CN108457463A - A kind of inner scaffold for construction and decoration - Google Patents

A kind of inner scaffold for construction and decoration Download PDF

Info

Publication number
CN108457463A
CN108457463A CN201810179375.7A CN201810179375A CN108457463A CN 108457463 A CN108457463 A CN 108457463A CN 201810179375 A CN201810179375 A CN 201810179375A CN 108457463 A CN108457463 A CN 108457463A
Authority
CN
China
Prior art keywords
baffle
base plates
babinet
counterweight base
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810179375.7A
Other languages
Chinese (zh)
Other versions
CN108457463B (en
Inventor
高佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Aerospace Construction Engineering Group Co Ltd
Original Assignee
高佳
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 高佳 filed Critical 高佳
Priority to CN201810179375.7A priority Critical patent/CN108457463B/en
Publication of CN108457463A publication Critical patent/CN108457463A/en
Application granted granted Critical
Publication of CN108457463B publication Critical patent/CN108457463B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/18Scaffolds primarily resting on the ground adjustable in height
    • E04G1/22Scaffolds having a platform on an extensible substructure, e.g. of telescopic type or with lazy-tongs mechanism
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/24Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
    • E04G2001/242Scaffolds movable on wheels or tracks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Movable Scaffolding (AREA)
  • Toys (AREA)

Abstract

The present invention provides a kind of inner scaffold for construction and decoration, is related to decorating apparatus field.This is used for the inner scaffold of construction and decoration, including counterweight base plates, the top both sides of the counterweight base plates and it is plugged with support column positioned at the front and backs of counterweight base plates, it is installed with baffle at the top of the support column, the top both sides of the baffle and it is both provided with fixed link positioned at the front and back of baffle, the inside of the fixed link and top plate is provided at the top of the counterweight base plates, the bottom both ends of the top plate are installed with mobile slide bar.This is used for the inner scaffold of construction and decoration, first gear rotation is driven by motor, so that first gear drives rack-plate to move up and down, achieve the effect that lifting, bull stick, which plays, increases firm effect, so that first gear is rotated synchronously, so that scaffold is suitable for different height and work, improve the use scope of scaffold.

Description

A kind of inner scaffold for construction and decoration
Technical field
The present invention relates to decorating apparatus technical fields, specially a kind of inner scaffold for construction and decoration.
Background technology
Scaffold refers to construction site as operation and solves vertically and horizontally to transport the various holders set up, and builds work It is used in exterior wall, interior decoration or the higher place that can not directly construct of floor height on the ground.
When interior decoration, scaffold is equally an indispensable part, currently, general scaffold in the market, in room When interior decoration, due to needing its local height of work to differ, above-mentioned scaffold is only used for level altitude, therefore causes certain Inconvenience in degree assembles and compares moreover, general scaffold is composed of a fixed connection by fastener, steel pipe, pedestal and backing plate It is cumbersome, it very arduously, wastes time, influences work task efficiency.
Invention content
(One)The technical issues of solution
In view of the deficiencies of the prior art, it the present invention provides a kind of inner scaffold for construction and decoration, solves general Scaffold inconvenient problem with use.
(Two)Technical solution
In order to achieve the above object, the present invention is achieved by the following technical programs:A kind of indoor foot hand for construction and decoration Frame, including counterweight base plates, the top both sides of the counterweight base plates and the front and back positioned at counterweight base plates are plugged with support Column, is installed with baffle at the top of the support column, top both sides of the baffle and equal positioned at the front and back of baffle It is provided with fixed link, the inside of the fixed link and is provided with top plate, the bottom two of the top plate at the top of counterweight base plates End is installed with mobile slide bar, and the both ends of the mobile slide bar run through fixed link and extend to the outside of fixed link, described The inside of counterweight base plates offers the first groove, and the inside both sides of first groove are both provided with limited post, the limited post It is installed with spring close to one end of the first groove inner wall, the one end of the limited post far from spring is through support column and extends To the inside of support column, the top both sides of the baffle are installed with babinet, and the babinet is internally provided with rack-plate, The upside of babinet is run through at the top of the inner wall of babinet and is extended at the top of the rack-plate, and babinet is run through in the bottom of the rack-plate Inner wall bottom and baffle and the downside for extending to baffle, the top of the rack-plate be fixedly connected with top plate.
The inner wall back side of the babinet is installed with motor, and the output end of the motor is installed with first gear, The side of the separate motor of the first gear is installed with first bevel gear, between the babinet activity be plugged with bull stick, The both ends of the bull stick are installed with second bevel gear, mutually ratcheting between the first bevel gear and second bevel gear, The bottom four corners of the counterweight base plates are installed with universal wheel, and the left end of the baffle is installed with switch.
Preferably, the bottom of the fixed link is at the top of screw and baffle by being fixedly connected, the fixed link it is interior Side offers straight slot compatible with mobile slide bar.
Preferably, the one end of the spring far from limited post is fixedly connected with the inner wall of the first groove, the support column Downside offers the second groove compatible with limited post.
Preferably, the bull stick extends to the outer surface fixing sleeve of box house and is connected to second gear, the babinet it is interior Wall bottom and clamping block is installed on the downside of the second gear.
Preferably, the two bottom sides of the counterweight base plates and it is installed with liquid positioned at the front and backs of counterweight base plates Push rod is pressed, the bottom of the hydraulic push rod is installed with rubber cushion blocks.
Preferably, the output end of the input terminal of the switch and motor is electrically connected, and the mobile slide bar is far from top plate Side is installed with ladder.
(Three)Advantageous effect
The present invention provides a kind of inner scaffolds for construction and decoration.Has following advantageous effect:
1, the inner scaffold for being used for construction and decoration drives first gear rotation by motor so that first gear band moving teeth Batten moves up and down, and achievees the effect that lifting, and bull stick, which plays, increases firm effect, so that first gear is rotated synchronously, makes Scaffold can be suitable for different height and work, and improve the use scope of scaffold.
2, the inner scaffold for being used for construction and decoration, passes through universal wheel so that scaffold conveniently moving, by spring and Being used cooperatively for limited post, achievees the effect that Fast Installation, reduces the time of installation, improves work human efficiency, is brought for people It need to be to convenient place.
Description of the drawings
Fig. 1 is structure of the invention sectional view;
Fig. 2 is schematic enlarged-scale view at A in Fig. 1 of the present invention;
Fig. 3 is schematic enlarged-scale view at B in Fig. 1 of the present invention;
Fig. 4 is structure of the invention side view;
Fig. 5 is top board structure vertical view of the present invention.
In figure:1 counterweight base plates, 2 support columns, 3 baffles, 4 first grooves, 5 second grooves, 6 springs, 7 limited posts, 8 hydraulic pressure Push rod, 9 rubber cushion blocks, 10 fixed links, 11 movement slide bars, 12 ladders, 13 straight slots, 14 top plates, 15 babinets, 16 rack-plates, 17 electricity Machine, 18 first gears, 19 first bevel gears, 20 second bevel gears, 21 bull sticks, 22 second gears, 23 clamping blocks, 24 screws, 25 universal wheels, 26 switches.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
The embodiment of the present invention provides a kind of inner scaffold for construction and decoration, as shown in Figs. 1-5, including counterweight base plates 1, the top both sides of counterweight base plates 1 and it is plugged with support column 2, the top of support column 2 positioned at the front and backs of counterweight base plates 1 It is installed with baffle 3, top both sides of the baffle 3 and front and back positioned at baffle 3 is both provided with fixed link 10, fixed link 10 inside and the tops of counterweight base plates 1 is provided with top plate 14, the bottom both ends of top plate 14 are installed with mobile cunning The both ends of bar 11, mobile slide bar 11 run through fixed link 10 and extend to the outside of fixed link 10, and the bottom of fixed link 10 passes through spiral shell Adjusting screw 24 is fixedly connected with the top of baffle 3, and the inside of fixed link 10 offers straight slot 13 compatible with mobile slide bar 11, leads to Cross screw 24 fixed link 10 is fixed on baffle 3, convenient for fixed link 3 mount and dismount, play the role of it is time saving, Pass through straight slot 13 so that mobile slide bar 11 can move up and down in fixed link 10, and it is recessed that the inside of counterweight base plates 1 offers first The inside both sides of slot 4, the first groove 4 are both provided with limited post 7, and limited post 7 is fixedly mounted close to one end of 4 inner wall of the first groove There are spring 6, the one end of limited post 7 far from spring 6 to run through support column 2 and extend to the inside of support column 2, spring 6 is far from limit One end of column 7 is fixedly connected with the inner wall of the first groove 4, and it is recessed that the downside of support column 2 offers compatible with limited post 7 second Slot 5, when support column 2 is inserted into counterweight base plates 1, limited post 7 is squeezed into the first groove 4, then is squeezed limited post 7 by spring 6 Enter in the second groove 5, play the effect of fixed support column 2, achievees the effect that support column 2 is easy for installation, brought convenience for people, The top both sides of baffle 3 are installed with babinet 15, and babinet 15 is internally provided with rack-plate 16, and the top of rack-plate 16 is passed through The upside of babinet 15 is worn at the top of the inner wall of babinet 15 and extends to, the bottom of rack-plate 16 is through the inner wall bottom of babinet 15 and gear The top of plate 3 and the downside for extending to baffle 3, rack-plate 16 is fixedly connected with top plate 14, this is used for the indoor foot of construction and decoration Hand cradle drives first gear 18 to rotate so that first gear 18 drives rack-plate 16 to move up and down, and reaches lifting by motor 17 Effect, bull stick 21, which plays, increases firm effect, so that first gear 18 is rotated synchronously, scaffold is enable to be suitable for not Same height work, improves the use scope of scaffold.
The inner wall back side of babinet 15 is installed with motor 17, and the output end of motor 17 is installed with first gear 18, The side of the separate motor 17 of first gear 18 is installed with first bevel gear 19, between babinet 15 activity be plugged with bull stick 21, the both ends of bull stick 21 are installed with second bevel gear 20, mutual tooth between first bevel gear 19 and second bevel gear 20 It closes, the outer surface fixing sleeve that bull stick 21 extends to inside babinet 15 is connected to second gear 22, the inner wall bottom of babinet 15 and is located at The downside of second gear 22 is installed with clamping block 23, by being used cooperatively for second gear 22 and clamping block 23, plays pair The restriction effect of first gear 18, when top plate 14 rises to demand height, clamping block 23 is limited by the main second gear 22 of card First gear 18 rotates, and avoids people station when on top plate 14, and rotation causes safety accident to first gear 18 suddenly, reaches protection Effect, the bottom four corners of counterweight base plates 1 are installed with universal wheel 25, the two bottom sides of counterweight base plates 1 and are located at counterweight bottom The front and back of plate 1 is installed with hydraulic push rod 8, and the bottom of hydraulic push rod 8 is installed with rubber cushion blocks 9, hydraulic pressure Push rod 8 works, and extends downwardly rubber cushion blocks 9 contacting ground, have the function that fixed scaffold, scaffold is avoided to move, and leads to Rubber cushion blocks 9 are crossed, the frictional force with ground is increased, enhance stability, the left end of baffle 3 is installed with switch 26, switch 26 The output end of input terminal and motor 17 be electrically connected, side of the mobile slide bar 11 far from top plate 14 is installed with ladder 12, Motor 17 is controlled by switch 26 to work so that scaffold is more convenient to use simple, to improve the work effect of worker Rate, when top plate 14 rises to certain height, since the height of people is different so that the short possibility of height is touched less than top plate 14, can To climb up top plate using ladder 12, it is used for the inner scaffold of construction and decoration, passes through universal wheel 25 so that scaffold movement side Just, being used cooperatively by spring 6 and limited post 7, achievees the effect that Fast Installation, reduces the time of installation, improve worker's Efficiency, being brought for people need to be to convenient place.
Operation principle:First, counterweight base plates 1 are moved on to the position for needing work using universal wheel 25, start hydraulic push rod 8 Counterweight base plates 1 are fixed, support column 2 is and then inserted into counterweight base plates 1, then fixes baffle 3 and fixed link 10, it is then sharp Motor 17 is controlled with switch 26 to start to work, and drives rack-plate 16 to move up and down by first gear 18, when top plate 14 is moved to When suitable height, stopping motor 17 and work, clamping block 23 blocks main second gear 22, and limitation first gear 18 rotates, finally, work People climbs up baffle 3, then climbs up top plate 14 by ladder 12 and work.
In conclusion this is used for the inner scaffold of construction and decoration, first gear 18 is driven to rotate by motor 17 so that First gear 18 drives rack-plate 16 to move up and down, and achievees the effect that lifting, and bull stick 21, which plays, increases firm effect, makes first Gear 18 can rotate synchronously, and so that scaffold is suitable for different height and work, improve the use scope of scaffold.
Also, for the inner scaffold of construction and decoration, pass through universal wheel 25 so that scaffold conveniently moving passes through bullet Being used cooperatively for spring 6 and limited post 7, achievees the effect that Fast Installation, reduces the time of installation, improves work human efficiency, is people Bring need to be to convenient place.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also include other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of variations, modification, replace And modification, the scope of the present invention is defined by the appended.

Claims (6)

1. a kind of inner scaffold for construction and decoration, including counterweight base plates(1), the counterweight base plates(1)Top both sides And it is located at counterweight base plates(1)Front and back be plugged with support column(2), the support column(2)Top be installed with Baffle(3), the baffle(3)Top both sides and be located at baffle(3)Front and back be both provided with fixed link(10), described Fixed link(10)Inside and be located at counterweight base plates(1)Top be provided with top plate(14), the top plate(14)Bottom both ends It is installed with mobile slide bar(11), the mobile slide bar(11)Both ends run through fixed link(10)And extend to fixed link (10)Outside, it is characterised in that:The counterweight base plates(1)Inside offer the first groove(4), first groove(4) Inside both sides be both provided with limited post(7), the limited post(7)Close to the first groove(4)One end of inner wall is installed with Spring(6), the limited post(7)Far from spring(6)One end run through support column(2)And extend to support column(2)Inside, institute State baffle(3)Top both sides be installed with babinet(15), the babinet(15)Be internally provided with rack-plate(16), institute State rack-plate(16)Top run through babinet(15)Inner wall at the top of and extend to babinet(15)Upside, the rack-plate(16) Bottom run through babinet(15)Inner wall bottom and baffle(3)And extend to baffle(3)Downside, the rack-plate(16)Top Portion and top plate(14)It is fixedly connected;The babinet(15)The inner wall back side be installed with motor(17), the motor(17)'s Output end is installed with first gear(18), the first gear(18)Separate motor(17)Side be installed with One bevel gear(19), the babinet(15)Between activity be plugged with bull stick(21), the bull stick(21)Both ends be fixedly mounted There is second bevel gear(20), the first bevel gear(19)With second bevel gear(20)Between mutually ratcheting, the counterweight base plates (1)Bottom four corners be installed with universal wheel(25), the baffle(3)Left end be installed with switch(26).
2. a kind of inner scaffold for construction and decoration according to claim 1, it is characterised in that:The fixed link (10)Bottom pass through screw(24)With baffle(3)Top be fixedly connected, the fixed link(10)Inside offer with Mobile slide bar(11)Compatible straight slot(13).
3. a kind of inner scaffold for construction and decoration according to claim 1, it is characterised in that:The spring(6) Far from limited post(7)One end and the first groove(4)Inner wall be fixedly connected, the support column(2)Downside offer and limit Position column(7)Compatible second groove(5).
4. a kind of inner scaffold for construction and decoration according to claim 1, it is characterised in that:The bull stick(21) Extend to babinet(15)Internal outer surface fixing sleeve is connected to second gear(22), the babinet(15)Inner wall bottom and be located at Second gear(22)Downside be installed with clamping block(23).
5. a kind of inner scaffold for construction and decoration according to claim 1, it is characterised in that:The counterweight base plates (1)Two bottom sides and be located at counterweight base plates(1)Front and back be installed with hydraulic push rod(8), the hydraulic thrust Bar(8)Bottom be installed with rubber cushion blocks(9).
6. a kind of inner scaffold for construction and decoration according to claim 1, it is characterised in that:The switch(26) Input terminal and motor(17)Output end be electrically connected, the mobile slide bar(11)Far from top plate(14)Side be fixedly mounted There is ladder(12).
CN201810179375.7A 2018-03-05 2018-03-05 A indoor scaffold frame for building decoration Active CN108457463B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810179375.7A CN108457463B (en) 2018-03-05 2018-03-05 A indoor scaffold frame for building decoration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810179375.7A CN108457463B (en) 2018-03-05 2018-03-05 A indoor scaffold frame for building decoration

Publications (2)

Publication Number Publication Date
CN108457463A true CN108457463A (en) 2018-08-28
CN108457463B CN108457463B (en) 2019-12-13

Family

ID=63217157

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810179375.7A Active CN108457463B (en) 2018-03-05 2018-03-05 A indoor scaffold frame for building decoration

Country Status (1)

Country Link
CN (1) CN108457463B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111719698A (en) * 2020-07-07 2020-09-29 首钢水城钢铁(集团)赛德建设有限公司 Installation method of super-large-span steel net rack
CN112096037A (en) * 2020-09-09 2020-12-18 厦门安科科技有限公司 Scaffold frame that can safe location construction
CN113431312A (en) * 2021-06-10 2021-09-24 赵传叶 Scaffold capable of transporting materials

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103321397A (en) * 2013-05-03 2013-09-25 武济群 Folding scaffold
CN205804909U (en) * 2016-06-15 2016-12-14 周口市贾鲁河工程管理处 Lifting scaffold
CN206458077U (en) * 2017-02-22 2017-09-01 崔理哲 A kind of water conservancy construction folding movable scaffold
CN107217827A (en) * 2017-07-20 2017-09-29 杨龙 A kind of water conservancy construction is used can the small-sized scaffold of automatic-lifting type
CN107542257A (en) * 2017-09-05 2018-01-05 成都科创谷科技有限公司 A kind of liftable split heads

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103321397A (en) * 2013-05-03 2013-09-25 武济群 Folding scaffold
CN205804909U (en) * 2016-06-15 2016-12-14 周口市贾鲁河工程管理处 Lifting scaffold
CN206458077U (en) * 2017-02-22 2017-09-01 崔理哲 A kind of water conservancy construction folding movable scaffold
CN107217827A (en) * 2017-07-20 2017-09-29 杨龙 A kind of water conservancy construction is used can the small-sized scaffold of automatic-lifting type
CN107542257A (en) * 2017-09-05 2018-01-05 成都科创谷科技有限公司 A kind of liftable split heads

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111719698A (en) * 2020-07-07 2020-09-29 首钢水城钢铁(集团)赛德建设有限公司 Installation method of super-large-span steel net rack
CN112096037A (en) * 2020-09-09 2020-12-18 厦门安科科技有限公司 Scaffold frame that can safe location construction
CN112096037B (en) * 2020-09-09 2022-01-25 厦门安科科技有限公司 Scaffold frame that can safe location construction
CN113431312A (en) * 2021-06-10 2021-09-24 赵传叶 Scaffold capable of transporting materials

Also Published As

Publication number Publication date
CN108457463B (en) 2019-12-13

Similar Documents

Publication Publication Date Title
CN108457463A (en) A kind of inner scaffold for construction and decoration
CN209979365U (en) Strength detection device is used in processing of composite plastic products
CN213710286U (en) Adjustable scaffold
CN213509479U (en) Construction platform convenient to remove
CN214995751U (en) Assembled scaffold for house building engineering
CN215107106U (en) Scaffold is built in room with adjustable height
CN109113312A (en) A kind of adjustable construction and decoration scaffold
CN214995725U (en) Scaffold for building construction
CN212105705U (en) Fitment instrument ladder with firm base
CN210767769U (en) Assembled building safety construction platform
CN210195193U (en) But height-adjusting's scaffold frame for house construction
CN112681701A (en) Scaffold for building construction
CN216921264U (en) Scaffold frame that building engineering can carry out altitude mixture control at top
CN212836594U (en) Scaffold for maintaining urban viaduct
CN208618773U (en) A kind of scaffold for building convenient for adjusting height
CN212002152U (en) Elevating gear for interior decoration
CN220889365U (en) Novel building construction support
CN211817822U (en) Scaffold frame for building engineering convenient to adjust
CN217503422U (en) Height-adjustable lighting device of bearing column for indoor soft packaging
CN219451466U (en) Safe ladder and scaffold of hanging
CN216664926U (en) Compound operation platform of scaffold frame of encorbelmenting
CN215948840U (en) Multifunctional scaffold convenient to construction
CN217299724U (en) Portable scaffold frame that stability is strong
CN212957551U (en) Movable scaffold for constructional engineering
CN214402665U (en) Civil engineering construction is with preventing empting construction support

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20191012

Address after: 230000 18 Floor, Block C, J2 District, Phase II Innovation Industrial Park, Hefei High-tech Zone, Anhui Province

Applicant after: Hefei dragon totem Information Technology Co., Ltd.

Address before: 233000 No. 185 Xinhuai Road, Longzihu District, Bengbu City, Anhui Province

Applicant before: Gao Jia

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20191118

Address after: 100071 Beijing city Fengtai District watch Dan No. 4, No. 6

Applicant after: China Aerospace Construction Engineering Group Co., Ltd

Address before: 230000 18 Floor, Block C, J2 District, Phase II Innovation Industrial Park, Hefei High-tech Zone, Anhui Province

Applicant before: Hefei dragon totem Information Technology Co., Ltd.

TA01 Transfer of patent application right
GR01 Patent grant