers to the inside and outside of the profile relative to each component itself, but the above-mentioned noun of locality is not
For limiting the present invention.
In order to solve the problems, such as that air conditioner in the prior art installation is inconvenient, the present invention provides a kind of mounting device and
Air-conditioning system.Wherein, air-conditioning system has following mounting devices.
Embodiment one
As shown in Figures 1 to 7, mounting device includes mounting bracket 100, wall hanging board 200 and traction component 300, mounting bracket 100
It is fixed at position to be installed;Wall hanging board 200 with air conditioner 500 for connecting;Wall hanging board 200 passes through traction component 300 and peace
It connects with shelving 100 position-adjustables.Due to being provided with traction component 300, thus under the draw of traction component 300,
Relative position between wall hanging board 200 and mounting bracket 100 can be adjusted, to meet different use demands.Wherein, pacify
Shelving 100 can fix on the wall, and under the action of traction component 300, the up and down motion of wall hanging board 200 may be implemented.Therefore,
Operation height when installation can be reduced, the installation effectiveness of air conditioner 500 is improved, preferably ensures the person peace of installation personnel
Entirely.
As shown in Figures 5 to 9, wall hanging board 200 includes wall hanging board ontology 210, disconnecting prevention structure 220 and interconnecting piece 230, anticreep
Structure 220 is arranged in the bottom of wall hanging board ontology 210 and is stretched out towards 500 side of air conditioner;Interconnecting piece 230 is arranged in wall hanging board
Top on ontology 210 and positioned at disconnecting prevention structure 220.In this way, air conditioner 500 is mounted on wall hanging board ontology 210, air conditioner
500 bottom is contacted with disconnecting prevention structure 220, and disconnecting prevention structure 220 can play good supporting role to air conditioner 500, in addition,
Air conditioner 500 is fixed on wall hanging board ontology 210, for being connect with air conditioner 500 therefore, in anticreep knot by interconnecting piece 230
Under the collective effect of structure 220 and interconnecting piece 230 so that the reliability and security that air conditioner 500 is connect with wall hanging board 200 is more
Height, and it is simple in structure, it is easy to operate, quick.
As shown in Fig. 5 to Fig. 8, disconnecting prevention structure 220 towards the top of wall hanging board ontology 210 a side surface as support face
To lift air conditioner 500.Disconnecting prevention structure 220 can be that air conditioner 500 provides enough support forces for lifting air conditioner 500,
Improve the reliability and security that air conditioner 500 is connect with wall hanging board 200.
Certainly, disconnecting prevention structure 220 can also be attached by way of clamping with air conditioner 500.At this point, disconnecting prevention structure
220 overhanging end is joint end, to be clamped with air conditioner 500.The connection type reliability and stability higher of clamping, and structure
Simply, easy to operate, quick.
As shown in Figures 5 to 9, interconnecting piece 230 is to be arranged on wall hanging board ontology 210 and stretched towards 500 side of air conditioner
The hook gone out, after air conditioner 500 assembles in place with hook, then in place with the assembly of disconnecting prevention structure 220.In this way, interconnecting piece 230 and anti-
220 collective effect of de- structure, connect with wall hanging board 200 for air conditioner 500 and provides double shield, reliability and stability is more
It is high.
As shown in Figures 1 to 8, wall hanging board 200 further includes suspended structure 240, and suspended structure 240 is arranged in wall hanging board ontology
On 210.Suspended structure 240 provides connection for the suspension connection of wall hanging board 200, is connected convenient for the suspension of wall hanging board 200.
Preferably, suspended structure 240 is directed towards the hanging column of 500 side of air conditioner stretching, and hanging column has ring-type recessed
Slot.Groove provides tie point for hanging column, the better reliability connected by groove, and easy to operation.
As shown in figure 9, wall hanging board 200 further includes mounting part 250, deviating from wall hanging board ontology 210 is arranged in mounting part 250
The side of air conditioner 500.Mounting part 250 is used for the fixed installation of wall hanging board 200, is the reliable of the fixed installation of wall hanging board 200
Property provides good guarantee.
Preferably, mounting part 250 is hook.
As shown in Figures 5 to 9, wall hanging board 200 further includes the mounting hole 260 for being passed through for fastener.Wall hanging board 200 is logical
It crosses fastener to be fixedly connected, reliability and stability higher, and simple in structure, it is easy to operate, quick.
As shown in Figures 5 to 9, wall hanging board ontology 210 includes main part 211 and adjutage 212, and the setting of interconnecting piece 230 exists
On main part 211;Adjutage 212 is extended downwardly by the bottom of main part 211, and the bottom of adjutage 212 is provided with anticreep knot
Structure 220.Air conditioner 500 is mounted on by interconnecting piece 230 and disconnecting prevention structure 220 on wall hanging board 200, interconnecting piece 230 and anticreep knot
220 collective effect of structure, connect with wall hanging board 200 for air conditioner 500 and provides double shield, reliability and stability higher;Separately
It is provided with interval between outer adjutage 212, is conducive to save material, reduces cost.
As shown in Figure 1, traction component 300 includes hitch structure 310 and dynamic structure 320, the both ends point of hitch structure 310
It is not connect with mounting bracket 100 and wall hanging board 200;Dynamic structure 320 is drivingly connected with hitch structure 310 to adjust wall hanging board 200
With the position relationship of mounting bracket 100.Hitch structure 310 drives for connecting mounting bracket 100 and wall hanging board 200, dynamic structure 320
Hitch structure 310 does that stretch roping dynamic, and then wall hanging board 200 is driven to be moved, to adjust wall hanging board 200 and mounting bracket 100
Position relationship.
As shown in Figures 1 to 5, the driving end 321 of dynamic structure 320 by mounting bracket 100 back side it is protruding after with lead
Guiding structure 310 connects.Hitch structure 310 is wrapped on the driving end 321 of dynamic structure 320, is made in the driving of dynamic structure 320
Under, the folding and unfolding that hitch structure 310 can be wound on driving end 321, and then realize the up and down motion of wall hanging board 200.
It should be noted that mounting device further includes controller, controller is connect with dynamic structure 320, to control power
The speed of start and stop and the rotation of structure 320.Controller controls traction knot by controlling the velocity of rotation of dynamic structure 320
The folding and unfolding speed of structure 310.
Preferably, dynamic structure 320 is motor, and the number of motor is 2.Each motor connects with hitch structure 310 respectively
It connects, to drive the extensional motion of hitch structure 310.
Preferably, hitch structure 310 is draught line.Draught line disclosure satisfy that requirement, and simple in structure, operation side
Just, cost is relatively low.
It should be noted that the toughness, intensity and wearability of selected draught line are stronger here, use disclosure satisfy that
It is required that.
It should be noted that when hitch structure 310 is draught line, need the one ends wound by draught line in wall hanging board
In the annular recess of 200 hanging column, effectively the end of draught line can be fixed in this way, to prevent draught line from
It falls off on wall hanging board.
As shown in Figures 1 to 6, traction component 300 is multiple and is intervally installed.Since traction component 300 is multiple
And be intervally installed, thus during the work time, can realize the dispersion of power, be conducive to increase stability, reliability higher.
Preferably, hitch structure 310 is 2.
As shown in Figure 1, mounting device further includes the guide assembly 400 being arranged on mounting bracket 100, wall hanging board 200 can
It is slided along guide assembly 400.Guide assembly 400 has guiding role, can guide the movement of wall hanging board 200, be conducive to improve
The stability and reliability of mounting device.
As shown in Fig. 1, Fig. 6, guide assembly 400 includes multiple guide rail sections 410, and is slided each other between multiple guide rail sections 410
Dynamic connection, at least one guide rail section 410 are fixed on mounting bracket 100, and at least another guide rail section 410 is connect with wall hanging board 200.
Due to the connection that slides over each other between multiple guide rail sections 410 of guide assembly 400, thus guide assembly 400 has Telescopic, into
And be conducive to the position change between mounting bracket 100 and wall hanging board 200.
As shown in Fig. 1, Fig. 6, guide rail section 410 is clamped with wall hanging board 200 and/or is connect by fastener.It is clamped and/or tight
The structure of firmware connection type is simple, easy for installation, quick, stability and good reliability.
As shown in Fig. 1, Fig. 6, at least one guide rail section 410 has clamping portion 411, should along the extending direction of guide rail section 410
Guide rail section 410 also has connection boss 412 for fixation fastener.Clamping portion 411 is used to connect wall hanging with boss 412 is connect
Plate 200 is fixedly connected wall hanging board 200 by way of clamping or fastener connection, and stability is good, and reliability is high, and
Simple in structure, easy to operate, quick, cost is relatively low.
In this specific embodiment, mounting part 250 Yu clamping portion 411 cooperation of wall hanging board 200.
Optionally, clamping portion 411 is buckling groove or blocked hole.Buckling groove or blocked hole disclosure satisfy that requirement, and tie
Structure is simple, easy to operation.When mounting part 250 is hook, hook stretches into blocked hole or buckling groove, to realize wall hanging board 200
With the connection of guide assembly 400.
In addition, in order to ensure that wall hanging board 200 is reliably connected with guide assembly 400, fastener can also be passed through wall hanging board
It tightens together with the connection boss 412 of guide rail section 410 after 200 mounting hole 260.In this way, guide assembly 400 and wall hanging board
200 are connected by fastener, are positioned also by the mode of clamping, so as to effectively place wall hanging board 200 from mounting bracket
It is detached from 100, that is, ensure that the installation reliability of air conditioner 500.
As shown in Figure 1 and Figure 2, multiple guide rail sections 410 are nested with one another setting.In this way, can be between multiple guide rail sections 410
Row stretching motion, and then be conducive to the position change between mounting bracket 100 and wall hanging board 200.
Optionally, there is at least part of mounting bracket 100 mounting groove, at least part of guide assembly 400 to be placed in
In mounting groove.Mounting groove connect convenient for guide assembly 400 with mounting bracket 100 for installing guide assembly 400.
As shown in Figure 1, mounting bracket 100 includes the first mounting plate 110, the second mounting plate 120 and connecting plate 130, the first peace
Loading board 110 has sliding slot hole 111;Second mounting plate 120 it is parallel with the first mounting plate 110 and interval setting, with the two it
Between form accommodating space, wall hanging board 200 is located at the side far from the second mounting plate 120 of the first mounting plate 110;First mounting plate
110 are connect by connecting plate 130 with the second mounting plate 120, at least part of guide assembly 400 be located in accommodating space and by
It is connect with wall hanging board 200 after being stretched out in sliding slot hole 111.Hold due to having between the first mounting plate 110 and the second mounting plate 120
Between emptying, thus be conducive to the fixed installation of guide assembly 400, in addition under the action of guide assembly 400,200 energy of wall hanging board
It is enough to be moved along sliding slot hole 111, realize the adjusting of position between wall hanging board 200 and mounting bracket 100.
Moreover, there are the second mounting plate 120 multiple through-holes, swell fixture to consolidate the second mounting plate 120 across multiple through-holes
It is scheduled at wall or other positions to be installed, and then realizes the fixed installation of mounting bracket 100.
As shown in Fig. 1, Fig. 6, connecting plate 130 is multiple and interval setting, two neighboring connecting plate 130 and the first mounting plate
110, the second mounting plate 120 surrounds mounting groove, and at least part of guide assembly 400 is placed in mounting groove.Connecting plate 130 is
Guide assembly 400 provides accommodating space, is easily installed guide assembly 400.
As shown in Fig. 1, Fig. 6, sliding slot hole 111 is multiple, and multiple sliding slot holes 111 are moved along perpendicular to wall hanging board 200
Direction be intervally installed;Guide assembly 400 is multiple, and there are one guide assemblies 400 for correspondence at each sliding slot hole 111.By
In be provided with sliding slot hole 111, thus be conducive to guide assembly 400 along sliding slot hole 111 move, while wall hanging board 200 with
Guide assembly 400 connects, and wall hanging board 200 is moved with guide assembly 400, and sliding slot hole 111 provides for the movement of wall hanging board 200
Avoiding space.
Optionally, mounting device further include protection structure (not shown), wall hanging board 200 can by protect structure with
Mounting bracket 100 connects, to keep wall hanging board 200 fixed relative to mounting bracket 100 when traction component 300 does not work.By
In being provided with protection structure, protection structure can link together wall hanging board 200 and mounting bracket 100, it is thus possible to preferably
There is wall hanging board 200 with respect to mounting bracket in the safety and reliability for ensureing mounting device when preventing hitch structure 310 from not working
100 occur sliding phenomenon.
Optionally, protection structure can be the combination of hook and hanging hole, and hook, wall hanging board 200 are provided on mounting bracket 100
With hanging hole, by linking up with the cooperation with hanging hole, to keep wall hanging board 200 fixed relative to mounting bracket 100;Protect structure
Can also be the combination of plug connector and jack, mounting bracket 100 and the opposite position of wall hanging board 200 have jack, pass through grafting
The cooperation of part and jack, to keep wall hanging board 200 fixed relative to mounting bracket 100.
As shown in Figures 1 to 4, air-conditioning system includes mounting device and air conditioner 500, air conditioner 500 and mounting device
Wall hanging board 200 connects.Air conditioner 500 be mounted on wall hanging board 200 on, under the action of traction component 300, air conditioner 500 with
Wall hanging board 200 moves up and down, and is conducive to the installation and maintenance of air conditioner 500 in this way, has preferably ensured the safety of staff.
It should be noted that when air conditioner 500 is declined automatically, controller controls the speed of motor rotation, in turn
The decrease speed of air conditioner 500 is controlled, air conditioner 500 slowly declines under the pulling of draught line, and 400 component of guide assembly will
It trails, and air conditioner 500 is integrally fixed at during declining on guide assembly 400.When air conditioner 500 is risen,
Motor reversal, pull draught line, air conditioner 500 will follows track up slowly rise, until installed position.
As shown in Figures 1 to 4, air conditioner 500 is clamped with wall hanging board 200.The mode stability of clamping is good, and reliability is high,
And it is simple in structure, easy to operate, quick, cost is relatively low.
Optionally, it is arranged fluted on air conditioner 500, wall hanging board 200 has the hook that coordinates with groove.Groove and hook
Connection type stability it is good, reliability is high, and simple in structure, and easy to operate, quick, cost is relatively low.
It should be noted that air conditioner 500 is mounted on as a kind of household electrical appliance in the family of consumer, and air conditioner
500 service life is up to 10 years to 30 years, and the time, dust or harmful bacteria in air will be from air conditioners 500 in the course of time
Air inlet or air outlet at enter the inside of air conditioner 500, because the inside of air conditioner 500 is dark moist, harmful bacteria is given to provide
Good growth environment.Go down for a long time, larger harm is generated to the body of consumer.Meanwhile it is a large amount of in air
Dust can accumulate fall air conditioner 500 in appearance, influence the appearance of air conditioner 500.In the installation process of conventional air conditioner 500
In, it needs complete machine to be directly installed on indoor wall, when being cleaned to air conditioner 500, needs operating personnel to carry out high
Locate operation, thus brings unfavorable result:
Because of aloft operation when 1, cleaning air conditioner 500, it has not been convenient to be operated;
2, high-rise working is also a kind of threat to the safety of operating personnel;
3, when air conditioner 500 is mounted on progress connection pipe for internal-external unit docking on wall, installation personnel band is given in aloft operation
Bigger difficulty is carried out.
Using the technical solution of the application, big damage need not be caused to the indoor wall of user when mounted, works as user
When air conditioner 500 is installed, it is necessary first to mounting device be fixed on indoor wall, mounting device is then controlled and be automatically lowered
At certain position, after operating personnel are on the ground the connecting tube of the internal-external machine of air conditioner 500 to connecting, air conditioner 500 is hung
On mounting device, start control, mounting device will pull 500 complete machine of air conditioner to rise to installation site automatically;When to sky
When device 500 being adjusted to be cleaned, it is only necessary to press movement controller, so that it may so that air conditioner 500 declines automatically, clean personnel just at this time
Do not need aloft operation, drop to the eminence of a people by this device 500 that installs an air conditioner, operating personnel can stand on the ground into
Any operation of row.In the process, operating personnel operate on the ground, greatly facilitate the installation of air conditioner 500,
Improve the safety of installation personnel.
Embodiment two
Difference lies in the number of motor is 1 with embodiment one.The shaft of motor is connect with gear, gear be it is multiple and
It is connect with hitch structure 310, motor is by gear drive to drive hitch structure 310 to work.
Embodiment three
Difference lies in traction component 300 is linear motor or linear cylinder, in this way, draw groups with embodiment one
Part 300 itself has the multi-functionals such as traction, power output and guiding simultaneously.
It can be seen from the above description that the above embodiments of the present invention realize following technique effect:
Mounting device liftable, the operation height of personnel, improves air conditioner when can thus reduce air conditioner installation
Installation effectiveness, while improving the Personal Safety of installation personnel.
Obviously, above-mentioned described embodiment only a part of the embodiments of the present invention, instead of all the embodiments.
Based on the embodiments of the present invention, obtained by those of ordinary skill in the art without making creative efforts all
Other embodiment should all belong to the scope of protection of the invention.
It should be noted that term used herein above is merely to describe specific implementation mode, and be not intended to restricted root
According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singulative
It is also intended to include plural form, additionally, it should be understood that, when in the present specification using term "comprising" and/or " packet
Include " when, indicate existing characteristics, step, work, device, component and/or combination thereof.
It should be noted that term " first " in the description and claims of this application and above-mentioned attached drawing, "
Two " etc. be for distinguishing similar object, without being used to describe specific sequence or precedence.It should be appreciated that using in this way
Data can be interchanged in the appropriate case, so that presently filed embodiment described herein can be in addition to illustrating herein
Or the sequence other than those of description is implemented.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field
For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, any made by repair
Change, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.
Claims (19)
1. a kind of mounting device for air conditioner, which is characterized in that including:
Mounting bracket (100), is fixed at position to be installed;
Wall hanging board (200), for being connect with air conditioner (500);
Traction component (300), the wall hanging board (200) can by the traction component (300) and the mounting bracket (100) position
Adjustably connect.
2. mounting device according to claim 1, which is characterized in that the traction component (300) includes:
Hitch structure (310), the both ends of the hitch structure (310) respectively with the mounting bracket (100) and the wall hanging board
(200) it connects;
Dynamic structure (320), the dynamic structure (320) are drivingly connected with the hitch structure (310) to adjust the wall hanging
The position relationship of plate (200) and the mounting bracket (100).
3. mounting device according to claim 2, which is characterized in that the driving end (321) of the dynamic structure (320) by
The back side of the mounting bracket (100) is protruding to be connect with the hitch structure (310) afterwards.
4. mounting device according to claim 2, which is characterized in that the hitch structure (310) is draught line.
5. mounting device according to any one of claim 1 to 4, which is characterized in that the traction component (300) is more
It is a and be intervally installed.
6. mounting device according to any one of claim 1 to 4, which is characterized in that the mounting device further includes setting
The guide assembly (400) on the mounting bracket (100) is set, the wall hanging board (200) can be sliding along the guide assembly (400)
It is dynamic.
7. mounting device according to claim 6, which is characterized in that the guide assembly (400) includes multiple guide rail sections
(410), and between multiple guide rail sections (410) slide over each other connection, and at least one guide rail section (410) is fixed on described
On mounting bracket (100), at least another described guide rail section (410) connect with the wall hanging board (200).
8. mounting device according to claim 7, which is characterized in that the guide rail section (410) and the wall hanging board (200)
It is clamped and/or is connected by fastener.
9. mounting device according to claim 8, which is characterized in that at least one guide rail section (410) has clamping
Portion (411), the extending direction along the guide rail section (410), the guide rail section (410) also have connection boss (412) with
In fixation fastener.
10. mounting device according to claim 9, which is characterized in that the clamping portion (411) is buckling groove or clamping
Hole.
11. mounting device according to claim 7, which is characterized in that multiple guide rail sections (410), which are nested with one another, to be set
It sets.
12. mounting device according to claim 6, which is characterized in that at least part of the mounting bracket (100) has
At least part of mounting groove, the guide assembly (400) is placed in the mounting groove.
13. mounting device according to claim 6, which is characterized in that the mounting bracket (100) includes:
First mounting plate (110), first mounting plate (110) have sliding slot hole (111);
Second mounting plate (120), second mounting plate (120) is parallel with the first mounting plate (110) and interval is arranged, with
Accommodating space is formed between, and the wall hanging board (200) is located at pacifying far from described second for first mounting plate (110)
The side of loading board (120);
Connecting plate (130), first mounting plate (110) are connected by the connecting plate (130) and second mounting plate (120)
It connects, at least part of the guide assembly (400) is located in the accommodating space and by being stretched out in the sliding slot hole (111)
It is connect afterwards with the wall hanging board (200).
14. mounting device according to claim 13, which is characterized in that the connecting plate (130) is multiple and interval is set
It sets, the two neighboring connecting plate (130) surrounds installation with first mounting plate (110), second mounting plate (120)
At least part of slot, the guide assembly (400) is placed in the mounting groove.
15. mounting device according to claim 13, which is characterized in that the sliding slot hole (111) is multiple, Duo Gesuo
Sliding slot hole (111) edge is stated to be intervally installed perpendicular to the direction that the wall hanging board (200) moves;The guide assembly
(400) it is multiple, there are one the guide assemblies (400) for correspondence at each sliding slot hole (111).
16. mounting device according to any one of claim 1 to 4, which is characterized in that the mounting device further includes protecting
Protection structure, the wall hanging board (200) can be connect by the protection structure with the mounting bracket (100), in the traction
Component (300) keeps the wall hanging board (200) fixed relative to the mounting bracket (100) when not working.
17. a kind of air-conditioning system, which is characterized in that including:
Mounting device, the mounting device are the mounting devices described in any one of claim 1 to 16;
Air conditioner (500), the air conditioner (500) connect with the wall hanging board (200) of the mounting device.
18. air-conditioning system according to claim 17, which is characterized in that the air conditioner (500) and the wall hanging board
(200) it is clamped.
19. air-conditioning system according to claim 18, which is characterized in that fluted, institute is arranged on the air conditioner (500)
Stating wall hanging board (200) has the hook coordinated with the groove.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810381421.1A CN108458470B (en) | 2018-04-25 | 2018-04-25 | Mounting device and air conditioning system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810381421.1A CN108458470B (en) | 2018-04-25 | 2018-04-25 | Mounting device and air conditioning system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108458470A true CN108458470A (en) | 2018-08-28 |
CN108458470B CN108458470B (en) | 2024-02-27 |
Family
ID=63236003
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810381421.1A Active CN108458470B (en) | 2018-04-25 | 2018-04-25 | Mounting device and air conditioning system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108458470B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109269079A (en) * | 2018-10-12 | 2019-01-25 | 青岛海尔空调器有限总公司 | A kind of air conditioner fixed device, air conditioner |
CN109269078A (en) * | 2018-10-12 | 2019-01-25 | 青岛海尔空调器有限总公司 | A kind of fixation device, air conditioner for air conditioner |
CN109269074A (en) * | 2018-10-12 | 2019-01-25 | 青岛海尔空调器有限总公司 | A kind of fixation device, air conditioner for air conditioner |
CN109269076A (en) * | 2018-10-12 | 2019-01-25 | 青岛海尔空调器有限总公司 | A kind of fixation device, air conditioner for air conditioner |
CN109269075A (en) * | 2018-10-12 | 2019-01-25 | 青岛海尔空调器有限总公司 | A kind of air conditioner fixed device, air conditioner |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101639283A (en) * | 2008-08-01 | 2010-02-03 | 乐金电子(天津)电器有限公司 | Mounting plate of detachable wall hanging type air conditioner indoor unit |
CN202358848U (en) * | 2011-11-01 | 2012-08-01 | 昆山艺城铝业制造有限公司 | Hoisting mechanism |
JP2013117356A (en) * | 2011-12-05 | 2013-06-13 | Daikin Industries Ltd | Indoor unit for air conditioner |
CN205151640U (en) * | 2015-11-12 | 2016-04-13 | 南昌理工学院 | Auxiliary elevating gear convenient to machine maintenance in air conditioning |
CN208238214U (en) * | 2018-04-25 | 2018-12-14 | 珠海格力电器股份有限公司 | Mounting device and air-conditioning system |
-
2018
- 2018-04-25 CN CN201810381421.1A patent/CN108458470B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101639283A (en) * | 2008-08-01 | 2010-02-03 | 乐金电子(天津)电器有限公司 | Mounting plate of detachable wall hanging type air conditioner indoor unit |
CN202358848U (en) * | 2011-11-01 | 2012-08-01 | 昆山艺城铝业制造有限公司 | Hoisting mechanism |
JP2013117356A (en) * | 2011-12-05 | 2013-06-13 | Daikin Industries Ltd | Indoor unit for air conditioner |
CN205151640U (en) * | 2015-11-12 | 2016-04-13 | 南昌理工学院 | Auxiliary elevating gear convenient to machine maintenance in air conditioning |
CN208238214U (en) * | 2018-04-25 | 2018-12-14 | 珠海格力电器股份有限公司 | Mounting device and air-conditioning system |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109269079A (en) * | 2018-10-12 | 2019-01-25 | 青岛海尔空调器有限总公司 | A kind of air conditioner fixed device, air conditioner |
CN109269078A (en) * | 2018-10-12 | 2019-01-25 | 青岛海尔空调器有限总公司 | A kind of fixation device, air conditioner for air conditioner |
CN109269074A (en) * | 2018-10-12 | 2019-01-25 | 青岛海尔空调器有限总公司 | A kind of fixation device, air conditioner for air conditioner |
CN109269076A (en) * | 2018-10-12 | 2019-01-25 | 青岛海尔空调器有限总公司 | A kind of fixation device, air conditioner for air conditioner |
CN109269075A (en) * | 2018-10-12 | 2019-01-25 | 青岛海尔空调器有限总公司 | A kind of air conditioner fixed device, air conditioner |
CN109269074B (en) * | 2018-10-12 | 2023-06-30 | 青岛海尔空调器有限总公司 | Fixing device for air conditioner and air conditioner |
CN109269075B (en) * | 2018-10-12 | 2023-06-30 | 青岛海尔空调器有限总公司 | Fixing device for air conditioner and air conditioner |
CN109269078B (en) * | 2018-10-12 | 2023-06-30 | 青岛海尔空调器有限总公司 | Fixing device for air conditioner and air conditioner |
CN109269076B (en) * | 2018-10-12 | 2023-07-25 | 青岛海尔空调器有限总公司 | Fixing device for air conditioner and air conditioner |
CN109269079B (en) * | 2018-10-12 | 2023-07-25 | 青岛海尔空调器有限总公司 | Fixing device for air conditioner and air conditioner |
Also Published As
Publication number | Publication date |
---|---|
CN108458470B (en) | 2024-02-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108458470A (en) | Mounting device and air-conditioning system | |
CN201680560U (en) | Wall-hung air conditioner | |
EP2184551A2 (en) | Indoor unit of air conditioner | |
CN208238213U (en) | Installing mechanism and air conditioner with it | |
CN208238214U (en) | Mounting device and air-conditioning system | |
CN208519961U (en) | Wall hanging board and mounting device and air-conditioning system for air conditioner | |
CN109413916A (en) | A kind of communication cabinet having dedusting function | |
CN208608613U (en) | A kind of vertical driving force cabinet cabinet body convenient to overhaul | |
CN108397896A (en) | Wall hanging board, mounting device and air-conditioning system | |
CN109990426A (en) | A kind of ventilated device of building being easily installed | |
CN207094692U (en) | A kind of movable part elevating mechanism of range hood and application have the range hood of the elevating mechanism | |
CN208253925U (en) | For the guide assembly of air conditioner and the mounting device of air conditioner | |
CN107339725A (en) | A kind of movable part elevating mechanism of range hood and application have the range hood of the elevating mechanism | |
CN207159629U (en) | Lowering or hoisting gear and clothes airing machine | |
CN209459092U (en) | Air conditioner | |
CN208124462U (en) | air conditioner | |
KR20100043992A (en) | Air conditioner | |
CN105066399A (en) | Lifting type panel grating installation structure and air conditioner | |
CN108507148A (en) | Installing mechanism and air conditioner with it | |
CN109288272A (en) | A kind of Domestic medicinal drug storage medicine outlet device having aeration-drying function | |
CN209344590U (en) | A kind of power control cabinet | |
CN211650564U (en) | Air purifier | |
CN208238021U (en) | air conditioner | |
CN106836965B (en) | A kind of portable protective fence and method for the maintenance of Internet of Things weak current engineering | |
CN211338393U (en) | Household elevator control cabinet |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |